CMPDI/DRAFT EIA/MCL/2014-15/Feb-15/20/01 Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP Expn. (Phase-III) (NORMATIVE 16.0 Mty, 3.0 Mty Incremental) (PEAK 20.0 Mty) TALCHER COALFIELD MAHANADI COALFIELDS LIMITED February 2015 Central Mine Planning & Design Institute Limited (A Subsidiary of Coal India Ltd.) Regional Institute-VII, OSHB Building, Bhubaneswar, Odisha-751 001

Transcript of Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP...

Page 1: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI/DRAFT EIA/MCL/2014-15/Feb-15/20/01

Environmental Impact Assessment

and Environment Management Plan

for LINGARAJ OCP Expn. (Phase-III)

(NORMATIVE 16.0 Mty, 3.0 Mty Incremental) (PEAK 20.0 Mty)

TALCHER COALFIELD

MAHANADI COALFIELDS LIMITED

February 2015

Central Mine Planning & Design Institute Limited

(A Subsidiary of Coal India Ltd.) Regional Institute-VII, OSHB Building, Bhubaneswar, Odisha-751 001

Page 2: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111

LIST OF CONTENTS

Sl.# Chapters Particulars Page No.

1. TOR and its Compliance of Lingaraj OCP Expn. (Phase-III) (20.0 Mty)ƒ .................................................................................................

1 -- 14

2. Proformaƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ 1 -- 46

3. Chapter-I Introduction

1.1 Purpose of the Reportƒƒƒƒƒƒƒƒƒƒƒ.. 1 -- 2

1.2 General Information ƒƒ.ƒƒƒƒƒƒƒƒƒƒ 2 -- 4

1.3 Scope of Studyƒƒƒƒƒ.ƒƒƒƒƒƒƒƒƒ. 4 -- 4

1.4 Sources & Types of Dataƒƒƒƒƒƒƒƒƒƒ. 5 -- 5

4. Chapter-II Project Description

2.1 Study Area Profileƒƒƒƒƒƒƒ.ƒƒƒƒƒƒ 1 -- 7

2.2 Project Profileƒƒƒƒƒƒƒƒƒ..ƒƒƒƒƒ.. 7 -- 13

2.3 Mine, Target, Life & Reserve..ƒƒƒƒƒƒƒƒ 14 -- 14

2.4 Mining Detailsƒ..ƒƒƒƒƒƒƒƒƒƒƒƒƒ.. 14 -- 15

2.5 Geo-mining Characteristicsƒƒƒƒƒƒƒƒƒ. 16 -- 16

2.6 Grade of Coal ƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ 16 -- 16

2.7 Other Parameters of Projectƒƒ..ƒƒƒƒƒƒ. 16 -- 21

2.8 Proposed Production Schedule OB Removal & Backfillingƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ

21 -- 21

2.9 Details of Land Requirementƒƒƒƒƒƒƒƒ ... 21 -- 22

2.10 Details of Equipment and Rational for Selection of Equipmentƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ..

22 -- 25

2.11 Vehicular Traffic Densityƒƒƒƒƒƒƒƒƒƒ.. 25 -- 27

2.12 Mineral & Transportationƒƒƒƒƒƒƒƒƒƒ.. 27 -- 27

2.13 Coal Sample Analysis Report ƒƒƒ. ƒƒƒƒ.. 28 -- 28

2.14 Strengthening of Existing Transportation Roadƒ 28 -- 28

2.15 Litigation / Pending Caseƒƒƒƒƒƒƒƒƒƒ. 28 -- 28

2.16 Details of Welfare Facilitiesƒƒƒƒƒƒƒƒƒ. 28 -- 29

2.17 Occupational Health Issuesƒƒƒƒƒƒƒƒƒ. 29 -- 30

2.18 Diversion of Nallah/Reorganisation of Existing Roadƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ

30 -- 30

Page 3: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111

Sl.# Chapters Particulars Page No.

2.19 Use of Natural Resourcesƒƒƒƒƒƒƒƒƒƒ 30 -- 31

2.20 Economic Parametersƒƒƒƒƒƒƒƒƒƒƒ.. 31 -- 31

5. Chapter-III Description of the Environment

3.1 Present Environmental Scenarioƒƒƒƒƒƒƒ 1 -- 1

3.2 Ambient Air Qualityƒƒƒƒƒƒƒ.ƒƒƒƒƒ.. 1 -- 21

3.3 Water Qualityƒƒƒƒƒƒƒƒƒƒ.ƒƒƒƒƒ 21 -- 31

3.4 Hydrology & Hydrogeologyƒƒƒ.ƒ.ƒƒƒƒƒ 31 -- 51

3.5 Noise Level Measurementƒƒƒƒƒƒƒƒƒ.. 52 -- 54

3.6 Land Use/Cover Patternƒƒƒƒƒƒ.ƒƒƒƒ. 54 -- 54

3.7 Socio-economic Scenarioƒƒƒ.ƒƒƒƒƒƒ... 55 -- 84

3.8 Soil Quality Studyƒƒ.ƒƒƒƒƒƒƒƒƒƒƒ. 85 -- 85

3.9 Information on Bio-diversityƒƒƒƒƒ.ƒƒƒƒ 85 -- 104

6. Chapter-IV Anticipated Env. Impacts & Mitigation Measures

4.1 Assessment of Impact and Control Measures on Air Quality ƒƒƒƒ..ƒƒƒƒƒƒƒƒƒƒƒ...

1

--

7

4.2 Assessment of Impact and Control Measures on Hydrology & Hydrogeologyƒƒƒƒƒƒ.ƒƒƒ.

8

--

30

4.3 Noise Qualityƒƒ.ƒƒƒƒƒƒƒƒƒƒ.ƒƒƒ 31 -- 32

4.4 Risk and Hazardsƒƒƒƒƒƒƒƒƒƒƒƒƒ.. 32 -- 34

4.5 Impact on Socio-economic Profileƒƒƒƒ.ƒƒ. 34 -- 37

4.6 Impact on Bio-diversityƒƒƒƒƒƒƒ.ƒƒƒƒ 37 -- 38

4.7 Impact on Land Use and Land Scapeƒƒƒƒƒ 38 -- 40

4.8 Impact on Traffic Movement and control measures ƒƒƒƒƒƒƒƒƒƒƒ.ƒƒƒƒƒ.

41

--

41

4.9 Impact on Public Healthƒƒƒƒƒƒƒƒƒƒƒ 41 -- 42

7. Chapter-V Analysis of Alternative Technology

5.1 Introductionƒƒƒƒƒƒƒƒƒƒ.ƒƒƒƒƒƒ 1 -- 1

5.2 Mining Technology for Envl. Managementƒƒƒ 1 -- 3

Page 4: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111

Sl.# Chapters Particulars Page No.

8. Chapter-VI Environmental Management System and Monitoring Organisation

6.1 Environmental Management Systemƒƒƒƒƒ. 1 -- 1

6.2 Monitoring Organisationƒƒƒƒƒƒƒƒƒƒ... 2 -- 5

6.3 Monitoring & Controlƒƒƒƒƒƒƒƒƒƒƒƒ. 5 -- 6

9. Chapter-VII Additional Studies

7.1 Disaster Management (Risk Assessment & Management) ƒƒƒƒƒƒƒƒ.ƒ.ƒƒƒƒƒ..

1

--

6

7.2 Social Impact & RR Action Planƒƒƒƒƒƒƒ.. 6 -- 8

7.3 Corporate Social Responsibilityƒƒƒƒƒƒƒ.. 8 -- 11

7.4 Habitat Management / Wildlife Conservation Costƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ.

12

--

12

7.5 Public Consultation / Hearingƒƒƒƒƒƒƒƒ. 12 -- 25

7.6 Rain Water Harvestingƒƒƒƒƒƒƒƒƒƒƒ. 25 -- 26

7.7 Slope Stabilityƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ 26 -- 38

7.8 Impact on riparian system within the 10 kms radius of the mining area be submittedƒƒƒ

39 -- 45

10. Chapter-VIII Project Benefits

8.1 Introductionƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ. 1 -- 1

8.2 Improvement in Physical Infrastructure & Community Developmentƒƒƒƒƒƒƒƒƒƒ.

1

--

2

8.3 Improvement in Social Infrastructureƒƒƒƒƒ. 2 -- 3

8.4 Employment Potentialƒƒƒƒƒƒƒƒƒƒƒ... 3 -- 4

8.5 Other Tangible Benefitsƒƒƒƒƒƒƒƒƒƒƒ 4 -- 4

11. Chapter-IX Environmental Economics

9.1 Introductionƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ. 1 -- 1

9.2 Expenditure to be incurred towards CSRƒƒƒ .. 1 -- 1

9.3 Compensatory Afforestation Costƒƒƒƒƒƒ.. 1 -- 1

9.4 Habitat Management / Wild Life Conservation Costƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ.

2

--

2

9.5 Rain Water Harvestingƒƒƒƒƒƒƒƒƒƒƒ. 2 -- 2

Page 5: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111

Sl.# Chapters Particulars Page No.

9.6 Community Development for Peripheral Villages 2 -- 2

9.7 Rehabilitation & Resettlement Costƒƒƒƒƒƒ 2 -- 2

9.8 Biological Reclamation Costƒƒƒƒƒƒƒƒ.. 3 -- 3

9.9 Mine Closure Costƒƒƒƒƒƒƒƒƒƒƒƒƒ. 3 -- 3

9.10 Revenue Cost for EIA & EMPƒƒƒƒƒƒƒƒ. 3 -- 3

12. Chapter-X Environmental Management Plan

10.1 Mine Closure Planƒƒƒƒƒƒƒ..ƒƒƒƒƒ.. 1 -- 30

10.2 Post-operational Stage Land Use Planƒƒƒƒ. 31 -- 33

10.3 Afforestation & Comprehensive Greenbelt Development Programme ƒƒƒƒƒƒ..ƒƒƒ.

33

--

38

10.4 Top Soil Management ƒƒƒƒƒƒƒƒƒƒƒ. 39 -- 39

10.5 Control Measures to Restore Land use & Land Scapeƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒƒ..

39

--

39

10.6 Control Measures for Traffic Movementƒƒƒƒ 40 -- 40

10.7 Biota Conservation Planƒƒƒƒƒƒƒƒƒƒ.. 40 -- 42

13. Chapter-XI Summary & Conclusion

11.1 Summarised Dataƒƒƒƒƒƒƒƒƒƒƒƒƒ.. 1 -- 5

11.2 Justification for Implementation of the Projectƒ. 5 -- 6

11.2 Executive Summaryƒƒƒƒƒƒƒƒƒƒƒƒ.. 6 -- 60

Page 6: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111

LIST OF ANNEXURES Sl# Particulars Annexure Page No.

1. Approval of Enhancement of Production of Mine Plan / Project Report

I 1 - 1

2. Copy pf Agreement of Drawing of Water II 1 - 2

3. Copy of Agreement of Power Supply III 1 - 11

4. Renwal of Explosive Licence / Letter from Concerned Authority to Use Magazine & Explosive

IV 1 - 4

5. Status of Compliance Consent to Establish for the Existing Project for Air & Water Issued by SPCB

VA 1 … 4

6. Status of Compliance Consent to Operate for the Existing Project for Air & Water Issued by SPCB

VB 1 … 6

7. Status of Forest Land for the Existing Project / Expn. Project

VI 1 … 2

8. Public Hearing Compliance of the Existing Project (16.0 Mty) (Peak 20.0 Mty)

VII 1 … 60

9. Health Study Report VIII 1 … 5

10. Soil Quality Report IX 1 … 5

11. Certified copy of Monitoring report of Environment Clearance Granted Originally for Lingaraj OCP of MCL by MoEF (Regional Office) Govt. of India, Bhubaneswar

X 1 … 15

12. Environmental Statement XI 1 … 5

Page 7: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111

LIST OF PLATES

Sl# Particulars Plate

1. Location Plans showing the Location of the Mine/Block Plate-I(A&B)

2. Geological Plan showing the Incrop of Coal Seam Plate-IIA

3. Lithologs of Boreholes Plate-II(B1&B2)

4. Geological Cross-Section Plate-IIC

5. Drainage Map Plate-III

6. Plan Showing Infrastructure Areas Plate-IV

7. Land Use/Cover Plan Core & Buffer Zone Plate-V

8. Study Area Map of Buffer Zone Plate-VI

9. Surface Master Plan Plate-VII

10. Present Working Plan Plate-VIII

11. 10th Year Stage Plan of Working Plate-VIIIA

12. Final Stage Dump Plan Plate-IXA

13. Transverse & Longitudinal Cross Section Plate-IXA1

14. Plan showing existing large Operating open cast mine positions Plate-IXB

15. Combined final stage plan Plate-IXC

16. Sampling Spot Location Plan (Air Monitoring Station) Plate-XA

(a) Isopleth for PM10 without Control Measures Plate-XA1

(b) Isopleth for PM10 with Control Measures Plate-XA2

(c) Isopleth for PM2.5 without Control Measures Plate-XA3

(d) Isopleth for PM2.5 with Control Measures Plate-XA4

17. Sampling Spot Location Plan (Water Monitoring Station) Plate-XB

18. Rehabilitation Layout Plate-XC

19. Pizometer Location Plan of Talcher Coalfield Plate-XI

Page 8: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Undertaking, Page - 1

UNDERTAKING It is certified that EIA-EMP Report for Lingaraj OCP

Expn. (Phase-III) (Normative Capacity 16.0 Mty; 3.0 Mty

incremental) (Peak Capacity 20.0 Mty) has been formulated

and the prescribed TORs have been compiled with data

obtained from Lingaraj OCP, Talcher Coalfield, MCL. Project

Report of Lingaraj OC Expn. Project (Phase-III), Normative

capacity 16.0 Mty (Peak 20.0 Mty) approved by MCL on

6/2/2010 at Kolkata and other various type of data and its

sources mentioned in Chapter-1, Para 1.4 are factually

correct.

Regional Director,

CMPDI, RI-VII, Bhubaneswar (Consultant)

G.M, Lingaraj Area, MCL

(Project Proponent)

Page 9: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 1

Page 10: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 2

Page 11: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 3

Page 12: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 4

Page 13: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 5

Page 14: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 6

Page 15: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 7

Page 16: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 8

Compliance of Terms of Reference (TOR) – Lingaraj OCP i) An EIA-EMP Report would be prepared for expansion from 13

MTPA to normative 16 MTPA with a peak prodn. Of 20 MTPA rated capacity in an ML/project area of within ML area of 1410.020 and an area of 83.19 ha outside the ML is for R&R colony, thus the total project area is 1493.2 ha based on the generic structure specified in Appendix-III of the EIA Notification 2006.

EIA-EMP report from 13 MTPA to Normative 16 MTPA with peak production of 20 MTPA has been prepared.

ii) An EIA-EMP Report would be prepared for 13 MTPA to normative 16 MTPA with a peak prodn. Of 20 MTPA rated capacity cover the impacts and management plan for the project specific activities on the environment of the region, and the environmental quality … air, water, land, biotic community, etc. through collection of data and information, generation or data on impacts including prediction modeling for 13 MTPA to normative 16 MTPA with a peak prodn. Of 20 MTPA of coal production based on approval of project / Mining Plan for 13 MTPA to normative 16 MTPA with a peak prodn. Of 20 MTPA. Baseline data collection can be for any season except monsoon.

