Environmental Impact Assessment & Environmental...
Transcript of Environmental Impact Assessment & Environmental...
Environmental Impact Assessment & Environmental
Management Plan
For
SYNTHETIC ORGANIC CHEMICALS AND CHEMICAL
INTERMEDIATES – EXPANSION & ADDITION OF NEW PRODUCTS
(EC CATEGORY 5(F))
At
Plot D-3/6, Dahej - III, GIDC Estate (Within PCPIR Region),
Kadodara Village, Taluka Vagra, District Bharuch, Gujarat
[ToR Letter Dated: 14 Nov 2019]
[Study Period: [1st Oct 2019 to 31st December 2019]
[Schedule 5 (f), Category–B as per EIA Notification 2006,
amended till date]
APPLICANT CONSULTANTS
UPL Limited.
Plot D-3/6, Dahej - III,
GIDC Estate(Within PCPIR Region),
Kadodara Village, Taluka Vagra,
District Bharuch, Gujarat
E-mail: [email protected]
Tel No: 7575008457
Eco Chem Sales & Services
Office floor, Ashoka Pavilion ’A’ New Civil Road, Surat, 395001
(NABET/EIA/1720/SA 085 (Rev.01)) Validity upto 31.07.2020
E-mail: [email protected]
Tel No: +912612236223
April – 2020
Doc. No: 2019_ECSS_EIAI2_1900019
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page ii
Undertaking by UPL for for Owing the Contents of EIA report
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page iii
Undertaking by Eco Chem Sales & Service for Owing the Contents of EIA report
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page iv
Authorization Letter
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page v
DECLARATION
Declaration by experts contributing to the EIA Report for Proposed Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products by UPL Ltd. under Schedule 5(f) Category–―B‖ as per EIA Notification 2006 and its amendment thereof.
―I, hereby, certify that I was a part of the EIA team in the following capacity that
developed this Report‖.
EIA COORDINATOR
Name : Mr. Sunil Patel
Signature & Date :
Sector : 5(f)
Period of involvement : October 2019 to April 2020
Contact Information
: Eco Chem Sales & Services, Office Floor, Ashoka Pavilion-A, Opp. Kapadia Health Club, New Civil Road, Surat, India-395 001 Landline No.: +91-261-2231630
FUNCTIONAL AREA EXPERTS
Functional Areas
Name of the Expert
Involvement (Period & Task) Signature & Date
Land Use
(LU)
FAE- Joshua Anand
Period of Involvement: November 2019 to December 2019
Tasks:
Supervision in development of land use maps of study area using GIS / related tools, site visit for
ground truth survey, finalization of land use maps, contribution to EIA documentation
Air Pollution Prevention, Monitoring &
Control
(AP)
FAE- Sunil Pandey
Period of Involvement: November 2019 to April 2020
Tasks:
Selection of monitoring locations, Supervision of air quality monitoring, Identification of impacts on Air quality, suggesting mitigation measures
and contribution to EIA documentation
Meteorology, Air Quality Modeling & Prediction
(AQ)
FAE- Dhaval Jhaveri
Period of Involvement: November 2019 to April 2020
Tasks:
Evaluation of meteorological data with collected secondary data, modeling and prediction,
identification of impacts, finalization of mitigation measures and contribution to EIA
documentation
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page vi
Functional Areas
Name of the Expert
Involvement (Period & Task) Signature & Date
Water Pollution
Prevention, Control &
Prediction of Impacts
(WP)
FAE- Sunil Pandey
TM-Nazneen Shaikh
Period of Involvement: November 2019 to April 2020
Tasks:
Water Balance, Water demand, Adequacy of ETP, Treatment Technology, Resource
Conservation, Mitigation Measures, EMP for water pollution and report preparation
Water Balance preparation, identifying recycling and reuse, Impacts identification and mitigation
measures and EIA documentation
Ecology and
Bio-diversity Conservation
(EB)
FAE- Dipti Patel
Period of Involvement: November 2019 to April 2020
Tasks:
Site visit and conduct of ecological survey, assessment of the impacts of proposed project
activities on the biological environment and contribution to EIA documentation
Noise & Vibration (NV)
FAE-Dipti Patel
Period of Involvement: November 2019 to April 2020
Tasks:
Checking of noise sampling results, analysis of data, identification of impacts and mitigation
measures, and contribution to EIA documentation
Socio-economic
(SE)
FAE-Ghanshyam
Patel
Period of Involvement: November 2019 to April 2020
Tasks:
Site visit and collection of secondary and primary from the surrounding area/villages of the proposed project. for impact identification and mitigation measures for incorporating to
EIA documentation
Hydrology, Ground Water
and Water Conservation
(HG)
FAE- Rekha Shah
Period of Involvement: November 2019 to April 2020
Tasks:
Site visit, Understanding and representing
groundwater conditions, supervision of
groundwater sampling, finalization of survey
findings, identification of impacts, suggestion of
mitigation measures and contribution to the EIA
documentation
Geology
(GEO)
FAE- Ravikant Sharma
Not involved, as Functional Area is rationalized as per QCI scheme for Accreditation Version 3
--
Soil Conservation
(SC)
FAE- Dr. B. K. Patel
Not involved, as Functional Area is rationalized as per QCI scheme for Accreditation Version 3
--
Risk Assessment &
Hazard Management
(RH)
FAE- Vinay Patil
Period of Involvement: November 2019 to April 2020
Tasks:
Identification of impacts & mitigation measures, safety during construction and operational
phase and contribution to EIA documentation
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page vii
Functional Areas
Name of the Expert
Involvement (Period & Task) Signature & Date
Solid waste and
Hazardous Waste
Management (SHW)
FAE- J. A. Rathi
TM- Nazneen Shaikh
Period of Involvement: November 2019 to April 2020
Tasks:
Identification of waste generated from the site, studying adequacy of mitigation measures for
management of hazardous waste and contribution to EIA documentation
Identification of waste generated from the site, studying management and disposal mode a and
contribution to EIA documentation
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Declaration Page viii
Declaration by the Head of the Accredited Consultant Organization/ authorized person
I, Rekha S. Shah, hereby, confirm that the above mentioned experts prepared the EIA
report of for Proposed Synthetic Organic Chemicals and Chemical intermediates- Expansion
& Addition of New Products by UPL Ltd. at Plot No. D-3/6, Dahej-III, GIDC Estate (Within
PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch, Gujarat.
I also confirm that EC has gone through the report, and the consultant organization shall be
fully accountable for any misleading information mentioned in this statement. It is certified
that No unethical practices including plagiarism have been carried out and external data /text
has not been used without proper acknowledgement, while preparing this EIA report.
.
Signature :
Name : Rekha Shah
Designation : CEO
Name of the EIA Consultant Organization :
Eco Chem Sales & Services, Surat
Office Floor, Ashoka Pavillion – A, Opp. Kapadia Health Club, Surat 395001 (GJ)
NABET Certificate Number : NABET/EIA/1720/SA 085 (Rev.01)
Valid up to July 31, 2020
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents ix
CONTENTS
1 INTRODUCTION ........................................................................................................... 1
1.1 PURPOSE OF THE REPORT ................................................................................ 1
1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT ................................ 1
1.2.1 Identification of Project ..................................................................................... 1
1.2.2 Project Proponent ............................................................................................ 2
1.3 BRIEF DESCRIPTION OF THE PROJECT AND ITS IMPORTANCE TO THE
COUNTRY & REGION ...................................................................................................... 4
1.3.1 Brief Description of the Project ......................................................................... 4
1.3.2 Importance to the Country and the Region ....................................................... 4
1.4 REGULATORY FRAMEWORK ............................................................................... 5
1.4.1 Statutory Clearance as Other Permissions ...................................................... 5
1.4.2 Scope of the Study .......................................................................................... 6
1.5 Structure of the EIA report .................................................................................... 19
2 PROJECT DESCRIPTION ........................................................................................... 20
2.1 TYPE OF PROJECT ............................................................................................. 20
2.2 NEED FOR THE PROJECT .................................................................................. 20
2.3 LOCATION OF THE PROJECT ............................................................................ 20
2.3.1 General Location of the Site ........................................................................... 20
2.3.2 Approach to the Project Site .......................................................................... 22
2.3.3 Site Details .................................................................................................... 22
2.4 SIZE OR MAGNITUDE OF OPERATION ............................................................. 25
2.4.1 Production Capacity ....................................................................................... 25
2.4.2 Cost of the Project ......................................................................................... 34
2.5 ASSOCIATED ACTIVITIES REQUIRES BY OR FOR THE PROJECT ................. 35
2.5.1 Utilities ........................................................................................................... 35
2.5.2 Land .............................................................................................................. 35
2.5.3 Power ............................................................................................................ 36
2.5.4 Fuel ............................................................................................................... 36
2.5.5 Water ............................................................................................................. 37
2.5.6 Manpower ...................................................................................................... 39
2.6 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION ................ 39
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents x
2.7 TECHNOLOGY AND PROCESS DESCRIPTION ................................................. 40
2.8 PROJECT DESCRIPTION .................................................................................... 40
2.8.1 Raw Material details ....................................................................................... 40
2.8.2 Transportation of Raw Material, Finished Products and Haz. Waste .............. 51
2.8.3 Storage Facilities ........................................................................................... 51
2.8.4 Resource Optimization/recycling and Reuse Envisaged in the Project ........... 55
2.8.5 Maximum Possible Loss Spots ...................................................................... 57
2.8.6 Leak Detection and Repair (LDAR) Program ................................................. 57
2.8.7 Air Emissions ................................................................................................. 59
2.8.8 Noise Pollution ............................................................................................... 67
2.8.9 Water Consumption, Waste Water Generation & Disposal Details ................. 68
2.8.10 Solid and Hazardous Waste Identification, Quantification, Storage and
Disposal 76
2.8.11 Project Layout and Components .................................................................... 82
2.8.12 Mitigation Measures at Design Stage ............................................................. 85
2.8.13 Assessment of New and Untested Technology .............................................. 85
2.8.14 Condensed Description .................................................................................. 85
3 DESCRIPTION OF THE ENVIRONMENT ................................................................... 87
3.1 INTRODUCTION .................................................................................................. 87
3.2 BASELINE STUDY AREA AND PERIOD .............................................................. 89
3.3 METHODOLOGY.................................................................................................. 89
3.3.1 Frequency of Sampling .................................................................................. 89
3.3.2 Method of Environmental Sampling and Analysis .......................................... 90
3.4 MICROMETEOROLOGY ...................................................................................... 92
3.4.1 Temperature .................................................................................................. 93
3.4.2 Humidity ......................................................................................................... 93
3.4.3 Wind Speed and Wind Direction .................................................................... 95
3.4.4 Wind Rose ..................................................................................................... 95
3.4.5 Interpretation of Micrometeorological Data ..................................................... 96
3.5 AIR ENVIRONMENT ............................................................................................ 97
3.5.1 Selection of Sampling Locations .................................................................... 97
3.5.2 Frequency and Parameters for Sampling ....................................................... 99
3.5.3 Methodology for Sampling and Analysis ........................................................ 99
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xi
3.5.4 Quality of Ambient Air .................................................................................. 100
3.5.5 Summary of Ambient Air Quality .................................................................. 102
3.5.6 Interpretation of Ambient Air Quality Data .................................................... 102
3.6 NOISE ENVIRONMENT ..................................................................................... 102
3.6.1 Sources of Noise Pollution ........................................................................... 102
3.6.2 Noise Level in the Study Area ...................................................................... 103
3.6.3 Summary of Noise Data ............................................................................... 106
3.6.4 Interpretation of Noise Data ......................................................................... 106
3.7 LAND ENVIRONMENT ....................................................................................... 106
3.7.1 Land Use Pattern of the Study area ............................................................. 106
3.7.2 Summary and Interpretation of Land Use Map ............................................. 109
3.8 GEOLOGY .......................................................................................................... 110
3.9 HYDROGEOLOGY ............................................................................................. 111
3.10 TRAFFIC STUDY................................................................................................ 113
3.10.1 Interpretation of Traffic Study ....................................................................... 113
3.11 SOIL QUALITY ................................................................................................... 114
3.11.1 Summary of Soil Data .................................................................................. 116
3.11.2 Interpretation of Soil Data ............................................................................ 116
3.12 WATER ENVIRONMENT .................................................................................... 116
3.12.1 Reconnaissance .......................................................................................... 116
3.12.2 Water Quality ............................................................................................... 117
3.12.3 Sampling and Analysis ................................................................................. 117
3.12.4 Ground Water .............................................................................................. 117
3.12.5 Summary of Ground Water Quality .............................................................. 122
3.12.6 Interpretation of Ground Water Quality Data ................................................ 122
3.12.7 Surface Water .............................................................................................. 122
3.12.8 Summary of Surface Water Quality .............................................................. 128
3.12.9 Interpretation of Surface Water Quality Data ................................................ 128
3.12.10 Marine Water ............................................................................................ 128
3.12.11 Summary of Marine Water Quality ............................................................ 130
3.12.12 Interpretation of Marine Water Quality Data .............................................. 130
3.13 ECOLOGY AND BIODIVERSITY ........................................................................ 131
3.13.1 Methodology ................................................................................................ 132
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xii
3.13.2 Floral Diversity of the Study Area ................................................................. 132
Fauna Diversity of the Study Area .............................................................................. 135
3.13.3 Interpretation on Ecology and Biodiversity ................................................... 137
3.14 SOCIO-ECONOMIC ENVIRONMENT ................................................................ 137
3.14.1 Socio-Economic Survey Methodology .......................................................... 138
3.14.2 Demography ................................................................................................ 138
3.14.3 Population Density ....................................................................................... 138
3.14.4 Sex Ratio ..................................................................................................... 139
3.14.5 Literacy Rate................................................................................................ 140
3.14.6 Economic Aspects ....................................................................................... 141
3.14.7 Amenities ..................................................................................................... 143
3.14.8 Interpretation of Socio Economic Data ......................................................... 145
4 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ........ 148
4.1 IMPACT ASSESSMENT METHODOLOGY ........................................................ 148
4.2 INVESTIGATED ENVIRONMENTAL IMPACTS DUE TO THE PROPOSED
PROJECT ..................................................................................................................... 149
4.2.1 Air Environment ........................................................................................... 153
4.2.2 Noise Environment....................................................................................... 174
4.2.3 Water Environment ...................................................................................... 175
4.2.4 Land Environment ........................................................................................ 179
4.2.5 Solid and Hazardous Waste Management ................................................... 180
4.2.6 Ecology & Biodiversity Environment ............................................................. 182
4.2.7 Socio Economic Environment ...................................................................... 183
5 ANALYSIS OF ALTERNATIVES ................................................................................ 185
5.1 Site Selection ...................................................................................................... 185
5.2 Technology Selection .......................................................................................... 185
6 ENVIRONMENTAL MONITORING PROGRAM ......................................................... 187
6.1.1 Air Environment ........................................................................................... 187
6.1.2 Noise Environment....................................................................................... 189
6.1.3 Water Environment ...................................................................................... 190
6.1.4 Land Environment ........................................................................................ 191
6.1.5 Solid and Hazardous Waste Management ................................................... 191
6.1.6 Traffic Monitoring ......................................................................................... 193
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xiii
7 ADDITIONAL STUDIES ............................................................................................. 196
7.1 PUBLIC CONSULTATION .................................................................................. 196
7.2 RISK ASSESSMENT .......................................................................................... 197
7.2.1 Objective of the Study .................................................................................. 197
7.2.2 Scope of Study ............................................................................................ 198
7.2.3 Hazard Identification .................................................................................... 198
7.2.4 Qualitative Risk Assessment ........................................................................ 203
7.2.5 Hazard Identification and Risk Assessment ................................................. 205
7.2.6 Quantitative Risk Assessment ..................................................................... 211
7.2.7 Hazards and damage criteria of hazardous chemicals: ................................ 215
7.2.8 Fatal Radiation Exposure Levels .................................................................. 216
7.2.9 OVERPRESSURE DAMAGE ....................................................................... 216
7.2.10 Hazards Associated with Toxic Materials ..................................................... 216
7.2.11 Damage Criteria ........................................................................................... 217
7.2.12 Weather Condition MCAS Development Techniques ................................... 218
7.2.13 Failure Rates ............................................................................................... 218
7.2.14 Consequences Analysis ............................................................................... 218
7.2.15 Consequence Analysis and Contours .......................................................... 220
7.2.16 Results of Consequence Analysis ................................................................ 247
7.2.17 Safety Mitigation Measures .......................................................................... 249
7.2.18 Occupational Health and Safety ................................................................... 257
7.3 DISASTER MANAGEMENT PLAN (DMP) .......................................................... 257
7.3.1 Occupational Hazards Specific Pre-Placement and Periodic Monitoring ...... 266
7.3.2 Monitoring Parameters and Frequency ........................................................ 267
7.3.3 Action Plan for OHS Standard Implementation ............................................ 267
8 PROJECT BENEFITS ................................................................................................ 271
8.1 IMPROVEMENTS IN THE PHYSICAL INFRASTRUCTURE .............................. 271
8.2 IMPROVEMENTS IN THE SOCIAL INFRASTRUCTURE ................................... 271
9 ENVIRONMENTAL COST BENEFIT ANALYSIS ....................................................... 273
9.1 PROJECT COST AND APPRAISAL ................................................................... 273
9.2 APPLICABILITY OF CBA AND SUMMARY ........................................................ 273
10 ENVIRONMENTAL MANAGEMENT PLAN ............................................................ 274
10.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP) .............................................. 274
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xiv
10.1.1 Objectives of EMP ....................................................................................... 274
10.1.2 Environment Management Plan ................................................................... 274
10.1.3 Compliance Monitoring ................................................................................ 277
10.1.4 Cost for Environment Management System ................................................. 278
10.2 ENVIRONMENT IMPROVEMENT ...................................................................... 278
10.2.1 Green Belt Development .............................................................................. 278
10.2.2 Rain Water Harvesting Scheme ................................................................... 284
10.3 CONCEPT OF WASTE MINIMIZATION, RECYCLE, REUSE / RECOVER,
ENERGY CONSERVATION AND NATURAL RESOURCE CONSERVATION .............. 285
10.4 SOCIAL WELFARE & UPLIFTMENT PLAN/ CER .............................................. 287
10.5 OCCUPATIONAL HEALTH OF WORKERS ........................................................ 295
10.5.1 Noise ........................................................................................................... 295
10.5.2 Heat ............................................................................................................. 295
10.5.3 Dust, other Chemicals and Metals being suspended in the Environment ..... 295
10.5.4 Occupational Hazards specific Pre-Placement and Periodical Health Checkup
295
10.5.5 Occupational Health Centre ......................................................................... 295
10.5.6 Plan and Fund allocation for Occupational Health and Safety measures ..... 296
10.6 ENVIRONMENTAL MANAGEMENT CELL ......................................................... 297
10.6.1 Integrated management system policy (Covering Responsible care, Quality,
Environment, Occupational Health, Safety and Energy) ............................................. 297
11 SUMMARY AND CONCLUSION ............................................................................ 299
11.1 PROJECT DESCRIPTION .................................................................................. 299
11.2 DESCRIPTION OF THE ENVIRONMENT .......................................................... 300
11.3 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES . 304
11.4 ENVIRONMENTAL MONITORING PROGRAMME ............................................. 305
11.5 ADDITIONAL STUDIES ...................................................................................... 306
11.6 PROJECT BENEFITS ......................................................................................... 307
11.7 ENVIRONMENT MANAGEMENT PLAN ............................................................. 308
11.8 SUMMARY AND CONCLUSION ........................................................................ 309
12 DISCLOSURE OF CONSULTANTS ....................................................................... 310
12.1 GENERAL .......................................................................................................... 310
12.2 BRIEF RESUME AND NATURE OF CONSULTANCY ....................................... 310
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xv
12.3 TEAM MEMBER FOR EIA REPORT .................................................................. 310
12.4 LABORATORY INVOLVED FOR BASELINE MONITORING AND OTHER
ANALYSIS ..................................................................................................................... 311
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xvi
LIST OF TABLES
Table 1.1: Brief of EC Granted Products and Capacities (Existing) ....................................... 1
Table 1.2: Awards & Achievements ....................................................................................... 3
Table 1.3: Details of Directors and Key Personnel ................................................................ 4
Table 1.4: Brief Description of the Project ............................................................................. 4
Table 1.5: Identified Applicable Statutory .............................................................................. 6
Table 1.6: Compliance with the Terms of Reference ............................................................. 6
Table 2.1: Co-ordinates of the project ................................................................................. 21
Table 2.2: List of Major Industries within 10 KM radius of Project Site ................................. 22
Table 2.3: Project Site Specific Environmental Sensitivity Details ....................................... 23
Table 2.4: Details of Existing Production Capacity (EC Granted) ........................................ 25
Table 2.5: Proposed production Capacity in Permitted Quantity (Expansion) in EC for
Speciality Chemicals ........................................................................................................... 28
Table 2.6: Proposed New Speciality Chemicals/Intermediates ............................................ 28
Table 2.7: Details of Existing By-Products (EC Approved) with source of generation, quantity
and end use ........................................................................................................................ 31
Table 2.8: Proposed By Product Generation from expansion & new products (Intermediate
and Speciality Chemicals) ................................................................................................... 32
Table 2.9: Capital Cost Projection ....................................................................................... 34
Table 2.10: Utilities ............................................................................................................. 35
Table 2.11: Details of Plant Captive MEE ............................................................................ 35
Table 2.12: Power Requirement .......................................................................................... 36
Table 2.13: Fuel Details ...................................................................................................... 36
Table 2.14 : Total Water Demand (Existing & Proposed) .................................................... 37
Table 2.15 : EC Approved Water Requirement ................................................................... 38
Table 2.16 : Details of Proposed Water Requirements for expansion & new Speciality
chemicals ............................................................................................................................ 38
Table 2.17: Manpower details (Existing & Proposed) ......................................................... 39
Table 2.18: Proposed schedule for approval and implementation ....................................... 39
Table 2.19: Details of Proposed product wise raw material requirement, its storage and
mode of transportation ........................................................................................................ 41
Table 2.20: Storage details of Finished Goods .................................................................... 51
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xvii
Table 2.21: Details of Solvent recovery for proposed expansion & new Speciality chemicals
........................................................................................................................................... 55
Table 2.22: Preventive Maintenance Schedule ................................................................... 58
Table 2.23: Existing Flue Gas Stack Details ........................................................................ 59
Table 2.24: Proposed Flue Gas Stack Details ..................................................................... 60
Table 2.25: Existing Process Gas Emissions Details........................................................... 61
Table 2.26: Proposed Process Stacks for Expansion & New Speciality Chemicals ............. 65
Table 2.27: The Standard Specification of Water Scrubber ................................................. 66
Table 2.28: The Standard Specification of Alkali Scrubber .................................................. 66
Table 2.29: Sources of Noise with their Sound Pressure Levels ......................................... 67
Table 2.30: Existing and Proposed Water Consumption Break-Up...................................... 69
Table 2.31: Existing and Proposed Waste water generation Break-Up ............................... 70
Table 2.32: Details of Recycled streams of existing & proposed project .............................. 70
Table 2.33: Details of Effluent treatment plant unit .............................................................. 73
Table 2.34: Effluent Characteristic at Inlet & Outlet ............................................................. 75
Table 2.35: Details of ETP,RO& MEE ................................................................................. 76
Table 2.36: Details of Existing & Proposed Solid & Hazardous Waste and its Management 78
Table 2.37: Area Break-Up of Site....................................................................................... 82
Table 2.38: Details of Mitigation Measures at Design Stage................................................ 85
Table 2.39: Condensed Description of Aspects of the Project likely to Cause Environmental
Effects ................................................................................................................................. 86
Table 3.1: Frequency of Environmental Monitoring ............................................................. 89
Table 3.2: Method of Environmental Sampling and Analysis ............................................... 90
Table 3.3: Meteorological Condition of Study Area .............................................................. 92
Table 3.4: Ambient Air Quality Monitoring Locations in the Study Region ........................... 99
Table 3.5: Details of Analysis Method ................................................................................. 99
Table 3.6: Min, Max, 98th Percentile and Average Value of PM10 and PM2.5 ...................... 100
Table 3.7: Min, Max, 98th Percentile and Average Value of SO2 and NOx ........................ 100
Table 3.8: Min, Max, 98th Percentile and Average Value of CO & NH3 ............................. 101
Table 3.9: Min, Max, 98th Percentile and Average Value of Cl2 & HCl .............................. 101
Table 3.10:Min, Max, 98th Percentile and Average Value of H2S & Total HC .................... 101
Table 3.11: Min, Max, 98th Percentile and Average Value of VOC as BTX ....................... 101
Table 3.12: Noise Monitoring Locations in the Study Region............................................. 105
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xviii
Table 3.13: Noise Monitoring report during day time ......................................................... 105
Table 3.14: Noise Monitoring report during night time ....................................................... 105
Table 3.15: Land use Statistics ......................................................................................... 109
Table 3.16: Geological Succession ................................................................................... 110
Table 3.17: Traffic Study Report ....................................................................................... 113
Table 3.18: Existing Traffic Scenario with respect to LOS ................................................. 113
Table 3.19: LOS Criteria ................................................................................................... 113
Table 3.20: Details of Soil sampling location ..................................................................... 115
Table 3.21: Soil Sample Analysis Result ........................................................................... 115
Table 3.22: Details of Ground Water sampling locations ................................................... 119
Table 3.23: Ground water Analysis Results ....................................................................... 119
Table 3.24: Details of Surface Water Sampling Locations ................................................. 124
Table 3.25: Surface water Analysis Results ...................................................................... 125
Table 3.26: Microbiological Analysis of surface Water ...................................................... 127
Table 3.27: Inland Surface Water Classification (CPCB Standards) .................................. 127
Table 3.28: Details of Marine and Sediment Sampling Locations ...................................... 130
Table 3.29: Marine Water Analysis Result ......................................................................... 130
Table 3.30: List of Trees in the Study Area ....................................................................... 132
Table 3.31: List of Shrubs in the Study Area ..................................................................... 133
Table 3.32: List of Herbs in the Study Area ....................................................................... 134
Table 3.33: List of Climbers in the Study Area................................................................... 134
Table 3.34: List of Mammals in the Study Area ................................................................. 135
Table 3.35: List of Domestic Animal in the Study Area ...................................................... 135
Table 3.36: List of Birds in the Study Area ........................................................................ 136
Table 3.37: List of Reptiles in the Study Area .................................................................... 137
Table 3.38: Details of Population in Study Area ................................................................ 139
Table 3.39: Details of Sex Ratio in Study Area .................................................................. 139
Table 3.40: Details of Literacy Rate in Study Area ............................................................ 140
Table 3.41: Details of Occupational Structure ................................................................... 142
Table 3.42: Educational Institutes in the Study Area ......................................................... 143
Table 3.43: Health Care Facilities in the Study Area ......................................................... 143
Table 3.44: Drinking Water Facilities in the Study Area ..................................................... 143
Table 3.45: Drainage Status in the Study Area.................................................................. 144
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xix
Table 3.46: Communication Facilities in the Study Area .................................................... 144
Table 3.47: Transportation Facilities in the Study Area ..................................................... 144
Table 3.48: Road Facilities in the Study Area .................................................................... 144
Table 3.49: Bank Facilities in the Study Area .................................................................... 144
Table 3.50: Power Facility in the Study Area ..................................................................... 144
Table 3.51: Summary of Baseline Monitoring Data ........................................................... 145
Table 4.1: Severity Criteria for Magnitude of Impacts ........................................................ 148
Table 4.2: Score ranges for Beneficial and Adverse Impacts ............................................ 149
Table 4.3: Criteria of Significance / Consequence ............................................................. 149
Table 4.4: Aspect-Impact Identification from Proposed Project ......................................... 150
Table 4.5: Impact Scoring and Mitigation Measures for Air Environment ........................... 153
Table 4.6: Incremental Traffic Study Report ...................................................................... 155
Table 4.7: Proposed Traffic Scenario with Respect to LOS ............................................... 155
Table 4.8: LOS Criteria ..................................................................................................... 155
Table 4.9: Traffic Management ......................................................................................... 156
Table 4.10: Detail of Stack & Emission ............................................................................. 158
Table 4.11: Detail of Vent & Emission ............................................................................... 158
Table 4.12: Summary of Point Source Modeling ............................................................... 161
Table 4.13: 24 hourly maximum incremental increase in GLC ........................................... 171
Table 4.14: Impact Scoring and Mitigation Measures for Noise Environment .................... 174
Table 4.15: Impact Scoring and Mitigation Measures for Water Environment .................... 176
Table 4.16: Impact Scoring and Mitigation Measures for Land Environment ..................... 179
Table 4.17: Impact Scoring and Mitigation Measures for Solid and Hazardous Waste
Management ..................................................................................................................... 180
Table 4.18: Impact Scoring and Mitigation Measures for Ecology & Biodiversity ............... 182
Table 4.19: Issues identified Village wise .......................................................................... 183
Table 5.1: Comparison for Alternative Site & Technology ................................................. 185
Table 6.1: Environmental Monitoring Program for Air Environment ................................... 188
Table 6.2: Environment Monitoring Program for Noise Environment ................................. 189
Table 6.3: Environmental Monitoring Program for Water Environment .............................. 190
Table 6.4: Environmental Monitoring Program for Land Environment ................................ 191
Table 6.5: Solid and Hazardous Waste Management........................................................ 192
Table 6.6: Traffic Monitoring Program ............................................................................... 193
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xx
Table 6.7: Summary of Environmental Monitoring Program .............................................. 194
Table 7.1: Flammable Criteria ........................................................................................... 199
Table 7.2: Flammable and Toxic Chemical Properties ...................................................... 200
Table 7.3: Physio-chemical Properties of some major Chemicals/Raw Materials .............. 201
Table 7.4: Risk Matrix for Qualitative Risk Assessment ..................................................... 203
Table 7.5: Risk Acceptability Criteria ................................................................................. 204
Table 7.6: Pre-Construction/Construction Phase ............................................................... 205
Table 7.7: Storage and Handling of Solid Chemicals......................................................... 205
Table 7.8: Storage and Handling of Corrosive/ Toxic Chemicals ....................................... 206
Table 7.9: Storage and Handling of Flammable Chemicals ............................................... 209
Table 7.10: Weather Condition selected for Consequence analysis .................................. 214
Table 7.11: Fatal radiation Exposure Level ....................................................................... 216
Table 7.12: Overpressure Damage Criteria ....................................................................... 216
Table 7.13: Input data ....................................................................................................... 217
Table 7.14: Failure Frequencies for Storage Tanks ........................................................... 218
Table 7.15: Acetone .......................................................................................................... 220
Table 7.16: Methanol ........................................................................................................ 227
Table 7.17: Toluene .......................................................................................................... 234
Table 7.18: Chlorine Gas tonner Toxic concentration Distance ......................................... 240
Table 7.19: Phosgene ....................................................................................................... 244
Table 7.20: Sodium Cyanide ............................................................................................. 245
Table 7.21: Summary of Maximum credible Effect ............................................................ 247
Table 7.22: Emergency Types .......................................................................................... 261
Table 7.23: Details of Detectors within premises ............................................................... 265
Table 7.24: Details of Emergency Contact Numbers ......................................................... 266
Table 7.25: Monitoring parameters and Frequency of monitoring ...................................... 267
Table 7.26: Budget for Occupational Health & Safety........................................................ 269
Table 10.1: Environmental Management Plan ................................................................... 275
Table 10.2 : Proposed Capital Cost & Recurring Cost for EMS ......................................... 278
Table 10.3: Areas identified for Green Belt for Development within the plant site .............. 279
Table 10.4: Details of Trees and Shrubs Species .............................................................. 280
Table 10.5: Budget Allotted for GBD in existing project ..................................................... 283
Table 10.6: Areas considered for roof-top rainwater harvesting ........................................ 285
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xxi
Table 10.7: Energy Conservation and Waste Minimization Measures ............................... 285
Table 10.8: UPL Khedut Pragati Program ......................................................................... 288
Table 10.9: Health & Sanitation ......................................................................................... 288
Table 10.10:Details of Placement after Training on Sheet Metal Works ............................ 289
Table 10.11: CSR activities carried out in and around Bharuch District ............................. 289
Table 10.12: Details of Environment & Nature Conservation (Vasudha Programme) under
ESC .................................................................................................................................. 290
Table 10.13: Education & Empowerment .......................................................................... 291
Table 10.14: Details of Employability & Entrepreneurship Programme under ESC: .......... 291
Table 10.15: Details of national and other area need programme under ESC ................... 292
Table 10.16: Budget Break-up for CER Activities of 5 years.............................................. 294
Table 11.1: Summary of Maximum Ground Level Concentration ...................................... 304
Table 11.2: Summary of Post Project Environmental Monitoring Program ........................ 305
Table 12.1: EIA Team Member ......................................................................................... 310
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xxii
LIST OF FIGURES
Figure 2.1: Solvent Recovery Plan ...................................................................................... 56
Figure 2.2 : EC Approved Water Balance Diagram (Existing) .............................................. 71
Figure 2.3: Proposed Water Balance Diagram for Expansions and New Speciality Chemicals
........................................................................................................................................... 72
Figure 2.4: Schematic Diagram of Proposed ETP ............................................................... 74
Figure 2.5: Schematic Diagram of Proposed STP ............................................................... 76
Figure 3.1: Graphical Presentation for the month wise Temperature Variation .................... 93
Figure 3.2:Graphical Presentation for the month wise Humidity Variation ........................... 94
Figure 3.3: Wind Rose Diagram .......................................................................................... 96
Figure 3.4: Methodology Used for Land use Classification ................................................ 107
Figure 3.5: Land use Statistics .......................................................................................... 109
Figure 3.6: Geological features of Gujarat ......................................................................... 111
Figure 3.7: Hydro-Geological features of Bharuch ............................................................. 112
Figure 3.8: Graph of Literacy Rate .................................................................................... 141
Figure 3.9: Graphical representation of occupational structure of Study Area ................... 143
Figure 4.1: Methodology for AQM ..................................................................................... 156
Figure 4.2: Isopleth for PM10 emitted from Flue Gas Stacks & Process Vents ................... 162
Figure 4.3: Isopleth for SO2 emitted from Flue gas stacks & Process vents ...................... 163
Figure 4.4: Isopleth for NOx Emitted from Process vent & Flue gas stack ......................... 164
Figure 4.5:Isopleth for NH3 Emitted from Process Gas Vents ............................................ 165
Figure 4.6: Isopleth for Cl2 emitted from Process Gas Vents ............................................ 166
Figure 4.7: Isopleth for H2S emitted from Process Gas Vents ........................................... 167
Figure 4.8: Isopleth for HC emitted from Process Gas Vents ............................................ 168
Figure 4.9: Isopleth for HCl emitted from Process Gas Vents ............................................ 169
Figure 4.10: Isopleth for HCN emitted from Process Gas Vents ........................................ 170
Figure 7.1: Consequence analysis; Event Tree Analysis for release of flammable liquid ... 213
Figure 7.2: Action Plan for Handling Emergency ............................................................... 259
Figure 7.3: Emergency Organization Chart ....................................................................... 264
Figure 7.4: On-site Emergency plan will be aligned with District disaster management plan
(Off-Site) ........................................................................................................................... 265
Figure 10.1: Organogram of Environment Management Cell ............................................. 297
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xxiii
LIST OF MAPS
Map 2.1: General and Specific Location Map ...................................................................... 21
Map 2.2: Google Earth Image ............................................................................................. 21
Map 2.3: Study Area Map of 10 Km Radius of Site ............................................................. 24
Map 2.4: Site Layout Plan ................................................................................................... 84
Map 3.1: Study Area Map ................................................................................................... 88
Map 3.2:Map showing the Monitoring Locations of Ambient Air .......................................... 98
Map 3.3: Map showing the Noise Monitoring Locations ..................................................... 104
Map 3.4: Land Use Map .................................................................................................... 108
Map 3.5: Map showing the Soil sampling locations ........................................................... 114
Map 3.6: Map showing the Ground water sampling locations ............................................ 118
Map 3.7: Map showing the Surface water sampling locations ........................................... 123
Map 3.8: Map showing the Marine water and sediment sampling locations ....................... 129
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Table of Contents xxiv
LIST OF PHOTOGRAPHS
Photograph 2.1: Photographs of Site .................................................................................. 25
Photograph 3.1: Sampling/Monitoring Activity ..................................................................... 91
Photograph 10.1: Existing Greenbelt development within the Premises ............................ 282
Photograph 10.2: Photographs of Existing CER/CSR Activities carried out by UPL Limited
......................................................................................................................................... 292
LIST OF ANNEXURES
Annexure 1: Copy of ToR Letter ........................................................................................ 313
Annexure 2: Copy of MoM of 540th Meeting of SEAC held on 14.08.2019 ........................ 326
Annexure 3: Copy of Existing EC dated 01.03.2019 .......................................................... 354
Annexure 4: Certified Compliance Report ......................................................................... 362
Annexure 5: Copy of CTE & CC&A ................................................................................... 365
Annexure 6: Copy of CC&A for existing packaging unit ..................................................... 384
Annexure 7: Land Possession Document .......................................................................... 389
Annexure 8: Checklist for implementation of LDAR Program to reduce emissions of VOCs
......................................................................................................................................... 390
Annexure 9: Water Supply Letter from GIDC .................................................................... 391
Annexure 10: Waste water disposal permission Letter from GIDC .................................... 392
Annexure 11: Membership for Co-Processing, TSDF & CHWIF ........................................ 393
Annexure 12: PCPIR EC ................................................................................................... 395
Annexure 13: Raw data of AAQ Measurements ................................................................ 407
Annexure 14: Storm Water Drainage Plan ........................................................................ 409
Annexure 15: Air dispersion modeling results & Isopleths ................................................. 410
Annexure 16: NABET & NABL Certificate ......................................................................... 423
Annexure 17: Environmental Policy ................................................................................... 426
Annexure 18: MSDS Sheets ............................................................................................. 427
Annexure 19: Existing Onsite Emergency Plan ................................................................. 428
Annexure 20: Process Description .................................................................................... 429
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Abbreviations xxv
ABBREVIATIONS
AMS- American Meteorological Society
AP/AQ- Air Pollution/ Air Quality
APCM- Air Pollution Control Measures
APHA- American Public Health Association
ARC/GIS- Arc geographical Information System
AWH- Air Water & Hazard Waste
CC&A- Consolidated Consent & Authorization
CPCB-Central Pollution Control Board
DMP- Disaster Management Plan
ECC - Emergency Control Center
EC-Environmental Clearance
EHS - Environment, Health and Safety
EIA- Environmental Impact Assessment
EMP - Environmental Management Plan
EMS- Environment Management System
EPA- Environment Protection Act
ERDAS- Earth Resource Development Assessment System
ERPG - Emergency Response Planning Guidelines
ETP- Effluent Treatment Plant
GIDC - Gujarat Industrial Development Corporation
GW- Ground Water
HIRA- Hazard Identification and Risk Assessment
HSE- Health Safety and Environment
HW- Hazardous Waste
IS- Indian Standards
ISO-International Organization for Standardization
KLD- Kilo Liter Per Day
LEL - Lower Flammability Limits
LOS- Level of Serviceability
LU/LC- Land Use/ Land Cover
MoEFCC - Ministry of Environment, Forests and Climate Change
MSDS - Material Safety Data Sheet
MSIHC - Manufacture, Storage, & Import of Hazardous Chemical Rules
NRSC- National Remote Sensing Centre
OHS- Occupational Health Center
OSHA - Occupational Safety and Health Administration
PCU-Passenger Car Unit
PEL - Permissible Exposure Limits
PPE – Personal protective equipment
QC-Quality Control
QMS- Quality Management System
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Abbreviations xxvi
R&D- Research and Development
RD- Resource Depletion
SCBA- Self-Contained Breathing Apparatus
SMC - Site Main Controller
SOP- Standard Operating Procedure
TL- Threshold Limit
TLV - Threshold Limit Value
ToR - Terms of References
TPA – Ton Per Annum
TPH- Tones per Hour
TPM- Tones Per Month
TSDF - Treatment, Storage and Disposal facility
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxvii
SUMMARYOF PROPOSED PROJECT AS PER APPENDIX III A of EIA
NOTIFICATION 2006 AND ITS AMMENDMENT
1. Project Description
Introduction
UPL Limited proposes expansion and addition of new products at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch,
Gujarat.
Background
UPL Limited proposes expansion and addition of new products at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch. The
project received Environmental Clearance from Ministry of Environment, Forest and Climate
Change vide letter no: F.No. IA-J-11011/306/2016-IA-II(I) dated 1st March 2019.
Consent to Establish is granted by Gujarat Pollution Control Board vide CTE No.
PCB/BRCH-B/CTE-399/ID-53667 dated 11.01.2019 and the project is presently under
construction phase.
The project has received Consolidated Consent and Authorization for repackaging of
Aminoacetonitrile Sulfate (AANS) with Consent order No. AWH-100737 dated 15.04.2019.
Due to change in market scenario, UPL limited wants to go for addition of new products and
expansion in capacity of EC Granted Speciality Chemicals products under Intermediate and
Specialty chemicals category only.
Project Site Location
The proposed expansion will be undertaken within the existing site at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch
,Gujarat.
Project Cost and Project Schedule
Cost of the proposed project is Rs. 1491.85 Cr. Out of this Rs. 20.450 Cr. will be used for
cost of Environmental Management System.
The CSR/CER cost will be Rs. 3.72 Cr. (0.25% additional capital investment of total project
cost). Project will be commissioned within 12 - 18 months after receipt of EC.
Project Requirements Land
Existing plot area is 755495.16 m2 and additional area required for proposed expansion is
263005.16 m2. Total area after expansion will be 755495.16 m2. The area required for
proposed expansion is available within existing plot area. No additional land will be required
for proposed project.
Power
The additional power requirement for proposed expansion will be 31 MWPH which will be
sourced from Dakshin Gujarat Vij Company Limited (DGVCL). Two additional D.G.Set of
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxviii
1200 KVA are proposed for proposed expansion. D.G. Sets will be used as backup power
source in emergency only.
Raw Material
Raw material required for the proposed expansion will be sourced from local market and will
be transported through trucks.
Boiler
7 x 40 T Boilers & 7 x 10 T Boiler will be provided with Natural Gas/FO as fuel based on
availability of these fuels.
Fuel
Natural Gas for Thermic Fluid heater. Natural Gas or Furnace Oil will be used as fuel for
boiler. HSD will be used for D.G sets. Natural gas will be supplied by GAIL and HSD will be
procured from local market.
.Water
The total water demand for existing approved & proposed expansion will be 25377 KLD.
(Fresh water: 12996 KLD + Recycle water 12381 KLD). Fresh water will be sourced from
GIDC.
Manpower
1500 people will be hired for proposed project. There will be indirect employment of drivers
and cleaners in transportation field.
2. Description of the Environment
Baseline environmental data
Baseline study was conducted during period of 1st Oct 2019 to 31st Dec 2019.
Ambient Air Quality
During the study PM2.5 was observed in the range of 33.1 – 47.4 µg/m3. Maximum
concentration of PM2.5 was found at Project site and minimum at Narnavi village.
PM10 was observed in the range of 63.2 – 88.1 µg/m3. Maximum concentration of
PM10 was found at Project site and minimum at Narnavi village.
SO2 concentration was observed in the range of 9.1 – 16.4 µg/m3, which is well within
the standard limit.
NOx concentration in was observed in the range of 14.5- 21.4 µg/m3, which is well
within the standard limit.
Monitoring and analysis was also carried out for CO, NH3, Cl2, HCl, H2S, Total HC
and VOC. Results for the CO, NH3, Cl2, H2S, HCl, Total HC and VOC were found well
within the norms.
All the results of ambient air quality parameters have been found within the limit as per
NAAQS. Based on comparison study of results for tested parameters with NAAQS, it is
interpreted that ambient air quality of studied locations is satisfactory. This interpretation
relates to the results found for locations and study period.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxix
Noise Quality
Average noise level was recorded 62.4 to 66.5 dB (A) at Project Site during day time
and it is 57.8 to 59.2 dB (A) during night time.
Average noise level was recorded 49.6 to 51.0 dB (A) at residential area during day
time and it is 41.8 to 42.4 dB (A) during night time.
Noise level monitoring was carried out 1 meter away from State HIghway-6 and
average noise level was recorded 80.5 dB (A) during day time and 76.1 dB (A)
during night time as per factory act 1948 noise level exposure limit for 8 hrs.is 90 dB
(A).
Based on noise level data obtained during the survey for residential area and commercial
area, it is interpreted that noise levels are within the standard norms prescribed by MoEFCC.
Looking towards the increase in noise generating sources it is suggested that there is need
to apply noise reducing devices at noise generating sources and generate public awareness.
Soil Quality
The soils are categorized as clay to clay loam based on different soil separates
(sand, silt and clay).
They have medium water holding capacity (42.8 to 49.4 %) and porosity varied from
42.5 – 46.8 %.
The pH of the soil samples narrowly ranged from 7.38 to 7.62 during the study
period.
The soil EC varied from 1.24 to 1.53 dS/m and ESP ranged from 10.6 to 11.3. These
parameters indicate that soils are neutral to alkaline in reaction, saline (EC > 0.8
dS/m) and non-sodic, as pH is <8.5 and ESP is < 15.
Among exchangeable basic cations, predominance of Calcium (17.2 to 23.6 meq/100
g soil) was seen followed by magnesium (8.6 to 11.4 meq/100 g), Na (3.4 to 4.5
meq/100 g soil) and K (1.0 to 1.8 meq/100 g soil).
Organic carbon (0.72 to 0.85 %) indicates that soils are medium in organic carbon
status. This shows that soils are medium in nitrogen status.
The results relating to total Fe, Cu, Cr, B and Zn do not show alarming
concentrations in different soil samples.
Based on soil analysis data it is concluded that soil at the studied locations are neutral to
alkaline in reaction. The soils are medium in nitrogen, low in phosphorus and medium in
potassium status. The levels of total Fe, Cu, Cr, B and Zn are within the limits. However, for
successful greenbelt development liberal quantity of organic manure and recommended
doses of N and double the recommended dose of P fertilizers should be applied.
Ground water
pH was observed in the range of 7.14 – 7.54, which meets with drinking water desirable
norms.
Turbidity was found in the range of 1.2 – 2.8 NTU.
Total Dissolved Solid (TDS) were recorded in the range of 586 - 1936 mg/L with
minimum at Nadarkha village and maximum at Rahiyad village.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxx
Conductivity varies from 906 to 3012 µmho/cm. The ratio of TDS to conductivity was
observed in the range of 0.6 to 0.65 which is within the desired range.
Total Hardness was in the range of 324 - 712 mg/L with minimum at Padariya village and
maximum at Rahiyad village.
Total Alkalinity was found in the range of 244 - 708 mg/L with minimum at Padariya
village and maximum at Narnavi village.
Chloride was found in the range of 172 to 552 mg/L and Sulphate varies from 38 to 268
mg/L.
Iron was found in the range of 0.10-0.28 mg/L with minimum at Nadarkha village and
maximum at Rahiyad and Narnavi village.
As microbiological parameters MPN analysis was also carried out and it was found
absent.
Based on comparison study of test results with drinking water norms it is interpreted that
water quality for the sample collected from the locations Kadodara, Sambheti, Nadarkha and
Padariya meet with the drinking water permissible limit, these water sources can be used in
washing, bathing, irrigation and they can also be used in drinking purpose in absence of
alternate source. Water qualities of other locations like Narnavi, Dahej and Rahiyad village
do not meet with the drinking water norms. Results of Total Hardness and Total Alkalinity is
more than prescribed limit, this is due to ingress of salinity. This interpretation relate to the
sample collected from particular location only.
Surface water
The following description is based on the analysis of the samples:
During the analysis pH of the sample was found in the range of 7.15 to 7.58.
TDS analysis was also carried out for surface water sample and it was found in the
range of 292-598 mg/L.
TSS was found in the range of 8-14 mg/L.
Total Hardness was found in the range of 132-246 mg/L.
DO is one of the important parameter to indicate towards the contamination of
organic matter. DO level decrease as soon as organic contamination increases.
During analysis DO was found in the range of 5.1-5.5 mg/L.
COD and BOD analysis was also carried out during the study period and results was found
in the range of 12-20 mg/L and 4-6 mg/L respectively.
Total Nitrogen was found in the range of 1.2-2.1 mg/L.
Iron content was found 0.08-0.28 mg/L and other heavy metals were found well
within the limit.
MPN test was also carried out for the surface water sample and it was found positive.
E-coli and Sstreptococci test was found negative in all samples.
Based on test result data comparison study with CPCB standard, it is interpreted that
surface water quality meet with the criteria C, D and E, it means these water sources can be
used for propagation of wild life, fisheries and Irrigation, industrial, cooling, controlled waste
disposal. This interpretation relate to the water sample collected during the survey from
particular locations only.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxxi
Marine Water
Temperature is an important parameter, which affects the living organisms. The
temperature of the water was less than ambient air temperature.
The pH was observed 8.12. pH range is maintained due to buffering action of
CO2,CO3-2 and HCO3
-2.
Salinity was observed 34.4 ppt.
DO is an essential parameter which affects the biotic component of the water. Fish
and other aquatic life take oxygen through the gill. DO levels affect the aerobic
bacterial population as well as chlorophyllous Phytoplankton. During study period
maximum DO level was recorded 5.8 mg/L.
BOD is also an important parameter to define the environmental scenario of marine
ecosystem as it affects the DO level. BOD was found <4 mg/L.
Iron was recorded 0.66 mg/L. Other Heavy metals were found well within the range.
During the analysis it was found that temperature of the marine water was below the ambient
temperature it indicates that there is no exothermic reactions take place. pH of the water
sample for different locations was found near 8.0. Some marine organism can survive at the
DO level of >4 mg/L and certain microorganism can survive up to DO level 0.2mg/L. During
testing it was found that DO of the marine sample was >4 mg/L. Based on the test results it
is interpreted that the water quality of marine is good and suitable for the survival of fishes
and other aquatic life. High DO and less BOD indicate that contamination of organic matter
in marine water body is not more than its self-purification capacity and probability of organic
matter in the sample is almost negligible.
Ecology and Biodiversity
The most commonly spotted bird species of this area are; Cattle Egret, Intermediate Egret,
Black-winged Stilt, Red-wattled Lapwing, Rock Pigeon, Eurasian Collared-Dove, Spotted
Dove, Chestnut-headed Bee-eater, Bank Myna and Common Myna. All the birds are
included in Schedule IV. Among the reptiles Oriental garden lizard was common. Among
mammals Black rat was common. Forest department of Bharuch has declared as reserved
forest near Dahej village, which false within 10 km radius from the project site. Mainly the
declared area as reserved forest is having Prosopis juliflora, Caltrops and Acacia species in
degraded condition. This area does not support to Schedule I mammalian species of wild
life. There is a good population of schedule-II species like Herpestes edwardsi (Indian grey
mongoose) and Naja naja (Indian cobra) as food chain is interlinked in the biological
environment. Dominant flora of the study region is Prosopis juliflora and acacia species.
Rosa (Rose), Gossypium (Cotton) and Cajanus cajan (Tur) are majorly cultivated by the
farmers of the majority villages. Natural vegetation of study area is in degraded condition
and wild mammal‘s density is also very low. No endangered or threatened species were
observed during the survey.
Socio economic During the primary survey it was observed that almost pukka road facility is available in all
villages within 10 km radius. Literacy rate of the study region is from 61.30% to 100.00%. On
the basis of survey for literacy rate data it is interpreted that there is need to promote
educate more and more people. Almost all the villages have more than 50 % people as non-
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxxii
workers. It indicates that the problem of unemployment can be solved by providing proper
training and education. There is also need to establish more industries so that maximum
number of employment can be generated. Basic amenities like Education facilities Health
care facilities, water supply, electric power supply, mode of transportation etc. are available
in all villages.
3. Anticipated Environmental impacts and mitigation measures
Air Environment
Project activities having impact on air quality includes manufacturing process and vehicular
movements. Major pollutants will be Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic traces,
HCN. Summary of Maximum Ground Level concentration at Project Site is provided in Table
1
Table 1: Summary of Maximum Ground Level Concentration
S.No. Pollutant Maximum Baseline
Concentration (µg/m3)
Incremental GLC (µg/m3)
Total Predictive
GLC (µg/m3) Distance in Km/Direction
1 PM10 88.1 3.39 91.5 0.25 km/N (Project Site)
2 SO2 16.4 4.14 20.5 0.25 km/N (Project Site)
3 NOX 21.4 5.43 26.83 0.25 km/N (Project Site)
4 NH3 3.3 2.81 6.11 0.25 km/N (Project Site)
5 Cl2 BDL 0.086 0.086 0.25 km/N (Project Site)
6 H2S BDL 0.713 0.713 0.25 km/N (Project Site)
7 HC 152 1.153 153.2 0.25 km/N (Project Site)
8 HCl BDL 2.898 2.898 0.25 km/N (Project Site)
9 HCN BDL 0.195 0.195 0.25 km/N (Project Site)
Mitigation measures include provision of Water Scrubber, & Adequate Stack Height to Flue
gas stacks and Fume Gas Incinerator, NH3/Alkali/water scrubber and Bag Filters.
Noise Environment
Major sources of noise pollution will be activities related to operation of boiler and general
utilities within the plant.
Mitigation measures include providing acoustic enclosures at plant site and providing
Personal Protective Equipment like Ear Plugs & ear muffs to workers and safety sign boards.
Water Environment
Effluent will be generated in from Process, Utilities, Washing, and domestic uses.
The Waste Water generation after proposed expansions will be 10044.2 KLD, out of which
recycled water will be 7152.28 KLD and effluent going to GIDC drain will be 2891.92 KLD.
The waste water will be treated in ETP, MEE and RO.
Land Environment
No major impact has been identified on land environment due to the proposed expansion
project. There will be paved areas & internal roads. The proposed site is located in Notified
Industrial Estate of GIDC Dahej (Within PCPIR region).
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxxiii
Solid Waste Management
Hazardous and Solid Waste generated during the operational phase will be disposed as per
prevailing legislation. TSDF and Common Incinerator Facility membership is procured. MoU
is signed with cement manufacturers for co-processing waste.
4. Environmental Monitoring Programme
Summary of Environmental Monitoring Program:
Table 2: Summary of Post Project Environmental Monitoring Program
S.
No. Particulars
Monitoring
Frequency
Duration of Sampling
Important Monitoring
Parameters
1.
Air Pollution
i. Selected 4 locations in and around plant site
specified by GPCB Twice in a
Week except monsoon
One Sample for 24 Hours As per GPCB /
CPCB Guidelines
ii. Stack gas analysis in all stacks.
Online (Based on
Applicability of CPCB
Guidelines) & Manual Monitoring
Once in Month/Quarter
for Manual As per GPCB /
CPCB
ii. Fugitive dust sampling (if any) at work zone as per CPCB or
GPCB. Once in quarter On Spot PM/VOCs/HCl/Cl2/
NH3
2.
Water and Wastewater Quality
A. Water quality in the study area
i. Surface Water Half yearly Grab Parameters specified under
IS:10500 ii. Treated Waste Water Analysis Continuous Composite
Parameters as per Consent
ii. Ground water analysis Quarterly Once Parameters as per Consent
3
Industrial Noise Levels
1. Major noise generating sources at plant site Quarterly Grab
Noise level in dB(A)
2. Along Road for transportation noise Quarterly - Noise level in
dB(A) 4.
Ambient Noise Levels
1 4 Locations Half Yearly - Noise level in dB(A)
5.
Soil Characteristics
Soil Selected 4 locations in core zone Half Yearly One Grab
sample As per
GPCB/Consent order
6. Work zone At plant site Half Yearly Once in work place Dust, Noise,
Illumination etc.
7.
Corporate Environme
ntal Responsib
In core and buffer zone in nearby villages Half yearly Once Activities done by
UPL Ltd
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxxiv
S.
No. Particulars
Monitoring
Frequency
Duration of Sampling
Important Monitoring
Parameters
ility
8.
Occupational Health Surveillan
ce At plant premises Half yearly
Once Employee Health
Register
9. Greenbelt Developm
ent Number of plantation (Units), Number of
Survived Trees/ Acre
Yearly Once Tress, survival rate, landscape
area. 10.
Environmental Audit As per Directions of
Honorary High Court, Yearly Once As per GPCB Guidelines
11.
Consents and
Authorization
Consent to Operate under applicable acts
Renewing 90 days before
expiry of validity
Once Before 90 days of expiry
12.
Compliance of EC
Conditions Submission of 6 monthly
Compliance Reports June and December Twice in a
year As per EC conditions
5. Additional Studies
Risk Hazard
Risk Assessment studies; Hazard identification and Risk Assessment (HIRA) and
Quantitative Risk Assessment (QRA) was carried out for the various activities and
Hazardous Chemical Storage at the facility. Activities are storage & Handling of Toxic,
Flammable, Corrosive and Solid Chemicals. The safety mitigation for proposed project
provided to reduce the initial Risks to Residual Risks. Consequence Modelling for
Hazardous chemicals like Ammonia, Phosgene, Sodium Cyanide, Toluene, Chlorine
Methanol, Acetone, etc. carried out using 2-D Risk Modelling to estimate the risk level of
radiation / explosion and toxicity radii to the facility and surroundings.
Considered and Adequate numbers of flammable and toxic gas detectors near to Flammable
Storage and surrounding area so that early detection and annunciation of flammable and
toxic concentration shall be initiated. For controlling the maximum accident scenario safety
mitigation and exiting Active & Passive protections are provided.
Emergency preparedness plan in case of natural or in plant emergencies:
Existing On-site and Off-site Emergency plan prepared as per MSIHC Rules and state
Factory Act will be updated based on Consequences analysis from 2D modelling. Likely On
site emergency is from storage of Flammable Chemicals. Mitigation measures considered
are
1. Installation of Adequate numbers of flammable and toxic gas detectors near to
Hazardous Chemicals Storage Location and surrounding area
2. Having DCS control system
3. Providing Fire hydrant Network line around the facility.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxxv
4. Increasing Active fire protections with CO2, DCP Fire Extinguishers, Foam Trolley and
passive protections for early detection by smoke and heat detectors, interlocked with
Water Sprinkler system.
5. Providing more nos of Emergency sirens at vulnerable locations.
6. Mutual agreement with adjoining industries and DMC, Dahej.
7. Carrying out construction of plant buildings will follow the criteria as per seismic zone- 3
During Natural disaster, District Disaster management plan shall be followed.
Occupational Health Measures
UPL Dahej will have developed Occupational Health Centre including provision of First Aid
kit, Periodic Medical Checkup of all contract and Employees. A qualified Doctor with Male
Nurse will remain available at facility. Antidotes will also be made available for Hazardous
Chemicals. All workers and employees will be provided safety gadgets like Helmet, Hand
gloves, Apron, Full fire protection suit, Safety Shoes, Gas Mask, Face-shield and Safety
goggles Company has well equipped emergency vehicle. Existing Action plan for OHS
standard implementation incorporated. Safety trainings (on Safe Material Handling, First Aid,
& all Safety Aspects) as per Gujarat Factory Rules will be strengthened more.
6. Project Benefits
Employment Generation:
The proposed expansion project will generate employment during the construction and
operation phase. Local skilled and semi-skilled workers will be hired during construction
phase as well as operation phase. During the operation phase, technical staff, general staff
for administrative work and other ancillary services i.e. O&M contractor and maintenance
services will be required on a temporary basis. In addition to 2000 Nos of Employees (for EC
Approved product manufacturing plants), the additional 1500 manpower will be required for
proposed project.
Employment Avenues:
The company will generate direct and indirect employment. Preference will be given
to the local people for employment based on their educational qualifications and
experience.
Apprentice Training is will be provided regularly.
7. Environment Management Plan
Effluent Management
The waste water generated from Process, Boiler, Cooling Tower, Washing & Domestic
Activities will be segregated based on characteristics and treatment will be given as per
characteristics. The High TDS, Low COD streams will be sent to MEE followed by RO for
utmost possible recycling. The low COD/low TDS waste water will be sent to ETP for
primary, secondary & tertiary treatment. After treatment & removal of pollutants, the treated
water will be tested for compliance to stipulated norms by GPCB & then on confirmation of
compliance the treated waste water will be discharged to GIDC drain for deep sea disposal.
.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Summary of EIA xxxvi
Domestic sewage generated will be treated in STP and reused for utility / gardening.
Air Emission Management
Water/Caustic/Acid Scrubber, Fume Gas Incinerator, Bag filter will be provided to process
gas stack. Solvent will be recovered to the tune of more than 95% with proper solvent
management plan.
Waters scrubber will be provided to boiler stack. Adequate stack height will be provided to
DG set and DG set will be used only during emergencies.
Solid and Hazardous Waste Management
ETP Sludge, Organic Residue, Aqueous waste, Discarded containers / bags / liners, Used
oil, Inorganic Salts from Evaporation / Process, Spent filter Material, Spent solvent,
Contaminated cotton waste, Insulation Waste, Non-recyclable Plastic waste, Used PPE,
Spent Catalyst, HCl sol. (28-32%), Fe (OH)2 Sludge & Iron Residue will be generated from
proposed project and this waste will be disposed as per Hazardous and Other Wastes
(Management and Transboundary Movement) Rules, 2016.
Greenbelt Development
For Green Belt Development, the company has already allotted 263005 m2 of the total land,
i.e. 34.81% in its existing project. Total 39500 no. of trees to be planted for green belt @
tree density of 1500 trees per hectare.
EMC
Environment & safety measures will be reviewed in EMC meeting on regular basis
CER/CSR Budget
A total amount of Rs. 3,72 Crore (0.25% of total project cost) is earmarked for the issues
identified during social need assessment and restricted to project area for 5 years. Major
activities include Education and Agriculture Development, Skill Development, Tree
plantation, Gram Pragati Yojna, Toilets Blocks in school.
Post Project Monitoring Plan
Post project monitoring plan includes monitoring of PM2.5, PM10, SO2, NOx, CO, NH3, Cl2,
HCl, H2S, Total HC and VOC, conducting third party environmental monitoring on quarterly
basis and submission of half yearly Environmental Clearance Condition compliance Report.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 1
1 INTRODUCTION
1.1 PURPOSE OF THE REPORT
M/s. UPL Limited intends for the Capacity Expansion and addition of New Synthetic Organic
Chemicals and Chemical Intermediates within existing project site of UPL Limited, Dahej
Site.
Purpose of the report is to identify environmental aspects, impacts and mitigation measures
arising out from proposed Expansions is to prepare EIA/EMP report as per Terms of
Reference (ToR) issued by Ministry of Environment, Forest and Climate Change, New Delhi.
ToR is attached as Annexure 1.
The project as initially submitted at SEAC Gujarat vide file No. SIA/GJ/85607/2019 &
Proposal No. SIA/GJ/IND2/38411/2019 under Category ―B‖ of Project Activity 5(f) of EIA
Notification 2006 & Amendments. However looking to expansions in existing EC granted
products, SEAC Gujarat has referred (Condition No. 10.1 (ii), of EC F.NO. IA-J-
11011/306/2016-IA-II (I) dated 01/03/2019 which is read as ―No further expansion or
modification in the plant shall be carried out without prior approval of the Ministry of
Environment, Forest and Climate Change) and recommended for application at MoEFCC for
proposed expansions in Speciality chemicals (Category 5(f) products). Hence the project is
being submitted at MoEFCC. Copy of the 540th SEAC MoM is attached as Annexure 2
This Report is prepared based on ‗Generic Structure of EIA‘ given in Appendix III and IIIA of
mentioned EIA Notification.
