ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf ·...

25
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 3 (GROUP OF MINES) Salanpur Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2008 Company

Transcript of ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf ·...

Page 1: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

ENVIRONMENTAL STATEMENT

IN

FORM-V (Under Rule-14, Environmental protection Rules, 1986)

(2015-2016)

FOR

CLUSTER NO. – 3 (GROUP OF MINES)

Salanpur Area

Eastern Coalfields Limited

Prepared at

Regional Institute – I

Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.)

G. T. Road (West End) Asansol - 713 304

CMPDI

ISO 9001:2008 Company

Page 2: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

1

ENVIRONMENTAL STATEMENT FORM – V

Environmental statement for the financial year ending 31st March, 2016

Cluster No. – 3

FOR THE YEAR: 2015-16

CONTENTS

SL.NO. CHAPTER PARTICULARS PAGE NO.

1 CHAPTER-I INTRODUCTION 2-5

2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-11

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO.

I AMBIENT AIR QUALITY 12-14

II NOISE LEVEL REPORT 15-16

III WATER QUALITY REPORT – MINE WATER QUALITY AND GROUND

WATER QUALITY

17-21

IV GROUNDWATER LEVEL REPORT 22

PLATES

I LOCATION PLAN

II PLAN SHOWING LOCATION OF MONITORING STATIONS

Page 3: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

2

CHAPTER – I

INTRODUCTION 1.1 GENESIS:

The Gazette Notification vide G.S.R No. 329 (E) dated13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the EC for the Cluster, the work of Environmental Statement for Cluster No. 3 was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.

1.2 PROJECT DESCRIPTION:

Prior to 2014 – 15, a large number of taken over mines from pre – nationalization period, mostly underground mines, in the old coalfields of Raniganj and Jharia did not have environmental clearance from the MoEF&CC and were operating on the basis of ‘Consents’ received from the respective PCBs. It was felt that if these mines could be brought under the ambit of EC, several measures for environmental protection and pollution control could be put in place. However, the work of obtaining EC for such mines, individually, would have taken a lot of time. To circumvent the problem, it was mooted that since the environmental problems being faced were of regional nature and not confined to individual mines alone, cluster/groups of such mines could be identified for preparing cluster-wise integrated EIA & EMPs, addressing such environmental concerns comprehensively and ensuring effective co-ordination of environmental control measures within each cluster. 13 such clusters were identified in the Raniganj Coalfield of ECL and EC has been obtained on the cluster approach for 12 such clusters. Cluster of Mines No. 3 is one of the clusters for which EC has been granted vide letter no. J-11015/13/2010-IA-II.(M) dated 20th October, 2014 for a combined peak capacity of 3.97 MTY and within a ML area of 1628 Ha. Cluster No. 3 is located in the north-western part of Raniganj Coalfield in Burdwan district of West Bengal between latitudes 23044’30’’ N & 23048’ N and longitudes 860 52' 15"E & 860 56' 30" E. It is situated at about 10 kms north of Asansol and 40 kms west of Durgapur. The area is well connected by roads and railways. The Eastern Railway Main line passes through the western part of the block. Bonjemehari railway siding is present on the above railway line inside the cluster. G.T.Road (NH-2) passes on the south of the block. Maithon reservoir, a multipurpose project of Damodar Valley Corporation, built over river Barakar is at a distance of 6 Kms west of the cluster boundary. River Ajay flows about 5 kms north of the cluster. It comes under the administrative control of Salanpur area, ECL. Location of cluster – 2 is shown in plate no. – 1.

Page 4: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

3

The composition of the cluster is tabulated as under:

# Name of Mine UG/OC Leasehold Area (Ha)

Normative/ Peak Capacity (MTY)

Life (Years)

1

Dabor UG (includes the leasehold of

erstwhile Dalmiya UG) UG

1204 0.06 0.07 > 25

Dabor-Phase I & II OC Mine (347Ha) OC 2.00 2.30 10

2 Bonjemehari UG UG

163 0.07 0.07 > 25

Bonjemehari OC Mine (50 Ha) OC 0.35 0.45 4

3 Sangramgarh UG UG

261 0.05 0.08 > 25

Sangramgarh Extension – OC Mine (25 Ha) OC 0.80 1.00 4

Total 1628 3.33 3.97

1. Dabor UG & OC At present, there is no production from UG mine. In the OC mine, shovel-dumper combination is used for both coal production and OB removal. Total production from OC mine was 0.744 MT during 2015 – 16. 2. Bonjmehari UG & OC At present, there is no production from UG mine. In the OC mine, shovel-dumper combination is used for both coal production and OB removal. Total production from OC mine was 0.436 MT during 2015 – 16. 3. Sangramgarh UG At present, there is no production from the mine.

1.3 ENVIRONMENTAL SCENARIO:

CMPDI has been engaged to carry out routine Environmental monitoring of the clusters. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air at 2 all - weather stations, 3 pre-monsoon stations and 3 post-monsoon stations (based on local meteorology) and compared with NAAQS, 2009 for quality. Samples of mine water are also collected and analysed every fortnight and compared with the MoEF Schedule – VI for discharge of effluents into land / streams. A complete analysis of the mine discharge samples which includes heavy metals and salts is carried out once every year during December. Noise level is recorded at 3 locations. Groundwater level in the cluster area is monitored by taking measurements at 5 earmarked dugwells in the months of January, May, August and November every year. Samples of groundwater from these wells, which are also utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500:2012 standards for drinking water quality. For the year 2015 – 16, the monitoring could be started only from the second fortnight of May, 2015 owing to certain delays in fixation of monitoring stations subsequent to the grant of EC. Location of the monitoring stations of air, noise & water are shown in Plate- II. The environmental monitoring results for 21 fortnights ending 31st March, 2016 are appended as Annexures – I, II & III. The environmental monitoring results for the year 2015-16 are summarized below:

Page 5: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

4

AMBIENT AIR QUALITY The PM10 concentration was found in the range of 60.4 to 326.0 µg/m3 and exceeded the NAAQS, 2009 limits on 34 occasions out of 90 samples while it has exceeded limits as per GSR 742 (E) standards stipulated by CPCB for old coalfields dated 25.09.2000 on 6 occasions out of 90 samples. The PM2.5 concentration was found in the range of 11.8 to 181.4 µg/m3 and exceeded the NAAQS, 2009 on 13 occasions out of 90 samples. The SO2 concentration remained below 10.0 µg/m3 and NOX concentration was in the range of 8.6 to 25.0 µg/m3 and was well within NAAQS, 2009. ENVIRONMENTAL STANDARDS:

(I) Environmental standard for Raniganj Coalfield vide MOEF, Govt. of India, Gazette

Notification No.GSR 742 (E) dated 25.09.2000 for 24 hourly samples at 500 meters from

dust generating point:

Station

Category

Pollutant Concentration (µg/m3)

TSPM PM10 SO2 NOx

Industrial 700.0 300.0 120.0 120.0

Residential 200.0 100.0 80.0 80.0

Station Category

Limits for noise (Leq) dB(A)

Day Time (6am-10pm)

Night Time (10pm-6am)