EIA-EMP report has been prepared from 13 MTPA to 16 MTPA (Peak 20 MTPA) Chapter-3 … 10.

iii) A map specifying locations of the State, District and project location.

Plate IA and IB

iv) A Study area map of the core zone and 10 km area of the buffer zone (1:50,000 scale) clearly delineating the major topographical features such as the land use, surface drainage of rivers / streams / nalas / canals, locations of human habitations, major constructions including railways, roads, pipelines, major industries / mines and other polluting sources. In case of ecologically sensitive areas such as Biosphere Reserves / National Parks / WL Sanctuaries / Elephant Reserves, forests (Reserved / Protected), migratory corridors of fauna, and areas where endangered fauna and plants of medicinal and economic importance found in the 15 km area of the buffer zone should be given.

Plate III, V & VI

v) Land use map (1:50,000 scale) based on a recent satellite imagery of the study area may also be provided with explanatory note of the land use. Satellite imagery per se is not required.

Plate V

vi) Map showing the core zone delineating the agricultural land (irrigated and unirrigated, uncultivable land (as defined in the revenue records), forest area (as per records), along with other physical features such as water bodies, etc. should be furnished.

Plate VII and VIII

vii) A contour map showing the area drainage of the core zone and 2-5 km of the buffer zone (where the water courses of the core zone ultimately join the major rivers / streams outside the lease / project area) should also be clearly indicated as a separate map.

Plate IIA & III

viii) A detailed Site plan of the mine showing the various proposed break-up of the land for mining operations such as the quarry area, OB dumps, green belt, safety zone, buildings, infrastructure, CHP, ETP, Stockyard, township / colony (within and adjacent to the ML), undisturbed area and if any, in topography such as existing roads, drains / natural water

Plate VII & VIII

Page 17: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 9

bodies area to be left undisturbed along with any natural drainage adjoining the lease / project and modification of thereof in terms of construction of embankments / bunds, proposed diversion / rechanneling of the water courses, etc. approach roads, major haul roads, etc.

ix) In case of any proposed diversion of nallah / canal / river, the proposed route of diversion / modification of drainage and their realignment, construction of embankment etc. should also be shown on the map.

Plate-III, IV & VII Chapter-2, para 2.18

x) Similarly if the project involves diversion of any road / railway line passing through the ML/project area, the proposed route of diversion and its realignment should be shown.

Plate-III, IV & VII Chapter-2, para 2.18

xi) Break up of lease / project area as per different land uses and their stage of acquisition.

Chapter-2, para 2.9 (C) & (E)

LANDUSE DETAILS FOR OPENCAST PROJECT

Sl. No.

Land use Within ML area

(ha) Outside ML area

(ha) Total

1. Agricultural land 2. Forest land 3. Wasteland 4. Grazing land 5. Surface water bodies 6. Settlements 7. Others (specify) Total : xii) Break-up of lease / project area as per mining operations. Chapter-2, Para 2.9 xiii) Impact of changes in the land use due to the start of the

projects if much of the land being acquired is agricultural land / forestland / grazing land.

Chapter-4, Para 4.7, Chapter-10, Para 10.1.9.4

xiv) Collection of one-season (non-monsoon) primary baseline data on environmental quality … air (PM10, PM2.5, SO2, NOX and heavy metals such as Hg, Pb, Cr, As, etc.), noise, water (surface and groundwater), soil along with one season met data coinciding with the same season for AAQ collection period.

Chapter-3, Para 3.1 to 3.8,

xv) Map of the study area (1:50,000 scale) (core and buffer zone clearly delineating the location of various stations superimposed with location of habitats, other industries / mines, polluting sources. The number and location of the stations in both core zone and buffer zone should be selected on the basis of size of lease / project area, the proposed impacts in the downwind (air)/downstream (surface water) / groundwater regime (based on flow). One station should be in the upwind / upstream / non-impact / non-polluting area as a control station. The monitoring should be as per CPCB guidelines and parameters for water testing for both ground water and surface water as per ISI standards and CPCB classification wherever applicable. Values should be provided based on desirable limits.

Plate-IV, V, XA, XB & XC

xvi) Study on the existing flora and fauna in the study area (10 km) carried out by an institution of relevant discipline and the list of flora and fauna duly authenticated separately for the core and

Chapter-3, Para 3.9

Page 18: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 10

buffer zone and a statement clearly specifying whether the study area forms a part of the migratory corridor of any endangered fauna. If the study area has endangered flora and fauna, or it the area is occasionally visited or used as a habitat by Schedule-I fauna, or if the project falls within 15 km of an ecologically sensitive area, or used as a migratory corridor then a comprehensive conservation plan should be prepared and submitted with EIA-EMP Report and comments from the the CWLW of the State Govt. also obtained and furnished.

xvii) Details of mineral reserves, geological status of the study are and the seams to be worked, ultimate working depth and progressive stage-wise working scheme until end of mine life should be reflected on the basis of the approved rated capacity and calendar plans of production from the approved Mining Plan. Geological maps and sections should be included. The progressive mine development and Conceptual Final Mine Closure Plan should also be shown in figures.

Chapter-2, Para 2.2.5, 2.3.2.6, Plate-II A, II (B1 & B2) & IIC, Chapter-10, Para 10.1, Plate-IXA & IXC.

xviii) Details of mining methods, technology, equipment to be used, etc. rationale for selection of that technology and equipment proposed to be used vis-à-vis the potential impacts.

Chapter-2, Para 2.10, Chapter-2, para 2.4 Chapter-5

xix) Impact of mining on hydrology, modification of natural drainage, diversion and channeling of the existing rivers / water courses flowing though the ML and adjoining the lease / project and one impact on the existing users and impacts of mining operations thereon.

Chaper-4, Para 4.2

xx) Detailed water balance should be provided. The break-up of water requirement for the various mine operations should be given separately.

Chapter-2, Para 2.7, Chapter-4, Para 4.2.2.4

xxi) Source of water for use in mine, sanction of the competent authority in the State Govt. and impacts vis-à-vis the competing users.

Chapter-2, Para-2.7, Annexure-II.

xxii) Impact of mining and water abstraction use in mine on the hydrogeology and groundwater regime within the core zone and 10 km buffer zone including long-term modeling studies on. Details of rainwater harvesting and measures for recharge of groundwater should be reflected in case there as a declining trend of groundwater availability and / or if the area falls within dark / grey zone.

Chapter-4, Para 4.2, Chapter-3, para 3.4, Chapter-7, para 7.6

xxiii) Impact of blasting, noise and vibrations. Chapter-4, Para 4.3 & 4.4

xxiv) Impacts of mining on the AAQ, predictive modeling using the ISCST-3 (Revised) or latest model.

Chapter-4, Para 4.1.

xxv) Impacts of mineral transportation … within and outside the lease / project along with flow-chart indicating the specific areas generating fugitive emissions. Impacts of transportation, handling, transfer of mineral and waste on air quality, generation of effluents from workshop, management plan for maintenance of HEMM, machinery equipment. Details of various facilities to be provided in terms of parking, rest areas, canteen, and effluents / pollution load from these activities.

Chapter-2, Para 2.12 Chapter-4, Para 4.1.3

xxvi) The committee desired that a calendar plan of production and OB generation including rehandling should be furnished with various options of backfilling the mine void at the final mine closure stage including option of dumping/receiving OB from neighbouring mines to avoid external OB dumping. Details of waste generation … OB, topsoil … as per the approved calendar programme, and their management shown in figures as well

Chapter-2, Para-2.7.1 & 2.8, Chapter-10, Para 10.1.9 Plate-IX A1

Page 19: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 11

explanatory chapter with tables giving progressive development and mine closure plan, green belt development, backfilling programme and conceptual post mining land use. OB dump heights and terracing should based on slope stability studies with a max of 28o angle as the ultimate slope. Sections of dumps (ultimate) (both longitudinal and cross section) with relation to the adjacent area should be shown.

xxvii) Progressive Green belt and afforestation plan (both in text figures as well as in table prepared by MoEF) and selection of species (local) for the afforestation / plantation programme based on original survey / landuse.

Chapter-10, Para 10.1.9.4, Para 10.3

Table-1: Stage-wise Landuse and Reclamation Area (ha) S No.

Land use Category Present (1st Year)

5th Year 10th Year 20th Year

24th Year (end of Mine life)

Total Area in ha.

1. Backfilled Area (Reclaimed with Plantation) 20.60 22.91 48.0 137.0 63.631 292.141

2. Excavated Area (not reclaimed)/void

246.71 246.71*

3. External OB dump (Reclaimed with plantation)

55.09

200.94 (Grass Carpeting) 256.03

4. Reclaimed Top Soil dump Concurrently Reclaimed in Backfilled & External Dump Area

5. Green Belt Area (Safety Zone) 15.48 43.51 51.59 -- -- 110.58 6. Undisturbed Area (Brought under

plantation) (Rationalisation of project boundary)

-- -- 2.08 -- -- 2.08

7. Roads (avenue plantation) 14.23 12.461 - - - 26.691

8. Area around buildings (R&R site and Residential colony) and Infrastructure

3.87 23.13 - - - 27.00

TOTAL 109.27 102.011 101.67 137.00 264.571 714.522 * Not considered for reclamation.

Table-2: Stage-wise Cumulative Plantation (Chapter-10, page 9) Sl. No. YEAR* Green Belt External Dump Backfilled area Others

(Undisturbed area/etc)

Total

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha) No. of trees

Area (ha)

No. of trees

Area (ha) No. of trees

1. Existing 17.60 59325 65.09* 177125 21.80 64652 15.98 28507 120.47 329609 2. 1st year

43.51 108775 -- -- 13.89 34700 21.461 53652 78.831 197127 3. 5th year 4. 10th year 59.83 149575 -- -- 29.07 72675 7.97 19925 96.87 242175 5. 15th year

-- -- -- -- 82.98 207501 -- -- 82.98 207501 6. 20th year

7. 21st year (end of Mine life) -- -- 190.94

Grass Carpetin

g 38.571 174485 -- -- 229.511 174485 8. 21- 24th year (post

mining) Total : 120.94 317675 256.03 177125 186.311 554013 45.411 102084 608.662 1150897

* External dump area will be rehandled.

Page 20: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 12

xxviii) Conceptual Final Mine Closure Plan, post mining land use and

restoration of land / habitat to pre-mining. A Plan for the ecological restoration of the area post mining and for land use should be prepared with detailed cost provisions. Impact and management of wastes and issues of rehandling (wherever applicable) and backfilling and progressive mine closure and reclamation.

Chapter-10, Para 10.1 & 10.2.

Table-3: Post-mining Landuse Patter of ML/Project Area (ha) (Chapter-10, page 10)

Sl. No.

Land Use during Mining Land Use (ha)

Plantation Water Body Public Use Undisturbed TOTAL 1. External OB Dump 256.03 - -- - 256.03

2. Top Soil Dump Concurrently Reclaimed in Backfilled & External Dump Area

3. Excavation 292.141 80.96 - 165.749 538.85 4. Roads - - - - - 5. Built up area 10.36 - 41.44 - 51.80 6. Green Belt 110.58 - - 442.34 552.92 7. Undisturbed Area (Rationalisation

of project boundary and diversion of existing coal transportation road)

2.08 - 8.33 - 10.41

TOTAL 671.191 80.96 49.77 608.089 1410.01 xxix) Flow chart of water balance. Treatment of effluents from

workshop, township, domestic wastewater, mine water discharge, etc. Details of STP in colony and ETP in mine. Recycling of water to the max. possible extent.

Chapter-4, Para 4.2.2.4.

xxx) Occupational health issues. Baseline data on the health of the population in the impact zone and measures for occupational health and safety of the personnel and manpower for the mine.

Chapter-2, Para 2.17, Annexure-VIII.

xxxi) Risk Assessment and Disaster Preparedness and Management Plan.

Chapter-7, Para 7.1.

xxxii) Integrating in the Env. Management Plan with measures for minimizing use of natural resources water, land, energy, etc.

Chapter-2, Para 2.19 Chapter-10, Para 10.1.9.3 to 10.1.9.5.

xxxiii) Including cost of EMP (capital and recurring) in the project cost and for progressive and final mine closure plan.

Chapter-9

xxxiv) Details of R&R. Detailed project specific R&R Plan with data on the existing socio-economic status of the population (including tribals, SC/ST, BPL families) found in the study

Chapter-7, Para 7.2.

Page 21: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 13

area and broad plan for resettlement of the displaced population, site for the resettlement colony, alternate livelihood concerns / employment for the displaced people, civic and housing amenities being offered, etc. and costs along with the schedule of the implementation of the R&R Plan.

xxxv) CSR plan along with details of villages and specific budgetary provisions (capital and recurring) for specific activities over the life of the project.

Chapter-7, Para 7.3

xxxvi) Public Hearing should cover the details of notices issued in the newspaper, proceedings / minutes of public hearing, the points raised by the general public and commitments made by the proponent should be presented in a tabular form. If the Public Hearing is in the regional language, an authenticated English Translation of the same should be provided.

Chapter-7 Para 7.5, Annexure-VII

xxxvii) In built mechanism of self-monitoring of compliance of environmental regulations.

Chapter-6

xxxviii) Status of any litigations/court cases filed / pending on the project.

Chapter-2, Para 2.15

xxxix) Submission of sample test analysis of : Characteristics of coal … this includes grade of coal and other characteristics … ash, S and heavy metals including levels of Hg, As, Pb, Cr, etc.

Chapter-2, Para 2.13.

xxxx) Copy of clearances / approvals … such as Forestry clearances Mining Plan Approval, NOC from flood and Irrigation Dept. (if req.), etc. wherever applicable.

Annexure-I and VI.

(A) Forestry Clearance Total ML/ Project Area (ha)

Total Forestland (ha)

Date of FC Extent of forestland

Balance area for which FC is yet to be obtained

Status of appl. For diversion of forestland

If more than one, provide details of each FC

140.01 186.311 2/7 March, 1989

186.311 Nil Stage-II clearance obtained.

Page 22: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 TOR, Page - 14

(B) Mining Plan / Project Approval Date of Approval of Mining Plan / Project Approval : 1st July, 2011 Copy of letter of Approval of Mining Plan / Project Approval (Annexure-I) (xxxxi) Corporate Environment Responsibility : --

a) The company must have a well laid down Environment Policy approved by the Board of Directors.

Chapter-7, Para 7.3.

b) The Environment Policy must prescribe for standard operating process / procedures to bring into focus any infringements / deviation / violation of the environmental or forest norms / conditions.

Chapter-7, Para 7.3.

c) The hierarchical system or Administrative Order of the company to deal with environmental issues and for ensuring compliance with the environmental clearance conditions must be furnished.

