ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR Environmental Clearance for Pig Iron plant (1x23m 3 ) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots AT Village Biswasdih, P.O. Gadi Srirampur District Giridih, Jharkhand. PROJECT AREA- 4.755 Ha. [ToR LETTER NO: F. No. 23-90/2018-IA.III(V) on Dated 1 st February, 2019] (STUDY PERIOD: 1 st October To 31 st December 2018) APPLICANT Lal Ferro Alloys Co. (P) Limited. Mr. Chetu Sao (Director) Village Biswasdih, P.O. Gadi Srirampur District Giridih, Jharkhand E-mail: [email protected] Ph: 9931573899 Fax: 06532-223003 FINAL EIA/EMP REPORT Rev.00_2020 DOCUMENT NO. 2018_VI_00035_FINAL EIA (July 2020) ENVIRONMENT CONSULTANT VARDAN ENVIRONET (QCI/NABET ACCREDITED NO. NABET/EIA/1922/RA 0166) Plot 82-A, IMT Manesar, Sector-5, Gurugram (Haryana) E-MAIL: [email protected] CONTACT: 0124-4291036, 09899651342

Transcript of ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL...

  • ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN

    FOR

    Environmental Clearance for Pig Iron plant (1x23m3) with capacity

    12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for

    installation of Induction Furnace (1x6 Ton) with production capacity

    of 18000 TPA MS Ingots AT

    Village Biswasdih, P.O. Gadi Srirampur District Giridih, Jharkhand.

    PROJECT AREA- 4.755 Ha.

    [ToR LETTER NO: F. No. 23-90/2018-IA.III(V) on Dated 1st February, 2019]

    (STUDY PERIOD: 1st October To 31st December 2018)

    APPLICANT

    Lal Ferro Alloys Co. (P) Limited. Mr. Chetu Sao (Director)

    Village Biswasdih, P.O. Gadi Srirampur

    District Giridih, Jharkhand

    E-mail: [email protected]

    Ph: 9931573899 Fax: 06532-223003

    FINAL EIA/EMP REPORT Rev.00_2020

    DOCUMENT NO. 2018_VI_00035_FINAL EIA

    (July 2020)

    ENVIRONMENT CONSULTANT VARDAN ENVIRONET

    (QCI/NABET ACCREDITED NO. NABET/EIA/1922/RA 0166) Plot 82-A, IMT Manesar, Sector-5, Gurugram (Haryana)

    E-MAIL: [email protected] CONTACT: 0124-4291036, 09899651342

    mailto:[email protected]:[email protected]

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    FINAL EIA/

    EMP REPORT

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    i

    REVIEW AND REVISION HISTORY History of revisions of the present report:

    Table I: History of the Revisions

    Rev. Date Modifications Remarks

    Rev.00 28.07.2020 FINAL EIA /EMP Report Report has been prepared by Team Vardan and all the comments of reviewers have been incorporated in FINAL EIA/EMP report.

    Document No. 2018_VI_00035

    Table II: Record of Review

    Rev. Date Description Review-1 Review-2 Approval

    Rev.00 28.07.2020 FINAL EIA /EMP Report

    Mr. K. M. Khare Mr. S.K. Sharma Mr. R.S. Yadav

    28.07.2020 30.07.2020 31.07.2020

    -

    -

    -

    This Report has been prepared by Vardan EnviroNet on behalf of and for the use of the M/s Lal Ferro Alloys Co. (P) Ltd with due consideration and skill as per our general terms and conditions of business and terms of agreement with the M/s Lal Ferro Alloys Co. (P) Ltd. DISCLAIMER

    Vardan EnviroNet has taken all reasonable precautions in the preparation of this report as per its auditable quality plan. Vardan EnviroNet also believes that the facts presented in the report are accurate as on the date it was written. However, it is impossible to dismiss absolutely, the possibility of errors or omissions. Vardan EnviroNet therefore specifically disclaims any liability resulting from the use or application of the information contained in this report. The information is not intended to serve as legal advice related to the individual situation.

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    EIA TEAM

    DECLARATION

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24

    ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of

    18000 TPA MS Ingots

    ii

    Declaration by Experts contributing to the EIA studies for M/s Lal Ferro Alloys Co. (P)

    Ltd at Village: Biswasdih, P.O. Gadi Srirampur, District: Giridih, Jharkhand.

    We, hereby certify that we were a part of the EIA report team in the following capacity that

    developed the above EIA.

    EIA coordinator:

    Name: Mr. K.M. Khare

    Signature and Date:

    Period of involvement: September 2018-July 2020

    Contact information: Vardan Environet, Plot No. 82A, Sector 5, IMIT Manesar,

    Gurugram (Haryana)-122052

    Contact – 9051920308

    Email Id: [email protected]

    Associate EIA Coordinator:

    Name: Mr. Anshul Yadav

    Signature and Date:

    Period of involvement: September 2018-July 2020

    Contact information: Vardan Environet, Plot No. 82A, Sector 5, IMT Manesar,

    Gurugra, Haryana -122052

    Contact – 9953147268

    Email Id: [email protected]

    Functional area experts:

    No Functional

    areas

    Name of the

    expert/s

    Signature Involvement

    (period and task**)

    1 AP*

    Mr. K.M. Khare (FAE – Cat. A)

    October 2018-April 2019

    a) Identifying the sources of

    emissions and mitigation

    mailto:[email protected]:[email protected]

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    EIA TEAM

    DECLARATION

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24

    ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of

    18000 TPA MS Ingots

    iii

    No Functional

    areas

    Name of the

    expert/s

    Signature Involvement

    (period and task**)

    Mr. Shubham Tyagi

    (Team Member, FAE – Cat. B)

    measures.

    b) Inventorisation of point Source

    Stacks emissions details.

    c) Site-specific micro-meteorology

    Monitoring and collection of

    secondary data.

    d) Air quality monitoring – location

    planning, supervision of AAQ

    monitoring, sample collection and

    preservation. e) Laboratory visit during analysis

    of samples

    f) Identification of air emission

    impacts from the project.

    g) Proposing mitigation measures

    along with budget for control of air

    pollution

    2 WP*

    Mr. K.M. Khare (FAE – Cat. A)

    October 2018-April 2019

    a) Surface water and ground

    water quality monitoring,

    Sampling, Preservation and

    assessment, impacts on Water

    environment and mitigations.

    b) Identification, characterisation

    of effluent streams and treatments

    there of

    c) Water balance and conservation

    measures d) Budget Allocation

    Mr. Shubham Tyagi (Team Member,

    FAE – Cat. B)

    3 AQ*

    Ms. Surbhi Rohan Makhwana

    (FAE – Cat. A )

    October 2018-June 2020

    a) Processing of site- specific micro-

    meteorological data

    b) Collection and use of

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    EIA TEAM

    DECLARATION

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24

    ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of

    18000 TPA MS Ingots

    iv

    No Functional

    areas

    Name of the

    expert/s

    Signature Involvement

    (period and task**)

    inversion/mixing Height data for

    modelling. c) Air dispersion modelling for prediction of GLCS due to PM10, S02 and NOx

    4 NV*

    Mr. Asif Hussain (FAE – Cat. A)

    October 2018-April 2019

    a) Analysis of ambient noise quality

    data b) Impact due to plant noise and abatement measures

    Mr. Shubham Tyagi (Team Member,

    FAE – Cat. B)

    5 EB*

    Dr. Niteesh Kumar

    (FAE – Cat. A)

    October 2018-April 2019

    a) Biological environment status in

    respect of terrestrial faun and

    aquatic eco system b) Impact on ecological environment

    6 HG* Mr. R.S. Yadav (FAE – Cat. A)

    October 2018-April 2019

    a) Ground water resource

    assessment b) Impact on ground water potential and mitigation measures for avoiding Ground water contamination.