Industrial 75.0 70.0

Residential 55.0 45.0

(II) National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial

and rural areas for 24 hourly samples:

Pollutant PM10 PM2.5 SO2 NOX

Concentration (µg/m3) 100.0 60.0 80.0 80.0

WATER QUALITY Ground water percolates into working area from the surrounding aquifers which have been exposed due to opencast mining. The mine is dewatered regularly to maintain dry working conditions. This mine discharge water is partly utilized for dust suppression by sprinkling at coal faces and on haul roads and the remainder is discharged onto adjoining cultivable lands for irrigation purposes. Part-B of the Environmental Statement proforma contains the detailed break-up of water consumption. The analysis results for the mine discharge water reveal that most of the parameters are within permissible limits prescribed by MoEF&CC as General Standards Schedule – VI for Class-‘A’ effluent (Effluent discharged into inland surface water) and IS 10500 for groundwater standards. In order to assess the impact of mining on the groundwater level, a network of 5 dugwells has been identified for monitoring of groundwater level in the months of January, May, August and November every year. Samples from these wells are collected and analysed during May every year and compared with IS 10500:2012 standards for drinking water. Mine water and ground water analysis results are given in Annexure-III.

Page 6: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

5

Well water level results are given in Annexure – IV.

NOISE LEVEL The day time noise level was found in the range of 56.0 to 72.0 dB(A). The noise level recorded is below permissible limit prescribed by MoEF&CC.

Page 7: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

6

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V

Environmental statement for the financial year ending March, 2016

PART – A SL. NO.

HEADING PARTICULARS

(I) NAME AND ADDRESS OF THE PROJECT

Cluster No. – 3 (Group of 3 Mines of ECL)

i Dabor UG & OC Dabor Colliery, P.O. – Samdih, P.S. – Salanpur, Burdwan, West Bengal,

713304

ii Bonjemehari UG & OC Bonjemehari Colliery, PO – Salanpur, Burdwan, West Bengal, 713357

iii Sangramgarh UG Sangramgarh Colliery, PO – Samdih, Burdwan, West Bengal, 713559

(II) INDUSTRY CATEGORY All mines in the cluster falls in red category

(III) PRODUCTION CAPACITY 3.97 MTY

(IV) YEAR OF ESTABLISHMENT All the mines in the cluster are taken over mines from pre-nationalisation period.

(V) DATE OF THE LAST ENVIRONMENTAL

STATEMENT SUBMITTED

The Environment Statement is being submitted for the first time in the financial year 2015 – 16 after the grant of EC on 20th October, 2014.

PART – B

WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION (Cu.m/day)

1. Dabor UG & OC

Sl.

No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting and Others) 36 36

B. COOLING (in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony (Mine water) 25 25

ii Colony (PHED water) 0.40 0.40

TOTAL 61.40 61.40

2. Bonjemehari UG & OC

Sl.

No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting and Others) 54 54

B. COOLING – DVC water

(in radiators of trucks/HEMM)

2.20 2.20

C. DOMESTIC

i Colony (Mine water) 40 40

ii Colony (PHED water) 0.60 0.60

TOTAL 96.80 96.80

Page 8: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

7

3. Sangramgarh UG Sl. No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting and Others)

Nil Nil

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony (Mine water)

ii Colony (PHED water)

TOTAL - -

(II) RAW MATERIAL CONSUMPTION :

1. Dabor UG & OC Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

0.557 kg/te 0.102 kg/te

2. Diesel 1.248 l/te 1.830 l/te

3. Lubricants 0.015 l/te 0.040 l/te

2. Bonjemehari UG & OC

Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

1.091 kg/te 3.129 kg/te

2. Diesel 1.264 l/te 1.085 l/te

3. Lubricants 0.048 l/te 0.041 l/te

3. Sangramgarh UG

Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal Nil Nil 2. Diesel

3. Lubricants

Page 9: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

8

PART – C POLLUTION GENERATED

Pollutio

n

Quantity of pollution generated Percentage variation from prescribed standards

with reasons

WATER Mine water discharge Analysis

results are given in Annexure-II.

The analysis results reveal that most of the parameters

are below permissible limits prescribed by MOEF as

General Standards for class ‘A’ effluent (Effluent discharged into inland surface water.)

AIR The main air pollutant is suspended

PM10 and PM2.5. The air quality results are appended as Annexure-

I.

Ambient air quality results show that the values of SO2

and NOx are within the prescribed standards. The concentration level of PM10 was exceeded 34 times and

that of PM2.5 was exceeded 13 times as per NAAQS, 2009.

PART – D HAZARDOUS WASTE

(As specified under Hazardous Waste (Management and Handling) Rules, 1989)

1. Dabor UG & OC Hazardous waste Total quantity

During

Previous

financial year (2014-15)

During

current

financial year (2015-16)

Disposal

method

A) From process

i)Used oil ii)Lead-Acid Batteries

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste

iv) Metal Scrap

4000 litres

16 Nos Nil Nos

-

Nil Kg

3000 litres

13 Nos Nil Nos

-

Nil Kg

Dealt in

Part – F

2. Bonjemehari UG & OC

Hazardous waste Total quantity

During Previous

financial

year(2014-15)

During current

financial

year(2015-16)

Disposal

method

A) From process

i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

3000 litres

12 Nos

Nil Nos -

-

3500 litres

11 Nos

Nil Nos -

-

Dealt in Part – F

Page 10: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

9

3. Sangramgarh UG Hazardous waste Total quantity

During Previous financial

year(2014-15)

During current financial

year(2015-16)

Disposal method

A) From process

i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Metal Scrap

Nil Nil

Approximate values may be given where actual values are not available. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form-13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

PART – E

SOLID WASTE Particulars Name of Mine Total quantity (In Million Cu.m)

During previous financial year

(2014-15)

During current financial year

(2015-16)

a) From process (Mining) Dabor OC 1.524 1.628

Bonjemehari OC 0.755 2.208

b) From pollution control

facilities

Dabor OC - -

Bonjemehari OC - -

c) Quantity recycled or reutilized back filled

Dabor OC 0.323 -

Bonjemehari OC 0.298 0.300

PART – F

PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF

CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID

WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH

THESE CATEGORIES OF WASTE.

Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Batteries are stored in Area Store from where replacement is taken. Metal scraps are declared and report is sent to HQ. The scraps are then auctioned and sold through HQ. Used oil are stored and re-used as lubricants in underground mines.

Page 11: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

10

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.

1.0 AIR POLLUTION CONTROL MEASURES:

Surfacing of all service roads/permanent roads by asphalt. The un-metalled roads is kept free of ruts, potholes, etc. Regular maintenance of HEMM engines to limit emission of harmful exhaust fumes. Physical removal of dust from the roads. Greenbelts around quarry, industrial sites, service building area besides avenue

plantation along roads.

Water spraying along the haul roads and coal transport route to limit the dust.

2.0 WATER POLLUTION CONTROL MEASURES: (for Mine/CHP/Workshop/Colony discharge water)

Protection walls and earth filling in abandoned pits are carried out in Bonjemehari colliery.