Chapter-6

d) To have proper checks and balances, the company should have a well laid down system of reporting of non-compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large.

Chapter-6

Specific TOR Minutes of the 17th EAC (Thermal & Coal Mining Projects) Meeting held on 23rd … 24th & 25th July 2014 in New Delhi. (i) Impact on riparian system within the 10 kms radius of the

mining area be submitted. Chapter-7, para 7.8

(ii) Monitoring of ground water at the depth equivalent to mine depth into the 10 kms radius of the mine be submitted.

Chapter-7, para 7.8

Page 23: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 1

PROFORMA FOR ENVIRONMENTAL APPRAISAL OF MINING PROJECTS (MINING SECTOR PROJECTS)

Note 1 : All information to be given in the form of Annex/s should be properly numbered and form part of

reply to this proforma. Note 2 : Please enter � in appropriate box where answer is Yes / No Note 3 : No abbreviation to be used – Not available or Not applicable should be clearly mentioned. Note 4 : Core zone is the mining lease area.

Buffer zone in case of ML area upto 25 ha is to be considered as 5 km all around the periphery of the core zone and for ML area above 25 ha an area 10 km all around the periphery of the core zone.

Note 5 : Adopt Scoping process in carrying out EIA study. Note 6 : Please indicate source of data. 1. General information

(a) Name of the project : Lingaraj OCP Expansion (Phase-III), (i) Name of the proponent : Project Officer,

Lingaraj OC Expn. Project. Mailing Address : Lingaraj Area, MCL,

P.O : Deul Bera Colliery, Dist. : Angul – 759 102 (Odisha).

E-mail : [email protected] , [email protected]

Telephone : 06760 – 241270 (O)

Fax No. : 06760 – 241269 (O) (b) Objective of the project : 1. To bridge the overall deficit of coal availability over

demand of MCL. 2. To meet demand of Kaniah STPS / Basket linkage.

(c) Location of mine (s) Village(s) Tahsil District State

Balugaon, Langijoda, Talabeda , Majirurihota , Gengutia , Dadara , Dhempakuta , Manikagoda , Malipoda , Badapasi , Debalayapur , Balugaon Khamar , Ambamunda , Nakulabaspur , Madanmohanpur, Khandulbahal , Daulbera

Talcher Angul Orissa

(d) Does the proposal relate to (i) New mine : No (ii) Expansion : Yes � Increase in ML area : No (Quarry area has only been increased from 510.851

ha to 538.851 ha) � Increase in annual

production : Yes ( from 13.0 Mty to 16.0 Mty Normative /

20.0 Mty peak) (iii) Renewal of ML : No (iv) Modernisation : No

Page 24: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 2

(e) Site information (i) Geographical location � Latitude : 20O57’39” & 20O58’18” North � Longitude : 85O09’33” & 85O12’12” East � Survey of India Topo sheet

number : 73 H/1

� Elevation above Mean Sea

Level : 85 to 120 m

� Total mining lease area (in ha) [Total land require- ment - (land for resettle-ment site + land for residential colony)]

: 1410.01 ha

(ii) Dominant nature of terrain � Flat : No � Undulated : Yes (gently undulating) � Hilly : No

2. Land usage of the mining lease area (in ha)$

(a)

Agricultural

:

Land Use for 13.0 Mty

Land Use for 16.0 Mty ( 20.0 Mty Peak)

828.699 828.699 (b) Forest : 186.311 186.311 (c) Waste land : 350.00 306.72 (d) Grazing : Nil Nil (e) Surface water bodies : 45.00 45.0 (f) Others (specify) - Settlements : Nil 43.28 Total : 1410.01 1410.01 $ Mining lease area ={total land requirement (1493.20 ha) –[ residential colony area (6.00 ha)

+rehabilitation site (77.19 ha)]} =1410.01 ha as per the section 3(c) and 3(d) of the MM (R&D) Act, 1957.

3. Indicate the seismic zone in which ML area falls. In case of zone IV & V, details of earth

quakes in last 10 years. (a) Severity (Richter scale) : Zone-II (b) Impact, i.e. damage to � Life : No � Property : No � Existing mine : No

Page 25: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 3

4. Br

eak-

up o

f the

min

ing

lease

area

(in

ha) a

s per

appr

oved

conc

eptu

al pl

an :

Purp

ose

Minin

g lea

se ar

ea

Total

Ar

ea ac

quire

d Ar

ea to

be ac

quire

d Go

verm

ent

Priva

te

Gove

rnme

nt Pr

ivate

Go

verm

ent

Priva

te

Fore

st Ot

hers

Agric

ultur

e

Othe

rs Fo

rest

Othe

rs

Agric

ultur

e

Othe

rs Fo

rest

Othe

rs Ag

ricult

ure

Othe

rs

1. Ar

ea to

be ex

cava

ted

113.8

59

424

.992 →

53

8.851

11

3.859

42

4.992

---

N

il

2.

Stor

age f

or to

psoil

---

Inc

luded

in Ite

m No

.5 →

---

---

Inc

luded

in Ite

m No

.5 →

---

N

il

3.

Over

burd

en / D

umps

(exte

rnal)

---

2

56.03

0

25

6.030

---

25

6.030

---

Nil

4. Mi

nera

l stor

age

---

Includ

ed in

Item

No.5

---

---

← I

nclud

ed in

Item

No.5

---

---

5. Inf

rastr

uctur

e (W

orks

hop,

CHP,

rly. s

iding

, ro

ads,

proje

ct off

ice, e

tc.)

---

51.80

51

.80

---

51

.80

---

Ni

l

6. Ra

tiona

lisati

on of

proje

ct bo

unda

ry an

d roa

d for

dive

rsion

---

10.41

10

.41

---

1

0.41

---

Nil

7. Ra

ilway

s (sid

ing)

8.

Gree

n Belt

$

9. Ta

ilings

pond

Inc

luded

in Ite

m No

.5

10

. Ef

fluen

t trea

tmen

t plan

t

11.

Coal

hand

ling p

lant /

mine

ral s

epar

ation

plan

t

12.

Town

ship

area

Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l Ni

l 13

. Ot

her (

spec

ify) [

300 m

safet

y zon

e for

blas

ting

danz

er zo

ne)

72.45

2 ←

4

80.46

7

552.9

19

72.45

2 ←

48

0.467

---

Ni

l

TO

TAL

186.3

11

1223

.699

1410

.01

186.3

11

1

223.6

99

---

Nil

N.B.

: 1.

Minin

g lea

se ar

ea =

[Tota

l land

requ

ireme

nt (1

493.2

00 ha

) – {r

esett

lemen

t site

(77.1

9 ha)

+ re

siden

tial c

olony

(6.00

ha)}]

= 14

10.01

ha.

Page 26: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 4

5. Township (outside mining lease)

(a) Total area (in ha) : 6.00 (b) No. of dwelling units : 456$ (c) Distance from mine site : (<) 5 km N.B : Besides the above land requirement, 77.19 ha of non-forest (govt. & tenancy) land is

required for resettlement site. $ Besides these dwelling units, the township of Talcher U/G mine are accommodating the

employees of existing Lingaraj OCP. Further, the residential colonies of Deulbera and Handidhua which are closing U/G mines, will meet the additional requirement.

6. Distance of water bodies (in km)

Distance from River bank@ Other water bodies@ sea/creek/lake/nullah, etc. (specify)

Mining lease boundary Bangaru Jhara – 2.40 km Brahmani River – 3.0 km Nandira Jhara - 5.20 km Singhada Jhara – 12.50 km Satyabadisagar Pond - Extinct

Ancillary facilities ---- ---- [ @ From highest flood line/high tide line.]

7. For projects falling within the Coastal Regulation Zone (CRZ)

Whether the mineral to be mined is of rare nature and not available outside CRZ?

: No

If yes, annex a scaled location map showing low tide line (LTL), high tide line (HTL) duly demarcated by one of the authorized agencies* [ *Director, Space Application Centre, Ahmedabad; Centre for Earth Sciences Studies, Thiruvananthapuram; Institue of Remote Sensing, Anna University, Chennai; Institute of Wetland Management & Ecological Designs, Kolkata: Naval Hydrographers’s Office, Dehradun: National Institute of Oceanography, Pajim, Goa: and National Institute of Ocean Technology, Chennai], boundary of mining lease area, distance of ML area from LTL and HTL CRZ boundary and CRZ classifiation of the project area as per the approved Coastal Zone Management Plan, and settlements, sand dunes, mangroves, forest land/patches, turtles breeding and nesting sites, etc., if any, in the project area.

8. Indicate aerial distance from the periphery of core zone/area from the periphery of buffer

zone to the boundary of following (upto 10 km):

Sl.# Areas Name Aerial distance from (in km) Core zone* Buffer zone*

1. National park / Sanctuary ---- --- --- 2. Biosphere Reserve / Tiger Reserve /

Elephant Reserve / any other Reserve

--- --- ---

3. Forest (RF / PF / unclassified) Kandhal Paturia Petachira

1.0 0.85 0.75

--- --- ---

Page 27: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 5

Sl.# Areas Name Aerial distance from (in km) Core zone* Buffer zone*

Rakas Kauchiakhol Kanheijena Kuio Bhulajhar Brahmanibahal Nisa

0.60 3.00 2.00 6.00 --- --- ---

--- --- --- --- 1.5 1.6

5.12 4. Habitat for migratory birds None Nil Nil 5. Corridor for animals of Schedule I & II

of the Wildlife (Protection) Act, 1972 Nil Nil Nil

6. Archaeological sites � Notified � Others

None None

Nil Nil

Nil Nil

7. Defence Installation --- --- --- 8. Industries/Thermal power plants TTPS (NTPC), Talcher

STPS (NTPC), Kaniah Heavy Water Plant NALCO Smelter NALCO Captive Power Plant

5.0 (S) ---

3.5 (S) ---

8.0 (S)

--- 5.0 (NW)

--- 1.5 (S)

---

9. Other mines Ananta OC Expn. Deulbera U/G Jagannath OC Expn. South Balanda OCM Kalinga OCP Lingaraj OC Expn. Nandira U/G Hingula Talcher U/G

Adjoining (W) Adjoining (SE) 2.0 (NW) 3.0 (NW) 7.0 (W) 4.0 (W) 5.0 (NW) 9.0 (W) Adjoining (S)

--- --- --- --- --- --- --- --- ---

10. Airport None Nil Nil 11. Railway lines Talcher - Sambalpur

(E.Co.Rly.) --- (<) 2.0

12. National / State Highways NH-42 NH-23

--- 1.0 (E)

5.0 ---

[* Buffer zone in case of ML area up to 25 ha, is to be considered as 5 km all around the periphery of the core zone and for ML area above 25 ha, an area 10 km all around the periphery of the core zone]

Page 28: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 6

9. Description of flora & fauna separately in the core and buffer zones@ [@ Consult the Wildlife (Protection) Act, 1972 as amended subsequently and list species with (1) Common name (2) Scientific name and (3) under which schedule of the Wildlife (Protection) Act the identified species fall. Get the list authenticated by an Expert in the field / credible scientific institute/ University / Chief Wildlife Warden office. Information to be based on field survey.] Source: Field Study for Lingaraj OC Expn. Project (Talcher Coalfield) by Richardson & Cruddas (1972) Ltd. (May,2013) A. Flora Core Zone Buffer Zone 1. Agricultural crops Allium cepa (Piaja), Allium

sativum (Rasuna) , Arachis hypogaea (Badam) etc.

Oryza sativa (Rice) , Allium cepa (Piaja), Allium sativum (Rasuna) , Arachis hypogaea (Badam) , Vigna radiata (Mung) etc.

2. Commerical crops Cucurbita Sativa (Kakudi), Lycopersicum esculentum (Tomato), Capsicum annum (Miricha) etc.

Cucurbita Sativa (Kakudi), Lycopersicum esculentum (Tomato), Capsicum annum (Miricha) , Brassica botrytis (phula kobi) , Abelmoschus esculentus (Bhendi) etc.

3. Plantation Magnifera Indica (Mango) , Melia azadirachta (Big neem) , Psidium guava (guava) etc.

Magnifera Indica (Mango) , Melia azadirachta (Big neem) , Psidium guava (guava) ,. Butea Monosperma (Plasha) , Shovea robusta (Sal) , Syzigium cumini ( Jambul) , Ficus bengalensis (Pipal) etc.

4. Natural vegetation / forest type

Open canopied dry deciduous forest.

Open canopied dry deciduous forest.

5. Grass lands Exists. Exists. 6. Endangered species None None 7. Endemic species Shorea robusta (Sal),

Buchnania lanzan (Chara), Madhuca Indica (Mahula) , Terminalia belarica (Bahada) etc.

Shorea robusta (Sal), Buchnania lanzan (Chara), Madhuca Indica (Mahula) , Terminalia belarica (Bahada) etc.

8. Others (specify) Nil Nil B. Fauna 1. Total listing of faunal

elements Due to biotic pressure , forest fire and overgrazing , the number of fauna found in core zone are few.

Due to biotic pressure , forest fire and overgrazing , the number of fauna found in buffer zone are few.

2. Endangered species None None 3. Endemic species Funambulus pennati

(Gunduchi musa), Herpestes edwardsi (Neula) , Tito alba (Pecha) , Corvus splendens (Kau) etc.

Funambulus pennati (Gunduchi musa), Herpestes edwardsi (Neula) , Tito alba (Pecha) , Corvus splendens (Kau) etc.

4. Migratory species None None 5. Details of aquatic

fauna, if applicable Fishes , Amphibians , Water

snakes etc. Fishes , Amphibians , Water

snakes etc.

Page 29: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 7

The details of flora and fauna are are given in Chapter – III of EIA / EMP. 10. Details of mineral reserves (as per approved Mining Plan)

Quantity (in million tonnes) (a) Proved : 484.956

(b) Indicated : ---

(c) Inferred : ---

(d) Mineable reserves : 321.50 (as on 01/04/2010) 279.33 (as on 01/04/2014)

11. Major geological formation / disturbances in the mining lease area

(a) Geological maps submitted : Yes [Plate No.- II (A)] (b) Geological sections submitted : Yes [Plate No.- II (B1+B2)] & IIC (c) Contour map submitted : Yes [Plate No.- II (A)] (d) Whether the presence, if any,

noted of

i. Faults : Yes ii. Dykes : No iii. Shear zone : Yes iv. Folds : No v. Other weak zones@ : Yes (@ Weak zones exist near the faults) (e) Source of data (Indicate) : CMPDIL

12. Production of mineral(s) and life of mine

(a) Rated capacity of mine mineral wise (Tonnes/annum)

: 16 Mty (Peak – 20 Mty)

(b) Life of mine at proposed capacity (Years)

: 21 years (Balance) (from 01/04/2010)

(c) Lease period (Years) : Throughout the mine life

(d) Date of expiry of lease (D/M/Y) : Not applicable

(e) Indicate in case of existing mine

:

i. Date of opening of mine : 1990-91 ii. Production in the last 5

years from year 2009-10 to year 2013-14 in million tonnes

: 2009-10 2010-11 2011-12 2012-13 2013-14

13.0 11.85 11.59 11.56 7.17

Page 30: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 8

iii. Projected production for the next 5 years from year 2014-15 to year 2018-19 in million tonnes

:

2014-15 2015-16 2016-17 2017-18 2018-19 16.0 16.0 16.0 16.0 16.0

iv. Whether mining was suspended after opening of the mine ?