    8 SE*

    Ms. Shilpa Mishra (FAE – Cat. A)

    October 2018-April 2019

    a) Determination of demographic

    profile including socio economy &

    livelihood

    b) Assessing the changes in socio

    economic pattern c)Budget Allocation

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    EIA TEAM

    DECLARATION

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24

    ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of

    18000 TPA MS Ingots

    v

    No Functional

    areas

    Name of the

    expert/s

    Signature Involvement

    (period and task**)

    9 SHW*

    Mr. S.K. Sharma

    (FAE – Cat. A)

    October 2018-April 2019

    a) Non-hazardous solid wastes

    generation, recycling and disposal

    b) Storage and management of

    hazardous solid wastes c)Budget Allocation

    10 SC*

    Mr. S.K. Sharma (FAE – Cat. A)

    October 2018-April 2019 a)Sampling, analysis and characterization of soil b) Assessment of fertility/productivity of soil, nutrient availability c) Remediation of soil pollution/contaminated soils d) Controlling degradation of soil/soil conservation

    11 LU*

    Mr. Ankur Agarwal

    (FAE – Cat. A)

    October 2018-April 2019

    a) Analysis of data related to land use

    pattern

    b) Land use map development. c) Impact on land environment in respect to land form change

    12 RH*

    Mrs. Anuradha Sharma

    (FAE – Cat. A)

    October 2018-April 2019

    a) Identification of hazardous

    prone areas

    b) Environment risk evaluation c) On-site and Off-site emergency planning

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    EIA TEAM

    DECLARATION

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24

    ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of

    18000 TPA MS Ingots

    vi

    Declaration by the Head of the accredited consultant organization

    I, R.S. Yadav, hereby, confirm that the above mentioned experts prepared the EIA of M/s Lal

    Ferro Alloys Co. (P) Ltd at Village: Biswasdih, P.O. Gadi Srirampur, District: Giridih, Jharkhand.

    I certify that this report has been prepared by ‘Vardan Environet’ with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client.

    I also confirm that I shall be fully accountable for any misleading information mentioned in this

    statement.

    Name: R.S.Yadav

    Signature

    Designation: Managing Director

    NABET Certificate No. & Issue Date: NABET/EIA/1922/RA 0166 issued on 17.06.2020 and valid

    upto 06.11.2022

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    vii

    TABLE OF CONTENTS

    Title Page No.

    i Review and Revision History i

    ii Declaration of Consultant ii

    iii Table of Contents vii

    iv TOR Compliance xviii

    VOLUME- I

    Chapter 1 INTRODUCTION 1-12

    1.1 Background 1

    1.2 Purpose of the Report 2

    1.3 Identification of Project & Project Proponent 3

    1.3.1 Project 3

    1.3.2 Project Proponent 3

    1.4 Brief Description of Nature, Size, Location of the Project and Its Important To The Country And Region

    4

    1.4.1 Nature of the project 4

    1.4.2 Size of the project 4

    1.4.3 Location of Project 5

    1.4.4 Importance of project to the Country and Region 6

    1.5 Scope of the Study- Details of Regulatory Scoping Carried Out (AS PER TOR) 6

    1.5.1 Terms of Reference issued by MoEF & CC 7

    1.5.2 Preparation of EIA 7

    1.5.3 Laws Applicable to this Project 9

    Chapter 2 PROJECT DESCRIPTION 13-37

    2.1 The Project 13

    2.2 Need & justification of the project 13

    2.3 Location of Project (Maps Showing General Location, Specific Locations, Project Boundary and Project Site Layout)

    13

    2.3.1 Project Location 13

    2.3.2 Plant Layout 15

    2.3.3 List of Industries 15

    2.4 Size And Magnitude of Operation 21

    2.5 Proposed Scheduled for Approval and Implementation 21

    2.5.1 Schedule for Approval of the Project 21

    2.5.2 Schedule for implementation of the Project 21

    2.6 Technology and Process Description 24

    2.6.1 Existing Units (Under Violation) 24

    2.6.2 Proposed Units 27

    2.7 Project Details 29

    2.7.1 Raw Material requirement 29

    2.7.2 Water Requirement 32

    2.7.3 Power Requirement 33

    2.7.4 Manpower Requirement 33

    2.7.5 Land Requirement 33

    2.7.6 Project Cost 34

    2.7.7 GreenBelt Development 34

    2.7.8 Solid Waste Generation & Management 34

    2.8 Description of mitigation measure incorporated in to the project to meet 35

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    viii

    environmental standard, environmental operating conditions or other EIA requirements