1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT
1.2.1 Identification of Project
UPL Limited proposes expansion and addition of new products at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch.
Due to change in market scenario, UPL limited wants to go for addition of new products and
expansion in capacity of EC Granted Speciality Chemicals products under Intermediate and
Specialty chemicals category only.
A detail of existing & proposed expansion is provided below in Table 1.1
Table 1.1: Brief of EC Granted Products and Capacities (Existing)
Product & its Category as per EIA,2006 Notification
Permission available in EC/ CTE Capacity (MTPA) EC is granted by MoEFCC vide Letter No. F.No. IA-J-
11011/306/2016-IA-II(I) dated 1st March 2019
Pesticides (Technical) Products 104000
Pesticide Specific Intermediates 67000
Formulations 40000
Captive Power Plant 55 MWPH
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 2
Product & its Category as per EIA,2006 Notification
Permission available in EC/ CTE Capacity (MTPA) EC is granted by MoEFCC vide Letter No. F.No. IA-J-
11011/306/2016-IA-II(I) dated 1st March 2019
Intermediate and Speciality Chemicals 80500
Table 1- 1: Brief of Proposed expansion & addition of new Intermediate and Speciality Chemicals
Product & its Category as per EIA,2006 Notification
Proposed Capacity (MTPA)
Remarks
Intermediate and Speciality Chemicals – EC Required 5(f)
20,000 Expansion in EC approved Intermediate and
Speciality Chemicals Capacity within EC Approved pant (For Product NaCN)
25,000
Expansion in EC approved Intermediate and Speciality Chemicals Capacity with new plant
(For Product Cyanuric Chloride)
2,86,800 Addition of New Intermediate and Speciality
Chemicals
3,31,800 --
1.2.2 Project Proponent
"UPL Limited " is a global generic crop protection, chemicals and seeds company,
headquartered in India (Mumbai).
UPL Group is leading Company manufacturing wide variety of Chemicals including
Agrochemicals. Caustic Soda, Chlorine, Specialty Chemicals, etc. UPL was established in
1969 by Mr. Rajjubhai D. Shroff, Chairman and Managing Director. The Company has
received various awards like Environment (CII), Safety (Golden Peacock) and Frost and
Sullivan for Sustainability. UPL is the first amongst three chemical industries in India, opted
to go for Responsible Care logo by Indian Chemical Council (formerly known as Indian
Chemical Manufacturers Association).
UPL Limited have a strong manufacturing base supported by engineers and scientists. The
R&D team of the Company develops various products as per the market requirements. The
company has central R&D and separate R&D at units. Most of the products manufactured
are agrochemicals used by the farmers. Products include herbicides, fungicides,
insecticides, biological and botanicals, seed treatment and adjuvants
AlI the manufacturing facilities in lndia have implemented Environmental Management
System Standard i.e. ISO 14001, Occupational Health & Safety Assessment Standards i.e.
ISO 45001 and Quality management System Standards i.e. ISO 9001. UPL Limited
voluntarily adopted the Codes of Practice of Responsible Care (RC) initiatives. UPL Limited
is one among the few industries permitted to use Responsible Care logo by Indian Chemical
Council (ICC).
UPL Limited have 48 manufacturing sites and customer base in 130+ countries all over the
world. The company has marketing network in 48 countries including America, Europe,
Africa, besides in all states of India.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 3
UPL Limited ranks 5th amongst crop protection product manufacturing company worldwide.
Its revenue is around USD 3.14 Billion. 10,800 employees of 40+ nationalities work with the
company. UPL has 13000+ product registrations and 1023 patents.
Table 1.2: Awards & Achievements
Year Award
2013 ―Awarded by CSR Excellence & Leadership Award 2013 in Global Summit Competition for Best Waste Water Mgmt. Practices‖.
2014-15
One of the manufacturing units (Unit 2 in Ankleshwar, Gujarat) received various awards including ―Efficiency for water usage in chemicals‖ by FICCI (Federation of Indian Chambers of commerce and Industry), ―Best steam managed system‖ by SteamTech 2015, and Green Manufacturing Excellence Award by Frost and Sullivan. (Challengers: Large business)
One of the manufacturing units (Unit 1 in Ankleshwar, Gujarat) received a certificate of appreciation from the National Safety Council.
2015-16
Received FICCI Chemicals & Petrochemicals Award 2015 for
efficiency in energy usage.
Received National Energy Conservation Award 2016 from BEE Ministry of Power.
Received silver medal India Green Manufacturing Challenge from International Research Institute for Manufacturing (IRIM), Chennai
Received Vietnam Association of Environmental Economics Award.
2017-18
UPL has received FTSE4Good logo certification
Adavanta Seeds DMCC was awarded ―Recognition Award- First place in Water Treatment & Management Category for Zeba Technology‖ by Gulf Sustainability
and CSR Award 2018
Awarded Excellence award for Best sustainable water management Company of the Year 2018.
2018-19
UPL awarded CSR Project of the year Award [ENVT] Large Impact by India CSR [CSR leadership summit] for UPL Social Forestry [Large Impact]
UPL awarded 1st Runner Up and Challengers Award at Frost & Sullivan - TERI Sustainability 4.0 Awards 2018 for Manufacturing and Environment Sector
UPL awarded ―Gold Award-Brands for Environment‖ for Top 10 Environment Friendly Factory in the country by Vietnam Association of Environmental Economics
UPL awarded ―Gold Award-Friendly Green Factory" for Top 20 Clean and Green Factory in country by Vietnam Association of Environmental Economics
UPL awarded ―Gold Award Sustainable development" for Top 20 Factory for sustainable development, innovation and systems in country by Vietnam Association of Environmental Economics
UPL awarded Golden Peacock Occupational Health & Safety Award – 2018
UPL was awarded Gold and Bronze-National Award for Manufacturing Competitiveness (NAMC) by International Research Institute for Manufacturing (IRIM)
UPL awarded Silver- Best Kaizen - Implementation of FTNIR for increasing productivity of MUP (Glufosinate Ammonium tech solution) by Quality Circle Forum of India
UPL awarded Gold-International Convention on Quality Control Circles by Singapore Productivity Centre
UPL awarded Gold Certificate of Merit at India Manufacturing Excellence Award (IMEA) by Frost & Sullivan‘
UPL awarded Best Tech Award Supporting Energy efficiency by Transformance Business Media
Rajnikant Shroff was honored with the Mexican Order of the Aztec Eagle
UPL has received FTSE4Good logo recertification
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 4
Details of Directors and Key Personnel is provided below in Table 1.3.
Table 1.3: Details of Directors and Key Personnel
S. No. Name with Designation Designation
1 Mr. Rajnikant D Shroff Chairman & Managing Director
2 Mrs. Sandra Shroff Vice Chairperson
3 Mr. Jai Shroff Global CEO of the Group
4 Mr. Vikram Shroff Director
5 Mr. Arun Ashar Director - Finance
6 Mr. Pradeep Goyal Independent Director
7 Dr. Reena Ramachandran Independent Director
8 Mr. Hardeep Singh Independent Director
9 Mr. Vasant Gandhi Independent Director
10 Ms. Usha Rao-Monari Independent Director
1.3 BRIEF DESCRIPTION OF THE PROJECT AND ITS
IMPORTANCE TO THE COUNTRY & REGION
1.3.1 Brief Description of the Project
Brief description of the project is given in Table 1.4
Table 1.4: Brief Description of the Project
S. No. Details Description
1 Nature
Proposed project involves the expansion in manufacturing capacity of Intermediates and Speciality Chemicals products along with addition of new intermediates and Speciality chemical products within existing
premises at Dahej, Gujarat
2 Product Expansion & Addition of new products of intermediates and Speciality
chemicals
3 Size / Plot Area The proposed expansion is of 331800 TPA & Plot Area: 755495.16
sq.m
5 Cost of the project
Existing – Rs. 2133.31 Cr.
Proposed – Rs. 1491.85 Cr.
Total: Rs. 3625.16 Cr.
1.3.2 Importance to the Country and the Region
India is one of the major hub of chemical manufacturing in Asia. Most of these chemicals are
of strategic importance. However all the key raw material are not readily available or
manufactured in India due to the complex nature of the product, chemistry and process.
Hence most of the manufacturer are dependent on import of the chemicals. This results in
higher dependency on imports and simultaneously reduces the cost advantages. This has
created a wide gap in demand and supply causing higher Forex outflows to purchase the
raw materials. Indian manufacturer are finding it difficult to compete in the international
market due to high raw material cost. Import of the key raw materials and chemicals affects
competing ability of Indian manufacturers. This has also resulted in increased forex outflow
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 5
in recent period. This scenario is unlikely to normalize in future. Indigenous production of
these complex raw material could help to minimize raw material cost and save forex outflow
giving dual advantage to Indian manufacturers to compete globally.
1.4 REGULATORY FRAMEWORK
1.4.1 Statutory Clearance as Other Permissions
As a part of Environmental Clearance Process, UPL Limited has submitted relevant
documents for propose project, namely Form-1, Prefeasibility Report and Proposed Terms of
Reference (TORs) at MoEFCC dated 09.10.2019 for carrying out Environmental Impact
assessment (EIA) studies vide File No J-11011/306/2016-IA-II(I), Standard ToR has been
received date 14th November, 2019 and attached as Annexure 1.
An application for ToR amendment was made dated 20.11.2019 for following:
1. Exemption of Public hearing as site is located in Notified Industrial Estate of PCPIR Dahej
2. Exemption of ZLD.
EDS was generated following the ToR amendment application dated 19.12.2019 stating that
PH is exempted and advice to submit Plan for Waste water management in EIA/EMP report.
A reply against the same was also submitted which was further agreed dated 25.12.2019 by
MoEFCC, copies and screenshots are attached in Annexure 1.
Existing Environmental Clearance:
The project received Environmental Clearance from Ministry of Environment, Forest and
Climate Change vide letter no: F.No. IA-J-11011/306/2016-IA-II(I) dated 1st March 2019.
Copy of Environmental Clearance is enclosed as Annexure 3. The existing project is under
construction stage, latest compliance report of existing EC has been submitted at RO,
MoEF&CC Bhopal for the period of April 2019 to September 2019 dated 23.11.2019. RO
MoEF&CC Bhopal has visited the site on 09.0.2020 and the certified compliance report is
obtained vide File No. 5-65/2019(ENV)/312 dated 27.05.2020. The certified copy & brief
summary of Certified Compliance report is enclosed as Annexure 4
Existing Consents:
Amendment to existing Consent to establish is granted by Gujarat Pollution Control Board
vide CTE No. GPCB/BRCH-B/CTE-399/ID-53667 dated 11.01.2019. Copy of amended
Consent to Establish is enclosed as Annexure 5.
The project has received Consolidated Consent and Authorization for repackaging of
Aminoacetonitrile Sulfate (AANS) with Consent order No. AWH-100737 dated 15.04.2019
and copy of the same is enclosed in Annexure 6.
Coastal Regulation Zone (CRZ):
The project does not fall in CRZ zone hence does not attract any CRZ clearance.
Wildlife Clearance:
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 6
The project does not attract any Wildlife clearance since No Wild life sanctuary /Eco
Sensitive Zone present in study area
The list of identified statutory applicable to the company is given in Table 1.5.
Table 1.5: Identified Applicable Statutory
S. No. Legal Instruments
1 The Factory License
2 The Factories Act, 1948
3 The Water (Prevention and Control of Pollution) Act, 1974 and Rules, 1975, as amended to date.
4 The Air (Prevention and Control of Pollution) Act, 1981 and Rules, 1982, as amended to date.
5 The Noise Pollution (Regulation and Control) Rules, 2000 as amended to date
6 The Manufacture, Storage and Import of Hazardous Chemical rules, 1989, as amended to date.
7 Hazardous and Other Wastes (Management and Trans boundary Movement) Rules, 2016 as amended to date
8 Solid Waste Management Rule, 2016
9 Construction and Demolition Waste Management Rules, 2016
10 The Environment (Protection) Act, 1986 and Rules, 1986, as amended to date
11 The Chemical accidents (Emergency Planning, preparedness and response) Rules, 1996
12 The Motor Vehicles Act, 1988 & The Central Motor Vehicle rules, 1989
13 Consents from GPCB
14 Public Liability Insurance Act, 1991 and Rules, 1991 as amended to date
15 Environmental Impact Assessment Notification, 2006 as amended to date
1.4.2 Scope of the Study
Compliance of ToR points as per the ToR letter issued by Ministry of Environment, Forest
and Climate Change, Impact Assessment Division, New Delhi. Compliance of the ToR is
provided in Table 1.6
Table 1.6: Compliance with the Terms of Reference
S. No ToR Points Reply Citation in EIA
report
ToR for Synthetic Organic Chemicals Industry
1 Executive Summary Summary of the EIA is provided in EIA report
Initial Pages of EIA report
2 Introduction
i Details of the EIA Consultant including
NABET accreditation
ECO CHEM SALES & SERVICES (ECSS), is an
Accredited Organization by Quality Council of India /NABET certificate No.
NABET/ EIA/1720/ SA 085 (Rev.01) validity up to 31
st
July 2020 NABET accreditation certificate is
incorporated in EIA Report.
Annexure 16, Pg.423
ii Information about the project
proponent
UPL limited earlier known as United Phosphorus
Limited started its
Sub-Sec.1.2.2., Ch.1, Pg. 2
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 7
S. No ToR Points Reply Citation in EIA
report
operation in the year 1993 and are involved in
manufacturing of wide range of pesticides
(technical), intermediates of pesticides and other
synthetic organic/inorganic chemicals across Gujarat
state
iii Importance and benefits of the project
Proposed expansion in project is needed to serve increasing demand from
market.
Sub-Sec.1.3.2., Ch.1, Pg.4
3 Project Description
i Cost of project and time of completion.
Cost of the proposed expansion is Rs. 1491.85
Cr. Project will be commissioned within 15-17 months after receipt of EC
Cost:
Sub-Sec. 2.4.2.,
Ch.2, Pg. 34
Time of Completion
Table 2.18, Pg. 39
ii Products with capacities for the
proposed project. Intermediate and Speciality Chemicals: 3,31,800 MTPA
Sec.2.4, Table 2.5, Table 2.6, Pg. 28,
Ch.2
iii
If expansion project, details of existing products with capacities and whether
adequate land is available for expansion, reference of earlier EC if
any.
Pesticides (Technical) Products: 104000 MTPA
Pesticide Specific Intermediates: 67000
MTPA
Formulations: 40000 MTPA
Captive Power Plant: 55 MWPH
Existing Product
Details
Sec.2.4, Table 2.4, Pg.25, Ch.2
Area-Break-Up
Sub- Sec. 2.8.11Table 2.37,
Pg. 82, Ch.2
iv List of raw materials required and their
source along with mode of transportation.
Raw material will be procured from local / Imported based on
requirement and mode of transportation will be
through road from respective supplier to site.
Sec. 2.8, Sub-Sec.2.8.1, Sub-Sec.2.8.2, Sub-
Sec.2.8.3, Pg. 40, Ch.2
v Other chemicals and materials
required with quantities and storage capacities
Formulations products will be stored at site
--
vi Details of Emission, effluents,
hazardous waste generation and their management.
Emission
Flue Gas stack: PM, SO2 and NOx
Management: Water Scrubber &
Adequate Stack Height
Process Stack: Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic traces, HCN
Management: Water/Caustic/Acid
Scrubber, Bag filter, fume Gas Incinerator will be provided to control the
Air Emission:
Sub-Sec. 2.8.7, Pg. 59, Ch.2
Effluent:
Sub-Sec. 2.8.9, Pg.68, Ch.2
Hazardous Waste Sub-Sec 2.8.10,
Pg. 76,Ch.2
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 8
S. No ToR Points Reply Citation in EIA
report
emission within norms
Effluent
Waste water generation will be 10044.2 KLD, out of
which Treated Effluent @ 2891.61 KLD will be
discharged & 7152.28 KLD will be recycled.
Management: ETP, RO, MEE
Hazardous Waste
ETP Sludge, Organic Residue, Aqueous waste,
Discarded containers / bags / liners, Used oil, Inorganic Salts from
Evaporation / Process, Spent filter Material, Spent
solvent, Contaminated cotton waste, Insulation Waste, Non-recyclable
Plastic waste, Used PPE, Spent Catalyst, HCl sol.
(28-32%), Fe (OH)2 Sludge & Iron Residue
This waste will be disposed off as per Hazardous &
Other waste (Management & Transboundary
Movement) Rules, 2016.
vii
Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and contract)
Water:
The total water requirement for existing & proposed expansion will be 25377
KLD. (Fresh water: 12996 KLD + Recycle water
12381 KLD). Fresh water will be sourced from GIDC.
Man Power: Additional 1500 Employees will be
hired.
Power: Existing 4 MWH & Additional 31 MWH will be
sourced from DGVCL.
Water
Sub-Sec. 2.8.9, Pg.68, Ch.2
Manpower & power:
Sec.2.5, Pg. 35 Ch.2
viii
Process description along with major equipment‘s and machineries, process
flow sheet (quantities) from raw material to products to be provided
Detailed process description along with major equipment‘s and
machineries, process flow sheet are provided in EIA
report
Annexure 20, Pg. 429
ix Hazard identification and details of
proposed safety systems.
Hazard identification by HIRA and details of
proposed safety systems is provided in the Risk
Sub-Sec.7.2.5, Pg. 205 Ch.7
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 9
S. No ToR Points Reply Citation in EIA
report
Assessment Chapter of EIA report
x Expansion/modernization proposals:
a
Copy of all the Environmental Clearance(s) including Amendments thereto obtained for the project from
MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest
Monitoring Report of the Regional Office of the Ministry of Environment
and Forests as per circular dated 30th May, 2012 on the status of compliance
of conditions stipulated in all the existing environmental clearances
including Amendments shall be provided. In addition, status of
compliance of Consent to Operate for the ongoing / existing operation of the project from SPCB shall be attached
with the EIA-EMP report.
The unit has obtained EC from MoEFCC for its
existing project vide letter No: F. No. IA-J-
11011/306/2016-IA-II(I) dated 1
st March 2019 and
the certified compliance report for existing EC is obtained vide File No. 5-65/2019(ENV)/312 dated
27.05.2020 from RO. MoEFCC, Bhopal for the period of April, 2019 to
September 2019
EC:
Annexure 3, Pg.
354
Certified Report Annexure 4, Pg.
362
b
In case the existing project has not obtained environmental clearance, reasons for not taking EC under the
provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be
provided. Copies of Consent to Establish/No Objection Certificate and Consent to Operate (in case of units
operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006)
obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the
SPCB shall be submitted.
Consent to Establish is granted by Gujarat
Pollution Control Board vide CTE No.
GPCB/BRCH-B/CTE-399/ID-53667 dated
11.01.2019 for existing project.
Annexure 5, Pg.365
4 Site Details
i
Location of the project site covering village, Taluka/Tehsil, District and State, Justification for selecting the
site, whether other sites were considered.
Proposed expansion will undertake in existing plot
area at Plot D-3/6, Dahej - III, GIDC Estate (Within
PCPIR Region), Kadodara Village, Taluka Vagra,
District Bharuch, Gujarat State.
No other site is considered since land is available with
same site of UPL for proposed project.
Location:
Sec. 2.3, Pg.20
Justification for site selection is provided in
Sec.5.1, Pg.185, Ch.5
ii
A Toposheet of the study area of radius of 10km and site location on
1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-sensitive
areas and environmentally sensitive places)
A study area map of 10 Km radius with site location is provided on Toposheet with Toposheet number
F43M9 & F43M10
Map 3.1, Pg. 88, Ch.3
iii Details w.r.t. option analysis for
selection of site Alternative site was not selected since proposed
Sec.5.1, Pg.185, Ch.5
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 10
S. No ToR Points Reply Citation in EIA
report
expansion is within the site premises only
iv Co-ordinates (lat-long) of all four
corners of the site.
Co-ordinates of project sites are given in EIA
report
Sec. 2.3, Table 2.121, Ch.2
v Google map-Earth downloaded of the
project site.
Google map-Earth image of project site is provided in
EIA report
Sec. 2.3, Map 2.2, Pg. 21, Ch.2
vi
Layout maps indicating existing unit as well as proposed unit indicating
storage area, plant area, greenbelt area, utilities etc. If located within an
Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate.
Layout maps indicating existing unit as well as
proposed unit indicating storage area, plant area,
greenbelt area, utilities etc. is provided in EIA report. Total Plot Area is 755495 m
2 and greenbelt area is
263005 m2
Map 2.4, Pg. 84, Sub-Sec.2.8.11,
Ch.2
vii
Photographs of the proposed and existing (if applicable) plant site. If
existing, show photographs of plantation/greenbelt, in particular.
Photographs of the proposed and existing site are provided in EIA report
Photograph 2.1, Pg. 25
viii
Landuse break-up of total land of the project site (identified and acquired),
government/private - agricultural, forest, wasteland, water bodies,
settlements, etc shall be included. (not required for industrial area)
Proposed land is given by GIDC to UPL.
. Area breakup of the total land of the project site is provided in EIA report
Sub- Sec. 2.8.11, Table 2.37, Pg. 82,
Ch.2
ix
A list of major industries with name and type within study area (10km
radius) shall be incorporated. Land use details of the study area
Indofil Industries Limited located at 5.5 kms towards
SE. There are other industries within 10 km
from the proposed project site details are provided in EIA report. Details of LU are also provided in EIA
report
Major Industries:
Table 2.2, Pg. 22, Ch.2
LU details of Study area:
Sec. 3.7, Pg.106, Ch.3
x Geological features and Geo-
hydrological status of the study area shall be included.
Geological features and Geo-hydrological status of the study is provided in EIA
report
Sec. 3.9, Pg. 111, Ch.3.
xi
Details of Drainage of the project up to 5km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level
of the river shall also be provided. (mega green field projects)
No river flows within 1 km of the proposed project
site.
Map 3.1, Pg. 88, Ch.3
xii
Status of acquisition of land. If acquisition is not complete, stage of
the acquisition process and expected time of complete possession of the
The land is owned by M/s UPL Limited provided by
GIDC Dahej. Land documents are provided in
Land documents are enclosed as
Annexure 7, Pg.389
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 11
S. No ToR Points Reply Citation in EIA
report
land. EIA report
xiii R&R details in respect of land in line
with state Government policy
Not Applicable as the site is located in GIDC Notified
Industrial Estate, Dahej (Within PCPIR)
--
5 Forest and wildlife related issues (if
applicable):
Not Applicable as the site is located in GIDC Notified
Industrial Estate, Dahej (Within PCPIR)
--
i
Permission and approval for the use of forest land (forestry clearance), if any,
and recommendations of the State Forest Department. (if applicable)
Not Applicable --
ii
Landuse map based on High resolution satellite imagery (GPS) of
the proposed site delineating the forestland (in case of projects involving
forest land more than 40 ha)
Not Applicable --
iii
Status of Application submitted for obtaining the stage I forestry clearance
along with latest status shall be submitted.
Not Applicable --
iv
The projects to be located within 10 km of the National Parks, Sanctuaries,
Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly
authenticated by Chief Wildlife Warden showing these features vis-à-vis the
project location and the recommendations or comments of the
Chief Wildlife Warden-thereon
Not Applicable --
v
Wildlife Conservation Plan duly authenticated by the Chief Wildlife
Warden of the State Government for conservation of Schedule I fauna, if
any exists in the study area
Not Applicable --
vi
Copy of application submitted for clearance under the Wildlife
(Protection) Act, 1972, to the Standing Committee of the National Board for
Wildlife
Not Applicable --
6 Environmental Status
i
Determination of atmospheric inversion level at the project site and site-
specific micrometeorological data using temperature, relative humidity, hourly wind speed and direction and
rainfall.
Micrometeorological data:
Temperature: 24.2oC -
36.2oC
Humidity: 34% to 96%
Wind Speed:0.1 to 13.0
Km/hr
Wind direction: NE-SW
Sec.3.4, Pg. 92, Ch.3
ii
AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to
the project shall be collected. The
AAQ data is brief below PM2.5 : 33.1 – 47.4µg/m
3
PM10 : 63.2 – 88.1 µg/m3
Sec.3.5 , Pg. 97, Ch.3
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 12
S. No ToR Points Reply Citation in EIA
report
monitoring stations shall be based CPCB guidelines and take into account
the pre-dominant wind direction, population zone and sensitive
receptors including reserved forests
SO2 : 9.1 – 16.4 µg/m3
NOx : 14.5- 21.4 µg/m3
Results for the CO, NH3, Cl2, HCl, H2S, Total HC
and VOC were found well within the norms
iii
Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM
Notification of Nov. 2009 along with - min., max., average and 98% values for each of the AAQ parameters from
data of all AAQ stations should be provided as an annexure to the EIA
Report
Raw data of all AAQ measurement is provided
in EIA report
Annexure 13, Pg.407
iv
Surface water quality of nearby River (100m upstream and downstream of discharge point) and other surface
drains at eight locations as per CPCB/MoEFCC guidelines
Surface water quality of nearby water bodies at six locations were carried out which includes from pond details provided in EIA
report
Sec.3.12, Pg.116, Ch.3
v Whether the site falls near to polluted
stretch of river identified by the CPCB/MoEFCC, if yes give details.
Not Applicable --
vi Ground water monitoring at minimum
at 8 locations shall be included.
Ground water monitoring was carried out at 7
locations.
Sec.3.12, Pg.116, Ch.3
vii Noise levels monitoring at 8 locations
within the study area
Noise levels monitoring was carried out at 8
location
Sec. 3.6, Pg.102, Ch.3
viii Soil Characteristic as per CPCB
guidelines. Soil sampling was carried
out at 4 location Sec. 3.11, Pg. 114,
Ch.3
ix
Traffic study of the area, type of vehicles, frequency of vehicles for
transportation of materials, additional traffic due to proposed project, parking
arrangement etc.
Traffic Study of the area was carried out at SH-6
and SH-206, details of the same is provided in EIA
report.
Parking will be provided at the site.
Existing Traffic Scenario
Sec. 3.10,Pg. 113, Ch.3,
Additional Traffic
Sec.4.2.1, Pg. 153, Ch.4
x
Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special
reference to rare, endemic and endangered species. If Schedule-I
fauna are found within the study area, a Wildlife Conservation Plan shall be
prepared and furnished.
Detailed description of flora and fauna (terrestrial and
aquatic) existing in the study area is provided in EIA report. No Schedule-I species is present in the study area. The site is
located in Notified Industrial Estate of Dahej
(Within PCPIR)
Sec. 3.13, Pg. 131, Ch.3
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 13
S. No ToR Points Reply Citation in EIA
report
xi Socio-economic status of the study
area.
Socio-economic status of the study area is provided
in EIA report
Sec.3.14, Pg.137, Ch.3
7 Impact and Environment Management
Plan -
i
Assessment of ground level concentration of pollutants from the
stack emission based on site-specific meteorological features. In case the
project is located on a hilly terrain, the AQIP Modelling shall be done using
inputs of the specific terrain characteristics for determining the
potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation)
on the AAQ of the area shall be assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project
site, habitation nearby, sensitive receptors, if any.
Assessment of ground level concentration of
pollutants with the help of AERMOD software, mainly PM, SO2, NOX, NH3, Cl2,
H2S, HC, HCl & HCN were carried out and total GLC after proposed expansion
are brief below:
PM10: 91.5 µg/m3
SO2: 20.5 µg/m3
NOX: 26.83 µg/m3
HCl: 2.898 µg/m3
Cl2: 0.086 µg/m3
NH3: 6.11 µg/m3
H2S: 0.713 µg/m3
HC: 153.2 µg/m3
HCN: 0.195 µg/m3
Sec.4.2.1, Pg. 153, Ch.4
ii Water Quality modelling - in case of
discharge in water body
Not applicable as the treated water from ETP is
sent to GIDC drain
Sub-Sec. 2.8.9, Pg.68, Ch.2
iii
Impact of the transport of the raw materials and end products on the surrounding environment shall be
assessed and provided. In this regard, options for transport of raw materials
and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor cum-rail
transport shall be examined
Impact of the transport of the raw materials and end
products on the surrounding environment is assessed and provided in
EIA report
Transportation details:
Sub-Sec. 2.8.2, Pg. 51, Ch.2
Impact:
Sec.4.2.1, Pg. 153, Ch.4
iv
A note on treatment of wastewater from different plant operations, extent
recycled and reused for different purposes shall be included. Complete
scheme of effluent treatment. Characteristics of untreated and
treated effluent to meet the prescribed standards of discharge under E(P)
Rules
A note on treatment of wastewater from different plant operations, extent recycled and reused for
different purposes is provided in EIA report.
Effluent:
Sub-Sec. 2.8.9, Pg.68, Ch.2
v Details of stack emission and action plan for control of emissions to meet
standards
Flue Gas Stack: Water Scrubber and adequate stack height will be provided. Natural gas/FO will be used as fuel in proposed boiler
Process Stack:
Water/Caustic/Acid Scrubber, fume Gas Incinerator Bag filter will be
Air Emission:
Sub-Sec. 2.8.7, Pg. 59, Ch.2
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 14
S. No ToR Points Reply Citation in EIA
report
provided to control the emission within norms
vi Measures for fugitive emission control
All the joints, flanges, pumps, glands, seals,
valves will be maintained in good conditions through
timely predictive and preventive maintenance;
Concrete road will be developed within plant
premises to avoid fugitive dust due to vehicle
movement.
Regular checking and maintenance of the
machineries will be carried out to avoid any leakages
Air Emission:
Sub-Sec. 2.8.7, Pg.67, Ch.2
vii
Details of hazardous waste generation and their storage, utilization and management. Copies of MOU
regarding utilization of solid and hazardous waste in cement plant shall
also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation, and natural
resource conservation.
ETP Sludge, Organic Residue, Aqueous waste,
Discarded containers / bags / liners, Used oil, Inorganic Salts from
Evaporation / Process, Spent filter Material, Spent
solvent, Contaminated cotton waste, Insulation Waste, Non-recyclable
Plastic waste, Used PPE, Spent Catalyst, HCl sol.
(28-32%), Fe (OH)2 Sludge & Iron Residue
This waste will be disposed off as per Hazardous &
Other waste (Management & Transboundary
Movement) Rules, 2016.
Hazardous Waste Sub-Sec 2.8.10,
Pg. 76,Ch.2
EMP
Sec.10.3, Pg. 285, Ch.10
viii
Proper utilization of fly ash shall be ensured as per Fly Ash Notification,
2009. A detailed plan of action shall be provided
Not Applicable as Natural gas/FO will be used as
Fuel in utilities
Sub-Sec.2.5.1, Pg.35, Ch.2
ix
Action plan for the green belt development plan in 33 % area i.e.
land with not less than 1,500 trees per ha. Giving details of species, width of
plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a
scheme for greening of the roads used for the project shall also be
incorporated.
For Green Belt Development, the company
has already allotted 263005 m
2 of the total land,
i.e. 34.81% in its existing project. Total 39500 no. of
trees to be planted for green belt @ tree density of 1500 trees per hectare.
Sub-Sec.10.2.1, Pg.278, Ch.10
x
Action plan for rainwater harvesting measures at plant site shall be
submitted to harvest rainwater from the roof tops and storm water drains to
recharge the ground water and also to use for the various activities at the
Total 66.783 KL/day of water will be available for a day for which HDPE tank of
100 m3. may be used for
gardening and washing purposes
Sub-Sec.10.2.2, Pg.284, Ch.10
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 15
S. No ToR Points Reply Citation in EIA
report
project site to conserve fresh water and reduce the water requirement from
other sources.
xi Total capital cost and recurring
cost/annum for environmental pollution control measures shall be included.
Total capital cost will be 20450 Lakh. and Recurring Cost of 1188 Lakh/Annum.
Sub-Sec.10.1.4, Pg.278, Ch.10
xii Action plan for post-project
environmental monitoring shall be submitted.
Action plan for post-project environmental monitoring is
provided in EIA report
Table 6.7, Pg. 194, Ch.6
xiii
Onsite and Offsite Disaster (natural and Man-made) Preparedness and
Emergency Management Plan including Risk Assessment and
damage control. Disaster management plan should be linked with District
Disaster Management Plan.
Unit has prepared Onsite and Offsite Disaster
(natural and Man-made) plan for existing units.
Additional Preparedness and Emergency
Management Plan including Risk Assessment
and damage control is detailed in Risk chapter of EIA report and plan will be
updated and approved
Existing Onsite & Offsite DMP
Annexure 19, Pg. 428
Proposed:
Sec.7.3, Pg. 257, Ch.7
8 Occupational health
i Plan and fund allocation to ensure the
occupational health & safety of all contract and casual workers
Plan and fund allocation to ensure the occupational
health & safety of all contract and casual
workers will be allotted
Sec. 7.3.3, Table 7.26, Pg.269, Ch.7
ii
Details of exposure specific health status evaluation of worker. If the
workers' health is being evaluated by pre designed format, chest x rays,
Audiometry, Spirometer, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during
pre-placement and periodical examinations give the details of the same. Details regarding last month analyzed data of above mentioned
parameters as per age, sex, duration of exposure and department wise.
Health evaluation of the workers will be carried out periodically once the plant
is under operation
--
iii
Details of existing Occupational & Safety Hazards. What are the
exposure levels of hazards and whether they are within Permissible
Exposure level (PEL). If these are not within PEL, what measures the
company has adopted to keep them within PEL so that health of the
workers can be preserved,
The existing plant is under construction stage
-
iv Annual report of health status of workers with special reference to Occupational Health and Safety.
Annual report of health status of workers will be carried out periodically once the plant is under
operation
--
9 Corporate Environment Policy
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 16
S. No ToR Points Reply Citation in EIA
report
i
Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be
detailed in the EIA report.
Yes, the company has a well laid down Environment
Policy approved by its Board of Directors
Annexure 17, Pg.426
ii
Does the Environment Policy prescribe for standard operating process /
procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms /
conditions? If so, it may be detailed in the EIA.
Yes --
iii
What is the hierarchical system or Administrative order of the company to deal with the environmental issues and
for ensuring compliance with the environmental clearance conditions? Details of this system may be given.
The hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions is
provided in EIA report
Sec.10.6, Pg. 297, Ch.10
iv
Does the company have system of reporting of non-compliances /
violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report
The reporting mechanism is provided in EIA report
Sec.10.6, Pg. 297, Ch.10
10
Details regarding infrastructure facilities such as sanitation, fuel,
restroom etc. to be provided to the labor force during construction as well
as to the casual workers including truck drivers during operation phase
In Majority local workers will be hired and
infrastructure facilities such as sanitation, fuel,
restroom etc. are already available at existing site
--
11 Enterprise Social Commitment (ESC)
i
Adequate funds (at least 2.5 % of the project cost) shall be earmarked
towards the Enterprise Social Commitment based on Public Hearing issues and item-wise details along with
time bound action plan shall be included. Socio-economic
development activities need to be elaborated upon.
Rs. 3.72 Cr. (0.25% of project cost) is allotted for
Socio-economic development activities under Enterprise Social
Commitment (CER). Activities includes
- Skill development
- Agricultural development
- Sanitation
- Education
- Social Forestry & Tree plantation
Sec.10.4, Pg.287, Ch.10
12
Any litigation pending against the project and/or any direction/order
passed by any Court of Law against the project, if so, details thereof shall
also be included. Has the unit received any notice under the Section 5 of
Environment (Protection) Act, 1986 or relevant Sections of Air and Water
Acts? If so, details thereof and
No litigation is pending against the project or any direction/order passed by any Court of Law against the project. The existing
project is under construction stage.
--
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 17
S. No ToR Points Reply Citation in EIA
report
compliance/ATR to the notice(s) and present status of the case
13 A tabular chart with index for point
wise compliance of above TOR Noted --
Specific terms of reference for Synthetic Organic Chemicals Industry
1 Details on solvents to be used,
measures for solvent recovery and for emissions control.
Solvents to be used includes 97% Ethyl
Acetate, Toluene, MDC,
Methyl tert butyl ether, Quinoline, DI
chloromethane, Petroleum Ether etc will be used.
Solvent recovery of minimum 95% will be done
Sec.2.8.4, Pg.55, Ch.2
2 Details of process emissions from the proposed unit and its arrangement to
control.
Process emission includes Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic
traces, HCN. Water/Caustic/Acid
Scrubber, Fume Gas Incinerator, Bag filter will
be provided
Sub-Sec. 2.8.7, Pg. 59, Ch.2
3
Ambient air quality data should include VOC, other process-specific
pollutants* like NH3*, chlorine*, HCl*, HBr*, H2S*, HF*,etc.,(*-as applicable).
AAQ data is brief below PM2.5 : 33.1 – 47.4µg/m
3
PM10 : 63.2 – 88.1 µg/m3
SO2 : 9.1 – 16.4 µg/m3
NOx : 14.5- 21.4 µg/m3
Results for the CO, NH3, Cl2, HCl, H2S, Total HC
and VOC were found well within the norms
Sec.3.5 , Pg. 97, Ch.3
4 Work zone monitoring arrangements
for hazardous chemicals.
Work zone monitoring will be carried out for Proposed
project during operation phase
--
5
Detailed effluent treatment scheme including segregation of effluent
streams for units adopting 'Zero' liquid discharge.
The waste water generated from prosed project will be treated in ETP, MEE & RO.
Waste water generation will be 10044.2 KLD, out of
which recycled water will be 7152.28 KLD & effluent going to GIDC drain will be
2891.92 KLD
Management: ETP, RO, MEE
Sub-Sec. 2.8.9, Pg.68, Ch.2
6 Action plan for odour control to be
submitted.
All liquid raw materials will be charged into reactors
with pumps or under gravity through closed
pipes
Vents of storage tanks will be provided with a water
filled trap to prevent escape of acid fumes.
Air Emission:
Sub-Sec. 2.8.7, Pg.67, Ch.2
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 18
S. No ToR Points Reply Citation in EIA
report
Boundary wall as Wind breaker will be provided to restrict the dispersion of odor & dust from the site
7
A copy of the Memorandum of Understanding signed with cement
manufacturers indicating clearly that they co-process organic
solid/hazardous waste generated.
Organic Residue & Aqueous Waste generated from process will be sent
for Co-processing. Membership with cement industry (Ambuja Cement) for Co-processing of waste have been obtained dated
10.02.2017
Annexure 11, Pg. 393
8 Authorization/Membership for the
disposal of liquid effluent in CETP and solid/hazardous waste in TSDF, if any
TSDF/CHWIF: Membership with TSDF for landfilling of waste from BEIL Dahej &
CHWIF for incinerable waste from BEIL
Ankleshwar has been obtained from vide letter
No. BEIL/ANK/2017 dated 9.02.2017
Effluent Disposal:
The treated effluent will be disposed into GIDC drain
and Approval for the disposal of 2891.6 KLD of water into GIDC drain has
been obtained vide GIDC/DEE/DRG/BRH/64
dated 03.02.2020 has been obtained
TSDF/CHWIF:
Annexure 11, Pg. 393
Effluent Disposal: Annexure 10, Pg.
392
9 Action plan for utilization of
MEE/dryers salts. MEE salts will be disposed
off into TSDF
Hazardous Waste Sub-Sec 2.8.10,
Pg. 76,Ch.
10 Material Safety Data Sheet for all the
Chemicals are being used/will be used.
Material Safety Data Sheet for all the Chemicals is provided in EIA report
Annexure 18, Pg. 427
11 Authorization/Membership for the
disposal of solid/hazardous waste in TSDF.
Membership with TSDF for landfilling of waste from BEIL Dahej & CHWIF for incinerable waste from
BEIL Ankleshwar has been obtained from vide letter
No. BEIL/ANK/2017 dated 9.02.2017
TSDF/CHWIF:
Annexure 11, Pg. 393
12 Details of incinerator if to be installed. Not Applicable --
13
Risk assessment for storage and handling of hazardous chemicals/
solvents. Action plan for handling & safety system to be incorporated.
Risk assessment for storage and handling of
hazardous chemicals/solvents &
Action plan for handling & safety system to be is provided in EIA report
Sec.7.2.5, Pg.205, Ch.7
14 Arrangements for ensuring health and Arrangements for ensuring Sub-Sec.7.2.18,
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 1 19
S. No ToR Points Reply Citation in EIA
report
safety of workers engaged in handling of toxic materials.
health and safety of workers engaged in
handling of chemicals is provided in EIA report
Pg. 257, Ch.7
1.5 STRUCTURE OF THE EIA REPORT
The entire EIA report is prepared based on the generic structure of EIA document given at
Appendix - III of the Notification No. S.O. 1533 dated 14th September 2006 at MoEFCC, New
Delhi.
The EIA Report has been prepared on the basis of EIA Notification 2006, with special
reference to the TOR conditions received from MoEFCC. The baseline data was collected
during 1st October 2019 to 31st December 2019.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 20
2 PROJECT DESCRIPTION
This chapter provides a condensed description of those aspects of the project likely to cause
environmental effects. Details are described in following sections with regards to type, need,
location, size or magnitude of project operations, technology and other related activities.
2.1 TYPE OF PROJECT
M/s UPL Limited Unit-12 is located at Plot D-3/6, Dahej - III, GIDC Estate (Within PCPIR
Region), Kadodara Village, Taluka Vagra, District Bharuch has planned for the
manufacturing of Pesticides Technical, Intermediates, Formulations and Intermediates &
Speciality Chemicals with captive power plant in their existing project for which EC has been
obtained. The proponent now intends to expand the existing production capacity permission
in Intermediates and Speciality Chemicals and addition of new Intermediates & Synthetic
Organic Chemicals (Chemical Intermediates) within existing Dahej unit. Total investment for
proposed expansion will be Rs. 1491.85 Cr.
2.2 NEED FOR THE PROJECT
Proposed project is needed to serve increasing demand from export market. Benefits of the
project are many folds. The proposed project for Manufacturing of various products are
based on the market surveys.
India is one of the major hubs of chemical manufacturing in Asia. Most of these chemicals
are of strategic importance. However, all the key raw material are not readily available or
manufactured in India due to the complex nature of the product, chemistry and process.
Hence most of the manufacturers are dependent on import of the chemical intermediates
and Speciality chemicals. This results in higher dependency on imports and simultaneously
reduces the cost advantages. This has created a wide gap in demand and supply causing
higher Forex outflows to purchase the raw materials. Indian manufacturer are finding it
difficult to compete in the international market due to high raw material cost.
2.3 LOCATION OF THE PROJECT
2.3.1 General Location of the Site
M/s UPL Limited is located at Plot D-3/6, Dahej - III, GIDC Estate (Within PCPIR Region),
Kadodara Village, Taluka Vagra, District Bharuch. The map showing general location is
provided in Map 2.1. Project boundary is shown on Google earth image as Map 2.2. The
Co-ordinates of the project are provided in Table 2.1. Site layout plan is attached as Map
2.4.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 21
Map 2.1: General and Specific Location Map
Map 2.2: Google Earth Image
Table 2.1: Co-ordinates of the project
Description Latitude (N) Longitude (E) Description Latitude (N) Longitude (E)
A 21°46'47.83"N 72°38'33.79"E N 21°46'27.08"N 72°38'35.10"E
N
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 22
Description Latitude (N) Longitude (E) Description Latitude (N) Longitude (E)
B 21°46'44.07"N 72°38'50.85"E O 21°46'27.12"N 72°38'38.24"E
C 21°46'40.12"N 72°38'49.90"E P 21°46'22.75"N 72°38'41.46"E
D 21°46'40.34"N 72°38'48.84"E Q 21°46'10.67"N 72°38'22.28"E
E 21°46'36.84"N 72°38'48.34"E R 21°46'22.84"N 72°38'11.61"E
F 21°46'35.71"N 72°38'52.21"E S 21°46'34.15"N 72°38'10.89"E
G 21°46'33.83"N 72°38'51.39"E T 21°46'37.08"N 72°38'18.25"E
H 21°46'33.26"N 72°38'53.65"E U 21°46'36.70"N 72°38'27.42"E
I 21°46'29.09"N 72°38'52.54"E V 21°46'35.82"N 72°38'27.65"E
J 21°46'22.58"N 72°38'42.43"E W 21°46'35.66"N 72°38'28.61"E
K 21°46'27.89"N 72°38'38.52"E X 21°46'41.42"N 72°38'28.62"E
L 21°46'30.99"N 72°38'38.17"E Y 21°46'44.10"N 72°38'32.94"E
M 21°46'30.93"N 72°38'34.78"E
The proposed site is surrounded by other industrial units. List of major industries within 10
km radius of project site is provided in Table 2.2.
Table 2.2: List of Major Industries within 10 KM radius of Project Site
S. No.
Name of Major Industries Type of Industry Distance and
Direction
1 Indofil Industries Limited Pesticides 5.58 KM SE
2 Meghmani Organic Ltd. Pigments 5.5 KM SE
3 Hemani Industries Ltd. Metals & Chemicals 6.5 KM SE
4 BIOS CROP CARE PVT. LTD. Pesticides 5.8 KM SSW
5 Tagros Chemical India Pvt. Ltd. Pesticides Intermediates 5.7 KM SE
2.3.2 Approach to the Project Site
By Road
The site is well connected with SH-06 Bharuch Amod road – adjacent towards NNW
By Air
Nearest is Surat (Domestic) airport - 73.23 km to S.
By Rail
The nearest railway station is Dahej at an aerial distance of ~9.12 km to SW.
The main Railway Station is Bharuch at an aerial distance of ~37.57 km to ESE.
2.3.3 Site Details
Current Status:
At Present Construction Activities are ongoing at site for Speciality chemicals. The UPL
Limited has planned for expansion in existing EC approved Intermediates and Speciality
chemicals and addition of new Speciality chemicals at site. The Speciality chemicals market
is dynamic & changes in product demand are frequent hence looking towards current market
demand, UPL Limited wants expansions within existing site and during construction phase
inception of expansion will save time & additional capital expenditures. The site photographs
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 23
are given as Photograph 2-1 & Study Area Map Plotted on Survey of India Toposheet is
given in Map 2.3.
Project site specific details are provided in Table 2.3
Table 2.3: Project Site Specific Environmental Sensitivity Details
S. No.
Environment Sensitivity
Details (Nearest aerial distance measured from center of the plot, in km)
Lat long of center point: 21°46'31.21"N, 72°38'32.07"E
1 Nearest Village Kadodara at 0.6 km to S and Padariya at 0.5 km to NW
from project boundary
1.1 Northward overview Adjacent to SH-6 & Padariya village at 0.5 km to NW
from project boundary
1.2 Southern overview Kadodara village at the distance of 0.6 km from project
boundary, Kadodara water tank
1.3 Western overview SH-6 and Open land of Plot no. D-3/5
1.4 Eastern overview Open land outside D-3 estate
2 Nearest water bodies
Padariya Pond – 0.26 km to NNW from project boundary, Kadodara pond – 0.77 km to SSE from project boundary
Bhukhi river – 14.32 km to SEE
3 National Highway NH-8 - 39.6 km to E
4 State Highway (Aerial distance
from project boundary)
SH-06 Bharuch Amod road - 0.02 km to NNW
SH-206 –Dahej Ferry point road-near SEZ 7.27 km to SSW
6 Nearest Railway station Dahej Railway Station - 9.12 km to SW
Bharuch Railway Station - 37.57 km to SEE
7 Nearest Airport/ Airbase
Surat (Domestic) airport - 73.23 km to S
Vadodara airport - 85.48 km to NE
Ahmedabad airport - 143.79 km to N
8 Mountain None
9 Reserve Forest Dahej RF – 9,6 Km to W
10 Heritage Site None
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 24
Map 2.3: Study Area Map of 10 Km Radius of Site
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 25
Photograph 2.1: Photographs of Site
Ongoing Construction activity for existing project
Mobile Toilets for construction workers Ongoing Construction activity for existing project
2.4 SIZE OR MAGNITUDE OF OPERATION
2.4.1 Production Capacity
As per the proposed project cost, the project is covered under large scale category of
manufacturing industries.
Details of existing and Proposed production capacity is provided in Table 2.4 to Table 2.6
respectively.
Table 2.4: Details of Existing Production Capacity (EC Granted)
S.No. Products EC Granted
Capacity, TPA
Pesticides (Technical)
1 S Metolachlor (a mixture of (S)-2-chloro-N-2(Ethyl-6-methylphenyl)-N-(2-methoxy-1-methylethyl) Acetamide and (R)-2-chloro-N-(2-ethyl-6-
methylphenyl)-N-(2-Methoxy-1-Methylphenyl) Acetamide in the
5000
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 26
S.No. Products EC Granted
Capacity, TPA
proportion 80 – 100 % to 20 – 0 %
2 Dicamba (3,6-dichloro-2-methoxybenzoic acid) 5000
3 Propanil (3‘,4‘-dichloroproionanilide) 10000
4 Clodinafop (R)-2-[4-[(5-chloro-3-fluoro-2-
pyridinyl)oxy]phenoxy]propanic acid 2000
5 Asulam (methyl[(4-aminophenyl) sylfonyl]carbamate) 4000
6 Azoxystrobin (methyl (E) -2-[[6-2(cynophenoxy) pyrimidinyl] oxy] –a-
(Methoxy methylene) benzeneacetate) 2000
7 Acephate (N-[methoxy (methylthio) phosphinoyl] acetamide 30000
8 Pilot Plant /Multi-Purpose Plant (MPP) (As Azoxystrobin)
(methyl (E) -2-[[6-2(cynophenoxy) pyrimidinyl] oxy] –a- (Methoxy methylene) benzeneacetate)
1000
9 Atrazine (6-chloro-N-ethyl-N‘-1(1-methylethyl)-1,3,5-triazine-2,4-
diamine) 5000
10 Glufosinate (ammonium (+) -2-amino-4- (hydroxyl methyl phosphinyl)
butanoate 10000
11 Sulphur WDG (Wettable Dispersible Granule)(Sulfur) 30000
Total 104000
Pesticide Specific Intermediates
12 Dimethyl Phosphoroamidothioate (DMPAT)
(O,O-Dimethyl phosphoramidothioate) 30000
13
Chloroformates
13.1 Phenyl ChloroFormate Or/ and Chloroformic Acid phenyl Ester 20000 (Either or and
Combined Capacity)
13.2 Benzophenone (Diphenyl Ketone)
14 Tri Methyl Phosphite (TMP) / (Trimethoxyphosphine)
5000 Tri Ethyl Phosphite (TEP) (Tri Ethoxy Phosphine)
15 Di Methyl Sulfoxide (Dimethyl Sulfoxide) 10000
16 Acrolein (2-Propenal) 2000
Total 67000
Intermediate and Speciality Chemicals
17 Ethylenediamine (EDA) (1,2-Diaminoethane) 30000
18 Meta Phenoxy Benzaldehyde (MPBAD) (3-phenoxy benzaldehyde) 3000
19 Methoxy Methyl Acrylate (MAM) (Methyl 3-methoxyacrylate) 1000
20 Aminoacetonitrile Sulfate (AANS) (Aminoacetonitrile bisulfate) 1000
21
Acid Chloride
21.1 Chloroacetyl Chloride (Monochloroacetyl chloride) 3000
21.2 Methoxyacetyl Chloride (Methoxyacetyl chloride) 400
21.3 2-Chloro-3, 3-tri fluoropropen-1,2 dimethylcyclopropane Carbonyl chloride (cyclopropanecarbonyl chloride, 3-[(1z)-2-chloro-3,3,3-
trifluoro-1-propen-1-yl]-2,2-dimethyl-,(1r,3s)) 600
21.4 DV Acid Chloride
(3-(2,2-dichlorovinyl)-2,2-dimethylcyclopropanecarbonyl Chloride) 1000
22
CS2 Based Product
22.1
Potassium Ethyl Xanthate (Potassium Ethyl Xanthate) 5000 (Either Or/and
Combined Capacity)
Sodium Isopropyl Xanthate (Sodium isopropyl xanthate)
Potassium Isopropyl Xanthate (Isopropylxanthic Acid Potassium Salt)
Potassium Amyl Xanthate (Dithiocarbonic Acid)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 27
S.No. Products EC Granted
Capacity, TPA
22.2 Dimethyl Cyanoiminodithiocarbonate (CCITM) (N-Cyano-S,S-
dimethyldithioimidocarbonate) 1000
22.3 1,6-Bis (N,N-dibenzylthiocarbamyldithio) hexane (N-Cyano-S,S-
dimethyldithioimidocarbonate) 2000
22.4 1-Methylamino-1-Methylthio-2 Nitroethene (n-methyl-1-(methylthio)-2-
nitrovinylamine) 2000
23
23.1 NaCN (Sodium Cyanide) 5000
23.2 Potassium Cyanide (Potassium Cyanide) 500
23.3 Cyanuric Chloride 15000
23.4 DL-Methionine (DL-2-Amino-4-(methylthio)butyric acid) 10000
TOTAL 80500
GRAND TOTAL (Products Granted EC) 251500
24 Captive Power Plant (3 Nos)
55 MWPH
(Phase 1 (20)+
Phase 2 (20) +
Phase 3 (15) MWPH)
Formulations
25 Liquid Formulations 20000
26 Solid Formulations 20000
Total (Products not requiring EC) 40000
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 28
Table 2.5: Proposed production Capacity in Permitted Quantity (Expansion) in EC for Speciality Chemicals
S. No.
Speciality Chemical Product Name
CAS NO
EC Approved Capacity in MTPA
EC Approve
d Category
EC Approv
ed Plant Zone
Proposed
Additional
Capacity in TPA
Total Capacity
after Expansion in MTPA
EC Categor
y Propose
d
After Expansion
Plant Zone
LD50 in
mg/kg
End Use of Proposed Products
1 Sodium Cyanide
(NaCN) 143-33-9 5000
5(F) Speciality Chemical
s
MP 5 20000 25000
5(F) Specialit
y Chemica
ls
Expansion in EC
Approved Capacity
Plant MP 5
6.4
Manufacturer of large-scale chemical
Manufacturer of Fine Chemical, gold mining
2 Cyanuric Chloride 108-77-0 15000
5(F) Speciality Chemical
s
MP 5 25000 40000
5(F) Specialit
y Chemica
ls
Additional Plant
315 Dyes, intermediates chemicals, optical
brighteners
TOTAL – A (Proposed Expansion) 20000 45000 65000
Table 2.6: Proposed New Speciality Chemicals/Intermediates
S. No.
Speciality Chemical Product Name CAS NO Proposed Capacity
MTPA
EC Category Proposed
Plant Zone LD50 in Mg/Kg
End Use of Proposed Products
1 UPDT (UPL, Drought Technology. (Starch based
Super absorbent Polymer) 863132–14–3 50000
5(F) Speciality Chemicals
New Plant in MP 12
na Water
Absorbent
2 Glacial Acetic Acid 64-19-7 30000 5(F) Speciality
Chemicals New Plant in
MP 12 3310
Flavor enhancer ,
Preservative
3 CCMP (2 Chloro 5 Chloro Methyl Pyridine) 70258-18-3 10000 5(F) Speciality
Chemicals New Plant in
MP 12 Na
Pharmaceuticals
4 TPPI (Tri Phenyl Phosphite) 101-02-0 10000 5(F) Speciality
Chemicals New Plant in
MP 12 1590
Pharmaceuticals and Polymer
5 DPMP (Diphenyl Methyl Phosphonate) 7526-26-3 12000 5(F) Speciality
Chemicals New Plant in
MP 12 233
Fire retardant polymer
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 29
S. No.
Speciality Chemical Product Name CAS NO Proposed Capacity
MTPA
EC Category Proposed
Plant Zone LD50 in Mg/Kg
End Use of Proposed Products
6 EDTA (Ethylene Di-Amine Tetra Acetic Acid) 60-00-4 20000 5(F) Speciality
Chemicals New Plant in
MP 8 >2000
Chelating agent
7 Indigo Blue 482-89-3 5000 5(F) Speciality
Chemicals New Plant in
MP 8 > 32000 Dyes Industry
8 HMTBA (Hydroxy Methylthio Butanoic Acid) 583-91-5 50000 5(F) Speciality
Chemicals New Plant in
MP 13 3478
Animal Nutrition
9 RP (Red Phosphorus) 7723-14-0 5000 5(F) Speciality
Chemicals New Plant in
MP 13 >15
Explosive industry
10 MAAN (Methyl Amino Aceto Nitrile) 109-82-0 2000 5(F) Speciality
Chemicals New Plant in
MP 8 No data available
Intermediate for AANS
11 Sodium Ferrocyanide 13601-19-9 2000 5(F) Speciality
Chemicals New Plant in
MP 8 5100
Stabilizers, dyes
12 Sulpherised Iso Butylene 68511-50-2 5000 5(F) Speciality
Chemicals New Plant in
MP 9 >2000 Lubricants
13 Thiophene 110-02-1 1000 5(F) Speciality
Chemicals New Plant in
MP 9 1400 Pharmaceutical
14 Cytosine 71-30-7 5000 5(F) Speciality
Chemicals New Plant in
MP 13 >2222 Pharmaceutical
15 NaSH based derivatives
15.1 Cysteamine hydrochloride Or 156-57-0
40000
5(F) Speciality Chemicals
New Plant in MP 9
1352 Pharmaceutical
15.2 Na2S (Sodium Sulphide with Na2SO4 Route) 1313-82-2 5(F) Speciality
Chemicals 246
Tanning industry, dyes
industry
16 Triethyl orthoformate (TEOF) 122-51-0 5000 5(F) Speciality
Chemicals New Plant in
MP 8 7060 Pharmaceutical
17 Trimethyl orthoformate (TMOF) 149-73-5 5000 5(F) Speciality
Chemicals New Plant in
MP 8 3130 Pharmaceutical
18 CS2 Based Derivative
Methyl isothiocyanate (MITC) 556-61-6 5000 5(F) Speciality New Plant in 72 Pharmaceutical
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 30
S. No.
Speciality Chemical Product Name CAS NO Proposed Capacity
MTPA
EC Category Proposed
Plant Zone LD50 in Mg/Kg
End Use of Proposed Products
Chemicals MP 9
19
Phosgene Derivatives*
19.1 Secondary Butyl Chloroformate (SBCF) Or 17462-58-7
6800 (Combined Capacity)
5(F) Speciality Chemicals
A New Common
Plant Proposed in Speciality Chemical
Zone MP 10
700 Cosmetic Industry
19.2 2-Ethyl Hexyl Chloroformate (EHCF) Or 24468-13-1 5(F) Speciality
Chemicals 5400
Cosmetic Industry
19.3 Di-Cyclo Hexyl carbodiimide (DCC) 538-75-0 5(F) Speciality
Chemicals 400 Pharmaceutical
20 Cyclo Propyl Acetylene (CPA) 6746-94-7 1000 5(F) Speciality
Chemicals New Plant in
MP 10 2000 Pharmaceutical
21 ZnDTP (Zinc Di Thio Phosphate) 19210-06-1 12000 5(F) Speciality
Chemicals New Plant in
MP 13 4170 Lubricant
22 Glutaraldehyde 111-30-8 5000 5(F) Speciality
Chemicals New Plant in
MP 11 No data available
Disinfectant
TOTAL - B for Proposed New Products in TPA 286800 (331800 TPA = 286800 TPA for New Products + 45000 TPA for Expansion in Permitted Quantity as per EC) TOTAL in TPA (A + B) for Expansions and New Products 331800
*Phosgene Is in-situ generated and used in captive manufacturing, there is no storage or selling is proposed.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 31
The details of EC approved and proposed by products generation with source, quantity and end use is given in Table 2.7 & Table 2.8
Table 2.7: Details of Existing By-Products (EC Approved) with source of generation, quantity and end use
S.No. By-Products EC approved
Capacity in MTPA Source End Use
1 Piperazine (PIP) 9510
Ethylene Di amine (EDA)
Internal/UPL Other units or Sold
2 Diethylenetriamine (DETA) - (95-99%) 3300 Internal/UPL Other units or Sold
3 Amino Ethyl Piperazine (AEP) - (95-99%) 1650 Internal/UPL Other units or Sold
4 Amino Ethyl Ethanol Amine (AEEA) - (95-99%) 990 Internal/UPL Other units or Sold
5 Hydroxy Ethyl Piperazine (HEP) - 98% 660 Internal/UPL Other units or Sold
6 Ammonium Sulphate Solution- 10-20% 18435 Internal/UPL Other units or Sold
7 Ammonia Solution – 10% 5980 Internal/UPL Other units or Sold
8 Aluminum Hydroxide 580 Benzophenone Internal/UPL Other units or Sold
9 Potassium Chloride (25-30%) 1750 Dicamba Internal/UPL Other units or Sold
10 Methyl acetate - (95-99%) 3810 Azoxistrobin - Pilot Plan
Internal/UPL Other units or Sold
11 Methanol (98-99 %) 1266 Azoxystrobin
Azoxystrobin - Pilot Plan Internal/UPL Other units or Sold
12 Anhydrous Ammonia or 2075
Tri Methyl Phosphite(TMP) / Tri
Ethyl Phosphite (TEP)
Internal/UPL Other units or Sold
13 20% aqs. Ammonia 10379 Internal/UPL Other units or Sold
14 Ammonium Chloride soln - 15-20% 43521 Internal/UPL Other units or Sold
15 Calcium chloride solution 30% or 24000 Internal/UPL Other units or Sold
16 Calcium Chloride powder 8000 Internal/UPL Other units or Sold
17 Di Calcium Phosphate (DCP) Sludge 540 Internal/UPL Other units or Sold
18 Aluminum Chloride solution –(20-25%) 8454 Meta Phenoxy
Benzaldehyde (MPBAD)
Internal/UPL Other units or Sold
19 Meta Bromo Benzaldehyde - (95-99%) 1290 Internal/UPL Other units or Sold
20 Aqs. Potassium Chloride (20-25%) 7770 Internal/UPL Other units or Sold
21 Dimethoxy methane - (95-99%) 722 Aminoacetonitrile Sulfate
(AANS) Internal/UPL Other units or Sold
22 Ammonium acetate (28-35%)or 70680 Acephate
Internal/UPL Other units or Sold
23 Acetic Acid & Ammonium sulphate - (95-99%) 83400 Internal/UPL Other units or Sold
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 32
S.No. By-Products EC approved
Capacity in MTPA Source End Use
24 Ammonium sulphate & Sodium Acetate (30%) 106560 Internal/UPL Other units or Sold
25 Hydrochloric Acid sol. (28-32%) 65818 Hexa methylene
diisocyanate Internal/UPL Other units or Sold
26 Methyl Mercaptan 710 1-Methylamino-1-
Methylthio-2-Nitroethene Internal/UPL Other units or Sold
27 Steam 1382400 Power Plant Internal/UPL Other units or Sold
28 30% Hydrochloric Acid Solution 3156 Chloroacetyl Chloride Internal/UPL Other units or Sold
29 30% Hydrochloric Acid Solution 440 Methoxyacetyl Chloride Internal/UPL Other units or Sold
30 30% Hydrochloric Acid Solution 276
2-Chloro-3, 3-tri fluoropropen-1,2
dimethylcyclopropane Carbonyl chloride
Internal/UPL Other units or Sold
31 30% Hydrochloric Acid Solution 527 Acid Chloride Scrubbing of SO2
Internal/UPL Other units or Sold
32 31% Sodium Sulphite Solution 14378 Internal/UPL Other units or Sold
33 Ethyl Acetate sol. (90-95%) 6000
Glufosinate
Internal/UPL Other units or Sold
34 Ammonia sol.-20% 600 Internal/UPL Other units or Sold
35 Ammonnium Chloride 26560 Internal/UPL Other units or Sold
36 Magnesium Chloride Sol. (25-28%) OR 33160 Internal/UPL Other units or Sold
37 Magnesium chlorate -50% 33160 Internal/UPL Other units or Sold
38 40% Ammonium sulphate 1061 Sodium Cyanide Internal/UPL Other units or Sold
39 40% Ammonium sulphate 80 Potassium Cyanide Internal/UPL Other units or Sold
40 40% Ammonium sulphate 2415 Cyanuric chloride
Internal/UPL Other units or Sold
41 30% Hydrochloric Acid solution 29676 Internal/UPL Other units or Sold
Table 2.8: Proposed By Product Generation from expansion & new products (Intermediate and Speciality Chemicals)
S.No. By-Products Proposed Capacity, MTPA Source End Use
1 30% HCL
12010 TPPI Internal/UPL Other units or To Sale
13362 DCC
Total 25372
2 Aq. Ammonia 42680 EDTA Internal/UPL Other units or To Sale
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 33
S.No. By-Products Proposed Capacity, MTPA Source End Use
2730 Indigo Blue
Total 45410
3 Ammonium Sulphate
1172 EDTA
Internal/UPL Other units or To Sale
750 Indigo Blue
97750 HMTBA
386 TEOF
220 TMOF
4600 NaCN
Total 104878
4 NaCl Soln 3360 EDTA Internal Use
5 Sodium Hydrosulphide NaSH
350 Sul Iso
For Sale 153600 Cysteamine Hydrochloride
350 MITC
3600 ZnDTP
Total 157900
6 Methanol
1440 Cytosine Internal/UPL Other units or To Sale
800 Glutaraldehyde
Total 2240
7 Caustic Soda (NaOH) 1795 Cytosine Internal Use
8 Ammonium Chloride
1816 TEOF
For Sale 2540 TMOF
4930 DCC
Total 9286
9 Potassium Chloride (KCl)
399 TEOF For Sale
276 TMOF
Total 675
10 Sulphur 3040 MITC For Sale
All By products will be sold to market.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 34
2.4.2 Cost of the Project
Cost of the proposed project is Rs. 1491.85 Cr. Out of this Rs. 204.50 Cr. will be used for
cost of Environmental Management System. The project cost break up is given in Table 2.9
Table 2.9: Capital Cost Projection
Group Particulars Proposed
Nos Cost (In Lakh)
Land 755495.16 Sq. m area of plot D-3/6
Process Plant
Reactors 250 6567
Condenser 660 4050
Hydrogenation reactor 5 635
Agitated Nutsche Filters (ANF) 15 750
Spray Dryers and Rotary Vacuum Dryers 10 750
Tank 500 3000
Process pumps 2500 5024
Ejector 20 200
Valve and Instruments 1 10000
Column 30 440
Utilities
Brine (up to - 20°C) 5 650
Boiler (For water and oil) 14 5000
D.G set 2 800
RO system 1 3000
Chilling plant 10 500
Cooling tower 40 450
Storage Tanks Water Storage Tank 3 1000
Raw material storage tank 10 5000
Environment
Air Pollution Control Measure (APCM) (Bag filter, Multi cyclone separator, water scrubber,
scrubber systems for process emissions), 19 1200
Effluent treatment plant (ETP)
1000 KLD 1
12320 MEE Plant 2
Sewage Treatment Plant (STP) 80 KLD and their accessories, Construction of stormwater
network 1
Acoustic enclosures for utility housing, D.G set -- 2
Installation of online monitoring systems, detector systems, CEMS, Odour Control
Measures, inhouse monitoring and analytical facilities, third party monitoring arrangements
-- 23
Plantation, irrigation, fertilizers and pesticides -- 143
Augmentation of storage areas for different types of wastes in compliance with the HW rules together with necessary infrastructure and
equipment for collection and transport, incineration plants
-- 6762
Civil Plant building civil and structural work 1 20190
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 35
Group Particulars Proposed
Nos Cost (In Lakh)
Preoperative expenses 1 6830
Piping Installation 1 15430
Insulation & Painting 1 8011
Safety Items 1 3503
Electrical installation 1 12450
Misc. expenses:- Lab, office, ware house, furniture & fixtures, office & lab requirement
1 943
Total -- 135623
Contingencies (10%) -- 13562.3
Grand Total -- 149185.3
2.5 ASSOCIATED ACTIVITIES REQUIRES BY OR FOR THE
PROJECT
2.5.1 Utilities
Details of the utilities proposed are detailed in Table 2.10
Table 2.10: Utilities
Particulars Proposed
Nos. Cost (In Lakh)
Brine (up to - 20°C) 5 650
Boiler (For water and oil) 14 5000
RO system 1 3000
Chilling plant 10 500
Cooling tower 40 450
Process Plants Captive MEE 5 9500
Table 2.11: Details of Plant Captive MEE
S.No Plant MEE Capacity
KLD Remarks
1 CCMP 145 Common MEE within plant
site.
