Environmental Monitoring Report Special Report February 2017
VIE: Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project - Tranche 1 Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB Review Mission, 17-24 October 2016.
Prepared by Dasan Consultants Co., Ltd. in joint venture with Kunhwa Engineering & Consulting Co., Ltd and International Consultants and Technocrats Pvt, Ltd for the Vietnam Expressway Corporation, the Ministry of Transport of Vietnam, and the Asian Development Bank.
![Page 2: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/2.jpg)
CURRENCY EQUIVALENTS (as of 10 February 2017)
VND1.00 = $0.000045 $1.00 = VND22,286
NOTE
In this report, "$" refers to US dollars unless otherwise stated. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
![Page 3: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/3.jpg)
![Page 4: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/4.jpg)
![Page 5: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/5.jpg)
![Page 6: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/6.jpg)
![Page 7: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/7.jpg)
![Page 8: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/8.jpg)
![Page 9: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/9.jpg)
![Page 10: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/10.jpg)
![Page 11: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/11.jpg)
![Page 12: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/12.jpg)
![Page 13: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/13.jpg)
![Page 14: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/14.jpg)
![Page 15: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/15.jpg)
![Page 16: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/16.jpg)
![Page 17: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/17.jpg)
![Page 18: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/18.jpg)
REPORT
on
Implementing Remedied countermeasures
responding to MoU of ADB Mission
(17th to 24th October 2016)
![Page 19: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/19.jpg)
PACKAGE A1
![Page 20: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/20.jpg)
NHÀ THẦU THỰC HIỆN CÁC CÔNG TÁC AN TOÀN LAO ĐỘNG TRÊN CÔNG TRƯỜNG THEO KẾ HOẠCH QUẢN LÝ AN TOÀN LAO ĐỘNG
The Contractor has carried out the Safety Work on the Construction site in accordance with Safety Management Schedule
1. Nhà Thầu thực hiện lắp dựng hàng rào ngăn cách khu vực thi công với nhà ở của
dân địa phương và lán trại của công nhân The Contractor installed fences around the construction limits to separate the site from local resident areas and the worker camps
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed fences around the construction to separate the Site and existing local road.
Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với đường dân sinh
![Page 21: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/21.jpg)
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed fences around the construction site to separate existing local road
Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với đường dân sinh
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed fences around the construction site to separate existing local road
Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với đường dân sinh
![Page 22: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/22.jpg)
Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After
The Contractor installed fences around the construction site to separate local resident areas Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương
Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After
Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương
The Contractor installed fences around the construction site to separate local resident areas
![Page 23: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/23.jpg)
2. Nhà Thầu thực hiện lắp đặt biển báo không cho người không có trách nhiệm vào
khu vực thi công
The Contractor has installed safety signs in order to prohibit the people without duty from entering the construction site
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed the excavated holes signs/ prohibit the people without duty from
entering the construction site Nhà Thầu lắp đặt biển báo Hố sâu nguy hiểm/ cấm người lạ đăng nhập vào công trường
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed the excavated holes signs/ prohibit the people without duty from
entering the construction site Nhà Thầu lắp đặt biển báo Hố sâu nguy hiểm/ cấm người lạ đăng nhập vào công trường
![Page 24: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/24.jpg)
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installs emergency sign/ construction regulations sign Nhà Thầu lắp đặt biển thông tin ứng cứu khẩn cấp/ biển nội quy công trình
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installs emergency sign/ construction regulations sign
Nhà Thầu lắp đặt biển thông tin ứng cứu khẩn cấp/ biển nội quy công trình
![Page 25: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/25.jpg)
3. Nhà Thầu thực hiện sửa chữa những đoạn đường công vụ bị hư hỏng The Contractor repaired the damaged sections of service road
Hình ảnh trước khắc phục/ Before
The Contractor repaired the damaged sections of service road
Nhà Thầu thực hiện sữa chữa những đoạn đường công vụ bị hư hỏng
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor repaired the damaged sections of service road
