![Page 1: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/1.jpg)
Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018
AFG: Panj Amu River Basin Sector Project
Prepared by Ministry of Agriculture, Irrigation and Livestock and Ministry of Energy and Water for the Ministry of Finance and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed
herein do not necessarily represent those of ADB's Board of Directors, Management, or staff,
and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any
designation of or reference to a particular territory or geographic area in this document, the
Asian Development Bank does not intend to make any judgments as to the legal or other status
of any territory or area.
![Page 2: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/2.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
Table of Contents
Part I- Introduction ................................................................................................................... 6
1.1. Objectives, Scope and Methodology ........................................................................ 7
1.2. Project Description ...................................................................................................... 7
1.3. Subproject Description.............................................................................................. 10
A. RSP Syaab: ........................................................................................................................... 10
B. RSP Sharawan ..................................................................................................................... 10
C. RSP Laqi ................................................................................................................................ 10
1.4. Project Activities and Progress ................................................................................ 11
1.3. Changes in project organization and environmental management team ......... 12
1.4. Relationships with contractors, owner, lender, etc. .............................................. 14
1.5. Stakeholders .............................................................................................................. 15
Part II - Environmental Monitoring ........................................................................................................... 15
2.2.1 Water Quality .................................................................................................................... 15
2.2.2 Noise and Vibration .......................................................................................................... 16
2.2.3 Ambient air quality ............................................................................................................ 16
2.2.4 Flora and Fauna ............................................................................................................... 16
2.2.5 Local resources utilization: .............................................................................................. 18
2.2.6 Solid Waste Generation: ................................................................................................. 18
2.2.7 Wastewater Generation: .................................................................................................. 18
2.2.8 Oil wastes /spills: .............................................................................................................. 18
2.2.9 Socio-Economics: ............................................................................................................. 18
2.2.10 Health: ................................................................................................................................ 18
2.2.11 Grievances of the local communities: ........................................................................... 18
Part III - Environmental Management ..................................................................................................... 19
3.1 The EMS, EMP, SEMP and work plans ................................................................. 19
3.2. EMP and Work Plans ................................................................................................ 19
3.2. Site inspections and audits ...................................................................................... 19
3.3 Corrective Action Plan .............................................................................................. 20
3.4 Consultation and complaints.................................................................................... 21
3.5 Conclusion .................................................................................................................. 21
3.6 Recommendations .................................................................................................... 21
![Page 3: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/3.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
3.7 Action Plan for the Next Period ............................................................................... 22
List of Figures:
Figure 1: Afghanistan Panj Amu Basin and its subbasin ..................................................................... 5
Figure 2: Afghanistan Panj Amu Basin Topography/ Elevation ......................................................... 5
Figure 3: (PIO) Structure at the Ministry of Energy and Water (MEW)…………………………… .. 9
Figrue 4: (PMO) Structure at the Ministry of Energy and Water (MEW)..………………………… 10
List of Tables:
Table 1: Project physical progress ..………………………… ............................................................... 8
Table 2: Corrective Action plan .............................................................................................................. 13
Table 3: Action Plan for the Next Period .............................................................................................. 16
Figrue 4: (PMO) Structure at the Ministry of Energy and Water (MEW)..………………………… 18
List of Annexes:
Anex 1: Photos of project site ................................................................................................................. 19
Aneex 2: Site Inspection check list ........................................................................................................ 23
Anex 3:Site Specific Environmental management plan ..................................................................... 29
![Page 4: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/4.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
Abbreviations
ADB Asian Development Bank
AF Affected Family
AH Affected Household
AP Affected person
CEMP Contractor’s Enviromental Managemnt paln
DAIL Department of Agriculture Irrigation and Livestock
DFID Departments for International Development UK
DSCS Design and Supervising Consultancy Servise
EARF Environmental Assesmnet Review Framework
EIA Envrionmnetal Impact Assessment
EMP Envionmental Managment Plan
EO Environmetnal Officer
ESCS Enging Supervision and Consultancy Servises
EU European Union
FAO Food Agricultrue Organization
GIRoA(GOA) Governmenta of the Islamic Repuplic of Afghanistan
GRC Grievance Redress Committee
HH Households
HRBMP Helmond River Basin Master Plan
IAs Irrigation Associations
ICB International competitive Bidding
IEE Initial Environmental Examination
IFCI Imam Sahib Proposed Protect Area
LKIP Lower Lokcha Irrigation Project
MAIL Minstry of Agriculture, Irrigation and Livestock
MEW Minstry of Energy and Water
MFF Multi-Tranche Financing Facility
MoM Minstry of Mines
MPH Minstry of Public Health
MRRD Minstry of Rrual Rehabilitation and Development
MUD Minstry of Urban Development
NBD Norther Basin Development
![Page 5: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/5.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
NEPA National Environmental Protection Agency
NFMP National Flood Managemnet Program
PC Public Consultation
PCO Project Coordination Office
PDF Project Development Facility
PMO Project Management Office
PPMS Project Performance Management System
PPTA Project Preparation Technical Assisstance
PSC Project Steering Committee
R&U Rehabilitation and Upgrading
RBA River Basin Authority
RBC River Basin Council
RRP Recommendation and Report of the President
UNEP United Nations Environment Program
UXO Unexploded Ordinance
WRDIP Water Resources Development Investment Program
![Page 6: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/6.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
6
PART I- INTRODUCTION
1. Since 2004, the European Union (EU) has supported the Government of Afghanistan
(GoIRA) in its reconstruction efforts by funding integrated water management programs in
the Panj Amu river basin.