2 RP (Red Phosphorous) 1.37 Common MEE within plant
site.
3 MAAN 48 Plant MEE
4 Cysteamine hydrochloride Or 1603.6 Common MEE within plant
site.
5 Cyanuric Chloride 345 Plant MEE
2.5.2 Land
The proposed expansion will be within existing site. The land is in the form of industrial plot
owned by the project proponent. Land documents are enclosed as Annexure 7.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 36
2.5.3 Power
The additional power requirement for proposed expansion will be 31 MWPH which will be
sourced from Dakshin Gujarat Vij Company Limited (DGVCL). Two additional D.G.Set of
1200 KVA are proposed for proposed expansion. D.G. Sets will be used as backup power
source in emergency only. Details of Existing & Proposed Energy and Power requirement
are tabulated in Table 2.12.
Table 2.12: Power Requirement
S. No.
Particulars Existing
EC Approved
Additional for proposed expansion
Total after Expansion
Source/Remarks
1 Power – Electricity
requirement (MWPH) 4 31 35
Dakshin Gujarat Vij Company Limited
(DGVCL)
2 CPP Phase 1 (MWPH) 20 0 20
No Expansion in Approved Captive
Power Plant Capacities 3 CPP Phase 2 (MWPH) 20 0 20
4 CPP Phase 3 (MWPH) 15 0 15
5 D.G.Set (back up) 4 X 2000
KVA 2 X 1200 KVA
4 X 2000 KVA & 2 X 1200 KVA
D.G will be used only during power failures as an emergency back up
2.5.4 Fuel
Details of fuel for existing and proposed expansion are provided in Table 2.13.
Table 2.13: Fuel Details
S. No.
Fuel UOM
Existing EC
Approved Quantity
Additional Proposed Quantity
Total after Expansion
Source Remarks for
Proposed
1 Natural Gas for Thermic Fluid heater
Nm3/day 5813 9965 15778 GAIL
Proposed: TPPI and
DPMP
2
Natural Gas for Boiler or
Nm3/day 1026037.4 667059 1693096 GAIL
Proposed Boiler: Boiler
(40TPHX7No.
10TPHx7Nos)
Coal/
Briquette for Boiler or
MT/day 2180.3 0 2180.3
Adani Coal supply/
Madhuram traders
Coal used only in
Existing
Furnace Oil for Boiler
MTPD 969 630 1599 BPCL/IOCL
Proposed Boiler: Boiler
(40TPHX7No
10TPHx7Nos)
3 Natural Gas for Process
Nm3/day 20833.9 147533 168366.9 GAIL
Proposed: NaCN, TEOF, TMOF,
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 37
S. No.
Fuel UOM
Existing EC
Approved Quantity
Additional Proposed Quantity
Total after Expansion
Source Remarks for
Proposed
Cyanuric Chloride
Plant
6 Natural Gas
for Incineration
Nm3/day 5860 20000 25860 GAIL
Proposed: Fume Gas Incinerators
7 HSD L/h 847 600 1447 Local
supplier
Proposed: (2NosX1200
KVA)
2.5.5 Water
Total Water Requirement:
Total Water requirement for EC granted project (Pesticide Technical, Intermediates,
Intermediates and Speciality Chemicals and Captive Power Plant) and Expansions and
addition of new Speciality chemicals is summarized in a Table 2.14 .
Table 2.14 : Total Water Demand (Existing & Proposed)
Water Type Water Demand
Existing EC Approved Products in KL/Day
Water Demand for Proposed Expansion & Addition of New
Speciality Chemicals in KL/Day
Total in KL/Day
Raw Water 12252 13125 25377
Recycled water 4642 7739 12381
Net Fresh Water demand after recycling
7610 5386 12996
Water Requirement (EC Granted Quantity):
Total Water requirement for EC granted project (Pesticide Technical, Intermediates,
Intermediates and Speciality Chemicals and Captive Power Plant) is 12252 KL/Day out of
which fresh water will be 7610 KL/Day and remaining 4642 KL/Day will be recycled water.
Fresh Water is sourced from GIDC. The existing water balance diagram is given as Figure
2.2. The UPL Limited has applied to GIDC for supply of fresh water since April 2019. The
Job for giving of water supply from GIDC is under progress. The EC Approved Water
Balance is Tabulated in Table 2.15
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 38
Table 2.15 : EC Approved Water Requirement
Water Requirement (For Proposed Expansions):
After proposed expansion total water consumption will be 13125 KLD. (Fresh water: 5386
KLD + Recycle water 7739 KLD). Fresh water will be sourced from GIDC. The proposed
water requirements are given in below Table 2.16. The water balance is given in Figure 2.3.
The unit has obtained assurance from GIDC for supply of required quantity of water. Copy of
the same is attached as Annexure 9.
Table 2.16 : Details of Proposed Water Requirements for expansion & new Speciality chemicals
S. No.
Usages Types
Raw Water KLD
Recycled/Reuse Water KLD
Net Fresh Water KLD
Remarks
1 Domestic 100 0 100 Fresh Water for domestic
purpose
2 Industrial
2.1 Processing 3776 3394 382 90% Water Recycle to
process
2.2 Boiler 3779 1569 2210 Steam Condensate and RO permeate recycled to boiler
2.3 Cooling 4321 2696 1625 RO permeate recycled to
Cooling tower
2.4 Washing 20 20 0 Recycled Water from STP
treated water
2.5 APCM/
Scrubber 1069 0 1069
Scrubber water either converted to byproduct or
sent to MEE/ETP
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 39
S. No.
Usages Types
Raw Water KLD
Recycled/Reuse Water KLD
Net Fresh Water KLD
Remarks
2.6 Gardening 60 60 0 Recycled Water from STP
treated water
TOTAL in KLD 13125 7739 5386
Water Source : GIDC Dahej
2.5.6 Manpower
The proposed expansion project will generate employment during the construction and
operation phase. Local skilled and semi-skilled workers will be hired during construction
phase as well as operation phase. During the operation phase, technical staff, general staff
for administrative work and other ancillary services i.e. O&M contractor and maintenance
services will be required on a temporary basis. In addition to 2000 Nos of Employees (for EC
Approved product manufacturing plants), the additional 1500 manpower will be required for
proposed project. Details of existing & Proposed manpower is given in Table 2.17
Table 2.17: Manpower details (Existing & Proposed)
Particular Existing Proposed Total After Expansion
Permanent Employment-During
Construction 100 100 200
Temporary Employment-During
Construction 500 300 800
Permanent Employment-During
Operation 600 500 1100
Temporary Employment-During
Operation 800 600 1400
Total 2000 1500 3500
2.6 PROPOSED SCHEDULE FOR APPROVAL AND
IMPLEMENTATION
Detailed list of activities and approvals require after receipt of EC and tentative time frame
required is given in Table 2.18
Project will be commissioned within 15-17 months after receipt of EC.
Table 2.18: Proposed schedule for approval and implementation
ACTIVITY / MONTH, YEAR MAY 20 JULY 20 NOV 20 APR-21 MAY-21 JUNE-21
Receipt of EC
CTE/NOC
Construction
Erection & completion
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 40
ACTIVITY / MONTH, YEAR MAY 20 JULY 20 NOV 20 APR-21 MAY-21 JUNE-21
CTO/CCA
Commissioning of Plant
2.7 TECHNOLOGY AND PROCESS DESCRIPTION
Details of Technology & Process description is provided in Annexure 20
2.8 PROJECT DESCRIPTION
2.8.1 Raw Material details
Details of product wise raw material requirement for proposed project is provided in Table
2.19.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 41
Table 2.19: Details of Proposed product wise raw material requirement, its storage and mode of transportation
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
1 UPDT 4166.67
Starch 1291.67 Solid RM
warehouse 215 HDPE Atm Atm Truck
Ceremic Ammonium
Nitrite 41.67 Solid
RM warehouse
7 HDPE Atm Atm Truck
Acrylonitrile 1270.83 Liquid Tank 212 SS304 Atm Nitrogen
Blanketing Container
KOH 1083.33 Solid RM
warehouse 181 SS316L Atm Atm Truck
45% Phosphoric Acid
375 Liquid Tank 63 PP-FRP Atm Nitrogen
Blanketing Container
Methanol 700 Liquid Tank 117 CS Atm Nitrogen
Blanketing Container
2 Glacial Acetic Acid
2500
28% Acetic Acid 8792.5 Liquid Tank 1465 SS316L Atm Nitrogen
Blanketing Container
97% Ethyl Acetate
70 Liquid Tank 12 SS316L Atm Nitrogen
Blanketing Container
3 CCMP 833
DCPD [ 95%] 478.33 Liquid Tank 80 PTFE line
CS Atm
Nitrogen Blanketing
Container
Acrolein 782.5 Liquid Tank 130 PTFE line
CS Atm
Nitrogen Blanketing
Container
Toluene 670.83 Liquid Tank 112 CS Atm Atm Container
TBA 61.67 Liquid Tank 10 SS316L Atm Nitrogen
Blanketing Container
K2CO3 50 Solid RM
warehouse 8 CI Atm Atm Truck
KOH 76.67 Solid RM
warehouse 13 HDPE Atm Atm Truck
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 42
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
Acrylonitrile 1019.1 Liquid Tank 170 SS304 Atm Nitrogen
Blanketing Container
HCl [ 10%] 420.83 Liquid Tank 70 PVDF-FRP Atm Nitrogen
Blanketing Container
Sodium chloride soln
1870 Liquid RM
warehouse 312 HDPE Atm Atm Truck
Hydroquinone 18.33 Liquid Drum 3 HDPE Atm Nitrogen
Blanketing Truck
Caustic flakes 21.67 Solid RM
warehouse 4 Fibre-Foam Atm Atm Truck
30% NaOH for scrubber
125 Drum 21 CS Atm Truck
DMF 911.67 Liquid Tank 152 SS304 Atm Nitrogen
Blanketing Container
Chlorine 560 Gas Tonner 93 CS Atm 6 kg/cm2
POCl3 797.5 Liquid Tank 133 PTFE line
CS Atm
Nitrogen Blanketing
Container
Sodium carbonate
291.67 Solid RM
warehouse 49 HDPE Atm Atm Truck
Piperazine 18.33 Solid RM
warehouse 3 HDPE Atm Atm Truck
4 TPPI 833
PCL3 379.17 Liquid Tank 63 SS316L Atm Nitrogen
Blanketing Container
Phenol 760 Liquid Tank 127 SS316L 55 deg.C Nitrogen
Blanketing Container
NaOH 32% 66.67 Liquid Tank 11 CS Atm Atm Container
5 DPMP 1000 TMP 189 Liquid Tank 32 SS316L Atm Nitrogen
Blanketing Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 43
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
TPPI 947 Liquid Tank 158 SS316L Atm Nitrogen
Blanketing Container
Catalyst 1 Solid RM Ware
house 0 HDPE Atm Atm Truck
6 EDTA 1666.7
NH3 503.33 Gas Bullet 84 CS Atm 6 kg/cm2 Container
Natural Gas 473.33 Gas No storage 79 NA NA NA
Formaldehyde (37%)
2261.67 Liquid Tank 377 SS316L Atm Nitrogen
Blanketing Container
Caustic solution (0.05N)
33.33 Liquid Tank 6 CS Atm Atm Container
Phosphoric acid 8.33 Liquid Tank 1 PP-FRP Atm Nitrogen
Blanketing Container
Ethylene diamine(EDA)
376.67 Liquid Tank 63 PTFE
coated CS Atm
Nitrogen Blanketing
Container
Caustic Lye (48%)
2486.67 Liquid Tank 414 CS Atm Atm Container
Hydrochloric Acid (30%)
3588.33 Liquid Tank 598 PVDF-FRP Atm Nitrogen
Blanketing Container
NaOH (30% solution) for HCN
Scrubber 590 Liquid Tank 98 CS Atm Atm Container
7 Indigo Blue
416.7
Ammonia 143.75 Gas Bullet 24 CS Atm Atm Truck
Methane 192.08 Gas No Storage 32 NA NA NA
Aniline 429.17 Liquid Tank 72 CS Atm Nitrogen
Blanketing Container
Methanol 7.92 Liquid U/G Tank 1 CS Atm Nitrogen
Blanketing Container
37% aqueous formaldehyde
378.75 Liquid Tank 63 SS316L Atm Nitrogen
Blanketing Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 44
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
solution
Toluene 12.92 Liquid U/G Tank 2 CS Atm Nitrogen
Blanketing Container
Potassium hydroxide (KOH)
844.58 Solid RM Ware
house 141 SS316L Atm Atm Truck
Sulfuric acid (H2SO4)
81.25 Liquid Tank 14 CS Atm Atm Container
Ammonia 229.58 Gas Bullet 38 CS Atm 6 kg/cm2 Truck
Sodium hydroxide (NaOH)
396.67 Liquid Tank 66 CS Atm Atm Container
Sodium carbonate (Na2CO3)
59.58 Solid RM Ware
house 10 HDPE Atm Atm Truck
Sodium Amide 344.17 Solid RM Ware
house 57 Ss304 Atm Atm Truck
Sodium Metal 204.17 Solid RM Ware
house 34
CS with Kerosene
Atm Atm Truck
8 HMTBA 4166.67
Ammonia gas NH3
697.92 Liquid No storage 116 NA Atm NA Container
Natural Gas 656.75 Liquid Bullet 109 CS Atm Atm Truck
MMP 2850 Liquid Tank 475 SS316L Atm Nitrogen
Blanketing Container
H2SO4 98% 2795.83 Liquid Tank 466 MS Atm Atm Container
Ammonia gas (NH3)
274.5 Liquid Tank 46 CS Atm Nitrogen
Blanketing Container
Ethyl acetate 17.08 Liquid Tank 3 CS Atm Nitrogen
Blanketing Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 45
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
MDC 33.33 Liquid Tank 6 SS316L 20 deg C Nitrogen
Blanketing Container
30% NaOH 1654.17 Liquid Tank 276 CS Atm Atm Container
9 RP (Red
Phosporous)
416.7
White Phosphorous
427.5 Solid Drum 71 CS Atm Atm Truck
Caustic Soda Lye (48%)
36.25 Liquid Tank 6 CS Atm Atm Container
30% Caustic for scrubber
41.67 Liquid Tank 7 PVDF-FRP Atm Atm Container
Hydrochloric Acid (30%)
176.67 Liquid Tank 29 PVDF-FRP Atm Nitrogen
Blanketing Container
10 MAAN Plant
166.67
Ammonium chloride
209.5 Solid RM Ware
house 35 CS 25 deg.C Atm Truck
Formaldehyde (37%)
638.83 Liquid Tank 106 SS316L Atm Nitrogen
Blanketing Container
Sodium cyanide (36.6%)
464.67 Liquid Tank 77 CS Atm Nitrogen
Blanketing Container
Caustic lye 158.67 Liquid Tank 26 CS Atm Atm Container
11 Sodium
Ferrocyanide
166.67
Iron 33.33 Liquid Tank 6 CS Atm Atm Container
HCl (33%w/w) 84.33 Solid RM Ware
house 14 PVDF-FRP Atm Atm Truck
30% NaCN 320 Liquid Tank 53 CS Atm Atm Container
48% NaOH 64.83 Liquid Tank 11 CS Atm Atm Container
12 Sulpherise
d Iso Butylene
416.67
Sulfur 192.31 Solid Open
Storage 32 CS Atm Atm Truck
Isobutylene 232.7 Gas Bullet 39 SS316L Atm 6 kg/cm2 Container
Hydrogen Sulphide (H2S)
4.17 Gas No Storage 1 SS316L NA 6 kg/cm2
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 46
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
30% NaOH 20.83 Liquid Tank 3 CS Atm Atm Container
13 Thiophine 83.33
CS2 141.67 Gas Tank 24 SS304 25 deg.C 6 kg/cm2 Container
Butanol 116.67 Liquid U/G Tank 19 SS316L Atm Nitrogen
Blanketing Container
Caustic 48% solution
233.33 Liquid Tank 39 CS Atm Atm Container
14 Cytosine 416.67
Acetonitrile 153.75 Liquid Tank 26 CS 15-20 deg.C
Nitrogen Blanketing
Container
Sodium Methoxide
202.5 Liquid Tank 34 SS304 Atm Nitrogen
Blanketing Container
CO 105 Gas No storage 18 NA NA NA NA
Urea 225 Solid RM ware
house 38 PVDF Bag Atm Atm Container
15.1
Cysteamine hydrochlorid
e OR
3333.33
Mono ethanol amine
4630 Liquid Tank 772 SS304 Atm Nitrogen
Blanketing Container
Sulphuric acid 7730 Liquid Tank 1288 CS Atm Atm Container
Toluene 697 Liquid U/G Tank 116 CS Atm Atm Container
Caustic Lye 6020 Solid RM ware
house 1003 CS Atm Atm Truck
Carbon Disulfide 5000 Liquid Tank 833 SS304 Atm Nitrogen
Blanketing Container
HCI [ 30%] 1060 Liquid Tank 177 PVDF-FRP Atm Nitrogen
Blanketing Container
HCl [20%] 3410 Liquid Tank 568 PVDF-FRP Atm Nitrogen
Blanketing Container
Chloroform 223 Gas Tank 37 SS304 25 deg.C Nitrogen
Blanketing Container
Caustic Lye for Effluent
3317 Liquid RM ware
house 553 CS Atm Atm Truck
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 47
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
Caustic Lye for Scrubber
1293 Liquid RM ware
house 216 CS Atm Atm Truck
15.2
OR Na2S (Sodium Sulphide
from Na2SO4)
3333.3 Na2SO4 5667 Liquid Tank 945 PP-FRP Atm Nitrogen
Blanketing Container
16 Triethyl
orthoformate (TEOF)
416.67
Ammonia 66.75 Gas Bullet 11 CS Atm 6 kg/cm2 Truck
Natural Gas 89.31 Gas No Storage 15 CS NA NA
Ethanol 430.63 Liquid U/G ST 72 CS Atm Nitrogen
Blanketing Container
Petroleum Ether1 36.32 Liquid Tank 6 SS304 25 deg.C Nitrogen
Blanketing Container
Hydrogen chloride
135.13 Liquid No Storage 23 NA Atm Nitrogen
Blanketing Internal
Potassium carbonate (K2CO3)
30.85 Solid RM ware
house 5 HDPE Atm Atm Truck
H2SO4 10 Liquid Tank 2 CS Atm Atm Container
NH3 3.33 Gas Bullet 1 CS Atm 6 kg/cm2 Truck
17 Trimethyl
orthoformate (TMOF)
416.67
NH3 94.8 Gas Bullet 16 CS Atm 6 kg/cm2 Truck
Natural Gas 127.2 Gas No Storage 21 CS NA NA NA
Methanol 423.9 Liquid U/G ST 71 CS Atm Nitrogen
Blanketing Container
Petroleum Ether 13.8 Liquid Tank 2 SS304 25 deg.C Nitrogen
Blanketing Container
Hydrogen chloride
159.4 Liquid Tank 27 PVDF-FRP Atm Nitrogen
Blanketing Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 48
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
Potassium carbonate (K2CO3)
21.6 Solid RM Ware
house 4 HDPE Atm Atm Truck
18
Sodium Cyanide (NaCN)
Existing & Expansion
1666.7
NH3 893.3 Gas Bullet 149 CS Atm 12.5 kg/cm2 Truck
Natural Gas 1193.3 Gas No Storage 199 CS NA NA
H2SO4 (98%) 273.3 Liquid Tank 46 CS Atm Atm Container
48% NaOH 3058.3 Liquid Tank 510 CS Atm Atm Container
19
Cyanuric Chloride – Existing & Expansion
2083.3
NaCN 15% Soln 12375 Liquid Tank 2063 CS Atm Nitrogen
Blanketing Container
Chlorine 2343.75 Gas Tonner 391 CS Atm 6 kg/cm2
NaOH 48% 302.08 Liquid Tank 50 CS Atm Atm Container
20
Methyl isothiocya
nate (MITC)
416.7
DI chloromethane 81.67 Liquid Tank 14 PEEK
Coated CS 15-20 deg.C
Nitrogen Blanketing
Container
Methyl Amine 613.33 Liquid Tank 102 SS304
15-20 deg.C
Nitrogen Blanketing
Container
(40% Soln.)
Carbon disulfide (CS2)
645.83 Liquid Tank 108 SS304 25 deg.C Nitrogen
Blanketing Container
NaOH 48% 2.08 Liquid Tank CS Atm Atm Truck
21
21.1
Sec Butyl Chlorofor
mate (SBCF)
566.67
Sec. Butanol 402.3 Liquid Tank 67 SS316L Atm Nitrogen
Blanketing Container
CO 226.7 Gas NO storage 38 NA NA NA
Cl2 566.7 Gas Tonner 94 CS Atm 6 kg/cm2
MDC 150.2 Liquid Tank 25 SS316L 20-25 deg.C
Nitrogen Blanketing
Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 49
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
C/s lye (~20% scrubber)
396.7 Liquid Tank 66 CS Atm Atm Container
OR OR OR OR OR OR OR
21.2
2 Ethyl Hexyl
Chloroformate
566.67
2-Ethyl hexanol 403 Liquid Tank 67 CS Atm Nitrogen
Blanketing Container
CO 173 Gas No Storage 29 NA NA NA --
Cl2 439 Gas No Storage 73 NA NA NA --
Carbon 0 Solid Tank 0 CS Atm Atm Container
MDC 102 Liquid Tank 17 SS316L 20-25 deg.C
Nitrogen Blanketing
Container
10% NaOH (scrubber)
85 Liquid Tank 14 CS Atm Atm Container
OR OR OR OR OR OR OR
21.3
Di-Cyclo Hexyl
Carbodiimide (DCC)
566.67
Cyclohexyl amine (Step-1)
415.37 Liquid Tank 69 CS Atm Nitrogen
Blanketing Container
Cyclohexyl amine (step-2)
323.57 Liquid Tank 54 CS Atm Nitrogen
Blanketing Container
CO 256.7 Gas No Storage 43 NA NA NA --
Cl2 651.1 Gas Tonner 109 CS Atm 6 kg/cm2 Truck
Toluene (Step-1+step-2)
50.43 Liquid Tank 8 CS Atm Nitrogen
Blanketing Container
Methyl tert butyl ether
147.33 Liquid Tank 25 SS304 25 deg.C Nitrogen
Blanketing Container
NH3 208.53 Liquid Tank 35 CS Atm Nitrogen
Blanketing Truck
Sodium Hydroxide
53.27 Liquid Tank 9 PP-FRP Atm Atm Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 50
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
22
Cyclo Propyl
Acetylene (CPA)
83.33
Cyclopropyl Methyl Ketone
164.7 Liquid Tank 27 SS316L Atm Nitrogen
Blanketing Container
CO 65.8 Gas No Storage 11 NA NA NA
Cl2 166.7 Gas Tonner 28 CS Atm 6 kg/cm2 Truck
Quinoline 13.8 Liquid Tank 2 SS316L Atm Nitrogen
Blanketing Container
Triphenyl phosphine oxide
(TPPNo) 27.1 Solid
RM ware house
5 HDPE Atm Atm Truck
ORTHO DICHLORO BENZENE
(ODCB)
53.3 Liquid Tank 9 SS316L Atm Nitrogen
Blanketing Container
DIMETHYL SULFOXIDE
(DMSO) 13.9 Liquid Tank 2 SS316L Atm
Nitrogen Blanketing
Container
NaOH (48%) 78.3 Liquid Tank 13 CS Atm Atm Container
23 ZnDTP 1000
Phosphorus pentasulphide
335.68 Liquid Tank 56 CS Atm Nitrogen
Blanketing Container
Secondary butyl alcohol
365.19 Liquid Tank 61 SS316L Atm Nitrogen
Blanketing Container
Methyl iso butyl carbinol
164 Liquid Tank 27 PP-FRP Atm Nitrogen
Blanketing Container
Lube oil (Alpron N-32)
192.6 Liquid Tank 32 HDPE Atm Atm Truck
Zink oxide 127.89 Solid RM ware
house 21 LDPE Bags Atm Atm Truck
Acetic acid 1.3 Liquid Tank 0 HDPE Atm Nitrogen
Blanketing Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 51
S. No.
Product Name
Capacity
TPM
Raw Material MT/
Month Liquid/So
lid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperat
ure in Deg C
Storage Pressure in
kg/cm2
Transportation
Fw-14 27 Solid RM ware
house 5
Paper Bags
Atm Atm Truck
Caustic lye 124.63 Solid RM ware
house 21 CS Atm Atm Truck
24 Glutaralde
hyde 416.67
Methylvinylether (MVE)
154.12 Liquid Tank 26 SS316L `-5 deg.C Nitrogen
Blanketing Container
Acrolein (ACR) 148.75 Liquid Tank 25 PVDF-FRP Atm Nitrogen
Blanketing Container
MDP 1.67 Liquid Tank 0.28 SS316L Atm Nitrogen
Blanketing Container
Note: Nitrogen Blanketing is generally between 150 to 500 mmWC pressure.
2.8.2 Transportation of Raw Material, Finished Products and Haz. Waste
From the proposed facility, approximately on daily basis 90 trucks per day (63 trucks of 20 tones capacity for carrying RM & FG + 27 truck of 20
tone for carrying Hazardous waste ) shall be using the SH-6 and SH-206. Employees and contract workers (~ 30 cars, 6 buses, 5 three wheelers &
40 two wheelers) shall use the same route during peak hours. Adequate parking space for trucks is already planned in existing project.
2.8.3 Storage Facilities
The storage details of finished goods is provided in Table 2.20
Table 2.20: Storage details of Finished Goods
S. No.
Product Name Capacity
TPM Liquid/Solid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperature in
Deg C
Storage Pressure in
kg/cm2 Transportation
1 UPDT 4166.67 Solid Bag 694 PP Atm Atm Truck
2 Glacial Acetic
Acid 2500 Liquid Tank 417 SS316L Atm
Nitrogen Blanketing
Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 52
S. No.
Product Name Capacity
TPM Liquid/Solid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperature in
Deg C
Storage Pressure in
kg/cm2 Transportation
3 CCMP 833 Liquid Tank 139 MSGL Atm Nitrogen
Blanketing Container
4 TPPI 833 Liquid Tank 139 SS316L Atm Atm Container
5 DPMP 1000 Liquid Tank 167 SS316L Atm Nitrogen
Blanketing Container
6 EDTA 1666.7 Solid Bag 278 PP Atm Atm Truck
7 Indigo Blue 416.7 Solid Bag 69 PP Atm Atm Truck
8 HMTBA 4166.67 Liquid Tank 694 SS316L Atm Nitrogen
Blanketing Container
9 Red
Phosphorous 416.7 Solid Drum 69 MS Atm Atm Truck
10 MAAN Plant 166.67 Solid Bag 28 PP Atm Atm Truck
11 Sodium
Ferrocyanide 166.67 Solid Bag / Drum 28 PP/MS Atm Atm Truck
12 Sulpherised Iso
Butylene 416.67 Liquid U/G Tank 69 SS316L Atm
Nitrogen Blanketing
Container
13 Thiophine 83.33 Liquid Tank 14 SS316L Atm Nitrogen
Blanketing Container
14 Cytosine 416.67 Solid Bag 69 PP Atm Atm Truck
15.1
Cysteamine hydrochloride
OR 3333.33 Solid Bag 556 PP 2-8°C Atm Truck
15.2 OR Na2S (Sodium
3333.3 Solid Bag 556 PP Atm Atm Truck
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 53
S. No.
Product Name Capacity
TPM Liquid/Solid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperature in
Deg C
Storage Pressure in
kg/cm2 Transportation
Sulphide from Na2SO4)
16 Triethyl
orthoformate (TEOF)
416.67 Liquid Tank 69 SS316L Atm Nitrogen
Blanketing Container
17 Trimethyl
orthoformate (TMOF)
416.67 Liquid Tank 69 SS316L Atm Atm Container
18 Sodium Cyanide (NaCN) Existing
& Expansion 1666.7 Solid Bag/Drum 278
PP/MS with Liner
Atm Atm Truck
19
Cyanuric Chloride – Existing & Expansion
2083.3 Solid Bag 347 PP Atm Atm Truck
20 Methyl
isothiocyanate (MITC)
416.7 Liquid Tank 69 SS316L 2-8°C Nitrogen
Blanketing Container
21.1
Sec Butyl Chloroformate
(SBCF) 566.67 Liquid Tank 94 SS316L Atm
Nitrogen Blanketing
Container
OR OR OR OR OR OR OR OR
21.2 2 Ethyl Hexyl Chloroformate
566.67 Liquid Tank 94 SS316L 2-8°C Nitrogen
Blanketing Container
OR OR OR OR OR OR OR OR
21.3
Di-Cyclo Hexyl Carbodiimide
(DCC) 566.67 Liquid Tank 94 SS316LL 55 deg C
Nitrogen Blanketing
Container
22 Cyclo Propyl
Acetylene (CPA) 83.33 Liquid Tank 14 SS316L Atm
Nitrogen Blanketing
Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 54
S. No.
Product Name Capacity
TPM Liquid/Solid Storage
Storage capacity in MT (5 days)
MOC Of Storage
container
Storage Temperature in
Deg C
Storage Pressure in
kg/cm2 Transportation
23 ZnDTP 1000 Liquid Tank 167 SS316L Atm Nitrogen
Blanketing Container
24 Glutaraldehyde 416.67 Liquid Tank 69 SS316L 2-8°C Nitrogen
Blanketing Container
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 55
2.8.4 Resource Optimization/recycling and Reuse Envisaged in the Project
Resource optimization/recycling and reuse envisaged in the project are mentioned below;
Efficient cooling towers are being planned to reduce evaporation losses.
Adequate solvent recovery system shall be provided to recover more than 95% and reuse the solvent and minimize the solvent loss. The solvent recovery details are given in Table 2.21
Recovery of valuable raw material and reused in process. .
Recycle and Reuse of MEE, Boiler condensate water after RO treatment.
Recovery of various by products from waste stream generated during production
process.
Use of Energy efficient chilling, cooling and Lighting system.
Details of Solvents consumed product wise and recovered is provided in Table 2.21
Table 2.21: Details of Solvent recovery for proposed expansion & new Speciality chemicals
S. No.
Product Name Raw Material Quantity of RM in Kg
Recycle in Kg
Consumption in Kg
Solvent Recovery
%
1 UPDT Methanol 10480 10312.00 168.00 98
2 Glacial Acetic
Acid 97% Ethyl Acetate
14096 14068.00 28.00 99.8
3 CCMP Toluene 16118 15313 805 95
4 Indigo Blue Methanol 2594 2575 19 99
Toluene 6651 6620 31 99.6
5 HMTBA Ethyl acetate 82 78 4 95
MDC 159 151.00 8 95
6 Cysteamine
hydrochloride
Toluene 4167 3958 209 95
Chloroform 1667 1600 67 96
7 Triethyl
orthoformate (TEOF)
Petroleum Ether
1742.16 1655 87.16 95
8 Trimethyl
orthoformate (TMOF)
Petroleum Ether
2449.09 2416 33.09 99
9 Methyl
isothiocyanate (MITC)
DI chloromethane
9767 9571 196 98
10 Sec Butyl
Chloroformate (SBCF) OR
MDC 5300 5035 265 95
11 2 Ethyl Hexyl Chloroformate
OR MDC 3600 3420 180 95
12 Di-Cyclo Hexyl Carbodiimide
(DCC)
Toluene 5769 5680 89 98
Methyl tert butyl ether
5550 5290 260 95
13 Cyclo Propyl
Acetylene (CPA)
Quinoline 3302 3137 165 95
ORTHO DICHLORO
12790 12151 639 95
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 56
S. No.
Product Name Raw Material Quantity of RM in Kg
Recycle in Kg
Consumption in Kg
Solvent Recovery
%
BENZENE (ODCB)
DIMETHYL SULFOXIDE
(DMSO) 3348 3181 167 95
14 Glutaraldehyde MDP 82.00 78.00 4.00 95
Solvent recovery plan
Wherever required, the solvents shall be directly pumped into day tanks from the
storage tanks and shall be charged into the reactors without involving any manual
handling.
All the pumps shall be of seal less type to avoid any leakage of solvent.
All necessary firefighting systems shall be provided with alarm system. Flame proof
wiring and flame proof electrical accessories shall be provided to avoid any mishap.
All the storage tanks and day tanks shall be connected to a vent system through
chilled water / brine condensers to prevent loss of solvent in the atmosphere.
A flow diagram of Solvent recovery Plan is shown as Figure 2.1
Figure 2.1: Solvent Recovery Plan
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 57
2.8.5 Maximum Possible Loss Spots
The maximum possible loss spots include Flanges, Bends, Gasket, Pipeline, Pumps, Air
Vents, Pin holes, Storage Surface loss.
The mitigation Measures to Control Maximum Loss of solvents or Flammable Chemicals are
following:
1. SAP Based Periodic Schedule for Preventive maintenance for Pumps, Storage
Tanks and Reactors will be prepared and followed accordingly.
2. Monitoring Plan of integrity and checking schedule for Pipeline and flange joint will
be prepared and followed accordingly.
3. Gasket and air vents will be checked during preventive maintenance.
4. NDT test for Pipeline and Associated Storage tank is done by third party in every five
year.
5. Regular Inspection of Storages and Audit by Third Party.
6. Thickness test of Storage tanks will be carried out by third party in every three year.
2.8.6 Leak Detection and Repair (LDAR) Program
Leak Detection and Repair (LDAR) is a program implemented to comply with environmental
regulations for reducing the fugitive emissions of targeted chemicals into the environment. In
addition to control fugitive emissions, LDAR Program also helps the industries to reduce
unwanted losses of chemicals and thereby increasing their profitability.
Purpose of Solvent:-
Solvents are used as an ingredient / raw material in manufacturing of SOC.
Solvents are media for reaction platform at difference stages of manufacturing.
Following steps will be followed for effective implementation of LDAR Program:
1. Identification of volatile chemicals which may contribute in VOCs:
In the proposed plant the list of chemicals which may contribute in VOCs are provided in
Table 2.21.
2. Identification of all the probable sources of leakage; Such as valves, pumps
and connectors
List of the sources of probable leakages is as follows.
Valves/Flanges
Pump glands handling above chemicals
Open vents from the tank top
Pump seals
Compressor seals
Pressure relief devices
Process drains
LPDs (Low Point Drains)
HPVs (High Point Vents)
A list of all such items shall be made and same shall be incorporated in the checklist for
LDAR.
1. Selection of appropriate method for leak detection.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 58
Considering the nature of the chemical; appropriate method shall be selected for leak
detection of individual chemicals from the list given below:
Visual check
LEL meter
VOC meter
Gas detector
Methods for rectification of identified leaks:
For all identified leaks, closure shall be ensured with the help of maintenance department
and records for the same shall be maintained.
VOC and Controls:-
To prevent losses of these solvents in atmosphere, following infrastructure shall be used in
addition to LDAR program.
Leak Free Pumps for transfer of solvents.
MSW Gaskets in solvent pipelines to prevent leakage from flanges.
Unloading of solvents from Tanker to Storage Tank through appropriate Transferring
system.
Condenser and scrubber system with proper cooling arrangement.
Closed loop sampling for sampling of Relative materials.
Monitoring of Solvent Losses:-
In storage and consumption of solvents in various products will be measured through
Level transmitters and load cells weighing systems resp. The quantity at each stage
will be reconciled periodically to arrive at losses.
Batch output will be monitored and reconciled with quantity of input raw materials
added.
Workplace VOC monitoring will be carried out at the shop floor.
Periodic Leakage Audit at Plant.
Preventive Maintenance to prevent Leakages
In order to prevent leakage from Pump, Seals, Valves etc, preventive maintenance will be
carried out periodically as per plan. In case of any recurring problem, action plan will be
prepared or frequency will be revised.
Table 2.22: Preventive Maintenance Schedule
S. No.
Component Preventive Maintenance schedule
1 Valves/flanges Quarterly
2 Compressor seals Quarterly
3 Pressure relief devices Yearly
4 Pump seals with visible liquid dripping Daily
5 Any component with visible leaks Weekly
6 Any component after repair/replacement Weekly
7 Pipeline Thickness Testing Yearly
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 59
Scheduling and checklist for leak detection
All points will be checked as per the checklist given in Annexure 8.
Immediate Repair of devices in case of Leakages
Plant will have an internal competent team of Technicians and Engineers to handle
different types of leakages round the clock.
Plant will also maintain adequate number of spares and consumables required to
repair the leaking device.
Plant will also have competent contractor team to handle Leakages and can repair
the same immediately.
Standby equipment like Pumps, valves etc will be kept basis the criticality and usage
2.8.7 Air Emissions
Flue Gas Stack:
For proposed project natural gas or FO will be utilized as fuel for proposed boilers (7 x 40 T
Boilers & 7 x 10 T Boiler). Natural gas will be used as fuel in Thermic Fluid heater and HSD
will be used as fuel in D.G set (Will be operated only during emergency only).
The details of Existing & proposed flue gas stacks with APCM is provided in Table 2.23 and
Table 2.24
Table 2.23: Existing Flue Gas Stack Details
S. No. Stack
Attached to
Stack Height in
Meter Fuel Parameter
Permissible Limits
Control Measures provided
Existing (EC Approved)
1.
Boiler 130 TPH x 2 nos.-
for captive power plant
(20 MW)
100 x 2 nos.
Briquettes/ Coal- 2180.3 MT/day Or
Natural gas - 1026037.4
NM3/day Or Furnace Oil
969 MTPD
Particulate Matter
100 mg/Nm3
ESP + water scrubber for each boiler
SO2 100 ppm
NOX 50 ppm
2.
Boiler 100 TPH – for
captive power plant (15 MW)
100
Particulate Matter
100 mg/Nm3
SO2 100 ppm
NOX 50 ppm
3. Boiler 31 TPH
x 2 nos. 55 x 2 nos.
Particulate Matter
150 mg/Nm3
SO2 100 ppm
NOX 50 ppm
4. Boiler 20 TPH
x 2 nos. 31 x 2 nos.
Particulate Matter
150 mg/Nm3
SO2 100 ppm
NOX 50 ppm
5. Boiler 40 TPH
x 2 nos. 55 x 2 nos.
Particulate Matter
150 mg/Nm3
SO2 100 ppm
NOX 50 ppm
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 60
S. No. Stack
Attached to
Stack Height in
Meter Fuel Parameter
Permissible Limits
Control Measures provided
6. Boiler 10 TPH
x 2 nos. 31 x 2 nos.
Particulate Matter
150 mg/Nm3
SO2 100 ppm
NOX 50 ppm
7. Thermic fluid heater-1 (4
lakh Kcal/ Hr)
30 x 3 nos.
Natural gas-1329 Nm
3/day
Particulate Matter
150 mg/Nm3
Not Applicable
SO2 100 ppm
NOX 50 ppm
8. Thermic fluid heater-1 (12 lakh Kcal/ h)
Natural gas-3986 Nm
3/day
Particulate Matter
150 mg/Nm3
SO2 100 ppm
NOX 50 ppm
9. Thermic fluid heater-1 (1.5 lakh Kcal/ h)
Natural gas-498 Nm
3/day
Particulate Matter
150 mg/Nm3
SO2 100 ppm
NOX 50 ppm Adequate Stack
Height
10. DG set (2000 KVA x 4 nos.)
20 x 4 nos.
Diesel- 747 L/h
To be used as stand by during power failure
11 DG set (500 KVAX1 Nos)
12 X 1nos Diesel- 100
L/h To be used as stand by during power failure
Table 2.24: Proposed Flue Gas Stack Details
S. No.
Stack Attached
to
Stack Height in
Meter Fuel Parameter
Diameter in mm
Permissible Limits
Control Measures provided
1 7 x 40 T Boiler
7 Stack/30M Height of
Each
Natural Gas or
FO
Particulate Matter
1000
150 mg/Nm3 Water Scrubber & Adequate Stack Height
SO2 100 ppm
NOx 50 ppm
2 7 x 10 T Boiler
7 Stack/30M Height of
Each
Natural Gas or
FO
Particulate Matter
1000
150 mg/Nm3 Water Scrubber & Adequate Stack Height
SO2 100 ppm
NOx 50 ppm
3 Thermic
Fluid Heater
1 Stack / 30 M
Height
Natural Gas
Particulate Matter
500
150 mg/Nm3
Adequate Stack Height SO2 100 ppm
NOX 50 ppm
4
DG set (1200
KVA x 2 nos.)
2 Stack/30M Height of
Each
HSD
Particulate Matter
350
150 mg/Nm3 Adequate Stack
Height SO2 100 ppm
NOx 50 ppm
Process Gas Vents:
Standard air pollution control measures will be provided for 19 proposed process emission
stacks. The Existing and proposed process air emission details are provided in Table 2.25 to
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 61
Table 2.26.
Table 2.25: Existing Process Gas Emissions Details
Stack No.
Stack attached
to
Air pollution Control System
Dia
in MM
Height (M)
Exit gas
velocity
(m/s)
Air emission
Pollutant Name Permissib
le limit (mg/ Nm
3)
Existing
(A) Ethylenediamine (EDA)
1.
2-Stage Water
scrubber of Vapor Liquid
separator
Water scrubber
500 30 2 NH3 175
(B) Dicamba
2.
Bag filter attached to SPD
Bag Filter 600 30 2 PM 20
(C) Dimethyl Phosphoroamidothioate (DMPAT)
3.
Reactor 2-Stage Caustic scrubber
500 30 2 PCl3 9
4.
NH3 recovery column
2-Stage water
scrubber 500 30 2 NH3 175
(D) Isocyanates & Chloroformates
5.
Reactor
1st
solvent +2
nd
water+3rd
caustic
scrubber
600 30 5 Phosgene NIL
6.
Reactor
2-Stage water & Caustic scrubber
600 30 5 HCl 20
(E) Tri Methyl Phosphite(TMP) / Tri Ethyl Phosphite (TEP)
7.
PCl3 storage
tank
Dilute Caustic scrubber
400 30 2 PCl3 0 9
8.
Reactor Dilute HCl
scrubber 500 30 2 NH3 175
9.
Wet scrubber attached to SPD
Water Scrubber
500 30 2 PM 150
(F) Meta Phenoxy Benzaldehyde (MPBAD)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 62
Stack No.
Stack attached
to
Air pollution Control System
Dia
in MM
Height (M)
Exit gas
velocity
(m/s)
Air emission
Pollutant Name Permissib
le limit (mg/ Nm
3)
10.
Reactor Alkali
Scrubber 600 30 5 Bromine 5
(G) Acephate
11.
Reactor 2-Stage water
scrubber 500 30 5 NH3 30
12.
Bag filter attached to SPD
Bag Filter 600 30 2 PM 20
(H) Sulphur-WDG (Wettable Dispersible Granule)
13.
Bag filter attached to SPD
Bag Filter 600 30 2 PM 20
(I) Chloroacetyl Chloride
14.
Reactor 2-Stage water
scrubber 500 30 2 HCl 20
15.
Reactor Caustic scrubber
500 30 2 SO2 40
(J) Methoxyacetyl Chloride
16.
Reactor Water
Scrubber 500 30 2 HCl 20
17.
Reactor Caustic scrubber
500 30 2 SO2 40
(K) 2-Chloro-3, 3-tri fluoropropen-1,2 dimethylcyclopropane Carbonyl chloride
18.
Reactor Water
Scrubber 500 30 2 HCl 20
19.
Reactor Caustic scrubber
500 30 2 SO2 40
(L) DV Acid Chloride
20.
Reactor Water
Scrubber 500 30 2 HCl 20
21.
Reactor Caustic scrubber
500 30 2 SO2 < 40
(M) DL-Methionine
22.
Reactor Water
Scrubber 500 30 2 NH3 < 175
(N) Acrolein, 1-Methylamino-1-Methylthio-2-Nitroethene , Sodium Cyanide ,Potassium Cyanide and Cyanuric Chloride (Existing Standards)
23.
Combined fume
incinerator 1 & 2 (2
nos.)
Thermal destructi
on
1000
30 10
PM 150
HCl 20
SO2 40
NOx 25
H2S 45
HC (Organic Trace) 20
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 63
Stack No.
Stack attached
to
Air pollution Control System
Dia
in MM
Height (M)
Exit gas
velocity
(m/s)
Air emission
Pollutant Name Permissib
le limit (mg/ Nm
3)
HCN 30
(N) Acrolein, 1-Methylamino-1-Methylthio-2-Nitroethene , Sodium Cyanide ,Potassium Cyanide and Cyanuric Chloride (Proposed Revised Standards)
23
Combined fume
incinerator 1 & 2 (2
nos.)
Thermal destructi
on
1000
30 10
PM 150
HCl 20
SO2 100
NOx 400
H2S 45
HC (Organic Trace) 20
HCN 30
(O) Sodium Cyanide
24.
Reactor
NH3 absorber in H2SO4 scrubber
800 40 2 NH3 175
(P) Potassium Cyanide
25.
Reactor
NH3 absorber H2SO4
scrubber
1000
35 2 NH3 175
(Q) Cyanuric Chloride
26.
Reactor (Crystalize
r)
HCl absorber
Water scrubber
500 30 2 HCl 20
(R) Tri Methyl Phosphide
27.
Spray dryer of CaCl2
Water scrubber
500 30 2 PM 150
(S) Glufosinate
28.
From Reactor to
water scrubber & its vent to Stack
Alkali scrubber
600 30 5 HC 20
29.
From Reactor to
water scrubber & its vent to Stack
Water scrubber
500 30 2 NH3 30
30.
From Reactor to
water scrubber & its vent
Caustic scrubber
500 30 2 HC + NH3 20 + 30
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 64
Stack No.
Stack attached
to
Air pollution Control System
Dia
in MM
Height (M)
Exit gas
velocity
(m/s)
Air emission
Pollutant Name Permissib
le limit (mg/ Nm
3)
to Stack
31.
From Reactor to
water scrubber & its vent to Stack
Caustic scrubber
500 30 2 PCl3 9
32.
From Tank to water
scrubber & its vent to Stack
Caustic scrubber
500 30 2 HCl 20
33.
From Reactor to
water scrubber & its vent to Stack
Carbon Absorption Tower
500 30 2 VOC + HC 60 + 20
(T) Captive Incinerator (2 nos)
34.
Incinerator Plant (for solid & liquid)
Caustic scrubber attached
to incinerator plant
500 30 2
PM 50
HCl 50
SO2 200
CO 100 (daily
avg.)
TOC 20
Total dioxin & Furans
0.2 ng TEQ/ Nm
3
(8 hr sampling)
Sb+As+Pb+Cr+Co+Cu+Mn+Ni+V & their compounds
1.5 mg/ Nm
3 (2 hr
sampling)
35.
Stack attached to Bag Filter-2 nos. for
pesticide formulatio
n products.
Bag filter 600 30 2 PM 20
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 65
Table 2.26: Proposed Process Stacks for Expansion & New Speciality Chemicals
S. No.
Source Scrubbing
Media Height
Exit gas
velocity
(m/s)
Dia
In mm
Emission to Air
Norms mg/nm3
1 Saponification Reactor
(UPDT) NH3 scrubbing
with Water 30 6 200 NH3 30
2 BFNCI reactor (CCMP) Alkali Scrubber 30 6 300 Chlorine 9
HCl 20
3 TPPI reactor Alkali Scrubber
followed by Water scrubber
30 6 350 HCl 20
4 EDA reactor (EDTA)
Water scrubber 30 6 600
NH3 30
5 Alkali Scrubber 30 HCl 20
6 Indigo Blue Water scrubber 30 6 400 NH3 30
7 HMTBA Dil H2SO4 30 6 400 NH3 30
8 Red Phosphorous Alkali followed
by Water 30 6 500 HCl 20
9 Sul Isobutylene Alkali Scrubber 30 6 500 H2S 5
10 Cysteamine
Hydrochloride`
Alkali Scrubber+Water
Scrubber 30 6 600 H2S 5
11 Cyanuric Chloride
Bag Filter followed by
Alkali Scrubber+Water
Scrubber
30 10 250 Cl2
HCl
9
20
12 MITC Alkali Scrubber 30 6 500 H2S 5
13 PCF/SBCF/2EHCF/DCC
Alkali Scrubber+Water
Scrubber Common Scrubber
30 6 500 HCl 20
14 CPA Alkali
Scrubber+Water Scrubber
20 6 500 HCl 20
15 ZnDTP Alkali
Scrubber+Water Scrubber
30 6 500 H2S 5
16 Na2S Flakes
Bag Filter Followed by Water Scrubber
20 2 600 PM, SO2, NOX
150 100 50
17
NaCN Plant
(Emergency Stack)
Two stage water
scrubber 40 5 800
NH3
HC
175
20
NaCN Plant
(Process Stack)
2 stage Alkali Scrubber +
Water Scrubber 35 10 1000
NH3
HCN
175
30
18 Natural gas based fume
gas incinerator - III (NaCN, TEOF,
Thermal Destruction
30 10 1000
PM 150
HCl 20
SO2 100
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 66
S. No.
Source Scrubbing
Media Height
Exit gas
velocity
(m/s)
Dia
In mm
Emission to Air
Norms mg/nm3
TMOF,Indigo Blue, EDTA, HMTBA,
Cyanuric Chloride)
NOx 400
H2S 45
HC Traces
20
HCN 30
19 Natural gas based fume
gas incinerator - IV (Thiophine, DCC,MITC)
Thermal Destruction
30 10 1000
PM 150
HCl 20
SO2 100
NOx 400
H2S 45
HC Organic Traces
20
HCN 30
Design Specifications of APCM
The Standard & General Specification of Water scrubbing system is provided in Table 2.27.
However during implementation of project, final designing considering QRA will be executed
based on which final dimensions of scrubber and equipment will be implanted.
Table 2.27: The Standard Specification of Water Scrubber
Type : Absorption Tank
Quantity : 01 No.
Diameter : 1.2 m
Height : 1.5 m
Absorbing Liquid : Water
MOC : Mild Steel
The general specification of Alkali scrubbing system is provided in Table 2.28. However,
during implementation of project, final designing considering QRA & Environmental Compliances will be executed based on which final dimensions of scrubber and equipment will be implanted.
Table 2.28: The Standard Specification of Alkali Scrubber
S. No. Name of the Equipment Capacity
1. Scrubber dia 400 mm
2. Packed length 3000 mm
3. Overall scrubber height 4500 mm
4. MOC of scrubber PP/FRP
5. Scrubbing media 10 % NaOH
6. Dilute alkali circulation tank 2000 liter HDPE
7. Alkali circulation pump 3 m3/h, SS, 10 m head
8. Vent size 200 mm, 11 m height.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 67
Fugitive Emission & Control Measures
Various hazardous chemicals will be stored and handled at site. Suitable control measures
will be taken to control the fugitive emission (primary and secondary) during loading/
unloading, storage and handling of chemicals. Some fugitive emissions control measures
are described below:
All the joints, flanges, pumps, glands, seals, valves will be maintained in good
conditions through timely predictive and preventive maintenance;
Concrete road will be developed within plant premises to avoid fugitive dust due to
vehicle movement.
Regular checking and maintenance of the same will be carried out to avoid any
leakages.
Manufacturing activity will be carried out in closed reactors/vessels.
All the raw materials will be stored in closed containers and sealed bags and will be
handled through closed system to avoid the handling losses.
All pumps handling hazardous chemicals shall be provided with mechanical seals to
prevent fugitive emission.
Manual Handling of various chemicals will be avoided and will be designed by
implementing latest automation technology.
Odour Control Measures
All liquid raw materials will be charged into reactors with pumps or under gravity
through closed pipes
Vents of storage tanks will be provided with a water filled trap to prevent escape of
acid fumes.
Boundary wall as Wind breaker will be provided to restrict the dispersion of odor &
dust from the site.
Regular Workplace Monitoring, Measurement & Improvement Plan Implementation.
2.8.8 Noise Pollution
Sources of Noise at Site
Noise from Machinery/ Equipment during construction phase
In addition to the plant activity, during construction phase, site preparation related activities
will also involve the operation of heavy equipment like pile drivers, loaders, etc. The
equipment will be used during daytime.
Noise from Operation of Plant
The high noise levels within the workplace, during maintenance also have the potential to
affect the workers on site.
The sources considered at the project site are given in Table 2.29.
Table 2.29: Sources of Noise with their Sound Pressure Levels
S. No.
Sources Levels dB(A)
Day Night
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 68
S. No.
Sources Levels dB(A)
Day Night
1 Compressor 85 85
2 Pumps 85 85
3 PD-ID Fan 85 85
4 D. G Set 100 100
Noise from Vehicular Traffic
Vehicle movement for transportation of materials and work force to the site will cause minor
noise emission as the frequency of vehicular movement will be few times in a week.
Noise from Pumps
Noise generated from Pumps, etc. will have a continuous effect, as they will work for more
hours in a day continuously.
For prevention and control of noise pollution at design stage, mitigation measures adopted
are listed in Table 2.38.
2.8.9 Water Consumption, Waste Water Generation & Disposal Details
Water Consumption for Existing project:
The water requirement for the EC Granted project (Pesticide Technical, Pesticide
Intermediate, Intermediates & Speciality Chemicals & Power Plant) is 12252 KLD out of
which fresh water will be 7610 KLD and remaining 4642 KLD will be recycled water. Fresh
water will be sourced from GIDC Dahej.
Water Consumption for Proposed project:
The water consumption will be 13125 KLD for proposed project, out of which fresh water will
be 5386 KLD and Recycled water will be 7739 KLD. Fresh water will be sourced from GIDC
Dahej.
Total After Expansion:
After expansion the total water consumption will be 25377 KLD, out of which fresh water will
be 12966 KLD and Recycled water will be 12381 KLD. Fresh water will be sourced from
GIDC Dahej.
Detailed water break-up for Existing & proposes project is provided in Table 2.30
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 69
Table 2.30: Existing and Proposed Water Consumption Break-Up
S.No. Usages Types Existing quantity
(KLD)
Proposed quantity
(KLD)
After Expansion
quantity
(KLD)
Remarks
A Domestic 150 100 250 Fresh Water for
domestic purpose
B Industrial
B1 Processing 1336 3776 5112 Water Recycle to
process
B2 Boiler 4118 3779 7897 Steam Condensate and RO permeate recycled to boiler
B3 Cooling 6106 4321 10427 RO permeate
recycled to Cooling tower
B4 Washing 20 20 40 Recycled Water from
STP treated water
B5 APCM/ Scrubber 472 1069 1541
Scrubber water either converted to
byproduct or sent to MEE/ETP
C Gardening 50 60 110 Recycled Water from
STP treated water
Total Industrial (B) 12052 12965 25017
Total Water Cons. (A+B+C)
12252 13125 25377
Recycled Water (RO permeate+ STP+ Direct
recycled) 4642 7739 12381
Fresh water from GIDC
(Total water Cons.– Recycled Water)
7610 5386 12996
The water will be sourced from GIDC Dahej, water supply letter has been obtained vide
letter no. GIDC/DEE(WS)/BRH/67 dated 27.01.2020 for 12,996 KLD supply. Copy of the
same is attached as Annexure 9
Waste Water Generation from Existing EC Approved project:
The waste water generation from EC Granted project (Pesticide Technical, Pesticide
Intermediate, Intermediates & Speciality Chemicals & Power Plant) is 5624 KLD out of which
recycled water is 3618 KLD and treated effluent discharged to GIDC drain is 2006 KLD.
Waste Water Generation from Proposed project:
The waste water generation will be 4420.2 KLD for proposed project, out of which recycled
water is 3534.28 KLD & treated effluent to be discharged at GIDC drain will be 885.92 KLD.
Total After Expansion:
After expansion the total waste water generation will be 10044.2 KLD, out of which recycled
water will be 7152.28 KLD and effluent going to GIDC drain will be 2891.92 KLD.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 70
Detailed waste water generation break-up for Existing & proposed project is provided in
Table 2.31
Table 2.31: Existing and Proposed Waste water generation Break-Up
S. No. Source of Generation
Existing quantity
(KLD)
Proposed quantity
(KLD)
After Expansion quantity
(KLD)
A Domestic 90 80 170
B Industrial
1 Processing 1651 770 2421
2 Boiler Blow Down 250 152.7 402.7
3 Contaminated steam
condensate 2059 1260 3319
4 Cooling 529 374.5 903.5
5 Washing 20 20 40
6 Multiple Effect Evaporator
(MEE) 1025 1763 2788
Total Industrial (B) 5534 4340.2 9874.2
Total Waste Water Gen. (A+B) 5624 4420.2 10044.2
Recycled Water
(RO Permeate/ MEE/ Condensate/STP) 3618 3534.28 7152.28
Treated Effluent To GIDC Drain
(Total Waste Water Gen. (A+B)-Recycled water)
2006 885.92 2891.92
Approval for the disposal of 2891.6 KLD of water into GIDC drain has been obtained vide
GIDC/DEE/DRG/BRH/64 dated 03.02.2020. A copy of the same is attached as Annexure 10
Water Recovery:
Details of streams recycled directly and indirectly within premises from existing & proposed
project along with quantity and area in which it is recycled is provided in Table 2.32
Table 2.32: Details of Recycled streams of existing & proposed project
Streams from Recovery through
Existing quantity
(KLD)
Proposed quantity
(KLD)
Total after Expansion quantity (KLD)
Process Cooling tower Blow down+ Boiler Blow down+
Contaminated & Non Contaminated Condensate
RO Permeate
3528 3454.28 6982.28
Domestic Water STP 90 80 170
Total 3618 3534.28 7152.28
The Water Balance diagram for existing and addition of new Speciality chemicals is given in
Figure 2.2 & Figure 2.3.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 71
Figure 2.2 : EC Approved Water Balance Diagram (Existing)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 72
Figure 2.3: Proposed Water Balance Diagram for Expansions and New Speciality Chemicals
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 73
Proposed Waste Water Management:
The waste water from process of 1763 KLD will be sent to MEE-1& 2 of 1800 m3 capacity,
the MEE condensate of 1410.4 KLD along with Boiler Blow down 152.7 KLD, Contaminated
steam condensate 1260 KLD and Cooling Tower blow down 374.5 KLD will be sent to RO of
3200 m3 capacity. The RO permeate 2718 KLD will be recycled and RO reject of 480 KLD
will be sent to MEE-3 of 500 m3 capacity, the condensate from MEE-3 of 383.712 KLD will
be sent again to RO of 400 m3 capacity, RO permeate of 287.78 KLD will be recycled and
RO reject of 95.928 KLD will be sent to ETP. Low TDS and Low COD stream from process
will be segregated of 770 KLD and will be directly treated in ETP along with washing water of
20 KLD. Thus effluent going to ETP will be 885.93 KLD.
A separate Effluent treatment plant of 1000 KLD capacity is proposed for treating the
industrial wastewater of 885.93 KLD and Sewage Treatment Plant of 80 KLD capacity is
proposed for treating domestic wastewater of 80 KLD. This is in addition to existing (EC
Approved) two ETP units of 1100 KLD and 100 KLD of sewage treatment plant. Technical
details of effluent treatment plant are provided in Table 2.33.