: No

If yes, details thereof including last production figure and reason for the same

: Not applicable

(f) Whether plans & sections provided ?

: Yes [Plate No.-VII,VIII,, VIII A, IXA, IXB& IXC]

13. Type and method of mining operations

Type Method Opencast : Yes Manual : Not applicable Underground : No Semi-mechanised : Not applicable Both : Not applicable Mechanised : Yes

14. Details of ancillary operations for mineral processing

(a) Existing : Not applicable (b) Additional : Not applicable

15. Mine details

(a) Opencast mine (i) Stripping ratio (mineral in tonnes to overburden in m3) : 0.69 (ii) Ultimate working depth (in m bgl) : 272.50 (iii) Indicate present working depth in case of existing

mine (in m bgl) : 160 m (As on 01/01/2015)

(iv) Thickness of topsoil (in m) � Minimum � Maximum � Average

: : :

0.150 0.200 0.175

(v) Thickness of overburden (in m) � Minimum � Maximum � Average

: : :

2.26 23.96 15.95

(vi) Mining Plan � Height and width of the bench in overburden /

waste.

:

Height Width 10m 32m

Page 31: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 9

� Height and width of the bench in orebody / coal seam

:

Height Width 10m 32m

� Proposed inclination / slope of the sides of the

opencast mine (separately for overburden, coal/ ore and overall slope of the pit sides) both while operating the mine as well as at the time of closure of the mine.

� Whether transverse sections across the open-

cast mine at the end of fifth year and at the end of the life of the mine have been submitted ?

: :

Working bench slope angle, Coal - 70o Working bench slope angle, OB-70o Overall pit slope at the closure of mine - 37o No

(vii) Type of blasting, if any, to be adopted : Control Blasting.

(b) Underground mines : (i) Seam/ore body : Min.Depth

(m) Max. Depth

(m) Avg.

thicknes(m) Rate of dip in degree

Direction of dip

�� Not applicable ��

(ii) Mode of entry into the mine

� Shaft � Adit � Incline

: : :

Not applicable

(iii) Details of machinery

� On surface � At face � For transportation � Others

: : : :

Not applicable

(iv)

Method of stoping (metalliferous mines)

� Open � Filled � Shrinkage � Caving � Combination of above � Others (specify)

: : : : : :

Not applicable

(v) Extraction method � Caving

� Stowing � Partial extraction

: : :

Not applicable

Page 32: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 10

(vi) Subsidence

� Predicted max. subsidence (in m) � Max. value of tensile strain (in mm/m) � Max. slope change (in mm/m) � Whether identified possible subsidence

area (s) superimposed on Surface Plan has been submitted ?

� Major impacts on surface features like natural drainage pattern, houses, buildings, water bodies, roads, forest, etc.

� Salient features of subsidence management (monitoring and control)

: : : : : :

Not applicable

16. Surface drainage pattern at mine site

(a) Whether the pre-mining surface drainage plan submitted? : Yes (Plate No.-III) (b) Do you propose any modification/diversion in the existing

natural drainage pattern at any stage ? if yes, when. Provide location map indicating contours, dimensions of water body to be diverted, direction of flow of water and proposed route/ changes, if any i.e. realignment of river/nullah/any other water body falling within core zone and its impact.

: No

17. Embankment and / or weir construction

(a) Do you propose, at any stage, construction of : (i) Embankment for protection against flood ? : No (ii) Weir for water storage for the mine ? : No (b) If so, provide details thereof. : Not applicable (c) Impact of embankment on HFL and settlment around. : Not applicable (d) Impact of weir on down-stream users of water. : Not applicable

18. Vehicular traffic density (outside the ML area)

Type of vehicles No. of vehicles per day (a) Existing : Two wheelers

Light Motor Vehicles Heavy Vehicles(Tippers)

713 625 121

(b) After the proposed activity : Two wheelers Light Motor Vehicles Heavy Vehicles(Tippers)

845 731 180

(c) Whether the existing road

network is adequate? If no, provide details of alternative proposal ?

: Yes

Page 33: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 11

19. Loading, transporation and unloading of mineral and waste rocks on surface :

(a) Manual : No (b) Tubs, mine cars, etc. : No (c) Scraper, shovels, dumpers/trucks : Yes (shovel, dozer, dumper and tippers) (d) Conveyors (belt, chain, etc.) : Yes (belt conveyors) (e) Others (specify) : Not applicable

20. Mineral(s) transporation outside the ML area

Qty. (in TPD) Percentage (%) Length (in km) (a) Road : 9697 16 (b) Rail : 50,909 84 25 (about) (c) Conveyors : --- --- (d) Ropeway : --- --- (e) Waterways : --- --- (f) Pipeline : --- --- (g) Others (specify) : --- --- Total : 60606 100

Page 34: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 12

21. Baseline meteorological & air quality data (a) Micro-meteorological data (Continuous monitoring through autographic instrument for one full season other than monsoon)

(i)Windrose pattern for one full season (16 points of compass, i.e. N, NNE, NE, ---) based

on 24-hourly data. For coastal area also furnish day-time and night-time data Details given in Chapter II.

� Day time : � Night time : � 24 hours period :

The windrose of the project site during 15th March,2013 to 12th June, 2013 is given below.

Fig-1

Page 35: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 13

(ii)

Site

spec

ific m

onito

red d

ata

Month

Wind

Spe

ed (k

mph)

Te

mper

ature

(O C)

Relat

ive H

umidi

ty (%

) Ra

in Fa

ll$ (mm

) Cl

oud C

over

@

(Octa

s of th

e sk

y)

Mean

Ma

x %

of

Calm

Me

an

(Dry

Bulb)

Hi

ghes

t Lo

west

Mean

High

est

Lo

west

Total

24

hrs

High

est

No. o

f Ra

iny D

ays

Mean

March

- 20

13

9.7

22.9

1.1

6 31

.27

40

21

58.2

84.0

26.0

0 0

0 Cl

ear

April

- 2

013

10.5

23.5

31.55

42

21

55

88

.0 20

.0 10

2

5 Cl

ear

May

- 2

013

7.2

18.5

31.28

42

22

52

.80

98.0

22.0

49

40

4 Cl

ear

$ 24

hrs r

ainfal

l sho

uld be

repo

rted f

rom

08:30

hrs I

ST of

prev

ious d

ay to

08:30

hrs I

ST of

the d

ay.

$ Ra

iny da

y is c

onsid

ered

whe

n 24

hrs r

ainfal

l is ≥

2.5 m

m.

@ V

isual

obse

rvatio

ns of

clou

d cov

er sh

ould

be re

cord

ed fo

ur tim

es a

day a

t reg

ular in

terva

ls.

(iii

) Ind

icate

name

and d

istan

ce of

the n

eare

st IM

D me

teoro

logica

l :

Data

colle

cted f

rom

IMD,

Ang

ul sta

tion w

hich i

s abo

ut 15

km by

road

.

statio

n fro

m wh

ich cl

imato

logica

l data

have

been

obtai

ned f

or

re

portin

g in t

he E

IA re

port,

if an

y.

Page 36: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 14

(b)

Ambi

ent a

ir qu

ality

dat

a* (R

PM, S

PM, S

O 2, N

O X)

[*

Monit

oring

shou

ld be

carri

ed ou

t cov

ering

one f

ull se

ason

exce

pt mo

nsoo

n - s

ame s

easo

n as i

n 21 (

a) (i)

]

[* Fr

eque

ncy o

f sam

pling

: Sam

pling

to be

done

twice

a we

ek fo

r the

entire

seas

on 24

hour

ly for

SPM

& R

PM. F

or ga

seou

s poll

utants

24 ho

urly

data

be

give

n irre

spec

tive o

f the

sam

pling

perio

d.]

i. Se

ason

& p

eriod

for w

hich

monit

oring

ha

s bee

n car

ried o

ut :

Monit

oring

was

don

e at

24 h

ourly

,with

an

inter

val o

f two

day

s in

a we

ek fo

r fou

r(4) c

onse

cutiv

e we

eks

in a

month

in

Pre

-mon

soon

sea

son

(i.e p

eriod

stat

ring

from

15th

March

,2013

to 1

2th Ju

ne, 2

013)

. ii.

No. o

f sam

ples

colle

cted

at ea

ch m

onito

ring

statio

n :

24 sa

mples

each

for P

M 10,P

M 2.5 ,

SO2,N

OX as

per C

PCB

guide

lines

.

PM

10

PM2.5

SO

2 NO

X Pb

** Na

me of

mon

itorin

g equ

ipmen

t use

d RD

S RD

S RD

S wi

th ga

seou

s sa

mplin

g atta

chme

nt an

d sp

ectro

photo

meter

RDS

with

gase

ous

samp

ling a

ttach

ment

and

spec

troph

otome

ter

Not a

pplic

able

Equip

ment

sens

ivity

AS pe

r IS:

5182

(P

art-I

V)-1

973

AS pe

r IS:

5182

(P

art-I

V)-1

973

AS pe

r IS:

5182

(P

art-I

I)-19

69

AS pe

r IS:

5182

(P

art-V

I)-19

75

Not a

pplic

able

Perm

issibl

e AAQ

sta

ndar

d (CP

CB)

(�g/m

3 )

Resid

entia

l 10

0 60

80

80

No

t app

licab

le Ind

ustria

l 10

0 60

80

80

No

t app

licab

le Se

nsitiv

e 10

0 60

80

80

No

t app

licab

le Mo

nitor

ing

Loca

tion

No. o

f Sa

mples

Dr

awn

Categ

ory*

(R

,I,S)

Min.

Max.

98%

tile

Mi

n. Ma

x. 98

%

tile

Min.

Max.

98%

tile

Mi

n. Ma

x. 98

%

tile

Min.

Max.

98%

tile

Core

zone

CA

1 24

sa

mples

I

110

136

134

26

38

37

9.4

16.4

16.4

10.9

25.7

25.6

CA2

24

samp

les

I 98

13

2 13

0 24

32

31

9

20.2

20

11

26

24.6

CA3

24

samp

les

I 74

11

2 10

8 20

26

26

7.2

11

.6 11

.4 6.8

14

.8 14

.6

Buffe

r zon

e BA

1 24

sa

mples

R

86

112

110

20

28

28

5.9

16.5

15.3

7.6

18.3

18.2

BA2

24

samp

les

R 96

13

0 12

4 20

28

28

10

.2 18

.9 18

.6 10

.4 23

.4 22

.3

BA3

24

samp

les

R 64

80

78

16

24

24

5.2

11

.2 11

.2 6.8

24

23

.1

Page 37: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 15

BA4

24

samp

les

R 60

84

84

16

21

21

4.2

11

.6 11

.4 8.5

12

.6 12

.5

BA5

24

samp

les

R 54

64

64

12

16

16

5.1

8.2

8.2

8.6

12

.5 12

.4

* R

=Res

identi

al ; I=

Indus

trial ;

S=Se

nsitiv

e; *

* Pb f

or m

inera

l spe

cific

sites

only

# An

nex a

loca

tion

map

indica

ting

locati

on o

f AAQ

stati

ons,

their

direc

tion &

disd

tance

w.r.

t pro

ject s

ite

: Gi

ven

in Pl

ate N

o.-XA

. Fo

r dist

ance

and

dire

ction

w.r.

t. pr

oject

site/c

ore

zone

, the d

etails

are g

iven b

elow

:

AA

Q S

tati

on

s

Sl.

No.

Lo

catio

n C

ode

Nam

e of

Loc

atio

n D

irect

ion

w.r

.t C

entr

e of

C

ore

Zon

e

Aer

ial D

ista

nce

(w.r

.t th

e M

ine

boun

dary

) 1.

CA

1 C

ore

Zon

e,

Pro

ject

offi

ce

--

--

2.

C

A2

Cor

e Z

one,

La

ngi j

oda

villa

ge

--

--

3.

C

A3

Cor

e Z

one,

A

mba

mun

da V

illag

e

--

--

4.

B

A1

Buf

fer

Zon

e,

Tal

abed

a V

illag

e

NE

0.

5

5.

B

A2

Buf

fer

Zon

e,

Hen

sam

ul V

illag

e

W

0.75

6.

B

A3

Buf

fer

Zon

e,

Tal

cher

tow

n

SE

0.

5

7.

B

A4

Buf

fer

Zon

e,

Kan

dhal

vill

age

N

1.

5

8.

B

A5

Buf

fer

Zon

e,

Gha

ntap

ada

villa

ge

S

1.6

Hea

vy m

etal

s fr

om a

ir S

ampl

es o

f Lin

gara

j OC

P :

(in

ppm

) H

g A

s S

e P

b C

r C

o C

u N

i Z

n M

n N

D

2.34

0.

78

17.2

2 78

.83

31.7

1 41

63.1

8 79

0.78

19

85.6

5 30

6.77

N

D :

Not

Det

ecte

d

Page 38: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 16

22

. Sta

ck an

d em

issio

n de

tails

, if an

y*

Sl.N

o. Pr

oces

s/unit

of

oper

ation

(eg.

DG

set, B

oiler

)

Heigh

t of

stack

(m)

Inter

nal to

p dia

. (m)

Flu

e Gas

exit

veloc

ity (m

/sec)

Em

ission

rate

(kg/h)

He

at em

ission

rate

from

top of

stac

k (kc

al/h)

Exha

ust /F

lue ga

s

SP

M

SO2

NOx

CO

Te

mp O c

De

nsity

Sp

ecific

He

at Vo

lumetr

ic flo

w ra

te (m

3 /h)

��

N

ot ap

plica

ble a

s the

re is

no

stac

k in

this

proj

ect

��

23

. De

tails

of f

ugiti

ve em

issio

ns d

urin

g m

inin

g op

erat

ions

*

:

Non-

point

spec

ific / f

ugitiv

e emi

ssion

sour

ces f

rom

this p

rojec

t are

:

-- Op

erati

on of

coal

winn

ing an

d ove

rbur

den r

emov

al.

--

Drilli

ng an

d blas

ting o

pertio

ns

--

Haul

road

of pa

ved a

nd un

pave

d typ

es.

-

- W

ind er

osion

from

coal

stock

piles

, ben

ches

and o

verb

urde

n dum

ps.

24. A

ir qu

ality

impa

ct p

redi

ctio

n (A

QIP)

*

---

(a)

Detai

ls of

mode

l(s) u

sed

for A

QIP

includ

ing gr

id siz

e, ter

rain

featur

es an

d inp

ut me

teoro

logica

l data

: Ind

ustria

l Sou

rce C

omple

x Sh

ort T

erm

3 (IS

CST3

) has

bee

n us

ed fo

r AQI

P us

ing s

ite s

pecif

ic mi

cro-m

eteor

ologic

al da

ta (h

ourly

data

for o

ne

comp

lete

seas

on i.e

. Mar

-June

, 201

3) a

s inp

ut for

wind

spee

d an

d de

ciding

atm

osph

eric

stabil

ity c

lass.