    2.9 Summary Of Significant Impacts 36

    2.10 Saleable Products/By-Products 37

    Chapter 3 DESCRIPTION OF THE ENVIRONMENT 38-108

    3.0 Introduction 38

    3.1 Study Area 38

    3.2 Study Period 39

    3.2.1 Components & Methodology 39

    3.3 Establishment of Baseline for Valued Environmental Components, As Identified in the Scope

    40

    3.3.1 Air Environment 40

    3.3.1.1 Micro-Meteorological data 41

    3.3.1.2 Ambient Air Quality

    3.3.2 Noise Environment 49

    3.3.3 Traffic Study 53

    3.3.4 Water Environment 56

    3.3.5 Soil Environment 61

    3.3.6 Land Use and Land Cover 66

    3.3.7 Geomorphology 72

    3.3.8 Geology of the Study Area 73

    3.3.9 Hydrogeological Study 74

    3.3.9.1 Site Specific Hydrogeology 76

    3.3.10 Socio-Economic Environment 78

    3.3.10.1 Demographic Structure of Study Area 79

    3.3.10.2 Occupational Pattern in Study Area 84

    3.3.10.3 Infrastructure Resource Base in Study Area 89

    3.3.10.4 Economic Resource Base in Study Area 92

    3.3.10.5 Cultural and Aesthetic Attributes in Study Area 92

    3.3.10.6 Socio-Economic Survey 92

    3.3.11 Ecology and Biodiversity 94

    3.3.11.1 Objectives of the study 95

    3.3.11.2 Site Selection Criteria 96

    3.3.11.3 Terrestrial Ecology Assessment 97

    3.3.11.4 Aquatic Diversity Assessment 105

    Cahpter 4 ANTICIPATED ENVIRONMENTAL IMPACT AND MITIGATION MEASURES 109-166

    4.1 Introduction 109

    4.2 Identification & Characterization of Impacts 110

    4.2.1 Impacts and mitigation measures due to project location 110

    4.2.2 Impacts and mitigation measures due to project design 110

    4.2.3 Impacts and mitigation measures during construction 110

    4.2.4 Impacts and Mitigation measures during Operation phase 111

    4.3 Impact Matrix 112

    4.4 Air Environment-Impacts & Control Measures 125

    4.4.1 During Construction Phase 125

    4.4.2 During Operational Phase 125

    4.4.2.1 Emission from Point Source (Stack) 125

    4.4.2.2 Emission from Area Source (Fugitive Emission) 125

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    ix

    4.4.3 Air Pollution Dispersion Modelling Studies 126

    4.4.3.1 Air Quality Model- AERMOD Software 126

    4.4.4 Air Quality Index 138

    4.4.5 Mitigative Measures-Process Emissions 141

    4.4.5.1 Emissions from Pig Iron Plant 141

    4.4.5.2 Emissions from Coke Oven Plant 142

    4.4.5.3 Emissions from Steel Melting Shop 142

    4.4.5.4 Fugitive Emissions from Plant 143

    4.5 Traffic Assessment -Impacts & Mitigation Measures 143

    4.5.1 During Construction Phase 144

    4.5.2 During Operational Phase 145

    4.6 Water Environment -Impacts & Control measures 147

    4.6.1 During Constructional Phase 147

    4.6.2 During operational Phase 148

    4.7 Noise Environment – Impacts & Mitigation measures 149

    4.7.1 During Construction Phase 149

    4.7.2 During Operational Phase 151

    4.8 Land Environment -Impacts & control measures 153

    4.8.1 During Construction Phase 153

    4.8.2 During Operational Phase 153

    4.9 Socio-Economic Environment 154

    4.9.1 Positive Impacts 155

    4.9.2 Adverse Impacts 156

    4.9.3 Occupational health Care 156

    4.9.4 General Mitigation Measures for Socio Economic Environment 157

    4.10 Ecology & Biodiversity-Impact & Mitigation Measures 158

    4.10.1 During Construction phase 158

    4.10.2 During Operational phase 158

    4.11 Greenbelt Development 159

    4.11.1 Action Plan for Greenbelt Development 160

    4.12 Rain water Harvesting 161

    4.13 CREP 164

    Chapter 5 ANALYSIS OF ALTERNATIVE TECHNOLOGIES 167-169

    5.1 Preamble 167

    5.2 Analysis of project location 167

    5.3 Analysis of Environmental Sensitivity of the Location Selected 167

    5.4 Analysis of Technology Selected 168

    Chapter 6 ENVIRONMENTAL MONITORING PROGRAM 170-178

    6.1 Introduction 170

    6.2 Parameters to be Monitored 170

    6.2.1 Ambient Air Quality 170

    6.2.2 Stack Emissions 171

    6.2.3 Fugitive Emissions 171

    6.2.4 Effluent Quality 172

    6.2.5 Ground Water Quality 172

    6.2.6 Noise Levels 172

    6.2.7 Greenbelt Developed 172

    6.2.8 Occupational Health & Safety Monitoring 173

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    x

    6.2.9 Training 173

    6.2.10 House keeping 173

    6.2.11 Periodic preventive maintenance 173

    6.2.12 Socio Economic Development 174

    6.2.13 Accidents and Diseases Monitoring 174

    6.3 Infrastructure Requirement 174

    6.4 Budget Allocation for Monitoring 174

    6.5 Environment Management Cell 175

    6.5.1 Monitoring & Responsibility 176

    6.6 Summary 178

    Chapter 7 ADDITIONAL STUDIES 179-223

    7.1 Preamble 179

    7.2 Socio-Economic Impact Assessment 179

    7.2.1 Introduction 179

    7.2.2 Objectives of Social Impact Assessment Study 179

    7.2.3 Rehabilitation & Resettlement Plan 180

    7.2.4 Survey of the Project Area 180

    7.2.5 Analysis of Data and Reconnaissance Exercise 180

    7.2.6 Details of Project Area 180

    7.3 Public Hearing 182

    7.3.1 Advertisement for Public Hearing 182

    7.4 Corporate Environment Responsibility 188

    7.5 Hazard Identification and Risk Assessment (HIRA) 190

    7.5.1 Hazards Identified in the Project 191

    7.5.2 Accident Analysis 192

    7.5.3 Identification of sources of Fire/Explosion and Toxic at M/s Lal Ferro Alloys 193

    7.5.4 Damage Criteria for Thermal Radiation and Overpressure Impacts 193

    7.5.5 Risk Assessment 194

    7.5.5.1 Risk Assessment & Damage Control 195

    7.5.5.2 Maximum Credible Accident Analysis (MCA) 195

    7.5.6 Mitigation Measures for Identified Hazard and Risks 200

    7.6 Occupational Health and Safety Onsite 203

    7.6.1 Details of exposure specific health status evaluation of worker 204

    7.7 Natural and Manmade Calamities 206

    7.7.1 Earthquake 206

    7.7.2 Storm 208

    7.7.3 Flood 208

    7.7.4 Air Raid 209

    7.7.5 Food and Water Poisoning 209

    7.8 Disaster Management Plan 209

    7.8.1 Key Elements 210

    7.8.2 On-Site Emergency Plan 211

    7.8.3 Off-Site Emergency Planning 220

    7.9 Conclusion 223

    Chapter 8 PROJECT BENEFITS 224-226

    8.1 Introduction 224

    8.2 Employment Potential 224

    8.2.1 Direct Employment 224

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xi

    8.2.2 Indirect Employment 224

    8.3 Improvement In Infrastructure 225

    8.4 Education 225

    8.5 Corporate Environment Responsibility 225

    8.6 Other Tangible Benefits 225

    8.7 Conclusions 226

    Chapter 9 ENVIRONMENTAL COST BENEFIT ANALYSIS 227

    9.1 Environmental Cost Benefit Analysis 227

    Chapter 10 ENVIRONMENT MANAGEMENT PLAN 228-233

    10.1 Introduction 228

    10.2 Purpose of Environmental management Plan 228

    10.3 Environment Management Policy & Environment Committee 228

    10.4 Implementation Of Environment Management Plan 233

    10.5 Budgetary Provision for EMP Implementation 233

    Chapter 11 SUMMARY AND CONCLUSION 234-258

    11.1 Introduction 234

    11.2 Project Description 234

    11.2.1 Location Details 234

    11.2.2 Manufacturing Process 235

    11.2.3 Project Requirement 239

    11.3 Baseline Environmental Status 241

    11.3.1 Meteorological Data 241

    11.3.2 Ambient Air Quality Data 241

    11.3.3 Ambient Noise Quality Data 242

    11.3.4 Water Quality Data 242

    11.3.5 Soil Quality Data 242

    11.3.6 Land use/Land Cover 242

    11.3.7 Hydrology 242

    11.3.8 Traffic Study 243

    11.3.9 Socio-Economic Status 243

    11.3.10 Ecology and Biodiversity 243

    11.4 Anticipation Environmental Impacts And Mitigation Measures 244

    11.4.1 Land Environment 244

    11.4.2 Air Environment 245

    11.4.3 Water Environment 247

    11.4.4 Noise Environment 249

    11.4.5 Socio-economic Environment 250

    11.4.6 Biological Environment 251

    11.4.7 Greenbelt Development 252

    11.4.8 Rain Water Harvesting 252

    11.5 Analysis Of Alternatives 252

    11.6 Environmental Monitoring Program 252

    11.7 Additional Studies 253

    11.7.1 Social Impact Assessment 253

    11.7.2 Public Hearing 253

    11.7.3 Corporate Environment Responsibility (CER) 256

    11.7.4 Hazard Identification and Risk management 256

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xii

    11.7.5 Risk Analysis 257

    11.7.6 Occupational Health and Safety 257

    11.8 Project Benefits 257

    11.9 Environmental Management Plan 258

    11.10 Conclusion 258

    Chapter 12 ASSESSMENT OF THR ECOLOGICAL DAMAGE ,REMEDIATION PLAN AND NATURAL AND COMMUNITY RESOURCES AUGMENTATION PLAN

    259-272

    12.1 Background 259

    12.2 Violation Details 259

    12.3 Objective Of The Study 261

    12.4 Ecological Damage Assessment And Remediation Plan 261

    12.5 Economic Benefit Due To Violation Activity 271

    12.6 Natural And Community Resources Augmentation Plan 271

    12.7 Conclusion Energy & Natural Resources Conservation Measures 271

    Chapter 13 DISCLOSURE OF CONSULTANT ENGAGED 273-276

    13.1 Introduction 273

    13.2 Services Of Vardan Environet 273

    13.3 Recognitions 274

    13.4 List Of Software Models For Environmental Studies 274

    13.5 Key Management Personnel Of Vardan 274

    13.6 Eminent Clientele Of Vardan 275

    13.7 Certifications Of Vardan Group 275

    VOLUME II

    ANNEXURES

    Annexure 1 Executive Summary 277-290

    Annexure 2 ToR Letter 291-302

    Annexure 3 Lab Reports 303-366

    Annexure 4 Land Documents 367-404

    Annexure 5 Consent to Establish 405-406

    Annexure-6 Public Hearing Documents 407-422

    Annexure-7 Credible Action Documents 423-434

    Annexure-8 Power Permission Document 435-451

    Annexure-9 DFO Letter 452

    Annexure-10 Water Permission Document 453-458

    LIST OF TABLE

    Table No. Title Page No.