2. The current Project continues this EU support in partnership with ADB as co-financier and
administrator. This will improve GoIRA ownership of fund management, increasing
sustainability and conforming to EU policy in Afghanistan of moving funding on-budget or
into co-financing arrangements.
3. The importance of the Project is in its impact on the well-being of rural communities in the
basin, and in its support for GoIRA’s sector investment plan, the $1.1 billion National Water
and Natural Resources Development Program.
4. The proposed project will increase agricultural productivity in the Panj-Amu River Basin
through improving access and use of irrigated water at farm, scheme and river levels. The
project will improve yields, cropping intensities and irrigated areas on a command area of
74,500ha, resulting in increased farm incomes and reduced rural poverty for over 400,000
beneficiaries, improved food security, import substitution, especially for wheat, and an
increase in exports for high-value products such as fruit and nuts. Additional benefits include
a reduction in conflict over water use, and an increase in sales of agricultural inputs such as
fertilizers.
5. The Project will be financed through an ADB sector grant. It will be implemented over the
seven-year period from late 2016 to late 2023, at an estimated cost of $76.75 million ($50
million in EU funds, $26 million in ADB funds and $0.75m in government counterpart funds).
6. The Project proponents are the Government of the Islamic Republic of Afghanistan (GoIRA),
ADB, and the EU. The Project Executing Agency (EA) is the Ministry of Finance (MOF). The
Implementing Agencies (IAs) are Ministry of Energy and Water (MEW) and Ministry of
Agriculture, Irrigation and Livestock (MAIL). MEW will be involved in Output 1. MAIL will be
involved in in Outputs 2 and 3.
![Page 7: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/7.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
7
1.1. Objectives, Scope and Methodology
7. The main objective of this report is to provide progress on implementation of the
Environmental Management Plan (EMP) and to report any other environmental concerns
occurred during project implementation. The report is also prepared to comply with
environmental safeguards of the Government of Afghanistan and ADB Safeguards Policy
Statement (SPS), 2009.
8. This environmental monitoring report is covering the monitoring of implementation of the
EMP by Contractors covering the period from January to June 2018.
9. The report is based on findings from field monitoring trips conducted by Project
implementation office and Project Management office (PMO), and reviewing documentation
related with environmental performance on the project sites and reporting materials,
submitted by Contractors.
1.2. Project Description
10. Output 1: Water allocation and availability improved. This output will provide the capacity
and resources for MEW, and associated river basin agency (RBA), and sub basin agencies
(SBAs) in the Panj-Amu river basin, to: (i) improve the conveyance and allocation of water to
irrigated areas through rehabilitating and upgrading head works and main canals in priority
schemes; (ii) establish and strengthen the capacity of 112 water user associations (WUAs)
to operate and maintain (O&M) conveyance infrastructure in these schemes to better
distribute water between the head, middle and tail end of canals more equitably; and for
them to work with RBA and SBAs to facilitate water sharing between schemes; and (iii)
enhance the capacity of MEW, RBA and SBAs for more effective water allocation between
schemes to benefit downstream users. In addition, support will also be provided to Afghan
members of the Afghanistan-Tajikistan transboundary technical working group to prepare
them for technical meetings and strengthen their ability to conduct negotiations regarding
the set-up and operations of the Panj River Basin Commission.
11. Output 2: Command areas enhanced. This output will provide the capacity and resources for
Ministry of Agriculture Irrigation and Livestock (MAIL), and associated Department of
Agriculture Irrigation and Livestock (DAIL) in the Panj-Amu river basin, to: (i) improve
irrigation infrastructure at the secondary and tertiary canal level, in schemes identified for
![Page 8: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/8.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
8
improvement under Output 1 in order to secure an integrated approach; (ii) establish and
strengthen the capacity of at least 105 Irrigation Associations (IAs) to operate and manage
irrigation infrastructure in these schemes to improve distribution of water within schemes;
and (iii) improve water use efficiency at the farm level by improved on-farm water
management and agronomic techniques (such as land levelling, bed and furrow irrigation,
and intercropping) with at least 6,300 farmers having improved knowledge from 21
demonstration plots.