Nhà Thầu thực hiện sữa chữa những đoạn đường công vụ bị hư hỏng
![Page 26: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/26.jpg)
4. Nhà Thầu thực hiện vệ sinh khu vực lán trại công nhân, khu vực thi công The Contractor has kept the worker camps, job sites clean and tidy
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor has kept the worker camps, job sites clean and tidy
Nhà Thầu thực hiện vệ sinh khu vực lán trại và khu vực thi công
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor has kept the worker camps, job sites clean and tidy
Nhà Thầu thực hiện vệ sinh khu vực lán trại và khu vực thi công
![Page 27: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/27.jpg)
5. Nhà Thầu thực hiện lắp đặt biển báo ở các điểm giao cắt tiếp giáp với đường dân địa phương, xịt rửa bánh xe trước khi ròi công trường The Contractor installed the safety signs at intersection with local road, The Contractor washed the wheels
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed the safety signs at intersection with local road
Nhà Thầu thực hiện lắp đặt biển báo An Toàn Giao Thông
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed the safety signs
![Page 28: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/28.jpg)
Nhà Thầu thực hiện lắp đặt biển báo An Toàn Giao Thông
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor has laid out the sign people at intersection with local road
Nhà Thầu bố trí người đánh tín hiệu tại những điểm giao cắt với đường dân sinh
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor has laid out the sign people at intersection with local road
Nhà Thầu bố trí người đánh tín hiệu tại những điểm giao cắt với đường dân sinh
![Page 29: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/29.jpg)
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor washed the wheels
Nhà thầu thực hiện rửa bánh xe
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor washed the wheels
Nhà thầu thực hiện rửa bánh xe
![Page 30: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/30.jpg)
6. Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ thùng chứa dầu Fire extinguishers have been equipped near worker camp and fuel stations
Hình ảnh thực hiện trên công trường ( Pictures on site)
Fire extinguishers have been equipped near worker camp and fuel stations Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ khu vực bồn chứa dầu
Hình ảnh thực hiện trên công trường ( Pictures on site)
Fire extinguishers have been equipped near worker camp and fuel stations
Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ khu vực bồn chứa dầu
![Page 31: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/31.jpg)
Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After
Fire extinguishers have been equipped near worker camp and fuel stations
Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ khu vực bồn chứa dầu
Hình ảnh thực hiện trên công trường ( Pictures on site)
the Contractor installed concrete floor at the area of chemical preservatives in order to
prevent chemical spills out. Nhà Thầu thực hiện lắp đặt sàn bê tông quanh khu vực bảo quản hóa chất tránh tình trạng
tràn hóa chất ra ngoài
![Page 32: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/32.jpg)
7. Nhà Thầu thực hiện trang bị tử thuốc, các loại thuốc và dụng cụ sơ cấp cứu The Contractor has provided medicine kits, first aid kits at construction site
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor has provided medicine kits, first aid kits at construction site Nhà Thầu thực hiện trang bị tử thuốc, các loại thuốc và dụng cụ sơ cấp cứu
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor has provided medicine kits, first aid kits at construction site Nhà Thầu thực hiện trang bị tử thuốc, các loại thuốc và dụng cụ sơ cấp cứu
![Page 33: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/33.jpg)
8. Nhà Thầu thực hiện lắp đặt hệ thống lan can, lưới bảo vệ và cầu than lên xuống
The Contractor installed the handrails, protection mesh and ladders at construction
9. Báo cáo khắc phục của từng Đơn Vị Nhà Thầu Phụ
Corrective Report of each Sub-contractor.
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed the handrails, protection mesh and ladders at construction
Nhà Thầu thực hiện lắp đặt hệ thống lan can, lưới bảo vệ và cầu than lên xuống
Hình ảnh thực hiện trên công trường ( Pictures on site)
The Contractor installed the handrails, protection mesh and ladders at construction Nhà Thầu thực hiện lắp đặt hệ thống lan can, lưới bảo vệ và cầu than lên xuống
![Page 34: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/34.jpg)
NHÀ THẦU THỰC HIỆN CÁC HƯỚNG DẪN CỦA TƯ VẤN GIÁM SÁT IMPLEMENTATION OF THE CONTRACTOR FOR NOTICE OF
CONSULTANTS MISSION OUTCOMES
NhàThầuxinchânthànhcảmơn Ban QuảnLýdựán, TưVấnGiámSátđãquantâm, sâusátvàcónhữnghướngdẫnđểNhàThầuhoànthiệnhơnvềcôngtácquảnlý An
ToànVệSinhMôiTrường. SauđâyNhàThầuđãtriểnkhaikhắcphụccácvấnđềmàTưVấnđãchỉdẫn:
The Contractor would like to thank all closed supports and instructions of EPMU BLLT, CSC for Safety & Environment Managements. Based on notice of CONSULTANTS
mission outcomes, we remedied as follows: 1.Nhà thầu Nam Tân khắc phục trong lán trại
AFTER
layouts the recycle bin Fire extinguishers have been equipped near worker camp
2.Trang bị tủ thuốc cứu thương trong lán trại
The Contractor has provided medicine kits, first aid kits at construction site
The Contractor has kept the worker camps
![Page 35: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/35.jpg)