3.0 NOISE POLLUTION CONTROL MEASURES:

Regular maintenance of machines and other equipment at Bunker and workshop including mine fan.

Providing green belt around core activity area, along road side in colony and in other vacant space.

All HEMM & light vehicle are provided with silencers.

Noise monitoring is being carried out regularly.

4.0 LAND RESOURCE MANAGEMENT:

Out of 2.208 Mm3 of OB generated, 0.30 Mm3 has been backfilled in Bonjemehari OC in 2015 – 16.

Page 12: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

11

PART – H ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION. The following are the additional investment proposals for environmental protection:

The Environmental monitoring of the project will be continued fortnightly as per the guidelines of Ministry of Environment and Forest (MOEF).

The Environmental Statement report will be submitted for each financial year ending 31st March.

Necessary Consent for discharge may be taken from Competent Authority, if required.

Solar lighting has been provided at Magazine House and Weigh Bridge in Dabor and Bonjemehari colliery.

PART – I

ANY OTHER PARTICULAR IN RESPECTOF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.

Page 13: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

12

Annexure – I AMBIENT AIR QUALITY

Station

No

Station Name Month Fortnight Date of

Sampling

PM10 PM2.5 SO2 NOx

3A1 In Salanpur village May Second 18-May-15 129.5 33.8 <10.0 24.1

3A1 In Salanpur village June First 02-Jun-15 132.1 34.5 <10.0 22.9

3A1 In Salanpur village June Second 17-Jun-15 124.9 30.2 <10.0 24.7

3A1 In Salanpur village July First 02-Jul-15 122.8 36.8 <10.0 22.3

3A1 In Salanpur village July Second 27-Jul-15 116.9 26.3 <10.0 24.0

3A1 In Salanpur village August First 13-Aug-15 112.8 24.6 <10.0 24.2

3A1 In Salanpur village August Second 20-Aug-15 96.2 22.6 <10.0 20.6

3A1 In Salanpur village September First 09-Sep-15 90.5 18.4 <10.0 17.6

3A1 In Salanpur village September Second 21-Sep-15 92.4 19.6 <10.0 17.2

3A1 In Salanpur village October First 08-Oct-15 91.4 18.8 <10.0 17.0

3A1 In Salanpur village October Second 29-Oct-15 90.8 17.5 <10.0 17.2

3A1 In Salanpur village November First 06-Nov-15 92.6 18.4 <10.0 17.0

3A1 In Salanpur village November Second 18-Nov-15 96.3 22.7 <10.0 19.6

3A1 In Salanpur village December First 08-Dec-15 110.8 31.6 <10.0 18.8

3A1 In Salanpur village December Second 29-Dec-15 112.4 32.4 <10.0 19.2

3A1 In Salanpur village January First 05-Jan-16 114.3 35.0 <10.0 18.6

3A1 In Salanpur village January Second 19-Jan-16 110.6 37.2 <10.0 19.8

3A1 In Salanpur village February First 10-Feb-16 136.2 62.6 <10.0 19.2

3A1 In Salanpur village February Second 22-Feb-16 135.0 60.8 <10.0 19.4

3A1 In Salanpur village March First 10-Mar-16 138.6 63.4 <10.0 19.6

3A1 In Salanpur village March Second 28-Mar-16 137.6 64.5 <10.0 19.4

3A2 In Melekola village October First 07-Oct-15 61.6 13.2 <10.0 12.6

3A2 In Melekola village October Second 29-Oct-15 62.3 14.8 <10.0 13.4

3A2 In Melekola village November First 06-Nov-15 63.8 15.2 <10.0 14.4

3A2 In Melekola village November Second 19-Nov-15 70.8 18.6 <10.0 15.2

3A2 In Melekola village December First 10-Dec-15 76.9 24.2 <10.0 15.0

3A2 In Melekola village December Second 30-Dec-15 75.8 26.9 <10.0 15.8

3A2 In Melekola village January First 07-Jan-16 76.0 23.6 <10.0 15.4

3A2 In Melekola village January Second 20-Jan-16 74.2 23.0 <10.0 15.2

3A2 In Melekola village February First 08-Feb-16 94.4 42.5 <10.0 16.2

3A2 In Melekola village February Second 26-Feb-16 95.8 44.1 <10.0 16.4

3A2 In Melekola village March First 15-Mar-16 95.5 45.3 <10.0 16.2

3A2 In Melekola village March Second 30-Mar-16 95.0 46.2 <10.0 16.3

3A3 In Patol village October First 07-Oct-15 74.2 17.6 <10.0 16.2

3A3 In Patol village October Second 27-Oct-15 72.8 17.2 <10.0 15.8

3A3 In Patol village November First 03-Nov-15 73.6 17.8 <10.0 16.2

3A3 In Patol village November Second 17-Nov-15 76.3 18.0 <10.0 16.4

3A3 In Patol village December First 15-Dec-15 82.5 21.7 <10.0 16.2

3A3 In Patol village December Second 30-Dec-15 84.3 22.8 <10.0 16.6

3A3 In Patol village January First 06-Jan-16 84.8 25.8 <10.0 16.6

3A3 In Patol village January Second 21-Jan-16 85.8 26.3 <10.0 16.8

3A3 In Patol village February First 15-Feb-16 124.7 52.6 <10.0 16.6

3A3 In Patol village February Second 18-Feb-16 125.3 53.1 <10.0 16.2

3A3 In Patol village March First 14-Mar-16 127.8 55.8 <10.0 17.3

3A3 In Patol village March Second 26-Mar-16 128.6 57.1 <10.0 17.6

3A4 In Lalganj village October First 08-Oct-15 67.3 16.4 <10.0 15.0