12. Output 3: Watersheds properly managed and protected. This output provides the capacity
and resources for MAIL, and associated DAILs in the Panj-Amu river basin to improve
community-based watershed management. This output includes (i) preparation of a
community-based natural resources management technical manual and guidebook; (ii)
training of DAIL’s staff as master trainers who will conduct training of communities; (iii)
identification of approximately 21 watershed/rangeland sites for restoration and protection;
(iv) creation of community forestry/rangeland associations for these sites; and (v)
preparation and implementation of natural resource management plans for these sites.
These activities will help restore 10,500 hectares of forestry and/or rangeland in the vicinity
of 21 prioritized subprojects and protect irrigation structures under Outputs 1 and 2 from
flash floods and sedimentation.
13. Construction activities are being implemented in output 1. Therefore, this report covers
environmental monitoring report of Seyaab, Sharawan and Laqi subprojects starting from
January 1 to June 30 2018.
14. The main Project activities related to output 1 are construction of Seyaab, Sharawan and
Laqi subprojects. To implement these construction works, a contract with the New United
Construction Company (NUC) was signed on 3rd July 2017.
![Page 9: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/9.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
9
I. FIGURE 1: AFGHANISTAN PANJ-AMU BASIN AND ITS SUB-BASIN
II. FIGURE 2: AFGHANISTAN PANJ-AMU BASIN TOPOGRAPHY/ ELEVATION
![Page 10: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/10.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
10
1.3. Subproject Description
A. RSP Syaab:
15. The existing Seyaab irrigation scheme is located in Keshim district, Badakshan province.
It irrigates 400 ha with water from the Keshim River. The main canal is 16 km long. The
proposed RSP civil works are:
a. Replacement headwork gates – Provide two new gates in the headwork.
b. Offtakes – Construct four offtakes on the main canal commanding 98 ha.
c. Cross-regulators – Construct four cross-regulators in the main canal.
d. Flow measurement infrastructure – Provide a calibrated staff gauge at each upgraded
offtake to support water distribution proportional to offtake command areas.
e. Water access points – Provide water access points on the main canal – four for domestic
water collection and two for livestock watering.
B. RSP Sharawan
16. The existing Sharawan irrigation scheme is located in Taloqan, Baharak, and Khwaja
Ghor districts of Takhar province. It irrigates about 13,000 ha.38 The main canal, the Rud-I
Sharawan, is 82 km long and has 62 secondary canals. The Proposed civil work is:
a. Offtakes – Upgrade five offtakes on the main canal commanding 1831 ha.
b. Cross-regulators – Construct seven cross-regulators in the main canal.
c. Flow measurement infrastructure – Provide a calibrated staff gauge at each
upgraded offtake to support water distribution proportional to offtake command
areas.
d. Water access points – Provide eleven domestic water collection and five livestock
water access points
C. RSP Laqi
![Page 11: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/11.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
11
17. The existing Laqi irrigation scheme is located in Aliabad district, Kunduz province. It irrigates
about 160 ha of fertile land around Aliabad city. The main canal is 15 km long and has
seven secondary canals. Residents report that the main canal was constructed manually by
local people about 80 years ago. The proposed RSP civil works are:
a. Intake works – Provide head regulator with spill weir and scour sluice in the main
channel 100 m downstream of the approach channel.
b. Offtakes– (i) Upgrade one offtake and (ii) provide one combined upgraded offtake in
place of two traditional offtakes 160 m apart; on the main canal commanding 72 ha.
c. Cross-regulators – Construct two cross-regulators in the main canal.
d. Flow measurement infrastructure – Provide a calibrated staff gauge at each
upgraded offtake to support water distribution proportional to offtake command
areas.
e. Water access points – Provision of one livestock and two domestic water access
points.
1.4. Project Activities and Progress
18. The activities which were carried out by the Contractor during the reporting period
comprised mainly of earth excavation, earth filling, back filling, stone masonry, cement
concrete and steel reinforcement.
Table1: Physical status of works:
PHYSICAL STATUS OF WORKS
S. No
Canal Name Structure Name
Status of Works
Remarks Progress %
Status
1
Seyaab Canal Badakshan
Head Work 98 Ongoing
2 Qomandan Zarin CR 100 Complete Changed to lining of Canal
3 Haji Wali CR and Offtake 100 Complete
4 Pul-Seyaab Dara CR and Offtake
100 Complete
5 Ghara Dara CR and Offtake
0 Mobilization Changed to Aghor Dara new super passage
6 Sharawan Canal
Amanullah CR and Offtake
0 Canceled Community problem
![Page 12: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/12.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
12
7 Takhar Baghak 2 CR and Offtake 30 Ongoing
8 Konchi CR and Offtake 0 Mobilization Changed to Bazoye Baghak 2 bank lining
9 Eshan Sayeed CR and Offtake
0 Canceled RBA/SRBA Req for New Changes
10 Haji Musa CR and Offtake 95 Ongoing
11 Haji Abdul Qayum CR and Offtake
0 Mobilization Design and shop drawings approved
12 Abil Ariq CR and Offtake 75 Ongoing
13
Laqi Canal Kunduz
Head Work 80 20% gabion work remaining
14 Abdul Hakim CR and Offtake
98
15 Nematullah CR and Offtake
98
16 Domestic water Access Point 0
Survey and Design Complete
17 Livestock Water Access Point 0
Survey and Design Complete
1.3. CHANGES IN PROJECT ORGANIZATION AND ENVIRONMENTAL MANAGEMENT
TEAM
19. The project proposal stipulated that the PMO, under MEW was to be fully staffed and
established by the commencement of the project. Similarly, Project Implementation Offices
(PIOs) were to be established in Kunduz and Taloqan provinces to manage and facilitate
project implementation.
