Enviroscreen brochure
-
Upload
nick-hartley -
Category
Business
-
view
363 -
download
0
Transcript of Enviroscreen brochure
1. Ebsford Environmental Ltdmore than just knotweedEbsford Environmental is so much more than justanother knotweed contractor and offers a range ofspecialised solutions; specifically tailored for theconstruction, development and land managementCost effectivesector. in-situ treatment ofWith a team of in-house consultants and regionaloffices in Yorkshire, Midlands and South West we are Japanese knotweedable to offer a national coverage with all the customer1200 Century Wayservice ethos of a small family business.Thorpe Park Business ParkAdd to this our FOC, guaranteed 48 hours survey Leedspromise and surely its time you gave Ebsford LS15 8ZAEnvironmental a try?Phone: 0113 2515015E-mail: [email protected] Environmental Services Include:Vegetation managementSite preparationInvasive weed eradicationAquatic EnhancementsSilt management, pumping and dredg- ingLake and pond restorationEcological fencingEbsford.co.ukEbsford.co.uk 2. Fast and effective Enviroscreen 20-20Enviroscreen 20-20Certainty in an uncertain market How does is work? How does it compare?Simply put, the Enviroscreen 20-20 is a revolution inUsing lightweight equipment and managed by qualified staff, ProcessTimescale Costthe field of Japanese knotweed treatment. A mobile,the Enviroscreen 20-20 is able to give a pragmatic solution;unique, mechanical solution which doesnt punish a which is comparable in time to a disposal option whilst being Residual Herbicidal1 Season2-3,000client for requiring a quick resolution. as cost effective as relocation or burial. Non Residual Herbicidal2-3 Season2-3,000The Enviroscreen 20-20 has been developed by MarkContaminated soil is target excavated under close supervisionProut WAMITAB, who has over 10 years experience of and transported to the Enviroscreen 20-20 treatment area. Burial 2-3 Days5-6,000dealing with Japanese knotweed on some of theThe Enviroscreen 20-20 is then loaded with the contaminatedhighest profile and most logistically complexsoil in order to separate it into three varying grades of Relocation and spraying2 Seasons 4-5000construction projects in recent times. material. This material is then manually sorted and viable rhizome is removed from the soil and segregated for later Off site disposal1 Day 8-10,000Using the knowledge gained from these sites and adisposal at a licensed facility.deep understanding of the biology of the plant, he was ENVIROSCREEN 20-20 2 Days4,000able to find a solution which would offer the samelevel of highly technical treatment but on smaller, *Above is calculated on a 5mx5m stand of Japanesemore constrained projects. knotweed using 3.5m x 2m excavation calculations andAnd so the Enviroscreen 20-20 was born.a total volume of 112.50m Ebsford Environmental Ltd1200 Century WayThorpe Park Business Park Enviroscreen 20-20 staff picking Japanese knotweed rhizomes from con- taminated soil LeedsLS15 8ZA Upon completion of the soil separation and picking element of the project, the material is re-engineered into low impactPhone: 0113 2515015 areas of the site and capped under 500mm of clean cover andE-mail: [email protected] monitored for five years as standard.Enviroscreen 20-20 with modified conveyor processing heavysoils