3. Lắp đặt hệ thống lan can trên mố A1.
AFTER AFTER
The Contractor installed the handrails, protection mesh and ladders at construction
AFTER AFTER
The Contractor installed the handrails, protection mesh and ladders at construction
Công ty Cổ Phần Nam Tân Chỉ huy phó
Trần Đăng Quân
![Page 36: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/36.jpg)
NHÀ THẦU THỰC HIỆN CÁC CÔNG TÁC AN TOÀN LAO ĐỘNG TRÊN CÔNG TRƯỜNG THEO KẾ HOẠCH QUẢN LÝ AN TOÀN LAO ĐỘNG
The Contractor has carried out the Safety Work on the Construction site in accordance with Safety Management Schedule
Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After
Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương
The Contractor installed fences around the construction site to separate local resident areas
Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After
Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương
The Contractor installed fences around the construction site to separate local resident areas
![Page 37: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/37.jpg)
![Page 38: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/38.jpg)
NHÀ THẦU THỰC HIỆN CÁC HƯỚNG DẪN CỦA TƯ VẤN GIÁM SÁT IMPLEMENTATION OF THE CONTRACTOR FOR NOTICE OF
CONSULTANTS MISSION OUTCOMES
NhàThầuxinchânthànhcảmơn Ban QuảnLýdựán, TưVấnGiámSátđãquantâm, sâusátvàcónhữnghướngdẫnđểNhàThầuhoànthiệnhơnvềcôngtácquảnlý An
ToànVệSinhMôiTrường. SauđâyNhàThầuđãtriểnkhaikhắcphụccácvấnđềmàTưVấnđãchỉdẫn:
The Contractor would like to thank all closed supports and instructions of EPMU BLLT, CSC for Safety & Environment Managements. Based on notice of CONSULTANTS
mission outcomes, we remedied as follows:
1.nhà thầu khăc phục.
BEFOR AFTER
Never position fix worker camps and water systems
Chưa khắc phục vị trí lán trại công nhân và hệ thống nước
location fix worker camps and unfreeze water system. khắc phục vị trí lán trại công nhân và khơi thông hệ thống nước.
![Page 39: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/39.jpg)
2 . nhà thầu khắc phuc.
BEFOR AFTER
Not yet overcome trash sorting. Chưa khắc phục thùng rác chưa phân
loại.
overcoming all the trash has been classified.
khắc phục tất cả thùng rác đã được phân loai.
AFTER AFTER
location fix worker camps and unfreeze water system.
(khắc phục vị trí lán trại công nhân và khơi thông hệ thống nước.)
location fix worker camps and unfreeze water system.
(khắc phục vị trí lán trại công nhân và khơi thông hệ thống nước).
![Page 40: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/40.jpg)
3.nhà thầu khăc phục.
AFTER AFTER
Chemical storage areas are separated
(Khu vực chứa hóa chất được ngăn cách)
Chemical storage areas are separated (Khu vực chứa hóa chất được ngăn cách)
4. Nhà thầu khắc phục
AFTER
Fully equipped with protective gear for the workers working on construction site Trang bị đầy đủ đồ bảo hộ lao động cho người làm việc trên công trường.
![Page 41: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/41.jpg)
![Page 42: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/42.jpg)
PACKAGE A2-1
![Page 43: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/43.jpg)
REPORT OF CORRECTIVE ACTIONS FOR ENVIRONMENT ISSSUES IN COMPLIANCE WITH ADB MISSION’S REQUIREMENTS FROM OCTOBER
17 TO OCTOBER 24, 2016
BÁO CÁO KHẮC PHỤC VẤN ĐỀ MÔI TRƯỜNG THEO YÊU CẦU CỦA ĐOÀN ADB TỪ NGÀY 17/10 ĐẾN 24/10/2016
PACKAGE A2-1 – GÓI THẦU A2-1
![Page 44: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/44.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
1. Pending issues of environment and construction safety in site inspection of ADB Mission/Những vấn đề môi trường và an toàn tồn tại trong đợt kiểm tra của đoàn ADB:
Local road used to access batching plant was damaged./Đường địa phương hiện đang được sử dụng đi vào trạm trộn bị hư hỏng nhiều.
It is required to make a concrete embankment at washing area for concrete trucks near exit of batching plant./Xây dựng một bờ bao bê tông tại khu vực rửa xe bê tông gần lối ra của trạm trộn.
It is required to improve management work of excavated soil on site. Excavated soil shall be moved to disposal area./Quản lý đất đào trên công trường cần được cải thiện và được chuyển đến bãi đổ thải.
Limit/ divide properly boundary between construction site and residential zones./Giới hạn/ phân định đúng ranh giới công trường với khu vực dân cư sinh sống.