3A4 In Lalganj village October Second 27-Oct-15 68.2 16.6 <10.0 15.4

Page 14: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

13

Station

No

Station Name Month Fortnight Date of

Sampling

PM10 PM2.5 SO2 NOx

3A4 In Lalganj village November First 03-Nov-15 69.8 17.2 <10.0 15.8

3A4 In Lalganj village November Second 18-Nov-15 71.4 17.6 <10.0 16.0

3A4 In Lalganj village December First 09-Dec-15 75.9 22.4 <10.0 15.5

3A4 In Lalganj village December Second 29-Dec-15 76.4 23.2 <10.0 15.8

3A4 In Lalganj village January First 06-Jan-16 77.6 26.2 <10.0 15.6

3A4 In Lalganj village January Second 19-Jan-16 78.2 27.4 <10.0 15.4

3A4 In Lalganj village February First 10-Feb-16 120.2 58.4 <10.0 17.2

3A4 In Lalganj village February Second 22-Feb-16 126.8 60.3 <10.0 17.0

3A4 In Lalganj village March First 15-Mar-16 128.2 61.2 <10.0 17.8

3A4 In Lalganj village March Second 21-Mar-16 129.4 62.3 <10.0 18.4

3A5 In Shirishbero village May Second 18-May-15 136.3 39.6 <10.0 22.7

3A5 In Shirishbero village June First 02-Jun-15 130.2 32.2 <10.0 20.8

3A5 In Shirishbero village June Second 17-Jun-15 124.4 29.5 <10.0 19.9

3A5 In Shirishbero village July First 02-Jul-15 118.3 32.9 <10.0 18.4

3A5 In Shirishbero village July Second 27-Jul-15 115.2 25.6 <10.0 19.2

3A5 In Shirishbero village August First 13-Aug-15 110.6 22.8 <10.0 19.9

3A5 In Shirishbero village August Second 20-Aug-15 95.0 20.8 <10.0 18.2

3A5 In Shirishbero village September First 10-Sep-15 90.1 17.4 <10.0 17.2

3A5 In Shirishbero village September Second 21-Sep-15 91.8 18.2 <10.0 17.0

3A6 In Harishdih village May Second 18-May-15 82.1 22.4 <10.0 12.1

3A6 In Harishdih village June First 02-Jun-15 80.6 26.8 <10.0 10.9

3A6 In Harishdih village June Second 17-Jun-15 78.3 19.8 <10.0 12.1

3A6 In Harishdih village July First 02-Jul-15 74.7 18.7 <10.0 14.5

3A6 In Harishdih village July Second 28-Jul-15 74.8 16.4 <10.0 14.2

3A6 In Harishdih village August First 13-Aug-15 71.5 15.8 <10.0 13.4

3A6 In Harishdih village August Second 21-Aug-15 69.2 15.6 <10.0 12.0

3A6 In Harishdih village September First 10-Sep-15 62.3 13.7 <10.0 11.6

3A6 In Harishdih village September Second 18-Sep-15 64.4 14.4 <10.0 12.0

3A7 In Dabar village May Second 18-May-15 81.3 24.9 <10.0 9.4

3A7 In Dabar village June First 02-Jun-15 80.1 24.5 <10.0 8.6

3A7 In Dabar village June Second 17-Jun-15 76.9 18.6 <10.0 9.6

3A7 In Dabar village July First 02-Jul-15 72.3 19.5 <10.0 10.6

3A7 In Dabar village July Second 27-Jul-15 68.3 15.8 <10.0 12.3

3A7 In Dabar village August First 13-Aug-15 66.8 14.7 <10.0 13.0

3A7 In Dabar village August Second 20-Aug-15 65.3 14.0 <10.0 10.2

3A7 In Dabar village September First 14-Sep-15 60.4 11.8 <10.0 10.0

3A7 In Dabar village September Second 18-Sep-15 61.6 12.9 <10.0 10.5

3A8 Bonjemehari near Railway siding January First 04-Jan-16 316.8 181.4 <10.0 22.8

3A8 Bonjemehari near Railway siding January Second 20-Jan-16 305.2 173.4 <10.0 23.6

3A8 Bonjemehari near Railway siding February First 10-Feb-16 310.1 146.8 <10.0 23.8

3A8 Bonjemehari near Railway siding February Second 25-Feb-16 319.2 153.7 <10.0 23.6

3A8 Bonjemehari near Railway siding March First 10-Mar-16 324.8 164.2 <10.0 24.9

3A8 Bonjemehari near Railway siding March Second 28-Mar-16 326.2 166.1 <10.0 25.1

Page 15: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

14

Annexure – I Analysis of Heavy Metals in Air

Station No

Station Name Month Fortnight

Date of Sampling

Arsenic Cadmium

Chromium

Mercury

Nickel Lead

3A1 In Salanpur village

September First 09-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

3A5 In Shirishbero village

September First 10-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.05

3A6 In Harishdih village

September First 10-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

3A7 In Dabar village September First 14-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.07

3A1 In Salanpur village

March First 10-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

3A2 In Melekola village

March First 15-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

3A3 In Patol village March First 14-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

3A4 In Lalganj village March First 15-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

3A8 Bonjemehari near Railway

siding

March First 10-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

Environmental standards: National Ambient Air Quality Standards (NAAQS) for residential, industrial and rural areas for 24 hourly/yearly samples:

Heavy Metal Arsenic (As) Cadmium

(Cd)

Chromium

(Cr)

Mercury

Hg)

Nickel

(Ni)

Lead

(Pb)