20. The Executing Agency for the Project is the Ministry of Finance (MOF) and the
Implementation Agency is Ministry of Energy and Water. MEW is responsible to oversee the
implementation of Output 1 through the existing WRDIP PMO in Kabul in the MEW main
office.
21. This PMO is part of an overall ADB PMO responsible for all ADB projects and programs
implemented by the Ministry. Also, for implementation of Output 1 a PIO for basin-level
activities in the river basin agency (RBA) in Kunduz and Taloqan, embedded within the RBA
office to avoid setting up a parallel structure and to strengthen government institutional
capacity.
22. With respect to the Project Management, PMO and PIOs of MEW have been established
and staffed as shown in the chart 1 and 2.
![Page 13: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/13.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
13
23. To meet ADB safeguard requirements the PMO engaged a full time Environmental
Safeguard Officer who is in charge for the Project’s environmental performance related to
construction / rehabilitation activities.
III. FIGURE 3: PROJECT IMPLEMENTATION OFFICER (PIO) STRUCTURE AT THE MINISTRY OF ENERGY AND WATER (MEW).
24. The Environmental safeguard officer is responsible to ensure timely submission of SEMPs
by Contractors, reviewing these SEMPs on compliance with IEEs requirements, conducting
environmental audit of construction sites.
25. During the reporting period there was no change in project organization and environmental
management team.
PIO Director
Administration
Officer
Finance Officer
SBA Finance officer Driver 1 SBA
Clerk
Junior Supervision
Engineers (SBAs)
GIS/IT Officer
Senior WUA Officer
Junior WUA Officers
(SBAs)
Senior River Basin
Planning Officer
Building Design
Engineer
![Page 14: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/14.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
14
IV. FIGURE 4: PROJECT MANAGEMENT OFFICE (PMO) STRUCTURE AT THE MINISTRY OF ENERGY AND WATER (MEW).
1.4. Relationships with contractors, owner, lender, etc.
26. During the reporting period relationship among Ministry’s PMO and PIO and the contractor
remained quite comfortable. A number of meetings with Contractor and Client were held at
site and offices. Emerging environmental issues such as sedimentation that causes the
Environmental Safeguards officer
Social Safeguards officer
PMO Director
PMO Deputy Director Project Manager
Deputy Director Other Project
Contract and Procurement officer
Admin and HR officer
Finance Officer
Driver 1 Driver 2 Driver 1 Driver 2
Senior Design and Supervision Engineer
![Page 15: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/15.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
15
color of water muddy along canal rehabilitation, replantation of trees and compensation to
tree owners were discussed and proper action taken.
1.5. Stakeholders
27. Since stakeholders are a key issue for project design, construction, operation, maintenance,
and decommissioning, the management body of P-ARBP project always would want to
make sure all stakeholders are involved and actively engaged in the decision making
process of projects so that anyone involved in the project is aware of the full range of issues,
and they appreciate the views of all stakeholders. In particular, any issue falling under
environmental features is discussed with the relevant stakeholders.
PART II - ENVIRONMENTAL MONITORING
28. During the reporting period, environmental compliance remained satisfactory as major
issues were properly considered and managed. Other issues were handled according to
guidelines provided in SSEMP.
29. Monitoring of construction site conducted normally by the PIO engineer during the period.
30. No adverse environmental impacts related to the implemented activities were noted or
observed within the reporting period.
31. All construction has been carried out within the land boundaries and no claims have been
raised by people in the subproject area.
32. No hazardous materials, which would require special handling, were found among the
waste. Therefore, all non-hazardous waste was removed from site and Camp area safely.
The waste materials were stored at places away from property boundary, from residences,
and water supply sources. All garbage carried away from the residential place and dump it
in the landfill.
33. The Contractor kept records of safety; environmental considerations of the construction
sites; air quality and noise; within the reporting period, no adverse environmental impacts
related to the works have been noted or observed.