Pred

iction

s has

bee

n ma

de o

n av

erag

e wi

nd s

peed

for

the

entire

sea

son,

aver

age

atmos

pher

ic sta

bility

has

bee

n ad

opted

from

the

Turn

er c

lassif

icatio

n, e

miss

ion ra

tes h

ave

been

es

timate

d by

usin

g the

emp

irical

formu

lae d

evelo

ped

from

the st

udy o

f Coa

l S &

T co

nduc

ted b

y the

Cen

tral M

inin

g Re

sear

ch In

stitu

te (C

MRI),

Dh

anba

d wh

ich w

as sa

nctio

ned

by th

e Mo

EF, G

ovt.

of In

dia,

and

few e

mpiric

al for

mulae

from

USE

PA. T

he m

odel

was a

pplie

d an

d it h

as b

een

obse

rved

that t

he a

bsolu

te PM

10 le

vels

of Li

ngar

aj OC

Exp

n Pro

ject f

or 8

.43 M

ty inc

reme

ntal c

apac

ity (i

.e. fr

om 11

.57 M

TPA

to 20

.0 MT

PA) w

ill be

84.6

7 μg

/cu.m

at K

andh

al Vi

llage

(1.5

km, N

) with

out c

ontro

l mea

sure

s, wh

erea

s the

same

will

be 7

9.67

μg/cu

.m w

ith co

ntrol

meas

ures

and

the

abs

olute

PM2.5

leve

ls of

Ling

araj

OC E

xpn

Proje

ct for

8.43

Mty

incre

menta

l cap

acity

(i.e.

from

11.5

7 MT

PA to

20.0

MTP

A) w

ill be

21.8

μg

/cu.m

at K

andh

al Vi

llage

(1.5

km, N

) with

out c

ontro

l mea

sure

s, wh

erea

s the

sam

e wi

ll be

20.8

μg/cu

.m w

ith c

ontro

l mea

sure

s. Ho

weve

r ,

max.

PM10

(129

.75 μ

g/cu.m

, 11

9.75

μg/cu

.m )

& PM

2.5 (

36.1

μg/cu

.m ,

30.1

μg/cu

.m )v

alues

are

at T

alabe

da vi

llage

whic

h is

cove

red

unde

r R

& R

Sche

me.

(b)

Maxim

um in

creme

ntal

GLC

value

s of p

olluta

nts

base

d on p

redic

tion

exce

rcise

:

(in

�/g

m3 ) Sl

.No.

Pollu

tants

Incre

menta

l valu

e Am

bient

air qu

ality

Resu

ltant

air qu

ality

1 2**

3**

SPM

SO

2 NO

x

Th

e deta

ils ar

e give

n belo

w.

[*

Ques

tion N

umbe

r 22,

23 &

24 n

eed n

ot be

filled

-in fo

r mine

s hav

ing M

L are

a of 2

5 ha.

or le

ss.],

[**

Infor

matio

n on I

tem N

o. 2

& 3 t

o be p

rovid

ed in

case

s with

capti

ve po

wer g

ener

ation

of 50

0 KVA

and

abov

e].

Page 39: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 17

PM

10

P

M2.

5 M

onito

ring

loca

tions

In

crem

enta

l w

ithou

t co

ntro

l m

easu

re

Incr

emen

tal

with

con

trol

m

easu

re

Am

bien

t ai

r qu

ality

Res

ulta

nt

valu

e w

ithou

t co

ntro

l m

easu

re

Res

ulta

nt

valu

e w

ith

cont

rol

mea

sure

Incr

emen

tal

with

out

cont

rol

mea

sure

Incr

emen

tal

with

con

trol

m

easu

re

Am

bien

t ai

r qu

ality

Res

ulta

nt

valu

e w

ithou

t co

ntro

l m

easu

re

Res

ulta

nt

valu

e w

ith

cont

rol

mea

sure

P

roje

ct

offic

e 11

7 59

12

3.75

24

0.75

18

2.75

45

22

30

.9

75.9

52

.9

Lang

ijoda

0

0

116.

83

116.

83

116.

83

0 0

27.4

27

.4

27.4

A

mba

mun

da

1 0

89.1

7 90

.17

89.1

7 0

0 23

.7

23.7

23

.7

Tal

abed

a 31

21

98

.75

129.

75

119.

75

11

5 25

.1

36.1

30

.1

Hen

sam

ul

0 0

110.

75

110.

75

110.

75

0 0

22.3

22

.3

22.3

T

alch

er

Tow

n 0

0 70

.71

70.7

1 70

.71

0 0

19.5

19

.5

19.5

K

andh

al

9 4

75.6

7 84

.67

79.6

7 3

2 18

.8

21.8

20

.8

Gha

ntap

ada

0 0

58.5

4 58

.54

58.5

4 0

0 14

.2

14.2

14

.2

Page 40: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 18

25 Water requirement (m3/day)

Purpose Existing (13.0 Mty)

Incremental (7.0 Mty)

Total For 20.0 Mty

A. Mine Site 1. Mine operation (Washing of dumpers, dozers and floor washing)

335.0

175.0 510.0

2. Land reclamation --- --- --- 3. Dust suppression (including road watering) 1765.0 265.0 2030.0 4. Drinking 243.0 47.0 290.0 5. Green Belt --- --- --- 6. Beneficiation --- --- --- 7. Washeries --- --- --- 8. Fire Service 200.0 130.0 330.0 9. Others (specify) -- --- --- B. Township 1. Green belt -- --- --- 2. Domestic 2457.0 113.0 2570.0 3. Others (specify) --- --- --- Total 5000.0 730.0 5730.0

26. Source of water supply@

Sl.No. Source m3/day 1. River(name) : Integrated Water Supply Scheme of Talcher Coalfield with intake

point at the Brahmani river (MCL). 2860.00

2. Groundwater --- 3. Mine water (sump/pit) 2870.00$ 4. Other surface water bodies (specify) : ---

[ @ Annex a copy of sanction letter/permission from the concerned authority (Central Ground Water Authority in case of ground water abstraction is from notified area/State Ground Water Board in case of non-notified area/State Irrigation Department for surface water pumping) for drawing water]. Agreement with Irrigation Division, Angul, for drawing water from Brahmani River executed on 08/06/2000 for Lingaraj OCM (Annexure-IV)] . $ Water demand is met from treated mine discharge water.

27. Lean season flow in case of pumping : 78.00

from river/nullah (cumec) [Brahmani River] 28. Groundwater potential of the study area : 64.86 Mm3/annum (Talcher block) : 97.64 Mm3/annum (Angul block) (Surce: CGWB, Eastern Region,

Bhubaneswar).

Page 41: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 19

28.1 Ground water availablility (a) Range of water table (m bgl) (i) Pre-monsoon (April/May) � Core Zone : less than 1.9 m bgl to about 10.20 m bgl � Buffer Zone : less than 1.0 m bgl to about 11.70 m bgl (ii) Post-monsoon (November) � Core Zone : less than 1.25 m bgl to about 3.67 m bgl � Buffer Zone : less than 1.60 m bgl to about 10.7 m bgl

(b) Total annual replenishable recharge$ (million m3 / year) � By rainfall infiltration factor method : 146.47 Mm3 (c) Annual draft excluding estimated draft through mine

discharge (million m3 / year) : 15.93

(d) Estimated draft through mine discharge$$ (million m3 / year) : 18.49 (e) Net annual ground water availability (million m3 / year) : 131.83 (f) Stage of ground water development in % : 26.11

$ Considering the area within 10 km radius from the peripherry of the project. $$ Includes the proposed Lingaraj OC Expn. Project (20.0 Mty,Peak) in the buffer zone.

28.2 Water demand - Competing users of the water source Sl. No.

Usage Present Consumption (m3/day)

Additional proposed as per local plan (m3/day)

Total (m3/day)

Surface Ground Surface Ground Surface Ground 1. Domestic The Brahmani river which has a maximum discharge of 5500 cumec and a

minimum discharge of 78 cumec, respectively will meet the demands of irrigation, industry and domestic requirement besides other needs.

2. Irrigation 3. Industry 4. Mining (i) Industrial Nil 2300.00* Nil 570 Nil 2870.00* (ii) Domestic 2700.00 Nil 160 Nil 2860 ---

5. Others (specify) Nil Nil Nil Nil Nil Nil Total : 2700.00 2300.00 160 570 2860 2870.00

[ * Industrial water demand will be met from the treated mine discharge water and treated industrial effluent]

Page 42: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 20

29 Water quality* (a) Annex physico-chemical analysis of water at intake point**

True copy of the Physico-chemical analysis of water at intake point i.e Brahmani river carried out by the State Public Health Laboratory, Bhuabenswar (ODISHA) is given below:

// True Copy //

Date of collection : 24.02.2012 Agency : State Public Health Laboratory,

Bhubaneswar (ODISHA). Ref. : OS/60/03/2012 dated – 15.03.2012 (All parameters are in mg/l unless

specified otherwise except pH) Sl.

No. Parameter Value Standard for drinking

water as per BIS-10500 1 pH 7.6 6.5-8.5 2 TDS 88.0 500.0 3 TSS 6.0 -- 4 Cl 5.9 250.0 5 TH : 44.0 300.0 6 CaH 28.0 -- 7 T Fe 0.39 0.30

Remarks – TDS- Total Dissolved Solids , TSS – Total suspended solids , Cl- Chloride ,

TH – Total Hardness , CaH – Calcium Hardness , T Fe – Total Iron. (b) In case of existing mine, annex report on quality of water discharge

i.e. complete physico-chemical analysis ** The analysis of mine discharge water of existing Lingaraj OC Expn. project is given below:

Season : Post-monsoon

Month : December Date of Sampling : 19/12/2013

20/12/2013

Area Lingraj Lingraj

MoEF-Sch-VI

Standards

Project Lingraj OCP Lingraj OCP

Sampling station Outlet of MDTP

Outlet of O&G Conf. Brhamani

river

Date 20.12.2013 19.12.2013 Color Acceptable Acceptable Acceptable Odour Agreeable Agreeable Agreeable

Temp. 0C 14.6 14.6 Nitrate Nitrogen 2.4 1.9 10

Ammonia Nitrogen 0.15 0.13 50

Page 43: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 21

Total Kjedahl Nitrogen

2.3 2.15 100

BOD 12 12 30 Arsenic <0.01 <0.01 0.20

Lead <0.05 <0.05 0.10 Hexavalent Chromium

<0.01 <0.01 0.10

Total Chromium <0.1 <0.1 2.00 Copper <0.02 <0.02 3.00

Zinc 0.24 0.2 5.00 Selenium <0.01 <0.01 0.05

Nickel <0.1 <0.1 3.00 Flouride 0.3 0.3 2.00 Dis. PO4 0.17 0.18 5.00 Sulphide 0.004 0.005 2.00 Phenols <0.001 <0.001 1.00

Manganese <0.05 <0.05 2.00 Iron 0.18 0.2 3.00

$ Shall not exceed 5oC above the receiving temperature. $$ BOD (3 days at 27oC)

N.B : (i) The methodology & instruments used and BDL levels for water and effluent analysis are given

below :

Methodology & Instruments used for Water and Effluent Analysis

Sl.No. Parameters Method/Instruments 1 pH Electrometric/pH meter 2 Turbidity Nephlometric/Nephloturbidity meter 3 Total suspended solids, total dissolved solids,

oil & grease and mineral oil Gravimetric/oven, electronic balance

4 BOD BOD test and titration/BOD incubator, pipette, burette, etc.

5 COD Reactor digestion and titration/reactor digester 6 Coliform MPN test/LTEK MPN kit. 7 Calcium, chloride, hardness, alkalinity Titrimetric/pipette, burette, etc. 8 Cadmium, copper, iron, lead, manganese,

mercury, nickel, total chromium & zinc Selective absorption/atomic absorption spectro-photometer.

9 Ammonical nitrogen, arsenic, colour, dissolved phosphate, fluoride, hexavalent chromium, nitrate nitrogen phenolics, selenium, sulphate, sulphide, total residual chlorine, total Kjeldahl nitrogen & boron.

Photometric/DR 2000

BDL Values for Water and Effluent Analyses

Sl.No. Parameters BDL Values Sl.No. Parameters BDL Values

1 Copper <0.02 10 Boron <0.01 2 Manganese <0.01 11 Phenolics <0.001 3 Mercury <0.001 12 Mineral oil <0.01 4 Cadmium <0.005 13 Sulphate <1.00 5 Selenium <0.01 14 Iron <0.02 6 Arsenic <0.001 15 Residual free chlorine <0.04

Page 44: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 22

7 Lead <0.05 16 Nitrate <0.01 8 Zinc <0.005 17 Fluoride <0.05 9 Hexavalen

Chromium <0.01

(ii) The existing mine is a discharging one. The analyses of ground water samples taken preferably

from down-stream direction of the mine in pre-monsoon and post-monsoon periods are given in Chapter-III of EIA/EMP.

[* For non-discharging mines at least four ground water samples to be taken preferably from downstream direction of the mine in pre-monsoon and post-monsoon periods and analysed. For discharging mines six samples are to be analysed.] ** All parameters as per BIS 10500, Indicate name of methodology, Equipment used for analysis and Detection Level (DL) for each parameter. *** Wherever any analytical parameter is below detection level, “BDL” (Below Detection Level) should be written instead of ‘NIL’.

30. Impact on ground water regime / stream / lake / springs due to mine dewatering* Hydro-geological assessment is given in Annexure-V.

(a) Radius of influence (in m) [To be estimated based on analysis of pumping test data and application of empirical formula]

: 795 m

(b) Whether saline water ingress will take place? (applicable to coastal areas)

: No

(c) Impact on stream / lake / springs : No impact [* Provide a comprehensive hydro-geological assessment report if the average mine

dewatering is more than 100 m3/day and or going below water table in non-monsoon period. The report should be based on preferably latest one year pre-monsoon and post-monsoon baseline data covering information on ground water situation, aquifer characteristics, water level conditions (April – May and November), estimate of ground water resources, predicted impact of the project on ground water regime and detailed remedial / conservation measures such as artificial recharge of ground water etc. The report should be based on actual field inventory out of existing wells, at least 30 observation wells in the buffer zone with supplementary information from secondary sources (mentioned name). For estimation** of ground water resource (refer Question No.28 above) be designated study area of the buffer zone may be sub-divided into command and non-command areas, watershed-wise (in case of hard rock / consolidated formations) / block-wise / mandal-wise in case of alluvial / unconsolidated formations)]. [** For estimating ground water resources in the area follow the Ground Water Estimation Committee recommendations of 1997]

Page 45: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 23

31. Waste water management

Mine (a) Daily average discharge (m3/day) from different sources

(i) Mine water discharge during � Lean period � Monsoon period

: :

13.0 Mty 20.0 Mty (Peak) 6996.00 7448.56 15820.00 16803.27

(ii) Workshop (Equipment & floor washing) : 285.00 408.00

(iii) Domestic (mine site) : @@

(Iv) Beneficiation / Washeries : NIL

(v) Coal Handling Plant : NIL

(vi) Tailings Pond : NIL

(vii) Others (specify) : NIL

Total Lean period – Mosoon Peiod

: 7281.00 7856.56 16105.00 17211.27

@@ Included in the domestic effluent from the residential colony.