![Page 45: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/45.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
2. Corrective actions of the Contractor/ Các biện pháp khắc phục của Nhà thầu:
Local road was damagedLocal road was damaged
Đường địa phương bị hư hỏng
The Contractor repaired local road at damaged sections
Nhà thầu đã sửa chữa đường địa phương tại các vị trí bị hư hỏng
![Page 46: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/46.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
Washing area for concrete truck mixer was not made
embankment to prevent water from overflowing Vị trí rửa xe mix chưa có bờ bao ngăn nước tràn ra
xung quanh
The Contractor made concrete embankment to prevent water from overflowing at sedimentation tank location
Nhà thầu đã đổ bê tông tạo bờ bao ngăn nước tràn ra xung quanh tại vị trí bể lắng
![Page 47: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/47.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
The Contractor moved excavated soil to disposal area
Nhà thầu đã di dời đất thải đến bãi đổ thải
Approved disposal area of Package A2-1 Bãi đổ thải được duyệt của Gói thầu A2-1
![Page 48: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/48.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
Residential zones are separated with construction site by iron
fence. Khu vực nhà dân với công trường cũng được ngăn cách bởi
hàng rào tôn.
The Contractor installed warning lights at night for areas that construction site intersects with local roads
Nhà thầu bố trí đèn cảnh báo vào ban đêm trên đường giao nhau với đường địa phương.
![Page 49: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/49.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
The Contractor limits the boundary between construction areas and residential zones by iron fence. Ranh giới giữa đường đi lại của người dân với công trường được nhà thầu rào lại bằng tôn.
![Page 50: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/50.jpg)
GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200
3. Conclusion/Kết luận:
The Contractor repaired local road used to access batching plant. However, due to rainy season and many traffic vehicles, repairing work is limited.
Nhà thầu đã sửa chữa đường địa phương đi vào trạm trộn. Tuy nhiên, do đang mùa mưa và lượng xe cộ lưu thông nhiều nên việc khắc phục còn hạn chế
The Contractor uses clean water to wash vehicles, so it does not affect environment. The Contractor made concrete embankment near sedimentation tank of batching plant to facilitate for
discharging directly water to sedimentation tank
Việc rửa xe cho xe phục vụ công trình chủ yếu là nước sạch nên cũng không ảnh hưởng tới môi trường nhiều. Nhà thầu đã xây bờ bao bê tông gần bể lắng trạm trộn để nước chảy trực
tiếp vào bễ lắng.
Useless excavated soil will be moved to our approved disposal area.
Đất thải tại công trình nếu không sử dụng tới thì nhà thầu sẽ cho chuyển về bãi đổ thải đúng nơi quy định.
The boundary between residential zones and construction site was installed. The Contractor installed warning lights at night for areas that construction site intersects with local roads
Khu vực ranh giới xung quanh nhà dân với công trường được nhà thầu lắp đặt hàng rào tôn. Nhà thầu cũng bố trí đèn cảnh báo vào ban đêm trên đường giao nhau với đường địa phương.
![Page 51: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/51.jpg)
PACKAGE A2-2
![Page 52: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/52.jpg)
![Page 53: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/53.jpg)
![Page 54: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/54.jpg)
![Page 55: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/55.jpg)
![Page 56: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/56.jpg)
![Page 57: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/57.jpg)
![Page 58: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/58.jpg)
![Page 59: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/59.jpg)
PACKAGE A3
![Page 60: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/60.jpg)
IMPLEMENTATION IN ACCORDANCE WITH NOTICE OF ADB MISSION OUTCOMES
NHÀ THẦU THỰC HIỆN CÁC HƯỚNG DẪN CỦA ĐOÀN ADB
The Contractor would like to thank all closed supports and instructions of EPMU
BLLT, CSC for Safety & Environment Managements. Based on notice of ADB mission
outcomes, we remedied as follows:
Nhà Thầu xin chân thành cảm ơn Ban Quản Lý dự án, Tư Vấn Giám Sát đã quan tâm,
sâu sát và có những hướng dẫn để Nhà Thầu hoàn thiện hơn về công tác quản lý An Toàn
- Vệ Sinh Môi Trường. Sau đây Nhà Thầu đã triển khai khắc phục các vấn đề mà Đoàn
ADB đã chỉ dẫn:
1. SOIL ON SITE IS REMOVED TO DESIGNATED AREA:
BEFORE AFTER
![Page 61: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/61.jpg)
2. A CONCRETE-LINED VEHICLE/WHEEL WASHING AREA SHOULD BE
PROVIDED NEAR THE EXIT OF BATCHING PLANT
BEFORE AFTER
![Page 62: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/62.jpg)
PACKAGE A4
![Page 63: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/63.jpg)
![Page 64: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/64.jpg)
![Page 65: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/65.jpg)
![Page 66: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/66.jpg)
![Page 67: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/67.jpg)
![Page 68: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/68.jpg)
![Page 69: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/69.jpg)
![Page 70: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/70.jpg)
![Page 71: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/71.jpg)
![Page 72: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/72.jpg)
![Page 73: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/73.jpg)
![Page 74: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/74.jpg)
![Page 75: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/75.jpg)
![Page 76: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/76.jpg)
![Page 77: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB](https://reader034.fdocuments.us/reader034/viewer/2022042121/5e9ba7329f8cb8610538ff85/html5/thumbnails/77.jpg)