2.2.1 Water Quality
34. River water quality remained safer as no water harmful activity was taken place during this
construction period, except the color of water that was muddy due to seasonal rain and
![Page 16: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/16.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
16
earth work in some canals. The water is directed to temporary irrigation canal and utmost
care was taken by the Contractor to prevent polluting of the river water from any oil spillage
and other waste.
2.2.2 Noise and Vibration
35. The Contractor took all necessary precautions to minimize the amount of noise and
vibrations coming from construction activities. All plant and equipment is properly maintained
in good operating condition, and that noisy construction activities effectively sound-reduced
by covering the room to avoid disturbance to any nearby noise sensitive receivers as
subproject is include the small structures, therefore most of the work is done by hand.
2.2.3 Ambient air quality
36. Based on the daily visual observation during the period emissions rates from construction
work were acceptable. Dust is controlled by watering the area regularly; and also the access
road, which is used for transportation always were watering by contractor to avoid dust
emission.
37. In addition, the area has been frequently inspected for any public complaints in particular the
farmers in adjacent to the project site to find out if any farming area has been affected by
dust generated by vehicles movements, but no evidence was seen nor had the contractor
recorded any complaints.
2.2.4 Flora and Fauna
38. During the reporting period a number of trees cut in different construction sites are listed in
the table below:
Table 2: Impact Assessment Table
Status of Trees Removal in Construction Site and their Compensation
Subproject Structures # of Removed Trees in
construction site
Types of
Trees
Compensation
payment
Total
Big
Non
fruit
Small
Non
Fruit
RS
P
Syaab
Keshim Bazar
Intake: 0
Bank lining of
the canal 128 21 107 Willow Not paid yet
![Page 17: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/17.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
17
Haji Wali Off
take 17 1 16 Willow Not paid yet
Pul Seyab
Dare Hairatan
Off take 57 5 52 Willow Not paid yet
Ghara Dara 0
Total 202 27 175
RS
P S
hara
wan
Amanullah -
Offtake and
weir
Baghak -
Offtake and
weir 15 5 10 Willow Not paid yet
Konchi -
Rehabilitation
of the existing
offtake
0
Ehsan Saeed -
Rehabilitation
of existing
offtake and
weir
0
Haji Musa -
Offtake and
weir 35 15 20 Willow Not paid yet
Haji Abdul
Qayum -
Offtake and
weir
0
Kishwari
CR&Off-take 10 10 Willow Not paid yet
Total 60 20 40
RS
P L
aq
i
Sarband Intake 15 15 Willow Not paid yet
Haji Hakim
Offtake 20 7 13 Willow Not paid yet
Haji Sakhidad
Offtake 20 8 12 Willow Not paid yet
Haji
Nematullah
Offtake 20 8 12 Willow Not Payed yet
Total 75 23 52
39. Consultation meeting conducted with affected people and related agencies regarding the
replantation of trees and also compensation will be done base on the LARP as already
provided.
![Page 18: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/18.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
18
2.2.5 Local resources utilization:
40. The contractor buys their fuel wood supplies from communities outside of the project area,
which is a socioeconomic support to the local community; no evidence has been recorded to
indicate local resources utilization for the project.
2.2.6 Solid Waste Generation:
41. The generated solid wastes are segregated into: metal and non-metal wastes. The project
management in the site collects and separates them from the decomposable wastes and
dumps them at the designated sites where the public discard their wastes.
2.2.7 Wastewater Generation:
42. For sewage management, the contractor used local bathroom, as the structures are small
and the most of labors are hired from nearby village and by the end of the day they will
leave the construction camp. For sanitation, the project management coordinate with the
farmers to decompose the toilet waste properly using pit latrines to evaporate the water from
human feces and to be dried and later it will dispose to the agriculture land by farmers.
2.2.8 Oil wastes /spills:
43. To avoid any combustion risks or social adverse impacts, the diesel tank is placed in an
area safe from any potential risk. There is no evidence of oil spills to contaminate the soil.
Similarly, other oil and lubricants have been managed to place them in the same area,
which are safe from any potential risks. The volume of storage is about 2000 liter or 2 cubic
meter, and there is no secondary containments.
2.2.9 Socio-Economics:
44. The project personnel buys their food and supplies (firewood, dairy, bread, fruit, beverages,
vegetables, etc.) from local communities and bazaars, which is a socioeconomic support to
the community.
2.2.10 Health:
45. All the staff working in the site is equipped with Personal Protective Equipment (PPE)
though few of them have frequently overlooked to putting on PPE. A special room equipped
with first aid kits in the camp is provided for the workers for emergency cases.
2.2.11 Grievances of the local communities:
46. There has been no grievance of local community recorded during the reporting period from
the construction site.
![Page 19: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/19.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
19
47. It is concluded that the construction activities of Representative Subprojects have not
significantly impacted adversely on the environment of the area. And that the environmental
management has been able to minimize the apparent impacts of the project.