Limit (µg/m3) 0.006 Not specified Not specified Not specified 0.02 0.5

Page 16: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

15

Annexure – II Noise Level

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

3N1 Workshop Bonjemehari OC Mine June Second 17-Jun-15 69.3

3N1 Workshop Bonjemehari OC Mine July First 02-Jul-15 68.8

3N1 Workshop Bonjemehari OC Mine June First 02-Jun-15 70.1

3N1 Workshop Bonjemehari OC Mine September Second 22-Sep-15 70.4

3N1 Workshop Bonjemehari OC Mine August First 13-Aug-15 67.5

3N1 Workshop Bonjemehari OC Mine August Second 20-Aug-15 68.5

3N1 Workshop Bonjemehari OC Mine September First 09-Sep-15 67.2

3N1 Workshop Bonjemehari OC Mine October First 07-Oct-15 69.2

3N1 Workshop Bonjemehari OC Mine October Second 27-Oct-15 69.8

3N1 Workshop Bonjemehari OC Mine November First 06-Nov-15 71.4

3N1 Workshop Bonjemehari OC Mine November Second 19-Nov-15 70.2

3N1 Workshop Bonjemehari OC Mine December First 07-Dec-15 70

3N1 Workshop Bonjemehari OC Mine December Second 18-Dec-15 61

3N1 Workshop Bonjemehari OC Mine January First 08-Jan-16 65

3N1 Workshop Bonjemehari OC Mine January Second 21-Jan-16 62

3N1 Workshop Bonjemehari OC Mine February First 10-Feb-16 72

3N1 Workshop Bonjemehari OC Mine February Second 22-Feb-16 68

3N1 Workshop Bonjemehari OC Mine March First 10-Mar-16 69

3N1 Workshop Bonjemehari OC Mine March Second 28-Mar-16 56

3N2 Workshop Sangramgarh Extension – OC Mine June Second 17-Jun-15 69.1

3N2 Workshop Sangramgarh Extension – OC Mine July First 02-Jul-15 66.3

3N2 Workshop Sangramgarh Extension – OC Mine June First 02-Jun-15 67.4

3N2 Workshop Sangramgarh Extension – OC Mine September Second 23-Sep-15 69.3

3N2 Workshop Sangramgarh Extension – OC Mine August First 13-Aug-15 71.3

3N2 Workshop Sangramgarh Extension – OC Mine August Second 20-Aug-15 69.5

3N2 Workshop Sangramgarh Extension – OC Mine September First 09-Sep-15 62.4

3N2 Workshop Sangramgarh Extension – OC Mine October First 08-Oct-15 66.5

3N2 Workshop Sangramgarh Extension – OC Mine October Second 27-Oct-15 67.4

3N2 Workshop Sangramgarh Extension – OC Mine November First 06-Nov-15 68.0

3N2 Workshop Sangramgarh Extension – OC Mine November Second 19-Nov-15 69.4

3N2 Workshop Sangramgarh Extension – OC Mine December First 07-Dec-15 62

3N2 Workshop Sangramgarh Extension – OC Mine December Second 18-Dec-15 63

3N2 Workshop Sangramgarh Extension – OC Mine January First 08-Jan-16 69

3N2 Workshop Sangramgarh Extension – OC Mine January Second 21-Jan-16 64

3N2 Workshop Sangramgarh Extension – OC Mine February First 08-Feb-16 58

3N2 Workshop Sangramgarh Extension – OC Mine February Second 22-Feb-16 63

3N2 Workshop Sangramgarh Extension – OC Mine March First 10-Mar-16 58

3N2 Workshop Sangramgarh Extension – OC Mine March Second 28-Mar-16 59

3N3 Pit-top Workshop Dabor OC June Second 17-Jun-15 66.4

3N3 Workshop Dabor OC July First 02-Jul-15 69.2

3N3 Workshop Dabor OC June First 02-Jun-15 68.3

3N3 Workshop Dabor OC September Second 22-Sep-15 67.8

3N3 Workshop Dabor OC August First 13-Aug-15 68.3

3N3 Workshop Dabor OC August Second 20-Aug-15 67.7

3N3 Workshop Dabor OC September First 09-Sep-15 65.9

3N3 Workshop Dabor OC October First 08-Oct-15 68.2

3N3 Workshop Dabor OC October Second 29-Oct-15 67.9

Page 17: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

16

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

3N3 Workshop Dabor OC November First 03-Nov-15 64.9

3N3 Workshop Dabor OC November Second 19-Nov-15 67.6

3N3 Workshop Dabor OC December First 07-Dec-15 60

3N3 Workshop Dabor OC December Second 18-Dec-15 69

3N3 Workshop Dabor OC January First 08-Jan-16 64

3N3 Workshop Dabor OC January Second 21-Jan-16 66

3N3 Workshop Dabor OC February First 15-Feb-16 60

3N3 Workshop Dabor OC February Second 26-Feb-16 67

3N3 Workshop Dabor OC March First 15-Mar-16 57

3N3 Workshop Dabor OC March Second 30-Mar-16 64

Page 18: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

17

Annexure – III

Effluent Water Quality for 5 parameters

Station No

Station Name Month Fortnight Date of Sampling

pH TSS TDS O&G COD

3MW1 Bonjemehari OC Mine May Second 23-May-15 7.44 30 514 <2.0 32

3MW1 Bonjemehari OC Mine June Second 18-Jun-15 6.94 26 604 <2.0 16

3MW1 Bonjemehari OC Mine July First 02-Jun-15 7.14 <25.0 598 <2.0 28

3MW1 Bonjemehari OC Mine August First 13-Aug-15 7.86 28 630 <2.0 20

3MW1 Bonjemehari OC Mine July Second 27-Jul-15 7.64 <25.0 590 <2.0 24

3MW1 Bonjemehari OC Mine August Second 20-Aug-15 7.94 <25.0 621 <2.0 16

3MW1 Bonjemehari OC Mine September First 09-Sep-15 8.03 30 637 <2.0 18

3MW1 Bonjemehari OC Mine June First 02-Jun-15 7.49 28 564 <2.0 32

3MW1 Bonjemehari OC Mine September Second 21-Sep-15 7.92 6 424 <2.0 28

3MW1 Bonjemehari OC Mine October First 07-Oct-15 8.24 9 498 <2.0 24

3MW1 Bonjemehari OC Mine October Second 29-Oct-15 8.14 10 486 <2.0 28

3MW1 Bonjemehari OC Mine November First 07-Nov-15 8.38 5 512 <2.0 12

3MW1 Bonjemehari OC Mine November Second 18-Nov-15 7.86 12 492 <2.0 20

3MW1 Bonjemehari OC Mine December Second 29-Dec-15 7.85 8 509 <2.0 24

3MW1 Bonjemehari OC Mine January First 07-Jan-16 7.89 8 489 <2.0 16

3MW1 Bonjemehari OC Mine January Second 21-Jan-16 7.92 9 501 <2.0 16

3MW1 Bonjemehari OC Mine February First 10-Feb-16 7.59 16 384 <2.0 32

3MW1 Bonjemehari OC Mine February Second 22-Feb-16 7.27 7 361 <2.0 32

3MW1 Bonjemehari OC Mine March First 10-Mar-16 7.60 7 370 <2.0 36

3MW1 Bonjemehari OC Mine March Second 28-Mar-16 7.70 12 410 <2.0 28

3MW2 Sangramgarh Extension – OC

Mine

May Second 23-May-15 7.48 34 788 <2.0 20

3MW2 Sangramgarh Extension – OC

Mine

June Second 20-Jun-15 6.79 <25.0 823 <2.0 24

3MW2 Sangramgarh Extension – OC Mine

July First 02-Jun-15 7.94 <25.0 812 <2.0 20

3MW2 Sangramgarh Extension – OC

Mine

August First 13-Aug-15 7.94 26 825 <2.0 20

3MW2 Sangramgarh Extension – OC

Mine

July Second 28-Jul-15 7.68 <25.0 816 <2.0 32

3MW2 Sangramgarh Extension – OC Mine