Table 2.33: Details of Effluent treatment plant unit
S. No. Description Qty. Dimensions /Size Unit Capacity Total Capacity
1 Collection tanks 1 7.5 m x 7.5 m x 3.6 m LD +
0.5 m FB 202.5 202.5
2 Oil & grease trap 1 8.25 m long x 3.8 m wide x
2.7m LD + 0.5m FB 84.6 84.6
3 Equalization tanks 2 14 m x 10 m x 5.5 m LD
+0.5m FB for each 770 1540
4 Neutralization
tank-I &II 2
Tank-I : 5 m x 5 m x 2.5 m LD +0.5 m FB for each
62.5 62.5
5 Primary Clarifier 1 13.5 m dia x 4.5 m LD + 0.5
m FB 644 644
6 Lime dosing
tanks/poly Alum 1/1
3.5 m x 2.5 m x 3.5 m LD +0.5 m FB
30 30
7 PLC room (FF) 1 - - -
8 Sludge sump 1 4 m x 3 m x 4 m LD + 0.5 m
FB 48 48
9 Bio-Reactor
(Aeration Tanks) 2
25 x14 x 6.5 LD+0.5FB for each
2275 4550
10 Secondary
Clarifier 2
11 Diax4.5SWD+0.5FB for each
333 665
11 Outlet tank 1 11 m x 11 m x 3 m LD + 0.5
m FB 363 363
12 Pressure sand
filters (PSF) 1 125 M3 125 M3 125 M3
13 Carbon Tower 1 125 M3 125 M3 125 M3
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 74
S. No. Description Qty. Dimensions /Size Unit Capacity Total Capacity
14 Filter press 2 - - -
Circulation pumps, transfer pumps, piping, instrumentation – as required
A schematic diagram of proposed ETP is provided in Figure 2.4
Figure 2.4: Schematic Diagram of Proposed ETP
The ETP shall be augmented as per requirement. The description of proposed ETP are given
below:
Primary Treatment
1. Collection tank:
Two nos. collection tanks shall be provided to receive raw effluent from plants.
2. Oil & Grease trap:
One no. of Oil & grease trap shall be provided to separate out floating oil & grease (if any)
from effluent.
3. Equalization tanks:
Oil & grease overflowed into Equalization tank-I or II. These equalization tanks shall serve
the purpose of equalizing the Effluent in terms of flow & strength, hence improving efficiency
of downstream treatment units.
4. Neutralization tank:
Lime Alum/Poly
To GIDC drain
Treated Effluent
Tank
Treated Effluent
Pit Sand/Activated
Carbon
FLOW DIAGRAM OF PROPOSED ETP AT UPL -
Filter Press
Clarifier Aeration Tank # 2
Secondary Clarifier
Aeration Tank # 1 Secondary
Neutralization And
Precipitation
Primary Clarifier
Equalizatio n Tanks
Filter
Filter Press
Industrial/ Domestic effluent
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 75
Equalized effluent shall be pumped to Neutralization tank. Here, acidic effluent gets
neutralized by addition of lime slurry solution. Effective mixing period for lime slurry solution
is 30-60 min. Here, polyelectrolyte sol. will be dosed to aid in big settle able flocs formation.
5. Primary Clarifier:
pH raised Effluent from above neutralization tank outlet shall be lead to Primary clarifier.
These flocs shall travel down towards hopper bottom whereas clear water shall travel upward
& then overflow into the outlet launder. Clarified effluent shall be lead to Aeration tanks.
Sludge withdrawal shall be periodically at regular intervals, depend on sludge generation rate
& filter press cycle, so that operating torque in the Clarifier mechanism does not increase
beyond the designed value.
Secondary Treatment
The primary treated effluent is to be given secondary treatment in the two aeration tanks.
This treatment works on principle of activated sludge system. Suitable bacterial mass is kept
developed in the aeration tanks. In these aeration tank, the organic material present is
decomposed by bacteria taking oxygen supplied by Fine Bubble air diffusers. The overflow
goes to secondary clarifiers. In secondary clarifier the Biomass is separated and recycled
back to bio reactor. Generated Excess Biomass sludge is taken to filter press for dewatering.
Tertiary Treatment
Clear water overflow of secondary clarifier is taken to Pit & feed through Sand bed filter &
Carbon Tower. Treated effluent conforming to permissible limits specified by GPCB shall be
discharged through Magnetic flow meter, online pH, TOC-TN meter, TSS meter into GIDC
underground drainage system connected to Final Pumping station from where it shall be
finally disposed into deep sea through u/g common conveyance pipeline of GIDC. Provision
shall be made for re-routing treated effluent back into ETP if found non-conforming by online
systems or laboratory results.
Effluent Characteristics (estimated) at ETP inlet and outlet
For the proposed project, the R & D team of UPL Limited have conducted treatability studies
and estimated the primary characteristics of each process steam and the combined effluent
quality.
Table 2.34: Effluent Characteristic at Inlet & Outlet
Parameter Inlet to ETP Treated Effluent
Performance Limit
pH 4.5 – 8.5 6.5 – 8.5 6.5 – 8.5
Temperature 32 °C 38°C 40°C
Suspended Solids 500 mg/l 90 mg/l < 100 mg/l
BOD 1500 mg/l 80 mg/l < 100 mg/l
COD 3500 mg/l 240 mg/l < 250 mg/l
Oil & Grease 10 mg/l 8 mg/l < 10 mg/l
Heavy metals 10 mg/l 2 mg/l < 3 mg/l
Cyanides Nil Nil < 0.2 mg/l
Phenolic Compounds 0.5 mg/l 0.4 mg/l < 1 mg/l
Ammonical Nitrogen 30 mg/l 25 mg/l < 50 mg/l
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 76
Table 2.35: Details of ETP,RO& MEE
Name Nos Capacity each
Waste Water treatment MEE 2 Nos 900 m3/day
Waste Water treatment R.O 4 Nos 800 m3/day
ETP 1Nos 100 m3/day
STP 1 Nos 80 m3/day
Proposed Sewage Treatment Plant:
A sewage treatment plant of 80 KLD is proposed, schematic diagram of the same is provided
in Figure 2.5.
Figure 2.5: Schematic Diagram of Proposed STP
Description of STP:
The sewage collected from the various streams shall be taken into a collection tank where it
shall undergo an anaerobic treatment. From there the sewage shall be taken into aeration
tank where it shall be treated with the help of aerobic bacteria and then it shall be passed to
settling tank. From settling tank, the mixed liquor shall be allowed to set and the supernatant
liquid to be overflowed into the holding tank. The water in the holding tank shall be passed
through a dual media filter and will be taken in treated water collection tank from where it
shall be pumped for gardening, and Utilities. The treated water from STP will meet standards
prescribed by GPCB & MoEF&CC.
2.8.10 Solid and Hazardous Waste Identification, Quantification, Storage and
Disposal
Solid and hazardous waste will be generated due to proposed expansion. Appropriate
disposal method will be adopted for different type of wastes. Landfilling waste will be sent to
common TSDF. Recyclable waste will be sold to GPCB/CPCB registered re-processor /
recycler and Incineration waste will be send to CHWIF site. Details of existing (EC Approved)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 77
and proposed Solid and Hazardous generated along with its management are provided in
Table 2.36.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 78
Table 2.36: Details of Existing & Proposed Solid & Hazardous Waste and its Management
S. No. Type of Waste Category (As Per Sch-2016)
Existing (MTPA)
Proposed MTPA
Total After Expansion
(MTPA)
Source of Generation
Mode of Storage & treatment
Mode of Disposal
1 ETP sludge/STP
Sludge 35.3 5180 2590 7770 From ETP/STP
Store in imperious
storage area with roofing
near ETP / STP
Sent to common TSDF for landfilling
2 Used Oil 5.1 240 120 360 Machinery
Store in drums in H.W. storage area (with shed and imperious
flooring)
Sale to CPCB registered re-
processor / recycler
3 Discarded
containers / bags / liners
33.1
Containers - 21556 Nos. (425 MT) /
Bags - 21366 Nos. (207
MT) / Container Liners -
21566 Nos. (425 MT)
Containers - 20000 Nos. (400 MT) /
Bags - 20000 Nos. (200
MT) / Container Liners -
21000 Nos. (400 MT)
Containers-41556 Nos. (825 MT)/
Bags-41366 No. (407 MT)/
Container Liners -42566
Nos. (825 MT)
Raw material containers / bags
Collection, decontamination
and store in imperious
storage area with roofing
Recycle/reuse into process or sale to GPCB authorized dealers and scrap
processors or contaminated drums
to approved decontamination
facility
4 Organic Residue 29.1 52062
41213 97518
From process
Store in drums / Tanks in H.W. storage area
(with shed and imperious flooring)
Sent to Cement Industry for co
processing / CHWIF site for
Incineration/Captive Incineration
5 Aqueous Waste 29.1 4243 From process
Store in drums / Tanks in H.W. storage area
(with shed and imperious flooring)
Sent to Cement Industry for co
processing / CHWIF site for Incineration / Captive Incineration
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 79
S. No. Type of Waste Category (As Per Sch-2016)
Existing (MTPA)
Proposed MTPA
Total After Expansion
(MTPA)
Source of Generation
Mode of Storage & treatment
Mode of Disposal
6 Inorganic Salts
from Evaporation / Process
35.3 127863 117774 245637 From process and
MEE
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Send to common TSDF site for
landfilling
7 Date -expired and off specification
pesticides 29.3 145 0 145 From process
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
CHWIF site for Incineration /Captive
Incineration
8 Spent filter
Material 36.2 118 134 252 From process
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Sent to CHWIF site for Incineration /
Captive Incineration
9 Spent solvent 29.4 6500 8575 15075 From process
Stored in drums / tanks in H.W. storage area
(with shed and imperious flooring)
Recovery / sale to GPCB approved
recyclers / Send to CHWIF for
Incineration / captive incineration
10 Contaminated cotton waste
33.2 29 33 62 From process
plant
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Sent to common TSDF site for
landfilling / Send to CHWIF site for
Incineration /Captive Incineration
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 80
S. No. Type of Waste Category (As Per Sch-2016)
Existing (MTPA)
Proposed MTPA
Total After Expansion
(MTPA)
Source of Generation
Mode of Storage & treatment
Mode of Disposal
11 Insulation Waste 33.1 39 44 83 From Equipment
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Send to common TSDF site for
landfilling
12 Non-recyclable Plastic waste
33.1 44 50 94 Raw material
containers / bags
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Send to common TSDF site for
landfilling
13 Used PPE 33.1 10 11 21 From process
plant
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Send to common TSDF site for
landfilling
14 Incineration ash 37.2 4000 0 4000 From incinerator
Packed in HDPE bags and
stored in designated
place (with shed and imperious
flooring)
Send to common TSDF site for
landfilling
15 Spent Catalyst 29.5 49 55.8 104.8 From process
Stored in Bags/drums in
designated place (with shed and imperious
flooring)
Send to CHWIF site for Incineration
16 HCl sol. (28-32%) 29.6 99894 25372 125266 From Process To be stored in
tanks By selling to actual
user.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 81
S. No. Type of Waste Category (As Per Sch-2016)
Existing (MTPA)
Proposed MTPA
Total After Expansion
(MTPA)
Source of Generation
Mode of Storage & treatment
Mode of Disposal
17 Fe (OH)2 Sludge 35.3 0 157 157 From Process
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Sent to common TSDF site for
landfilling
18 Iron Residue 36.1 0 251 251 From Process
Stored in drums / bags in H.W. storage area
(with shed and imperious flooring)
Sent to common TSDF site for
landfilling
Membership with cement industry (Ambuja Cement) for Co-processing of waste have been obtained dated 10.02.2017.
Membership with TSDF for landfilling of waste from BEIL Dahej & CHWIF for incinerable waste from BEIL Ankleshwar has been obtained from vide
letter No. BEIL/ANK/2017 dated 9.02.2017.
Copies of Memberships are attached as Annexure 11.
Storage of Hazardous Waste:
The separate Hazardous waste storage area as per MoEFCC/CPCB Guidelines will be provided within existing premises for temporary storage of
Hazardous waste as and when generated. The area will be covered & paved with proper flooring so to avoid seepage of waste into soil.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 82
2.8.11 Project Layout and Components
The proposed expansion will be within existing factory premises (Existing Area: 755495.16
m2). The company had already proposed 34.81% green belt of the total land, i.e. 263005.16
m2. The proposed expansion will be within existing area. Detailed area break-up of the site is
shown in Table 2.37
Table 2.37: Area Break-Up of Site
S. No.
Particular Area m
2
(EC Approved)
Expansions
Area- NaCN plant
only (m2)
Area sq.m (Proposed)
Area in m2
(After Expansion)
Only Speciality Chemical
Zone Except NaCN
1 Admin Block 4636 0 0 4636
2 QC lab 2000 0 0 2000
3 Plant Facilities (MP1 to MP13)
*3A Pesticide Technical
(MP1, MP 2 & MP 3)
126199 0 37952.5 164151.5
*3B Pesticide Intermediates
(MP 4)
*3C
Speciality Chemicals (EC Approved MP 4 & MP 5) &
(MP 8 To MP 13 Proposed)
*3D Formulations (MP 6)
4 Utility Facility (Boiler) 15400 0 0 15400
5 UG Storage Tanks 5060 0 0 5060
6 Pilot Plant/Multi-Purpose Plant (MP 7) 3000 0 0 3000
7 Captive Power Plant 11057 0 0 11057
8 Coal Storage 6400 0 0 6400
9 Ash Storage 4000 0 0 4000
10 Incinerator Unit for Fumes 4786 0 4786 9572
11 Captive Incineration Unit for Organic
Liquid (2 Nos) 2393 0 0 2393
12 ETP+RO+MEE 6400 0 2700 9100
13 Raw Water Storage 17022 0 0 17022
14 CS2 storage Area 1622 0 0 1622
15 RM Storage 7182 0 0 7182
16 Finished Goods Storage 7182 0 0 7182
17 Cylinder Storage area 3000 0 0 3000
18 Hazardous Waste Storage Area 5200 0 1450 6650
19 Approach Road/ Drain 110529 0 2706 113235
20 Others (Change room, Wash room,
Internal Passages, Canteen, Security room)
58608 0 0 58608
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 83
S. No.
Particular Area m
2
(EC Approved)
Expansions
Area- NaCN plant
only (m2)
Area sq.m (Proposed)
Area in m2
(After Expansion)
Only Speciality Chemical
Zone Except NaCN
Total Occupied Area 401676 0 49594.5 451270.5
21 Open Area 86014.16 0 36419.66 36419.66
22 Green Belt 263005 0 0 263005
23 Ponds 4800 0 0 4800
Total 755495 0 755495
The Plant Layout showing all facilities including green belt is attached as Map 2.4 .
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 84
Map 2.4: Site Layout Plan
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 85
2.8.12 Mitigation Measures at Design Stage
Details of mitigation measures adopted at design stage are provided in Table 2.38
Table 2.38: Details of Mitigation Measures at Design Stage
Name of Plant
Environmental Attributes
Operational Controls at Design Stage
Air Noise Water SHW
Air (Prevention & Control of
Pollution) Act – 1981 and Rules,
1982 as amended to date
The Noise Pollution
(Regulation and
Control) Rules,
2000 as amended to date
Water (Prevention & Control of
Pollution) Act – 1974 and Rules
1975 as amended to
date
Hazardous and Other Wastes (Management
and Trans boundary
Movement) Rules, 2016 as
amended to date
Synthetic Organic
Chemical Intermediates
Energy
Major initiatives including installation of VFD‘s
Regular energy conservation initiatives will be taken to reduce energy consumption
Use of energy efficient appliances
Air
Bag filters, Scrubbers
(Alkali/Water/NH3, Acid) for process
stacks, Fume Gas Incinerator for
residue process emissions and Adequate stack
height to Flue gas stacks will be
provided
--
-- --
Waste Water -- --
Waste water generated
will be treated in
RO, MEE & ETP
--
Solid and Hazardous
Waste -- -- --
Solid & Haz waste
generated will be disposed as per HW & Other
waste Management Rules, 2016
2.8.13 Assessment of New and Untested Technology
No recommendation of Assessment of New and Untested Technology was given during
appraisal stage; hence it is not carried out.
2.8.14 Condensed Description
The condensed description of those aspects of the project likely to cause environmental
effects is given in Table 2.39.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 2 86
Table 2.39: Condensed Description of Aspects of the Project likely to Cause Environmental Effects
S. No. Activity Aspects
Project Pre- Construction/ Construction
1 Site clearance Removal of top soil & Land clearance
2 Fabrication work for plant equipment land preventive
maintenance work
Generation of scraps
Noise generation
Fall in pit, land sliding from sidewalls
3 Vehicular movement for
transportation of construction material and waste
Emission of NOx & CO
Noise generation
Leakage/spillage of material
4 Influx of workers during
construction phase
Sewage generation
Employment generation
Commissioning/ Project Operation
1 Manufacturing Process
Emission of Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic traces, HCN
Fugitive emission of solvents
Waste Water Generation
Generation of Hazardous waste
Dust generation
Spillage and Leakage of Raw Material/ Product
2 Floor Washing Generation of waste water
3 Export of Product Increase in market scenario
General & Utilities
1 Operation of Boiler & Cooling
tower
Emission of PM, SOx and NOx from Boiler, Generation of waste water from Cooling and Boiler Blow Down
Noise generation from Boiler / DG Set
2 Operation of ETP, RO & MEE Generation of waste water
Generation salts
3 Influx of workers operational
phase
Sewage generation
Employment Generation
4 Handling of Products and Raw
materials
Generation of Discarded Containers
Fugitive Emission from storage tanks, Valves joints etc.
5
Vehicular movement for transportation of raw materials, finished goods and Industrial
Waste
Increase in traffic load
Emission of HC & CO
Noise generation
6 Raw water intake for Plant
Operation and Domestic Uses Consumption of water from GIDC
7 Equipment maintenance Generation of used oil and lubricants
Generation of scraps and used spares etc.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 87
3 DESCRIPTION OF THE ENVIRONMENT
3.1 INTRODUCTION
The baseline environmental quality is assessed through field studies within the probable
impact zone for various components of the environment viz. Air, Noise, Water, Soil, Ecology
& Bio diversity and Socio-economy. An exhaustive attempt has been made in the current
chapter to disclose all possible baseline status of environmental quality in the study area,
which further serves as the basis for identification, prediction and evaluation of impacts.
Study area has been decided by considering 10 km radius from the project site. Villages
covered within study region are shown in the Map 3.1.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 88
Map 3.1: Study Area Map
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 89
3.2 BASELINE STUDY AREA AND PERIOD
The baseline environmental study has been conducted for the study region within 10 km
radius of the project site for the period 1st Oct 2019 to 31st Dec 2019. An attempt has been
made in this chapter to prepare baseline status of environment component covering air,
water, land, flora, fauna and social status.
3.3 METHODOLOGY
The baseline environmental study was carried out for the various environmental components
viz, Air, Water, Soil, Ecology and Biodiversity, Socio Economy and Noise. A desktop study
was carried out to select the sampling locations and site visit was done by our field area
experts. After the site visit, locations were finalized. During the submission of field area
expert report and discussion looking to the extent of impact, 5 km radius was considered as
core zone and rest 5 km radius was considered as buffer zone. All the locations have been
selected within 10 km radius from the project site as per the requirement of TOR and
environmental samples were collected from the selected locations of the study area. Before
starting the survey activity for ecology and bio diversity, secondary data were used as
reference during the desktop survey for listing the species of study zone and planning the
survey. In case of socio economy, secondary data have also been used for deciding the
parameters to be surveyed during socio economic data collection. As a secondary source of
data, for Ecology and Biodiversity survey various publications by the government of India and
literature available on internet site were used. Some photograph showing the monitoring and
survey activities are presented in Photograph 2.1
3.3.1 Frequency of Sampling
Details of frequency of environmental sampling considered for the study are illustrated in
Table 3.1.
Table 3.1: Frequency of Environmental Monitoring
Attributes Sampling
Locations in study area
Parameters Frequency
A. Air Environment
Micro-meteorological
Data Nr. Project Site
Temperature, Relative Humidity, Precipitation Wind direction,
Wind Speed.
Hourly data for the period 1
st Oct 2019
to 31st Dec 2019.
Ambient Air Quality
Eight locations in the study region
PM2.5, PM10, SO2, NOx, CO, NH3, Cl2, HCl, H2S, Total HC
and VOC as BTX
24 hour basis, twice a week during study
period
B. Noise
Ambient Noise Quality
Eight locations in the study region
Noise Levels in dB (A). Once in Study
Period.
C. Water
Ground Water Samples from seven locations in the study
region
Physical, Chemical, Microbiological and Heavy
Metal.
Once in Study Period.
Surface Water Samples from six
locations in the study Physical, Chemical,
Microbiological and Heavy
Once in Study Period.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 90
Attributes Sampling
Locations in study area
Parameters Frequency
region Metal.
Marine water Sample from six location during high tide and low tide in the study region
Physical, Chemical, Microbiological
Once in Study Period.
D. Soil
Soil Quality Samples from four
locations in the study region
Physical, Chemical Characteristics, Soil Texture.
Once in Study Period.
3.3.2 Method of Environmental Sampling and Analysis
The methods adopted for environmental sampling and analysis are illustrated in following
Table 3.2
Table 3.2: Method of Environmental Sampling and Analysis
Attributes Methods
Sampling/Preservation Analysis/data analysis
A. Air Environment
Micro-meteorological Data
Data collected on hourly basis using wind monitor as per CPCB Guideline. as per
IS 8829
IS 8829
Ambient air quality As per IS: 5182, CPCB & AWMA. IS:5182,CPCB & AWMA
B. Noise Instrument : Sound level meter Survey carried out as per
CPCB guideline.
C. Water
Ground Water and Surface Water
Standard Methods for Examination of Water and Wastewater, 23rd edition,
APHA 2017.
IS 3025 & Standard Methods for Examination of Water and
Wastewater, 23rd edition, APHA 2017.
D. Soil Quality IS 2720, Soil Testing in India (Department of Agriculture &
Cooperation).
IS 2720, Laboratory developed Method as per NABL
requirement and Book - Soil Testing in India (Department of
Agriculture & Cooperation).
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 91
Photograph 3.1: Sampling/Monitoring Activity
Surface water – Nadarkha Ground water –Rahiyad
Traffic Survey Ambient air – Rahiyad village
Noise – Project site Soil – Narnavi village
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 92
EB Survey EB Survey
3.4 MICROMETEOROLOGY
The study of micro meteorological data helps to understand the variations in the ambient air
quality status in that region. The prevailing micrometeorological condition at project site plays
a crucial role in transport and dispersion of air pollutants. The persistence of the predominant
wind direction and wind speed at the project site decide the direction and extent of the air
pollution impact zone. The principal variables which affect the micrometeorology are
horizontal transport and dispersion, convective transport and vertical mixing and topography
of the area towards local influences. Micrometeorological data were collected by using the
wind monitor as per CPCB guideline which was installed near project site. All the
micrometeorological data were collected on hourly basis. Meteorological conditions of the
study area are presented in Table 3.3.
Table 3.3: Meteorological Condition of Study Area
Month Temperature (
oC) Relative Humidity (%) Wind Speed (km/hr)
Min. Max. Min. Max. Min. Max.
Oct‘19 24.2 36.2 34 96 0.1 11.0
Nov'19 21.1 34.5 34 96 0.1 9.0
Dec'19 15.5 33.4 37 92 0.1 13.0
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 93
3.4.1 Temperature
During the study period minimum temperature was recorded 15.5oC on 30th Dec 2019 and maximum temperature was recorded as 36.2oC on 15th
Oct 2019. Temperature data were collected on hourly basis during the study period. Variation of temperature is graphically presented in Figure 3.1.
Figure 3.1: Graphical Presentation for the month wise Temperature Variation
3.4.2 Humidity
Humidity affects the nature and characteristics of pollutants in the atmosphere as it is the measure of amount of moisture in the atmosphere.
Humidity helps suspended particulate matter to coalesce and grow to settle under the gaseous pollutants by providing them aqueous medium.
During the study period minimum Humidity was recorded 34% on 16th Oct 2019 & 18th Nov 2019 and maximum Humidity was recorded as 96% on
22nd Oct 2019 and 08th Nov 2019. The variation in humidity is represented graphically in Figure 3.2.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92
Max. 31 32 32 33 32 33 33 34 35 35 33 33 35 35 36 35 35 34 33 32 32 31 30 31 29 29 33 32 35 34 34 34 30 33 32 33 33 29 29 31 31 34 33 33 33 33 33 32 32 31 31 34 33 32 34 33 33 33 33 32 33 32 33 33 33 32 31 31 31 32 32 31 30 29 29 28 27 28 30 30 31 31 32 32 29 30 28 28 28 26 27 26
Min. 26 26 27 26 25 26 26 25 26 26 25 25 26 26 26 24 24 25 26 26 25 25 24 24 25 25 25 25 25 25 27 26 25 24 24 24 25 25 24 24 25 24 23 24 23 23 23 22 22 21 21 22 24 23 23 22 21 23 22 21 21 22 21 24 25 25 20 18 18 19 20 19 18 19 17 17 18 17 17 18 20 20 21 20 20 19 18 17 17 16 15 16
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
Tem
per
atu
re (
oC
)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 94
Figure 3.2:Graphical Presentation for the month wise Humidity Variation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92
Max. 93 90 92 92 92 91 93 92 88 90 92 88 82 84 84 77 70 74 80 84 80 96 90 80 76 90 94 91 88 84 80 90 94 91 91 91 84 93 96 93 94 93 89 80 76 83 82 79 74 83 82 83 80 77 88 84 83 82 90 88 89 92 89 74 72 68 63 80 82 82 83 81 85 86 80 80 83 82 90 90 88 85 80 82 85 81 78 72 66 77 81 82
Min. 77 66 66 64 66 64 68 63 58 63 65 64 52 35 40 34 36 48 60 64 56 70 74 66 66 67 66 65 60 54 56 56 73 70 72 56 61 77 71 68 72 56 56 48 48 59 56 42 34 50 56 45 50 45 49 46 50 52 55 52 52 65 54 47 52 50 37 48 44 55 56 43 40 55 48 52 64 57 63 55 62 50 50 52 66 58 54 46 40 45 52 47
0
20
40
60
80
100
120H
um
idit
y (%
)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 95
3.4.3 Wind Speed and Wind Direction
Hourly wind speed data were collected for the period 1st Oct 2019 to 31st Dec 2019 with the
help of wind monitor. The rate of dispersion, diffusion and transportation of pollutants in the
atmosphere mainly depend on wind speed and its direction. Wind direction and velocity data
have been collected during the study period. Dominant wind direction in the study period was
from NE-SW during the study period. Wind speed was observed from 0.1 to 11.0 km/hr in the
month of Oct 2019, from 0.1 to 9.0 km/hr in the month of Nov 2019 and from 0.1 to 13.0 km/hr
in the Month of Dec 2019. Month-wise maximum and minimum wind speed data are tabulated
in Table 3.3.
3.4.4 Wind Rose
Wind rose diagram is a graphical representation of the magnitude and direction of wind speed
considering all the directions. From the knowledge of wind rose one can easily predict the
direction and extent of spreading of the gaseous and particulate matter from the source. Wind
rose diagram has been prepared by using hourly wind velocity and dominant wind direction
data and is presented in Figure 3.3
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 96
Figure 3.3: Wind Rose Diagram
3.4.5 Interpretation of Micrometeorological Data
During the study period, wind was blowing in the direction NE-SW and wind speed range 0.1
to 13.0 km/hr during the study period. Based on the wind direction and wind speed, it is
interpreted that chances of maximum dispersion of air pollutant will be in SW direction during
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 97
the period Oct to Dec. Based on the hourly data obtain during the study period, it can be also
interpreted that there is no major change.
3.5 AIR ENVIRONMENT
Air is the Earth‘s atmosphere having the gases in which living organisms live and breathe but
air is being deteriorated day by day due to the anthropogenic and natural sources. In present
scenario Industrialization, Energy production and the burning of fossil fuels has polluted the air
environment. Ambient air quality monitoring was carried out for the assessment of the existing
status of background air quality in the study area. This will be useful for assessing the
conformity of the ambient air quality to the standards even after commencement of the
proposed project.
3.5.1 Selection of Sampling Locations
Following points were considered during the selection of Ambient Air Quality Monitoring
locations.
Topography/terrain of the study area,
Regional synoptic scale climatologically norm‘s,
Densely populated areas within the region,
Location of surrounding Industries,
Representation of regional background,
Facility for Ambient Air Monitoring,
Representation of valid cross – sectional distribution in downwind direction,
Avoidance of proximity of roads, construction activity or any other perturbing activity
which may be temporary in nature, which may lead to some erroneous conclusions.
Availability of manpower, electricity, approach, sturdy structure and protection of
samplers.
Dominant Wind Direction.
To establish the baseline status around the project site of the study region, monitoring was
conducted for 8 numbers of locations during 1st Oct 2019 to 31st Dec 2019. At the time of
location selection previous micrometeorological data was referred and general wind pattern in
the study region was considered for the selection of minimum one location in the downwind
direction and one upwind direction. However, ambient air monitoring locations were selected
in all the directions looking towards the possibility of change in wind pattern during the study
period. Ambient Air Quality monitoring locations are presented in Map 3.2 & Table 3.4
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 98
Map 3.2:Map showing the Monitoring Locations of Ambient Air
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 99
Table 3.4: Ambient Air Quality Monitoring Locations in the Study Region
Code Location Distance/Direction w.r.t to Project site
Latitude and Longitude
Selection Criteria
A1 Project Site - 21°46'43.08"N
72°38'35.73"E -
A2 Kadodara 1.2 km/SE 21°45'54.12"N
72°38'38.33"E Crosswind
A3 Narnavi 2.7 km/NNE 21°47'45.77"N
72°39'23.41"E Upwind
A4 Dahej 9.3 km/SW 21°42'48.07"N
72°34'56.65"E Downwind
A5 Sambheti 2.6 km/SE 21°45'35.09"N
72°39'40.55"E Crosswind
A6 Nadarkha 5.7 km/ENE 21°46'58.99"N
72°41'49.07"E Crosswind
A7 Padariya 0.9 km/NW 21°46'53.65"N
72°38'13.22"E Crosswind
A8 Rahiyad 9.2 km/SW 21°42'10.53"N
72°40'17.31"E Crosswind
3.5.2 Frequency and Parameters for Sampling
Sampling team was appointed with one FAE and Technical Assistant to carry out Ambient Air
Quality Monitoring for 8 numbers of locations within 10 km radius from the project site.
Sampling and analysis was carried out as per CPCB, IS 5182 & EPA and instrument operation
manual for the parameters PM2.5, PM10, SO2, NOx, CO, NH3, Cl2, HCl, H2S, Total HC and
VOC. After the completion of sampling, samples were brought to the laboratory in Ice box and
filter box for analysis. Frequency of sampling was twice a week during study period.
3.5.3 Methodology for Sampling and Analysis
Samples were collected by using the PM10 and PM2.5 micron dust samplers at suitable height
from obstruction free area as per the availability of the facility. Sampling and Analysis was
carried out as per CPCB Guideline, instrument operational manual and National
Environmental Engineering Research Institute. Detail of reference method is presented in
Table 3.5.
Table 3.5: Details of Analysis Method
S. No.
Parameters Test Method
i. Particular matter (PM 2.5) SOP No. WI/5.4/02-B/03,Issue No.1
Date:01/01/2010, CPCB Guideline
ii. Particulate Matter (PM10) IS 5182 (Part 13):2006/Reaffirmed 2012
iii. Sulphur Dioxide (SO2) IS 5182 (Part 2):2001/Reaffirmed 2012
iv. Oxide of Nitrogen (NOx) IS 5182 (Part 6):2006
v. Carbon monoxide (CO) Methods of Air Sampling & Analysis AWMA,
APHA (CO Analyser)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 100
S. No.
Parameters Test Method
vi. Ammonia (NH3) SOP No.WI/5.4/02-B/06, Issue
No.1: 2010
vii. Chlorine (Cl2) IS-5182 (Part 19):1982 (Reaffirmed 2009)
viii. Hydrochloric Acid (HCl) SOP No. WI/5.4/02-B/17,Issue No.1
ix Hydrogen Sulphide (H2S) IS-5182 (Part 7):1973 (Reaffirmed 2009)
x. Total HC Multi Gas Detector
xi. VOC as BTX Methods of Air Sampling & Analysis AWMA,
APHA (GC)
3.5.4 Quality of Ambient Air
Minimum, maximum, average and 98th percentile values for the parameters PM2.5, PM10, SO2,
NOx, CO, NH3, Cl2, HCl, H2S, Total HC and VOC are tabulated in Table 3.6 to Table 3.11 to
describe the quality of Ambient Air.
Table 3.6: Min, Max, 98th Percentile and Average Value of PM10 and PM2.5
Code
PM10 (µg/m3) PM2.5 (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile
98th
Max. Avg.
A1 72.8 87.6 88.1 80.2 37.3 46.7 47.4 40.8
A2 70.1 85.1 85.6 76.2 36.1 44.3 45.5 39.1
A3 63.2 78.0 78.3 72.0 33.1 41.3 41.9 37.0
A4 70.0 85.6 86.5 76.3 34.4 45.3 46.8 38.4
A5 65.5 78.6 78.7 71.9 34.2 40.1 41.0 36.6
A6 65.4 81.4 82.2 72.9 33.8 41.8 42.4 37.3
A7 70.0 85.3 85.4 77.4 35.3 45.0 45.2 39.0
A8 68.3 84.0 85.2 75.2 35.0 43.9 44.9 38.5
NAAQ Standard limit 100 60
Table 3.7: Min, Max, 98th Percentile and Average Value of SO2 and NOx
Code
SO2 (µg/m3) NOX (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile
98th
Max. Avg.
A1 11.2 16.1 16.4 13.7 15.8 20.8 21.4 17.9
A2 9.9 15.2 15.4 12.9 14.5 18.9 19.4 16.9
A3 9.7 14.5 14.5 12.3 15.4 18.0 19.0 16.9
A4 11.4 15.8 16.1 13.5 16.2 20.3 20.8 18.0
A5 9.1 14.6 14.8 12.1 14.6 18.6 18.6 16.6
A6 10.1 15.3 15.5 13.1 15.1 20.0 20.3 17.7
A7 9.9 14.9 15.3 12.5 14.8 19.2 19.3 17.3
A8 9.6 14.4 14.5 12.3 15.7 19.2 19.5 17.4
NAAQ Standard limit
80 80
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 101
Table 3.8: Min, Max, 98th Percentile and Average Value of CO & NH3
Code
CO(µg/m3) NH3 (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile 98
th
Max. Avg.
A1 414 501 502 456 1.9 3.2 3.3 2.5
A2 420 493 494 467 1.3 2.3 2.3 1.7
A3 456 513 514 487 1.1 1.9 1.9 1.3
A4 482 541 542 514 1.3 2.9 2.9 1.8
A5 418 494 496 456 1.1 1.9 1.9 1.4
A6 458 516 518 484 1.2 2.1 2.3 1.6
A7 440 503 504 472 1.1 1.9 1.9 1.5
A8 418 483 484 455 1.3 2.6 2.6 1.7
NAAQ Standard limit
2000 400
Table 3.9: Min, Max, 98th Percentile and Average Value of Cl2 & HCl
Code
Cl2 (µg/m3) HCl (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile 98
th
Max. Avg.
A1 <1.0 - <1.0 - <7.9 - <7.9 -
A2 <1.0 - <1.0 - <7.9 - <7.9 -
A3 <1.0 - <1.0 - <7.9 - <7.9 -
A4 <1.0 - <1.0 - <7.9 - <7.9 -
A5 <1.0 - <1.0 - <7.9 - <7.9 -
A6 <1.0 - <1.0 - <7.9 - <7.9 -
A7 <1.0 - <1.0 - <7.9 - <7.9 -
A8 <1.0 - <1.0 - <7.9 - <7.9 -
BDL of Cl2 – 1.0 µg/m3, BDL of HCl – 7.9 µg/m3
Table 3.10:Min, Max, 98th Percentile and Average Value of H2S & Total HC
Code
H2S (µg/m3) Total HC (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile 98
th
Max. Avg.
A1 <5.0 - <5.0 - 125 151.8 152 142.5
A2 <5.0 - <5.0 - 104 131.6 132 118.0
A3 <5.0 - <5.0 - 88 111.8 112 101.2
A4 <5.0 - <5.0 - 102 135.2 136 117.7
A5 <5.0 - <5.0 - 74 97.6 98 85.3
A6 <5.0 - <5.0 - 78 103.6 104 91.0
A7 <5.0 - <5.0 - 80 109.2 110 93.8
A8 <5.0 - <5.0 - 70 91.4 92 79.8
BDL of H2S – 5.0 µg/m3
Table 3.11: Min, Max, 98th Percentile and Average Value of VOC as BTX
Code
VOC as BTX (µg/m3)
Min. Percentile 98th
Max. Avg.
A1 15 24.7 25 19.7
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 102
Code
VOC as BTX (µg/m3)
Min. Percentile 98th
Max. Avg.
A2 14 21.8 22 17.8
A3 10 17.7 18 13.7
A4 15 23.8 24 19.8
A5 10 16.9 17 14
A6 10 17.8 18 14.2
A7 11 17.8 18 14.3
A8 10 19.8 20 14.8
3.5.5 Summary of Ambient Air Quality
During the study PM2.5 was observed in the range of 33.1 – 47.4 µg/m3. Maximum
concentration of PM2.5 was found at Project site and minimum at Narnavi village.
PM10 was observed in the range of 63.2 – 88.1 µg/m3. Maximum concentration of PM10
was found at Project site and minimum at Narnavi village.
SO2 concentration was observed in the range of 9.1 – 16.4 µg/m3, which is well within
the standard limit.
NOx concentration in was observed in the range of 14.5- 21.4 µg/m3, which is well
within the standard limit.
Monitoring and analysis was also carried out for CO, NH3, Cl2, HCl, H2S, Total HC and
VOC were found well within the norms.
3.5.6 Interpretation of Ambient Air Quality Data
All the results of ambient air quality parameters have been found within the limit as per
NAAQS. Based on comparison study of results for tested parameters with NAAQS, it is
interpreted that ambient air quality of studied locations is satisfactory.
3.6 NOISE ENVIRONMENT
The objective of the baseline noise survey was to identify existing noise sources and to
measure background noise levels at the sensitive receptors within the study area. Peoples‘
perception of noise varies depending on number of factors including their natural sensitivity
and hearing ability, past experience of sound, cultural factors and the time of day at which
sound is experienced. Continuous sound is perceived quite differently from intermittent sound
at the same level. High or continuous noise levels may cause permanent loss of hearing
ranging from reduced perception at certain frequencies to total deafness. At comparatively
lower levels noise may have psychological effects including disturbance of sleep, annoyance
and irritation.
3.6.1 Sources of Noise Pollution
The sources of noise pollution in the study area are industrial noise, noise due to commercial
activities, noise generated by Community, Vehicular traffic etc.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 103
3.6.2 Noise Level in the Study Area
Noise level monitoring was carried out with the help of sound level meter at 8 different
locations fall under residential, industrial and high noise generating source. Noise sampling
locations are presented in Map 3.3 and Table 3.12. Analysis results are presented in Table
3.13 & Table 3.14
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 104
Map 3.3: Map showing the Noise Monitoring Locations
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 105
Table 3.12: Noise Monitoring Locations in the Study Region
Code Location Latitude and Longitude
Selection Criteria
N1 Project site
(Nr. Main Gate)
21°46'43.37"N
72°38'35.19"E Industrial Area
N2 Project Site
(Nr. Gardening area)
21°46'42.56"N
72°38'35.97"E Industrial Area
N3 Kadodara 21°45'56.38"N
72°38'37.18"E Residential Area
N4 Narnavi 21°47'45.67"N
72°39'22.48"E Residential Area
N5 Sambheti 21°45'35.15"N
72°39'39.51"E Residential Area
N6 Padariya 21°46'54.57"N
72°38'13.29"E Residential Area
N7 SH-6 21°46'51.75"N
72°38'33.43"E Highway
N8 SH-206 21°42'35.16"N
72°35'45.80"E Highway
Table 3.13: Noise Monitoring report during day time
Code Lmin
dB Ld dB(A)
Lmax
dB
Limit dB(A) as per Noise Pollution (Regulation and Control) Rules,
2000
N1 62.6 66.5 70.8 75
N2 58.8 62.4 66.1 75
N3 46.5 50.4 53.8 55
N4 46.8 51.0 54.4 55
N5 47.0 50.8 54.2 55
N6 46.3 49.6 53.5 55
N7 76.2 80.5 84.4 -
N8 74.6 77.8 81.8 -
Table 3.14: Noise Monitoring report during night time
Code Lmin
dB
Ln
dB(A)
Lmax
dB
Limit dB(A) as per Noise Pollution (Regulation and Control) Rules, 2000
N1
55.8 59.2 63.1 70
N2
54.1 57.8 61.6 70
N3
39.8 42.0 44.8 45
N4
39.5 42.1 44.7 45
N5
39.6 41.8 44.6 45
N6
40.0 42.4 45.0 45
N7 72.2 76.1 80.5 -
N8 70.4 73.4 77.8 -
Note: Day time –6.00 AM to 10.00 PM, Night time – 10.00 PM to 6.00 AM
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 106
Noise standards have been designated for different types of land use i.e. residential,
commercial, industrial areas and silence zones, as per ‗The Noise Pollution (Regulation and
Control) Rules, 2000, Notified by Ministry of Environment and Forests, New Delhi, February
14, 2000. Different standards have been stipulated for day (6 AM to 10 PM) and night (10 PM
to 6 AM). The noise level study shows that the noise levels are meeting the acceptable norms.
3.6.3 Summary of Noise Data
Average noise level was recorded 62.4 to 66.5 dB (A) at Project Site during day time
and it is 57.8 to 59.2 dB (A) during night time.
Average noise level was recorded 49.6 to 51.0 dB (A) at residential area during day
time and it is 41.8 to 42.4 dB (A) during night time.
Noise level monitoring was carried out 1 meter away from State HIghway-6 and
average noise level was recorded 80.5 dB (A) during day time and 76.1 dB (A) during
night time as per factory act 1948 noise level exposure limit for 8 hrs.is 90 dB (A).
Noise level monitoring was carried out 1 meter away from State Highway- 206 and
average noise level was recorded 77.8 dB (A) during day time and 73.4 dB (A) during
night time as per factory act 1948 noise level exposure limit for 8 hrs.is 90 dB (A).
3.6.4 Interpretation of Noise Data
Based on noise level data obtained during the survey for residential area and commercial
area, it is interpreted that noise levels are within the standard norms prescribed by MoEFCC &
CC. Looking towards the increase in noise generating sources it is suggested that there is
need to apply noise reducing devices at noise generating sources and generate public
awareness.
3.7 LAND ENVIRONMENT
3.7.1 Land Use Pattern of the Study area
Studies on land use aspects of eco system play an important role to identify sensitive issues
and to take appropriate action for maintaining ecological homeostasis in the region. The main
objective of this section is to provide a baseline status of the area, so that temporal changes
due to the proposed project on the surroundings can be assessed in future.
Data Used: United States Geological Survey (USGS) Satellite Data: Land sat 8 cloud free
data has been used for Land use /Land cover analysis, Satellite Sensor–OLITIRS multi-
spectral digital data has been used for the preparation of land use/ land cover map of present
study. Survey of India reference map on 1:50,000 scales have been used for the preparation
of base map and geometric correction of satellite data. Ground trothing has been carried out
to validate the interpretation accuracy and reliability of remotely sensed data, by enabling
verification of the interpreted details and by supplementing with the information, which cannot
be obtained directly on satellite imagery.
Methodology: The methodology used for the study consists of following components.
Methodology Adopted for Thematic Data Extraction from the Satellite Imageries
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 107
ERDAS image processing 10.0 software and ARC/GIS 10.0 software were used for the
project. ERDAS 10.0 image processing software was used for digital processing of the spatial
data. Digital image processing techniques were applied for the mapping of the land use land
cover classes of the provided area from the satellite data. Methodology used for land use
classification and mapping is presented in Figure 3.4. Land use map is presented in Map 3.4.
Land Use Statistic (10 km) is presented in figure 3.10 and Table 3.15.
Figure 3.4: Methodology Used for Land use Classification
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 108
Map 3.4: Land Use Map
(Source: Land use mapping and primary survey of the area)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 109
Table 3.15: Land use Statistics
% Area sq. km Land Use Land Cover Area sq. km %
39.28 137.92 Range Land
Trees/Orchard 24.8629 7.08
Salt Marsh 13.3259 3.80
Grass Land 59.7995 17.03
Scrub Land 39.936 11.37
22.53 79.11 Settlement
Industry 15.684 4.47
Saltpan 60.9418 17.36
Resident 2.48594 0.71
28.99 101.77 Agriculture Crop Land 52.8392 15.05
Fallow Land 48.9311 13.94
2.76 9.70 Muddy/Barren Land Muddy/Barren Land 9.69673 2.76
6.44 22.60 Water body Water body 22.6045 6.44
100 351.11 Total 351.11 100
Figure 3.5: Land use Statistics
3.7.2 Summary and Interpretation of Land Use Map
The area surrounding the project site is largely a Saltpan covering around 17% of the total
study area. Agriculture Land is covering around 30% of the total study area. Range Land is
covering around 39.2% of the total study area. Barren Land is covering around 2.76% of the
total study area. Settlement is covering around 22.53% out of which industry comprises of
4.47 of the total study area.
7% 4%
17%
11%
5% 17%
1%
15%
14%
3%
6%
Land Use Statistic Trees/Orchard
Salt Marsh
Grass Land
Scrub Land
Industry
Saltpan
Resident
Crop Land
Fallow Land
Muddy/Barren Land
Waterbody
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 110
3.8 GEOLOGY
The rock formations in this region are covered by a thick pile of alluvium and their exposures
are scanty except margin of the region. The sediments mainly comprise silt, sand and silty
clay deposits belonging to Khatpur and Varahi Formation. Bharuch is situated on the northern
bank of Narmada river, is an important industrial and commercial town of South Gujarat.
Bharuch is located at the southern Jambusar- Bharuch block of the Cambay Graben. The
town is located in the Narmada seismic zone. The zone follows closely the ENE-WSW course
of the Narmada river. Its southern margin envelops the Tapti river & it probably continues into
the Arabian sea, south of Kathiawar peninsula. The predominant WSW to westerly trends of
the Narmada and the Tapti rivers suggest that river courses are controlled by a system of
faults. Northwards and southwards deflections of the trend of the Narmada river from
Nawagaon to Bharuch can be similarly controlled to the N-S to NNW-SSE faults in the Deccan
Traps.
Geologically the area comprises of alluvial formations of recent to sub recent age. The
geological succession in stratigraphical order is provided in Table 3.16
Table 3.16: Geological Succession
Era Period Age Lithology
Cenozoic Quaternary Sub‐Recent to Recent
Alluvium consisting of sand
clay beds
Tertiary Lower Miocene Clay
The alluviam deposit of sub‐recent to recent age is observed in the area. It consists of
alternate bands of Yellowish brown clay and fine to coarse grained sand. The tertiary
formation consists of clay underlies the alluvium. As the area is under the influence of sea
water intrusion no efforts has been made by local farmers or industries for ground water
exploration.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 111
(Source- CGWB, Bharuch District)
Figure 3.6: Geological features of Gujarat
3.9 HYDROGEOLOGY
The main hydrological unit in the area is alluvium formation. The alluvium formation mainly
comprises of alternate bands of sand and clay. The sand formation consists of medium to fine
grained and works as aquifer. The ground water in area is highly saline so no efforts have
been done to extract ground water.
Hydrogeological map is shown in Figure 3.7 the hard rocks, the semi-consolidated
Cretaceous, and Tertiary formations and unconsolidated alluvial deposits, all comprise multi –
aquifer systems thereby presenting unconfined as well as confined groundwater conditions in
the entire district. Tertiary formations, are inherently saline and contain poor quality of
groundwater. Groundwater occurs under unconfined conditions in the limestone and
sandstone aquifers of Bagh beds. Occurrence and movement of groundwater is restricted
mainly to the fractures and joints in the limestones and sandstones. The discharge in dug
wells varies from 30 to 50 m3/day. The bagh beds, where overlain by Deccan Trap are likely to
yield groundwater under confined conditions. The Deccan Trap have given rise to multi-
layered stratified aquifers. Each individual flow comprises two distinct units, namely the upper
vesicular basalt and the lower massive basalt. The massive basalt is hard and compact with
Project site
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 112
primary porosity but the vesicular basalts exhibit porosity. The movement of groundwater is
therefore controlled by the secondary porosity developed by the presence of fractures and
joints. The paleo-weathering which is invariably observed at depth near the top of every flow,
has given rise to good aquifers at depth. The yield of the dug wells in Deccan traps, which
range in depth from 5 to 25m bgl, sustain pumping from 1/2 hour to 10 hour with discharge
varying from 200 to 1200 litre per minute (LPM) for drawdown of 4 to 7 m. Bore well tapping
deeper zones down to 150m below ground level (bgl), have yielded 100 to 600 LPM for a
drawdown of 6 to 15m. The sandstone are the main aquifers in the Tertiary formations but the
limestone also yield significant quantities of groundwater wherever karstic development have
taken place. Deep tube well tapping the Tertiary formations is capable of yielding 300 to 3000
LPM of water for meager drawdown of 1 to 7m. The alluvium formations in the western most
part of the area do not constitute potential aquifers on account of inferior quality of water. (Source – CGWB, Bharuch 2014)
(Source – CGWB, Bharuch 2014)
Figure 3.7: Hydro-Geological features of Bharuch
During the year 2012 an overall rise in water levels was observed due to recharge from
monsoon rainfall of 707 mm during the year An average rise of about 2 m was observed over
the pre-monsoon water levels in large part of the district. Rise to the tune of more than 2 m is
observed in pockets in eastern as well as western parts and southern part of the district.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 113
3.10 TRAFFIC STUDY
Traffic surveys aim to capture data that accurately reflects the real traffic situation in the area.
It may be counting the number of vehicles using a road or collecting journey time information.
Any development/Expansion of commercial project, directly or indirectly affect the traffic.
Proposed project is adjacent to State Highway 6 and 206. Proposed project will attract to
commercial vehicles as a result traffic load will also increase on highways. Traffic data helps in
planning and design of road construction, renovation or maintenance works, and for assessing
the economic feasibility of future road works. To assess the traffic load, 4 no. of surveyors
were appointed to survey for State Highway 6 and 206.
Traffic data collected continuously for 24 hours by visual observation and counting of vehicles
under three categories, viz., heavy motor vehicles, light motor vehicles and two/three
wheelers. As traffic densities on the roads are high, two persons were deployed
simultaneously at each station during each shift- one person on each of the two directions for
counting the traffic. At the end of each hour, fresh counting and recording was undertaken.
Total numbers of vehicles per hour under the three categories were determined. Traffic study
is conducted on State Highway 6 and 206.
Table 3.17: Traffic Study Report
S.
No.
Vehicles
Distribution
No. of Vehicles/Day
Passenger
Car
Unit (PCU)
Total No. of Vehicle in PCU
Total No. of Vehicle (PCU)/Hour
SH-6 SH-206 SH-6 SH-206 SH-6 SH-206
1. Cars 5814 5366 1.0 5814 5366 242 224
2. Buses 568 512 3.0 1704 1536 71 64
3. Trucks 484 455 3.0 1452 1365 61 57
4. Two wheelers 8241 7855 0.5 4121 3928 172 164
5. Three
wheelers 2066 1894 0.75 1550 1421 65 59
Total 17173 16082 14641 13616 611 568
Table 3.18: Existing Traffic Scenario with respect to LOS
Road V (Volume in
PCU/hr) C (Capacity in
PCU/hr) Existing V/C
Ratio LOS
SH-6 611 1250 0.49 C
SH-206 568 1250 0.45 C
Table 3.19: LOS Criteria
V/C LOS Performance
0.0-0.2 A Excellent
0.2-0.4 B Very Good
0.4-0.6 C Good/Average/Fair
0.6-0.8 D Poor
0.8-1.0 E Very Poor
3.10.1 Interpretation of Traffic Study
LOS values have been calculated based on traffic data on SH-6 and SH-206 and it has been
found 0.49 and 0.45 respectively. LOS value indicates that the performance of SH-6 and SH-
206 is good w.r.t. traffic load.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 114
3.11 SOIL QUALITY
4 numbers of samples were collected from different locations within 10 km radius to assess
the baseline status of soil. Analysis was also carried out for physico-chemical parameters as
well as the parameters to define the texture class. Soil samples were collected by using
Khurpi, Augar and Core cutter. Samples were brought to the laboratory in polythene bags.
Standard procedures have been followed for soil sampling and analysis. Soil sampling
locations are presented in Map 3.5 and tabulated in Table 3.20. Results are presented in
Table 3.21.
Map 3.5: Map showing the Soil sampling locations
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 115
Table 3.20: Details of Soil sampling location
Code Location Latitude and Longitude Selection Criteria
S1 Project site 21°46'43.02"N
72°38'35.40"E Non-Agriculture Land
S2 Dahej 21°42'52.68"N
72°34'50.40"E Non-Agriculture Land
S3 Kadodara 21°45'49.57"N
72°38'40.24"E Agriculture Land
S4 Narnavi 21°47'42.17"N
72°39'23.04"E Agriculture Land
Table 3.21: Soil Sample Analysis Result
S. No Parameters Unit S1 S2 S3 S4
1 Water Holding Capacity % 48.2 49.4 45.2 42.8
2 Porosity % 45.6 46.8 43.1 42.5
3 Bulk Density gm/cc 1.24 1.22 1.30 1.32
4 Particle Size Distribution
a. Sand % 24.1 22.5 27.6 29.4
b. Silt % 22.3 21.7 32.8 32.5
c. Clay % 53.6 55.8 39.6 38.1
5 Texture - Clay Clay Clay loam Clay loam
6 Cation Exchange Capacity meq/100 g 38.8 41.3 34.5 30.2
7 pH - 7.56 7.62 7.44 7.38
8 Electrical Conductivity dS/m 1.44 1.53 1.38 1.24
9 SAR - 1.4 1.5 1.4 1.3
10 Exchangeable Sodium % 10.6 10.9 11.0 11.3
11 Exchangeable Calcium meq/100g 22.4 23.6 19.6 17.2
12 Exchangeable Magnesium meq/100g 10.8 11.4 9.8 8.6
13 Exchangeable Sodium meq/100g 4.1 4.5 3.8 3.4
14 Exchangeable Potassium meq/100g 1.5 1.8 1.3 1.0
15 Organic Carbon(OC) % 0.72 0.80 0.85 0.79
16 Total Nitrogen % 0.062 0.069 0.073 0.068
17 Nitrate N mg/100gm 8.5 7.8 8.8 8.3
18 Total Phosphorus mg/100gm 12.4 11.6 13.2 12.2
19 Total Iron mg/100gm 112.4 104.5 122.3 114.2
20 Total Zinc mg/100gm 3.4 3.1 2.8 2.5
21 Total Copper mg/100gm 1.4 1.2 0.9 0.7
22 Total Boron mg/100gm 2.14 1.96 1.84 1.76
23 Total Chromium mg/100gm 1.12 1.04 0.92 0.84
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 116
3.11.1 Summary of Soil Data
The soils are categorized as clay to clay loam based on different soil separates (sand,
silt and clay).
They have medium water holding capacity (42.8 to 49.4 %) and porosity varied from
42.5 – 46.8 %.
The pH of the soil samples narrowly ranged from 7.38 to 7.62 during the study period.
The soil EC varied from 1.24 to 1.53 dS/m and ESP ranged from 10.6 to 11.3. These
parameters indicate that soils are neutral to alkaline in reaction, saline (EC > 0.8 dS/m)
and non-sodic, as pH is <8.5 and ESP is < 15.
Among exchangeable basic cations, predominance of Calcium (17.2 to 23.6 meq/100
g soil) was seen followed by magnesium (8.6 to 11.4 meq/100 g), Na (3.4 to 4.5
meq/100 g soil) and K (1.0 to 1.8 meq/100 g soil).
Organic carbon (0.72 to 0.85 %) indicates that soils are medium in organic carbon
status. This shows that soils are medium in nitrogen status.
The results relating to total Fe, Cu, Cr, B and Zn do not show alarming concentrations
in different soil samples.
3.11.2 Interpretation of Soil Data
Based on soil analysis data it is concluded that soil at the studied locations are neutral to
alkaline in reaction. The soils are medium in nitrogen, low in phosphorus and medium in
potassium status. The levels of total Fe, Cu, Cr, B and Zn are within the limits. However, for
successful greenbelt development liberal quantity of organic manure and recommended doses
of N and double the recommended dose of P fertilizers should be applied.
3.12 WATER ENVIRONMENT
Physical, Chemical and Microbiological factors influencing water quality are so interrelated
that a change in any water quality parameter may trigger other changes in a complete network
of interrelated variables. Selected water quality parameters for surface and ground water
resources along with biological indicators within study region have been used for water
environment and assessing the impact on it by proposed project. A study on water
environment aspects of ecosystem plays an important role in environmental assessment to
identify water related sensitive issues.
3.12.1 Reconnaissance
As a significant part of predefined framework of the present study water samples were
collected from selected locations. The Reconnaissance survey was undertaken and
monitoring locations were finalized based on:
Presence, Location and uses of major water bodies in the region,
Type and Location of Industrial/residential areas, their intake and effluent disposal
locations,
Likely areas that can represent baseline conditions.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 117
3.12.2 Water Quality
With the start of water quality study, the water resources in the study area were divided into
three categories for getting ideal upshot of baseline status of water quality of the region.
These three categories as determined are:
Ground water resources (tube well, open well, springs etc.)
Surface water resources including ponds, river, canals.
Marine water
3.12.3 Sampling and Analysis
All the water samples were collected and analyzed as per ―Standard Methods for Examination
of Water & Wastewater‖, APHA 23rd edition, 2017. Water Samples for the analysis of physico-
chemical parameters were collected in plastic carboy and parameter wise preserved onsite as
per the technique defined in the book of APHA, 23rd edition, 2017. Temperature, pH and DO
were analyzed onsite and samples were brought to the laboratory for the analysis of remaining
parameters.
3.12.4 Ground Water
To assess the quality of ground water, samples were collected from 7 numbers of locations for
the analysis of physico-chemical and microbiological parameters. Ground water sampling
locations are presented in Map 3.6 and Table 3.22. Analysis results are presented in Table
3.23
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 118
Map 3.6: Map showing the Ground water sampling locations
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 119
Table 3.22: Details of Ground Water sampling locations
Code Location Distance/Direction w.r.t to
project site Latitude and Longitude Source
GW1 Kadodara 1.2 km/SE 21°45'50.75"N
72°38'38.85"E Bore well
GW2 Narnavi 2.7 km/NNE 21°47'41.98"N
72°39'23.87"E Bore well
GW3 Dahej 9.3 km/SW 21°42'42.92"N
72°34'53.44"E Bore well
GW4 Sambheti 2.6 km/SE 21°45'35.77"N
72°39'38.92"E Bore well
GW5 Nadarkha 5.7 km/ENE 21°47'0.12"N
72°41'47.60"E Open Well
GW6 Padariya 0.9 km/NW 21°46'53.61"N
72°38'10.64"E Bore well
GW7 Rahiyad 9.2 km/SW 21°42'12.09"N
72°40'14.05"E Open Well
Table 3.23: Ground water Analysis Results
S. No.
Parameters
Unit GW1 GW2 GW3 GW4 GW5 GW6
GW7
Drinking Water Specification IS 10500: 1992 (Reaffirmed 2012)
Desirable
Limit
Permissible Limit
1 Temperatur
e 0C 24.5 24.5 25.5 24.5 24.5 25 24.5 -- --
2 pH @ 250C pH Unit 7.36 7.54 7.18 7.42 7.32 7.46 7.14 6.5 – 8.5
No Relaxation
3 Colour Hazen <5 <5 <5 <5 <5 <5 <5 5 15
4 Odour -- Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable --
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 120
S. No.
Parameters
Unit GW1 GW2 GW3 GW4 GW5 GW6
GW7
Drinking Water Specification IS 10500: 1992 (Reaffirmed 2012)
Desirable
Limit
Permissible Limit
5 TDS @ 180
0C
mg/L 942 1902 1252 704 586 842 1936 500 2000
6 Conductivit
y µmho/cm 1422 2934 1810 1080 906 1284 3012 -- --
7 Turbidity NTU 1.8 2.6 2.3 1.5 1.2 2 2.8 1 5
8 TSS mg/L <2 <2 <2 <2 <2 <2 <2 -- --
9 Total
Hardness as CaCO3
mg/L 584 568 604 342 344 324 712 200 600
10 Calcium mg/L 142 122 168 76 82 68 126 75 200
11 Total
Alkalinity as CaCO3
mg/L 326 708 496 308 248 244 640 200 600
12 Chloride mg/L 324 552 405 206 172 308 524 250 1000
13 Magnesium mg/L 46 64 45 37 34 37 96 30 100
14 Sulphate mg/L 52 148 55 38 42 58 268 200 400
15 Total
Phosphorus (PO4-P)
mg/L 1.5 2.8 2 1.8 1.2 1.6 2.4 -- --
16 Sodium mg/L 130 410 220 130 82 180 380 -- --
17 Potassium mg/L 25 156 46 22 16 32 132 -- --
18 Fluoride mg/L 0.8 1 0.8 0.7 0.6 0.7 1 1 1.5
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 121
S. No.
Parameters
Unit GW1 GW2 GW3 GW4 GW5 GW6
GW7
Drinking Water Specification IS 10500: 1992 (Reaffirmed 2012)
Desirable
Limit
Permissible Limit
19 Phenolic
Compound mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.001 0.002
20 Oil and Grease
mg/L <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 -- --
21 Dissolved Oxygen
mg/L 5.2 5.1 5.1 5.3 5.4 5.2 5 -- --
22 Nitrate mg/L 0.6 0.8 0.7 0.6 0.5 0.8 0.9 45 No
Relaxation
23 Total
Nitrogen mg/L 1.3 1.7 1.4 1.3 1.1 1.6 1.9 - -
24 Iron mg/L 0.24 0.28 0.15 0.2 0.1 0.22 0.28 0.3 No
Relaxation
25 Copper mg/L <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.05 1.5
26 Boron mg/L 0.06 0.08 0.08 0.06 0.05 0.07 0.1 0.5 1
27 Chromium mg/L <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05 No
Relaxation
28 Zinc mg/L 0.15 0.12 0.18 0.2 0.16 0.21 0.24 5 15
29 Total
Coliform
Present/ Absent Absent Absent Absent Absent Absent Absent
Shall not be detectable in any100 ml of sample Absent
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 122
3.12.5 Summary of Ground Water Quality
pH was observed in the range of 7.14 – 7.54, which meets with drinking water
desirable norms.