PART III - ENVIRONMENTAL MANAGEMENT
3.1 The EMS, EMP, SEMP and work plans
48. The initial environmental examinations (IEE) and Site Specific Environmental Management
Plan (SEMP) is available at site. Recommendations by SEMP are being followed to handle
day to day environmental issues.
49. Health and safety kits are also available at site. Implementation of all mitigation measures
during construction activities under the project were monitored.
50. If there are any grievances being made of any potential adverse impacts of the project,
those will be reported to the PIO supervision Engineers as and when they occur and in turn
they will alert the PMO’s Environmental Officer who will follow up and address any issues
raised. If they cannot be resolved, the PIO Coordinator and the EO calls a meeting of the
involved stakeholders to finally resolve the matter to the satisfaction of the community.
3.2. EMP and Work Plans
51. The ongoing civil works contract in Sharawan, Syaab and Laqi projects, the PIO and the
Contractors are fully aware of the set out requirements for the protection of the environment.
The contractors have (i) established an operational system for managing environmental
impacts; (ii) carried out all of the monitoring and mitigation measures set forth in the
environmental management plan prepared and (iii) allocated the budget required to ensure
that such measures are carried out.
3.2. Site inspections and audits
52. Site supervision and inspections, as well as monitoring of compliance of construction
activities are important aspects to ensure the proper implementation of EMP requirements.
53. Environmental management team of Construction and Supervision Consultants carry out
permanent supervision activities and monitoring of the project performance on regular
bases.
![Page 20: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/20.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
20
54. The construction supervision engineers from PIO and contractors undertake daily
inspections and have been instructed to monitor the construction activities to avoid any
significant environmental or social implications.
3.3 Corrective Action Plan
55. The Contractor is currently in the process of implementing corrective actions for
environmental issues pointed out by the environmental officer in June 2018. The corrective
actions taken against specific environmental issues identified between January to June
2018 are summarized in Table 3.1 below:
Table 3: Corrective action plan for the period of January to June 2018
Date of
submission
Description of
Non-Compliance
Corrective Action
Required (CAR)
including deadline
Performance
Date/Resolution Status of
CAR
Jan 10th
2018
Environmental
Log book in the
construction site.
Contractor is advised
to have an
environmental log book
in the construction site.
Corrected on: Jan 15th 2018
Jan 10th
2018
Generator sound
which caused
noise specially in
lunch time.
Contractor is advised
to stop the generator
during the lunch time. Corrected on: Jan 12th 2018
Mar 15th
2018
Trees cutting in
construction site
Contactor were
advised to conduct
consultation meeting
with AP before cutting
trees.
Corrected on: Under
process
May 10th
2018
PPE wearing:
some of the
labors haven’t
wear the PPE, as
All labors are advised
by safeguard engineer
to wear the PPE, as it
will rescue their life.
Corrected on: May 11th
2018
![Page 21: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/21.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
21
3.4 Consultation and complaints
56. The communities living or farming in the affected zone of Sharwan, Syaab and Laqi project
have had no complaints from the project during the reporting period. In case of any
grievances, it is soon reported to the supervision engineer as and when they occur so they
will alert the PIO Coordinator who follows up and address the issues as soon as possible.
3.5 Conclusion
57. EMP implementation is generally satisfactory. The contractors have assigned staff in charge
of daily environment, health and safety inspections.
58. Environmental supervision staff have been contracted. Internal monitoring reports were
prepared by contractors and PIO, and submitted to the PMO.
59. There were no reported personnel or safety accidents on the project during this period non
property damage or vandalism during this period.
60. Health and safety kits are also available at site. Implementation of all mitigation measures
during construction activities under the project were monitored.
61. All the staffs working in the site is equipped with Personal Protective Equipment (PPE)
though few of them have frequently overlooked to putting on PPE.
62. There has been no grievance of local community recorded during the reporting period from
construction site.
3.6 Recommendations
63. Presence of a trained medical person and environmental inspector should be ensured
during working hours at site.
64. EMP compliance records still need more attention at site.
65. All staff include labor should be advised to wear PPE on construction site for their safety.
it is very
important for
them.
![Page 22: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/22.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
22
66. The drinking water storage tanks should be flushed and chlorinated on a weekly basis to
avoid microbial contamination.
67. The contractor was advised to strictly follow the ADB’s Environmental safeguard guidelines
and other security requirements in and around the construction site.
68. Submission of monthly compliance report by the Contractor should be strictly on time.
3.7 Action Plan for the Next Period
69. All environmental issue followed up normally by PIO and PMO but some important issue will
be monitored based on the following action plan during the monitoring period.
Table 4: Action plan for the next monitoring period.