    1.1 Existing and Proposed Project 4

    2.1 Salient Feature of The Proposed Project 14

    2.2 Details of Existing and Proposed Facilities 21

    2.3 Project Implementation Schedule 22

    2.4 MBF Basic Parameters 26

    2.5 Production Capacity of SMS 28

    2.6 Description of Steel Melting Shop 28

    2.7 Raw Material Requirement 29

    2.8 Water Requirement for Existing and Proposed Units 32

    2.9 Power Requirement for Existing & Proposed Units 33

    2.10 Land Use Break-up of Plant Area 33

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xiii

    2.11 Details of Solid Waste Generation, Handling and Utilization 34

    2.12 Mitigation Measures for Pollution Control in Existing and Proposed Units 35

    3.1 Environmental Components and Their Sources/Methodologies 40

    3.2 Secondary Meteorological Data for Dumka, Jharkhand (1981-2010) 42

    3.3 Onsite Meteorological Data (Period: 1st October to 31st December, 2018) 43

    3.4 Techniques Adopted/Protocols for Ambient Air Quality Monitoring 46

    3.5 Ambient Air Quality Data 47

    3.6 Noise level data 52

    3.7 Summarized Traffic data 54

    3.8 Existing Traffic Scenario and LOS 55

    3.9 Ground Water Quality Data 58

    3.10 Surface water quality data 59

    3.11 Physico-chemical Properties of Soil 63

    3.12 Land use/ land cover analysis 66

    3.13 Summarized Demographic Structure of the Study Area 79

    3.14 Demographic structure of the villages in the study area 80

    3.15 Occupational Structure of the Study Area 84

    3.16 Infrastructure Resource Base of the Study Area 89

    3.17 List of the Villages for Field Survey 93

    3.18 Mode of data collection and parameters considered during the Survey 96

    3.19 Checklist of Natural Vegetation (Core & Buffer Zone) 98

    3.20 Faunal Diversity observed along core and buffer zone 103

    3.21 Phytoplankton and Zooplanktons Recorded in the Study Area 106

    3.22 Common fish species recorded in Buffer Zone 107

    3.23 Wetland/Marshland Diversity of Study area 107

    4.1 Impact Identification Matrix 112

    4.2 A Characteristics of Environmental Impacts from Construction Phase 114

    4.2 B Characteristics of Environmental Impacts from Operational Phase 116

    4.3 Emission Data for Modeling 127

    4.4 Emission factors of Indian Vehicles 128

    4.5 Predicted GLC & Resultant Cumulative GLC at AQM Stations 129

    4.6 Predicted 24 Hourly GLC & Resultant Cumulative GLC at AQM Stations 132

    4.7 AQI Category based on pollutants concentration 138

    4.8 Health impacts based on the AQI values 139

    4.9 Sub-Index values for each air pollutant at selected sites 139

    4.10 Cumulative effect of all pollutants based on AQI values 141

    4.11 Details of Pollution Control Facilities 142

    4.12 PCU for Operation Phase 145

    4.13 Existing and Operation phase PCU’s 145

    4.14 LOS study of Proposed Project 145

    4.15 Daily Emissions from Transportation during Operation Phase 146

    4.16 Details of the Water Pollution Control facilities 149

    4.17 Noise levels of Construction Equipment 150

    4.18 Details of Solid Waste Generation, Handling and Utilization 153

    4.19 Matrix of Impact Assessment on Socio-Economic Parameters 154

    4.20 Qualitative Effects on Socio-Economic Environment 155

    4.21 Budgetary Outlets of Greenbelt Development For Five Years 161

    4.22 Data Assumed and/or Available for Rain water harvesting 161

    4.23 Quantification of Runoff Water 162

    4.24 Calculation for Hourly Runoff 162

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xiv

    4.25 Compliance with Charter on Corporate Responsibility for Environment Protection (CREP)

    164

    6.1 Ambient Air Quality – Frequency and Parameters 171

    6.2 Stacks To Be Monitored After the Implementation of The Project 171

    6.3 Fugitive Emission to be Controlled & Monitored 171

    6.4 Monitoring of Effluent Quality 172

    6.5 Cost of Environmental Monitoring Program 175

    7.1 Summarized Details of the Socio Economic Survey 181

    7.2 Summary of the Issues Raised During Public Hearing and Action Plan 184

    7.3 Proposed Activities under Corporate Environment Responsibility & Budget 189

    7.4 List of Damages Envisaged at Various Heat Loads 194

    7.5 Site Specific HIRA of Lal Ferro Alloys Co (P) Ltd. 197

    7.6 Details of Fire Fighting Facilities onsite 202

    7.7 Summary of Recommended Personal Protective Equipment According to Hazard

    202

    7.8 PEL level Summary as per OSHA 204

    7.9 Breakup Details of OH&S Budget 205

    7.10 Emergency Recovery Plan 207

    10.1 Budgetary Provision for Environmental Protection Measures 233

    11.1 Raw Material Requirement 239

    11.2 Land Use Break-up 240

    11.3 Power Requirement for Non-Violating & Violating Units 240

    11.4 Water Requirement for Non-Violating & Violating Units 241

    11.5 Solid Waste Generation & Utilization for Non-Violating & Violating Units 245

    11.6 Details of Pollution Control Facilities 246

    11.7 Details of the Water Pollution Control facilities 248

    11.8 Summary of the Issues Raised During Public Hearing and Action Plan 253

    12.1 Assessment of Environmental / Ecological Damage and Remediation/ EMP suggested

    262

    12.2 Natural and Community Resource Augmentation Plan With Allocated Budgetary 271

    12.3 Summary of Remediation Plan, Natural Resource Augmentation Plan and Community Resource Augmentation Plan

    272

    LIST OF FIGURE

    Figure No. Title Page No.