(b) Waste water treatment plant; flow sheet for treatment process attatched.

: Yes (see Fig.-2)

Page 46: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 24

Pum

p(s)

Pum

p(s)

Aer

atio

n T

ank

Cla

rifie

r

Ove

rflo

w

Slu

dge

Dry

ing

Bed

(s)

Und

erflo

w to

aer

atio

n ta

nk

Slu

dge

for

disp

osal

as

farm

yard

man

ure

Dom

estic

effl

uent

fr

om v

ario

us s

ourc

es

Scr

een

Cha

nnel

C

olle

ctio

n W

ell

Flo

wsh

eet

for

Do

mes

tic

Eff

luen

tT

reat

men

tP

lan

t

Flo

wsh

eet

for

Tre

atm

ent

of

Ind

ust

rial

Eff

luen

tfr

om

wo

rksh

op

Indu

stria

l

FIG

.-2

Min

e di

scha

rge

Doz

ing

of c

oagu

lant

Set

tling

Tan

k

Cle

ar w

ater

ov

erflo

wP

ump(

s)

Wat

er fo

r re

use

for

doze

r,

dum

per

and

floor

was

hing

be

side

s sp

rayi

ng o

n ha

ul r

oad

Flo

wsh

eet

for

Tre

atm

ent

of

Min

eD

isch

arg

ew

ater

Cle

ar w

ater

to n

atur

al

drai

n

Oil

and

Gre

ase

Man

ual r

ecov

ery

of O

il an

d G

reas

e C

lear

wat

er to

nat

ural

dr

ain

or r

euse

Slu

dge

for

land

fill

Set

tling

Tan

k

Tre

ated

ef

fluen

t fo

r

Page 47: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 25

(c) Quantity of water recycled/reused/to be recycled in

:

(i) Percentage Lean Period : Monsoon Period :

31.6 % 17 %

Every effort will be made to totally recycle/reuse the treated effluents to the extent possible by storing in lowlying area as a step for “water harvest” except in unusual situation in monsoon season.

(ii) m3/day 2870

(d) Point of final discharge : Final Point Quantity discharged (in m3/day) 1. Surface

(i) Agricultural land (ii) Waste land (iii) Forest land (iv) Green belt

| | | Nil | |

2. River / nullah

13934.42 m3/day (monsoon period) Nil$ (lean period)

3. Lake Nil 4. Sea Nil 5. Others (specify) Nil Total Nil $ The treated waste water will be totally recycled except in unusual situation as a step

for harvesting water. (e) Users of discharge water i. Human : No ii. Livestock : No iii. Irrigation : No iv. Industry : Yes v. Others (specify) : Nil

(f) Details of the river / nullah, if final effluent is / will be discharged (cumec)

(Brahmani river) i. Average flow rate : Not available but maximum flow

rate is 5,500 cumec ii. Lean season flow rate : Not available but minimum flow

rate is 78 cumec iii. Aquatic life : Exists iv. Analysis of river water 100 metres upstream

and 100 metres downstream of discharge point. : Yes (Given below)

Page 48: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Pro

form

a, P

age

- 26

SU

RFAC

E W

ATER

SAM

PLIN

G LO

CATI

ON A

ND A

NALY

SIS

RESU

LT A

T TA

LCHE

R CO

ALFI

ELD

Sl. N

o.

Sam

ple I

D Vi

llage

De

tails

of S

ampl

ing

Loca

tion

1. NS

W-3

Si

rigid

a Up

stre

am o

f con

fluen

ce o

f Ban

garu

jhor

and

Rive

r Bra

ham

ini.

2. NS

W-5

Gu

rujan

guli

Nand

ira Jh

or

PRE-

MONS

OON

ANAL

YSIS

RES

ULTS

Sl

. No.

Sam

ple

code

Dt. o

f sa

mpl

ing

Colo

urTS

SDO

PHFe

Chlo

ride

BOD

(3day

s 27

C)

TDS

CuSO

4NO

3F

SeAs

PbCd

ZnCr

+6Ph

enol

icsTo

tal

hard

ness

(C

aCO3

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)1

NSW-

3Ma

y-13

22.0

05.6

08.0

8<0

.0514

.001.2

010

2.00

<0.02

83.5

40.5

1<0

.01<0

.01<0

.05<0

.005

<0.02

<0.01

<0.00

164

.002

NSW-

5Ma

y-13

22.0

05.5

08.1

0<0

.0512

.001.4

084

.00<0

.026

1.33

0.55

<0.01

<0.01

<0.05

<0.00

50.1

7<0

.01<0

.001

56.00

IS: 2

296 I

nland

surfa

ce w

ater

$4.0

06.5

-8.5

5.00

600.0

03.0

015

00.00

1.50

400.0

050

.001.5

00.0

50.2

00.1

015

.000.0

50.0

1$

Clas

s "C'

Limi

ts

Sour

ce –

Hydr

ogeo

logica

l Inve

stiga

tion f

or D

ispos

al of

Ash i

n Mine

Void

s (Qu

arry

nos.

2, 3A

& 3

B ) in

Sou

th Ba

landa

OCP

of Ja

gann

ath A

rea o

f MCL

, Talc

her C

oalfie

lds , O

disha

, Nov

.’14.

PO

ST-M

ONSO

ON A

NALY

SIS

RESU

LTS

Sl. N

o.Sa

mple

code

Dt. o

f sa

mplin

gCo

lour

TSS

DOPH

FeCh

lorid

eBO

D (3

days

27

C)

TDS

CuSO

4NO

3F

SeAs

PbCd

ZnCr

+6Ph

enol

icsTo

tal

hard

ness

(C

aCO3

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)(m

g/L)

(mg/L

)1

NSW-

3De

c-13

46.0

05.3

08.3

4<0

.058.0

0<2

.064

.00<0

.028.0

01.7

70.3

1<0

.01<0

.01<0

.05<0

.005

<0.02

<0.01

<0.00

136

.002

NSW-

5De

c-13

46.0

05.5

07.8

3<0

.0528

.00<2

.030

8.00

<0.02

66.00

7.09

0.64

<0.01

<0.01

<0.05

<0.00

50.1

7<0

.01<0

.001

204.0

0

IS: 2

296 I

nland

surfa

ce w

ater

$4.0

06.5

-8.5

5.00

600.0

03.0

015

00.00

1.50

400.0

050

.001.5

00.0

50.2

00.1

015

.000.0

50.0

1$

Clas

s "C'

Limi

ts

Sour

ce –

Hydr

ogeo

logica

l Inve

stiga

tion f

or D

ispos

al of

Ash i

n Mine

Void

s (Qu

arry

nos.

2, 3A

& 3

B ) in

Sou

th Ba

landa

OCP

of Ja

gann

ath A

rea o

f MCL

, Talc

her C

oalfie

lds , O

disha

, Nov

.’14.

Page 49: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 27

Township

(a) Waste water generation from township (m3/day) (avg.)

: 1602 (b) Are you planning to provide sewage treatment

plant? : Yes

(c) Usage of treated water : The treated water will be reused for irrigation of plantation area.

$ Includes the domestic wastewater from the mine site.

32. Attatch water balance statement in the form of a flow diagram indicating sources(s), consumption (section-wise) and output

Water Balance Statement based on Peak Demand (Lingaraj OCP)

Water supply scheme and treated effluent from the project

Potable Water Supply for Residential Colony & Service Buildings

Industrial Effluent Treatment Plant

Fire Fighting and Dust Suppression

5730 m3/day Potable water consumption Industrial consumption

2860 m3/day 510 m3/day 2360 m3/day

Domestic Treatment Plant

Losses

572 m3/day 2288 m3/day Treated clear water for reuse

Treated clear water for watering of plantation area

Sludge for landfill or farmyard manure

1602 m3/day

408 m3/day

Page 50: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 28

33. Ambient noise level, Leq. [dB(A)]

Summary of noise level data generated during post-monsoon season,2013 (March to May,2013)are given below:

Sl. No.

Location of Sampling Station

Noise Level dB(A) Day-time Night-time

Min. Max. Permissible limit Min. Max. Permissible

limit A. Core Zone 1. Project Office 55.2 57.8 75 51.0 54.0 70 2. Langi Joda Village 54.7 58.7 75 52.7 56.5 70 3. Amhanunda Village 44.4 45.1 75 38.7 40.5 70 B. Buffer Zone 1. Talabeda Village 43.8 45.9 55 40.2 41.0 45 2. Hensamul Village 44.6 48.4 55 40.8 42.6 45 3. Talcher town 56.7 58.6 55 51.0 51.3 45 4. Kandhal Village 40.2 43.7 55 36.3 37.5 45 5. Ghantapada village 42.2 44.2 55 36.5 39.6 45

34. Solid waste

(a) Topsoil and solid waste quantity and quality

Name (Lump/fines/slurry/

sludge/others) Composition Quantity

(m3/month) (avg.) Method of disposal

Mining activity* a. Topsoil (Lump and fine) b. Overburden (Lump and fine) c. Others (specify)

Clay loam & sandy gravel Weathered shale & rock and some alluvium material

Nil

| | | | | | 8,81,865 | | | | |

Nil

Topsoil will be concurrently and progressively used/ carpeted over the technically reclaimed area. Overburden will be dumped internally. Then the dumps will be re-claimed both technically and biologically.

Nil

Effluent Treatment Plant (sludge)

1) Completely stabilised domestic

399.30

Used as landfill or farmyard manure

Page 51: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 29

waste 2) Oily Sludge

42.0

Land filling.

Total 8,82,306.30 N.B : The above solid wastes do not contain any hazardous/toxic substances. [* Annex layout plan indicating the dump sites ] (Plate No.IXA & IXC)

(b) (i) Does waste(s) contain any hazardous/toxic substance/ : radioactive materials or heavy metals? Overburden generated during mining operation does not contain any hazardous

subtance. However, the batteries used in HEMM, the oily sludge, etc. from the workshop contain hazardous substances.

(ii) If yes, whether details and precautionary measures provided? : Yes.

The details of hazardous wastes from the project and pre-cautionary measures provided are given below :

Sl.# Waste description Quantity per annum (approx.)

Method of disposal/precautionary

measures 1. Used oil 200 kl Will be stored in drums safely in

store for disposal through auction to authorised reprocessors or to be used as lubricant in the U/G mines.

2. Used batteries 300 nos. To be stored safely for auction to authorised reprocessors.

3. Oily sludge 500 cu.m. To be disposed in impervious layer lined pits.

4. Filters & filter materials containing oil during maintenance of vehicles

2500 nos.

(c) Recovery and recycling possibilities : Used oil will be used as lubricants

in U/G mines and also dispposed off through auction.

(d) Possible user(s) of the solid waste : For hazardous waste like used batteries are disposed through auction to battery makers. Non-hazardous solid wastes like topsoil and overburden material are used for reclaiming the decoaled area of this project progressively.

(e) (i) Is the solid waste suitable for backfilling? : Yes

(ii) If yes, when do you propose to start backfilling. : Backfilling is in progress..

Page 52: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 30

(in million m3)

Solid waste(s) Already

accumulated (A)

To be generated (B)

% of A & B to be backfilled

A B Overburden (including topsoil)

116.50 M.cu.m.*

195.92 M.cu.m.*

312.42 M.cu.m.

100 % (During post

closure period)

Other (specify) Nil Nil Nil Nil * As on 01.01.15 Land Reclamation Plan

(f) In case waste is to be dumped on the ground, indicate (i) Associated environmental problems : Slope failure and siltation of water body.

(ii) Number & type of waste dumps : One external overburden dump.

� No. of external dumps : One � Max. projected height of dumps (in m) :| The height of each tier will not � No. of terraces & height of each stage :| exceed 30m for stability against | dump failure. Total height (max) of | external dump - 60 m. � Overall slope of the dump (degree) : 28 � Proposed reclamation measures: : Out of 256.03 ha,108.88 ha has been

used by external dumping. Out of 108.88 ha , 65.09 ha has been technically and biologically reclaimed. The plantation has been done on 55.09 ha. Grass grass carpeting has been done on remaining 10 ha. Grass carpeting will be done on the balance area. Further no external dumping will be done. Proper drainage arrangements like catch and foot drains have been provided. The external dump will be rehandled during post closure period.

(iii) Section of waste dump in relation to the : Yes, the sections of internal dumps adjacent ground profile attatched are given in plate No.IXA & IXA1.

35. Fuel/Energy requirements* [* To be furnished for mines having ML area more than 25ha or captive power generation of 500 KVA and above]

(a) Total power requirement

(in MkWh/annum) Sl. No.

Mine Site Township and other common services

Others (specify)

Total

1. Present 37.37 40.00 Nil 77.37 2. Proposed/additional 1.24 - Nil 1.24 Total 38.61 40.00 Nil 78.61

Page 53: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 31

(b) Source of power (in MkWh/annum)

Sl.No. SEB/Grid* (CESCO) Captive power plant DG Sets 1. Present 77.37 Nil Nil

2. Proposed 1.24 Nil Nil

Total 78.61 Nil Nil

[ * Annex a copy of the sanction letter from the concerned authority.] The project is already drawing power from the concerned authority for which agreement has

already been made on 18/05/1993 (Annexure-III).

(c) Details of fuels

Sl. No. Fuel

Daily Consumption (TPD) Calorific value (k cal/kg) % Ash % Sulphur

Existing Proposed 1. HSD 20.12 kl

(during 2013-14)

58.15 kl (avg.)

10670 - 0.20

2. LSHS Nil Nil � Not available � 3. Others (specify) Nil Nil

36. Storage of inflammable/explosive materials

Sl. No.

Name Number of storages Consumption (in TPD) (avg.)

Maximum quantity at any point of time (in TPD)

1. Fuels From fuel delivery station 58.15 kl/day 78.27 kl/day 2. Explosives$ Existing magazine facilities

of the coalfield 17900 kg/day 24209.09 kg/day

$ SMS System will be used and existing magazine facilities will be utilised.

37. Human settlement

Core zone Buffer zone Population$ 3472 1,51,107 No. of villages 20 97 Number of households village-wise

695 (Total) 30,222 (Total)

$ As per 2011 Census record or actual survey

Page 54: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 32

38. Rehabilitation & Resettlement (R&R) plan*

[* Provide a comprehensive rehabilitation plan, if more than 1000 people are likely to be displaced, other-wise a summary plan]

(a) Villages falling within the study area

Villages Number Name

Core zone 17

Balugaon, Langijoda, Talabeda , Majirurihota , Gengutia , Dadara , Dhempakuta , Manikagoda , Malipoda , Badapasi , Debalayapur , Balugaon Khamar , Ambamunda , Nakulabaspur , Madanmohanpur, Khandulbahal , Daulbera

300 m from blasting site(s)

Buffer zone 97 Kandhal, Teheranpur, Ghantapada, Bikrampur, Tentoloi, Kendupali, etc.