August Second 20-Aug-15 7.90 <25.0 814 <2.0 16

3MW2 Sangramgarh Extension – OC

Mine

September First 09-Sep-15 7.96 <25.0 810 <2.0 20

3MW2 Sangramgarh Extension – OC

Mine

June First 02-Jun-15 7.58 26 798 <2.0 24

3MW2 Sangramgarh Extension – OC Mine

September Second 21-Sep-15 7.98 10 438 <2.0 24

3MW2 Sangramgarh Extension – OC

Mine

October First 08-Oct-15 7.94 6 488 <2.0 16

3MW2 Sangramgarh Extension – OC

Mine

October Second 29-Oct-15 7.98 12 518 <2.0 32

3MW2 Sangramgarh Extension – OC Mine

November First 07-Nov-15 8.18 13 506 <2.0 28

3MW2 Sangramgarh Extension – OC

Mine

November Second 18-Nov-15 7.88 8 484 <2.0 12

3MW2 Sangramgarh Extension – OC December Second 29-Dec-15 7.88 6 475 <2.0 24

Page 19: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

18

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

Mine

3MW2 Sangramgarh Extension – OC

Mine

January First 06-Jan-16 7.87 10 486 <2.0 32

3MW2 Sangramgarh Extension – OC Mine

January Second 21-Jan-16 7.88 9 475 <2.0 24

3MW2 Sangramgarh Extension – OC

Mine

February First 10-Feb-16 6.99 12 870 <2.0 32

3MW2 Sangramgarh Extension – OC

Mine

February Second 26-Feb-16 6.86 8 865 <2.0 28

3MW2 Sangramgarh Extension – OC Mine

March First 10-Mar-16 7.03 8 865 <2.0 32

3MW2 Sangramgarh Extension – OC

Mine

March Second 28-Mar-16 7.10 14 861 <2.0 24

3MW3 Dalmia OC May Second 23-May-15 7.98 <25.0 287 <2.0 32

3MW3 Dalmia OC June Second 18-Jun-15 8.67 <25.0 294 <2.0 24

3MW3 Dalmia OC July First 02-Jun-15 7.82 28 290 <2.0 24

3MW3 Dalmia OC August First 13-Aug-15 8.24 <25.0 322 <2.0 30

3MW3 Dalmia OC July Second 27-Jul-15 8.18 <25.0 310 <2.0 24

3MW3 Dalmia OC August Second 20-Aug-15 8.12 26 340 <2.0 34

3MW3 Dalmia OC September First 09-Sep-15 8.16 <25.0 334 <2.0 32

3MW3 Dalmia OC June First 02-Jun-15 7.94 <25.0 286 <2.0 24

3MW3 Dalmia OC September Second 21-Sep-15 7.78 6 398 <2.0 20

3MW3 Dalmia OC October First 08-Oct-15 7.87 5 482 <2.0 16

3MW3 Dalmia OC October Second 29-Oct-15 7.86 14 524 <2.0 24

3MW3 Dalmia OC November First 07-Nov-15 8.22 12 502 <2.0 20

3MW3 Dalmia OC November Second 18-Nov-15 7.92 10 490 <2.0 24

3MW3 Dalmia OC December Second 30-Dec-15 8.50 7 447 <2.0 32

3MW3 Dalmia OC January First 06-Jan-16 8.79 7 457 <2.0 16

3MW3 Dalmia OC January Second 21-Jan-16 8.79 7 470 <2.0 16

3MW3 Dalmia OC February First 10-Feb-16 8.06 18 373 <2.0 24

3MW3 Dalmia OC February Second 26-Feb-16 8.06 9 339 <2.0 32

3MW3 Dalmia OC March First 10-Mar-16 8.09 10 401 <2.0 28

3MW3 Dalmia OC March Second 28-Mar-16 8.21 16 391 <2.0 24

3MW4 Muktaichandi OC May Second 23-May-15 7.63 26 686 <2.0 16

3MW4 Muktaichandi OC June Second 20-Jun-15 6.85 26 705 <2.0 8

3MW4 Muktaichandi OC July First 02-Jun-15 7.86 <25.0 696 <2.0 16

3MW4 Muktaichandi OC August First 13-Aug-15 8.16 <25.0 712 <2.0 10

3MW4 Muktaichandi OC July Second 27-Jul-15 8.20 <25.0 690 <2.0 16

3MW4 Muktaichandi OC August Second 20-Aug-15 8.20 <25.0 710 <2.0 12

3MW4 Muktaichandi OC September First 09-Sep-15 8.26 <25.0 708 <2.0 10

3MW4 Muktaichandi OC June First 02-Jun-15 7.71 28 696 <2.0 16

3MW4 Muktaichandi OC September Second 21-Sep-15 7.96 8 434 <2.0 08

3MW4 Muktaichandi OC October First 07-Oct-15 7.94 7 452 <2.0 12

3MW4 Muktaichandi OC October Second 29-Oct-15 8.42 8 494 <2.0 16

3MW4 Muktaichandi OC November First 07-Nov-15 7.74 11 486 <2.0 24

3MW4 Muktaichandi OC November Second 18-Nov-15 8.14 10 528 <2.0 16

3MW4 Muktaichandi OC December Second 30-Dec-15 8.24 9 444 <2.0 16

3MW4 Muktaichandi OC January First 06-Jan-16 8.21 5 438 <2.0 24

3MW4 Muktaichandi OC January Second 21-Jan-16 8.31 6 440 <2.0 24

Page 20: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

19

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

3MW4 Muktaichandi OC February First 10-Feb-16 7.31 20 815 <2.0 32

3MW4 Muktaichandi OC February Second 25-Feb-16 7.21 10 790 <2.0 40

3MW4 Muktaichandi OC March First 10-Mar-16 7.51 14 814 <2.0 40

3MW4 Muktaichandi OC March Second 28-Mar-16 7.55 8 827 <2.0 32

Effluent Water Quality Standards (MoEF Schedule – VI Standards)

Parameters pH TSS TDS Oil & Grease COD

Limit 5.5-9.0 100 Not Specified 10 250

Effluent Water Quality for full parameters (29 parameters)

Cluster 3 3 3 3 Effluent Water

(MOEF Schedule-VI

Standard)

Station No 3MW1 3MW2 3MW3 3MW4

Station Name Bonjemehari

OC Mine

Sangramgarh

Extension – OC Mine

Dalmia OCP Muktaichandip

ur OCP

Month December December December December

Fortnight First First First First

Date of Sampling

08-Dec-15 08-Dec-15 10-Dec-15 09-Dec-15

Colour 5 3 3 3 Unobjectionabl

e

Odour Unobjectionabl

e

Unobjectionabl

e

Unobjectionabl

e

Unobjectionabl

e

Unobjectionabl

e

TSS 8 9 7 6 100.0

pH 8.01 8.0 7.97 8.14 5.5-9.0

Temperature(De

g C)

22.0 21.9 21.4 22.0 Shall not

exceed 50C above the

receiving water temp

Oil & Grease <2.0 <2.0 <2.0 <2.0 10.0

Total Residual

Chlorine

<0.02 <0.02 0.03 <0.02 1.0

Ammonical

Nitrogen

0.62 0.48 0.38 0.46 50.0

Total Kjeldahl Nitrogen

1.28 1.34 1.32 1.42 100.0

Free Amonia <0.4 <0.4 <0.4 <0.4 5.0

BOD 3 3 4 4 30.0

COD 40 16 24 24 250.0

Arsenic <0.005 <0.005 <0.005 <0.005 0.2

Lead <0.005 <0.005 <0.005 <0.005 0.1

Hexavalent Chromium

0.04 0.02 0.03 0.04 0.1

Total Chromium 0.06 0.04 0.04 0.06 2.0

Copper 0.04 0.03 0.03 0.04 3.0

Zinc 0.04 0.06 0.04 0.06 5.0

Page 21: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

20

Selenium <0.005 <0.005 <0.005 <0.005 0.05

Nickel <0.10 <0.10 <0.10 <0.10 3.0

Fluoride 0.45 0.62 0.49 0.41 2.0

Dissolved

Phosphate

1.28 1.62 1.58 1.72 5.0

Sulphide 0.007 0.009 <0.005 0.008 2.0

Phenolics <0.001 <0.001 <0.001 <0.001 1.0

Manganese 0.26 0.20 0.22 0.24 2.0

Iron 0.10 0.12 0.14 0.16 3.0

Nitrate Nitrogen 3.2 2.8 2.6 3.4 10.0

Cadmium <0.001 <0.001 <0.001 <0.001 0.003

Total Dissolved

Solids

480 505 508 471 Not Specified

Page 22: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

21

Annexure – III

Groundwater Quality

Cluster No 3 3 3 3 3

Indian Drinking Water

Standard (IS-10500)