    1.1 Digitized Map of Study area 5

    2.1 Map showing location of project site 17

    2.2 Topographic Map of 10 Km Radius Study Area 18

    2.3 Google Map Of Project site 19

    2.4 Layout Map of Project Site 20

    2.5 A typical flow-scheme of Non Recovery Type Coke Oven plant 26

    2.6 Blast Furnace Process Flow 27

    2.7 Material balance for Steel Production 31

    2.8 Water Balance Diagram 32

    3.1 Ombrothermic Diagram based on IMD data 42

    3.2 Wind Rose Diagram of Giridih District (Oct - Dec) 43

    3.3 Ambient Air Quality Monitoring Locations 45

    3.4 Graphical representation of Particulate Pollutants 48

    3.5 Graphical representation of Gaseous Pollutants 48

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xv

    3.6 Graphical representation of CO pollutant 48

    3.7 Noise Quality Monitoring Locations Map 50

    3.8 Equivalent Noise Levels at all Monitoring locations 52

    3.9 Transportation Map of Project Site 54

    3.10 Pie Chart Representation for Total Vehicular Data 54

    3.11 Map showing Water Sampling Locations 57

    3.12 Map showing Soil sampling locations 61

    3.13 Satellite imagery of 10 km study area 68

    3.14 LULC map of 10 km Study Area 69

    3.15 Contour map of 10 km Study Area 70

    3.16 Digital Elevation Map of 10 km Study Area 71

    3.17 Drainage map of 10 km Study area 73

    3.18 Hydrogeological map of the Giridih District 75

    3.19 Depth to the water levels at the pre-monsoon period (May 2012) 76

    3.20 Depth to water levels at the post-monsoon period (November 2012) 76

    3.21 Map for Site Specific Pre-Monsoon Water Level 2019 77

    3.22 Map for Site Specific Post-Monsoon Water Level 2019 77

    3.23 Seasonal Water Level Fluctuation Map for Site 2019 78

    3.24 Bar Diagram Representing the Population in the Villages 82

    3.25 Bar Diagram Representing the Ratio of Population In The Study Area 83

    3.26 Bar Diagram Representing the Population Scheduled Caste and Scheduled Tribes in the Study Area

    83

    3.27 Bar Diagram Representing the Population Male and Female Literates in the Study Area

    84

    3.28 Distribution of workers under Main Worker Category in the study area 88

    3.29 Occupational structure in the study area 89

    4.1 Windrose Plot - Giridih (October to December) 126

    4.2 Isopleths for Incremental Conc. (μg/m3) for PM10 (Failure) 130

    4.3 Isopleths for Incremental Conc. (μg/m3) for PM2.5 (Failure) 131

    4.4 Isopleths for 24 Hr. Incremental Conc. (μg/m3) for PM10 (Control) 133

    4.5 Isopleths for 24 Hr. Incremental Conc. (μg/m3) for PM2.5 (Control) 134

    4.6 Isopleths for 24 Hr. Incremental Conc. (μg/m3) for NOx (Control) 135

    4.7 Isopleths for 24 Hr. Incremental Conc. (μg/m3) for SO2 (Control) 136

    4.8 Schematic Diagram of Recharge Pit 163

    6.1 Organization chart of Environmental Monitoring Group (EMG) 176

    7.1 Earth Quake Zonation Map 206

    7.2 Onsite DMP - Disaster Control / Management System 212

    7.3 Various Organizations Involved During Emergency 220

    10.1 Organizational Set-up for Environmental Committee 229

    10.2 Board Resolution 231

    10.3 Environmental Policy of M/s Lal Fero Alloys Co (P) Ltd 232

    ABBREVIATIONS AAQM Ambient Air Quality Monitoring APCD Air Pollution Control Devices

    cm Centimeter CPCB Central Pollution Control Board

    dB Decibel DG Diesel Generator

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xvi

    ABBREVIATIONS E East

    ECC Emergency Control Centre EIA Environmental Impact Assessment

    EMC Environmental Management Cell EMP Environmental Management Plan EPA Environmental Protection Agencies ESE East of South East STP Sewage treatment plant FCC False Colour Composite GIS Geographical information system GLC Ground level concentration GPS Global Positioning System IMD Indian Meteorological Department IRS Indian Remote Sensing Satellite

    ISCST Industrial Source Complex, Short Terms ISO International Organization of Standardization ISS Indian Standard Specification

    JSPCB Jharkhand State Pollution Control Board KLD Kilo Litre Per Day Km Kilometer KVA Kilo Volt Ampere KW Kilo Watt m Meter

    M bgl Meter Below Ground Level mg Milligram

    MoEF&CC Ministry of Environment, Forest and Climate Change mRL Mean Reference Level

    MSMEs Micro, Small and Medium Enterprises N North

    NE North-East SH State Highway

    NNE North of North-East NNW North of North-West NO2 Nitrogen Dioxides NW North-West

    OHSAS Occupational Health & Safety Assessment PPE Personal Protective Equipment PPM Part Per Million Pvt. Private QC Quality Council QCI Quality Council of India QRA Quantitative Risk Assessment R&R Rehabilitation & Resettlement

    RSPM Respirable Suspended Particulate Matter SE South- East

    SEIAA State Level Environmental Assessment Authority SO2 Sulphur Dioxide SOI Survey of India

    SPM Suspended Particulate Matter

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TABLE OF

    CONTENTS

    M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    xvii

    ABBREVIATIONS SSE South of South-East SSW South of South-West TAC Traffic Advisory Committee TDS Total Dissolve Solid TOR Terms of Reference TPH Tones Per Hour TS Total Solid

    TSDF Treatment, Storage and Disposal Facility US EPA United State Environmental Protection Agencies µg/m3 Micro gram per meter cube w.e.f. With Effective From w.r.t. With Reference To W/W Weight By Weight WNW West Of North-West WSW West Of South-West ZLD Zero Liquid Discharge

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xviii

    F. No. 23-90/2018-IA.III(V) M/s Lal Ferro Alloys Co. (P) Ltd., Village: Biswasdih, P.O. Gadi Srirampur, Distt: Giridih, Jharkhand

    TERMS OF REFERENCE – STATUS OF COMPLIANCE

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    A. Specific ToR

    i The state government/SPCB to take action against the project proponent under the provisions of the Environment (Protection) Act, 1986, and further no consent to operate or occupancy certificate to be issued till the project is granted EC.

    JSPCB vide letter dated on 31.07.2015 has requested, Judicial Court, Girdih to issue notice to M/s Lal Ferro Alloys Co Pvt. Ltd. and case no. 63/15/2015 was filed against M/s Lal Ferro Alloys Co Pvt. Ltd. u/s 37 of Air (Pollution & Control of Pollution) Act, 1981 and u/s 44 of Water (Prevention & Control of Pollution) Act, 1974.

    Annexure-7

    - 423

    ii Public hearing to be conducted by the concerned State Pollution Control Board.

    The public hearing was conducted by Jharkhand State Pollution Control Borad on 23.01.2020 at Chhurriwala Garden Harsingh Raidih, Dist - Giridih, Jharkhand for M/s Lal Ferro Alloys Co. (P) Ltd.

    Details of Public Hearing is provided in EIA/EMP Report Annexure- 12

    Annexure - 6

    - 407

    iii The issues raised during public hearing and commitment of the project proponent on the same along with time bound action plan to implement the commitment and financial allocation thereto should be clearly provided.

    Issues raised during public hearing and time bound action plan proposed along with budgetary provisions is given in the EIA/EMP Report

    7 Table 7.2 184

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xix

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    iv The Project Proponent shall be required to submit a bank guarantee equivalent to the amount of remediation plan and natural and community resource augmentation plan with the SPCB prior to the grant EC. The quantum shall be recommended by the SEAC and finalized by the regulatory authority. The bank guarantee shall be released after successful implementation of the EMP, followed by recommendations of the SEAC and approval of the regulatory authority.

    Noted -

    - -

    B. Generic ToR

    1. Executive Summary Executive Summary is enclosed as Annexure- I with EIA/EMP Report.

    Annexure-1

    277

    2. Introduction

    i Details of the EIA Consultant including NABET accreditation

    Vardan EnviroNet, is an accredited organization by Quality Council of India/NABET certificate no. NABET/EIA/1922/RA0166 and NABET accreditation certificate is incorporated in EIA/EMP Report.

    13 13.7 275

    ii Information about the project proponent

    M/s Lal Ferro Alloys Pvt. Ltd.

    Directors: Shri Chetu Sao

    1 1.3.2 3

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xx

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    Address: Village: Biswasdih, P.O. Gadi Srirampur, Dist: Giridih, Jharkhand Phone no: 9931573899 Fax: 06532-223003 Mail id: [email protected]

    iii Importance and benefits of the project

    Importance:

    Pig Iron is one of the basic raw materials required by the foundry and casting industry for manufacture of various types of castings for the engineering sector.