Item
# Action to be taken
Person
Responsible
for follow-up
Nominated
Completion Date Status
1
Preparation and
Submission of EMR for
the period of July-
December 2018
PMO
Environmental
specialist
December 30th
2018
2
Conducting On job
training to PIO staff and
contractor
PMO
Environmental
specialist
August 2018
3
Checking of contractor’s
Environmental log book. PIO August 2018
4
Monitoring of corrective
action plan with
contractor
PMO/ PIO September 2018
5
Monitoring of RSPs
Sharwan, Syaab and
Laqi
PIO/ PMO August 2018
![Page 23: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/23.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
23
Annexures
Annex 1: Construction Site Photos
A. Keshim Bazar intake
![Page 24: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/24.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
24
B. Qumandan Zarin structure.
![Page 25: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/25.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
25
C. Haji Mosa Structure
![Page 26: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/26.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
26
D. First Aid Kit in construction site:
![Page 27: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/27.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
27
Appendix 2: Environmental Site Inspection Checklist
Ministry of Energy and Water
Water Resource Development and Investment Program
Environmental site inspection checklist
Project : P-ARBP 48042-001 Site Location :
Construction stage / status during inspection : Construction work
Inspection Date : Inspection Time :
Inspected by : PIO ( Supervision Engineer)
Inspection Items
Implemented?
N/A
REMARKS
(i.e. specify location, good
practices, problem observed,
possible cause of nonconformity
and/or proposed
corrective/preventative actions)
Yes No*
1. Air Pollution Control
1.1. Are the construction sites
watered to minimize dust
generated?
1.2. Are all vehicles carrying dusty
loads covered/watered over
prior to leaving the site?
1.3. Are demolition work areas
watered? (e.g. trimming
activities by using breaker)
![Page 28: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/28.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
28
Inspection Items
Implemented?
N/A
REMARKS
(i.e. specify location, good
practices, problem observed,
possible cause of nonconformity
and/or proposed
corrective/preventative actions)
Yes No*
1.4. Are dusty roads paved and/or
sprayed with water?
1.5. Are dust controlled during
percussive drilling or rock
breaking?
1.6. Is dark smoke controlled from
machinery?
Outmost care undertakes to
control the smoke of machinery by
maintenance of engine.
1.7. Others (please specify)
2. Water Pollution Control
2.1. Are vehicles cleaned before
leaving the site?
2.2. Is the water is muddy during
the construction work?
Actually some canals were dry
during the reporting period as the
water is used for irrigation, in the
same time temporary canal
provided to avoid water pollution.
2.3. Is the public road/area around
the site entrance and site
hoarding kept clean and free
of muddy water?
2.4. Are fuel and lubricant cussed
water pollution.?
![Page 29: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/29.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
29
Inspection Items
Implemented?
N/A
REMARKS
(i.e. specify location, good
practices, problem observed,
possible cause of nonconformity
and/or proposed
corrective/preventative actions)
Yes No*
2.5. Are waste water of
construction site flowing to the
river?
2.6. Are cement and other waste
are washed in the river?
Contractor are advised to avoid
washing of cement and any other
waste into the river/ canal.
3. Noise Control
3.1. Are Construction site closer to
the villagers?
3.2. Do generators operate with
doors closed?
3.3. Do the people have
complaints from noise
pollution?
3.4. Any noise mitigation
measures adopted (e.g. use
noise barrier / enclosure)?
Only Electric generator located in
the door and roof closed room to
avoid from noise pollution, also all
machinery is maintained to avoid
noisy.
3.5. Are silenced equipment’s
utilized?
3.6. Are generators are turned off
during lunch hours and night?
![Page 30: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/30.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
30
Inspection Items
Implemented?
N/A
REMARKS
(i.e. specify location, good
practices, problem observed,
possible cause of nonconformity
and/or proposed
corrective/preventative actions)
Yes No*
4. Waste Management
4.1. Is the site kept clean and tidy?
(e.g. litter free, good
housekeeping)
4.2. Are separate chutes used for
inert and non-inert wastes?
4.3. Are separated labelled
containers / areas provided
for facilitating recycling and
waste segregation?
4.4. Are construction wastes /
recyclable wastes and general
refuse removed off site
regularly?
4.5. Are oil drums and equipment’s
provided with drip trays?
4.6. Are drip trays free of oil and
water?
4.7. Is litter, foam or other
objectionable matters in
nearby water drain/sewer
cleaned?
5. Protection of Flora, Fauna and Historical
Heritage
![Page 31: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/31.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
31
Inspection Items
Implemented?
N/A
REMARKS
(i.e. specify location, good
practices, problem observed,
possible cause of nonconformity
and/or proposed
corrective/preventative actions)
Yes No*
5.1. Are disturbance to terrestrial
flora minimized (e.g. plants to
be preserved)?
Outmost care was taken to
prevent cutting of trees but in
some construction site a number
of trees cut and consultation has
made for replanting of trees.
5.2. Are disturbance to terrestrial
fauna minimized (if rare
species identified)?