Turbidity was found in the range of 1.2 – 2.8 NTU.
Total Dissolved Solid (TDS) were recorded in the range of 586 - 1936 mg/L with
minimum at Nadarkha village and maximum at Rahiyad village.
Conductivity varies from 906 to 3012 µmho/cm. The ratio of TDS to conductivity was
observed in the range of 0.6 to 0.65.
Total Hardness was in the range of 324 - 712 mg/L with minimum at Padariya village
and maximum at Rahiyad village.
Total Alkalinity was found in the range of 244 - 708 mg/L with minimum at Padariya
village and maximum at Narnavi village.
Chloride was found in the range of 172 to 552 mg/L and Sulphate varies from 38 to
268 mg/L.
Iron was found in the range of 0.10-0.28 mg/L with minimum at Nadarkha village and
maximum at Rahiyad and Narnavi village.
As microbiological parameters MPN analysis was also carried out and it was found
absent.
3.12.6 Interpretation of Ground Water Quality Data
Based on comparison study of test results with drinking water norms it is interpreted that
water quality for the sample collected from the locations Kadodara, Sambheti, Nadarkha and
Padariya meet with the drinking water permissible limit, these water sources can be used in
washing, bathing, irrigation and they can also be used in drinking purpose in absence of
alternate source. Water qualities of other locations like Narnavi, Dahej and Rahiyad village
do not meet with the drinking water norms. Results of Total Hardness and Total Alkalinity is
more than prescribed limit, this is due to ingress of salinity. This interpretation relate to the
sample collected from particular location only.
3.12.7 Surface Water
To assess the quality of Surface water, sample was collected from 6 numbers of locations
for the analysis of physico-chemical and microbiological parameters. Frequency of sampling
was once during the study period. Sampling and analysis was carried out as per ―Standard
Methods for Examination of Water and Wastewater 23rd edition, 2017. Surface water
sampling locations are presented in the Map 3.7 & Table 3.24. Analysis results are
presented in Table 3.25 and Table 3.26.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 123
Map 3.7: Map showing the Surface water sampling locations
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 124
Table 3.24: Details of Surface Water Sampling Locations
Code Location Distance/Direction w.r.t.
project site Latitude and Longitude Source
SW1 Kadodara 1.2 km/SSE 21°45'49.54"N
72°38'41.93"E Pond
SW2 Padariya 0.8 km/WNW 21°46'47.81"N
72°38'10.16"E Pond
SW3 Sambheti 2.5 km/SE 21°45'33.80"N
72°39'36.69"E Pond
SW4 Nadarkha 5.6 km/ENE 21°46'56.88"N
72°41'49.64"E Pond
SW5 Rahiyad 8.8 km/SE 21°42'5.80"N
72°40'16.81"E Pond
SW6 Narnavi 2.5 km/NNE 21°47'41.06"N
72°39'24.74"E Pond
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 125
Table 3.25: Surface water Analysis Results
S.
No. Parameters Unit SW1 SW2 SW3 SW4 SW5 SW6
1. Temperature 0C 24.5 24.0 25.0 24.5 25.5 24.5
2. pH @ 250C pH Unit 7.42 7.56 7.28 7.15 7.46 7.58
3. Colour Hazen 10 8 5 8 5 8
4. Odour - Unobjectionable Unobjectionable Unobjectionable Unobjectionable Unobjectionable Unobjectionable
5. TDS @ 1800C mg/L 592 598 292 388 318 322
6. Conductivity µmho/cm 916 924 432 599 492 492
7. TSS mg/L 14 10 8 12 8 10
8. Total Hardness as
CaCO3 mg/L 246 214 142 166 132 142
9. Calcium mg/L 46 58 26 42 34 36
10. Total Alkalinity as
CaCO3 mg/L 192 196 106 126 108 112
11. Chloride mg/L 222 204 98 138 112 108
12. Magnesium mg/L 32 17 19 15 11 13
13. Sulphate mg/L 22 32 18 22 16 22
14. Total Phosphorus mg/L 2.4 2.1 1.5 1.9 1.8 1.6
15. Sodium mg/L 120 130 54 80 68 64
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 126
S.
No. Parameters Unit SW1 SW2 SW3 SW4 SW5 SW6
16. Potassium mg/L 24 22 6 8 6 8
17. Fluoride mg/L 0.8 0.7 0.5 0.6 0.5 0.6
18. Phenolic Comp. mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1
19. Oil and Grease mg/L <1.0 <1.0 <1.0 <1.0 <1.0 <1.0
20. Dissolved Oxygen mg/L 5.2 5.1 5.5 5.3 5.4 5.3
21. COD mg/L 18 20 12 14 14 12
22. BOD (3 days at 27 0C) mg/L 6 6 4 5 5 4
23. Nitrate mg/L 0.9 0.8 0.6 0.7 0.6 0.7
24. Total Nitrogen mg/L 2.1 1.8 1.3 1.5 1.2 1.4
25. Iron mg/L 0.28 0.25 0.08 0.12 0.18 0.15
26. Copper mg/L <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
27. Boron mg/L 0.12 0.08 0.05 0.06 0.08 0.06
28. Chromium mg/L <0.03 <0.03 <0.03 <0.03 <0.03 <0.03
29. Zinc mg/L 0.26 0.24 0.12 0.18 0.15 0.20
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 127
Table 3.26: Microbiological Analysis of surface Water
Code Total coliform Fecal coliform
Escherichia coli
Fecal Streptococci
Most Probable No (MPN): No/100 Ml
SW1 28 24 <1.8 <1.8
SW2 26 22 <1.8 <1.8
SW3 18 14 <1.8 <1.8
SW4 20 14 <1.8 <1.8
SW5 18 12 <1.8 <1.8
SW6 20 16 <1.8 <1.8
Table 3.27: Inland Surface Water Classification (CPCB Standards)
S. No.
Characteristics Class
A B C D E
1. Dissolved Oxygen, mg/L, Min 6 5 4 4 -
2. Biochemical Oxygen Demand, mg/ L Max 2 3 3 - -
3. Total Coliform Organisms*
MPN/100 ml, Max 50 500 5000 - -
4. Total Dissolved Solids mg/L Max 500 - 1500 - 2100
5. Chlorides (as CL), mg/L, Max 250 - 600 - 600
6. Colour, Hazen Units, Max 10 300 300 - -
7. Sodium Absorption Ratio, Max - - - - 26
8. Boron (as B) mg/L Max - - - - 2
9. Sulphates (as SO4), mg/L Max 400 - 400 - 1000
10. Nitrates (as NO3), mg/L Max 20 - 50 - -
11 Free Ammonia (as N), mg/L Max - - - 12 -
12. Conductivity at 250C, micromhos/cm, Max - - - 1000 2250
13. pH value 6.5-8.5 6.5-8.5 6.5-8.5
6.5-8.5
6.5-8.5
14. Iron (as Fe), mg/l, Max 0.3 - 50 - -
15. Fluorides (as F), mg/L, Max 1.5 1.5 1.5 - -
16. Copper (as Cu), mg/L, Max 1.5 - 1.5 - -
* If the Coliform is found to be more than the prescribed tolerance limits, the criteria for
Coliform shall be satisfied if not more than 20 percent of samples show more than the
tolerance limit specified, and not more than 5 percent of samples show values more than 4
times the tolerance limits. Further, the fecal Coliform should not be more than 20 percent of
the Coliform.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 128
Source: Indian Standard (IS: 2296 – 1982).
A‘ Drinking water surface without conventional treatment but after disinfection
B‘ Outdoor bathing (organized)
C‘ Drinking water source with conventional treatment followed by disinfection
D‘ Propagation of wild life, fisheries
E‘ Irrigation, industrial, cooling, controlled waste disposal
3.12.8 Summary of Surface Water Quality
The following description is based on the analysis of the samples:
During the analysis pH of the sample was found in the range of 7.15 to 7.58.
TDS analysis was also carried out for surface water sample and it was found in the
range of 292-598 mg/L.
TSS was found in the range of 8-14 mg/L.
Total Hardness was found in the range of 132-246 mg/L.
DO is one of the important parameter to indicate towards the contamination of
organic matter. DO level decrease as soon as organic contamination increases.
During analysis DO was found in the range of 5.1-5.5 mg/L.
COD and BOD analysis was also carried out during the study period and results was
found in the range of 12-20 mg/L and 4-6 mg/L respectively.
Total Nitrogen was found in the range of 1.2-2.1 mg/L.
Iron content was found 0.08-0.28 mg/L and other heavy metals were found well
within the limit.
MPN test was also carried out for the surface water sample and it was found positive.
E-coli and Sstreptococci test was found negative in all samples.
3.12.9 Interpretation of Surface Water Quality Data
Based on test result data comparison study with CPCB standard, it is interpreted that surface
water quality meet with the criteria C, D and E, it means these water sources can be used for
propagation of wild life, fisheries, Bathing and Irrigation, industrial, cooling, etc. This
interpretation relate to the water sample collected during the survey from particular locations
only.
3.12.10 Marine Water
To assess the quality of Marine water sample was collected during high tide for the analysis of
physico chemical, nutrient, heavy metal, demand analysis. Frequency of sampling was once
during the study period and samples were collected as per standard method for the
examination of water & wastewater APHA 23rd Edition, 2017. Sampling locations are shown in
the Map 3.8 & Table 3.28. Test results are presented in Table 3.29.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 129
Map 3.8: Map showing the Marine water and sediment sampling locations
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 130
Table 3.28: Details of Marine and Sediment Sampling Locations
Table 3.29: Marine Water Analysis Result
S.No. Parameters Unit M1
1. pH pH unit 8.12
2. Temperature °C 23.5
3. TSS mg/L 114
4. Salinity Ppt 34.4
5. DO mg/L 5.8
6. BOD mg/L <4.0
7. Phosphate mg/L <0.1
8. Total Nitrogen mg/L <0.1
9. Oil & Grease mg/L <1.0
10. Phenolic compound mg/L <0.01
11. Total Chromium mg/L <0.03
12. Cadmium mg/L <0.05
13. Lead mg/L <0.01
14. Mercury mg/L <0.01
15. Iron mg/L 0.66
16. Zinc mg/L 0.24
17. Nickel mg/L <0.3
18. Boron mg/L 0.18
19. Copper mg/L 0.30
3.12.11 Summary of Marine Water Quality
Temperature is an important parameter, which affects the living organisms. The
temperature of the water was less than ambient air temperature.
The pH was observed 8.12. pH range is maintained due to buffering action of
CO2,CO3-2 and HCO3
-2.
Salinity was observed 34.4 ppt.
DO is an essential parameter which affects the biotic component of the water. Fish
and other aquatic life take oxygen through the gill. DO levels affect the aerobic
bacterial population as well as chlorophyllous Phytoplankton. During study period
maximum DO level was recorded 5.8 mg/L.
BOD is also an important parameter to define the environmental scenario of marine
ecosystem as it affects the DO level. BOD was found <4 mg/L.
Iron was recorded 0.66 mg/L. Other Heavy metals were found well within the range.
3.12.12 Interpretation of Marine Water Quality Data
During the analysis it was found that temperature of the marine water was below the ambient
temperature it indicates that there is no exothermic reactions take place. pH of the water
Code Source
M1 Marine Water
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 131
sample for different locations was found near 8.0. Some marine organism can survive at the
DO level of >4 mg/L and certain microorganism can survive up to DO level 0.2mg/L. During
testing it was found that DO of the marine sample was >4 mg/L. Based on the test results it
is interpreted that the water quality of marine is good and suitable for the survival of fishes
and other aquatic life. High DO and less BOD indicate that contamination of organic matter
in marine water body is not more than its self-purification capacity and probability of organic
matter in the sample is almost negligible.
3.13 ECOLOGY AND BIODIVERSITY
Ecology is the scientific study of the relations that living organisms have with respect to each
other and their natural environment. Producer, consumer and decomposer govern whole
cycle of ecology. Plant and animal both are interdependent to each other. Producer is
necessary for each consumer. Plant plays their role in ecology as producer. Plant, animals
and microorganism together with the environment in which they live make an independent
unit called the Ecosystem. The main objective of the ecological survey is aimed to find out
baseline status of flora and fauna of the study region. An ecological survey of the study area
was conducted particularly with reference to listing of species and assessment of the
existing baseline ecological (terrestrial and marine ecosystem) conditions in the study area.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 132
3.13.1 Methodology
We had used methodology as per our QMS Quality Procedure for Ecology and Biodiversity
for conducting ecology and biodiversity study.
Core Zone: Projects site and 5 km radius w.r.t. project site.
Buffer Zone: 10 km radii w.r.t. project site.
Study period: 1st Oct 2019 to 31st Dec 2019
3.13.2 Floral Diversity of the Study Area
During survey natural flora of study region were found with very less development of flora. No
distinct variation was observed in vegetation covered of study region. Vegetation near
villages and along the road was represented by trees and shrubs. Flora detail is presented in
Table 3.30 to Table 3.33.
Trees: Total 28 species of trees belong to 13 families are enumerated from the study area.
Table 3.30: List of Trees in the Study Area
S. No. Family and Scientific Name Vernacular Name Common Name
1. Arecaceae
1/1 Phoenix sylvestris Khajuri Date Palm
2/2 Roystonea regia - Royal Palm
2. Boraginaceae
3/1 Gerascanthus gharaf Gundi Gondni
3. Cornaceae
4/1 Alangium salvifolium Ankol Sage Leaved Alangium
4. Casuarinaceae
5/1 Casuarina equisetifolia Sharu Whistling Pine
5. Combretaceae
6/1 Terminalia crenulata Sadala Laurel
7/2 Terminalia catappa Badam Indian Almond
6. Caesalpiniaceae
8/1 Cassia fistula Garmalo Golden shower tree
9/2 Tamarindus indica Amli Tamarind
10/3 Bauhinia purpurea Kachnar Butterfly tree
7. Fabaceae
11/1 Acacia nilotica Desi Baval Gum arabic tree
12/2 Butea monosperma Khakhro Palas
13/3 Dalbergia sissoo Sissoo Indian rosewood
14/4 Pongamia pinnata Karanj Pongam Tree
15/5 Prosopis juliflora Gando Baval Mesquite
8. Mimosaceae
16/1 Acacia auriculiformis - Earleaf Acacia
17/2 Albizia odoratissima kalo shirish Ceylon rosewood
18/3 Albizia procera Killai (kelvo) White siris
9. Meliaceae
19/1 Azadirachta indica Limdo Neem
10. Myrtaceae
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 133
S. No. Family and Scientific Name Vernacular Name Common Name
20/1 Eucalyptus species Nilgiri Nilgiri
21/2 Syzygium cumunii Jambudo Black Plum
22/3 Callistemon viminalis - Weeping Bottle brush
11. Moraceae
23/1 Ficus benghalensis Vad Banyan tree
24/2 Ficus racemosa Umero Cluster fig
25/3 Ficus religiosa Pipdo Peepal
26/4 Morus alba Shetur White Mulberry
12. Rutaceae
27/1 Aegle marmelos Bili Bel
13. Simaroubaceae
28/1 Ailanthus excelsa Ardusa Indian Tree of Heaven
Shrubs: Total 21 species of trees belong to 12 families are enumerated from the study area.
Table 3.31: List of Shrubs in the Study Area
S.No. Family & Scientific Name Vernacular Name Common Name
1. Acanthaceae
1/1 Barleria prionitis Kapas Cotton
2/2 Hygrophilaauriculata (Schum.)Heine Kanta shelio Hygrophila
2. Asclepiadaceae
3/1 Calotropis procera Akdo Rubber Bush
3. Apocynaceae
4/1 Carissa carandas Karmada Karanda
5/2 Nerium indicum Karen Oleander
4. Euphorbiaceae
6/1 Ricinus communis Divelo (Erandi) Castor bean
5. Fabaceae
7/1 Tephrosia purpurea Sartankho Tephrosia
6. Loranthacea
8/1 Dendrophthoe falcate Vando Honey Suckle Mistletoe
7. Lythraceae
9/1 Lawsonia inermis Mehendi Henna
8. Malvaceae
10/1 Hibiscus rosa-sinensis Jasud China Rose
11/2 Hibiscus vitifolius Van Kapas Grape Leaved Mallow
12/3 Thespesia lampas Paras Piplo Ban Kapas
13/4 Abutilon indicum Khapat Indian Mallow
9. Oleaceae
14/1 Nyctanthes arbor-tristis Parijatak Har singar
10. Rutaceae
15/1 Citrus limon Limbu Lemon
11. Rhamnaceae
16/1 Ziziphus nummularia Chani bor Jhar Beri
17/2 Zizyphus oenoplia Boydino velo Jackal Jujube
18/3 Ziziphus mauritiana Bor Indian jujube
19/4 Zizyphus xylopyrus Ghat Bor Gottai
12. Verbenaceae
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 134
S.No. Family & Scientific Name Vernacular Name Common Name
20/1 Lantana carnara Ghaneri Lantana
21/2 Clerodendrum serratum Vilayati Mendi Blue Fountain Bush
Herbs: Total 20 species of trees belong to 15 families are enumerated from the study area.
Table 3.32: List of Herbs in the Study Area
S. No. Family and Scientific Name Vernacular Name Common Name
1. Apiaceae
1/1 Centella asiatica Brahmi Indian Pennywort
2. Amaranthaceae
2/1 Aerva sanguinolenta Karadia Climbing Wool-Plant
3/2 Achyranthes aspera Anghedi Prickly Chaff Flower
3. Apocynaceae
4/1 Catharanthus roseus Barmasi Periwinkle
4. Asteraceae
5/1 Echinops echinatus Shulio Indian Globe Thistle
5. Caesalpiniaceae
6/1 Cassia tora Kunvandio Stinking Cassia
6. Convolvulaceae
7/1 Ipomoea aquatica Nali Water Morning Glory
7. Fabaceae
8/1 Arachis hypogaea Mungfali F Groundnut
9/2 Trigonella foenum-graecum Methi Fenugreek
10/3 Crotalaria prostrata Ran methi Prostrate Rattlepod
8. Lamiaceae
11/1 Ocimum sanctum Tulsi Holy basil
12/2 Ocimum basilicum Sabje Basil
9. Malvaceae
13/1 Hibiscus lobatus Tali Lobed Leaf Mallow
10. Musaceae
14/1 Musa paradisiaca Kela Banana
11. Nymphaeaceae
15/1 Nymphaea pubescens Kamal Pink Water Lily
12. Papaveraceae
16/1 Argemone mexicana Darudi Mexican Prickly Poppy
13. Phyllanthaceae
17/1 Phyllanthus fraternus Bhonya Amli Gulf Leaf-Flower
14. Poaceae
18/1 Sorghum bicolor Bajri Sorghum
15. Solanaceae
19/1 Capsicum annuum Marchi Capsicum
20/2 Datura metel Ganthovalo Dhanturo Devil's Trumpet
Climbers: Total 5 species of trees belong to 5 families are enumerated from the study area
Table 3.33: List of Climbers in the Study Area
S. No. Family and Scientific Name Vernacular Name Common Name
1. Vitaceae
1/1 Ampelocissus latifolia Jungli Wild Grape
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 135
S. No. Family and Scientific Name Vernacular Name Common Name
2. Nyctaginaceae
2/1 Bougainvillea spectabilis Bougainvelia Great Bougainvillea
3. Cucurbitaceae
3/1 Cucurbita maxima Kolu Giant Pumpkin
4. Menispermaceae
4/1 Tinospora cordifolia Gulvel Gulbel
5. Zygophyllaceae
5/1 Tribulus terrestris Gokhru Goathead
Cultivated Plants in the Study Area
The prevalent cropping systems of this area are the cumulative results of past and present
decisions by individuals; these decisions are usually based on experience, tradition,
expected profit, personal preferences and resources, and so on. The crop occupying the
highest percentage of the sown area of this region is taken as the major crop and all other
possible alternative crops which are sown in this region either as substitutes of the base crop
in the same season or as the crops which fit in the rotation in the subsequent season, are
considered as minor crop. No any major/minor and vegetable crop in the core zone was
observed during study period, but observed major/minor and vegetable crop in the buffer
zone.
a. Major Crops: Cajanus cajan (Tur) and Gossypium (Cotton).
b. Minor crops: Sorghum bicolor (Jowar).
c. Major Vegetable corps: The major vegetables grown in the study area (buffer zone) were: Abelmoschus esculentus (Bhinda), Lagenaria siceraria (Bottle gourd), Luffa acutangula (Gilka) and Momordica charantia (Bitter gourd).
d. Major Ornamental Plants: Rosa (Rose) and Tagetes (Marigold).
Fauna Diversity of the Study Area
There was no endangered species observed during faunal survey, list of fauna detail
summarized in Table 3.34 to Table 3.37.
Table 3.34: List of Mammals in the Study Area
S.No. Scientific Name Common Name Schedule as per WPA 1972
1. Herpestes edwardsi Nurulia, Noria Schedule II
2. Funambulus penanti Khiskoli Schedule IV
3. Rattus rattus Rat Schedule V
4. Mus musculus Mouse Schedule V
5. Chiroptera Bat Schedule V
Table 3.35: List of Domestic Animal in the Study Area
S.No. Scientific Name Common Name
1. Bubalus bubalis Buffalo
2. Bos taurus Cow
3. Capra aegagrushircus Goat
4. Canis lupus familiaris Dog
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 136
Table 3.36: List of Birds in the Study Area
S. No. Scientific Name Common Name Local Name Schedule
and Status Mig.
Status
1. Ardeola grayii Indian pond heron Kani Bagli Schedule IV R
2. Bubulcus ibis Cattle egret Baglo Schedule IV R
3. Egretta garzetta Little egret Dhodo Baglo Schedule IV R
4. Egretta gularis Indian reef heron - Schedule IV R
5. Elanus caeruleus Black winged kite - LC R
6. Milvus migrans Black kite Govinda samadi LC R
7. Vanellus indicus Red-wattled lapwing Titodi Schedule IV R
8. Vanellus malabaricus Yellow-wattled
lapwing Titodi Schedule IV R
9. Charadrius dubius Little ringed plover Titodi Schedule IV R
10. Tringa ochropus Green sandpiper Leelitutvari LC R
11. Himantopus himantopus
Black-winged stilt - LC R
12. Columba livia Blue rock pigeon Parevun Schedule IV R
13. Streptopelia decaocto Eurasian collared
dove Dhol LC R
14. Streptopelia chinensis Spotted dove Vanaholi LC R
15. Psittacula krameri Rose ringed
parakeet Sudo, Popat LC R
16. Psittacula
cyanocephala Plum-headed
parakeet Popat Not listed R
17. Cuculus micropterus Indian cuckoo Bharti Kokant Schedule IV R
18. Eudynamys scolopacea
Asian Koel Koyal LC R
19. Glaucidium radiatum Barred Jungle owlet Van chibari Schedule IV R
20. Caprimulgus asiaticus Common Indian
nightjar Deshi chhapo LC R
21. Alcedo atthis Common kingfisher Lagothi Schedule IV R
22. Halcyon smyrnensis White breasted
kingfisher Kalkaliyo Schedule IV R
23. Coracias benghalensis Indian roller Nilkant Schedule IV R
24. Hirundo daurica Redrumped swallow Kenchiababil LC R
25. Dicrurus adsimilis Fork-tailed Drongo Kalokoshi Schedule IV R
26. Sturnus pagodarum Brahminy myna Shamshir babbai Schedule IV R
27. Acridotheres tristis Indian myna Kabar Schedule IV R
28. Acridotheres ginginianus
Bank myna Kabar Schedule IV R
29. Pycnonotus cafer Red vented bulbul Bulbul Schedule IV R
30. Turdoides caudatus Common babbler Sheradi laledu Schedule IV R
31. Turdoides striatus Jungle babbler Vana laledo Schedule IV R
32. Saxicoloides fulicata Indian robin Deoli LC R
33. Motacilla flava Yellow wagtail Matanopilakya LC R
34. Cinnyris asiaticus Purple sunbird Phul chakli LC R
35. Aethopyga siparaja Crimson sunbird - LC R
36. Ploceus philippinus Baya Sughari Schedule IV R
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 137
Table 3.37: List of Reptiles in the Study Area
S.No. Scientific Name Common Name Schedule as per WPA 1972
1. Calotes versicolor Oriental garden lizard Not listed
2. Calotes rouxi Roux's forest lizard Not listed
3. Sitana ponticeriana Fan-throated lizard Not listed
4. Chamaeleo zeylanicus Indian chameleon Not listed
6. Naja naja Indian cobra Schedule II
Source: Primary Survey and Forest Department, Bharuch District
Fishes: Catla, Mrigal, Minor Corp, Crab etc.
Rare and Endangered Fauna of the Study Area
Wild Life (Protection) Act, 1972, amended on 17th January 2003, is an Act to provide for the
protection of wild animals, birds and plants and for matters connected therewith or ancillary
or incidental thereto with a view to ensuring the ecological and environmental security of the
country. Some of the sighted fauna was given protection by the Indian Wild Life (Protection)
Act, 1972 by including them in different schedules. All the birds are included in schedule IV.
No any rare and endangered faunal species were found in the study area.
Endemic Fauna of the Study Area
None of the sighted animal species can be assigned endemic species category of the study
area.
3.13.3 Interpretation on Ecology and Biodiversity
The most commonly spotted bird species of this area are; Cattle Egret, Intermediate Egret,
Black-winged Stilt, Red-wattled Lapwing, Rock Pigeon, Eurasian Collared-Dove, Spotted
Dove, Chestnut-headed Bee-eater, Bank Myna and Common Myna. All the birds are
included in schedule IV. Among the reptiles Oriental garden lizard was common. Among
mammals Black rat was common. Forest department of Bharuch has declared as reserved
forest near Dahej village, which false within 10 km radius from the project site. Mainly the
declared area as reserved forest is having Prosopis juliflora, Caltrops and Acacia species in
degraded condition. This area does not support to schedule I mammalian species of wild life.
There is a good population of schedule-II species like Herpestes edwardsi (Indian grey
mongoose) and Naja naja (Indian cobra) as food chain is interlinked in the biological
environment. Dominant flora of the study region is Prosopis juliflora and acacia species.
Rosa (Rose), Gossypium (Cotton) and Cajanus cajan (Tur) are majorly cultivated by the
farmers of the majority villages. Natural vegetation of study area is in degraded condition
and wild mammal‘s density is also very low. No endangered or threatened species were
observed during the survey.
3.14 SOCIO-ECONOMIC ENVIRONMENT
Socioeconomics (also known as socio-economics or social economics) is the social
science that studies how economic activity affects social processes. In general it analyses
how societies progress, stagnate, or regress because of their local or regional economy, or
the global economy.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 138
In order to assess and evaluate the likely impacts arising out of any new or existing projects
in socio-economic environment, it is necessary to gauge the apprehension of the people in
the surrounding areas. Socio-economic survey serves as an effective tool for fulfilling this
requirement.
The rapid industrialization of the study region has greatly influenced the socio economic and
health environment in the villages. Increasing industrialization and population density has
increased pressure on resources, civic amenities and public infrastructure. Economic
conditions of the local people have improved with the increasing industrialization and greater
employment opportunities.
The socio-economic environment includes demography structure, population density, literacy
level, and employment levels. The data establish a baseline for the prediction of likely
impacts of the proposed activity on the socio-economic environment. Secondary information
pertaining to the study area villages was collected from Government Agencies, Census data
for the year 2011, and statistical abstracts to compile the socio-economic data.
3.14.1 Socio-Economic Survey Methodology
Socio-economic survey tools provide a means of improving understanding of local resource
management systems, resource use and the relative importance of resources for
households and villages. They can also be used to elicit insights on interaction with
government decision-making systems, community perceptions of trends and priority issues,
and community-based institutions and their role in the sustainable use and conservation of
natural resources.
Data Collection: Following steps were considered for the collection of primary data:
1. Identification of Study Area: The study area was identified before carrying out the
survey. All the related information which could affect the prosperity, development & literacy
were also collected.
2. Site Visit: Location wise survey plan & format for data collection were prepared for site
visit. Data regarding Land Characteristics, Population, Literacy, Workers and Amenities were
collected during the survey.
Analysis of Data: The data collected by primary survey were verified with secondary data
collected from sources like Government Agencies, Census data for the year 2011, and
statistical abstracts.
3.14.2 Demography
Almost all villages in the study area are experiencing a rapid growth of population due to
industrialization. The total population of study region is summarized in Table 3.38.
3.14.3 Population Density
Population density in the study area varies from 38–177 person/sq. km. Details of the same
are tabulated in Table 3.38.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 139
Table 3.38: Details of Population in Study Area
Villages No. of
Household
Total
Population
Total area
(Sq.km)
Population density
(Person/sq.km)
Padariya 131 647 5.39 120
Paniadara 514 2563 41.45 62
Goladara 201 890 8.42 106
Narnavi 151 692 6.67 104
Aladar 166 830 21.70 38
Trankal 129 543 7.40 73
Ambhel 159 721 10.29 70
Limdi 110 539 7.59 71
Pakhajan 255 1286 16.82 76
Nadarkha 92 447 5.30 84
Janiadara 150 729 10.36 70
Sambheti 82 416 3.51 119
Samatpor 79 367 2.95 124
Akhod 174 831 8.63 96
Nandida 160 719 12.20 59
Galenda 120 611 5.71 107
Atali 239 1150 10.63 108
Jolva 338 1442 8.75 165
Rahiyad 355 1694 14.37 118
Vadadla 201 822 6.79 121
Kadodara 420 1995 13.25 151
Vav 155 727 6.43 113
Dahej 3426 13495 76.31 177
Total 7807 34156 310.92 -
3.14.4 Sex Ratio
The sex ratio i.e. the number of females per 1000 males is in range of 617 – 1072 with lowest
in Dahej and highest in Ambhel. The Sex ratio i.e. the number of females per 1000 males
indirectly reveals certain sociological aspect in relation to female births, infant mortality
among female children. Details of the same are tabulated in Table 3.39.
Table 3.39: Details of Sex Ratio in Study Area
Zone of Study
Male Population
Female Population
Total Population
Sex Ratio
(Female to 1000 Male)
Padariya 340 307 647 903
Paniadara 1360 1203 2563 885
Goladara 462 428 890 926
Narnavi 349 343 692 983
Aladar 431 399 830 926
Trankal 287 256 543 892
Ambhel 348 373 721 1072
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 140
Zone of Study
Male Population
Female Population
Total Population
Sex Ratio
(Female to 1000 Male)
Limdi 278 261 539 939
Pakhajan 671 615 1286 917
Nadarkha 220 227 447 1032
Janiadara 361 368 729 1019
Sambheti 226 190 416 841
Samatpor 182 185 367 1016
Akhod 435 396 831 910
Nandida 383 336 719 877
Galenda 314 297 611 946
Atali 612 538 1150 879
Jolva 807 635 1442 787
Rahiyad 862 832 1694 965
Vadadla 419 403 822 962
Kadodara 1018 977 1995 960
Vav 378 349 727 923
Dahej 8,345 5,150 13,495 617
Total 19,088 15,068 34,156 -
3.14.5 Literacy Rate
The literacy level of the study area is summarized in Table 3.40 and graphically presented in
Figure 3.8.
Table 3.40: Details of Literacy Rate in Study Area
Villages Literate Literacy (%)
Male Female Total Male Female Total
Padariya 293 205 498 86.18 66.78 76.97
Paniadara 1003 652 1655 73.75 54.20 64.57
Goladara 371 260 631 80.30 60.75 70.90
Narnavi 283 227 510 81.09 66.18 73.70
Aladar 341 254 595 79.12 63.66 71.69
Trankal 225 163 388 78.40 63.67 71.45
Ambhel 258 184 442 74.14 49.33 61.30
Limdi 229 175 404 82.37 67.05 74.95
Pakhajan 548 416 964 81.67 67.64 74.96
Nadarkha 183 142 325 83.18 62.56 72.71
Janiadara 273 238 511 75.62 64.67 70.10
Sambheti 188 128 316 83.19 67.37 75.96
Samatpor 182 185 367 100.00 100.00 100.00
Akhod 340 239 579 78.16 60.35 69.68
Nandida 293 213 506 76.50 63.39 70.38
Galenda 243 219 462 77.39 73.74 75.61
Atali 494 363 857 80.72 67.47 74.52
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 141
Villages Literate Literacy (%)
Male Female Total Male Female Total
Jolva 661 414 1075 81.91 65.20 74.55
Rahiyad 690 620 1310 80.05 74.52 77.33
Vadadla 331 271 602 79.00 67.25 73.24
Kadodara 801 568 1369 78.68 58.14 68.62
Vav 324 251 575 85.71 71.92 79.09
Dahej 6704 3266 9970 80.34 63.42 73.88
Total 15,258 9,653 24,911 - - -
Figure 3.8: Graph of Literacy Rate
Among all the villages of study area Samatpor is having high literacy rate i.e. 100.00%. There
is not much difference between female literacy rate and male literacy rate in the study region.
Female literacy rate is an important indicator for social change.
3.14.6 Economic Aspects
Economic aspects of the study area include the economic structure of the people of the
surrounding area. It can be predicted that economic structure of the study area will be
improved with time, because it consists large industrial estate and hence there are more
employment opportunities.
According to working status, whole population of the study area is divided into:
Marginal workers
Non workers
Main workers
Census department has defined 10 categories of workers in Main workers. It consists of
cultivators, agricultural, labourer those engaged in livestock, forestry, fishing, mining and
quarrying, manufacturing, processing and repairs in household industries and other services.
Workers engaged in the work for a period less than 6 month during the reference year falls
0
20
40
60
80
100
120
% L
iter
acy
Villages
Literacy (%) Male Literacy (%) Female Literacy (%) Total
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 142
under marginal workers. Workers engaged in unpaid household duties e.g. students, retired
person, dependents etc. falls under non-workers. Detail of occupational structure is shown in
Table 3.41
Table 3.41: Details of Occupational Structure
Zone of Study Total Workers
Non-Workers (%) Main Workers (%) Marginal Workers (%)
Padariya 53.79 36.32 9.89
Paniadara 45.73 24.15 30.12
Goladara 60.90 25.39 13.71
Narnavi 40.32 32.66 27.02
Aladar 46.27 49.40 4.34
Trankal 69.80 27.44 2.76
Ambhel 71.01 25.94 3.05
Limdi 71.61 26.72 1.67
Pakhajan 56.84 36.86 6.30
Nadarkha 55.93 44.07 -
Janiadara 73.53 18.93 7.54
Sambheti 67.31 32.69 -
Samatpor 68.39 20.16 11.44
Akhod 59.93 39.95 0.12
Nandida 32.55 25.87 41.59
Galenda 71.03 23.24 5.73
Atali 54.52 24.78 20.70
Jolva 60.54 33.91 5.55
Rahiyad 69.36 23.08 7.56
Vadadla 59.00 36.86 4.14
Kadodara 55.54 29.02 15.44
Vav 64.65 32.74 2.61
Dahej 61.74 33.17 5.09
Aladar have significant employment i.e. 49.40 % as main workers, while the lowest employment as
main workers in Janiadara i.e.18.93%. Almost all the villages have more than 50 % people as non-
workers. Rapid industrialization in the last two decades has resulted in significant changes in the
occupational profile of the local people. There is an overall trend among the youth to opt for
employment in service sector and move away from traditional occupation.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 143
Figure 3.9: Graphical representation of occupational structure of Study Area
3.14.7 Amenities
Details of Amenities like Educational Institute, Health Care, Drinking Facilities, Drainage
Communication, Transportation etc are provided below:
Table 3.42: Educational Institutes in the Study Area
Govt. Primary School
Private Primary School
Govt. Middle School
Govt. Secondary
School
Private Secondary
School
Govt. Senior Secondary
School
Private Senior
Secondary School
26 1 0 4 0 2 0
In study area village availing Govt. Primary, Private Primary School, Govt. Secondary School and Govt. Senior Secondary School facility are available in study area. For higher studies Bharuch division is main center for the study area.
Table 3.43: Health Care Facilities in the Study Area
Community Health Centre
Primary Health Centre
Primary Health Sub Centre
Veterinary Hospital
0 2 4 1
In study area village availing Primary Health Centre, Primary Health Sub Centre and Veterinary Hospital etc.
Table 3.44: Drinking Water Facilities in the Study Area
Tap Water Untreated
Covered Well
Uncovered Well
Hand Pump
Tube Wells/Borehole
River/Canal Tank/Pond/Lake
24 4 19 9 6 5 13
Various types of drinking water facilities were availed in the study area e.g. Tap water, and Hand pump etc.
0
10
20
30
40
50
60
70
80%
of
Work
ers
Villages
Non Workers (%) Total Workers Main Workers(%)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 144
Table 3.45: Drainage Status in the Study Area
Closed Drainage Open Drainage No Drainage Open Kuccha
Drainage
0 18 6 8
Drainage and sanitation facilities were not adequate in the study area. Mostly Open drainage, and open pukka drainage observed in the village.
Table 3.46: Communication Facilities in the Study Area
Post Office Sub Post Office Telephone Public Call Office /Mobile (PCO)
2 12 26 11
Post Office, Sub-post Office, Telephone (Landline) and PCO facility were availed in village for communication purpose.
Table 3.47: Transportation Facilities in the Study Area
Public Bus Service
Railway Station
Auto/Modified Autos Taxi Vans Tractors
24 1 18 1 12 5
A well planned and efficient network of transport is an essential component for a developing country. In the absence of efficient network of transport, a State‘s economy would suffer from major grid lock in terms of overall growth potential of that area. In village public bus facility was availed and other facilities were railway station, auto, vans and tractors etc.
Table 3.48: Road Facilities in the Study Area
Black Topped (pucca) Road
Gravel (kuchha) Roads
Water Bounded Macadam
All Weather Road
Navigable Waterways
(River/Canal) Footpath
24 14 24 21 0 24
Roads are the basic means of communication for the development of any economy. All type of roads were present in the study area.
Table 3.49: Bank Facilities in the Study Area
Commercial Bank Cooperative Bank Agricultural Credit
Societies Self - Help
Group (SHG)
3 2 1 24
Banking facility was found in village. Self-help group activities were performed by the women groups.
Table 3.50: Power Facility in the Study Area
Power Supply For Domestic Use
Power Supply For Agriculture Use
Power Supply For Commercial Use
Power Supply For All Users
24 24 24 24
In village availed power facility in the form of domestic, commercial and for agricultural uses.
Source: District Census Handbook 2011, Gujarat.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 145
3.14.8 Interpretation of Socio Economic Data
During the primary survey it was observed that almost pukka road facility is available in all
villages within 10 km radius. Literacy rate of the study region is from 61.30% to 100.00%. On
the basis of survey for literacy rate data it is interpreted that there is need to promote educate
more and more people. Almost all the villages have more than 50 % people as non-workers.
It indicates that the problem of unemployment can be solved by providing proper training and
education. There is also need to establish more industries so that maximum number of
employment can be generated. Basic amenities like Education facilities Health care facilities,
water supply, electric power supply, mode of transportation etc. are available in all villages.
Summary of Baseline Monitoring is provided in Table 3.51
Table 3.51: Summary of Baseline Monitoring Data
Ambient air quality monitoring
S. NO.
Criteria pollutants
Unit Maximum
value Minimum
value
98th percentile
value
Prescribed standard
1. PM10 µg/m3 88.1 63.2 87.6 100
2. PM2.5 µg/m3 47.4 33.1 46.7 60
3. SO2 µg/m3 16.4 9.1 16.1 80
4. NOX µg/m3 21.4 14.5 20.8 80
All the results of ambient air quality parameters have been found within the limit as per NAAQS. Based on comparison study of results for tested parameters with NAAQS, it is interpreted that
ambient air quality of studied locations is satisfactory. This interpretation relate to the results found for particular locations and study period.
Noise monitoring
S. NO.
Parameter Unit Maximum value Minimum value Prescribed standard
1. Ld (Day) dB(A) 80.5 49.6 -
2. Ln(Night) dB(A) 76.1 41.8 -
Based on noise level data obtained during the survey for residential area and commercial area, it is interpreted that noise levels are within the standard norms prescribed by MoEFCC & CC. Looking towards the increase in noise generating sources it is suggested that there is need to apply noise
reducing devices at noise generating sources and generate public awareness.
Soil quality and characteristics
S. NO.
Parameter Unit Maximum value Minimum value
1. pH - 7.62 7.38
2. Electrical
Conductivity dS/m 1.53 1.24
3. Sodium meq/100gm 4.5 3.4
4. Potassium meq/100gm 1.8 1.0
5. Phosphorous mg/100g 13.2 11.6
6. Total Nitrogen % 0.073 0.062
Based on soil analysis data it is concluded that soil at the studied locations are neutral to alkaline in reaction. The soils are medium in nitrogen, low in phosphorus and medium in potassium status. The
levels of total Fe, Cu, Cr, B and Zn are within the limits. However, for successful greenbelt development liberal quantity of organic manure and recommended doses of N and double the
recommended dose of P fertilizers should be applied.
Ground Water
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 146
S. NO.
Parameter Unit Maximum
Value Minimum
Value Desirable
Limit Permissible
Limit
1. pH - 7.54 7.14 6.5-8.5 No Relaxation
2. TDS mg/L 1936 586 500 2000
3. TSS mg/L <2 <2 - -
4. Total Hardness mg/L 712 324 200 600
5. Chloride mg/L 552 172 250 1000
6. Total Alkalinity mg/L 708 244 200 600
7. Fluoride mg/L 1.0 0.6 1.0 1.5
8. Iron mg/L 0.28 0.10 0.3 No Relaxation
Based on comparison study of test results with drinking water norms it is interpreted that water quality for the sample collected from the locations Kadodara, Sambheti, Nadarkha and Padariya meet with the drinking water permissible limit, these water sources can be used in washing, bathing, irrigation and they can also be used in drinking purpose in absence of alternate source. Water qualities of
other locations like Narnavi, Dahej and Rahiyad village do not meet with the drinking water norms. Results of Total Hardness and Total Alkalinity is more than prescribed limit, this is due to ingress of
salinity. This interpretation relate to the sample collected from particular location only.
Surface Water
S. NO.
Parameter Unit Maximum
Value Minimum
Value Permissible Limit
1. pH - 7.58 7.15 6.5-8.5
2. TDS mg/L 598 292 2000
3. DO mg/L 5.5 5.1 -
4. COD mg/L 12 20 -
5. BOD mg/L 4 6 -
Based on test result data comparison study with CPCB standard, it is interpreted that surface water quality meet with the criteria C, D and E, it means these water sources can be used for propagation of wild life, fisheries and Irrigation, industrial, cooling, and Bathing. This interpretation relate to the water
sample collected during the survey from particular locations only.
Marine water
During the analysis it was found that temperature of the marine water was below the ambient temperature it indicates that there is no exothermic reactions take place. pH of the water sample for
different locations was found near 8.0. Some marine organism can survive at the DO level of >4 mg/L and certain microorganism can survive up to DO level 0.2mg/L. During testing it was found that DO of
the marine sample was >4 mg/L. Based on the test results it is interpreted that the water quality of marine is good and suitable for the survival of fishes and other aquatic life. High DO and less BOD
indicate that contamination of organic matter in marine water body is not more than its self-purification capacity and probability of organic matter in the sample is almost negligible.
Ecology and Biodiversity
The most commonly spotted bird species of this area are; Cattle Egret, Intermediate Egret, Black-winged Stilt, Red-wattled Lapwing, Rock Pigeon, Eurasian Collared-Dove, Spotted Dove, Chestnut-headed Bee-eater, Bank Myna and Common Myna. All the birds are included in schedule IV. Among
the reptiles Oriental garden lizard was common. Among mammals Black rat was common. Forest department of Bharuch has declared as reserved forest near Dahej village, which is within 10 km
radius from the project site. Mainly the declared area as reserved forest is having Prosopis juliflora, Caltrops and Acacia species in degraded condition. This area does not support to schedule I
mammalian species of wild life. There is a good population of schedule-II species like Herpestes edwardsi (Indian grey mongoose) and Naja naja (Indian cobra) as food chain is interlinked in the
biological environment. Dominant flora of the study region is Prosopis juliflora and acacia species. Rosa (Rose), Gossypium (Cotton) and Cajanus cajan (Tur) are majorly cultivated by the farmers of the majority villages. Natural vegetation of study area is in degraded condition and wild mammal‘s density is also very low. No endangered or threatened species were observed during the survey.
Socio Economic
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 3 147
During the primary survey it was observed that almost pakka road facility is available in all villages within 10 km radius. Literacy rate of the study region is from 61.30% to 100.00%. On the basis of survey for literacy rate data it is interpreted that there is need to promote educate more and more people. Almost all the villages have more than 50 % people as non-workers. It indicates that the
problem of unemployment can be solved by providing proper training and education. There is also need to establish more industries so that maximum number of employment can be generated. Basic amenities like Education facilities Health care facilities, water supply, electric power supply, mode of
transportation etc. are available in all villages.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 148
4 ANTICIPATED ENVIRONMENTAL IMPACTS AND
MITIGATION MEASURES
This chapter comprises the information regarding the identified beneficially or adversely
environmental impacts due to possible aspects predicted because of location of the plant,
expected / predicted accidents scenario, conceptualization of project, preconstruction &
construction activities and due to operation of machineries/equipment/reactors.
Environmental aspect-impact relationship will be identified and quantified with its scale of
magnitude and scale of importance, accordingly significance of impact will be determined
along with mitigation measures.
4.1 IMPACT ASSESSMENT METHODOLOGY
The impact assessment essentially consists of three steps:
1. Impact Identification
2. Impact Predictions
3. Impact Analysis for determination of significance of impacts
Here, impact assessment has been done based on Leopold Matrix in which each aspect and
its potential in creating impact is expressed in terms of its magnitude and importance. For
quantitative representation, both magnitude & importance are represented by values as
described below:
Purpose of Impact Assessment:
Listing of environmental aspects (i.e. activities or parts thereof that can cause
environmental impacts).
Identifying applicable components of the environment on which the environmental
aspects can cause significant environmental impact.
Making reason / possible inter-relationships that lead to environmental impact
creation.
Listing the environmental components likely to receive impacts, along with the key
impacting activities on each component.
Scale of Importance: Importance of an interaction is related to its significance, or an
assessment of probable consequences of anticipated impact. It ranges from 1 to 9; with 9
representing a very important interaction and 1 of relatively low.
Scale of Magnitude: Impact score or magnitude ranges from 0-5 with positive and negative
values, depending upon the impact rising out of the project activity. Refer Table 4.1.
Table 4.1: Severity Criteria for Magnitude of Impacts
S. No Category Description of category Impact
Adverse Beneficial
1 No impact - 0 0
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 149
S. No Category Description of category Impact
Adverse Beneficial
2 No appreciable impact Short term reversible -1 1
3 Significant impact Long term reversible -2 2
4 Major impact Irreversible but of lesser extent -3 3
5 High impact Irreversible but of medium extent -4 4
6 Permanent impact Severe irreversible impact -5 5
Score of each of the component is multiplied by ‗‘Importance factor‖ and total score is
obtained by summation of both. Score ranges of impact evaluation based on matrix score is
given in Table 4.2
Table 4.2: Score ranges for Beneficial and Adverse Impacts
S. No
Total score Outcome
A +ve / -ve Beneficial impact / adverse impact
1 0-300 No appreciable Beneficial impact / adverse impact
2 300-600 Appreciable but reversible adverse impact-mitigation measures are needed
3 600-900 Significant adverse impacts: most of the impacts are reversible. Mitigation measures are crucial.
4 900-1200 Major adverse impacts; most of the impacts are reversible. Alternative site selection to be considered.
5 >1200 Permanent irreversible impact; alternatives to the project need to be explored
Significance:
The mitigation measures are suggested based on the criteria of significance / consequence
as per the Table 4.3 for individual Valued Environmental Components (VECs) in following
sections.
Table 4.3: Criteria of Significance / Consequence
Score Significance/Consequence
-/+ 1 to -/+ 9 Low
-/+ 10 to -/+ 30 Medium
-/+31 to -/+ 45 High
4.2 INVESTIGATED ENVIRONMENTAL IMPACTS DUE TO THE
PROPOSED PROJECT
Assessment of Significance of Impacts
Assessment of aspect and impact from the proposed activity is described in Table 4.4
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 150
Table 4.4: Aspect-Impact Identification from Proposed Project
S. No.
Project Activity
N/ A
N/ E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) or Air Water Effluent Land SHW
Ecology & Biodiversity
Social
Resource Depletion
Total
(-ve) AP/AQ NV SW GW Effluent
/ Sewage
LU/ LC
Soil HW C&D SW Ter. Aqu. Infrastruct
ures
Economic / Employmen
t
Health & Safety
RD
Scale of Importance 7 5 4 5 6 4 5 7 4 4 5 3 5 9 7 5 85
1 Project Pre- Construction/ Construction
1.1 Site clearance N Removal of top soil
during site clearance 1,2,3,4,5 -1 -1
1.2 Excavation and paving of site
N Generation of debris
from excavation activities
1,2,3,4,5 -1 -1
N Dust generation from excavation activities
1,2,3,4,5 -1 -1
AN Fall in Pit 1,2,3,4,5 -2 -2
1.3
Civil works including building of structures and Heavy equipment
operations
N Use of construction
material- stone, aggregates
1,2,3,4,5 -3 -3
AN Fall from Height 1,2,3,4,5 -1 -1
N Generation of C&D
Waste 1,2,3,4,5 -1 -1
N Noise generation from
Heavy Equipment operation
1,2,3,4,5 -1 -1 -2
1.4
Vehicular movement for
transportation of construction material and
waste
N Increase in traffic load
on existing road 1,2,3,4,5 -1 -1
N
Emission of HC, CO, NOx & PM from
vehicular transportation during construction
phase
1,2,3,4,5 -1 -1
1.5
Influx of workers during
construction phase
N Employment
generation during construction phase
1,2,3,4,5 1 1
N Sewage generation during construction
phase 1,2,3,4,5 -1 -1
2 Storage & Handling of Hazardous Chemicals 0
2.1 Loading/Unloadin
g of Solvent N
Leakage of Solvent from weak Joint
1,2,3,4,5 -2 -2
2.2 Handling of Toxic
chemical like Phosgene
N Leakage/Emission of
Toxic fumes from weak joints/vents
1,2,3,4,5 -2 -2
3 Commissioning/ Project Operation 0
3.1 Manufacturing
process N
Emission of Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic
traces, HCN
1,2,3,4,5 -3 -2 -5
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 151
S. No.
Project Activity
N/ A
N/ E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) or Air Water Effluent Land SHW
Ecology & Biodiversity
Social
Resource Depletion
Total
(-ve) AP/AQ NV SW GW Effluent
/ Sewage
LU/ LC
Soil HW C&D SW Ter. Aqu. Infrastruct
ures
Economic / Employmen
t
Health & Safety
RD
Scale of Importance 7 5 4 5 6 4 5 7 4 4 5 3 5 9 7 5 85
N Wastewater
Generation from process
1,2,3,4,5 -2 -3 -5
AN
Spillage and Leakage of Solvents/Acids
during manufacturing process.
1,2,3,4,5 -1 -2 -3
N Fugitive Emissions of
Solvents 1,2,3,4,5 -3 -2 -5
N Generation of
Hazardous waste from process
1,2,3,4,5 -1 -3 -4
AN
Hazards from Toxic gases/
Flammable/Explosion due to Runaway
Reaction.
1,2,3,4,5 -2 -2
4 General & Utilities 0
4.1
Operation of D.G Set, Cooling tower, Boiler,
etc.
N Emission of PM, SO2
and NO x from D. G & Boiler
1,2,3,4,5 -3 -2 -5
N
Generation of wastewater from
Cooling and Boiler Blow Down
1,2,3,4,5 -2 -3 -5
N Noise generation from
D.G Set 1,2,3,4,5 -1 -1 -2
4.2 Equipment and Floor Washing
N
Generation of wastewater during
equipment and floor washing
1,2,3,4,5 -1 -3 -4
4.3 Influx of workers
N Employment
Generation during operational phase
1,2,3,4,5 5 5
N Sewage generation during operational
phase 1,2,3,4,5 -1 -2 -3
4.4
Vehicular movement for
transportation of raw materials, finished goods and Industrial
Waste
N Increase in traffic load
during operational phase
1,2,3,4,5 -3 -3
N
Emission of HC & CO from vehicular
transportation during operational phase
1,2,3,4,5 -2 -2
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 152
S. No.
Project Activity
N/ A
N/ E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) or Air Water Effluent Land SHW
Ecology & Biodiversity
Social
Resource Depletion
Total
(-ve) AP/AQ NV SW GW Effluent
/ Sewage
LU/ LC
Soil HW C&D SW Ter. Aqu. Infrastruct
ures
Economic / Employmen
t
Health & Safety
RD
Scale of Importance 7 5 4 5 6 4 5 7 4 4 5 3 5 9 7 5 85
4.5 Equipment
maintenance
N
Removal of used lubricant oil from
equipment maintenance activities.
1,2,3,4,5 -2 -2
N
Generation of scraps and used spares etc.
from equipment maintenance activities.
1,2,3,4,5 -2 -2
4.6
Stormwater Generation
during Rainy Season
AN
Contamination of surface/ground water, soil and biodiversity during stormwater
runoff
1,2,3,4,5 -1 -1 -1 -1 -1 -5
4.7 Raw water intake
source from GIDC
N Consumption of fresh
water 1,2,3,4,5 -3 -2 -5
4.8 Unpacking and
packing of materials
N Generation of
Discarded drums/bags 1,2,3,4,5 -2 -2
4.9 ETP and MEE
Operation N
Generation of ETP sludge and MEE Salts
1,2,3,4,5 -2 -2
4.1 Greenbelt
Development N
Reduction in Air and noise pollution
1,2,3,4,5 5 5 10
Total of Individual VEC's -12 3 -10 -2 -12 0 -5 -9 -2 -2 -2 -1 -4 6 -12 -5 -69
TOTAL -84 15 -40 -10 -72 0 -25 -63 -8 -8 -10 -3 -20 54 -84 -25 -383
Interpretation: The final score is -383 which concludes ―Appreciable but reversible adverse impact-mitigation measures are needed‖.
Mitigation measures for the impacts on individual VEC are discussed in detail in next section.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 153
4.2.1 Air Environment
Potential impacts on Air Environment /Nearby Ambient Air Quality are tabulated in Table 4.5.
Table 4.5: Impact Scoring and Mitigation Measures for Air Environment
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) & (-ve)
Air Total Score
Significance / Consequence
Mitigation Measured
AP, AQ
Scale of Importance 7
1
Excavation and paving of
site
Dust generation
from excavation activities
1,2,3,4,5 -1 -7 Low
Regular water sprinkling will be done and Dust mask will be
provided
2
Vehicular movement for transportation
of construction
material
Emission of HC, CO,
NOx & PM from
vehicular transportatio
n during construction
phase
1,2,3,4,5 -1 -7 Low
• Maintaining the speed limit of
vehicle transporting construction materials.
• Use of only PUC certified vehicles
3 Manufacturin
g process
Emission of Cl2, HCl,
NH3, H2S, PM, SO2, NOx, HC Organic
traces, HCN
1,2,3,4,5 -3 -21 Medium
Water/Caustic/Acid Scrubber, fume gas incinerator. Bag filter will be
provided to control the emission within norms
4 Manufacturin
g process
Fugitive Emissions of
Solvents 1,2,3,4,5 -3 -21 Medium
Solvents will be recovered by installation of
solvent recovery system and it will
be reused into manufacturing
process
5
Operation of D.G Set, Cooling
tower, Boiler, etc.
Emission of PM, SO2 and
NOx from D.G & Boiler
1,2,3,4,5 -3 -21 Medium
Waters scrubber will be provided to
boiler stack. Adequate stack
height will be provided to DG set and DG set
will be used only during
emergencies
6
Vehicular movement for transportation
of raw materials, finished
goods and
Emission of HC & CO
from vehicular
transportation during
operational
1,2,3,4,5 -2 -14 Medium
Maintaining the speed limit of vehicle transporting construction materials. Covered vehicles
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 154
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) & (-ve)
Air Total Score
Significance / Consequence
Mitigation Measured
AP, AQ
Scale of Importance 7
Industrial Waste
phase with tarpaulin for transportation of raw materials • Use of only PUC certified vehicles
7 Greenbelt
Development Reduction in Air pollution
1,2,3,4,5 5 35 High
Positive Impact, will improve the esthetic value of the project site
Construction Phase
Impacts:
Dust generation from excavation activities
Emission of HC, CO, NOx & PM from vehicular transportation during construction
phase.
Spillage of Raw Material during transportation.
Mitigation Measures:
Regular water sprinkling will be done and Dust mask will be provided
Maintaining the speed limit of vehicle transporting construction materials.
Use of covered vehicles with tarpaulin for transport of raw materials.
Use of only PUC certified vehicles
Materials will be transported in closed trucks. Drivers will be trained for handling
accidental situations
Early construction of Paved Road To avoid dust emissions.
Operation Phase
Impacts:
Emission of Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic traces, HCN.
Fugitive Emissions of Solvents
Emission of PM, SO2 and NOx from D.G & Boiler
Emission of HC & CO from vehicular transportation during operational phase
Mitigation Measures:
Water Scrubber, Acid & Alkali Scrubber & Fume gas incinerator will be provided to
control the emission within norms.
Solvents will be recovered by installation of solvent recovery system and it will be
reused into manufacturing process.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 155
Waters scrubber will be provided to boiler stack. Adequate stack height will be
provided to DG set and DG set will be used only during emergencies.
Maintaining the speed limit of vehicle transporting construction materials.
Use of covered vehicles with tarpaulin for transport of raw materials.
Use of only PUC certified vehicles
Green Belt development - Positive Impact, will improve the esthetic value of the
project site.
Incremental Traffic
From the proposed facility, approximately on daily basis 90 trucks per day (63 trucks of 20
tones capacity for carrying RM & FG + 27 truck of 20 tone for carrying Hazardous waste )
shall be using the SH-6 and SH-206. Employees and contract workers (~ 30 cars, 6 buses, 5
three wheelers & 40 two wheelers) shall use the same route during peak hours (i.e. morning
0800 hours to 1030 hours and evening 1600 hours to 2000 hours). Traffic Study for
incremental traffic is provided in Table 4.6.
Table 4.6: Incremental Traffic Study Report
S. No.
Vehicles Distribution
No. of Vehicles/Day
Passenger Car
Total No. of Vehicle in PCU
Total No. of Vehicle (PCU)/Hour
SH-6 SH-206
Unit (PCU) SH-6 SH-206 SH-6 SH-206
1 Cars 5844 5366 1 5844 5366 243.5 223.6
2 Buses 574 512 3 1722 1536 71.75 64.0
3 Trucks 544 485 3 1632 1455 68 60.6
4 Two
wheelers 8281 7855 0.5 4140.5 3927.5 172.5208 163.6
5 Three
wheelers 2071 1894 0.75 1553.25 1420.5 64.71875 59.2
Total 17314 16112 14892 13705 620.5 571
Table 4.7: Proposed Traffic Scenario with Respect to LOS
Road V (Volume in
PCU/hr) C (Capacity in
PCU/hr) Existing V/C
Ratio LOS
SH-6 620 1250 0.50 C
SH-206 571 1250 0.46 C
Table 4.8: LOS Criteria
V/C LOS Performance
0.0-0.2 A Excellent
0.2-0.4 B Very Good
0.4-0.6 C Good/Average/Fair
0.6-0.8 D Poor
0.8-1.0 E Very Poor
The existing LOS value of the SH-6 & SH-206 is ―C‖, after expansion also the LOS value
remains same, the incremental traffic is negligible and will not have significant impact on
existing roads as the capacity of road is sufficient to take increasing load. The impact due to
increase in number of vehicles and its Mitigation measures are detailed in Table 4.9
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 156
Table 4.9: Traffic Management
Identified Aspect
Impacts Significance of Impacts
Mitigation Measures
Increase in Traffic load due to expansion
Increase in transportation will lead to increase in road traffic.
Emission of pollutants like HC, NOx& CO.
Noise generation from vehicular movement.
Spillage or leak of materials during transportation.
Medium
Vehicles having PUC certificates will only be allowed to transport materials at project site.
Dust generation will be reduced by maintaining the speed limit of vehicle transporting raw materials & finished goods.
Materials will be covered/closed to avoid leakage or spillage.
Air Quality Modeling
The flue gas stack & process gas vent are considered as a point source to predict the impact
on ambient air quality during the operational phase. The prediction has been done by using
AERMOD View Gaussian Plume Dispersion model.
Methodology
The methodology for Air Quality Modeling using AERMOD View Gaussian Plume Dispersion
model is given in Figure 4.1.
Figure 4.1: Methodology for AQM
Meteorological Parameters
Surface meteorological data at project site was collected for October-Dec,2019.The hourly
meteorological data considered during this period were:
Wind Speed & Direction;
Ambient atmospheric temperature;
Cloud cover;
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 157
Relative humidity.
Following parameters were considered for dispersion modeling – Point Source
Quantity of fuel;
Emission rate of pollutants;
Stack & Vent:
o Internal diameter at top; and height from ground level;
o Exit gas velocity;
o Exit gas temperature
Efficiencies of various proposed pollution control devices.
Source of Emission
Flue gas emission of PM, SO2, & NOx, from the stack attached to Steam Boilers &
Thermic Fluid Heater.
Process emission of PM, SO2, NOX, NH3, Cl2, H2S, HC, HCl & HCN from the vent
attached to process stacks as per
Table 2.26
The stack & vent details along with emission rate of pollutants are given in Table 4.10 &
Table 4.11.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 158
Table 4.10: Detail of Stack & Emission
Stack Details Emission*
S. No.
Stack Attache
d to
No. of Stack
Capacity
Height
(m)
Diameter (m)
Gas Exit Vel.
(m/s)
Gas Exit Temp.
(oC)
Fuel Fuel cons. SO2 Emitted
(gm/sec)
NOx Emitted
(gm/sec)
1 40 T Boiler
7 40 TPH 30.0
1.0 15.00 408.0 NG 3176 Sm3/hr 0.0086 1.40
2 10 T Boiler
7 10 TPH 30.0
1.0 15.00 408.0 NG 794 Sm3/hr 0.0022 1.40
3 Thermic
Fluid Heater
1 10 TPH 30.0
0.5 15.00 408.0 NG 415 Sm3/hr 0.0011 0.35
Note: *The PM is not involved in emission due the absent of Ash content in Natural Gas Specification.