    • The growth of the steel sector is intricately linked with the growth of the Indian economy and especially the growth of the steel consuming sectors.

    Benefits:

    • The region shall also be benefited from the project as there will be direct employment of people in the plant.

    • There will be lot of scope for indirect employment of the people of the state in and around the project site like in transportation sector.

    Details of importance and benefits of the project are incorporated in the EIA.

    Importance and Benefits of the project is given in the EIA/EMP Report

    1 1.4.4 6

    3. Project Description

    I. Cost of project and time of completion.

    Total Project Cost: Rs. 11.47 Crores.

    Time of Completion:

    2 2.7.6

    2.5.2

    34

    21

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxi

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    Mini Blast Furnace and Coke Oven Plant are installed and

    under violation. 1x6 Ton Induction Furnace is proposed

    and will be installed within 24 months after receipt of

    Environmental Clearance from the Ministry of

    Environment, Forests and Climate Change (MOEF&CC),

    and Consent to Establish from Jharkhand State Pollution

    Control Board (JSPCB).

    II. Product with capacities for the proposed project.

    1x6 Ton Induction Furnace with Ingot Casting Facility – 18,000 TPA MS Ingots

    2 2.10 37

    III. If expansion project, details of existing products with capacities and whether adequate land is available for expansion, reference of earlier EC if any.

    Mini Blast Furnace - 12000 TPA Pig Iron (Under Violation)

    Coke Oven Plant – 15,000 TPA Coke (Under Violation)

    The plant covers a total land area of 4.75 Ha.

    Adequate land is available for the expansion.

    The project was installed after taking Consent to Establish from JSPCB on 25.01.2007. No prior Environmental Clearance was taken under EIA Notification, 2006.

    2 2.4 21

    IV. List of raw materials required and their source along with mode of transportation.

    The major raw materials required are iron ore, coal, limestone, dolomite, manganese ore, sponge iron and scrap.

    Details of raw material required with their source and mode of transportation are given in the EIA/EMP Report.

    2 Table 2.7 29

    V. Other chemicals and materials required with quantities and storage capacities.

    No other chemicals and materials are used in the process.

    NA NA NA

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxii

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    VI. Details of Emission, effluents, hazardous waste generation and their management.

    Emission from point and area sources are given in the

    EIA/EMP Report.

    There will be no discharge of waste water from the plant

    as Zero liquid effluent discharge (ZLD) will be adopted. All

    the sections of the existing and proposed plant will be in

    closed circuit.

    Further, in the proposed expansion only ‘Used Oil’ will be generated as hazardous waste and the same shall be sold to the registered recyclers.

    4

    4.4.2

    Table 4.11

    Table 4.16

    4.8.2

    125

    141

    149

    153

    VII. Requirement of water, power, with source of supply, status of approval, water balance diagram, manpower requirement (regular and contract)

    Water Requirement - 160 m3/day

    Source: Requirement will be met from existing Bore wells

    Total power requirement is 3.5 MW which will be sourced from DVC.

    The total estimated manpower requirement during the operation of units under violation as well as proposed units shall be 120.

    2

    2.7.2

    2.7.3

    2.7.4

    32

    33

    33

    VIII. The project proponent shall furnish the requisite documents from the competent authority in support of drawl of ground water and surface water and supply of electricity.

    Application has been submitted to CGWB/CGWA vide F.No 21-4/669/JH/IND/2020 dated on 22.07.2020 to obtain permission for 160 KLD groundwater withdrawal.

    Power Permission has been obtained from DVC for supply of power

    Annexure-10

    Annexure-7

    -

    -

    453

    435

    IX. Process description along with major equipment and machineries, process flow sheet (Quantitative)

    Process description along with major equipment and machineries, process flow sheet (Quantitative) from raw material to products is given in EIA

    2 2.6 24

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxiii

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    from raw material to products to be provided.

    X. Hazard identification and details of proposed safety systems.

    Hazard identification and details of proposed safety systems is given in the EIA/EMP Report.

    7 7.5 190

    XI. Expansion/modernization proposals:

    a. Copy of all the Environmental Clearance(s) including Amendments there to be obtained for the project from MOEF&CC/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment, Forest and Climate Change as per circular dated 30th May, 2012 on the status of compliances of conditions stipulated in all the existing environmental clearance including Amendments shall be provide. In addition, status of compliance of Consent to Operate for the ongoing existing operation of the project from SPCB/PCC shall be attached with the EIA-EMP report.

    Not Applicable

    EC was not taken before installation of the existing plant.

    CTO was never granted by JSPCB for operation of the installed Units.

    - - -

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxiv

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    b. b) In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the EIA Notification 1994 and/or Notification 2006 shall be provided. Copies of Consent of Establish/No Objection Certificate and Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted.

    The existing plant for production of 12,000 TPA Pig Iron through 1x23m3 Mini Blast Furnace and 2x12 Ovens Non-recovery type Coke Oven Plant for production of 15,000 TPA Coke were installed after taking Consent to Establish from JSPCB vide letter No. 225 dated 25.01.2007.

    The prior Environmental Clearance under EIA Notification, 2006 was not taken due to ignorance about the requirement and hence taken ToR from MoEF&CC on 01.02.2019 as per provisions under S.O. 804 (E) dated 14.03.2017 for the project under Violation and expansion.

    CTO was never granted by JSPCB for operation of the installed plant and the plant was never operated since installation.

    Copy of CTE is enclosed as Annexure-5

    Annexure-5

    - 405

    4. Site Details

    I. Location of the project site covering village, Taluka/ Tehsil, District and State, Justification for selecting the site, whether other sites were considered.

    Project site is located at Village: Biswasdih, P.O. Gadi Srirampur, District: Giridih, Jharkhand.

    The expansion project will also be installed within the plant premises and is a downstream facility of the existing plant, hence alternative site is not examined.

    1 1.4.3 5

    II. A toposheet of the study area of radius of 10 km and site location on 1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-

    Toposheet of the study area is given in EIA/EMP Report. 2 Fig. 2.2 18

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxv

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    sensitive areas and environmentally sensitive places)

    III. Details w.r.t. option analysis for selection of site

    Analysis of Site selection is given in the EIA/EMP Report. 5 5.2 167

    IV. Co-ordinates (lat-long) of all four corners of the site

    Corner Coordinates of the project boundary are given in the EIA/EMP Report

    2 Fig. 2.3 19

    V. Google map-Earth downloaded of the project site.

    Google imaginary of project site downloaded from Google earth is given in the EIA/EMP Report.

    2 Fig. 2.3 19

    VI. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate.

    Layout map of indicating existing unit as well as proposed unit is given in the EIA/EMP Report.

    2 Fig. 2.4 20

    VII. Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/ greenbelt, in particular

    Photographs of plantation/ greenbelt is given in EIA/EMP Report

    2 - 16

    VIII. Land use break-up of total land of the project site (identified and acquired), government/ private-agricultural, forest, wasteland,

    Area of the plant is 4.75 Ha which is acquired by project proponent. The present land use is for industrial activity.

    2 2.7.5 33

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxvi

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    water bodies, settlements, etc shall be included. (not required for industrial area).

    IX. A list of major industries with name and type within study area (10km radius) shall be incorporated. Land use details of the study area.

    A list of major industries with name & type within study area (10 km radius) and Land use details of study area is given in EIA/EMP Report.