Station No 3GW1 3GW2 3GW3 3GW4 3GW5

Station Name

Dugwell near Sangramgarh

office

Dugwell at house of

Mr.Parimal Mahato at

Dabor village

Dugwell at backside of staff

room, Achra High School

Dugwell at health centre

of Jemari village

Dugwell at health

centre of Jemari village

Month May'15 May'15 May'15 May'15 May'15

Fortnight Second Second Second Second Second

Date of sampling

23-May-15 23-May-15 22-May-15 22-May-15 22-May-15 Desirable Limit

Permissible Limit

Colour,Hazen unit Max

4 3 4 4 3 5.0 25.0

Odour Unobjectionable

Unobjectionable Unobjectionable Unobjectionable

Unobjectionable

Unobjectionable

Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable

Turbidity,NTU Max

4.0 3.6 2.8 3.4 3.2 5.0 10.0

pH 7.53 7.32 7.58 7.25 7.65 6.5-8.5 6.5-8.5

Total Hardness

196 404 204 472 232 300.0 600.0

Iron <0.06 <0.06 <0.06 <0.06 <0.06 0.30 1.00

Chlorides 91 167 74 246 18 250.0 1000.0

Res Free chlorine

<0.02 <0.02 <0.02 0.05 0.04 0.20 0.20

Dissolved Solids

583 725 325 788 398 500.0 2000.0

Calcium 49.6 112 56 123.2 54.4 75.0 200.0

Copper <0.03 <0.03 <0.03 <0.03 <0.03 0.05 1.5

Manganese <0.02 <0.02 <0.02 <0.02 <0.02 0.1 0.3

Sulphate 62 68 67 71 59 200.0 400.0

Nitrate 3.99 9.30 7.97 6.64 5.75 45.0 100.0

Fluoride 0.62 0.48 0.57 0.61 0.68 1.0 1.5

Selenium <0.005 <0.005 <0.005 <0.005 <0.005 0.01 0.01

Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 0.05 0.05

Lead <0.005 <0.005 <0.005 <0.005 <0.005 0.05 0.05

Zinc 0.02 0.03 0.04 0.01 <0.01 5.0 15.0

Hex Chromium

<0.01 <0.01 <0.01 <0.01 <0.01 0.05 0.05

Boron <0.01 <0.01 <0.01 <0.01 <0.01 1.0 5.0

Coliforms (MPN)

Nil Nil Nil Nil Nil Not Specified

Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 0.001 0.002

Alkalinity 208 160 172 124 188 200.0 600.0

Page 23: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Environmental Statement (Form-V) Cluster No. – 3 (Group of Mines) 2015-16

22

Annexure – IV

Groundwater Level

Station No

Station Name Month Fortnight

Date of Sampling

Ground Water Level

BGL (mtr )

3GWL1 Dugwell near Sangramgarh office May Second 23-May-15 9.00

3GWL1 Dugwell near Sangramgarh office November Second 18-Nov-15 8.25

3GWL1 Dugwell near Sangramgarh office January Second 30-Jan-16 9.20

3GWL1 Dugwell near Sangramgarh office August Second 21-Aug-15 1.00

3GWL2 Dugwell at house of Mr.Parimal Mahato at Dabor village

May Second 23-May-15 6.85

3GWL2 Dugwell at house of Mr.Parimal

Mahato at Dabor village

November Second 28-Nov-15 6.80

3GWL2 Dugwell at house of Mr.Parimal

Mahato at Dabor village

January Second 30-Jan-16 9.10

3GWL2 Dugwell at house of Mr.Parimal Mahato at Dabor village

August Second 21-Aug-15 3.75

3GWL3 Dugwell at backside of staff

room, Achra High School

May Second 23-May-15 8.70

3GWL3 Dugwell at backside of staff

room, Achra High School

November Second 28-Nov-15 7.35

3GWL3 Dugwell at backside of staff room, Achra High School

January Second 30-Jan-16 8.05

3GWL3 Dugwell at backside of staff

room, Achra High School

August Second 21-Aug-15 5.05

3GWL4 Dugwell at health centre of

Jemari village

May Second 22-May-15 4.50

3GWL4 Dugwell at health centre of Jemari village

November Second 18-Nov-15 3.25

3GWL4 Dugwell at health centre of

Jemari village

January Second 30-Jan-16 3.70

3GWL4 Dugwell at health centre of

Jemari village

August Second 21-Aug-15 1.70

3GWL5 Dugwell of west bengal state electricity distribution, Dendua

May Second 22-May-15 2.00

3GWL5 Dugwell of west bengal state

electricity distribution, Dendua

November Second 28-Nov-15 1.05

3GWL5 Dugwell of west bengal state

electricity distribution, Dendua

January Second 30-Jan-16 0.70

3GWL5 Dugwell of west bengal state electricity distribution, Dendua

August Second 21-Aug-15 1.10

Page 24: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

Plate - 1

West Bengal

Burdwan District

Page 25: ENVIRONMENTAL STATEMENT IN FORM-Veasterncoal.gov.in/notices/environment/20161130salanpur1.pdf · ENVIRONMENTAL STATEMENT IN FORM-V ... 1.2 PROJECT DESCRIPTION: ... a multipurpose

3

T

O

J

A

M

T

A

R

A

K

O

L

K

A

T

A

T

O

D

H

A

N

B

A

D

G

.

T

.

R

O

A

D

N

H

-

2

N

RS

P

u

n

t

a

K

h

a

l

Maithan Dam

Barakar River

M

a

i

n

L

i

n

e

E

.

R

a

i

l

w

a

y

Radhanagar

RS

M

a

i

n

L

i

n

e

S

.

E

.

R

a

i

l

w

a

y

Sanctoria Coal Branch

S.E. Railway

G

r

a

n

d

C

h

o

r

d

E

a

s

t

e

r

n

R

a

i

l

w

a

y

E

a

s

t

e

r

n

R

l

y

.

C

h

a

n

c

h

B

r

.

T

o

S

a

l

a

n

p

u

r

E

.

R

.

I

k

r

a

B

r

a

n

c

h

E

.

R

l

y

.