Table 4.11: Detail of Vent & Emission
Vent Details Emission
S. No.
Vent Attached to Height
(m)
Diameter
(m)
Gas Exit Vel.
Gas Exit
Temp. (oC)
APCM Pollutant Permissible
limit (mg/Nm3)
Emission after APCM
(gm/sec)
1 Saponification Reactor
(UPDT) 30 0.2 6 320
NH3 scrubbing with Water
NH3 30 0.03
2 BFNCI reactor (CCMP) 30 0.3 6 320 Alkali Scrubber Chlorine 9 0.02
HCl 20 0.04
3 TPPI reactor 30 0.35 6 320 Alkali Scrubber
followed by Water scrubber
HCl 20 0.05
4 EDA reactor (EDTA)
30 0.6 6 320 Water scrubber NH3 30 0.24
5 30 0.6 6 320 Alkali Scrubber HCl 20 0.16
6 Indigo Blue 30 0.4 6 320 Water scrubber NH3 30 0.11
7 HMTBA 30 0.4 6 320 Dil H2SO4 NH3 30 0.11
8 Red Phosphorous 30 0.5 6 320 Alkali followed by
Water HCl 20 0.11
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 159
Vent Details Emission
S. No.
Vent Attached to Height
(m)
Diameter
(m)
Gas Exit Vel.
Gas Exit
Temp. (oC)
APCM Pollutant Permissible
limit (mg/Nm3)
Emission after APCM
(gm/sec)
9 Sul Isobutylene 30 0.5 6 320 Alkali Scrubber H2S 5 0.03
10 Cysteamine Hydrochloride 30 0.6 6 320 Alkali
Scrubber+Water Scrubber
H2S 5 0.04
11
Cyanuric Chloride 30 0.25 10 320 Bag Filter followed by Alkali
Scrubber+Water Scrubber
Cl2 9 0.01
HCl 20 0.03
12 MITC 30 0.5 6 320 Alkali Scrubber H2S 5 0.03
13 PCF/SBCF/2EHCF/DCC 30 0.5 6 320
Alkali Scrubber+Water
Scrubber Common Scrubber
HCL 20 0.11
14 CPA 20 0.5 6 320 Alkali
Scrubber+Water Scrubber
HCL 20 0.07
15 ZnDTP 30 0.5 6 320 Alkali
Scrubber+Water Scrubber
H2S 5 0.03
16 Na2S Flakes 20 0.3 2 320 Bag Filter
Followed by Water Scrubber
PM, 150 0.20
SO2, 100 0.13
NOX 50 0.07
17
NaCN Plant (Emergency Stack)
40 0.8 5 320 Two stage water
scrubber
NH3 175 0.1638
HC 20 0.0187
NaCN Plant (Process Stack) 35 1 10 320 2 stage Alkali
Scrubber + Water Scrubber
NH3 175 0.2239
HCN 30 0.0384
18 Natural gas based fume gas
Incinerator - III (NaCN, 30 1 10 320
Thermal Destruction
PM 150 0.1645
HCl 20 0.0219
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 160
Vent Details Emission
S. No.
Vent Attached to Height
(m)
Diameter
(m)
Gas Exit Vel.
Gas Exit
Temp. (oC)
APCM Pollutant Permissible
limit (mg/Nm3)
Emission after APCM
(gm/sec)
TEOF, TMOF,Indigo Blue, EDTA, HMTBA, Cyanuric
Chloride)
SO2 100 0.1097
NOx 400 0.4386
H2S 45 0.049
HC Traces 20 0.0219
HCN 30 0.0329
19 Natural gas based fume gas incinerator - IV (Thiophine,
DCC,MITC) 30 1 10 320
Thermal Destruction
PM 150 0.1645
HCl 20 0.0219
SO2 100 0.1097
NOx 400 0.4386
H2S 45 0.049
HC 20 0.0219
HCN 30 0.0329
Assumptions
The dispersion modeling assumptions considered are as follows:
The flue gas stack emission rate for SO2 was calculated based on the sulphur content (4.9 mg/m3) specification of Natural gas and the NOx
was calculated based on flue gas emission standards.
The process emission rate for PM, SO2, NOX, NH3, Cl2, H2S, HC, HCl & HCN was calculated based on GPCB Permissible limits for process
emission from vent.
The terrain of the study area was considered as flat
The mathematical equations used for the dispersion modeling assumes that the earth surface acts as a perfect reflector of plume and physic-
chemical processes such as dry and wet deposition and chemical transformation of pollutants are negligible.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 161
Isopleths & Results
The maximum of 24 hourly highest GLC‘s of PM, SO2, NOX, NH3, Cl2, H2S, HC, HCl & HCN
due to flue gas stack & process vent emission (Point source) is summarized in Table 4.12.
Table 4.12: Summary of Point Source Modeling
Pollutant Maximum of 24 hourly highest Concentration
(µg/m3)
Distance (m)
Direction
(Degrees)
PM 8.04 250 30
SO2 7.18 250 340
NOX 8.99 250 220
NH3 5.68 250 220
Cl2 0.412 250 210
H2S 1.418 250 220
HC 1.386 750 200
HCN 0.461 250 240
HCl 4.461 250 220
Isopleth for PM, SO2, NOX, NH3, Cl2, H2S, HC, HCl & HCN is given in Figure 4.2 to Figure
4.10
The 1st highest 24-hr concentration values of incremental GLC and air dispersion modelling
detailed results are attached as Annexure 15
The Windrose diagram is given as Figure 3.3, Chapter 3
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 162
Figure 4.2: Isopleth for PM10 emitted from Flue Gas Stacks & Process Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 163
Figure 4.3: Isopleth for SO2 emitted from Flue gas stacks & Process vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 164
Figure 4.4: Isopleth for NOx Emitted from Process vent & Flue gas stack
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 165
Figure 4.5:Isopleth for NH3 Emitted from Process Gas Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 166
Figure 4.6: Isopleth for Cl2 emitted from Process Gas Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 167
Figure 4.7: Isopleth for H2S emitted from Process Gas Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 168
Figure 4.8: Isopleth for HC emitted from Process Gas Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 169
Figure 4.9: Isopleth for HCl emitted from Process Gas Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 170
Figure 4.10: Isopleth for HCN emitted from Process Gas Vents
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 171
Prediction of Incremental GLC of Pollutants on Air Environment
Results
The incremental increase in GLC of PM, SO2, NOX, NH3, Cl2, H2S, HC, HCl & HCN due to
flue gas stack & process vent (Point source) presented in Table 4.13.
Table 4.13: 24 hourly maximum incremental increase in GLC
S.No.
AAQ Monitoring Location (Distance in Km/
Direction)
Pollutant
Maximum Baseline
Concentration (µg/m
3)
Incremental GLC (µg/m
3)
Total Predictiv
e GLC (µg/m
3)
NAAQS Concentrati
on Limit (µg/m
3)[1]
1
Project site (0.25 km/N)
PM10
88.1 3.39 91.5
100
Kadodara (1.2 km/SE) 85.6 0.54 86.1
Narnavi (2.7 km/NNE) 78.3 0.34 78.6
Dahej(9.3 km/SW) 86.5 0.24 86.7
Sambheti (2.6 km/SE) 78.7 0.5 79.2
Nadarkha (5.7 km/ENE) 82.2 0.43 82.6
Padariya (0.9 km/NW) 85.4 0.71 86.1
Rahiyad (9.2 km/SW) 85.2 0.24 85.4
2
Project site (0.25 km/N)
SO2
16.4 4.14 20.5
80
Kadodara (1.2 km/SE) 137 15.4 0.34 15.7
Narnavi (2.7 km/NNE)22.5 14.5 0.23 14.7
Dahej(9.3 km/SW) 225 16.1 0.16 16.3
Sambheti (2.6 km/SE) 137 14.8 0.32 15.1
Nadarkha (5.7 km/ENE) 67.5
15.5 0.3 15.8
Padariya (0.9 km/NW) 315 15.3 0.43 15.7
Rahiyad (9.2 km/SW) 225 14.5 0.16 14.7
3
Project site (0.25 km/N)
NOX
21.4 5.43 26.83
80
Kadodara (1.2 km/SE) 137 19.4 1.6 21
Narnavi (2.7 km/NNE)22.5 19 0.66 19.66
Dahej(9.3 km/SW) 225 20.8 1.56 22.36
Sambheti (2.6 km/SE) 137 18.6 0.75 19.35
Nadarkha (5.7 km/ENE) 67.5
20.3 0.78 21.08
Padariya (0.9 km/NW) 315 19.3 1.2 20.5
Rahiyad (9.2 km/SW) 225 19.5 0.86 20.36
4
Project site (0.25 km/N)
NH3
3.3 2.81 6.11
400
Kadodara (1.2 km/SE) 137 2.3 1.02 3.32
Narnavi (2.7 km/NNE)22.5 1.9 0.26 2.16
Dahej(9.3 km/SW) 225 2.9 0.3 3.2
Sambheti (2.6 km/SE) 137 1.9 0.49 2.39
Nadarkha (5.7 km/ENE) 67.5
2.3 0.57 2.87
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 172
S.No.
AAQ Monitoring Location (Distance in Km/
Direction)
Pollutant
Maximum Baseline
Concentration (µg/m
3)
Incremental GLC (µg/m
3)
Total Predictiv
e GLC (µg/m
3)
NAAQS Concentrati
on Limit (µg/m
3)[1]
Padariya (0.9 km/NW) 315 1.9 1.14 3.04
Rahiyad (9.2 km/SW) 225 2.6 0.3 2.9
5
Project site (0.25 km/N)
Cl2
BDL 0.086 0.086
Not Specified
Kadodara (1.2 km/SE) 137 BDL 0.047 0.047
Narnavi (2.7 km/NNE)22.5 BDL 0.019 0.019
Dahej(9.3 km/SW) 225 BDL 0.013 0.013
Sambheti (2.6 km/SE) 137 BDL 0.019 0.019
Nadarkha (5.7 km/ENE) 67.5
BDL 0.034 0.034
Padariya (0.9 km/NW) 315 BDL 0.065 0.065
Rahiyad (9.2 km/SW) 225 BDL 0.013 0.013
6
Project site (0.25 km/N)
H2S
BDL 0.713 0.713
Not Specified
Kadodara (1.2 km/SE) 137 BDL 0.317 0.317
Narnavi (2.7 km/NNE)22.5 BDL 0.042 0.042
Dahej(9.3 km/SW) 225 BDL 0.087 0.087
Sambheti (2.6 km/SE) 137 BDL 0.131 0.131
Nadarkha (5.7 km/ENE) 67.5
BDL 0.159 0.159
Padariya (0.9 km/NW) 315 BDL 0.292 0.292
Rahiyad (9.2 km/SW) 225 BDL 0.077 0.077
7
Project site (0.25 km/N)
HC
152 1.153 153.2
Not Specified
Kadodara (1.2 km/SE) 137 132 0.694 132.7
Narnavi (2.7 km/NNE)22.5 112 0.08 112.1
Dahej(9.3 km/SW) 225 136 0.242 136.2
Sambheti (2.6 km/SE) 137 98 0.464 98.5
Nadarkha (5.7 km/ENE) 67.5
104 0.075 104.1
Padariya (0.9 km/NW) 315 110 0.408 110.4
Rahiyad (9.2 km/SW) 225 92 0.242 92.2
8
Project site (0.25 km/N)
HCl
BDL 2.898 2.898
Not Specified
Kadodara (1.2 km/SE) 137 BDL 0.878 0.878
Narnavi (2.7 km/NNE)22.5 BDL 0.072 0.072
Dahej(9.3 km/SW) 225 BDL 0.231 0.231
Sambheti (2.6 km/SE) 137 BDL 0.381 0.381
Nadarkha (5.7 km/ENE) 67.5
BDL 0.694 0.694
Padariya (0.9 km/NW) 315 BDL 0.92 0.92
Rahiyad (9.2 km/SW) 225 BDL 0.231 0.231
9 Project site (0.25 km/N) HCN BDL 0.195 0.195 Not Specified
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 173
S.No.
AAQ Monitoring Location (Distance in Km/
Direction)
Pollutant
Maximum Baseline
Concentration (µg/m
3)
Incremental GLC (µg/m
3)
Total Predictiv
e GLC (µg/m
3)
NAAQS Concentrati
on Limit (µg/m
3)[1]
Kadodara (1.2 km/SE) 137 BDL 0.081 0.081
Narnavi (2.7 km/NNE)22.5 BDL 0.01 0.01
Dahej(9.3 km/SW) 225 BDL 0.029 0.029
Sambheti (2.6 km/SE) 137 BDL 0.051 0.051
Nadarkha (5.7 km/ENE) 67.5
BDL 0.021 0.021
Padariya (0.9 km/NW) 315 BDL 0.064 0.064
Rahiyad (9.2 km/SW) 225 BDL 0.029 0.029
Interpretation:
PM10 concentration is observed in the range of 78.6- 91.5 µg/m3, which is well within
the standard limit
SO2 concentration is observed in the range of 14.7 – 20.5 µg/m3, which is well within
the standard limit
NOx concentration is observed in the range of 19.35- 26.83 µg/m3, which is well
within the standard limit.
NH3 concentration is observed in the range of 2.16- 6.11 µg/m3, which is well within
the standard limit.
Cl2 concentration is observed in the range of 0.013 – 0.086 µg/m3.
H2S concentration is observed in the range of 0.042 – 0.713 µg/m3.
HC concentration is observed in the range of 92.2- 153.2 µg/m3.
HCl concentration is observed in the range of 0.072- 2.898 µg/m3.
HCN concentration is observed in the range of 0.01-0.195 µg/m3.
After the proposed expansion the predictive GLC values are found well below the standard
limits
General Mitigation Measures
Mitigation Measures for Air Quality Control during Operation Phase:
Availability of Greenbelt to attenuation of pollution/protection of receptor through
greenbelt/green cover.
Ensure proper Operation & Maintenance of APCM.
Regular monitoring of air pollutant concentrations.
All trucks shall be PUC Certified from time to time.
DG Set will be operated during power failure only.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 174
4.2.2 Noise Environment
Operational controls and mitigation measures are provided against noise generating
activities in Table 4.14.
Table 4.14: Impact Scoring and Mitigation Measures for Noise Environment
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) & (-
ve)
Noise Total Score
Significance / Consequence
Mitigation Measured
NV
Scale of Importance 5
1
Civil works including
building of structures and Heavy equipment operations
Disturbance to Habitat
due to Noise generation
1,2,3,4,5 -1 -5 Low
Use of properly certified,
tested and calibrated
equipments
2
Operation of D.G Set, Cooling
tower, Boiler, etc.
Noise generation from D.G
Set
1,2,3,4,5 -1 -5 Low
Acoustic enclosures would be
provided. DG set will be used only
during emergencies
3 Greenbelt
Development
Reduction in dispersion of Noise pollution
1,2,3,4,5 5 25 Medium
Positive Impact, will reduce the
noise dispersion in surrounding environment
Construction Phase
Impacts:
Disturbance to Habitat due to Noise generation
Mitigation Measures:
Use of properly certified, tested and calibrated equipments
Operation Phase
Impacts:
Noise generation from D.G Set
Mitigation Measures:
Acoustic enclosures would be provided. DG set will be used only during emergencies
Adequate Greenbelt development
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 175
4.2.3 Water Environment
A number of sources from proposed project can cause potential impacts on water
environment which includes groundwater, surface water and effluent generation as
discussed below:
Based on the identified project activities impact on water environment is accessed. Scoring
of the same is done and mitigation measures are prepared based on these scores which are
given in Table 4.15.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 176
Table 4.15: Impact Scoring and Mitigation Measures for Water Environment
S. No. Project Activity Identified Aspect Scale of
Magnitude (+ve) & (-ve)
Water and Wastewater
Total Score
Significance / Consequence
Mitigation Measured
SW GW Effluent
Scale of Importance 4 5 6
1
Influx of workers during
construction phase
Sewage generation during
construction phase
1,2,3,4,5 0 0 -1 -6 Low Sewage will be
treated in mobile STP
2
Manufacturing process
Wastewater Generation from
process 1,2,3,4,5 -2 0 -3 -26 Medium
WW from process partially will be reused back in process and
partially will be treated in RO,MEE
& ETP
Spillage and Leakage of
Solvents/Acids during
manufacturing process.
1,2,3,4,5 0 -1 0 -5 Low
Area will be paved to avoid the
spillage/leakage leaching into GW
3 Operation
Cooling tower, Boiler, etc.
Generation of wastewater from
Cooling and Boiler Blow Down
1,2,3,4,5 -2 0 -3 -26 Medium Effluent will be
treated in RO,MEE & ETP
4 Equipment and Floor Washing
Generation of wastewater during
equipment and floor washing
1,2,3,4,5 -1 0 -3 -22 Medium
Effluent will be treated in proposed ETP and discharge
to GIDC drain
5 Influx of workers Sewage
generation during operational phase
1,2,3,4,5 -1 0 -2 -16 Medium
Sewage will be treated in STP and treated water will be used for gardening
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited.
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 177
S. No. Project Activity Identified Aspect Scale of
Magnitude (+ve) & (-ve)
Water and Wastewater
Total Score
Significance / Consequence
Mitigation Measured
SW GW Effluent
Scale of Importance 4 5 6
6 Stormwater
Generation during Rainy Season
Contamination of surface water, soil and biodiversity
during stormwater runoff
1,2,3,4,5 -1 -1 0 -9 Low
Separate stormwater drains will be provided to
avoid mixing of storm water with
process area
7 Raw water intake
from GIDC Consumption of
fresh water 1,2,3,4,5 -3 0 0 -12 Medium
Recycling of water & RWH practice to reduce the need of fresh. Check water
consumption through flow meters
Usage of Harvested Rain Water in
Process/Utility to reduce dependency
on Surface water
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 178
Construction Phase
Impacts:
Sewage generation during construction phase
Mitigation Measures:
Sewage will be treated in proposed STP and reuse for gardening.
Operation Phase
Impacts:
Wastewater Generation from process
Generation of wastewater from Cooling and Boiler Blow Down
Generation of wastewater during equipment and floor washing
Sewage generation during operational phase
Contamination of surface water, soil and biodiversity during storm water runoff
Consumption of fresh water
Mitigation Measures:
Maintaining records of water consumption and wastewater generation
Waste Water from process partially will be reused back in process and partially will
be treated in RO, MEE and ETP.
Domestic Sewage will be treated in proposed STP and recycle for gardening
Separate stormwater drains will be provided to avoid mixing of storm water with
process area.
Wherever possible, use equipment wash down waters and other process waters
(such as leakages from pump seals) to be used as makeup solutions for subsequent
batches
Storage areas should be secure and covered, preventing exposure to rain and
unauthorized access.
Garland drains will be provided surrounding the Plant to avoid storm water
contamination.
Recycling of water & RWH practice to reduce the need of fresh. Check water
consumption.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 179
4.2.4 Land Environment
Potential impacts on Land Environment are tabulated in Table 4.16.
Table 4.16: Impact Scoring and Mitigation Measures for Land Environment
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) & (-ve)
Land Environment and Natural Resource
Total Score
Significance / Consequenc
e
Mitigation Measured
LU/ LC
Soil
Scale of Importance 4 5
1 Site
clearance
Removal of top soil
during site clearance
1,2,3,4,5 0 -1 -5 Low
Top soil will be stacked separately and will be used for greenbelt
development and filling low lying
area
2 Manufacturing process
Spillage and
Leakage of Raw
Material/ Product during
manufacturing process
1,2,3,4,5 0 -2 -10 Medium
The area will be paved to
avoid the mixing of spillage or
leakage into soil
Generation of
Hazardous waste from
process
1,2,3,4,5 0 -1 -5 Low
HW will be disposed off as per HW
management Rules, 2016 to
avoid direct disposal on
land
3
Stormwater Generation
during Rainy
Season
Contamination of
surface water, soil
and biodiversity
during stormwater
runoff
1,2,3,4,5 0 -1 -5 Low
Separate storm water drains will be provided to
avoid mixing of storm
water with process area
Construction Phase
Impacts:
Removal of top soil during site clearance
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 180
Spillage and Leakage of Raw Material/ Product during manufacturing process
Generation of Hazardous waste leading to direct disposal on land.
Mitigation Measures:
The expansion will be carried out within existing premises
Top soil will be stacked separately and will be used for greenbelt development and
filling low lying area
The area will be paved to avoid the mixing of spillage or leakage into soil
Hazardous waste will be handle and disposed off as per Hazardous Waste
Management Rules, 2016.
Landscaping and development of green belt to maintain fertility of soil within project
site and surrounding area.
Operation Phase
Impacts:
Contamination of surface water, soil and biodiversity during stormwater runoff
Mitigation Measures:
Separate storm water drains will be provided to avoid mixing of stormwater with
process area.
4.2.5 Solid and Hazardous Waste Management
Based on the identified project activities impact due to waste generation is accessed.
Scoring of the same is done and mitigation measures are prepared based on these scores
which are given in Table 4.17.
Table 4.17: Impact Scoring and Mitigation Measures for Solid and Hazardous Waste Management
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) &
(-ve)
Waste Generation Total
Score
Significance /
Consequence
Mitigation Measured
HW
C&D
SW
Scale of Importance 7 4 4
1 Excavation and paving
of site
Generation of debris
from excavation activities
1,2,3,4,5 0 -1 0 -4 Low Debris will be
reused in filling low lying area
2
Civil works including
building of structures and Heavy equipment operations
Generation of C&D Waste
1,2,3,4,5 0 -1 0 -4 Low
C&D waste will be disposed as per C&D Waste
Management Rules 2016
3 Manufactur Generation 1,2,3,4,5 -3 0 0 -21 Medium HW will be
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 181
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) &
(-ve)
Waste Generation Total
Score
Significance /
Consequence
Mitigation Measured
HW
C&D
SW
Scale of Importance 7 4 4
ing process
of Hazardous waste from
process
disposed off as per HW
management Rules, 2016
4 Equipment maintenan
ce
Generation of used oil
and lubricants
from equipment
maintenance activities during
operational phase
1,2,3,4,5 -2 0 0 -14 Medium
Used oils and lubricants will
be handed over to registered re-refiners
Generation of scraps and used spares
etc. from equipment
maintenance activities during
operational phase
1,2,3,4,5 0 0 -2 -8 Low
Scraps will be handed over to
authorized dealers
5
Unpacking and
packing of materials
Generation of Discarded drums/bags
1,2,3,4,5 -2 0 0 -14 Medium
Waste Drums/Barrels/
bags and containers will
be handed over to authorized
decontamination facility
6 ETP and
MEE Operation
Generation of ETP
sludge and MEE Salts
1,2,3,4,5 -2 0 0 -14 Medium
ETP & MEE Sludge will be disposed to TSDF Site
Construction Phase
Impacts:
Generation of debris from excavation activities
Generation of C&D Waste
Mitigation Measures:
Debris will be reused in filling low lying area
C&D waste will be disposed as per C&D Waste Management Rules 2016
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 182
Operation Phase
Impacts:
Spillage and Leakage of Raw Material/ Product during manufacturing process
Generation of Hazardous waste from manufacturing process
Generation of used oil and lubricants from equipment maintenance activities during
operational phase
Generation of scraps and used spares etc. from equipment maintenance activities
during operational phase
Generation of Discarded drums/bags
Generation of ETP sludge and MEE Salts
Mitigation Measures:
Manufacturing process will be carried out in closed system
Hazardous waste will be managed as Hazardous Waste Management Rules, 2016
Used oils and lubricants will be handed over to registered re-refiners
Scraps will be handed over to authorized dealers
Waste Drums/Barrels/bags and containers will be handed over to approved
decontamination facility
ETP & MEE Sludge will be disposed to TSDF Site.
Storage of Hazardous Waste in a Separate Paved & Covered Area with restricted
entry.
Handling of Hazardous Waste through Authorized Person Only.
4.2.6 Ecology & Biodiversity Environment
Operational controls and mitigation measures are provided against activities identified
having impacts on Ecology & Biodiversity Environment are given in Table 4.18.
Table 4.18: Impact Scoring and Mitigation Measures for Ecology & Biodiversity
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) & (-
ve)
Ecology & Biodiversity Total
Score
Significance / Consequence
Mitigation Measured Ter. Aqu.
Scale of Importance 5 3
1
Civil works including
building of structures and Heavy equipment operations
Disturbance to Habitat due to
Noise generation
1,2,3,4,5 -1 0 -5 Low
It will be ensure that no fauna or flora species are disturbed. Activities will be carried out
during day time only
2
Stormwater Generation
during Rainy Season
Contamination of surface
water, soil and biodiversity
1,2,3,4,5 -1 -1 -7 Low
Separate storm water drains will be provided to
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 183
S. No.
Project Activity
Identified Aspect
Scale of Magnitude (+ve) & (-
ve)
Ecology & Biodiversity Total
Score
Significance / Consequence
Mitigation Measured Ter. Aqu.
Scale of Importance 5 3
during stormwater
runoff
avoid mixing of storm
water with process area
Construction Phase
Impacts:
Disturbance to Habitat due to Noise generation
Mitigation Measures:
Greenbelt of 34.81% is already planned within the premises.
It will be ensure that no fauna or flora species are disturbed. Activities will be carried
out during day time only
Operation Phase
Impacts:
Contamination of surface water, soil and biodiversity during stormwater runoff
Mitigation Measures:
Separate stormwater drains will be provided to avoid mixing of process area with
storm water.
4.2.7 Socio Economic Environment
The proposed project will have positive impact on the Socio-Economic of the country &
region
Approximately 1500 people will be employed by the proponent and opportunities will
be given to local people first.
The upcoming project will also lead to ancillary development around the project site
like small shops, tea stalls, vehicle repairers etc. which will create positive impact on
environment.
Project will generate revenue for the country.
Proponent has also allocated budget under the Corporate Environment Responsibility (CER)
for the improvement of village in study area. The issues identified during the Socio Survey in
baseline studies are listed in Table 4.19 and budget is allocated against each under five
year plan. CER Budget is detailed in Ch.10.
Table 4.19: Issues identified Village wise
Village Issues identified
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 4 184
Village Issues identified
Vadadla,Kadodara, Padariya, Ambethi, Vav,
Paniadara, Janiadar, Goldara, Galenda, Dahej
- Skill development
- Agricultural development
- Sanitation
- Education
- Social Forestry & Tree plantation
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 5 185
5 ANALYSIS OF ALTERNATIVES
5.1 SITE SELECTION
The expansion is proposed within the existing site within PCPIR Dahej for which EC has
already been granted, the existing project is under construction and planning stage, following
are the benefits:
The infrastructure planned in existing project can be utilized
Adequate space is available at existing site for proposed project
Since existing project is at planning & construction stage, additional infrastructure
required for proposed project can be accommodated within the same.
Benefits of PCPIR:
Substantial Utility supply – Water, Power & Gas
Availability of Drainage Network for disposal of treated waste water
Availability of chemical handling port i.e. Gujarat Chemical Port Terminal Company
Limited (GCPTCL) in Dahej
One of the 4 PCPIRs‘ declared by Ministry of Chemicals and Fertilizers, Government
of India under PCPIR Policy 2007.
Special Investment Region
Strategic location
Easy Connectivity – Rail, Air and Sea
Area of 453 sq. km
In addition to the above, the following factors within the study area (10 km) have also been
considered:
There is no National Park or Wild Life Sanctuary.
There are no metropolitan cities.
There are no ecologically sensitive areas.
Hence Alternative site is not considered.
5.2 TECHNOLOGY SELECTION
The manufacturing process/ technology selected is simple, cost effective and has less
negative impact to environment and resources also the technology is developed by UPL in
their R& D centers.
Table 5.1: Comparison for Alternative Site & Technology
S. No. Site Particular Option 1- Existing site
1 Land Available for expansion
2 Internal infrastructure, roads, buildings and utilities Already well developed
3 Other infrastructure/Connectivity in the area Available
4 Availability of labour Available
5 Manufacturing facility Facilities available
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 5 186
S. No. Site Particular Option 1- Existing site
6 Finished goods customers Available
7 Employment Available
Well Tested Environment friendly Technology developed in the UPLs‘ R&D Centre will be
used in the manufacturing of products. All safety precautions will be inbuilt in the process
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 187
6 ENVIRONMENTAL MONITORING PROGRAM
6.1.1 Air Environment
In order to measure effectiveness of mitigation measures, technical aspects like
measurement methodologies, frequency, location, data analysis, reporting schedules,
emergency procedures & procurement schedules are covered in this chapter along with
detailed budget.
Detailed environmental monitoring program for air environment is given in Table 6.1.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 188
Table 6.1: Environmental Monitoring Program for Air Environment
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Excavation and paving of site
Dust generation from excavation activities
Regular water sprinkling will be done and Dust mask
will be provided SPM
PM Gravimetric IS:5182 (Part 23)
2006
Once a season
(Excluding rainy season)
At site EHS Manager
Vehicular movement for transportation of construction material
and waste
Emission of HC, CO, NOx & PM from
vehicular transportation during construction phase
Maintaining the speed limit of vehicle transporting construction materials.
Use of only PUC certified vehicles
PM10 PM2.5, Sox, NOx
PM10-Gravimetric IS:5182 (Part 23)
2006 PM2.5-Gravimetric
IS:5182
Once a season
(Excluding rainy season)
At site EHS Manager
Manufacturing process
Emission of Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic
traces, HCN
Water/Caustic/Acid Scrubber, Bag filter will be
provided to control the emission within norms
Principal parameters
will be followed as
per IS method
Measurement methodology will
be followed as per IS method
Once a Month
(Excluding rainy season)
Process Stack
EHS Manager
Manufacturing process
Fugitive Emissions of Solvents
Solvents will be recovered by installation of solvent
recovery system and it will be reused into
manufacturing process
Principal parameters
will be followed as
per IS method
Measurement methodology will
be followed as per industry best
practices
Once a month
(Excluding rainy season)
Plant location
EHS Manager
Operation of D.G Set, Boiler etc.
Emission of PM, SO2 and NOx from D.G &
Boiler
Water Scrubber & Adequate Stack Height will be provided to stacks. DG set will be sued only during
emergencies
PM, SO2 & NOx in stack
of Boiler
Stack monitoring by Isokinetic
sampling IS:11255
Once in a Month for Boiler & During
Operation for
D.G set
Flue gas stack
EHS Manager
Vehicular movement for transportation of
raw materials, finished goods and
Industrial Waste
Emission of HC & CO from vehicular
transportation during operational phase
• Maintaining the speed limit of vehicle transporting
construction materials. • Use of only PUC certified
vehicles
PM10 PM2.5, SOx
PM10-Gravimetric IS:5182 (Part 23)
2006 PM2.5-Gravimetric
IS:5182
Once a month
(Excluding rainy season)
At site EHS Manager
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 189
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Greenbelt Development
Reduction in Air and noise pollution
Positive Impact, will improve the esthetic value
of the project site
No of trees planted
Counting of
Tress by physical survey
Once a year At site EHS Manager
6.1.2 Noise Environment
Detailed environmental monitoring program for noise environment is given in Table 6.2.
Table 6.2: Environment Monitoring Program for Noise Environment
Project Activity Identified Aspect
Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Civil works including building of structures and Heavy equipment
operations
Disturbance to Habitat due to
Noise generation
Use of properly certified, tested and calibrated
equipments & Restricted activities during daytime only
Leq Levels for Day and night time
ISLM 100 Once a month At site EHS Manager
Operation of D.G Set, Cooling tower, Boiler,
etc.
Noise generation from D.G Set
Acoustic enclosures would be provided. DG set will be used
only during emergencies
Leq Levels for Day and night time
ISLM 100 Once a month At site EHS Manager
Greenbelt Development
Reduction Air and noise pollution
Positive impact No of trees
planted
Counting of
Tress by physical survey
Once a year At site EHS Manager
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 190
6.1.3 Water Environment
Detailed environmental monitoring program for water environment is given in Table 6.3.
Table 6.3: Environmental Monitoring Program for Water Environment
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Manufacturing process
Wastewater Generation from
process
WW from process partially will be reused back in
process and partially will be treated in RO,MEE & ETP
Inlet and outlet characteristics as per consent condition and
Methodology will be followed as per IS method.
Continuous Online
Monitoring System
At ETP EHS Manager
Operation of Cooling tower, Boiler, etc.
Generation of wastewater from
Cooling and Boiler Blow Down
Effluent will be treated in RO,MEE & ETP
Equipment and Floor Washing
Generation of wastewater during
equipment and floor washing
Effluent will be treated in proposed ETP and discharge
to GIDC drain
Influx of workers Sewage generation during operational
phase
Sewage will be treated in STP and treated water will be
used for gardening & utility
Equipment maintenance
Contamination of surface water, soil and biodiversity
during storm water runoff
Separate stormwater drains will be provided to avoid
mixing of storm water with process area
Raw water intake Consumption of
fresh water
Recycling of water & RWH practice to reduce the need of
fresh. Check water consumption through flow
meters
Quantity of fresh water consumed
Metering Daily Water inlet EHS Manager
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 191
6.1.4 Land Environment
Detailed environmental monitoring program for water environment is given in Table 6.4.
Table 6.4: Environmental Monitoring Program for Land Environment
Project Activity Identified Aspect
Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Site clearance Removal of top soil during site
clearance
Top soil will be stacked separately and will be used for greenbelt development and filling low lying area
Quantity of Soil
Volume of Soils Daily At site EHS Manager
Manufacturing process
Spillage and Leakage of Raw Material/ Product
during manufacturing
process
The area will be paved to avoid the mixing of spillage or
leakage into soil
Area under paved
surface area measurement Monthly At site EHS Manager
Stormwater Generation during
Rainy Season
Contamination of surface water,
soil and biodiversity
during stormwater
runoff
Separate stormwater drains will be provided to avoid
mixing of storm water with process area
Principal parameters and methodology will be followed as per
IS method
During Storm water flowing outside the
premise of the factory
Final Storm Water
Discharge Points
Plant In charge
6.1.5 Solid and Hazardous Waste Management
Detailed environmental monitoring program for Solid Waste, Construction Waste and Hazardous waste is given in Table 6.5.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 192
Table 6.5: Solid and Hazardous Waste Management
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Excavation and paving of site
Generation of debris from excavation
activities
Debris will be reused in filling low lying area or given to approved re
processors
Quantity of debris
Record of quantity
generated & disposed
Daily At site EHS Manager
Civil works including building of structures and Heavy equipment
operations
Generation of C&D Waste
C&D waste will be disposed as per C&D
Waste Management Rules 2016
Quantity of Waste
Record of quantity
generated & disposed
Daily At site EHS Manager
Manufacturing process
Spillage and Leakage of Raw Material/ Product
during manufacturing process
Manufacturing process will be carried out in closed
system
Consumption records of
Raw Material
Daily Register of Raw Materials
During production
process
At production
area Plant Manager
Generation of Hazardous waste
from process
HW will be disposed off as per HW management
Rules, 2016 to avoid direct disposal on land
Quantity of Haz Waste
Records of Haz Waste
Generation, Storage & Disposal
Daily At Storage
of Haz Waste
EHS Manager
Equipment maintenance
Generation of used oil and lubricants from equipment
maintenance activities during
operational phase
Used oils and lubricants will be handed over to registered re-refiners
Quantity of Waste
Record of quantity
generated Daily At site EHS Manager
Generation of scraps and used spares etc.
from equipment maintenance
activities during operational phase
Scraps will be handed over to authorized dealers
Quantity of Waste
Record of quantity
generated Daily At site EHS Manager
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 193
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Unpacking and packing of materials
Generation of Discarded
drums/bags
Waste Drums/Barrels/bags and containers will be
handed over to authorized decontamination facility
Quantity of Waste
Record of quantity
generated Daily Storage area EHS Manager
ETP and MEE Operation
Generation of ETP sludge and MEE
Salts
ETP & MEE Sludge will be disposed to TSDF Site
Quantity of Waste
Record of quantity
generated Daily ETP EHS Manager
6.1.6 Traffic Monitoring
An efficient traffic management program will be developed to ensure smooth and congestion free traffic movement on nearby state highway and
from Plant. This plan will be as shown in Table 6.6
Table 6.6: Traffic Monitoring Program
Impacting Activity
Mitigation Measures
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Emergency Procedure
Procurement Schedule
Remarks
Increase in Traffic load
due to expansion
Controlled vehicular movement (preferably with clearly demarcated entry/exit) with adequate supervision
Records number of
trucks/tanker entry/exit
Manual
Throughout construction
and operation phase
Entry and exit gates
Security In-charge
As per TREM Card
During construction
and operation phase
--
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 194
Above mentioned monitoring program can be summarized as tabulated in Table 6.7.
Table 6.7: Summary of Environmental Monitoring Program
S.No. Particulars Monitoring
Frequency
Duration of Sampling
Important Monitoring
Parameters
1.
Air Pollution
i. Selected 4 locations in and around plant site
specified by GPCB Twice in a
Week except monsoon
One Sample for 24 Hours As per GPCB /
CPCB Guidelines
ii. Stack gas analysis in all stacks.
Online (Based on
Applicability of CPCB
Guidelines) & Manual Monitoring
Once in Month/Quarter
for Manual As per GPCB /
CPCB
ii. Fugitive dust sampling (if any) at work zone as per CPCB or
GPCB. Once in quarter On Spot PM/VOCs/HCl/Cl2/
NH3
2.
Water and Wastewater Quality
A. Water quality in the study area
i. Surface Water Half yearly Grab Parameters specified under
IS:10500 ii. Treated Waste Water Analysis Continuous Composite
Parameters as per Consent
ii. Ground water analysis Quarterly Once Parameters as per Consent
3
Industrial Noise Levels
1. Major noise generating sources at plant site Quarterly Grab Noise level in
dB(A) 2. Along Road for transportation
noise Quarterly Grab Noise level in dB(A)
4.
Ambient Noise Levels
1 4 Locations Half Yearly Grab Noise level in dB(A)
5.
Soil Characteristics
Soil Selected 4 locations in core zone Half Yearly One Grab
sample As per
GPCB/Consent order
6. Work zone At plant site Half Yearly Once in work place Dust, Noise,
Illumination etc.
7.
Corporate Environme
ntal Responsib
ility In core and buffer zone in
nearby villages Half yearly Once Activities done by UPL Ltd
8.
Occupational Health Surveillan
ce At plant premises Half yearly
Once Employee Health
Register
9. Greenbelt Developm
Number of plantation (Units), Number of Yearly Once Tress, survival
rate, landscape
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 6 195
S.No. Particulars Monitoring
Frequency
Duration of Sampling
Important Monitoring
Parameters
ent Survived Trees/ Acre
area.
10. Environmental Audit As per Directions of
Honorary High Court, Yearly Once As per GPCB Guidelines
11.
Consents and
Authorization
Consent to Operate under applicable acts
Renewing 90 days before
expiry of validity
Once Before 90 days of expiry
12.
Compliance of EC
Conditions Submission of 6 monthly
Compliance Reports June and December Twice in a
year As per EC Notification Amendment
Monitoring of the above parameters will carried out to assess the performance of pollution
control equipment‘s installed to achieve the statutory norms. In case emissions/pollutant will
found to exceed the norms, the ‗on duty‘ personnel will check the relevant parameters and
take appropriate corrective actions. A record of corrective and preventive action will be
maintained as per requirement.
Documentation and Records
The environmental department in respect of operation of pollution control facility will maintain
following records:
Monthly and annual progress reports: Immediately upon the completion of monitoring as
per the planned schedule, report shall be prepared & necessary documents shall be
forwarded to the concerned person.
Instruction manual for operation and maintenance of pollution control equipment.
Instruction manual for monitoring of gaseous parameter & hazardous waste
management.
Records of medical check-up of employees.
Regularly all documents & records shall be reviewed for necessary improvement of
the monitoring plan/mitigation measures/environmental technologies as well as for
necessary actions of Environmental Management Cell.
Budgetary Provision for Environmental Monitoring and Management Cost
Project proponent has already allotted Capital and Recurring cost for the Environment
Monitoring and Management which is detailed in Ch.10.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 196
7 ADDITIONAL STUDIES
7.1 PUBLIC CONSULTATION
Public Consultation is not applicable the proposed project as the project site falls under
PCPIR, Dahej Industrial Estate Zone III, (According to the OM, Vide letter No.-J-
1101/321/2016- IA. H (I), from MOEFCC Dated: 27th April 2018, Subject: Exemption from
Public Consultation for the projects / activities located within the Industrial Estates / Parks.).
The EC Document for PCPIR Region is attached as Annexure 12.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 197
7.2 RISK ASSESSMENT
M/s UPL Limited, Dahej plans to expand its manufacturing, storage and handling facilities for
its synthetic organic chemicals & chemical intermediates. For getting Environmental
clearance for this proposed expansion project, it proposes to carry out Risk Assessment
before new processes or activities are introduced.
Risk assessment is the overall process of hazard identification, risk analysis, and risk
evaluation.
Hazard identification is the process of finding, listing, and characterizing hazards.
Risk analysis is a process for comprehending the nature of hazards and determining
the level of risk.
Risk analysis provides a basis for risk evaluation and decisions about risk control.
Information can include current and historical data, theoretical analysis, informed
opinions, and the concerns of stakeholders.
Risk analysis includes risk estimation.
Risk evaluation is the process of comparing an estimated risk against given risk
criteria to determine the significance of the risk.
Risk control means actions implementing risk evaluation decisions. Risk control can
involve monitoring, re-evaluation, and compliance with decisions.
Risk assessments are very important as they form an integral part of an occupational health
and safety management plan. They help to:
Create awareness of hazards and risk.
Identify who may be at risk (e.g., employees, cleaners, visitors, contractors, the
public, etc.).
Determine whether a control program is required for a particular hazard.
Determine if existing control measures are adequate or if more should be done.
Prevent injuries or illnesses, especially when done at the design or planning stage.
Prioritize hazards and control measures.
Meet legal requirements where applicable.
The aim of the risk assessment process is to evaluate hazards, then remove that hazard or
minimize the level of its risk by adding control measures, as necessary. By doing so, a safer
and healthier workplace is created.
7.2.1 Objective of the Study
M/s UPL Limited, Dahej for its capacity expansion and addition of New synthetic organic
chemicals and Chemical Intermediates within the existing site located in Dahej shall handle
chemicals, some of which are hazardous in nature by virtue of their intrinsic chemical
properties or their operating temperatures or pressures or a combination of them. Fire, toxic
release or combinations of them are the hazards associated with industrial plants using
hazardous chemicals. More comprehensive, systematic and sophisticated methods of Safety
Engineering, such as, Hazard Analysis and Qualitative/Quantitative Risk Assessment have
been developed to improve upon the integrity, reliability and safety of industrial plants, the
same has been discussed in detail under their respective headings.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 198
7.2.2 Scope of Study
a) Hazards Identification (the scope of risk assessment will be specific for hazardous
chemicals / substances used as raw materials in the process, the physical area
where storage of chemicals is made, processes involved in carrying out
manufacturing and handling of products. It includes routine and non-routine activities
such as maintenance, repair, or cleaning).
b) Hazard Assessment and Evaluation ( Qualitative and Quantitative)
c) Disaster Management Plan (On site emergency plan) & Preparedness (OH&S)
Methodology:
a) Hazard identification by studying the information on plant location, layout of the
equipment & process condition; methods and procedures used in the processing,
use, handling or storage of the substance, etc. The lifecycle of the product, process
or service (e.g., design, construction, uses, decommissioning). The duration and
frequency of the task (how long and how often a task is done).
The machinery, tools, materials, etc. that are used in the operation and how they are
used (e.g., the physical state of a chemical, or lifting heavy loads for a distance).
Any possible interactions with other activities in the area and if the task could affect
others (e.g., cleaners, visitors, etc.).
b) Hazard assessment by qualitative risk analysis and quantitative risk analysis. Quantification of Hazard involves selection of most credible scenario or worst case scenario; by using 2D Modelling. Estimate consequences scenarios in the plant such as fire, explosion and toxic effect; Estimate frequency of occurrence of any incident is to be found out by reliability analysis;
c) Prioritize and Reduce risk by the measures and procedures necessary to control
such exposure by means of engineering controls, work practices, and hygiene
practices and facilities. Ranking or prioritizing hazards is one way to help determine
which risk is the most serious and thus requires to be control first. Priority is usually
established by taking into account the employee exposure and the potential for
incident, injury or illness. . Hazard control methods are often grouped into the
following categories:
Elimination (including substitution).
Engineering controls.
Administrative controls.
Personal protective equipment.;
d) Disaster Management can be defined as the organization and management of
resources and responsibilities for dealing with all humanitarian aspects of
emergencies, in particular preparedness, response and recovery (Occupational
Health & Safety) in order to lessen the impact of disasters.
7.2.3 Hazard Identification
Identification of causes and types of hazards is the primary task for planning for risk
assessment. Hazard can happen because of the nature of the chemicals handled and also
the nature of process involved.
The methods employed for hazard identification in this study are:
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 199
Identification of major hazards based on Manufacture, Storage and Import of
Hazardous Chemicals, and emergency vents;
Identification of hazardous units and segments of plants and units based on relative
ranking technique. Example: Fire- Explosion and Toxicity Index (FE&TI)
In preparing the Risk Assessment report, The Manufacture, Storage and Import of
Hazardous Chemical Rules,1989 as amended from time to time is followed and as per
Schedule -11 of these rules ,On- Site Emergency Plan is suitably addressed in the chapter
There are storage for flammable, Toxic and irrigative nature of chemicals in the UPL Dahej
given as given in Table 2.19 and Table 2.20, Ch.2.
a) Toxic Chemicals
There is no any Chemicals having the following values of acute toxicity and owing to their
physical and chemical properties are capable of producing major accidents:
There is a chemical i.e. Chlorine. Which has LC50 for a 10-minute exposure with standard
level of activity were estimated at 433, 173, and 364 ppm for the regular.
b) Flammable Chemicals:
Flammable gases: Gases which at 20°C and at standard pressure of 101.3 KPa are:
Ignitable when in a mixture of 13 percent or less by volume with air, or
Have a flammable range with air of at least 12 percentage points regardless of the
lower flammable limits.
There are some chemical which are flammable in nature Table 7.1.
Table 7.1: Flammable Criteria
S. No.
Flammable Criteria Range Chemicals
1 Extremely flammable
liquids flash point lower than or equal to 23°C and
boiling point less than 35°C -
2 Very highly flammable
liquids flash point lower than or equal to 23°C and
initial boiling point higher than 35°C
Acetone
Methanol
Toluene
Ethyl Acetate
3 Highly flammable
liquids flash point lower than or equal to 60°C but
higher than 23°C -
4 Flammable liquids flash point higher than 60°C but lower than 90°
C -
Note: - The flammability shall be determined by tests or by calculation in accordance with methods
adopted by International Standards Organization ISO Number 10156 of 1990 or by Bureau of Indian
Standards ISI Number 1446 of 1985.
Proposed project has flammable Chemicals like Acetone, Methanol, Toluene & Ethyl
Acetate. Hazardous Properties are provided in Table 7.2.
c) Explosives:
Explosives means a solid or liquid or pyrotechnic substance (or a mixture of substances) or
an article.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 200
Which is in itself capable by chemical reaction of producing gas at such a
temperature and pressure and at such a speed as to cause damage to the
surroundings;
Which is designed to produce an effect by heat, light, sound, gas or smoke or a
combination of these as a result of non-detonative self-sustaining exothermic
chemical reaction.
At UPL Dahej plant, No explosive chemicals are stored
Table 7.2: Flammable and Toxic Chemical Properties
S. No.
Name of Chemicals
Nature Storage Cap. BP
°C
FP °C
LEL
%
UEL
%
Storage Condition
1 Acetone Flammable Tank 10 KL 56 -20 2.5 12.8 Ambient
2 Methanol Flammable Tank 10 KL 64.5 12 6 36 Ambient
3 Toluene Flammable Tank 10 KL 110.6 4.4 1.1 7.1 Ambient
4 Chlorine
Gas Toxic/
Irritative Tonner 910 Kg -195.8 - - -
Pres 8 Kg/cm2&
Amb Temp
5 Ethyl
Acetate Flammable Tank 10 KL 77 -4 2.0 11.0 Ambient
6 Phosgene Toxic Pipeline - 8 NA NA NA
Press - 0.5 Kg/Cm
2
Amb.Temp.
7 Sodium Cyanide
Toxic Tank 5 KL 1496 NA NA NA Ambient
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 201
Table 7.3: Physio-chemical Properties of some major Chemicals/Raw Materials
S. No.
Raw Material
Capacity
MT/ Month
Liquid /Solid
Storage BP
°C
FP °C
LEL
%
UEL
%
MOC Of Storage container
Storage Temp
0C
Storage Pressure kg/cm2
1. Acrylonitrile 1270.83 Liquid Tank 77.3 -0.2 3.1 17.0 SS304 Atm Nitrogen Blanketing
2. Methanol 700 Liquid Tank 64.7 12 6 31 CS Atm Nitrogen Blanketing
3. Acetic Acid 8792.5 Liquid Tank 117-
118 NA 4 19.0 SS316L Atm Nitrogen Blanketing
4. Acrolein 782.5 Liquid Tank 77.3 30 NA NA PTFE line CS Atm Nitrogen Blanketing
5. Toluene 670.83 Liquid Tank 110.6 4 1.1 4.1 CS Atm Atm
6. TBA 61.67 Liquid Tank 83760 4 NA NA SS316L Atm Nitrogen Blanketing
7. HCl [ 10%] 420.83 Liquid Tank 83 NA NA NA PVDF-FRP Atm Nitrogen Blanketing
8. DMF 911.67 Liquid Tank NA 58 NA NA SS304 Atm Nitrogen Blanketing
9. Chlorine 560 Gas Tonner Decom-
poses
NA NA NA CS Atm 6 kg/cm2
10. Ammonia 503.33 Gas Bullet 36 NA NA NA CS Atm 6 kg/cm2
11. Sulfuric acid 81.25 Liquid Tank 290 -
338 NA NA NA CS Atm Atm
12. Ethyl acetate 17.08 Liquid Tank 77 -4 2.0 11.5 CS Atm Nitrogen Blanketing
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 202
S. No.
Raw Material
Capacity
MT/ Month
Liquid /Solid
Storage BP
°C
FP °C
LEL
%
UEL
%
MOC Of Storage container
Storage Temp
0C
Storage Pressure kg/cm2
13. Sodium cyanide 464.67 Liquid Tank 1496 NA NA NA CS Atm Nitrogen Blanketing
14. CS2 141.67 Gas Tank 46 -30 1 60 SS304 25 deg.C 6 kg/cm2
15. Butanol 116.67 Liquid U/G
Tank 116 35 1.4 11.2 SS316L Atm Nitrogen Blanketing
16. Ethanol 430.63 Liquid U/G ST 78 16.6 3.3 19.0 CS Atm Nitrogen Blanketing
17. Ortho Dichloro
Benzene 53.3 Liquid Tank 179 67 2.20 12.0 SS316L Atm Nitrogen Blanketing
18. Dimethyl Sulfoxide 13.9 Liquid Tank 189 87 2.6 42 SS316L Atm Nitrogen Blanketing
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 203
Summary
The chemical properties shown in the above table describes the hazardous properties
associated to the chemicals i.e. flammable & Toxic. The safety measures and mitigation for
the above chemical refer Safety Mitigation Measures.
Layout map
The storage facilities for the raw material and finished goods have been shown in the layout
map as shown in Map 2.4.
7.2.4 Qualitative Risk Assessment
Qualitative risk analysis is the process of assessing individual project risk characteristics -
the probability of occurrence and the impact they would have on a project if happening -
against a scale.
The scale used for the analysis groups project risks into three or more categories according
to their impact, such as low, medium and high.
The main purpose of the qualitative risk analysis is prioritizing risks according to their
probability and impact
A Risk Matrix and Risk Acceptability criteria for Qualitative Risk Assessment is provided in
Table 7.4 & Table 7.5.
Hazard Identification and Risk Assessment (HIRA) is a process that consists of a number of
sequential steps such as hazard identification, consequence & frequency assessment, risk
estimation based on the existing controls and recommendations to reduce those risks which
are not under acceptable limits
In Qualitative Risk Assessment, risk has been analysed using methodology called HIRA-
Hazards Identification & Risk Assessment. In HIRA, major manual activities carried out by
plant personnel as well as contract labors have been considered.
Qualitative Risk Assessment has been carried out for the following areas:
Pre-Construction/Construction Phase
Storage and Handling of Solid Chemicals
Storage and Handling of Corrosive/ Toxic Chemicals
Storage and Handling of Flammable Chemicals
Table 7.4: Risk Matrix for Qualitative Risk Assessment
LIKEHOOD/ PROBABILITY
SEVERITY
Catastrophic (Death/ System Loss)
Major/ Critical
(Serious injury/ Illness)
Moderate (Less
Serious Injury/ Illness)
Minor/ Marginal (Minor Injury/ Illness)
Insignificant/Negligible (No injury /illness)
1 2 3 4 5
Almost Certain
E H H H M M
Likely D H H M M L
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 204
Possible C H M M M L
Unlikely B M M M L L
Impossible A M M L L L
Table 7.5: Risk Acceptability Criteria
Risk Range
Risk Acceptability Criteria
Remarks
H Unacceptable/
High Management‘s Decision/Action Plan Required. Potential off-site
Impact.
M Medium Generally Minor Impact. Acceptable with Management‘s Review.
Specific monitoring or SOP to be followed.
L Low Acceptable without Review. Manage through Routine Procedure.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 205
7.2.5 Hazard Identification and Risk Assessment
Table 7.6: Pre-Construction/Construction Phase
S. No.
Process Or Activity
Associated Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
1 Site Clearance, excavation and paving of site
Dust generation & increase in
SPM/ RSPM in air
Fall into pit due to paving the
side
Health effect on workers and surrounding
People
Risk of injury to workers
2 C M
Water spray on the ground before excavation.
Work permit procedure to be followed.
Shoring of the sides while digging the ground.
Use of dust mask.
1 B L
2
Vehicular movement for
transportation of construction
material
Emission of PM10, HC, NOx, & CO
Noise generation
Health effect
Risk of injury to workers due to
accidents
2 E M
P.U.C Certified Vehicles
Regular Maintenance of Vehicles
Specified Route of transport on Paved Roads.
1 C L
Table 7.7: Storage and Handling of Solid Chemicals
S. No.
Process Or Activity
Associated Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
t
y
Lik
elih
oo
d
Ris
k
Sev
eri
t
y
Lik
elih
oo
d
Ris
k
1 Handling Solid Raw materials/
Chemical.
Chemical Exposure
Skin and eye irritation
2 C M
Operators/Workers to be trained for Safe Work Practices.
Chemical handling bags to be labelled properly
Availability of Eye wash and Safety shower station nearby
Keep away from sources of ignition. Ground all equipment containing material.
1 B L
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 206
S. No.
Process Or Activity
Associated Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
t
y
Lik
elih
oo
d
Ris
k
Sev
eri
t
y
Lik
elih
oo
d
Ris
k
Use an approved/certified respirator or equivalent
Use of suitable protective clothing like Splash goggles, Lab coat, Dust respirator, Wash with a disinfectant soap and cover the contaminated skin with an anti-bacterial cream
Keep away from incompatibles such as oxidizing agents, alkalis
Keep container in cool & dry place
2 Cleaning of
Chemical Spillage. Dust Exposure. Eye/ Skin Irritation 2 C M
Use appropriate tools to put the spilled solid in a convenient waste disposal container
Vapour and dust respirator,
Dust mask will be used.
Suitable protective clothing, gloves, boots will be used.
1 B L
Table 7.8: Storage and Handling of Corrosive/ Toxic Chemicals
S. No.
Process Or Activity
Associated Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
1
Acids Unloading & loading of HCl. H2SO4.
Exposure to acid fumes (due to leakage in pipe/ container/ valves etc.). Splash over body.
Skin/ Eye irritation and Acid burns.
2 C M
Proper Engineering Controls at Liquid transfer points.
Unloading activity will be carried out in well-ventilated area under proper supervision. Training for lifting and chemical transporting technique from one location to another location will be provided
Periodic Inspection of flanges/ferrule joints will be carried out.
Availability of Eye wash and Safety shower at
1 B L
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 207
S. No.
Process Or Activity
Associated Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
unloading /loading areas.
Neutralization media will be kept available in areas where acids are stored/ handled/ used.
PPEs like chemical safety goggles or full face shield, Rubber or neoprene gloves and additional protection including impervious boots, apron shall be used.
Respirators shall be used.
Acid proof floorings shall be constructed. Keep container in a cool, well-ventilated area. Keep away from incompatibles materials such as combustible, organic materials, metals, acids, moisture
In case of spillage, Absorb with DRY earth, sand or other non-combustible material. Use water spray to reduce vapours
PPEs like chemical safety goggles or full face shield, Rubber or neoprene gloves and additional protection including impervious boots, apron shall be used.
Use of air Respirators.
Eye wash stations & Safety Shower will be installed in near vicinity.
Trained workers will be allowed to work in this area.
Dyke wall will be provided.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 208
S. No.
Process Or Activity
Associated Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
2
Handling of Toxic gases like Chlorine & Bromine
Exposure to Chlorine and Bromine fumes
Severe irritation to eyes, skin
Chlorine Gas Detector with alarm will be installed at vulnerable locations.
Bromine will be absorbed with an inert material and put the spilled material in an appropriate waste disposal
Eye wash station or Safety Shower shall be installed in storage area.
Provision of an automatic leak detection system
Display of Safety warning postures/signs inside the area.
3
Tank overflow /leakage from valve / Flange joints etc.
Exposure to acid fumes.
Severe irritation to eyes, skin. Breathing
3 B M
Level indicator shall be provided.
Provision of adequate Dyke wall for containment of spillage. Absorb with DRY earth, sand or other non-combustible material.
PPEs like chemical safety goggles or full face shield, Rubber or neoprene gloves and additional protection including impervious boots, apron shall be used.
Use of air Respirators.
Eye wash stations & Safety Shower shall be installed in near vicinity.
2 B L
4.
Handling of Phosgene and Sodium Cyanide
Exposure of Toxic gas
Severe irritation to eyes, skin & Breathing result to Death.
2 C H Refer section 7.2.17.1 1 B L
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 209
Table 7.9: Storage and Handling of Flammable Chemicals
S.
No.
Process Or Activity
Associated
Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
eli
ho
od
Ris
k
1
Solvent handling / Unloading & Loading
Exposure to fumes (due to leakage from joints, corroded lines failure etc.).
Skin burn. Eye irritation and respiratory disorder.
3 C M
Dyke will be provided.
Level Indicator will be installed at Storage Tank
Will be stored in well-ventilated area.
Eye wash station and Safety Shower will be installed in nearby location.
Maintenance will be carried as per schedule.
Employee will be provided with impervious clothes, gloves face shield (eight-inch minimum), dust and splash proof safety goggles, chemically resistant safety shoes, etc.
Proper trainings to be provided to the operators/ workers.
SOPs will be prepared and followed the same.
Keep container in a cool, well-ventilated area. Keep away from incompatibles such as reducing agents, combustible materials, organic materials, metals, acids, moisture. Do not allow the area where cylinders are stored to exceed 52°C for chlorine.
Antidotes will be provided for all hazardous products in OHC.
Splash goggles. Full suit. Vapour respirator. Boots. Gloves. A self-contained breathing apparatus should be used to avoid inhalation of the product. Be sure to use an approved/certified respirator or equivalent
Exhaust ventilation or other engineering controls to keep the airborne concentrations of vapours below their respective threshold limit value. Maintain the Oxygen level above 19.5% in the
2 B L
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 210
S.
No.
Process Or Activity
Associated
Hazards
Health & Safety Impact (Risk)
Initial Risk
Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
eli
ho
od
Ris
k
workplace for chlorine handling
Eye wash station or Safety Shower shall be installed in storage area.
Provision of an automatic leak detection system
Display of Safety warning postures/signs inside the area.
2 Filling of Storage Tanks
Due to tank overflow
Eyes and Skin irritation.
4 B M
Level indicator shall be installed and the same shall be checked for its proper operation.
Dyke wall shall be available to contain the spill.
Periodic inspection to be carried for all the related accessories of level indicator.
2 B L
Conclusion
It can be seen from the above table that:
After providing mitigation measure in Vehicular movement for transportation of construction material activity of Pre-construction/ construction
phase. Storage and Handling of Solid Chemicals. Storage and Handling of Corrosive/ Toxic Chemicals, Storage and Handling of Flammable
Chemicals have the risk probability will change from almost certain to possible as well as its residual risk will change from medium to low.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 211
7.2.6 Quantitative Risk Assessment
Quantitative Risk Assessment (QRA) is a structured approach to identify and understanding
the hazards and risks associated with Storage and Handling of flammable/ toxic chemicals.
QRA for existing facilities and processes is in place. Consequence analysis is done for
expansion project. Based on the consequence analysis, control measures and Disaster
management Plan (On-site Emergency Plan) is proposed in this section.
In previous Environment clearance project, QRA of various hazardous chemical has been
carried out to estimate of risk to the proposed plant. Following chemicals have been selected
to carry out consequence analysis.
• Acetic anhydride,
• Acrolein
• Anhydrous Ammonia,
• Aniline,
• CS2,
• Di-chloro methane,
• 2,6 Di Iso propyl Amine,
• Dimethylformamide,
• Ethyl Acetate,
• Ethylene dichloride,
• Ethylene Oxide,
• Isopropyl alcohol,
• Methyl acrylate,
• Methyl Chloride,
• Methyl Mercaptan,
• Methyl Isobutyl Ketone
• Mono Chloro Benzene
• Monoethanol Amine
• Ortho Di chloro Benzene
• Phosphorus trichloride
• Propylene
• Thionyl Chloride
• Tri Ethyl Amine
• Tri Methyl benzene
In present proposed project there are some chemicals are considered for QRA for plotting of
damage contour:
Phosgene
Sodium Cyanide
Ethyl Acetate
Toluene
Chlorine Tonner
Methanol
Ammonia
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 212
Additional Safety Measures will be provided to control the potential loss. Refer Section
7.2.17
METHODOLOGY ADOPTED FOR QUANTITATIVE RISK ASSESSMENT (QRA)
Failure or ineffectiveness of the controls can lead to hazardous situation in the industry
handling potentially hazardous substances. Following factors are considered for carrying out
consequence analysis:
Intrinsic properties; flammability, instability and toxicity.
Pressure, temperature and state of matter.
Inventory of stored chemicals
Environmental factors; topography and weather.
Handling and storage conditions.
The study has been carried out in accordance with the National and International codes of
practices using Process Hazard Analysis Software Tool (PHAST/ SAFETI) software. The
version of the PHAST/ SAFETI V 6.7 software package by DNV is used for carrying out the
risk analysis.
The full terms of potential hazardous scenarios and consequence events associated with the
installation and operation was considered in the analysis.
Based on the operations to be carried at the plant, the Risk Analysis conducted to identify
the affected distances and the damage of property and population from the identified
scenarios considering the Maximum Credible Loss Scenario (MCLS) & Worst-case scenario.
Maximum credible loss scenarios have been worked based on the inbuilt safety systems and
protection measures to be provided for the operation of the facility & the Worst-case
scenario i.e. 100% catastrophic rupture have been worked out based on failure of the inbuilt
safety system.