    2 2.3.3 15

    X. Geological features and Geo-hydrological status of the study area shall be included.

    Geological Features

    The oldest geological formation which occurs in the district is the crystalline metamorphic of Archaean age, which forms the basement. The area is underlain by rocks belonging to Chotanagpur granite gneissic complex of Proterozoic age comprising of biotite and quartz biotite granite gneiss. These are overlain by lower Gondwana sedimentaries which were deposited in the slowly sinking faulted troughs or basins. Quartz biotite granite gneiss covers a large part of the area and seems to be intruded by granites. Some area has been noticed with basaltic formation of cretaceous era.

    Geological features is given in the EIA/EMP Report

    Geo-hydrological Features

    Ground water under unconfined condition is occurring in the weathered mantle whereas under semi-confined to confined condition it occurs in deeper fractures. The

    3

    3

    3.3.8

    3.3.9

    73

    74

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxvii

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    water level in the area underlies in the phreatic conditions. The site is having specific yield upto 10 m3/hr. Pre-Monsoon (May 2019) water level depth at the site varies from 7.2 to 10.3 mbgl and Post-Monsoon (November 2019) water level depth varies from 4.8 to 7.4 mbgl. The project area lies in the ‘Safe’ category zone for the future ground water development.

    Geo-hydrological features is given in the Chapter-3 of EIA/EMP Report

    XI. Details of Drainage of the project upto 5km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level of the river shall also be provided. (mega green field projects)

    Not Applicable, No major river is within the 1 km of the project site.

    Usri Nadi – 4.1 KM, Barakar River – 8 KM

    Drainage map is provided in EIA/EMP Report

    3 Fig. 3.17 73

    XII. Status of acquisition of land. If acquisition is not complete, stage of the acquisition process and expected time of complete possession of the land.

    Total Area of 4.75 ha. is already acquired by project proponent. Land documents are attached as an Annexure - 4.

    Annexure-4

    367

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxviii

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    XIII. R&R details in respect of land in line with state Government policy.

    The proposed Expansion will be carried out within the existing premises. There will be no additional land requirement. Hence, no Land Acquisition, Resettlement and Rehabilitation are envisaged for this project.

    - - -

    5. Forest and wildlife related issues (if applicable):

    I. Permission and approval for the use of forest land (forestry clearance), if any, and recommendations of the State Forest Department. (if applicable).

    Not applicable as no forest land is involve in the project. - - -

    II. Land use map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha).

    Not Applicable as no forest land is involved in the project

    However, Land use map based on High resolution satellite imagery (GPS) of the proposed site is detailed in EIA/EMP report.

    3 3.13 68

    III. Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted.

    Not Applicable. - - -

    IV. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent

    No National Park/Wild life Sanctuary within 10 km.

    - - -

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxix

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon.

    V. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area.

    Not applicable as no Schedule-I species observed during the study.

    - - -

    VI. Copy of application submitted for clearance under the Wildlife (Protection) Act,1972, to the Standing Committee of the National Board for Wildlife

    Not Applicable - - -

    6. Environmental Status

    I. Determination of atmospheric inversion level at the project site and site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall.

    The site-specific micro-meteorological data; temperature, relative humidity, hourly wind speed and direction and rainfall are given in the EIA/EMP report.

    3 Table 3.3 43

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxx

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    II. AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved forests.

    The monitoring stations are selected based on CPCB guideline and taken into account the pre-dominant wind direction, population zone and sensitive receptors etc.

    3 3.3.1.2 44

    III. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification of Nov. 2009 along with – min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA/EMP Report.

    Raw data of all AAQ measurement is detailed in EIA/EMP report.

    Min., Max., Average and 98 percentile values for each of the AAQ parameters and for each location is given in the EIA/EMP Report.

    Lab report is enclosed in the EIA/EMP Report as Annexure-3.

    3 Table 3.5 47

    IV. Surface water quality of nearby River (60m upstream and downstream) and other surface drains at eight locations as per CPCB/ MoEF&CC guidelines.

    Surface water is collected from eight locations as per CPCB/ MoEF&CC guidelines from nearby water bodies. Ponds and Rivers within the Study Area.

    Monitoring locations is given in Chapter-3, para 3.3.4, page 56 and Water Quality at page-60

    3 Table 3.10

    59

    V. Whether the site falls near to polluted stretch of river identified

    No - - -

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxi

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    by the CPCB/ MoEF&CC.

    VI. Ground water monitoring at minimum 8 locations shall be included.

    About 8 ground water samples were collected from dug wells, tube wells with in the study area to assess the water quality

    3 Table 3.9 58

    VII. Noise levels monitoring at 8 locations within the study area.

    Ambient noise levels were measured using integrated

    sound level meter at 8 locations.

    Results are given in the EIA/EMP Report

    3 Table 3.6 53

    VIII. Soil Characteristic as per CPCB guidelines.

    Soil samples were collected from 8 sampling locations from various land uses and geological features. Soil Characteristic as per CPCB guidelines is detailed in EIA/EMP report.

    3 Table 3.11

    63

    IX. Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc.

    Traffic study of the area, type of vehicles, frequency of vehicles, and additional traffic due to proposed project is given in the EIA/EMP report.

    3

    3.3.3

    53

    X. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule-I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and furnished.

    Detailed Biological Environment survey was conducted by Functional Area Expert of M/s Vardan Environet.

    The detail of flora and fauna (Terrestrial and Aquatic) present in the study area is given in the EIA/EMP Report.

    3 3.3.11 94

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxii

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    XI. Socio-economic status of the study area.

    Socio-economic survey was conducted by Functional Area Expert (Socio-economic) of M/s Vardan Environet. The details are incorporated in the EIA/EMP Report.

    3 3.3.10 78

    7. Impact Assessment and Environment Management Plan

    I. Assessment of ground level concentration of pollutants from the stack emission based on site-specific meteorological features. In case the project is located on a hilly terrain, the AQIP Modeling shall be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ.

    Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be well assessed. Details of the model used and the input data used for modeling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any.

    The project is not located on a hilly terrain.

    Air quality Modeling has been done for determining cumulative impact of all sources of emission. ISCST3 (US-EPA approved) Dispersion Model was used to predict the impact of the project on air quality.

    The details are incorporated in EIA/EMP Report.

    4 4.4.3 126

    II. Water Quality modelling– in case, if Not applicable as the proposed project has adopted - - -

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxiii

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    the effluent is proposed to be discharged into the local drain, then Water Quality Modelling study should be conducted for the drain water taking into consideration the upstream and downstream quality of water of the drain.

    “Zero liquid effluent Discharge (ZLD)”.

    III. Impact of the transport of the raw materials and end products on the surrounding environment shall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail cum road transport or conveyor-cum-rail transport shall be examined.

    Impact of the transport of the raw materials and end products on the surrounding environment is given in the EIA/EMP report.

    4 4.5.2 145

    IV. A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards

    Softening Plant backwash shall be treated in Neutralization Plant. Cooling Tower blow down water along with effluent from Neutralization plant shall be used for slag cooling. Septic tank along with soak pit has been installed for the treatment of domestic waste water. Domestic effluent, if any, will be used for horticulture. Zero Effluent Discharge from the Plant.

    4 4.6 147

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxiv

    S. No.

    TOR Point Reply Citation

    Chapter No.

    Item No. Page No.

    of discharge under E(P) Rules.

    V. Details of stack emission and action plan for control of emissions to meet standards.

    Stack emission shall be from the flue gases from Induction Furnace, Coke Oven and Mini Blast Furnace.