M

a

i

n

l

i

n

e

Nonia Khal

C

h

i

n

c

h

u

r

i

a

R

S

23°40'N

Ushagram

Murgachori

Satpukhuria

Gomaria

Bagrasola

Majiara

Bhanora

DomohaniBaraboni

Natundih

Jhapradhura

Shitadhura

Katanidangal

Kelejora

Puchra

Beldanga

Gopalbad

Moldanga

Khyerkunda

Kashidanga

Sanyasi

Khayerbad

Kapistha

Narayanpur

Kalipathar

Khayerban

Madanpur

Sarsathali

Bindudih

Hosenpur

Belpahari

Mahishmura

Tilaboni

Barira

Ramdih

Shirishbero

Bhadurdanga

Majhiadih

Kashidangal

Damdoha

Lukarpara

Barabal

Haldar Colony

Kalyaneswari

Lalbazar

Victoria

Ramnagar

Tentuljhora

Mahespur

Nekrajuria

Debipur

Damagaria

Duburdih

Kadhhito

Purandih

Hadlo

Dendua

Chanptaria

Damagaria

Sabanpur

Digari

Shrirampur

Kashikuthi

Murgatanr

Bhuskadih

Mahatanr

Shantinagar

Dhanudih

Banskutia

Bathanbari

Sidhabari

Ramchandrapur

Kaladabar

Brindaban

Kalipathar

Gadipara

Marandikuhi

Hangarpara

Tentuldanga

Kushiara

Hansipahari

Dangripara

Rangadih

Huchukpara

Shimulbon

Debaghutti

Chirundangal

Keotjuli

Paharikulhi

Mahulbon

Rajdangal

Piyasala

Amui

Nandal

Baradanga

Mahanpur

Shrirampur

Mahishmura

Muktarchandi

Phulberia

Lachmanpur

Balaram Chak

Khudka

Dhundabad

Banbirdih

Basudebpur

Salanpur

Benjimari

Jemari

Patol

Alkusha

JanardansayerThekedanga

Balkunda

Madhai Chak

Sadhna

Radhaballabpur

Lahat Shyamdih

Lalganj

Pahargora

Parbatpur

Maniddanga

Karrabdih

Paniphala

Palasban

Sidabari

Baradanga

Ashanboni

Rebatijubati

Taldanga

Baradanga

Itapara

Raghunath Chak

Baliapur

Amdiha

Raniganja

Amtala

Kanskuli

Hansipahari

Sarasbad

Rangasol

Kharubazar

Achhra

jorebari

Malbahal

Kusumkanali

Dhanguri

Benagari

Rangameta

Butberia

Muchidih

Jemariget

Pratppur

Alladih

Rupnarayanpur

Pithakiari

Chitaldangal

Amdanga

Harishdih

Mihijam

Khugut

Chittaranjan

Uttar Rampur

Keshurdih

Kirtanmela

Chayanpur

Kansanko

Dabar

Manhara

Ghiadoba

Ghiadoba

Dharaspur

Paharpur

Khayerbandh

Kalya

Ketoban

Kadwa

Nomakesia

Mohandipara

Bonpore

Bhaga

Amui

Bagjori

Kusbedia

Muratal

Mahanpur

Tarra

Tarra

Kulkara

Sagaria

Debalkunda

Kalikamali

Kantapahari

Mirzapur

Aliganja

Roniakora

Rashna

Kijo

Gourangdih

Digalpahari

Pachurlo

Chhotkara

Satta

Rangdabhit

Alipur

Panuria

Daskiyari

Kalipathar

Parulberia

Banspathari

Radhaballavpur

Metela

Mathura

Phutberia

Juridangal

Jasaidi

Belachak

Niamatpur

Ganyutia

Junut

Asanboni

Pathardih

Hijuli

Dishergarh

Bhagabatidih

Dubeswari

Deliya

Sialdanga

Saltore

Rakta

Narayanchak

Hatinal

Debidanga

Bhamaria

Kumradanga

Parbelia

Asanboni

Hirakhun

Shitalpur

Chhottadhemo

Patra

Harbala

Sanctoria

Chinakuri

Chapa Dhawra

Sodepur

Narsingbandh

Burnpur

Saldanga

Suryanagar

Mithani

Baradhemo

Bidyanandapur

Aluthia

Bhaladiha

Chaprad

Mankeswar

karanbera

Bejdih

Radhanagar

Shitaldhawra

Pathmohona

Ranisar

Hakmanbag

Aldih

Bangram

Rangapara

Bandangal

Kuilapur

Jorpara

Damodar

Purushottampur

Dharampur

Hirapur

Barachak

Gopalpur

Bartoria

Shanrmara

Bara Dighari

Jagatdih

Phatepur

Narsamuda

Santa

Burungdanga

Dipopara

ASANSOL

Ismail

Nabaghanti

Shyambandh

Rahamatnagar

Mahujuri

Shitala

Dhadka

Kalla

Manberia

Boldih

Chunga

Begunia

Barira

Kurargaria

Azadnagar

Patharkhad

Ramchandra Dangal

Kendua

Shipur

Syaldanga

Lalbazar

Naktikanyapur

Kalikapur

Sitarampur

Sitarampur

Kultora

Dedi

Chalbalpur

Lachipur

Kumardiha

Melekola

Ramjibanpur

Sudi

Raghunathbati

Ethora

Sarakdih

Marichkota

Angaria

Sitakanyapur

Napara

Madanpur

Bansarakdih

Monoharbahal

Panchgachia

Palashdiha

Nuni

Jayramdanga

Baropukuria

Saragdih

Haripur

Mucchadanga

Sitadanga

Chinchuria

Dhadka

Piyasala

Barakar

Colony

SANGRAMGARH UG

DABOR UG

BONJ

HEMA

RI U

G

(Running)

Mohonpur O.C.P.

Running

Bonjemehari

Inc.

PF

PF

Maithan Colony

Chakarbathan

Paradih

Barajor

Beliyad

Kalimati

Rajpura Colony

Mahatadih

Bakardangal

Kesharkural

Jajpur

Badurdih

Palhar

Durgapur

PF

Majiyara

Luchibad

Nutangaon

Dumarkanda

Jogira

Lakhdih

Jhukundar

Chanch

Garphalbari

Kumardubi

Panchmahali

Dudhapani

Chirkunda

Gusainpara

Jaldanga

Kewra

Satyanarayan Colony

Bhalka

Bijra

Raghunathpur

PF

PF

PF

Saltore

PF

Gagna

PF

PF

PF

Alladih

23°35'N

23°50'N

23°55'N

Kachcha Road

Protected Forest

Reserved Forest

SAND

Built Up

Road (ECL/NH)

Water Bodies

(River, Nala, Dam)

River/Nalah

EASTERN COALFIELDS LIMITED

Location of Sampling Stations

JOB NO

CMPDIISO 9001 Company

R I NE V XXX X 21

1 OF 1

0

OF CLUSTER NO. 3

ENVIRONMENTAL STATEMENT FOR CLUSTER NO. 3

111438

2 KMS

23°45'N

Permanent Air Station

Pre - monsoon

Post - monsoon

Predominant Wind Direction

during October - March (Post - Monsoon)

Predominant Wind Direction

during April - September

(Pre - Monsoon & Monsoon Period)

3A1

3A2

3A3

3A4

3A5

3A6

3A7

Station Code Type of Station Name of StationAIR QUALITY MONITORING STATIONS

3A1 Permanent Air Station In Salanpur Village3A2 Post monsoon Air Station In Melekola Village3A3 In patol Village3A4 In Lalganj Village3A5 Pre monsoon Air Station In Shirishbero Village3A6 In Harishdih Village3A7 In Dabor Village

Post monsoon Air StationPost monsoon Air Station

Pre monsoon Air StationPre monsoon Air Station

Station Code Name of Station (Workplace)NOISE SAMPLING STATIONS

3N1 Bonjemehari OC Mines3N2 Sangramgarh Extension - OC Mine3N3 Dabor OC

Station Code Mine/Effluent Water StationMINE/ EFFLUENT WATER STATIONS

3MW1 Bonjemehari OC Mine3MW2 Sangramgarh Extension - OC Mine

Station Code Location of Dug WellGROUND WATER LEVEL

3GWL1 Dugwell near Sangramgarh Office3GWL2 Dugwell at house of Mr. Parimal Mahato at Dabor village3GWL33GWL43GWL5 Dugwell of West Bengal State Electricity distribution, Dendua

Dugwell at backside of staff room, Achra High SchoolDugwell at health centre of jemari village

3N1 3N3

3N23MW1

3MW2

3GWL43GWL3 3GWL2

3GWL5

3GWL1