The Worst case Scenario assumed as catastrophic rupture, as per the guidelines suggested
by Chemical Process Quantitative Risk Assessment (CPQRA) by AIChE or Purple Book
(CPR-18E), and maximum inventory at the time of failure.
Consequence analysis and calculations are effectively performed by computer software
using models validated over a number of applications. Consequence modelling is carried out
by PHAST/ SAFETI (version 6.7) of DNV Software.
PHAST uses the Unified Dispersion Model (UDM) capable of describing a wide range of
types of accidental releases. The Model uses a particularly flexible form, allowing for sharp-
edged profiles, which become more diffuse downwind.
PHAST contains data for a large number of chemicals and allows definition of mixtures of
any of these chemicals in the required proportion. The calculations by PHAST involve
following steps for each modeled failure case:
Run discharge calculations based on physical conditions and leak size.
Model first stage of release (for each weather category).
Determine vapor release rate by flashing of liquid and pool evaporation rate.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 213
Dispersion modelling for Flash fire and toxic chemicals taking into account weather
conditions.
In case of flammable release, calculate size of effect zone for fire and explosion.
The hazardous materials considered in this study are mostly flammable liquids
Figure 7.1: Consequence analysis; Event Tree Analysis for release of flammable liquid
OTHER FACTORS CONSIDERED FOR RISK ASSESSMENT:
METEOROLOGICAL CONDITIONS
The consequences of released toxic or flammable material are largely dependent on the
prevailing weather conditions; The most important meteorological parameters which affect
the atmospheric dispersion of the escaping material include crucial variables such as wind
direction, wind speed, atmospheric stability and temperature. Rainfall does not have any
direct bearing on the results of the risk analysis; however, it can have beneficial effects by
absorption / washout of released materials. Actual behavior of any release would largely
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 214
depend on prevailing weather condition at the time of release. For the present study we used
the meteorological data of the Dahej, Bharuch District.
ATMOSPHERIC PARAMETERS
The wind speed and wind direction data which have been used for the study is summarized
below:
Wind Speed : 2.5 & 5 m/s
Atmospheric Stability : F and D
WEATHER CATEGORY
Table 7.10: Weather Condition selected for Consequence analysis
Time Remarks
Weather Condition
Temperature in °C
Wind speed m/s Stability Class
Day Time Prevalent during the day,
most times of the year 32 2.5 D
Night Time Prevalent during the night,
most times of the year 26 2.5 F
Monsoon Period
Prevalent during the monsoon months
26 5 D
One of the most important characteristics of atmosphere is its stability. Stability of
atmosphere is its tendency to resist vertical motion or to suppress existing turbulence. This
tendency directly influences the ability of atmosphere to disperse pollutants emitted into it
from the facilities. In most dispersion scenarios, the relevant atmospheric layer is that
nearest to the ground, varying in thickness from a few meters to a few thousand meters.
Turbulence induced by buoyancy forces in the atmosphere is closely related to the vertical
temperature gradient.
Temperature normally decreases with increasing height in the atmosphere. The rate at
which the temperature of air decreases with height is called Environmental Lapse Rate
(ELR). It will vary from time to time and from place to place. The atmosphere is said to be
stable, neutral or unstable according to ELR is less than, equal to or greater than Dry
Adiabatic Lapse Rate (DALR), which is a constant value of 0.98°C/100 meters.
Pasquill stability parameter, based on Pasquill – Gifford categorization, a meteorological
parameter, describes the stability of atmosphere, i.e., the degree of convective turbulence.
Pasquill has defined six stability classes ranging from `A' (extremely unstable) to `F'
(extremely stable). Wind speeds, intensity of solar radiation (daytime insulation) and night
time sky cover have been identified as prime factors defining these stability categories.
When the atmosphere is unstable and wind speeds are moderate or high or gusty, rapid
dispersion of pollutants will occur. Under these conditions, pollutant concentrations in air will
be moderate or low and the material will be dispersed rapidly.
When the atmosphere is stable and wind speed is low, dispersion of material will be limited
and pollutant concentration in air will be high. In general, worst dispersion conditions (i.e.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 215
contributing to greater hazard distances) occur during low wind speed and very stable
weather conditions.
7.2.7 Hazards and damage criteria of hazardous chemicals:
Hazards
An inherent chemical or physical characteristic that has the potential for causing damage to people, property, or the environment. In this document it is the combination of a hazardous material, an operating environment, and certain unplanned events that could result in an accident. Type of flammable effects are described below:
Pool fire:
The combustion of material evaporating from a layer of liquid at the base of the fire.
Flash fire:
The combustion of a flammable vapor and air mixture in which flame passes through that mixture at less than sonic velocity, such that negligible damaging overpressure is generated.
Jet Fire:
A fire type resulting from the discharge of liquid, vapor, or gas into free space from an orifice, the momentum of which induces the surrounding atmosphere to mix with the discharged material.
Vapor cloud explosion:
Explosive oxidation of a vapor cloud in a non-confined space (not in vessels, buildings, etc.). The flame speed may accelerate to high velocities and produce significant blast overpressure. Vapor cloud explosions in plant areas with dense equipment layouts may show acceleration in flame speed and intensification of blast.
Boiling Liquid Expanding Vapour Explosion (BLEVE):
A type of rapid phase transition in which a liquid contained above its atmospheric boiling point is rapidly depressurized, causing a nearly instantaneous transition from liquid to vapor with a corresponding energy release. A BLEVE is often accompanied by a large fireball if a flammable liquid is involved, since an external fire impinging on the vapor space of a pressure vessel is a common BLEVE scenario. However, it is not necessary for the liquid to be flammable to have a BLEVE occur.
Hazards Associated with Explosives chemicals
Damage Criteria
Damage due to thermal radiations and overpressure have been arrived at by taking into
consideration the published literature on the subject. The consequences are then visualized
by the superimposing the damage effects zones on the proposed plan site and identifying
the elements within the project site as well as in the neighboring environment, which might
be adversely affected, should one or more hazards materialize.
Thermal damage
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 216
The effect of thermal radiation on people is mainly a function of intensity of radiation and
exposure time. The effect is expressed in terms of the probability of death and different
degrees of burn. The following tables give the effect of various levels of heat flux.
7.2.8 Fatal Radiation Exposure Levels
Table 7.11: Fatal radiation Exposure Level
RADIATION LEVEL
(KW/m2)
FATALITY
1% 50% 99%
EXPOSURE IN SECONDS
4.0 67 165 --
12.5 15 36 90
37.5 4 9 20
7.2.9 OVERPRESSURE DAMAGE
Table 7.12: Overpressure Damage Criteria
OVER PRESSURE
(mbar)
MECHANICAL DAMAGE TO EQUIPMENTS
DAMAGE TO PEOPLE
300 Heavy damage to plant &
structure.
1% death from lung damage
>50% eardrum damage
>50% serious wounds from flying objects
100 Repairable damage >1% eardrum damage
>1% serious wounds from flying objects
30 Major glass damage Slight injury from flying glass
10 10% glass damage ***
7.2.10 Hazards Associated with Toxic Materials
It is necessary to specify suitable concentration of the toxic substance under study to form
the end-point for consequence calculations. American Industrial Hygiene Association (AIHA)
has issued Emergency Response Planning Guidelines (ERPG) for many chemicals,
describes the various scenarios:
ERPG-1 is the maximum airborne concentration below which it is believed that nearly
all individuals could be exposed for up to 1 hour without experiencing other than mild
transient adverse health effects or perceiving a clearly defined, objectionable odour.
ERPG-2 is the maximum airborne concentration below which it is believed that nearly
all individuals could be exposed for up to 1 hour without experiencing or developing
irreversible or other serious health effects or symptoms, which could impair an
individual's ability to take protective action.
ERPG-3 is the maximum airborne concentration below which it is believed that nearly
all individuals could be exposed for up to 1 hour without experiencing or developing
life-threatening health effects.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 217
Toxic limit values as TLV (Threshold Limit Value), STEL (Short Term Exposure Limit),
Immediately Dangerous to Life or Health (IDLH) concentrations are issued by US National
Institute for Occupational Safety and Health (NIOSH).
TLV: Threshold Limit Value – is the permitted level of exposure for a given period on a
weighted average basis (usually 8 hrs. for 5 days in a week).
STEL: A Short Term Exposure Limit (STEL) is defined by ACGIH as the concentration to
which workers can be exposed continuously for a short period of time without suffering from:
Irritation
Chronic or irreversible tissue damage
Narcosis of sufficient degree to increase the likelihood of accidental injury, impair self-
rescue or materially reduce work efficiency.
The permitted Short Time Exposure Limit usually have maximum exposure for 15-minute
and should not be exceeded more than four times in a day as long as the time weighted
average is not exceeded.
IDLH: IDLH is an acronym for Immediately Dangerous to Life or Health. This refers to a
concentration, formally specified by a regulatory value, and defined as the maximum
exposure concentration of a given chemical in the workplace from which one could escape
within 30 minutes without any escape-impairing symptoms or any irreversible health effects.
This value is normally referred to in respirator selection.
7.2.11 Damage Criteria
In consequence analysis studies, in principal three types of exposure to hazardous effects
are distinguished:
Heat radiation from jet fire, pool fire,
Toxic effects, from toxic materials or toxic combustion products.
The chosen damage criteria are given and explained as per the Guidelines for QRA – Green
Book (Method for determination of Physical Damage – CPR-16E), Purple Book (CPR-18E)
for QRA released by Centre for Chemical Process Safety (CCPS)
The details of planning including classification of events, consequence of Fire, Consequence
of Overpressure, Consequence of Toxic release, and Pasquill stability classes area given in
Table 7.13.
Table 7.13: Input data
Input data Consideration
Volume inventory Quantity of material
Scenario Leak, Catastrophic Rupture
Leak size Pin Hole, Medium leak for storage tank
Storage conditions
Pressure, Temperature
Tank details Height, Diameter
Bund details Bund height, Bund area
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 218
Input data Consideration
Weather condition
Wind speed, Pasquil stability, Atmospheric temperature, Relative humidity, Terrain type
7.2.12 Weather Condition MCAS Development Techniques
As a first step towards risk assessment is to identify the possible release scenarios based on
available information about scenario development for Maximum Credible Accident Scenarios
(MCAS).
Selection of Maximum Credible Loss Scenarios (MCLS’)
Following points are considered while selecting the release scenarios:
Flash point for flammable chemicals;
IDLH of Toxic chemicals & Total inventory of the material.
Operating/ Storage Temperature and Pressure of the material.
7.2.13 Failure Rates
A leak or rupture of the tank / pipe, releasing some or all its contents, can be caused by
brittle failure of the tank walls, welds or connected pipework due to use of inadequate
materials, combined with loading such as wind, earthquake or impact. The failure rates are
the deciding factor for selecting the MCAS‘. The failure rates for selected MCAS‘ are given in
Table 7.14.
Table 7.14: Failure Frequencies for Storage Tanks
Categories Catastrophic Rupture Frequency
(per tank per year) Leak Frequency (per year)
Atmospheric Storage Tank 3.0 × 10-6
2.8× 10-3
Reference: International Association of Oil & Gas Producers (OGP); Report No. 434-3, March 2010.
7.2.14 Consequences Analysis
In a plant handling hazardous chemicals, the main hazard arises due to storage and
handling of hazardous chemicals as mentioned above. If these chemicals are released into
the atmosphere, it may cause damage due to resulting fires or vapor clouds. Blast
overpressures depend upon the reactivity class of material between two explosive limits.
The consequences of the release of Hazardous substances by failures or catastrophes and
the damage to the surrounding area can be determined by means of models. Models help to
calculate the physical effects resulting from the release of hazardous substances and to
translate the physical effects in terms of injuries and damage to exposed population and
environment. To assess the damage level caused by the various accidental events, it is
essential to firm up the damage criteria with respect to different types of accidents e.g.
thermal radiation, toxicity, explosion overpressure etc.
Consequence analysis involves the application of mathematical, analytical and computer
models for calculation of effects and damages subsequent to a hydrocarbon release
accident. Consequence models are used to predict the physical behavior of the hazardous
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 219
incidents. The techniques used to model the consequences of hydrocarbon and other
hazardous material releases cover the following:
Modeling of discharge rates when holes develop in process equipment/pipe
work/pipeline.
Modeling of the size and shape of flammable and toxic gas clouds from releases in
the atmosphere;
Modeling of the flame and radiation field of the releases that are ignited and burn as
jet fire, pool fire, flash fire and BLEVE/ Fire ball;
Modeling of the explosion fields of releases, which are ignited away from the point of
release.
The information normally required for consequence analysis includes meteorological
conditions, failure data of equipment and components, ignition sources, population
characteristics within and outside the plant, acceptable levels of risk etc.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 220
7.2.15 Consequence Analysis and Contours
As the MCLS‘ were developed for the selected set of chemicals, the next step is to carry out the consequence analysis. The consequence
analysis results along with their contours are presented in the following sections.
Table 7.15: Acetone
Pinhole leak of Acetone Tank
Flash Fire
Jet Fire
Late Pool Fire
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 221
Overpressure
Medium Leak of Acetone Tanks
Flash Fire
Jet Fire
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 222
Late Pool Fire
Overpressure
Catastrophic Rupture of Acetone Tanks
Flash Fire
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 223
Jet Fire
Fireball Hazard
NR : Not Reached , NH : No Hazard
Flash Fire radii in case of Pinhole leak of Acetone Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 224
Late Pool fire radii in case of Pinhole leak of Acetone Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 225
Flash Fire radii in case of Medium leak of Acetone Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 226
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 227
Table 7.16: Methanol
Pinhole leak of Methanol Tank
Flash Fire
Jet Fire
Late Pool Fire
Medium Leak of Methanol Tanks
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 228
Flash Fire
Jet Fire
Late Pool Fire
Overpressure
Catastrophic Rupture of Methanol Tanks
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 229
Flash Fire
Late Pool Fire
Fireball Hazard
Overpressure
NR : Not Reached , NH : No Hazard
Flash Fire radii in case of Pinhole leak of Methanol Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 230
Late Pool fire radii in case of Pinhole leak of Methanol Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 231
Flash Fire radii in case of Medium leak of Methanol Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 232
Late Pool fire radii in case of medium leak of Methanol Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 233
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 234
Table 7.17: Toluene
Pinhole leak of Toluene Tank
Flash Fire
Jet Fire
Late Pool Fire
Medium Leak of Toluene Tanks
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 235
Flash Fire
Jet Fire
Late Pool Fire
Overpressure
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 236
Catastrophic Rupture of Toluene Tanks
Flash Fire
Late Pool Fire
Fireball Hazard
Overpressure
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 237
Flash Fire radii in case of Pinhole leak of Toluene Tank
Late Pool fire radii in case of Pinhole leak of Toluene Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 238
Flash Fire radii in case of Medium leak of Toluene Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 239
Late Pool fire radii in case of medium leak of Toluene Tank
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 240
Table 7.18: Chlorine Gas tonner Toxic concentration Distance
Pinhole leak of Chlorine Tonner
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 241
Maximum
Concentration
Pinhole leak at Relief valve of Chlorine Tonner
Maximum
Concentration
NR : Not Reached , NH : No Hazard
Maximum concentration Radii of Chlorine Tonner in case of Pinhole leak.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 242
Maximum concentartion Radii of Chlorine Tonner in case of Pinhole leak at releif valve
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 243
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 244
Table 7.19: Phosgene
Pinhole leak of Phosgene for 600 sec – There is No Storage of Phosgene hence considered pipeline
rupture scenario
Maximum toxic
Concentration
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 245
Table 7.20: Sodium Cyanide
10 MM leak of Sodium Cyanide for 600 sec
Maximum toxic
Concentration
Maximum toxic concentration radii in case of 10 mm leak of Sodium Cyanide Solution
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 246
Toxic Radii in case of Pin hole leak of Ammonia Bullet in 5/D weather Criteria
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 247
Toxic Radii in case of Medium leak of Ammonia Bullet in 5/D weather Criteria
From above contours of Ammonia Bullet, it is observed that the maximum outdoor toxic radii dispersion for pinhole and medium leak of ammonia is within
plant premises only
7.2.16 Results of Consequence Analysis
Table 7.21: Summary of Maximum credible Effect
Chemical/ Scenario
Effect Distance in Meters at specific Weather condition
Distance (m) Weather
Scenario
Pinhole Medium Catastrophic Pinhole Medium Cat.
Acetone 19.99 72.15 72.15 2.5 F Late Pool Fire Late Pool Fire Jet Fire
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 248
Chemical/ Scenario
Effect Distance in Meters at specific Weather condition
Distance (m) Weather
Scenario
Pinhole Medium Catastrophic Pinhole Medium Cat.
Methanol 16.87 42.3 37.2 2.5 F Late Pool Fire Late Pool Fire Jet Fire
Toluene 35.08 64.1 51.8 5 D Late Pool Fire Overpressure Late pool fire
Chlorine Gas 159.7 - 972 2.5 D Max Conc. Max Conc. Max Conc.
Phosgene 170 - - 5 D Max Conc. - -
Sodium Cyanide - 8.92 - 1.5 F - Max Conc. -
Ammonia 119 517 5 D Toxic Radii Toxic Radii -
It can be seen from the summarized table above that the risk of late pool fire is highest in worst case scenario of release of toxic level of
Chlorine Gas of weather class 2.5 D is 159 m in case of Pinhole leak for 600 Sec.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 249
7.2.17 Safety Mitigation Measures
Mitigation Measures against Risk
Based on the risk assessment analysis following precautionary mitigation measures are recommended for the project.
The installation of all the equipment will be as per guidelines of provision of Gujarat
Factories Rule 1963 & Its amendments.
For any case of fire emergency, standard type of Firefighting equipment and fire
extinguishers will be provided in the storage area as well as required places in the
plant.
Smoking will be strictly prohibited inside the plant premises.
Personnel protective equipment will be provided to workers.
First Aid facility and First-aid trained person will be available at the time of chemical
handling operation.
For Chlorine gas detection/Alarm system and Response time will be designed to
control exposures.
Based on emergency raised by the proposed project, level of emergency identified
and will be incorporated in ONSEP.
Provision of Nitrogen blanketing for hazardous chemicals and finished goods will be
provided.
During manufacturing process external cooling media will be provided to control
runaway reaction in the reactor.
During emergency, details of contact no are provided in Sec 7.3 of Disaster
management plan.
MOC of storage tank and pipeline will be as per chemical/process compatibility and
API code to avoid hazards.
Control and cut-off of Domino effect or cascade effect of fire due to flammable
storage tank, Sprinkler system/water curtain on Storage tank and bund wall, Water &
Foam hydrant monitor will be provided to Storage tank yard.
Construction & Erection Phase
The following will be implemented by the contractor while carrying out civil construction.
Required PPE will be provided to cover occupational foot, head, hearing, and eye protection.
Fall Protection/ Working at height: The Contractor is required to provide fall protection to
employees who are working at heights equal to or greater than 1.8 m. fall protection can be
in the form of perimeter protection such as guardrails and toe rails, personal protective
equipment (PPE), a safety monitoring system, or a fall protection plan. Activities that require
personal fall protection systems include steel erection bolting, riveting, fitting-up and
plumbing-up, work over water and some deep excavation work.
Foot Protection: If machines or operations present the potential for foot injury, the
contractor will provide foot protection with safe design and construction for the work to be
performed. Workers and visitors shall not be allowed on a construction site without safety
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 250
shoes. The foot protection will be provided for workers working with concrete or cement.
Gum boot shall be provided to avoid contact with cement/RCC mixtures and mortar.
Head Protection: If head hazards remain after all steps have been taken to control them
(safety nets for work at heights, proper housekeeping), the Contractor will provide workers
with appropriate head protection. Safety helmet will be recommended. When the worker is
carrying load on the head a suitable head protection will be provided.
Noise Protection: Workers shall wear hearing protection devices (ear plugs, ear muffs,
canal caps), whenever the diesel operated engines, DG set, or other noisy machines are
operating in the area.
Eye Protection: When operations present potential eye injury from physical or chemical
elements, the Contractor will select, provide, maintain and required affected workers to use
appropriate eye protection. Eye protection is required while working on RCC dismantling,
steel fabrication, welding, rough plastering and painting work. Any work which involves
looking upside also requires the protection e.g. electrical cabling on walls and ceiling. The
various eye protecting devices like safety glasses and goggles, face shields and welding
helmets will be provided to workers.
Hand protection: Suitable hand gloves shall be provided for working with cement or mortar.
A suitable anti-allergic cream or protecting gel shall be applied on the hands for persons who
develop allergy with cement or lime.
Electrical Safety
A licensed electrician is/shall be deployed to complete all temporary wiring and
electrical installations required for construction activities.
Fuses and circuit breakers (ELCB‘s) are/shall be used to protect motherboards,
conductors and equipment to avoid short circuiting and electric shock. MCB‘s and
fuses is/will also to be used to protect the electrical equipment from over current and
over voltage.
Extension cords for equipment or as part of a temporary wiring system is/shall not be
damaged or compromised in any way and insulation must be of the highest grade.
The joints of electrical wires are/shall be avoided, or an extension cord can be used if
needed
Approved Rubber Mat will be used in the MCC Room below the panels.
Anytime electrical equipment will be deactivated for repair, or circuits will be shut off,
the equipment will be locked out and tagged at the point where it can be energized.
Proper earthling will be ensured for all equipment and electrical panels
Temporary lights shall not be suspended by their cords.
The employer shall provide the necessary safety equipment, supplies and monitoring
equipment to their personnel.
During the operation stage maintenance of transformer and manning of electrical
substation shall be by the competent persons only.
Safety Measures of Phosgene Handling:
Phosgene pipeline will be installed as double jacketed and without joints to avoid
leakages.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 251
Nitrogen purging provision and adequate MOC as per API code for Pipeline will be
provided.
Detectors with Alarm will be installed at vulnerable location.
Flow meter will be installed near to process area and phosgene generator.
Phosgene will be used as and when required basis during manufacturing of
Phosgene derivatives.
Scrubber system will be provided to Process vent.
Portable monitor Portable monitors can be used to locate phosgene leaks within and
around phosgene-processing areas.
Emergency shutdown will be provided during emergency or leakages.
Safety Shower will be provided near to phosgene operation area and process area.
Safety Measures of Sodium Cyanide Storage & Handling:
Adequate ventilation will be provided to keep airborne concentration below exposure
standard.
Sodium cyanide will be stored away from Acid & water components.
Proper protective clothing must be worn that covers the body including the face.
A safety shower and eyewash should be available. Do not breathe dust or mist.
Avoid contact with skin, eyes and clothing.
Do not smoke anywhere near the storage and handling of sodium cyanide solid or
associated handling equipment
Do not touch damaged containers or spilled material unless wearing appropriate
personal protective equipment.
Change and wash clothing, and personal protective equipment if contaminated, or
before storing and/or re-using. Wash hands and face thoroughly after handling and
before work breaks, eating, drinking, smoking and using toilet facilities.
Make sure that NaCN solid of solution does not come into direct contact with the
body.
Avoid contact with contaminated skin, clothing and equipment by wearing protective
gloves;
Wear chemical goggles as a minimum level of eye protection to prevent sodium
cyanide dust entering eyes;
Avoid inhalation of sodium cyanide dust during rescue in contaminate areas by
wearing suitable respiratory protection;
Respiratory protection will be suggested: an air supplied breathing apparatus, or
positive pressure self-contained breathing apparatus.
Remove immediately by washing in case sodium cyanide solution is spilled since
cyanic acid vapor is also formed by the reaction with carbonic acid gas in the air.
Ventilation equipment will be provided in those areas where sodium cyanide is
handled for a long time.
The handling area will be such an easy-to-wash concrete floor.
Avoidable of long-term storage and use of treatment tank for drain water.
This material will be handled by at least two workers to watch the situation with each
other.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 252
Do not eat foods or drink beverage in the same area where sodium cyanide is
handled.
Safety Measures of Ammonia:
Proper MOC of Ammonia Pipeline transfer will be selected to avoid leakage and
rupture.
Storage will be kept away from high temperature and oxidizing agent
Regular inspection of Ammonia storage
Detectors with warning alarm will be provided.
Adequate PPE‘s will be provided Workers and employees
Portable monitors will be provided to detect leakages.
Process control Measures:
Engineering Controls:
MOC of Process Reactors will as per compatibility of reaction.
MOC of Pipeline will be also as per API STD and chemical compatibility.
Level indicator, Temperature indicator, PSV, Vent line and knock-out drum
facility will be provided to the reactors.
To avoid run away reaction external cooling media/ utility will be provided
within jacketed reactor.
Pressure Alarm, temperature alarm, Toxic gas alarm with detection system
will be installed at reactors.
Fire hydrant & monitor will be installed into plant premises to control fire.
PPE’s:
Adequate PPE‘s like safety helmet, safety shoes, Apron, safety goggles &
nose mask as primary safety gadgets will be provided to each personnel.
During operation proper hand gloves like nitrile, heat proof, electrical proof,
cut-resistant gloves will be provided.
Special PPE‘s like full body gown, shoe cover, nose mask will be provided for
classified area to avoid contamination.
Administrative control:
Induction training at entrance for each personnel (new person) will be
available as video lecture for short duration to cover whole plant.
Periodic training on various safety topics will be arranged to refresh the
operational safety.
Periodic mock drill will be carried out quarterly.
Hazardous area Classification will be carried out after the commissioning of plant.
Safety Mitigation Measures
Transportation, Storage and Handling of Chemicals
Hazardous area classification will be carried out after well establishing of plant.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 253
Layout and location of hazardous chemical storage area based on natural and
Mechanical ventilation.
A spare barrel of enough quantity is kept ready for any emergency spillage or
leakage.
Regular inspection of all the storage tanks of hazardous chemicals will be carried out.
Display Boards is provided on all storage tanks which include the name of the
chemicals, Calibration of tanks and date of Painting.
All equipment related to hazardous chemical storage is maintained and calibrated
regularly.
SOP for handling will be displayed in local language for safe operating procedure.
Standard procedure for unloading will be in place and implemented for safe
unloading of road tanker.
Muffler on the silencer of the tanker during entering in factory premises.
Water showering system (Automated sprinkling system) will be provided to the
flammable chemical storage area.
On site detectors for fire based on heat &/or smoke detection with alarm system will
be provided as required.
Adequate firefighting systems are provided as required. Details of the same are
elaborated in related section.
First aids boxes are also will be provided at prominent places in the plant.
Area is declared as ―NO SMOKE ZONE‖.
Provisions of PESO standards for Storage & Handling of Cl2
Storage
Cylinders are/will be stored in a cool, dry, well ventilated place under cover, away
from boilers, open flames, steam pipes or any potential sources of heat and such
place of storage are/shall be easily accessible.
The storage shed is fire resistant construction.
Gas cylinders are/will not be stacked in a vertical position.
Cylinders are/will not be stored under conditions, which will cause them to corrode.
Cylinders are/will not be stored along with any combustible material.
Empty cylinders are segregated from the filled ones and care taken that all the valves
are tightly shut.
Handling
Cylinders are adequately supported during handling.
Conveyors, trolleys and cradles of adequate strength, as far as possible, be used
when moving the cylinders.
The cylinders are handled carefully and not be allowed to fall upon one another or
otherwise subjected to any undue shock.
Sliding, dropping or playing with cylinders is prohibited.
Cylinders used in horizontal position is so secured that they cannot roll.
Open flames, lights, mobile phones, lighting of fires, welding and smoking is
prohibited.
Working places is classified as HAC.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 254
Safety Measures for Flammable Chemicals
Storage for sealed drums are out of direct sunlight and remote from sources of heat
to avoid generation of pressure.
Drums are stored at ground level and measures taken to prevent corrosion of the
drum base.
Adequate ventilation is available to ensure that in case of incidental release of
chemicals (vapor) the vapor concentration is as low as possible, and in any event
within the regulatory requirements.
Safety Measures for Transportation of Raw Material
Training is provided to driver and cleaner regarding the safe driving, hazards of
Flammable chemicals, emergency handling .
TREM card is kept with Driver.
.
Fire extinguishers .
Flame arrestor is provided to exhaust.
Instructions are given not to stop road tanker in populated area.
Hazard Identification symbol and emergency telephone number is displayed as per
HAZCHEM CODE.
Appropriate PPEs are kept with TL.
In case of leak or spill:
Area will be isolated.
Container shall be isolated.
Source of leakage will be checked.
Damaged containers or spilled material shall not be attended without wearing
appropriate protective clothing.
Leakage will be stopped, if possible, to do so without risk.
Water spray will be used to reduce vapors (but do not put water directly on leak,
spill area or inside container).
Combustibles (wood, paper, oil, etc.) will be kept away from spilled material.
Safety Measures for Unloading of Raw Material from Tanker
Priority is given to Tanker to immediately enter the storage premises at site and not
be kept waiting near the gate or the main road.
Security person will check License, TREM CARD, Fire extinguisher condition; SCBA
set condition, Antidote Kit, required PPEs as per SOP laid down.
Store officer will take sample as per sampling SOP from sampling point.
After approval of QC department unloading procedure will be allowed be started, as
per rules & guidelines.
Safety Measures for Drum Storage and Handling
Drums are stored at designated location or secured in a safety storage cabinet.
Approved methods of equipping a drum and dispensing liquids from it is following.
Drums, carboys and related accessories are inspected on regular basis for
maintenance purpose.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 255
All the vessels and equipment are earthed properly and protected against static
electricity. Also, proper earthling facilities are provided for drums.
Materials are transferred by pumping through pipeline or by vacuum, from drums.
Drums for flammable liquids have proper closures that can withstand the expected
handling conditions without leaking.
Storage area Safety
Pipes and equipment are inspected at regular intervals.
Entry of unauthorized persons is prohibited.
Spark-resistant tools are used.
Combustibles (wood, paper, oil, etc.) are kept away from spilled material.
SS storage tanks are provided as per IS code.
Dyke wall will be provided to storage tank.
Level transmitter is provided with low level/high level auto cut-off provision.
Fire hydrant monitor with foam attachment facility is provided.
Suitably eye-wash, showers and water showers to body is provided nearby acid and
Caustic Storage area.
FLP type pump & electrical fittings is provided.
All storage areas are isolated from all sources of open flame and well posted with'
NO SMOKING' signs and provided with adequate firefighting/extinguishing system.
Ways to Minimize the Manual Handling of the Hazardous Chemicals
SOPs, work instructions are prepared and followed.
Fork lifts are used for unloading chemical bags, bags movements within plant, etc.
Cranes, hoists, pallet trucks, conveyors, etc. are used as per the requirement, to
eliminate manual handling.
Lifting tools & tackles are used, wherever required.
Trainings are provided to relevant staff, operators, workers for the risk associated
with manual handling of hazardous chemicals, ways to overcome those risk, etc.
Process Safety Measures
For the safety in production area some important critical safety measures are
provided within the process technology/equipment itself.
The details of the general safety measures for process unit are as below;
Process parameters control is provided vide Standard Operating Procedures.
All reaction vents are connected to either vapor condensers system or gaseous
scrubber system.
Trained person is engaged for handling of hazardous materials.
Proper safety precautions are taken during handling of hazardous materials.
Further all the vessels are examined periodically by a recognized competent person.
All the vessels and equipment are well earthed appropriately and well protected
against Static Electricity. Also, for draining in drums proper earthling facilities have
been provided.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 256
Reaction column pressure and temperature data are regularly monitored and
assessment of properties of flammable chemicals are evaluated to avoid
fire/explosion scenarios.
Temperature indicators are provided near all reactors.
Caution note, safety posters, stickers, periodic training & updating in safety and
emergency preparedness plan is displayed and conducted.
Total reaction will be carried out in closed jacketed vessel having cooling water
supply to control temperature in case of run-away reaction.
Emergency reactor shutdown system is implemented.
Preventive safety
The safety measures in form of the general Do's & Don'ts for safety in process & other plant
area are as below:
Check VOC content for flammable and make sure that no flammable vapor contents.
Keep proper and adequate fire extinguisher near work area.
Check all motors are disconnected and fuse pulled out before maintenance.
Work in any equipment must be conducted in presence of supervisor.
Make sure all process lines are disconnected.
Do not work on equipment without permission from plant head and maintenance
head.
Do not allow any employment without pre medical checkup or without checking
fitness.
Use proper PPE.
Safety Measures for Safety at Work
Management has listed some of the Do's & Don'ts activities to strengthen the SAFETY AT
WORK, which will be followed strictly:
Do's:
Ensuring that operators/workers etc. follows the SOPs, Safety procedures &
standards, work permit system etc.
Inspection of Storage Area, Earthling & Bonding system.
Inspection of all Fire Fighting Facilities /Check Alarms operation.
Checking the availability of Spill Containment Kit.
Make sure existing fire extinguishers are fully charged and ready for action.
Inspections of plant, machinery, tools, equipment, premises, work practices,
processes, procedures and general environment must be carried out for the health
and safety of plant, people and surrounding.
On-site and Offsite Emergency Plans shall be reviewed and updated, as per the
requirement.
Don’ts:
Don't allow anyone who hasn't received specific safety and operational training to get
indulge in any site activity.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 257
Don't perform any activity without proper permit.
Don't perform your own maintenance.
Don‘t compromise on Design and Engineering part.
Don't panic if you are in a risky situation.
Don't allow spilled chemicals to drain to sewers/gutters etc.
7.2.18 Occupational Health and Safety
MSDS of hazardous chemicals will be prepared & made available with the management as
well as concern personnel working with the chemicals or area likely to be affected by the
chemicals.
In general following are the key safety measure will be provided for the proposed project.
Provision of drinking water supply for the employees as per standard of the drinking
water as per WHO guidelines.
Availability of proper sanitary facilities for the employees so that they do not suffer from
any health ailments.
Provision of all necessary equipment like portable detector, online detectors and other
laboratory equipment as proposed for regular monitoring of workplace air and other
conditions.
Establish the safety policy.
Organize training program for information on accident prevention, proper control and
maintenance of equipment, first aid training and safe material handling practices.
Monitoring of occupational hazards like noise, ventilation, chemical exposure will be
carried out at frequent intervals.
Provision of ear muffs/ ear plugs to the workers exposed to higher noise level.
Provision of proximity suits and self-breathing apparatus.
Provision and compulsory use of necessary PPEs like helmet, safety goggles, face
mask, hand gloves and safety shoes etc. for all workers. Disaster management plan
(dump).
7.3 DISASTER MANAGEMENT PLAN (DMP)
INTRODUCTION OF THE PLAN:
UPL limited Dahej will be developed On-site emergency plan as per MSIHC Rule 1989,
which comprised the Action plan for tackle the Emergency situation in the plant premises as
well as outside premises.
The EMERGENCY ACTION PLAN formulated herein, based on Risk Assessment
(Qualitative & Quantitative Risk Assessment) contains the measures as described in EIA
Report that are required to be taken and Co-ordination procedures for various activities,
various agencies both internal and external, to help prevent escalation of dangerous
situations. Some definitions used in on-site emergency plan are given below:
AN ACCIDENT:
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 258
Accidents are considered and action plan to counter the Emergency are described in
Detailed Onsite Emergency plan attached in Annexure 19
OBJECTIVES OF THE EMERGENCY PLAN:
To define and assess the emergencies, including risk and environment impact
assessment.
To contain the incident and bring it under control by mobilizing the internal resources
and with the help of Mutual Aid schemes.
To safeguard the lives.
To minimize the damage to property and/or neighboring environment. To inform
employees, the general public and the authority about the hazards / risks assessed,
safeguard provided and the role to be played by them in the event of emergency
Initiating and organizing evacuation affected persons
Medical preparedness for the probable casualties
Integration of resources under OFF – SITE EMERGENCY PLAN OF DISTRICT
CONTINGENCY PLAN, BHARUCH
To secure the safe rehabilitation of affected areas and to restore normally.
To work out a plan with all provisions to handle emergencies and to provide for
emergency preparedness and the periodical rehearsal of the plan.
ON-SITE & OFF-SITE EMERGENCY PLAN
The on-site emergency plan deals with measures to prevent and control emergency within
the factory and not affecting outside public or environment. Proposed & Identified Hazards
will be incorporated and updated into existing On-Site Emergency Plan.
The off-site emergency plan will deal with measures to prevent and control emergencies
affecting public and the environment out-side the premises. It is also called a district
contingency plan of the district. It is administered by the collect orate through Directorate
Industrial Safety & Health Department.
1. Name and address of the person Furnishing the information : Factory Manager
Address: UPL Limited, Plot D-3/6, Dahej - III, GIDC Estate (Within PCPIR Region),
Kadodara Village, Taluka Vagra, District Bharuch, Gujarat
Key personnel of the Organization and Responsibilities assigned to them in case of
an emergency
Key personnel of the Organization:
- SMC/IC (Site Main Controller)
- Deputy Incident Controller (Deputy to Shift-in-charge)
- Other key personnel (Maintenance, Safety Officer, Admin)
- Essential Workers
Responsibilities assigned to concerned department and person given in Existing Emergency
Action plan attached in ONSEP as Annexure 19
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 259
Figure 7.2: Action Plan for Handling Emergency
2. Outside organizations if involved in assisting during on-site emergency: The
Company will have mutual aid agreement with nearby industries: Proposed and
which are developing
UPL Limited has Mutual Agreement with nearby industries and Disaster management Center
for specific emergency help.
(a) Type of accidents Leakage of toxic chemicals for long duration. Medium scale explosion confined to the factory premises. Medium scale fire inside the factory premises.
(b) Responsibility assigned. To depart fire tender with fire officer and fireman. Work under Incident Controller during emergency.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 260
Help in Rescue operations. Arrange water if exhausted.
3. Details of liaison arrangement between the organizations
It will be done for
Fire tender with water & foam, and Fire Extinguisher. Fire Officer & Fire man. Emergency Vehicle if required.
4. Information on the preliminary hazard analysis:
1) Type of Accidents
Hazard Assessment in view of qualitative and Quantitative Risk Assessment has been
carried out. The Risk identified and estimated the Explosion and Toxic radii to the facility and
surrounding.
The methods employed for hazard identification in this study are:
Identification of major hazards based on Manufacture, Storage and Import of
Hazardous Chemicals;
Identification of hazardous units and segments of plants and units based on relative
ranking technique. Example: Fire- Explosion and Toxicity Index (FE&TI)
The chemicals properties of toluene, Acetone, & Ethyl Acetate etc. are studied for hazard
assessment.
Qualitative Risk Assessment:
Qualitative Risk Assessment has been carried out for the following areas:
Hazard involving during Pre-Construction/ Construction Phase;
Fall from work at height during slab structure.
Dust Exposure during excavation
Storage and Handling of Solid Chemicals.
Storage and Handling of Corrosive/ Toxic Chemicals
Storage and Handling of Flammable Chemicals
HIRA study carried out for above mentioned activities quantified the risks as per Risk Matrix
and initial Risk reduced at Residual Risk.
Quantitative Risk Assessment
Quantitative risk assessment carried out for chemicals like Acetone, Toluene, Ethyl Acetate,
,Methanol & Chlorine proposed project and Accidents scenarios are considered as:
1. Vapor Cloud Explosion
2. Pool Fire
3. Flash Fire
4. Toxic
5. Leakage from Pipeline due to damage by external sources, sabotage.
6. Ruptured of Pipeline and Storage Tanks
7. Catastrophic Rupture
2) System elements or events that can lead to a major accident
As per classification level the emergency from proposed project is following:
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 261
Classification of Emergency
The Level of Emergency can be classified in three Categories, which is given in Table 7.22.
Table 7.22: Emergency Types
Classification Description Causes Applicability
Level – 1
The leakage or emergency, which is confinable within the
plant/area.
Small pipe/valve rupture or similar leakages that
do not affect outside premises.
Release of toxic chemicals for short
duration.
Small fire in the plant.
Methanol
Acetone
Ethyl Acetate
Level – 2
The emergency, which is confinable within the
factory premises.
Leakage of toxic chemicals for long
duration.
Medium scale explosion confined to the factory
premises.
Medium scale fire inside the factory premises.
Chlorine
Level – 3
The emergency, which is not confinable within the factory premises and general public in
the vicinity are likely to be affected.
Heavy / Profuse leakage of toxic /
flammable gases for a long duration.
Explosion of high magnitude affecting the
adjacent area.
Major fire inside the factory premises
NA
Extreme case Leakage in Storage tank of Toluene, Ethyl Acetate, Chlorine tonner may lead
to major accident.
Maximum credible effect scenario identified the distances (horizontal affected area in meter)
provided in Sub-Sec 7.2.6 however the detailed control measures and action plan will be
provided in Emergency Action Plan in ONSEP attached as Annexure 19
Hazards
Hazards are identified which are:
Fire due to flammable liquid.
Vapor cloud explosion.
Spillage of Flammable/Toxic chemical due to leakage
Spillage from Tank Truck overflow while loading and unloading operation.
Failure caused by corrosion defects.
Failure of Civil structure.
Failure of Mechanical seal.
Exposure to fugitive dust, noise, and other emissions.
Fire in Electric Panels.
3) Safety relevant components
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 262
Safety Gadgets will be provided to all contract and Employees.
Fire Water network line and Hydrant monitor will be installed as per fire load of the
plant.
Active fire protections with CO2, DCP Fire Extinguishers, Foam Trolley and passive
protections for early detection by smoke and heat detectors, interlocked with Water
Sprinkler system.
Mock Drill: Every Quarterly will be carried out.
Training: Safety lectures on various Topics will be conducted for each employee &
contract person and record will be maintained.
Safety Experts will be deployed for Safety training and Mock Drill.
5. Details about the site
The project site is located at Plot D-3/6, Dahej - III, GIDC Estate (Within PCPIR Region),
Kadodara Village, Taluka Vagra, District Bharuch, Gujarat.
Geographical Data: It is described in Sec.2.3, Ch.2
a) Location of dangerous substances.
Locations of Hazardous Substances are Storage tank yard for solvents, Acids & Alkali, Fuel
Oil, Raw Material Storage for Solid & Liquid Chemicals and Finished Product storage area.
These area/ will be classified as per Hazardous Area Classification (HAC).
b) Seat of key personnel
It is described in Emergency Action plan attached in Annexure 19
c) Emergency control room
A well-established Emergency Control room developed at UPL Limited Dahej Plant. Detailed
introduction has been incorporated in emergency action plan attached in Annexure 19
Description of hazardous chemicals at plant site:
a) Chemicals (Quantities and toxicological data):
Hazardous chemicals study carried out as per:
Identification of major hazards based on Manufacture, Storage and Import of
Hazardous Chemicals;
Identification of hazardous units and segments of plants and units based on relative
ranking technique. Example: Fire- Explosion and Toxicity Index (FE&TI) Chemicals
are with Physical and Hazardous Properties are discussed in above sections
b) Transformation if any, which could occur.
No any transformation is envisaged.
c) Purity of hazardous chemicals.
Hazardous chemical will have purity > 99 %.
6. Likely dangers to the plant.
Gas leakages, Fire & Explosion due to leakage and rupture of pipeline and storage tanks.
7. Enumerate effects of Accident
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 263
a) Stress and strain caused during normal operation
Leakages & Spillages of hazardous chemicals.
Overpressure of the reactor.
Overflow of Hazardous chemicals.
b) Fire and explosion inside the plant and effect if any, of fire and explosion
outside.
Risk assessment has been carried out to find out the maximum credible loss scenario. The
contours of Heat radiation and toxic due to leakage and catastrophic rupture of storage tanks
are plotted using DNV Phast 6.7 Consequence Modeling. It is carried out to emphasize
quantitative Risk for Hazardous Chemical Storage.
The dispersion contours and Distances are given in Sub-Sec 7.2.6.
8. Details regarding:
(i) Warning, alarm, safety, and security Systems:
Detailed Systems are described in Emergency Action plan attached in Annexure 19
(ii) Alarm and hazard control plans in line with disaster control and hazard control
Planning, ensuring necessary technical and Organizational precaution:
The Disaster control plan is prepared and in line with Onsite Emergency and Off-site
Emergency. The necessary precautions are warning alarms, Safety-Interlocks, SOP‘s for
specific operation, cause & effect analysis for each instrument and equipment will also
prepared to ensure the technical and organizational precaution.
The communication system within Disaster man agent center and Plant intercommunication
plan will be updated after commissioning of Plant.
(iii) Reliable measuring instrument, control units and servicing of such equipment.
Proper functioning of instrument and Equipment the reliability function for Detectors, gauges
and weigh balance plan will be updated. Periodic schedule for Maintenance & Calibration will
be prepared. Calibration will be done with standard solution and methods.
(iv) Precautions in designing of the foundation and load bearing parts of the building.
Designing of foundation and load bearing parts of the building will comply requirements of
Seismic Resistance design / Zone III.
(v) Continuous surveillance of operations
Control room will have DCS System operated by trained operator.
Round the clock monitoring of operations by trained manpower.
Immediate corrective measures by the authorized personnel.
(vi) Maintenance and repair work according to the generally recognized rules of
goods Engineering practices;
The Good engineering practices will be adhered for reliability. The preventive maintenance
schedule will be prepared for each critical equipment and periodic calibration of instrument
will be prepared and implemented.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 264
9. Details of communication facilities available during Emergency and those required
for an off-site Emergency;
Communication facilities will be established as per emergency communication plan
enumerated in the diagram On-site & Off-Site Emergency.
Figure 7.3: Emergency Organization Chart
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 265
Figure 7.4: On-site Emergency plan will be aligned with District disaster management plan (Off-Site)
10. Details of fire-fighting and other facilities available and those required for an off-
site emergency.
Safety & Fire department has trained fire man and safety gadgets like CO2, DCP Fire
Extinguishers, Foam Trolley and passive protections for early detection by smoke and heat
detectors, interlocked with Water Sprinkler system.
Details of type, number along with locations as per Risk assessment is provided in Table
7.23
Table 7.23: Details of Detectors within premises
S. No. Detectors Location No of detectors
1 Toxic gas Chlorine storage 01
Bromine 01
2 Fire detector Storage Tank yard 04
3 Heat detector Reactor/ Process area 02
4 Flame detectors Storage Tank yard 04
Emergency contact number during emergency:
Details of emergency contact numbers are provided in Table 7.24
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 266
Table 7.24: Details of Emergency Contact Numbers
First person to be contacted in the case of emergency:
Name of the shift
First person to be contacted in the case of emergency
Name & Designation Place of
availability
Contact No
Mobile
General (G)
Mr. Subhat Jindal
(Factory Manager)
Dahej 9727719308
Mr. Subodh Namjoshi Ankleshwar 9099903979
On Holiday Mr. Subhat Jindal
(Factory Manager)
Dahej 9727719308
Source: Existing Onsite Emergency Plan
For the Off-site emergency mutual agreement aid will be arranged.
- The Fire tender with water & foam, and Fire Extinguisher
- Emergency Vehicle if required, Trained Fire man.
Details of additional fire safety systems
1. Foam Trolley across site for each plant.
2. Gas detector for Gases/Chemicals having flash point <39 deg.C
3. Fire alarms and smoke detectors in Buildings.
4. Fire Blankets for containment.
5. Early Suppression Fast Response Fire Sprinkler Systems (ESFR) for suitable products.
6. Dedicated sand buckets for each plant.
11. Details of first aid and hospital services Available and its adequacy
UPL Limited has developed Occupational Health Centre including provision of First Aid kit,
Periodic Medical Checkup of all contract and Employees. A qualified Doctor with Male Nurse
will remain available at facility. Antidotes will also be available for Hazardous Chemicals. All
workers and employees are provided safety gadgets like Helmet, Hand gloves, Apron, Full
fire protection suit, Safety Shoes, Gas Mask, Face-shield and Safety goggles Company has
well equipped emergency vehicle. Existing Action plan for OHS standard implementation
incorporated. Safety trainings (on Safe Material Handling, First Aid, & all Safety Aspects) as
per Gujarat Factory Rules will be strengthened more.
7.3.1 Occupational Hazards Specific Pre-Placement and Periodic
Monitoring
UPL Ltd , Dahej will developed their policy and norms. All the workmen will be put to medical
examination and testing periodically. Based on the medical examination report/feedback,
workmen will be counseled and put in different area /job rotation kind of activities.
Following will be the periodic tests conducted by UPL:
Lab investigations, like fasting blood sugar, post prandial blood sugar, urine routine
Hematology profiles including, complete blood count, ESR, blood grouping and RH
type,
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 267
Lipid profiles including, Cholesterol, Triglycerides, HDL, LDL, VLDL, Liver Function
Test including, SGOT, SGPT, Total Bilirubin, Direct Bilirubin, Total Protein, Albumin,
A/G Ratio, AIKP GGT
Renal Function Tests including, BUN, Creatinine, Electrolytes, Uric Acid, Inorganic
Phosphorus, Calcium
Non-Invasive Investigations including, Chest X-ray, ECG, ECHO, Pulmonary
Function Test, USG Abdomen-Screening, Vision Test, Audiometry.
7.3.2 Monitoring Parameters and Frequency
The monitoring parameters and frequency of monitoring for the proposed project will be
carried out as follows:
Table 7.25: Monitoring parameters and Frequency of monitoring
S. No. Item Parameters Frequency
1. Occupational
Health
Pre-Employment check-up:
Vision, Audiometry, Spirometer, Chest Skiagram, Urine, Complete blood
count, etc.
Once at the time
of appointment
Periodical check-up:
Vision, Audiometry, Spirometer, Urine, RBS, Liver function tests (LFT),
Complete blood count, Anemia, etc.
Age <30 yrs: once in 5 years; 31-40 yrs, once in 4 years; 41-50 yrs: once in 2 years; above
>50 yrs, once in a year
Post-employment check-up:
Vision, Audiometry, Spirometer, Chest Skiagram, Urine, Complete blood
count, etc.
Once at the time
of relieving
2. Workplace Monitoring
Ammonia, HCl, H2S, VOC Monthly
3. Safety Safety Audit Yearly
7.3.3 Action Plan for OHS Standard Implementation
This program will:
Identify hazards in the workplace
Eliminate or minimize the potential for injuries and disease
Limit financial losses resulting from injuries and disease
Be monitored to ensure that it meets its goals and UPL requirements
Roles and responsibilities
Roles and responsibilities of all working personnel will be defined. The purpose is to help
everyone understand their own roles and the roles of others so they can work toward
common health and safety goals.
Employer’s responsibilities
Employers have both general and specific responsibilities related to hazard control and
worker health and safety. In carrying out these duties, management—from the chief
executive officer through to the first-level supervisor—can demonstrate their commitment to
health and safety in the workplace.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 268
General responsibilities will be as under;
Ensure the health and safety of the associates and contract personnel present at the
workplace.
Establish health and safety policy (included in EHS policy).
Provided general direction to all about their responsibilities and roles in providing a
safe and healthy workplace.
Provided specific direction and delegate authority to those responsible for health and
safety.
Consult and cooperate with individuals carrying out occupational health and safety
duties.
Provide workers with the information, instruction, training and supervision necessary
to protect their health and safety.
Provide supervisors with the support and training necessary to carry out their health
and safety responsibilities.
Provide and maintain protective equipment, devices, and clothing and ensure that
they are used.
Hazard control responsibilities given below;
Identify potential hazards through regular inspections and either laminate or control
the hazards without delay.
Remedy any workplace conditions that are hazardous to worker health or safety.
Develop written safe work procedures.
Encourage workers to express concerns and suggest improvements on health and
safety issues, for example, through safety talks, meetings or consultation with worker
representatives.
Supervisor’s responsibilities
Supervisors will give first priority to health and safety and the same priority as productivity or
quality control. They must know and comply with occupational health and safety
requirements. A supervisor is defined in the Occupational Health and Safety Regulation as
―a person who instructs, directs and controls workers in the performance of their duties.‖ Any
worker (management or staff) who meets this definition of supervisor has the responsibilities
of a supervisor for the workers under their control.
General responsibilities are as under;
Ensure the health and safety of all workers under their direct supervision.
Know the UPL requirements that apply to the work being supervised and ensure that
they will be followed.
Ensure that workers under their supervision are made aware of all known or
reasonably foreseeable health and safety hazards where they work.
Consult and cooperate with safety committee members or EHS-Officer, and
cooperate with others carrying out occupational health and safety duties.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 269
Ensure that the appropriate personal protective equipment and clothing are available,
properly worn when required, and properly inspected and maintained.
Investigate unsafe conditions reported to them and ensure that corrective action is
taken without delay.
Workers’ responsibilities
Workers will have general responsibilities for their own health and safety and that of other
workers. In addition, they have the responsibility to refuse unsafe work; discriminatory action
cannot be taken against them for refusing to do unsafe work.
General responsibilities are as under:
Cooperate with the Safety committee and EHS officers, and any other person
carrying out occupational health and safety duties.
Learn and follow safe work procedures.
Be alert to hazards, and report hazards or problems to the supervisor or employer.
Use the protective clothing, devices, and equipment provided.
Perform work in a safe manner. Do not engage in horseplay or work while impaired
by alcohol, drugs, or other causes.
OHS Program
OHS Program will be implemented and a safety committee will be formed comprising
personnel from management, supervisors and contractors. Safety budget is also allocated
for Employee and Contract workers as given in Table 7.26
Table 7.26: Budget for Occupational Health & Safety
Welfare Safety Expenses Description Amount (in Lakh)
Safety week/ Env Day Celebration/ERT Competition
Celebrations 3.50
Medicine for BCA tests for all employees
Rs. 15/person. 0.27
OHC Medicine Average
2000 /Month 0.24
Bio Disposal Charges 14500 per month 1.74
Recognition of CSM A and B Quarterly Recognition 1.00
Annual Medical Checkup Rs.1560 /Person 2.65
FMO, Doctor 1.25 Lakh per month 15.00
Safety shoes Company Staff: 150, Labor : 50, Reserve Stock : 25 Total : 225
2.70
Boiler suit washing and repair Rs.8/-per piece 1.44
Third party safety audit
Statutory requirement/Year 1.50
Third party ambient air monitoring
0.24
IMS audit
1.00
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 7 270
Welfare Safety Expenses Description Amount (in Lakh)
SSRP Rs700 per person 5.60
Printing- Safety work permits, log books
3.00
Total 39.88
OHS program would be designed to address the specific needs of the individual workplace.
OHS program will have the following seven elements:
An OHS policy statement, aim of the program and the responsibilities for health and
safety
Regular inspection of premises, machinery, tools, equipment, and work practices
Appropriate written instructions for workers
Periodic management meetings to discuss health and safety
Investigation of accidents and other incidents in order to take action to prevent similar
incidents
Records and statistics
Instruction and supervision of workers
OHS policy
The OHS policy typically states
The employer‘s commitment to the OHS program
The employer‘s commitment to protect the health and safety of workers
The aims and priorities of the OHS program
The responsibilities of the employer, supervisors, and workers
The written policy will be signed by the Director and Management representative. All workers
will be made aware of the policy and its importance. It will be given to all new workers and
posted in the workplace.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 8 271
8 PROJECT BENEFITS
8.1 IMPROVEMENTS IN THE PHYSICAL INFRASTRUCTURE
The proposed manufacturing unit will increase physical infrastructure in terms of new plant
and machineries, pollution control systems, basic amenities etc.
8.2 IMPROVEMENTS IN THE SOCIAL INFRASTRUCTURE
Existing Project:
UPL Ltd. is continuously involved in various Socio-economic welfare programmes since
1969 with the inception of its manufacturing operations at Vapi, Gujarat which indicates an
active Enterprise Social Commitment (ESC) over the last five decades. The group has
central ESC team for planning and execution of ESC activities. Six Key focus areas of UPL‘s
ESC:
1. Agriculture Development
2. Health & Sanitation
3. Environment & Nature Conservation
4. Education & Empowerment
5. Employability & Entrepreneurship
6. National & Local Area needs
Proposed Project:
The proposed expansion project of existing UPL, Dahej plant will provide direct employment
to the people of the area and thousands will get business opportunity to feed the demand of
project and the people working for the project.
Small market will be developed to feed daily demand of the people working for the proposed
project. People will get medical, education and business opportunities.
UPL will conduct need based survey in the area under supervision of local panchayat and
district administration.
The needy person will be supported as per requirement. This will improve infrastructure and
economic status of the people living in the area.
Other project proponent will take advantage of developed infrastructure of the area to set up
industry which will further improve infrastructure and economy of the area.
UPL has allotted budget under CER for 5 years for following Initiatives:
Skill Development
Agriculture Development
Emerging Local area need
Toilet Blocks in School
School Development Programme
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 8 272
Conservation (Social Forestry & School Plantation Eco Club)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 9 273
9 ENVIRONMENTAL COST BENEFIT ANALYSIS
9.1 PROJECT COST AND APPRAISAL
Environmental Cost Benefit Analysis (CBA) is an analytical way to make an educated
decision regarding the commencement of an industrial activity or similar
trade/commercial/infrastructure activity. This involves a comparison of the costs of an action
with considerations of the benefits associated with that action. CBA assists the regulators to
evaluate the benefits and challenges imposed by the upcoming activity in commercial terms
with respective to the impact on the environmental scenario such as human wellbeing,
quality of life and environmental wellbeing.
An important component of a CBA is a base situation which is a situation when no changes
take place. All decisions are then compared to the base situation. Once the base and a
relevant time period are established, benefits and costs can be calculated in terms of human
and environmental well-being. In this case, a benefit is defined as anything that increases
human well-being, and a cost is anything that decreases it. CBA aims to maximize economic
efficiency at a point where marginal benefits and marginal costs are equal.
9.2 APPLICABILITY OF CBA AND SUMMARY
During the scoping/ ToR stage, no recommendation of environmental cost benefit analysis
was suggested by the appraisal committee. Hence specific environmental Cost Benefit
Analysis is not carried out in preparing in this EIA report.
Environmental monitoring and management cost are adequately described in Chapter 6
(Environmental Management program) and Chapter 10 (Environmental Management Plan).
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 274
10 ENVIRONMENTAL MANAGEMENT PLAN
Description of the administrative aspects of ensuring that mitigative measures are
implemented and their effectiveness monitored, after approval of the EIA.
The Environmental Management Plan (EMP) constitutes an important part of the EIA report.
The main purpose of EMP is to minimize the identified potential environmental impacts to be
generated from the proposed project and to mitigate the consequences. UPL Limited on
basis of the impacts identified, sets targets to reduce the negative impacts, plans and
decides action plan to achieve the target effectively and efficiently. EMP ensures an effective
implementation methodology and alternatives for mitigation measures
planned/recommended to reduce or eliminate the adverse impacts to maximum possible
extent during the operation of the proposed project.
10.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP)
As mentioned in earlier section, EMP is a system to address potential adverse impacts, to
instruct project proponent to introduce standards of good practice to be adopted for all
project activities.
10.1.1 Objectives of EMP
Following are long-term objectives of the Environmental Management Plan for all the
environmental attributes:
To comply with all the regulations stipulated by Central /State Pollution Control
Boards related to applicable laws.
To create good working conditions.
To encourage support and conduct developmental works for the purpose of
achieving environment standards and to improve methods of environment
management.
Streamline environmental activities to add value to efficiency and effectiveness.
To encourage and achieve highest performance and response from individual
employees and contractors.
To plan out the complete strategy to take care of stakeholder engagement.
To contribute significantly for sustainable development
10.1.2 Environment Management Plan
Based on the mitigation measures provided for the anticipated environmental impacts and
environmental management plan is prepared. Description of administrative aspects like role
and responsibilities in the following table are elaborated for ensuring that mitigative
measures are implemented and their effectiveness is monitored as planned. Environment
management plan is prepared for valued environmental components like air, water, land,
human being and ecology.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 275
Details of identified aspect due to proposed activities in the project and its management plan
are given in Table 10.1.
Table 10.1: Environmental Management Plan
S.No
Identified Aspect Impact Zones
Mitigation Measure Effectiveness Responsib
ilities
Air Environment
1 Dust generation from excavation activities
Within project site
Regular water sprinkling will be done and Dust mask will be
provided
Monitoring records of Ambient Air quantity
Ensuring PPE are used by workers through Permit of
Work System
EHS Manager
2
Emission of HC, CO, NOx & PM from
vehicular transportation during construction phase
Within project site and along
transportation route
Maintaining the speed limit of vehicle &
Tarpaulin covering of all transporting
construction materials. Use of only PUC certified vehicles
Verifying valid PUC of vehicle entering the premises and tarpaulin cover
checklist mentioning the same in work
orders.
Security Guard
3 Emission of HCL,
Cl2, Ammonia.
Within 0.5 km near Process
Area
Water Scrubber and Caustic Scrubber will be provided to control
the emission within norms
Ensuring proper functioning of Wet scrubber through
Internal & MoEF&CC Approved Laboratory emission monitoring
on regular basis
EHS Manager
4 Fugitive Emissions of
Solvents
Within 0.5 km near Process
Area
Vapor/Solvent recovery system shall
be provided
Ensuring proper functioning of Vapor/Solvent
Recovery System though detectors
EHS Manager
5
Emission of Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic
traces, HCN
Within 0.5 Km from
DG set and process
area
Water/Caustic/Acid Scrubber, fume gas Incinerator, Bag filter
will be provided to control the emission
within norms & Usage of Clean fuel
Efficient working of pollution abatement system through third
party emission monitoring on regular
basis
EHS Manager
6
Emission of HC & CO from vehicular
transportation during operational phase
Within project site and along
transportation route
• Maintaining the speed limit of vehicle
transporting raw materials through tarpaulin covering. • Use of only PUC certified vehicles
Verifying valid PUC of vehicle entering the premises and
mentioning the same in work orders.