    Bag Filter systems have been provided for cleaning of MBF flue gas from BF Stove, flue gas from Coke Ovens. Cyclone-cum-spark arrester with Bag Filter shall be installed with Induction Furnace. Details are given in EIA/EMP Report

    4 Table 4.11

    142

    VI. Measures for fugitive emission control

    • Dust suppression systems at all transfer points

    • Dust extraction with Bag Filters at Coal & Coke Crushing & Screening Plant

    • Pucca roads within premises, water sprinkling in dusty areas and greenbelt/plantation to arrest fugitive dust.

    • Water sprinkling at all dust generating points

    • Raw materials loading / unloading in covered shed

    Details are given in EIA/EMP Report

    4 4.4.5.4 143

    VII. Details of hazardous waste generation and their storage, utilization and disposal. Copies of MOU regarding utilization of solid and hazardous waste shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/ recover techniques,

    Generation of ‘Used Oil’, after the proposed expansion shall be approx. 10 kiloliters per annum and will be sold to the registered recyclers.

    The hazardous waste will be stored and disposed as per Hazardous Waste (Management, Handling & Transboundary Movement) Rules 2016.

    2 2.7.8 34

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxv

    Energy conservation, and natural resource conservation.

    VIII. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided.

    No Fly ash generated from the plant - - -

    IX. Action plan for the greenbelt development in 33% area i.e. land with not less than 1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The greenbelt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated.

    Greenbelt will be developed over ~33% area of the total plant area. Out of the 4.75 ha. of the plant area, about 1.57 ha. will be developed as greenbelt. Approx. 2500 trees will be planted.

    Greenbelt Development Plan is given in EIA/EMP Report.

    4 4.11 159

    X. Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the groundwater and also to use for the various activities at the project site to conserve freshwater and reduce the water requirement from other sources.

    Rainwater Harvesting Scheme proposed at plant site to harvest approx. 27,300 cum. of rainwater per year is given in Chapter 4 of the EIA/EMP report.

    4 4.12 161

    XI. Total capital cost and recurring cost/annum for environmental pollution control measures shall be included

    Capital cost for Pollution Control measures is Rs.223 lakhs and recurring cost is 29 lakhs.

    10 Table 10.5

    233

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxvi

    XII. Action plan for post-project environmental monitoring shall be submitted.

    Details for post project monitoring are incorporated in EIA/EMP Report.

    6 6.2 170

    XIII. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.

    Disaster management plan is prepared and given in the EIA/EMP Report with an aim of taking precautionary step to control the hazard or to avert disaster.

    7 7.8 209

    8. Occupational health

    I. Plan and fund allocation to ensure the occupational health & safety of all contract and casual workers.

    Fund allocated Rs. 10 lakhs for OH&S (capital Expenditure)

    Fund allocated for OH&S monitoring is Rs.2 lakhs per year.

    7

    10

    Table 7.9

    Table 10.1

    205

    233

    II. Details of exposure specific health status evaluation of worker. If the workers’ health is being evaluated by pre-designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during pre-placement and periodical examinations give the details of the same. Details regarding last month analyzed data of above mentioned parameters as per age, sex, duration of exposure

    Workers' health shall be evaluated as per pre-designed

    formats for chest X rays, Audiometry, Spirometry, Vision

    testing (Far & Near vision, color vision and /or any other

    ocular defect) ECG during preplacement and periodical

    examinations. This has been discussed in EIA/EMP

    Report.

    7 7.6.1 204

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxvii

    and department wise.

    III. Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards and whether they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved.

    Details of existing Occupational & Safety hazards

    associated with the operation of M/s Lal ferro Alloys Co.

    Pvt. Ltd. along with their Permissible Exposure Level (PEL)

    are detailed in Chapter-7 of EIA.

    7 7.6 203

    IV. Annual report of health status of workers with special reference to Occupational Health and Safety

    This shall be implemented once the plant will be put into

    operation.

    - - -

    9. Corporate Environment Policy

    i. Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA/EMP Report.

    Yes, the M/s Lal ferro alloys Co. Pvt. Ltd. has well laid down Environment Policy of the Company, approved by the Board of Directors.

    Environment Policy is given in the EIA/EMP Report

    10 Fig 10.3 232

    ii. Does the Environment Policy prescribe for standard operating process/procedures to bring into focus any infringement/deviation/violation of the environmental or forest norms/conditions? If so, it may be detailed in the EIA.

    Yes, the Environment Policy prescribe for SOP regarding reporting of any deviation/violation of the environmental or forest norms/conditions to the Board of Directors of the Company. Details are incorporated in EIA/EMP Report.

    10 10.3 228

    iii. What is the hierarchical system or Hierarchical system of the company is given in the 10 Fig 10.1 229

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxviii

    Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given

    EIA/EMP Report, approved by the Board of Directors of the Company.

    iv. Does the company have system of reporting of non-compliances/violations of environmental norms to the Board of Directors of the company and/or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA/EMP Report

    Yes, the company has system of reporting of non-compliances/violations of environmental norms to the Board of Directors of the company.

    10 10.3 228

    10. Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase.

    The following facilities will be provided in the plant:

    • First aid and rest rooms

    • Canteen and welfare center

    • Toilets and change rooms

    • Car parks and cycle/scooter stands.

    - - -

    11. To address the Public Hearing issues, an amount as specified under Ministry's Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018 amounting to Rs. 12.3 lakhs, shall be earmarked by the project

    Rs. 12.3 Lakhs has been earmarked for the Corporate Environment Responsibility (CER) to meet expenditures for the commitments made to the stakeholders during Public Hearing and Social Impact assessment Study.

    7 7.4 188

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xxxix

    proponent, towards Corporate Environment Responsibility (CER). Distinct CER projects shall be carved out based on the local public hearing issues. Project estimate shall be prepared based on PWD schedule of rates for each distinct Item and schedule for time bound action plan shall be prepared. These CER projects as indicated by the project proponent shall be implemented along with the main project. Implementation of such program shall be ensured by constituting a Committee comprising of the project proponent, representatives of village Panchayat & District Administration. Action taken report in this regard shall be submitted to the Ministry's Regional Office. No free distribution/donations and or free camps shall be included in the above CER budget.

    12. Any litigation pending against the project and/or any direction/order passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the

    Yes,

    JSPCB vide letter dated on 31.07.2015 has requested, Judicial Court, Girdih to issue notice to M/s Lal Ferro Alloys Co Pvt. Ltd. and case no. 63/15 was filed against M/s Lal Ferro Alloys Co Pvt. Ltd. u/s 37 of Air (Pollution & Control of Pollution) Act, 1981 and u/s 44 of Water

    Annexure-7

    - 423

  • ENVIRONMENT IMPACT ASSESSMENT/EMP- FINAL REPORT

    TOR COMPLIANCE M/s Lal Ferro Alloys Co. (P) Limited at Village: Biswasdih, P.O: Gadi Srirampur, District: Giridih, Jharkhand

    Proposal: Environmental Clearance for Pig Iron plant (1x23m3) with capacity 12000 TPA and Coke Plant (24 ovens) of capacity 15000 TPA and for installation of Induction Furnace (1x6 Ton) with production capacity of 18000 TPA MS Ingots

    Document No. 2018_VI_00035_FINAL EIA M/s VARDAN ENVIRONET, Plot No. 82A, Sec-5, IMT Manesar, Gurugram, Haryana- 122052

    Page | xl

    Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case

    (Prevention & Control of Pollution) Act, 1974.

    13. A tabular chart with index for point wise compliance of above ToRs.

    Complied

    14. The ToRs prescribed shall be valid for period of three years for submission of the EIA-EMP reports along with Public Hearing Proceedings

    Noted

    The following general points shall be noted:

    i All documents shall be properly indexed, page numbered.

    Noted - - -

    ii Period/date of data collection shall be clearly indicated.

    Noted - - -

    i