Township site Nil --- (b) Details of Village(s) in the core zone

The project area comprising of excavation zone, infrastructure sites, ext. OB dump area and safety zone for blasting covers partly and / or fully 17 (seventeen) villages namely, Balugaon, Langijoda, Talabeda , Majirurihota , Gengutia , Dadara , Dhempakuta , Manikagoda , Malipoda , Badapasi , Debalayapur , Balugaon Khamar , Ambamunda , Nakulabaspur , Madanmohanpur, Khandulbahal , Daulbera besides some villages where R&R not required. Out of 1134 project affected families , 1043 families are settled. The remaining 91 families are to be settled.. These displaced families will be resettled and rehabilitated socially, culturally and economically along with other displaced families such as major married sons, unmarried daughters of 30 years of age, divorcee/deserted women/widows, physically handicapped and/or mentally retarded persons irrespective of age & sex, unmarried brothers/sisters whose parents are not alive, homestead less families (unobjectionable encroachers) and landless families (unobjectionable encroachers) as per the latest Norms of Govt. of Orissa.

Sl.# Village name Population*

Average Annual Income Tribal Others

1. Balugaon 100 408 Not available 2. Langijoda --- 441 -do- 3. Talabeda 68 273 -do- 4. Majirurihota --- 40 -do- 5. Gengutia 62 154 -do- 6. Dadara --- 63 -do- 7. Dhempakuta --- 66 -do- 8. Manikagoda --- 48 -do- 9. Malipoda 43 81 -do- 10. Badapasi 61 21 -do- 11. Debalayapur 56 36 -do- 12. Balugaon Khamar 108 408 -do- 13. Ambamunda --- 74 -do- 14. Nakulabaspur --- 144 -do- 15. Madanmohanpur 3 186 -do-

Page 55: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 33

Sl.# Village name Population*

Average Annual Income Tribal Others

16. Khandhulbahal --- 6 -do- 17. Daulbera 170 12 -do- 18. Remun --- 12 -do- 19. Hensamul 68 293 -do- 20. Kandhal --- 67 -do- Total 639 2833

[* As per 20011 Census / actual survey] (c) Population to be displaced and / or Land oustees

Name of village(s) falling within

Number of oustees Land (only) Homstead (only) Land and Homestead (Both)

Mining Lease 1. Balugaon

508

2.Longijoda 441 3.Talabeda 341 4. Majirurihota 40 5. Gengutia 216 6.Dadara 63 7.Dhempakuta 66 8.Manikagoda 48 9.Malipoda 124 10.Badapasi 24 11.Debalayapur 50 12.Balugaon Khamar 516 13.Ambamunda 74 14.Nakulabaspur 144 15.Madanmohampur 189 16.Khandulbahal 6 17.Daulbera 182 18.Remun 12 19.Hensul 361 20. Kandhal 67 440 3032 Township Site --- Nil ---

(d) Whether R&R plan has been finalised? If yes, : Yes, R&R is in progress for existing salient features of R&R plan for oustees 13.0 Mty Project as per Norms of Govt. of Odisha.

No additional R&R is required for proposed project. 20.0 Mty (Peak).

Page 56: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 34

(i) Site details where the people are : Gurujang village with necessary proposed to be resettled & facilities civic amenities. existing / to be created

(ii) Fund earmarked for compensation : Rs.899.41 lakh including the R & R package cost of original project.

(iii) Agency/Authority responsible for their : GM, Lingaraj Area resettlement

(iv) Time of commencement of resettlement : In progress of Project Affected People (PAP)

(v) Period by which resettlement of : By the 8th year of operation PAP will be over

39. Lease-wise plantation details

(a) Lease area (in ha) Existing (13.0 Mty) Proposed Expn. (20.0 Mty, Peak)

i. Area broken up : 275.85 235.001 263.001 ii. To be broken up :

iii. Area not to be broken-up : 899.159 871.159 (b) Township area (in ha) : 6.0 6.0 (c) Area afforested and proposed (in ha) : Peripheral Dumps Roads Township Others i. Existing : 17.60 (safety zone) 86.89$ 14.23 1.75 --- ii. Proposed : 103.34 (safety zone) 164.511

(Backfilled area)

12.461 14.89 2.08*

$ Both internal & external dumps., *-rationalisation area , Note- Grass carpeting done on 10.0 ha of external dump.

No. and type of trees planted and proposed (i) Existing

� When plantation was started? :

Month/Year (July,1991)

No. of plant species planted Number of saplings (per ha) 3,29,609 2,500 � Survival rate % : 75 � Avg. height

: 1.2 – 7.0 m

(ii) Proposed

No. of plant species to be planted Number of saplings (per ha) 8,21,288 Block Plantation-2500

Avenue Plantation-1600

Page 57: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 35

40. Environmental health and safety (a) What major health and safety hazards are

anticipated? : Slope failure in mine pit, external &

internal OB dumps, fire, mine inundation, accidents and health hazards like silicosis, pneumoconiosis, etc., are anticipated.

(b) What provisions have been made/ proposed to be made to conform to health and safety requirements?

: Given in Chapter-II, EIA & EMP report.

(c) In case of an existing mine (i) Comprehensive report on health status

of the workers under the Mines Act annexed.

: No worker is not found to be suffering from any occupational health hazards till date. Health of workers is checked regularly under PME (Periodic Medical Examination) in which each worker is covered in a span of 5 years. Report on health status of workers enclosed (Annexure-VIII).

(ii) Mineralogical composition of RPM (dust) � Free silica : Less than 5% in the coal dust

� Chromium* (Total as well as Hexavalent)

� Lead**

: :

Not applicable

[* Only for Chromite mines] [** Only for Base Metal mines]

(d) Information on radiation protection measures, if applicable

: Not applicable

41. Environmental Management Plan

Salient features of environmental protection measures

Sl. No.

Environmental issues* Already practised, if applicable Proposed

1. Air pollution Dust extractors/arrestors for drills or wet drilling arrangement, water sprinklers, greenbelts, black topping and proper maintenance of haul roads.

In addition to existing arrangement Fog Cannon / Atomiser for fugitive dust control will be installed and more than 85% coal winning by Surface Miner.

2. Water pollution Effluent treatment plants for various effluents. Domestic effluent – DETP Workshop effluent – Oil & Grease Trap Mine effluent - MDTP

Same as existing.

3. Water conservation Reuse of treated mine discharge water , treated industrial waste water and treated domestic effluent.

Same as existing.

4. Noise pollution Greenbelts, personal protective devices, Same as existing.

Page 58: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 36

Sl. No.

Environmental issues* Already practised, if applicable Proposed

silencers in exhaust pipe of the vehicles, etc..

5. Solid Waste / Tailings

Solid waste is dumped either externally or internally and then reclaimed both technically and biologically.

Same as existing.

6. Land degradation Mined out land is backfilled to the extent possible and then reclaimed both technically and biologically. Ext. OB dump will be rehandled during post closure period..

Same as existing.

7. Erosion & Sediment Proper drainage arrangement with provision of garland drains and settling tanks. Run-off water : Dumps- Catch drain and foot drain Mine innundation – Garland drain Storm water – Masonary drain

Same as existing.

8. Topsoil Scraping of topsoil from the excavation area for progressive and concurrent utilisation during technical reclamation.

Same as existing.

9. Ground vibration Controlled blasting with adherence to all provision of Coal Mines Regulations.

Same as existing.

10. Wildlife conservation Afforestation and compensatory afforestation for creating habitats for wildlife

An amount of Rs. 282.0 lakhs has been kept for habitat management / Wildlife conservation measures.

11. Forest protection Compensatory afforestation, plantation in backfilled area & ext. OB dump areas besides creation of greenbelts around mine, infrastructure & residential colony.

Same as existing.

12. Others (specify) Nil Nil [* As applicable] 42. Compliance with environmental safeguards (For existing units)

(a) Status of the compliance of conditions of environmental clearance issued by MoEF, if any, enclosed

: Yes (Annexure – X)

(b) Status of the compliance of 'Consent to Operate' issued by SPCB, if any, enclosed.

: Yes (Annexure- VA & VB)

(c) Latest ‘Environmental Statement’ enclosed : Yes (Annexure –XI)

43. Scoping of EIA

Whether environmental impact assessment of the project has been carried out by following scoping process?

: Yes

Page 59: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 37

If yes, a copy of scoping of EIA annexed. : Yes (Given in Chapter IV,EIA & EMP report).

44. Mine closure

(a) Have you planned mine closure? : Yes (b) Submitted a conceptual mine closure plan. : Yes, (Plate No. IXA, IXB & IXC)

‘Progressive Mine Closure Plan’ given in Chapter – X, EIA / EMP report .

(c) If yes, indicate estimated amount for implementing the same (in Rs. Lakh)

: Total Mine Closure cost – Rs.19893.89 lakhs (as per latest guidelines).

45. Capital cost of the project (in Rs. lakh) : Sanctioned capital investment for the project is Rs. 383.16 crore. 46. Cost of environmental protection measures

(in Rs. lakh) Sl. No.

Capital cost Annual recurring cost Existing Proposed$ Existing Proposed

1 Pollution Control : (Separately provide break-up) � Water sprinklers/tankers � Dust suppression/extraction – CHP and

ventilation � Industrial effluent tratment plant � Sewage treatment plant � Garland drain and stormwater drainage

arrangements

114.00 46.00

45.53 71.83

103.78

} 752.21

--- ---

--- --- ---

--- ---

--- --- ---

Sub-total (1) : 381.14 752.21 2 Pollution Monitoring (Separately provide

break-up) - Field instruments and monitoring 16.60 --- ---

3 Occupational Health 456.52 $$ --- --- 4 Green Belt

� Mine | (including compensatory � Township | afforestation)

245.54 --- ---

5 Reclamation/Rehabilitation of mined out area

682.28 --- ---

6 Others (specity) a. Indigenous People’s development Programme b. Miscellaneous cost like relamation studies, EIA & EMP preparation , data generation etc.

25.00

38.36

--- ---

Total 1845.44 752.21 --- --- $ Cost base : October 2013. $$ Medical facilities are provided in the project.,

Page 60: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 38

47. Amount earmarked for socio-economic welfare measures for the nearby villages other than R&R plans. – Corporate Social Responsibility (CSR)

CSR expenditure for last four years by Lingaraj OCP is given below. Year 2011-12 2012-13 2013-14 2014-15 Total Amount in Rs. Lakhs.

297.13 379.39 654.98 242.54 1574.04

CSR fund is allocated on 2% of the average net profit of the company for the three immediate preceeding financial year or @ Rs. 2 per tonne of the coal produced in the previous year whichever is higher.

48. Public hearing

(a) Date of Advertisement 06.08.2014 (b) Newspapers in which the

advertisement appeared The Sambad (Odiya daily) &

The New Indian Express (English daily)

(c) Date of public hearing (DD/MM/YY)

09.09.2014

(d) Public Hearing Panel chaired by & members present

The public hearing panel was chaired by Sri Sushanta Kumar Barik , Additional District Magistrate, Angul. The members present were : 1. Dr. Binod Bihari Das, Regional Officer, SPCB 2. Sri G.P.Mohapatra, Senior Manager, (Personal),

Lingaraj OCP (e) No. of people attended the

public hearing meeting and number of people from the lease area

200 no. of people attended the meeting from nearby villages. Only 32 no. of people signed the attendance sheet. 13 nos. of persons had delivered their views.

(f) Summary/details of public hearing in tabular form

Issues raised by the Public

Action taken/ compliance as on 31.12.2014

Action proposed to be taken

Reclamation of the mine void after removing coal and OB dump management and land / soil pollution

Reclamation of mine void and external OB dump is done on regular basis. Till now the area of mine void reclaimed biologically is 21.80 ha out of a total excavated area of 275.85 ha. Similarly, till now external OB dump area biologically reclaimed is 65.09 ha out of a total external OB dump area of 256.030 ha.

Out of total mine void of 538.85 ha, 292.14 ha of void will be filled with over burden. The remaining 246.71 ha of void will be left out as water body for harvesting rain water as well as for filling over burden material from neighbouring developing mine.

Top soil Management

This is a running mine. Hence top soil is concurrently excavated and spreaded over the technically reclaimed area/ OB dump. However top soil storage is made temporarily whenever space is not

A detail top soil management plan considering the present condition of mine is under process at CMPDIL.

Page 61: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 39

available for spreading the same and biologically conserved by planting grass, legumes, agaves etc.

Fly ash dumping by M/S NALCO Ltd and M/S Bhusan Steel Ltd.

At present no fly ash from any industry is being dumped in this mine.

There is no proposal of fly ash dumping in the mine.

Air pollution 1. Dust suppression at CHP feeder breaker by water spraying through perforated pipe and mist sprayer.

2. Covering of CHP feeder breaker, belt conveyor, coal bunker by G.I. sheet to prevent propagation of dust.

3. Dust suppression on road by water spraying through high capacity mobile water sprinkler (14 nos. on roll).

4. Dust suppression on road, railway siding, CHP areas, workshop and site office areas by water spraying through automatic fixed water sprinklers(71 nozzles)

5. Installation of Non-Visible Emission (NVE) assembly in all drills.

6. Plantation in and around infrastructure and workings and also road side. Total plantation made till now 329609 nos.

7. Fire fighting for any spontaneous heating of coal. Firefighting organization is in place for immediately dealing with any fire or spontaneous heating in mine.

8. Installation of Instant Shower System.

9. Trucks going outside the mine are covered by tarpaulin to prevent any spillage.

10. Overloading of trucks is avoided to prevent spillage of coal.

11. Coal production by Surface miner

1. Installation of dry fog system for dust suppression at all the CHPs.

2. All the permanent coal transportation roads will be made of rigid concrete pavement and installation of fixed water sprinkler/ atomizer beside the road.

3. Transportation of coal from CHP to railway siding Silo by belt conveyor there by avoiding road transportation.

4. Producing maximum coal (about 90%) by surface miner which is considered to be one of the most eco-friendly equipment. By using surface miner drilling and blasting are completely eliminated. As water spraying is done along with the water injecting system hence there is no chances of dust generation during cutting and loading of coal.

5. Thickness and area of greenbelt will be further increased to prevent propagation of dust from the dust generation sources.

6. Using water atomizer the railway siding and other places to deal and control

Page 62: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 40

(4 nos.) to minimize the drilling, blasting thereby reducing the dust & heating /fire in coal seam/OB dump. In 2013-14 production through Surface Miner was 74.90% out of total production of 7.17 M.te. In this year Surface Miner Production is 82.59% up-to Dec. 2014 out of total production of 8.00 M.te.