Security Guard
Noise
1 Disturbance to
Habitat due to Noise generation
Within 0.5km from project site
Use of properly certified, tested and
calibrated equipment
Third party noise monitoring on regular
basis
EHS Manager
2 Noise generation
from D.G Set
Within 500 m from DG
set and process
area
Acoustic enclosures would be provided. DG
set will be used only during emergencies
Noise monitoring on regular basis by
Internal & MoEF&CC Approved Laboratory
EHS Manager
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 276
S.No
Identified Aspect Impact Zones
Mitigation Measure Effectiveness Responsib
ilities
Water and Wastewater
1 Sewage generation during construction
phase
Toilets, Washroom
s in the plant
Sewage will be treated in STP / Soak Pits
--- Site
Manager
2 Wastewater
Generation from process
Production area
WW from process partially will be reused back in process and
partially will be treated in RO,MEE & ETP
Online Continuous Monitoring at Treated
Water Discharge Line & Internal as well as MoEF&CC
Approved Laboratory testing of Treated Waste Water on regular basis for
parameters given by CPCB/SPCB
EHS Manager
3 Consumption of fresh
water
Production and utility
area
Recycling of water & RWH practice to
reduce the need of fresh. Check water
consumption through flow meters
EHS Manager
4
Generation of wastewater from
Cooling and Boiler Blow Down
Production area
Effluent will be treated in proposed ETP and sent to RO. No waste
water will be discharge outside the premises
EHS Manager
5
Generation of wastewater during
equipment and floor washing
Washing Area
Effluent will be treated in RO,MEE & ETP
EHS Manager
6 Sewage generation during operational
phase
Toilets, Washroom
s in the plant
Sewage will be treated in STP and treated
water will be used for gardening
EHS Manager
7
Contamination of surface water, soil
and biodiversity during stormwater
runoff
Within project site
Separate stormwater drains will be provided
to avoid mixing of storm water with
process area
Ensuring provision of separate storm water
drains
EHS Manager
Land Environment
1 Removal of top soil
during site clearance Within site premises
Top soil will be stacked separately and will be used for
greenbelt development and filling low lying
area
Ensure stacking of soil and using the
same for plantation within site premises
EHS Manager
2
Spillage and Leakage of Raw Material/ Product
during manufacturing process
Production area
The area will be paved to avoid the mixing of
spillage or leakage into soil
Ensuring paved production area
EHS Manager
3
Contamination of surface water, soil
and biodiversity during stormwater
runoff
Within project site
Separate stormwater drains will be provided
to avoid
Ensuring provision of separate storm water
drains
EHS Manager
Hazardous and Solid Waste
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 277
S.No
Identified Aspect Impact Zones
Mitigation Measure Effectiveness Responsib
ilities
1 Generation of debris
from excavation activities
Within site premises
Debris will be reused in filling low lying area
Inspection for full use of debris for leveling within site Ensuring good housekeeping
EHS Manager
2 Generation of C&D
Waste Within site premises
C&D waste will be disposed as per C&D Waste Management
Rules 2016
Ensuring C&D waste is disposed as per
C&D waste management Rules
2016
EHS Manager
3
Spillage and Leakage of Raw Material/ Product
during manufacturing process
Production area
Manufacturing process will be carried out in
closed system
Ensuring provision of closed system for
manufacturing process
EHS Manager
4 Generation of
hazardous waste from process
Production area
HW will be disposed off as per HW
management Rules, 2016
To ensure minimum spillage and
leakages and regular cleaning of the area
EHS Manager
5
Generation of used oil and lubricants from equipment
maintenance activities during
operational phase
Utility area
Used oils and lubricants will be handed over to
registered re-refiners
To ensure that used oils and lubricant are
sold to authorized dealers
EHS Manager
6
Generation of scraps and used spares etc.
from equipment maintenance
activities during operational phase
Within site premises
Scraps will be handed over to authorized
dealers
To ensure waste generated stored properly, records
maintained and to be sold within stipulated
time
EHS Manager
7 Generation of
Discarded drums/bags
Within site premises
Waste Drums/Barrels/bags
and containers will be handed over to
authorized decontamination
facility
To ensure waste generated stored properly, records
maintained and to be disposed within stipulated time
EHS Manager
8 Generation of ETP sludge and MEE
Salts ETP Area
ETP & MEE Sludge will be disposed to
TSDF Site
To ensure waste generated stored properly, records
maintained and to be disposed within stipulated time
EHS Manager
10.1.3 Compliance Monitoring
Monitoring of the compliance of the conditions as stipulated in CC&A is complied.
1. CC&A: Environment Head will ensure that conditions as mentioned in CC&A are duly
complied regularly and will ensure its effectiveness by periodic monitoring.
2. Post EC condition compliance will be ensured, and six-monthly compliance reports will
be submitted to regional office MoEFCC of the region.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 278
10.1.4 Cost for Environment Management System
Cost of the proposed project is Rs. 1491.85 Cr. Out of this Rs. 204.50 Cr. will be used for
cost of Environmental Management System. Break-Up of EMS capital and Recurring is
provided in Table 10.2
Table 10.2 : Proposed Capital Cost & Recurring Cost for EMS
Group Particulars
Proposed Capital Cost
Proposed Recurring Cost of
EMS / Annum
Cost (In Lakh) Cost (In Lakh) /
Annum
Environment
Air Pollution Control Measure (APCM) (Bag filter, Multi cyclone separator,
water scrubber, scrubber systems for process emissions),
1200 16
Effluent treatment plant (ETP) 1000 KLD
12320 1000 MEE Plant
Sewage Treatment Plant (STP) 80 KLD and their accessories,
Construction of stormwater network
Acoustic enclosures for utility housing, D.G set
2 2
Installation of online monitoring systems, detector systems, CEMS, Odour Control Measures, inhouse
monitoring and analytical facilities, third party monitoring arrangements
23 10
Plantation, irrigation, fertilizers and pesticides
143 150
Augmentation of storage areas for different types of wastes in compliance
with the HW rules together with necessary infrastructure and equipment for collection and transport, incineration
plants
6762 10
Total 20450 1188
10.2 ENVIRONMENT IMPROVEMENT
10.2.1 Green Belt Development
Existing Greenbelt:
For Green Belt Development, the company has already allotted 263005 m2 of the total land,
i.e. 34.81% in its existing project.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 279
This plan is based on an assessment for listing all species that suit the soil and water
properties of the area based on the following:
CPCB guidelines for green belt development
Native species observed in the terrestrial survey of baseline study for the project
The unit will develop greenbelt along the periphery of the site & internal road sides. Details
of the areas allotted for greenbelt within the premises is provided in
Table 10.3: Areas identified for Green Belt for Development within the plant site
Area Area sq. m
At the periphery of MP- 4 plant 38564.80
At the periphery of MP – 2 and adjacent to parking area 57558.56
Between MP – 4 Plant and well 18395.00
Along the periphery near coal & ash storage, ETP, PP-1,2,3 & incineration units-1,2,3
50406.55
Near parking area and security office (Gate-4) 9632.51
Near parking area (Gate-3) 52265.01
Between parking area and canteen (Gate-2) 35366.58
Near canteen and security office 816.15
Total 263005.16
(34.81% of site area)
Type of Plantation:
Along internal roads : Plantation need to be done in 3 lines i.e. first line of only flowering
herbs/shrub, second line should be of shrub/hedge in close spacing and along the road a
row of small trees.
Along the periphery : Tall trees with good canopy at a height of 5 m onwards and total height
at least 20 m shall be planted at a spacing of 2.5 m x 2.5 m and giving a density of 1500
trees per hectare.
At open land area : Small to large trees planted at a spacing of 2.5 m x 2.5 m and giving a
density of 1500 trees per hectare
The following points will be considered for selection of plants species to be grown:
Greenbelt absorbs both gaseous as well as particulate pollutants to a great extent.
Thus, removes/reduce pollutant from the atmosphere. For absorbance of gases, the
duration of the foliage should be longer.
Characteristics of tree/plants including shapes of crowns considered necessary for
effective removal of dust particles.
Greenbelt/Plant species having good root system will be selected, so that soil erosion rates
can be controlled significantly
Details of tress species to be planted considered in existing project is provided in
Table 10.4
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 280
Table 10.4: Details of Trees and Shrubs Species
S. No. Area Suitable Species For Green Belt
Scientific Name Common Name
1 At Coal Yard
and Ash silos (Existing project)
for Coal dust (Existing project)
Fly Ash (Existing project)
SO2, NOx
Citrus lemon Limbu
Acacia catechu Khair
Ixora coccinea Ixora
Euphorbia neriifolia Thor
Clerodenron phlomoides Arni
Tree:
Ficus benghalensis Banyan tree
Mangifera indica Mango tree
Aegle marmelos Bili
Ficus religiosa Peepal Tree
Tectona grandis Sag
Butea monosperma Khakharo
Terminalia arjuna Arjun
Ficus elastica Indian Rubber Tree
Acacia auriculiformis Australian Baval
Terminalia catappa Badam
Acacia nilotica Baval
Albizia procera White siris
Azadirechta indica Neem tree
Eucalyptus hybrid Mysore gum
Gliricidia sepium Mexican lilac
Pithecellobium dulce Goras Amli
Dalbergia sisoo Sisam
Casuarina glauca Sharu
Cocos nucifera Coconut tree
2 Process emissions and fugitive emissions from tank farms
Suspended particulate matter(SPM)
Shrub:
Calotropis procera Ankado
Calotropis gigantea Moto Ankado
Plumeria rubra Champa
Hibiscus rosa-sinensis Jasood
Thevetia peruviana Pili Karen
Nerium indicum Karen
Lantana camara Lantana
Lantana salvifolia Bhuru lantana
Tree:
Acacia nilotica Baval
Aegle marmelos Bili
Azadirecta indica Neem tree
Butea monosperma Khakharo
Cassia fistula Garmala
Eucalyptus camaldulensis River red gum (Nilgiri)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 281
S. No. Area Suitable Species For Green Belt
Scientific Name Common Name
Eucalyptus moluccana Grey box (Nilgiri)
Eucalyptus globules Nilgiri
Ficus benghalensis Banyan tree
Ficus religiosa Peepal Tree
Mangifera indica Mango tree
Phoenix dactylifera Khajuri
Albizia procera White siris
Dalbergia sisoo Sisam
Casuarina equisetifolia Jangli saru
Moringa oleifera Saragvo
Sulphur dioxide (SO2)
Shrub:
Lantana camara Lantana
Lantana salvifolia Bhuru lantana
Tree
Acacia nilotica Baval
Aegle marmelos Bili
Alstonia scholaris Saptaparni
Azadirecta indica Neem tree
Butea monosperma Khakharo
Cassia siamea Kasid
Diospyros melanoxylon Tendu
Emblica officinalis Amla
Eucalyptus camaldulensis River red gum (Nilgiri)
Eucalyptus moluccana Grey box (Nilgiri)
Eucalyptus globules Nilgiri
Salvadora oleoides Piludi
Salvadora persica Piludi
Ficus benghalensis Banyan tree
Ficus religiosa Peepal Tree
Moringa oleifera Saragvo
Polyalthia longifolia Asopalav
Psidium guajava Jamphal
Syzygium cumini Jambu
Tamarindus indica Imli
Pithecelobium dulce Goras Amli
Dalbergia sisoo Sisam
Albizia procera White siris
Casuarina equisetifolia Jangli saru
Holoptelia integrifolia Khanjho
Zizyphus mauritiana Bordi
Delonix regia Gulmohar
Nitogen oxide (NOx)
Shrub:
Lantana camara Lantana
Lantana salvifolia Bhuru lantana
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 282
S. No. Area Suitable Species For Green Belt
Scientific Name Common Name
Tree:
Acacia nilotica Baval
Aegle marmelos Bili
Alstonia scholaris Saptaparni
Azadirecta indica Neem tree
Butea monosperma Khakharo
Delonix regia Gulmohar
Diospyros melanoxylon Tendu
Emblica officinalis Amla
Ficus benghalensis Banyan tree
Ficus religiosa Peepal Tree
Holoptelia integrifolia Kanju
Mangifera indica Mango tree
Moringa oleifera Saragvo
Polyalthia longifolia Asopalav
Psidium guajava Jamphal
Syzygium cumini Jambu
Tamarindus indica Imli
Zizyphus mauritiana Bordi
Pithecelobium dulce Goras Amli
Eucalyptus camaldulensis River red gum (Nilgiri)
Eucalyptus moluccana Grey box (Nilgiri)
Eucalyptus globules Nilgiri
Salvadora oleoides Piludi
Salvadora persica Piludi
Albizia procera White siris
Dalbergia sisoo Sisam
Casuarina equisetifolia Jangli saru
Photograph 10.1: Existing Greenbelt development within the Premises
Plantation of saplings and plants at existing site
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 283
A model showing vie of Plant after cosntruction
Budget Allocation for Existing Greenbelt already considered within Project Site
Total 39500 trees to be planted for green belt @ tree density of 1500 trees per hectare.
Details of budget breakup allotted for greenbelt development is provided in Table 10.5
Table 10.5: Budget Allotted for GBD in existing project
S. No.
Particulars
Basis of estimation
Capital Cost
Basis of estimation
Additional Recurring Cost Per Annum
No. of trees / sq. m
Unit Rate per tree or per sq. m
(Rs. In lac) Unit Rate per tree or per sq. m
[Rs. In lac]
1 Saplings 39500 100 40 5% of new saplings to
be re-planted 1.98
2 Plantation services
39500 25 10 20 0.4
3
Maintenance services (watering, trimming, weeding)
39500 - - 15 75
4 Fertilizers
and pesticides
39500 4 2 5 2
5 Soil filling 263005 5 13 - -
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 284
S. No.
Particulars
Basis of estimation
Capital Cost
Basis of estimation
Additional Recurring Cost Per Annum
No. of trees / sq. m
Unit Rate per tree or per sq. m
(Rs. In lac) Unit Rate per tree or per sq. m
[Rs. In lac]
6 Irrigation
layout 263005 30 78.9
Repair and replacements
@ 1% of total layout
0.79
TOTAL :- 143 88
Plantation Technique and Care
Plantation Technique
Following basic procedures need to be followed for greening the area.
Since the project area having poor / slightly saline soil quality, plantation of tree species
required approx. 1m3 pit for soil enrichment
Pit should be filled with imported soil with 3:1:1 the ratio of sand, silt and form yard
manure.
Procure well grown saplings of recommended species from the nearby Forest
Department nursery
Make 1m diameter ring bund around the planted saplings for water retention
Watering of sapling is species specific, therefore watering need to be done daily in
monsoon and once in 2 days in other seasons for a period of two years.
Multi-layered plantation comprising of medium height trees (6-8m height) and shrubs (3-5m
height) will be proposed for the green belt.
Monitoring Protocol
The plantations need to be managed by regular watering, soil enrichment work,
applying manure, weeding and provide proper protection.
Replacement of sapling (replanting) required whenever mortality occurs in the
plantation during the growth stage.
Plantation requires after care for a period of minimum five years till the saplings attain
matured tree stage.
Plantation outside the premises:
Proponent will also plant new trees on GIDC roads in consultation with GIDC. Species
planted shall be dust absorbers, SO2 and NOx absorber species.
10.2.2 Rain Water Harvesting Scheme
To quantify the amount of water that can be harvested and utilised after collection, three
values are used. These are Mean Annual Rainfall, Catchment area and Rainfall run-off
coefficient.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 285
Table 10.6: Areas considered for roof-top rainwater harvesting
S. No.
Location of Roof Area Area in sq. m
1 Administrative block 4636
2 QC lab 2000
3 Others (change room, wash room, internal passages, quarantine) 58608
Total 65244
Total roof top area available for rain water harvesting is 65244 m2. Considering 747.23 mm
annual average rain fall, the potential of roof top rain water harvesting would be
(65244*1*747.23) i.e. 4,87,52,274.12 L. Assuming that only 50% of this potential could be
stored, the quantity of water available in a year would be (0.5*4,87,52,274.12) i.e.
2,43,76,137.06 L/ year. The quantity of water available for a day would be (2,43,76,137.06 /
365) i.e. 66783.94 L/Day i.e. (66.783 kL/day). It is evident that the rainwater harvesting
potential is considerable and may be used for gardening and washing purposes.
Two HDPE tank are provided in Layout Plan to store 66.78 KLD of water during rainy
season. A storm water network plan of the project site is attached as Annexure 14
10.3 CONCEPT OF WASTE MINIMIZATION, RECYCLE, REUSE /
RECOVER, ENERGY CONSERVATION AND NATURAL
RESOURCE CONSERVATION
Details of Waste Minimization and Energy Conservation steps to be taken for existing &
proposed project is provided in Table 10.7
Table 10.7: Energy Conservation and Waste Minimization Measures
S. No. Particulars Measures
1 Steam
Generation
Burner to be Dual fired (Gas & Liquid Fuels)
Condensing Economizer for Waste Heat recovery from flue gases
Flow meter installation for feed water, steam & fuel
2 Steam
Distribution
Drip leg with steam trap for every 30Mtrs length and at every rise point
Steam Traps, Strainers, Air vent assembly and Moisture Separator
Only IB trap to be provided with desired quantity & pressure ratings
Insulation as per standard with skin temperature not more than 10 oC
from ambient
Condensate to be collected in closed loop and needs to returned to Boiler Section
3 Steam
Utilization
Individual flow meter for 1Ton per hour steam consumers
Install Moisture separator before Flow Meter & Ejector Inlet
Monitoring and recording of steam flow in DCS
Close loop temperature control system for all steam users / heating applications
4 Condensate &
Flash Steam Recovery
Install smokeless Flash recovery system from all condensate
Contaminated condensate after heat recovery to be sent to CT
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 286
S. No. Particulars Measures
5 Chiller Compressor
Evaporative Condenser instead of Conventional S&T condenser (If not packaged system)
Single Circuit system(Eliminating Primary pumps) - Pump ---> Process ---> Evaporator ---> Storage Tank
Motor to be VFD compatible
Provision of VFD if average load is 60% of installed capacity / Batch process
Provision of Flow meter & Temperature Transmitter's for TR Monitoring
Provision of suitable S.E.C (like KW/TR, SM3/TR, Kg/TR, etc.) monitoring & tracking system along with recording at Local / DCS
Insulation as per standard with skin temperature not less than 5deg. C from ambient
6 Air / N2
Compressor
Flow meter for Air / N2Generation
Drain trap for wet air reservoir
7 Cooling Tower
Approach to be 2.8 0C
Return pipe line be inverted U loop at plant side
RCC basin slope at 50:1 on opposite direction of pump suction
From the basin lowest point 6 inch drain valve to be provided to remove sludge
Provide Side Stream Filter with 3 to 5% of Circulation rate with differential pressure switch across filter bed
Makeup water flow meter with totalizer
Basin water level control system
RTD to measure supply temperature and plant return temperature
Pressure gauge at CT inlet line
FRP blades for CT Fan (Aero Dynamic)
Wet Bulb Temperature to be considered as 29 deg.C
8 Pumps & Blowers
Select duty point at Best Efficiency Point
Consider Coating for impeller& casing
Consider Mechanical Seal
9 Electrical
All motors to be VFD compatible
Energy Meter with communication facility to be provided for 50HP and above motors
Consider higher Energy Efficient motors
LED Lighting for vessels, building, plant& street lighting
10 General Chilled water as utility for all HE's which is having process temperature in between 15 to 40
oC
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 287
10.4 SOCIAL WELFARE & UPLIFTMENT PLAN/ CER
The company also proposes to carry out social welfare activities for the welfare of local
community. The company has proposed a detailed Corporate Environment Responsibility
(CER) Plan. Under this plan, the proponent has allocated a budget of Rs. 3.72 Cr. to be
spent within a span of 5 years in nearby villages. Activities under the following areas have
been identified and shall be carried out:
Education and Youth Development
Infrastructure Development
Miscellaneous activities
Social – Awareness
Health – Awareness
Existing Social Upliftment Plans of UPL
At UPL, Enterprise Social Commitment (ESC) programmes have been in practice since
decades. The goal of ESC is to be responsible for social activities and encourage a positive
impact through these activities on the environment, consumers, employees, communities,
stakeholders and all other related spheres. M/s. UPL Ltd is committed towards Social
Responsibilities, and it‘s a pleasure to involve in such efforts.
UPL Ltd. is continuously involved in various Socio-economic welfare programmes since
1969 with the inception of its manufacturing operations at Vapi, Gujarat which indicates an
active Enterprise Social Commitment (ESC) over the last five decades. The group has
central ESC team for planning and execution of ESC activities.
Five Year ESC Planning
As per latest OM F. No.22-65/2017-IA, dated 1st May, 2018, the fund allocation for the CER
is Rs. 3.72 Cr. (0.25% of Additional Capital Investment of Rs. 1491.85 Cr. for undertaking
the Socio Economic development activities. Further, a deep need analysis study will be
conducted to clinically understand the need of society, to estimate their causes and to make
action plan for addressing those needs.
Six Key focus areas of UPL’s ESC:
1. Agriculture Development
2. Health & Sanitation
3. Environment & Nature Conservation
4. Education & Empowerment
5. Employability & Entrepreneurship
6. National & Local Area needs
1. Agriculture Development (UPL Khedut Pragati)
UPL Khedut Pragati Program is an Agriculture Development initiative implemented by the
ESC department of UPL limited. This Programme is mainly focused on agriculture
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 288
development because agriculture is the backbone of rural India. More than 70% of the total
population is dependent directly or indirectly on agriculture for its subsistence. Considering
the situation surrounding area, multiple agriculture projects will be carried out under the
umbrella of ―UPL Khedut Pragati‖
UPL Khedut Pragati will be based on making the agriculture more sustainable and profitable
venture for the farmers through increasing the yield of agriculture produce, reducing the cost
of cultivation and better management of natural resources. The Program/Intervention
UPL Khedut Pragati Program 4000 Farmer Families have been benefited under ESC as per
details given below:
Table 10.8: UPL Khedut Pragati Program
Program/Intervention Duration Program Reach (Till Date)
UPL AKRSP SRI Project 4 Years 1500 Farmers/21 Villages
Dang Paddy Development Program 3 Years 354 farmers/10 Villages
Agriculture initiatives at Ankleshwar 2 Years 500 farmers
UPL Centre for Agriculture Excellence 15 Years 13,082 farmers
UPL Bori Bagicha Project 2 Years 928 farmers/10Villages
Dang Moringa development Program 2 Years 104 farmers/9 villages
Agriculture Project with Co-operative -Valsad
1 Years 1000 FARMERS/16 Villages
Agriculture Development Program 1 Years 208 farmers
Vandri Cluster Development Project 1 Years 400 farmers
2. Health and Sanitation
UPL will work on its School Sanitation Programme by making toilet blocks in surrounding
schools and health programme by medical facilities and nursing education. UPL‘s Health
and Sanitation programme details under ESC are given below:
Table 10.9: Health & Sanitation
Program/Intervention Duration Program Reach (Till Date)
Rotary Hospital, Vapi 40 years OPD Patient/Year: 45,000 To 50,000 IPD Patient/ year:10,000 TO 12,000
Sandra Shroff ROFEL College of Nursing, Vapi
13 years 55 students/year
UPL School Sanitation Program 2 years 3000 students and 3000 commuters/day
3. Environment & Nature Conservation (Vasudha Programme)
The strategy envisaged for Nature Conservation is called as UPL Vasudha Programme.
Vasudha in Sanskrit means the Mother Earth, the giver of wealth. The UPL Vasudha
Programme is aiming for integrated nature conservation project involving all stakeholders.
UPL Social Forestry - To enhance the biodiversity by increasing the
forest cover which will give sustainable livelihood opportunity to local
community‖.
Eco Club Project - This is an initiative to make the young generation
aware about the importance of protecting nature and maintaining
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 289
ecological balance. These clubs are formed in schools and students participate in
environment related activities through these clubs.
UPL Niyojan Yojna -
This center started in the year of January 2017 partner with The Center for Entrepreneurship
Development (GoG) thru GIDC Trade: Sheet Metal Worker (Fitter & Welder)
Table 10.10:Details of Placement after Training on Sheet Metal Works
S. No
Trade
Number of Students (Till March 2019)
Mobilized Enrolled Passed Placed NCVT NCVT PASS
1 Sheet Metal Worker (Basic
Fitter) 60 18 18 12 18 18
2 Sheet Metal Worker (Basic
Fitter) 60 20 20 12 20 20
3 Sheet Metal Worker (Basic
Fitter) 80 20 20 13 20 20
4 Sheet Metal Worker (Basic
Welder) 50 15 12 10 14 14
5 Sheet Metal Worker (Basic
Welder) 50 20 20 12 20 20
6 Sheet Metal Worker (Basic
Welder) 50 23 23 16 23 23
Year Total 350 116 113 75 115 115
Table 10.11: CSR activities carried out in and around Bharuch District
S. No.
CSR project/activity identified
Sector in which the project is covered
Projects/Programme Amount spent Direct or through
implementing agency*
Local areas/others
State/district
1
Shroff S. R. Rotary Institute of Chemical Technology (SRICT)
an institution specializing in
chemical technology to provide the specific needs of the Chemical
Industry in Gujarat
Promoting Education
At & P – Vataria 393135
Tal – Valia
District – Bharuch, Gujarat
Ankleshwar Rotary Education
Society
2
UPL Niyojaniya Kendra is a Skill
Development center to provide industry-specific skills like
Chemical Operator, Fitter, Electrician,
Plumber etc
Livelihood Enhancement
Makarpura District - Bharuch, Gujarat
S R Shroff Aajivika Trust
(SRSAT)
3 UPL KhedutPragati
Project for promotion of intermediate
Livelihood Enhancement
Villages around
Jhagadia
District - Bharuch, Gujarat
S R Shroff Aajivika Trust
(SRSAT)
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 290
S. No.
CSR project/activity identified
Sector in which the project is covered
Projects/Programme Amount spent Direct or through
implementing agency*
Local areas/others
State/district
technology, Kitchen Garden, Drumstic
promotion etc.
4
Model Village Project - Development
Support to community around factory
location. Support like School bag and book
provisioning, Infrastructure support, Medical Support etc.
Rural Development
AT & PO - Jhagadia
District - Bharuch, Gujarat
Direct by Company
5
UPL Vasudha Project for nature
conservation involving various stakeholders
by creating awareness.
Environment Sustainability
AT & PO - Jhagadia
District - Bharuch, Gujarat
S R Shroff Aajivika Trust
(SRSAT)
6
UPL Suraksha Abhyaan
1) for Industrial Training Institute (ITI) to create awareness
among ITI students on Occupational Health &
Safety especially in chemical industry.
2) For Girls safety to create awareness in
school children to safeguard the girl
child against any kind of exploitation and sexual harassment
Special Education
AT & PO - Jhagadia
District - Bharuch, Gujarat
Direct by Company
Table 10.12: Details of Environment & Nature Conservation (Vasudha Programme) under ESC
Program/Intervention Duration Program Reach (Till Date)
Eco Club Project 3 years 5000+students
Sarus Conservation Project, Vadodara 2 years 3500 students and 1000 villagers
UPL Social Forestry Project 1 years 48,736 tree sapling and 1,20,000 mangrove sapling planted
4. Education & Empowerment
UPL will go for School Development Programme and will have provision for infrastructure
support to government school to enhance the access and to provide enabling condition for
quality education. Details of Education & Empowerment programme under ESC are given
below:
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 291
Table 10.13: Education & Empowerment
Program/Intervention Duration Program Reach (Till Date)
Smt. Sandraben Shroff GyanDham School, Vapi 16 Years 1600 students / year
Gnyan Dham Eklavya Model Residential School, Vapi
5 Years 350+students / year
Smt. Pushpavati Devidas Shroff Sanskardeep Vidyala Ankleshwar
16 Years 1140 students/ year
Shroff ‗s Rotary Institute of Chemical Technology (SRICT), Vataria, Ankleshwar
4 Years 330+ students / Year
GIDC Rajju Shroff ROFEL Institute of Management Studies(GRIMS), Vapi
18 Years 120 students/ year
Mobile EducationVan Project, Ankleshwar 16 Years 34 Villages
5. Employability & Entrepreneurship
The small scale industry plays a pivotal role in rural economy in terms of employment. Our
project area has large segment of population which is illiterate and unemployed. Lack of
opportunity makes them incapable to take up jobs so we have started supporting through
Skill based Entrepreneurial training.
Under the Thematic focus of Employability & Entrepreneurship, UPL have formed women
Self Help Group (Jai Yogeshwar Mahila Mandal) to build the capacity of tribal women at
Kachhigam, Block Umargam, District Valsad. UPL have organized Entrepreneurial Skill
Development programme on Artificial Jewellary in association with Utkarsh Mahila
Association. The key topics covered in the programme were Career and Scope, types of raw
materials, types making instruments, type of products (Mangal Sutra etc.) costing,
entrepreneurial and marketing topics.
Table 10.14: Details of Employability & Entrepreneurship Programme under ESC:
Program/Intervention Duration Program Reach (Till Date)
Skill Development Initiative UPL Niyojaniy Kendra
3 Years 817 youth trained and placed
UPL Udyamita 3 Years 1141 women members
Skill Based Entrepreneurial Development Program
3 Years 783 participants
UPL Goatery Project 1 Years 40 families
6. National and Local Area Need
Being a responsible corporate citizen, UPL always respond to address the local area need
by undertaking development initiative to help our community grow. We do all need based
activity for community around our factory sites. UPL focus areas will include:
Response to Natural Disaster
Suraksha Abhiyan (Road safety, Girl Safety and Industrial Safety)
Support of Non-Financial Aid
Any other Development Activity
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 292
Table 10.15: Details of national and other area need programme under ESC
Program/Intervention Duration Program Reach (Till Date)
Industrial Safety Training 3 years 1976 students
Girl Safety Training 3 years 9938 Girls
Road/ Highway Safety Training 2 years 8173 students
Home Safety Training 1 year 292 women
UPL Goatery Project 1 year 40 families
UPL Unnati 1 year 6 community-based organizations
Global Parli Project 1 year 15 villages
National Day Celebration
(15th August & 26
th January)
Annual Nayak Faliya,Ghodi, Nurpura & Rampura
Photographs of Existing CER/CSR activities are provided in Photograph 10.2
Photograph 10.2: Photographs of Existing CER/CSR Activities carried out by UPL Limited
BEFORE
After
Construction of New School Building at Village Kadodara
Social Forestry Plantation at Village Kadodara, Vav, Padaria and Paniadara
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 293
Mangrove Plantation at Dahej Coastal Belt
Bi-Cycle Distribution to Students At Janiadara Village
The proposed expansion project of existing UPL plant will provide direct employment to the
people of the area and thousands will get business opportunity to feed the demand of project
and the people working for the project. Small market will be developed to feed daily demand
of the people working for the proposed project. People will get medical, education and
business opportunities. UPL will conduct need based survey in the area under supervision of
local panchayat and district administration. The needy person will be supported as per
requirement. This will improve infrastructure and economic status of the people living in the
area. Other project proponent will take advantage of developed infrastructure of the area to
set up industry which will further improve infrastructure and economy of the area.
Corporate Environment Responsibility (CER)
As per latest OM F. No.22-65/2017-IA, dated 1st May, 2018, the fund allocation for the CER
is Rs. 3.72 Cr. (0.25% of Additional Capital Investment of Rs. 1491.85 Cr. for undertaking
the Socio Economic development activities. Budget with break up for five years is provided
in Table 10.16.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 294
Table 10.16: Budget Break-up for CER Activities of 5 years
Year
CER Initiatives For Surrounding 10 Villages
UPL Niyojaniy
(Skill Development)
UPL Khedut Pragati
(Agriculture Development)
UPL GramPragati (Emerging Local area
need)
UPL School Sanitation (Toilet Blocks in School)
School Development Programme
UPL Vasudha Programme (Nature Conservation)
GRAND TOTAL UPL Social
Forestry
(Tree Plantation)
UPL Mangrove Plantation
Village Name: Vadadla,Kadodara, Padariya, Ambethi, Vav, Paniadara, Janiadar, Goldara, Galenda, Dahej
Year 1 0.12 0.2 0.02 0.12 0.08 0.08 0.14 0.76
Year 2 0.1 0.2 0.02 0.12 0.08 0.08 0.14 0.74
Year 3 0.1 0.2 0.02 0.12 0.08 0.08 0.14 0.74
Year 4 0.1 0.2 0.02 0.12 0.08 0.08 0.14 0.74
Year 5 0.1 0.2 0.02 0.12 0.08 0.08 0.14 0.74
Grand Total 0.52 1 0.1 0.6 0.4 0.4 0.7 3.72
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 295
10.5 OCCUPATIONAL HEALTH OF WORKERS
10.5.1 Noise
Noise will be regularly monitored at plant boundary and near high noise generating
equipment against workplace monitoring requirement as per Factory Act.
All Workmen working in high noise areas are/ will be provided with ear plug, ear muff etc.
where noise levels excess of 80 dbA.
10.5.2 Heat
The project does not envisage conditions that could lead to excess heating. Consequently,
special requirements for protection against heat stress are not anticipated. However, the
following shall be carried out:
Ventilation shall be provided to take care of heat evacuation. An air-exchange ratio of at
least 6 will be maintained at all times
Drinking water availability shall be ensured at several locations within the plant to ensure
workers have easy access to the same
In case of occasional handling of heated equipment or materials, suitable PPEs such as
heat resistant gloves will be used.
10.5.3 Dust, other Chemicals and Metals being suspended in the
Environment
Workmen are/ will be provided with appropriate PPEs, like nose musk / nose respirator,
gloves, helmets, protective uniform and clothing, eye protections etc.
10.5.4 Occupational Hazards specific Pre-Placement and Periodical Health
Checkup
As per policy and norms all of the workmen are/ will be put to medical examination
periodically as per Factory Act and based on the medical report actions is/ shall be taken.
10.5.5 Occupational Health Centre
OHC is declared near main gate and factory medical officer shall visit schedule is once in a
week. The OHC shall have necessary equipment and arrangements for first-aid treatments.
The OHC shall be manned with Medical assistant and trained first-aiders round the clock.
List of trained first aider which is trained approved organization shall be kept in all ECC as
well as in OHC and safety notice board to get help in organizing for medical help major
problem.
Antidotes for major chemicals handled by the unit are identified and listed as follows. These
shall be made available at OHC.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 296
10.5.6 Plan and Fund allocation for Occupational Health and Safety measures
Appropriate fund allocation shall be done for implementing Occupational Health and Safety
measures as delineated in Safety Manual and standard procedures and directions.
Towards management of occupational health and safety in the unit, provisions to be made
for maintaining an efficient system are described hereunder:
Safe and ergonomic design and layout of plant, machinery, tools and control equipments keeping in view the safety and pollution prevention in mind.
Effective pollution control measures for land, water and air.
Process equipment designed and fabricated as per standards for safe and efficient working
Proper handling of all spillages by introducing spill control procedures for various chemicals.
Hazardous Zone Classification done for entire site
Sufficient parking area with unidirectional vehicular movement with separate entry and exit.
Two or more staircases on each floor in all high rise buildings (more than four floors).
Sufficient lighting, ventilation, drinking water facility, sanitary blocks, firefighting and first aid arrangements.
Work permit system for specific task
PPE as per operations shall be provided and it shall be ensured that workers make proper use of PPE
Regular workplace monitoring as per GFR to be carried out and records maintained in prescribed form 37.
Explore methods for reducing the fugitive emissions.
Hazardous chemicals stored in their respective specified area.
Material safety data sheet for all the concerned materials to be available at the site.
Adequate firefighting equipment provided at relevant areas.
Fire alarms and LEL detectors to be installed in process plants and storage areas.
Emergency telephone numbers displayed at required places.
Regular Safety audits shall be conducted by internal team as well as third party in compliance with GFR
Planned schedule for inspections of safety devices shall be followed and records shall be maintained.
On-site emergency plan to be prepared and upgraded periodically.
Separate ways / gates for entry and exit in project premises.
Since there are more than one main raw material for many of the products, it is suggested to implement stringent three level permit system for raw material issue from warehouse and tank farms before indenting in process plants to minimize disoperation‘s and batch failures due to miscommunication or operator flaws and errors. A good record keeping practice should be maintained. Store activities need to be given due importance and handled by qualified personnel.
Ensure that the transporters of hazardous chemicals are provided with PPE and carry TREM cards during transportation.
Approach distance to any staircase shall not be more than 30 mt on each floor.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 297
10.6 ENVIRONMENTAL MANAGEMENT CELL
The company is/ will have a system of reporting of non-compliances / violations of
environmental norms to the Board of Directors of the company and / or stakeholders at
large. The reporting mechanism is detailed in this section.
Organogram of environment management cell is as shown in Figure 10.1
Figure 10.1: Organogram of Environment Management Cell
10.6.1 Integrated management system policy (Covering Responsible care,
Quality, Environment, Occupational Health, Safety and Energy)
UPL limited, engaged in the business of Pesticides, Chemicals and industrial Products are
committed to customer satisfaction, guiding principles of Responsible Care and continual
improvement in our integrated Management System and performance.
To achieve this, we commit ourselves to:
Comply with all applicable legislation and other requirements to which we
subscribe;
Conserve natural resource water, raw materials and promote the development of
green surroundings;
Incorporate suitable technologies & method for improvement in quality, energy
efficiency & protection of environment including prevention of pollution and
prevention of injury & ill health.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 10 298
Eliminate, minimize or control the environmental aspects as well as occupational
health and safety (OHS) hazards and risks;
Provide high degree of safety promotion and encourage safe behavior among all;
Proactively monitor the incidents, unsafe conditions, unsafe acts, hygiene as well
as promptly report and act on such conditions;
Ensuring availability of information and all necessary resources to achieve
objectives & targets Comply work procedures with self-discipline and hold everyone
accountable for their responsibility;
Promote & support procurement of energy efficient system and usage of renewable
energy, Wherever feasible;
Strengthen awareness, skills and competence of employees and contractors'
workmen and foster dialogue with vendors, customers and community.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 299
11 SUMMARY AND CONCLUSION
11.1 PROJECT DESCRIPTION
Introduction
UPL Limited proposes expansion and addition of new products at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch,
Gujarat.
Background
UPL Limited proposes expansion and addition of new products at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch. The
project received Environmental Clearance from Ministry of Environment, Forest and Climate
Change vide letter no: F.No. IA-J-11011/306/2016-IA-II(I) dated 1st March 2019.
Consent to Establish is granted by Gujarat Pollution Control Board vide CTE No.
PCB/BRCH-B/CTE-399/ID-53667 dated 11.01.2019 and the project is presently under
construction phase.
The project has received Consolidated Consent and Authorization for repackaging of
Aminoacetonitrile Sulfate (AANS) with Consent order No. AWH-100737 dated 15.04.2019.
Due to change in market scenario, UPL limited wants to go for addition of new products and
expansion in capacity of EC Granted Speciality Chemicals products under Intermediate and
Specialty chemicals category only.
Project Site Location
The proposed expansion will be undertaken within the existing site at Plot D-3/6, Dahej - III,
GIDC Estate (Within PCPIR Region), Kadodara Village, Taluka Vagra, District Bharuch
,Gujarat.
Project Cost and Project Schedule
Cost of the proposed project is Rs. 1491.85 Cr. Out of this Rs. 20.450 Cr. will be used for
cost of Environmental Management System.
The CSR/CER cost will be Rs. 3.72 Cr. (0.25% additional capital investment of total project
cost). Project will be commissioned within 12 - 18 months after receipt of EC.
Project Requirements Land
Existing plot area is 755495.16 m2 and additional area required for proposed expansion is
263005.16 m2. Total area after expansion will be 755495.16 m2. The area required for
proposed expansion is available within existing plot area. No additional land will be required
for proposed project.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 300
Power
The additional power requirement for proposed expansion will be 31 MWPH which will be
sourced from Dakshin Gujarat Vij Company Limited (DGVCL). Two additional D.G.Set of
1200 KVA are proposed for proposed expansion. D.G. Sets will be used as backup power
source in emergency only.
Raw Material
Raw material required for the proposed expansion will be sourced from local market and will
be transported through trucks.
Boiler
7 x 40 T Boilers & 7 x 10 T Boiler will be provided with Natural Gas/FO as fuel based on
availability of these fuels.
Fuel
Natural Gas for Thermic Fluid heater. Natural Gas or Furnace Oil will be used as fuel for
boiler. HSD will be used for D.G sets. Natural gas will be supplied by GAIL and HSD will be
procured from local market.
.Water
The total water demand for existing approved & proposed expansion will be 25377 KLD.
(Fresh water: 12996 KLD + Recycle water 12381 KLD). Fresh water will be sourced from
GIDC.
Manpower
1500 people will be hired for proposed project. There will be indirect employment of drivers
and cleaners in transportation field.
11.2 DESCRIPTION OF THE ENVIRONMENT
Baseline environmental data
Baseline study was conducted during period of 1st Oct 2019 to 31st Dec 2019.
Ambient Air Quality
During the study PM2.5 was observed in the range of 33.1 – 47.4 µg/m3. Maximum
concentration of PM2.5 was found at Project site and minimum at Narnavi village.
PM10 was observed in the range of 63.2 – 88.1 µg/m3. Maximum concentration of
PM10 was found at Project site and minimum at Narnavi village.
SO2 concentration was observed in the range of 9.1 – 16.4 µg/m3, which is well within
the standard limit.
NOx concentration in was observed in the range of 14.5- 21.4 µg/m3, which is well
within the standard limit.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 301
Monitoring and analysis was also carried out for CO, NH3, Cl2, HCl, H2S, Total HC
and VOC. Results for the CO, NH3, Cl2, H2S, HCl, Total HC and VOC were found well
within the norms.
All the results of ambient air quality parameters have been found within the limit as per
NAAQS. Based on comparison study of results for tested parameters with NAAQS, it is
interpreted that ambient air quality of studied locations is satisfactory. This interpretation
relates to the results found for locations and study period.
Noise Quality
Average noise level was recorded 62.4 to 66.5 dB (A) at Project Site during day time
and it is 57.8 to 59.2 dB (A) during night time.
Average noise level was recorded 49.6 to 51.0 dB (A) at residential area during day
time and it is 41.8 to 42.4 dB (A) during night time.
Noise level monitoring was carried out 1 meter away from State HIghway-6 and
average noise level was recorded 80.5 dB (A) during day time and 76.1 dB (A)
during night time as per factory act 1948 noise level exposure limit for 8 hrs.is 90 dB
(A).
Based on noise level data obtained during the survey for residential area and commercial
area, it is interpreted that noise levels are within the standard norms prescribed by MoEFCC.
Looking towards the increase in noise generating sources it is suggested that there is need
to apply noise reducing devices at noise generating sources and generate public awareness.
Soil Quality
The soils are categorized as clay to clay loam based on different soil separates
(sand, silt and clay).
They have medium water holding capacity (42.8 to 49.4 %) and porosity varied from
42.5 – 46.8 %.
The pH of the soil samples narrowly ranged from 7.38 to 7.62 during the study
period.
The soil EC varied from 1.24 to 1.53 dS/m and ESP ranged from 10.6 to 11.3. These
parameters indicate that soils are neutral to alkaline in reaction, saline (EC > 0.8
dS/m) and non-sodic, as pH is <8.5 and ESP is < 15.
Among exchangeable basic cations, predominance of Calcium (17.2 to 23.6 meq/100
g soil) was seen followed by magnesium (8.6 to 11.4 meq/100 g), Na (3.4 to 4.5
meq/100 g soil) and K (1.0 to 1.8 meq/100 g soil).
Organic carbon (0.72 to 0.85 %) indicates that soils are medium in organic carbon
status. This shows that soils are medium in nitrogen status.
The results relating to total Fe, Cu, Cr, B and Zn do not show alarming
concentrations in different soil samples.
Based on soil analysis data it is concluded that soil at the studied locations are neutral to
alkaline in reaction. The soils are medium in nitrogen, low in phosphorus and medium in
potassium status. The levels of total Fe, Cu, Cr, B and Zn are within the limits. However, for
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 302
successful greenbelt development liberal quantity of organic manure and recommended
doses of N and double the recommended dose of P fertilizers should be applied.
Ground water
pH was observed in the range of 7.14 – 7.54, which meets with drinking water desirable
norms.
Turbidity was found in the range of 1.2 – 2.8 NTU.
Total Dissolved Solid (TDS) were recorded in the range of 586 - 1936 mg/L with
minimum at Nadarkha village and maximum at Rahiyad village.
Conductivity varies from 906 to 3012 µmho/cm. The ratio of TDS to conductivity was
observed in the range of 0.6 to 0.65 which is within the desired range.
Total Hardness was in the range of 324 - 712 mg/L with minimum at Padariya village and
maximum at Rahiyad village.
Total Alkalinity was found in the range of 244 - 708 mg/L with minimum at Padariya
village and maximum at Narnavi village.
Chloride was found in the range of 172 to 552 mg/L and Sulphate varies from 38 to 268
mg/L.
Iron was found in the range of 0.10-0.28 mg/L with minimum at Nadarkha village and
maximum at Rahiyad and Narnavi village.
As microbiological parameters MPN analysis was also carried out and it was found
absent.
Based on comparison study of test results with drinking water norms it is interpreted that
water quality for the sample collected from the locations Kadodara, Sambheti, Nadarkha and
Padariya meet with the drinking water permissible limit, these water sources can be used in
washing, bathing, irrigation and they can also be used in drinking purpose in absence of
alternate source. Water qualities of other locations like Narnavi, Dahej and Rahiyad village
do not meet with the drinking water norms. Results of Total Hardness and Total Alkalinity is
more than prescribed limit, this is due to ingress of salinity. This interpretation relate to the
sample collected from particular location only.
Surface water
The following description is based on the analysis of the samples:
During the analysis pH of the sample was found in the range of 7.15 to 7.58.
TDS analysis was also carried out for surface water sample and it was found in the
range of 292-598 mg/L.
TSS was found in the range of 8-14 mg/L.
Total Hardness was found in the range of 132-246 mg/L.
DO is one of the important parameter to indicate towards the contamination of
organic matter. DO level decrease as soon as organic contamination increases.
During analysis DO was found in the range of 5.1-5.5 mg/L.
COD and BOD analysis was also carried out during the study period and results was
found in the range of 12-20 mg/L and 4-6 mg/L respectively.
Total Nitrogen was found in the range of 1.2-2.1 mg/L.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 303
Iron content was found 0.08-0.28 mg/L and other heavy metals were found well
within the limit.
MPN test was also carried out for the surface water sample and it was found positive.
E-coli and Sstreptococci test was found negative in all samples.
Based on test result data comparison study with CPCB standard, it is interpreted that
surface water quality meet with the criteria C, D and E, it means these water sources can be
used for propagation of wild life, fisheries and Irrigation, industrial, cooling, controlled waste
disposal. This interpretation relate to the water sample collected during the survey from
particular locations only.
Marine Water
Temperature is an important parameter, which affects the living organisms. The
temperature of the water was less than ambient air temperature.
The pH was observed 8.12. pH range is maintained due to buffering action of
CO2,CO3-2 and HCO3
-2.
Salinity was observed 34.4 ppt.
DO is an essential parameter which affects the biotic component of the water. Fish
and other aquatic life take oxygen through the gill. DO levels affect the aerobic
bacterial population as well as chlorophyllous Phytoplankton. During study period
maximum DO level was recorded 5.8 mg/L.
BOD is also an important parameter to define the environmental scenario of marine
ecosystem as it affects the DO level. BOD was found <4 mg/L.
Iron was recorded 0.66 mg/L. Other Heavy metals were found well within the range.
During the analysis it was found that temperature of the marine water was below the ambient
temperature it indicates that there is no exothermic reactions take place. pH of the water
sample for different locations was found near 8.0. Some marine organism can survive at the
DO level of >4 mg/L and certain microorganism can survive up to DO level 0.2mg/L. During
testing it was found that DO of the marine sample was >4 mg/L. Based on the test results it
is interpreted that the water quality of marine is good and suitable for the survival of fishes
and other aquatic life. High DO and less BOD indicate that contamination of organic matter
in marine water body is not more than its self-purification capacity and probability of organic
matter in the sample is almost negligible.
Ecology and Biodiversity
The most commonly spotted bird species of this area are; Cattle Egret, Intermediate Egret,
Black-winged Stilt, Red-wattled Lapwing, Rock Pigeon, Eurasian Collared-Dove, Spotted
Dove, Chestnut-headed Bee-eater, Bank Myna and Common Myna. All the birds are
included in Schedule IV. Among the reptiles Oriental garden lizard was common. Among
mammals Black rat was common. Forest department of Bharuch has declared as reserved
forest near Dahej village, which false within 10 km radius from the project site. Mainly the
declared area as reserved forest is having Prosopis juliflora, Caltrops and Acacia species in
degraded condition. This area does not support to Schedule I mammalian species of wild
life. There is a good population of schedule-II species like Herpestes edwardsi (Indian grey
mongoose) and Naja naja (Indian cobra) as food chain is interlinked in the biological
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 304
environment. Dominant flora of the study region is Prosopis juliflora and acacia species.
Rosa (Rose), Gossypium (Cotton) and Cajanus cajan (Tur) are majorly cultivated by the
farmers of the majority villages. Natural vegetation of study area is in degraded condition
and wild mammal‘s density is also very low. No endangered or threatened species were
observed during the survey.
Socio economic
During the primary survey it was observed that almost pukka road facility is available in all
villages within 10 km radius. Literacy rate of the study region is from 61.30% to 100.00%. On
the basis of survey for literacy rate data it is interpreted that there is need to promote
educate more and more people. Almost all the villages have more than 50 % people as non-
workers. It indicates that the problem of unemployment can be solved by providing proper
training and education. There is also need to establish more industries so that maximum
number of employment can be generated. Basic amenities like Education facilities Health
care facilities, water supply, electric power supply, mode of transportation etc. are available
in all villages.
11.3 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION
MEASURES
Air Environment
Project activities having impact on air quality includes manufacturing process and vehicular
movements. Major pollutants will be PM10 Cl2, HCl, NH3, H2S, PM, SO2, NOx, HC Organic
traces, HCN. Summary of Maximum Ground Level concentration at Project Site is provided
in Table 11.1
Table 11.1: Summary of Maximum Ground Level Concentration
S.No. Pollutant Maximum Baseline
Concentration (µg/m3)
Incremental GLC (µg/m3)
Total Predictive
GLC (µg/m3) Distance in Km/Direction
1 PM10 88.1 3.39 91.5 0.25 km/N (Project Site)
2 SO2 16.4 4.14 20.5 0.25 km/N (Project Site)
3 NOX 21.4 5.43 26.83 0.25 km/N (Project Site)
4 NH3 3.3 2.81 6.11 0.25 km/N (Project Site)
5 Cl2 BDL 0.086 0.086 0.25 km/N (Project Site)
6 H2S BDL 0.713 0.713 0.25 km/N (Project Site)
7 HC 152 1.153 153.2 0.25 km/N (Project Site)
8 HCl BDL 2.898 2.898 0.25 km/N (Project Site)
9 HCN BDL 0.195 0.195 0.25 km/N (Project Site)
Mitigation measures include provision of Water Scrubber, & Adequate Stack Height to Flu
gas stacks and Fume Gas Incinerator, NH3/Alkali/water scrubber and Bag Filters.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 305
Noise Environment
Major sources of noise pollution will be activities related to operation of boiler and general
utilities within the plant.
Mitigation measures include providing acoustic enclosures at plant site and providing
Personal Protective Equipment like Ear Plugs & ear muffs to workers and safety sign boards.
Water Environment
Effluent will be generated in from Process, , Utilities, Washing, and domestic uses.
The Waste Water generation after proposed expansions will be 10044.2 KLD, out of which
recycled water will be 7152.28 KLD and effluent going to GIDC drain will be 2891.92 KLD.
The waste water will be treated in ETP, MEE and RO.
Land Environment
No major impact has been identified on land environment due to the proposed expansion
project. There will be paved areas & internal roads. The proposed site is located in Notified
Industrial Estate of GIDC Dahej (Within PCPIR region).
Solid Waste Management
Hazardous and Solid Waste generated during the operational phase will be disposed as per
prevailing legislation. TSDF and Common Incinerator Facility membership is procured. MoU
is signed with cement manufacturers for co-processing waste.
11.4 ENVIRONMENTAL MONITORING PROGRAMME
Summary of Environmental Monitoring Program
Table 11.2: Summary of Post Project Environmental Monitoring Program
S.No. Particulars Monitoring
Frequency
Duration of Sampling
Important Monitoring
Parameters
1.
Air Pollution
i. Selected 4 locations in and around plant site
specified by GPCB Twice in a
Week except monsoon
One Sample for 24 Hours As per GPCB /
CPCB Guidelines
ii. Stack gas analysis in all stacks.
Online (Based on
Applicability of CPCB
Guidelines) & Manual Monitoring
Once in Month/Quarter
for Manual As per GPCB /
CPCB
ii. Fugitive dust sampling (if any) at work zone as per CPCB or
GPCB. Once in quarter On Spot PM/VOCs/HCl/Cl2/
NH3
2.
Water and Wastewater Quality
A. Water quality in the study area
i. Surface Water Half yearly Grab Parameters
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 306
S.No. Particulars Monitoring
Frequency
Duration of Sampling
Important Monitoring
Parameters
specified under IS:10500
ii. Treated Waste Water Analysis Continuous Composite Parameters as per
Consent
ii. Ground water analysis Quarterly Once Parameters as per Consent
3
Industrial Noise Levels
1. Major noise generating sources at plant site Quarterly Grab
Noise level in dB(A)
2. Along Road for transportation noise Quarterly - Noise level in
dB(A) 4.
Ambient Noise Levels
1 4 Locations Half Yearly - Noise level in dB(A)
5.
Soil Characteristics
Soil Selected 4 locations in core zone Half Yearly One Grab
sample As per
GPCB/Consent order
6. Work zone At plant site Half Yearly Once in work place Dust, Noise,
Illumination etc.
7.
Corporate Environme
ntal Responsib
ility In core and buffer zone in
nearby villages Half yearly Once Activities done by UPL Ltd
8.
Occupational Health Surveillan
ce At plant premises Half yearly
Once Employee Health
Register
9. Greenbelt Developm
ent Number of plantation (Units), Number of
Survived Trees/ Acre
Yearly Once Tress, survival rate, landscape
area. 10.
Environmental Audit As per Directions of
Honorary High Court, Yearly Once As per GPCB Guidelines
11.
Consents and
Authorization
Consent to Operate under applicable acts
Renewing 90 days before
expiry of validity
Once Before 90 days of expiry
12.
Compliance of EC
Conditions Submission of 6 monthly
Compliance Reports June and December Twice in a
year As per EC conditions
11.5 ADDITIONAL STUDIES
Risk Hazard
Risk Assessment studies; Hazard identification and Risk Assessment (HIRA) and
Quantitative Risk Assessment (QRA) was carried out for the various activities and
Hazardous Chemical Storage at the facility. Activities are storage & Handling of Toxic,
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 307
Flammable, Corrosive and Solid Chemicals. The safety mitigation for proposed project
provided to reduce the initial Risks to Residual Risks. Consequence Modelling for
Hazardous chemicals like Ammonia, Phosgene, Sodium Cyanide, Toluene, Chlorine
Methanol, Acetone, etc. carried out using 2-D Risk Modelling to estimate the risk level of
radiation / explosion and toxicity radii to the facility and surroundings.
Considered and Adequate numbers of flammable and toxic gas detectors near to Flammable
Storage and surrounding area so that early detection and annunciation of flammable and
toxic concentration shall be initiated. For controlling the maximum accident scenario safety
mitigation and exiting Active & Passive protections are provided.
Emergency preparedness plan in case of natural or in plant emergencies:
Existing On-site and Off-site Emergency plan prepared as per MSIHC Rules and state
Factory Act will be updated based on Consequences analysis from 2D modelling. Likely On
site emergency is from storage of Flammable Chemicals. Mitigation measures considered
are
8. Installation of Adequate numbers of flammable and toxic gas detectors near to
Hazardous Chemicals Storage Location and surrounding area
9. Having DCS control system
10. Providing Fire hydrant Network line around the facility.
11. Increasing Active fire protections with CO2, DCP Fire Extinguishers, Foam Trolley and
passive protections for early detection by smoke and heat detectors, interlocked with
Water Sprinkler system.
12. Providing more nos of Emergency sirens at vulnerable locations.
13. Mutual agreement with adjoining industries and DMC, Dahej.
14. Carrying out construction of plant buildings will follow the criteria as per seismic zone- 3
15. During Natural disaster, District Disaster management plan shall be followed.
Occupational Health Measures
UPL Dahej will have developed Occupational Health Centre including provision of First Aid
kit, Periodic Medical Checkup of all contract and Employees. A qualified Doctor with Male
Nurse remain available at facility. Antidotes are also available for Hazardous Chemicals. All
workers and employees will be provided safety gadgets like Helmet, Hand gloves, Apron,
Full fire protection suit, Safety Shoes, Gas Mask, Face-shield and Safety goggles Company
has well equipped emergency vehicle. Existing Action plan for OHS standard implementation
incorporated. Safety trainings (on Safe Material Handling, First Aid, & all Safety Aspects) as
per Gujarat Factory Rules will be strengthened more.
11.6 PROJECT BENEFITS
Employment Generation:
The proposed expansion project will generate employment during the construction and
operation phase. Local skilled and semi-skilled workers will be hired during construction
phase as well as operation phase. During the operation phase, technical staff, general staff
for administrative work and other ancillary services i.e. O&M contractor and maintenance
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 308
services will be required on a temporary basis. In addition to 2000 Nos of Employees (for EC
Approved product manufacturing plants), the additional 1500 manpower will be required for
proposed project.
Employment Avenues:
The company will generate direct and indirect employment. Preference will be given
to the local people for employment based on their educational qualifications and
experience.
Apprentice Training is will be provided regularly.
11.7 ENVIRONMENT MANAGEMENT PLAN
Effluent Management
The waste water generated from Process, Boiler, Cooling Tower, Washing & Domestic
Activities will be segregated based on characteristics and treatment will be given as per
characteristics. The High TDS, Low COD streams will be sent to MEE followed by RO for
utmost possible recycling. The low cod/low TDS waste water will be sent to ETP for primary,
secondary & tertiary treatment. After treatment & removal of pollutants, the treated water will
be tested for compliance to stipulated norms by GPCB & then on confirmation of compliance
the treated waste water will be discharged to GIDC drain for deep sea disposal. .
Domestic sewage generated will be treated in STP and reused for utility / gardening.
Air Emission Management
Water/Caustic/Acid Scrubber, Fume Gas Incinerator, Bag filter will be provided to process
gas stack. Solvent will be recovered to the tune of more than 95% with proper solvent
management plan.
Waters scrubber will be provided to boiler stack. Adequate stack height will be provided to
DG set and DG set will be used only during emergencies.
Solid and Hazardous Waste Management
ETP Sludge, Organic Residue, Aqueous waste, Discarded containers / bags / liners, Used
oil, Inorganic Salts from Evaporation / Process, Spent filter Material, Spent solvent,
Contaminated cotton waste, Insulation Waste, Non-recyclable Plastic waste, Used PPE,
Spent Catalyst, HCl sol. (28-32%), Fe (OH)2 Sludge & Iron Residue will be generated from
proposed project and this waste will be disposed as per Hazardous and Other Wastes
(Management and Transboundary Movement) Rules, 2016.
Greenbelt Development
For Green Belt Development, the company has already allotted 263005 m2 of the total land,
i.e. 34.81% in its existing project. Total 39500 no. of trees to be planted for green belt @
tree density of 1500 trees per hectare.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 11 309
EMC
Environment & safety measures will be reviewed in EMC meeting on regular basis
CER/CSR Budget
A total amount of Rs. 3,72 Crore (0.25% of total project cost) is earmarked for the issues
identified during social need assessment and restricted to project area for 5 years. Major
activities include Education and Agriculture Development, Skill Development, Tree
plantation, Gram Pragati Yojna, Toilets Blocks in school.
Post Project Monitoring Plan
Post project monitoring plan includes monitoring of PM2.5, PM10, SO2, NOx, CO, NH3, Cl2,
HCl, H2S, Total HC and VOC, conducting third party environmental monitoring on quarterly
basis and submission of half yearly Environmental Clearance Condition compliance Report.
11.8 SUMMARY AND CONCLUSION
UPL limited has a vast experience in the manufacturing of various technical grade
agrochemicals and Synthetic Organic Chemicals for many years at different plants and
locations.
The present expansion is planned at the existing facility where no new land is acquired for
the expansion.
Further most of infrastructure like internal roads, buildings, Raw material storages,
firefighting systems, laboratory facilities, OHC, communication system, trained manpower
area already planned in existing project. Employment will be given to local people as per
Gujarat Government guidelines.
It will generate more foreign revenue by exporting
Import burden of materials from other countries will reduce
Considering the modern effective pollution abatement technology, the adverse impact on
environment & health will be minimized to a greater extent. Residual impacts will further be
controlled with effective Environment, Occupational Health and Safety management
systems. All statutory norms with respect to Air, Water & Hazardous Waste will be adhered
to. Social development activities will be effectively monitored. With all this considerations, it
can be seen that Environmental Clearance to the project will be beneficial to local
community, region and country at large.
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 12 310
12 DISCLOSURE OF CONSULTANTS
12.1 GENERAL
UPL limited has appointed Eco Chem Sales & Services (ECSS) for carrying out this
Environmental Impact Assessment Study as per the EIA notification, 2006 as amended till
date. ECSS has approved EIA coordinators and Field Area Experts for undertaking
Environmental and related studies in twenty one (21) approved sectors by NABET, Quality
Council of India, New Delhi.
12.2 BRIEF RESUME AND NATURE OF CONSULTANCY
ECO CHEM SALES & SERVICES (ECSS) is one of the leading companies in the field of
Environmental Consultancy Service providers in India. We are NABET Accredited consultant
for conducting Environmental Impact Assessment Studies (EIA) and obtaining
Environmental Clearances. We also take up services which include and are not limited to
Environment Monitoring and Testing, Environment Audit, Risk Assessment Studies, Turnkey
solutions, Operation and Maintenance contracts and obtaining various statutory clearances
from Ministry of Environment, Forest and Climate Change (MoEFCC) and State Pollution
Control Boards. ECSS also has branch offices in Vapi, Dahej and Vadodara, Gujarat.
The accreditation certificate number NABET/EIA/1720/SA 085 (Rev.01) is valid up to 31st
July, 2020. Copy of NABET certificate is attached as Annexure 16
12.3 TEAM MEMBER FOR EIA REPORT
Table 12.1: EIA Team Member
Name of
Internal Team
Member
Activity / Area Involvement
Actual Work Performed
Under Approved
Expert
Jagdish Rathi Quality Check
Project planning; Understanding of project;
Site visit; Discussion with client; Guidance in
writing and modification in Contents; Impact
Assessment; Review of EIA/EMP report.
EC
Nazneen
Shaikh
EIA Report
writing (TM)
Team Member- Coordination for data
collection, data analysis, coordination with
FAEs, various chapter preparations,
compiling the primary & secondary data into
EIA report.
EIA
Anish Jani Land use (LU)
Team Member- Assisting in coordination for
data collection and data analysis, Assisting in
map preparation & report writing
FAE-LU
Nazneen
Shaikh
Water
Pollution,
Team Member- Identification of surface water
sampling stations; water requirement / FAE-WP
Synthetic Organic Chemicals and Chemical intermediates- Expansion & Addition of New Products within existing premises of UPL Limited
Eco Chem Sales & Services, Surat Doc. No: 2019_ECSS_EIAI2_1900019 Chapter 12 311
Name of
Internal Team
Member
Activity / Area Involvement
Actual Work Performed
Under Approved
Expert
Prevention and
Control (WP)
demand calculation; identification of impacts
and relevant mitigation measures; assisting
in preparation of management plan and
report writing
Nazneen
Shaikh
Solid &
Hazardous
Waste
Management
(SHW)
Team Member- Assisting in solid waste
generation calculation, preparing solid waste
disposal plan, assistance in FAE
Report writing, assisting in identifying
hazardous waste generation sources and
preparing environmental management plan.
FAE-SHW
Mr. Vaibhav
Rana
Meteorology,
Air Quality
Modeling
&prediction
(AQ)
Team Member- Data collection, assistance in
report preparation to FAE FAE-AQ
Mr. Deep
Kumar
Risk
Assessment &
Hazard
Management
(RH)
Team Member- Assistance in Identification of
impacts & mitigation measures, safety during
construction and operational phase and
report writing
FAE-RH
12.4 LABORATORY INVOLVED FOR BASELINE MONITORING AND
OTHER ANALYSIS
ECSS has NABL accredited Laboratory with Certificate No. TC – 6603, dated 15/11/2019
valid up to 14/11/2021 for testing of Water, Wastewater, Sewage, Air, Noise and Soil. Copy
of the same is attached in Annexure 16.