5.3. Any historical heritage exists
on site? If yes, ensure
appropriate measures taken to
preserve it
6. Resource Conservation
6.1. Are diesel-powered plants and
equipment’s shut off while not
in use to reduce excessive
use?
6.2. Are materials stored in good
condition to prevent
deterioration and wastage
(e.g. covered, separated)?
7. Emergency Preparedness and Response
7.1. Are fire extinguishers properly
maintained and not expired?
![Page 32: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/32.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
32
Inspection Items
Implemented?
N/A
REMARKS
(i.e. specify location, good
practices, problem observed,
possible cause of nonconformity
and/or proposed
corrective/preventative actions)
Yes No*
7.2. Are accidents and incidents
reported and reviewed, and
corrective & preventive
actions identified and
recorded?
No accident and incidents
reported during the reporting
period, but if there is any accident
it will be reported and recorded.
7.3. Are labor and staff are
equipped with PPE?
Signature of Site Inspector Date
Reviewed by Environmental Specialist
Date
![Page 33: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/33.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
33
Annex 3: Site-specific Environmental Management Plan for Haji Musa offtake
Construction Activities Issue to be considered Mitigation measures
Earthworks,
Main structures construction
Canal rehabilitation and
upgrading
Sickness, injury, or
death of workers and
people near the site.
1. Provide training to all staff on Environment and Health & Safety
on the following topics
➢ General rules and regulations to be followed on the
construction site and camps.
➢ Construction activity-specific rules and regulations
including working on bridge, working with electrical
tools etc.
➢ Exclude unsafe working practices and unsafe tools from
the construction-site.
➢ Fire-extinguisher is available and easily accessible in all
operating machinery and in all sections of the construction
site.
➢ Available and easily accessible first aid kits in all operating
machinery and in all sections of the construction site.
➢ Season- fit uniform and other PPE provided to workers
and other staff.
➢ Incentive measures and penalties to enforce the use of PPE.
➢ Health & safety incidents to be recorded and reported on
to the ENGINEER and to relevant authorities when needed.
![Page 34: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/34.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
34
Lack of information
and understanding
leading to frustration and
complaints.
➢ Install posters or project informational boards with relevant
information for the Public: field office location, operating
hours, names of responsible contact persons, phone numbers
and email addresses, etc.
➢ Keep a complaint log available at the field office or in any
other easily accessible location for affected people.
➢ Allocate personal responsible for dealing with issues raised
by the Public and APs.
• Problem in
irrigation in
construction site.
• Causing Traffic
Problem for men
and animals using
the road.
➢ Providing diversion canal for irrigation, temporary road and
pedestrian to the local people.
• Destroying of
crops due to
providing of
temporary road.
➢ Avoid or minimize impacts by consultation with affected
household through compensation and providing job opportunities
as mentioned in LARP.
![Page 35: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/35.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
35
Dust Generation
i.
➢ Regular water spraying of construction works surfaces;
➢ Regulate the speed level of vehicles and machinery.
➢ Provide to workers and vehicle drivers with dust protective
masks and ensure they are using it.
Sedimentation and
pollution of drainage
canal.
ii.
➢ Prevent run off from construction sites.
➢ Regularly inspect, repair or maintain drainage structures to
avoid sedimentation especially after rainfall events.
➢ Clean all operating machinery and undertake refueling at
safe distance from drainage channel.
Noise and vibration
impacts nearby resident
iii.
➢ Avoid locating machinery and equipment near sensitive
receptors ( near building).
➢ Schedule noisy activities towards the middle of the day.
➢ Ensure workers and drivers are provided with appropriate
PPE including ear protective equipment.
➢ Using Low-level vibration equipment near sensitive receptors
(near residual buildings).
Construction wastes
iv.
➢ Construction waste, garbage and rubbish should be
removed from the site daily or even more frequently.
➢ No waste should be left on site by the end of the working
day.
➢ Facilities for rubbish and garbage accumulation and
removal are installed and emptied regularly.
![Page 36: Environmental Monitoring Report...Environmental Monitoring Report Project Number: 48042-001 Bi-Annual June 2018 AFG: Panj Amu River Basin Sector Project Prepared by Ministry of Agriculture,](https://reader033.fdocuments.us/reader033/viewer/2022041810/5e5791d281bdf4136d781d9f/html5/thumbnails/36.jpg)
Bi-annual Environmental Monitoring Report, Jan-June 2018
36
➢ Remove construction waste to corresponding landfill of
the community.
Fuel and Oil spoil
v.
➢ Check that vehicles are regularly maintained to prevent fuel and
oil leakages.
➢ Stop the operation of leaking machinery and replace with those in
proper working condition.
➢ Clean the area of spillage immediately to prevent potential
contamination of soil and groundwater using a dedicated
absorbent material.
Construction site clearance
including tree removal.
Loss of ecological
services and aesthetic
value of trees removed
from construction sites.
➢ Afforestation and tree replantation.