12. Introduction of heavy duty truck mounted vacuum cleaner (Mechanical Road Sweeper) for cleaning of road (1 no.).

13. Dispatch of coal is made mostly through Rail mode which is considered to be one of the most ecofriendly modes of transport. In 2013-14, dispatch through rail is 88.68% out of total dispatch of 7.18 M.te. In this year rail dispatch is 89.69% out of total dispatch of 5.88 M.te.

of the fugitive dust.

Water pollution 1. Effluent treatment plant (ETP) for treatment of workshop effluent – 02 nos. The treated effluent is not allowed to go outside and totally reused for dust suppression.

2. Mine discharge treatment plant (MDTP or ST-1) for taking care of mine discharge and other discharges as well.

3. Catch drain around the OB dump and garland drain around the excavated area. Settling tank (ST-4) is provided for treatment of the OB dump washing which comes through the catch drain.

4. All the washings from Lingaraj railway siding and nearby coal stock come to another settling tank (ST-2) and are treated there before discharging outside.

5. All the washings from Deulbera railway siding and nearby coal stock come to another settling tank (ST-3) and are treated there before discharging outside.

6. Construction of Roof Top Rain

1. A thorough study is proposed to be made by scientific institution for overall water management/ pollution control measures of the mine. It is intended to make the mine zero discharge system. However, after study if it is found that zero discharge is not feasible then suitable and adequate control measures will be taken as per the study.

2. As mentioned above if after study it is found that outside discharge will have to be made from the mine then real time monitoring system will be installed in all the outlets going out of the mine. In such cases, online connection to the server of Odisha State Pollution Control Board will be provided for instant

Page 63: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 41

water harvesting points (6 nos.), Earthen pond 9 nos. in the nearby villages,sedimentation ponds(03nos)

7. Main Mine sump (02 nos.) with total capacity of 28.35 lakh m3 for settling of suspended solid which is the only pollutant in coal mine effluent. No Acidic effluent is observed in this mine for which regular monitoring is done.

transmission of data of the water monitoring as mentioned above.

Rise in ambient temperature and Combating thermal pollution

Occurrences of spontaneous heating/ fire in the mine/coal stocks are negligible which may contribute to rise in Ambient temperature. However the following actions have been taken for dealing with fire/spontaneous heating.

(a) About 80% coal is produced by cutting through surface miners, thereby reducing the cracks & loose coal which ultimately prevent oxygen to enter into the coal seams, thereby reducing fire/spontaneous heating in the coal seam.

(b) Coal stock has been continuously reduced to have the minimum exposure of coal to the air. On 1st April’ 2012 coal stock was 20.69 lakhs te. which is reduced to 11.03 lakhs te. on 31st Oct. 2014.

(c) Firefighting arrangement is in place to deal with fire in the mine if any. A scheme/plan for control & dealing with fire is in place.

It is intended to increase the coal production by surface miner (which is considered as one of the eco-friendly system of mining) to about 90% of total production.

Noise pollution due to drilling and blasting

There is no Noise/ vibration pollution in this Mine. The noise & vibration is negligible in this mine as about 80% coal production comes from surface miner where no drilling, blasting or crushing is required. Hence no vibration is occurred. Further rest about 20% coal production where drilling/ blasting is involved, delay detonators is used for reducing the vibration. The Plants & machineries including HEMM are having in-built noise pollution control measures. The noise level is also measured fortnightly in four monitoring stations around the mine. The monitoring reports show that noise level are always within the prescribe limit.

It is intended to increase the coal production by surface miner (which is considered as one of the eco-friendly system of mining) to about 90% of total production.

Page 64: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 42

Ground water depletion

Declining of ground water is temporary phenomenon and is limited in aerial extent around quarry area. After backfilling of the mine pit surrounding ground water level will be restored. Rain water harvesting system is already existing at six locations. Renovation and revitalization of near by nine (9) no. of ponds have been done.

Rain water harvesting system will be constructed and installed in all the residential buildings and other service buildings

Plantation of fruit bearing trees

30% of trees planted in the mine are of fruit bearing varieties. Beside that every year fruit bearing sapling are distributed among the employees of Lingaraj OCP, Lingaraj Area and the local villagers to plant in their resident to make the area green. Total plantation made till date is 329609 nos. Plants are maintained for 5 years at the cost of MCL so that by this time the plants become self-sustaining to survive on their own.

Same will continue.

Employment opportunity for local Youth. Service or pollution grant to be provided to each resident of Talcher within 5 km radius of mine.

Till 01.01.2015 a total number of 1043 persons have been offered permanent employment/cash compensation in lieu of employment/annuity in the project. Detail is given in R&R head.

Employment for 80 persons is under consideration.

Development of Nearby Villages.

Total expenditure of developmental work in last 3 years: Kandhal G.P. = Rs. 16542816.36 Kankili G.P. = Rs. 10684185.16 Talcher G.P. = Rs. 62117055.51

Development will continue

Water supply to nearby villagers

Water to the nearby 37 villages and 18 municipality wards is supplied by tanker during the summer season i.e. from 16th February to 15th June. The work for water supply through pipe line to 19 nearby villages is being made through RWSS and is at the completion stage. Out of 19 villages, water supply arrangements to 11 villages have already been completed and water supply in those villages is in progress. However, for the rest 08 villages water supply will be made very soon. Till now Rs. 20 Crore has been deposited to RWSS for the said work. Besides the above arrangement/ work,

The same will continue.

Page 65: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 43

water supply to the Talabera village under Kandhal GP is in progress.

Public road maintenance to prevent accident

Total work done for construction and maintenance of road in last three years: 2011-12 = 208.43 Lakhs 2012-13 = 259.06 Lakhs 2013-14 = 166.87 Lakhs 2014-15 = 33.78 Lakhs

It is continuous process which is being done on regular basis.

Health and education facilities in the area. Health insurance of Rs. 5 lakhs to be provided to the residence of Talcher within 5 km radius of the mine.

Regular health camp is organized in nearby villages for free check up of the villagers and some medicines are also distributed free of cost. No. of health camps organized is as below: 2012-13 = 04 Health camps 2013-14 = 12 Health camps 2014-15 = 11 Health camps Regarding health insurance this is to mention that the environment surrounding the Lingaraj OCP is kept as good as possible by providing the environment mitigation measures as mentioned earlier in this report. Hence, health problems due to Lingaraj OCP cannot be accepted as mentioned by some people in the meeting. However, treatment facilities in N.S.Central Hospital are provided to the local villagers either at nominal cost (Rs. 2.00 per visit). Construction and maintenance of schools of nearby villages are made under CSR head. Expenditure in this head for three years is Rs. 56.37 lakhs. Besides that, 3 schools with classes up to 12th standard and one Nursing School are run by MCL with 100% sponsorship to increase the education level in the area.

The same practice will be continued. However, a medical college is proposed to be established at Talcher by 100% sponsorship by MCL.

Page 66: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 44

Proper utilization of CSR fund

Proposals pertaining to CSR works are received through Gram Panchayate/ Panchayate Samiti/ Municipality directly or through BDO/Sub-Collector/Collector at different levels i.e. either at Project level/Area kevel or HQ level. All such proposals are put in front of CSR Committee for co-ordination & scrutiny. After no objection from CSR Committee, only agreed works are taken for CSR activities for estimation and tendering process. It is guided by CSR policy of MCL / CIL. Fund is allocated on 2% of the average net profit of the company for the three immediate preceeding financial year or @ Rs. 2 per tonne of the coal produced in the previous year whichever is higher.

The same practice will continue.

Kandhal village panchayat should be considered as adopted village for all benefits.

Maximum benefit is given to the Kandhal Gram Panchayat by Lingaraj OCP. Total work done in Kandhal Gram Panchayat under CSR head is Rs. 12930180 (Rs. One crore twenty nine lakhs thirty thousand one hundred eighty) till August 2014. Besides that maximum employment (more than 90% of total 1043 employment) has been given to the persons from the Kandhal Gram Panchayat. However, provision exists under CSR policy of MCL for adopting nearby villages provided they satisfy certain criteria.

MCL will do its best to improve the existing living conditions in the kandhal village.

Proper rehabilitation arrangement by making villages of displaced people.

As per the R&R policy of Govt. of India, displaced people are provided plots in the resettlement site having all basic infrastructure for colonial living. In the said policy there is also provision for interested displaced families to be settled in an area of their own choice by taking compensation in lieu of plots which is presently Rs. 725000 /- per family and increases with inflation index. Further, MCL is also providing the basic amenities like electricity, water, road and drainage system in the area where more than 20 displaced families are settled on their own choice. In addition to that, infrastructures etc. are constructed where displaced families are settled along with nearby villages.

More amenities will be provided by MCL to improve the living standards of the land oustees residing at R&R colonies.

Page 67: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 45

Land acquisition should be made under LA Act and not under CB Act.

CB Act is enacted by the parliament specifically for acquisition of land by Govt. companies or PSUs where coal exists. This act has a provision for transfer of all rights including mining rights to the user agency at one go, where as in LA act when land is acquired for mining, a mining lease is required to be taken under MC Rules which lingers the process of acquisition and thereby delay the transfer of benefits to the affected people. However, the land under LA Act is also acquired where the land is required for development of infrastructures only.

No additional land is required.

People whose lands have been acquired should be brought under Swarna Yojana Package.

All persons who have been displaced after 15.05.2010 are covered under Swarna Yojana Package as per the conditions stipulated in the said package.

Action is already being done.

Page 68: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Proforma, Page - 46

49. Whether the following approvals* (wherever applicable) have been obtained?

(i) Site clearance from MOEF Not Applicable. (ii) ‘Consent for Establishment’ from the State Pollution

Control Board Yes.(Annexure – VA) (for 13.0 Mty project)

(iii) NOC from Atomic Mineral Divison No (Not applicable) (iv) Mining plan approval from IBM / Ministry of Coal Mining Plan of Lingaraj OCP

Expn.(16.0 Mty/20.0 Mty,Peak) has been approved by MoC on 01.07.2011 (Annexure-I).

(v) In case of existing mines, mining scheme approval from IBM

No (Not applicable)

(vi) Forestry clearance under FCA, 1980 Forestry clearance obtained.(Annexure – VI).

(vii) NOC from Chief Controller of Explosives Already obtained for existing magazine.(Annexure –IV).

(viii) Commitment regarding availability / pumping of water from the concerned Authorities

Yes ( Annexure-II)

(ix) In case of ML area falling in notified areas of the Central Ground Water Authority, NOC from them.

No

[* Annex copies of approvals and number them]

50. Was / is there any court case relating to the project or related No activities? If so, provide details of present status. Verification : The data and information given in this performa are true to the best of my knowledge and belief. Signature of applicant * With full name and address [* Owner or his authorized signatory] Date : Place:

Page 69: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 1, Page - 1

Chapter – 1

INTRODUCTION 1.1 PURPOSE OF THE REPORT

Project Report of Lingaraj OCP was initially planned and approved in

February 1991 with target capacity of 5.0 Mty for a capital outlay of Rs.229.84 crore

for Departmental Variant. Coal from Lingaraj OCP was linked to Kaniah STPS as per

approved PR. Coal was proposed to be dispatched to the above STPS through the

merry-go-round (MGR) system.

Project Report for Lingaraj OCP Expansion (10.0 Mty) (5.0 Mty incremental)

was sanctioned in February 2003 by CIL Board for an additional capital of Rs.98.89

crores for coal outsourcing and OB departmental variant.

The existing Lingaraj OCP Expansion (Phase-II) 13.0 Mty (3.0 Mty

incremental) for an additional capital of Rs.2.18 crores was approved in June 2006 by

MCL Board for Coal and OB both outsourcing variant. Environmental clearance for

Lingaraj OC Expansion (Phase-II) 13.0 Mty (3.0 Mty incremental) was obtained vide

letter No. J/11015/223/2005.II(M) dtd.02.02.2006. The existing project is mainly

linked to Kaniah STPS. About 80% of coal production from this project will be linked

to Kaniah STPS and the remaining will be linked to other power houses of South

India and basket linkage.

The proposed Lingaraj OCP Expansion (Phase-III) (16.0 Mty / 20.0 Mty

Peak) (3.0 Mty / 7.0 Mty incremental) is based on Revised geological report on

exploration of Lingaraj block June 2000 (Annexure I). An area of about 28 ha only

has been proposed to be annexed in the southern side of the sanctioned mine

boundary (i.e. within safety zone of Lingaraj OC Expn. (13.0 Mty).

The project report of Lingaraj OC Expn. (16.0 Mty / 20.0 Mty Peak) has been

approved by MCL Board in its 116th meeting on 6/2/2010 at Kolkata.

Page 70: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 1, Page - 2

Mining plan for Lingaraj OCP Expansion (Phase-III) 16.0 Mty was approved

vide letter No.34012/(4)/2011-CPAM, Govt. of India, Ministry of coal dt.1st July 2011.

Form-I and prefeasibility report for Lingaraj OCP Expansion (Phase-III) 13.0

Mty to 16.0 Mty (normative) and 20.0 Mty (Peak) was discussed in 21st Expert

Appraisal Committee (EAC) (Thermal & Coal Mining) on 29th March 2011.

After detailed deliberation, the committee had sought the following details:

1. Specific action plan drawn up for the project as it is located within the

critically polluted area of Angul.

2. Total waste management plan, OB dumping and reclamation including

conceptual mine closure of mine void, etc. should be furnished taking

into consideration the neighbouring large operating opencast mines,

Bhubaneswari, Ananta, etc. in an integrated manner.

Submission of the above details and further discussed in the EAC (Expert

Appraisal Committee) meeting was held on 23-24th January 2012. EAC had

recommended Terms of Reference (TOR) for Lingaraj OCP Expansion (Phase-III)

(16.0 Mty Normative & 20.0 Mty Peak) vide letter No. J-11015/174/2010-IA.II(M),

MoEF, Govt. of India, New Delhi 21st March 2012.

This EIA-EMP has been made by incorporating the compliance of the said

Terms of Reference (TOR).

1.2 GENERAL INFORMATION 1.2.1 NAME AND ADDRESS OF THE PROJECT

(a) Name & size of the project

: Lingaraj OCP Expn. (Phase-III) (Normative

Capacity 16 Mty & Peak Capacity 20.0 Mty)

(i) Name of the project proponent

: Project Officer, Lingaraj OC Expn. Project, MCL.

Page 71: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 1, Page - 3

Mailing Address : Mahanadi Coalfields Limited,

P.O : Deul Bera Colliery,

Dist. : Angul … 759 102 (Odisha)

E-mail : [email protected]

Telephone : 06632 - 113769

Fax No. : 06632 - 542844

(b) Objective of the project : 1. To bridge the over all deficit of coal availability

over demand of MCL.

2. To meet demand of Kaniah STPS/ Basket

linkage.

(c) Nature of the project

(i) New mine : No.

(ii) Expansion : Yes

� Increase in ML area

: No. (Quarry area has only been increased from

510.851 ha to 538.851 ha)

� Increase in annual production

: Yes (from 13.0 Mty to 16.0 Mty Normative / 20.0

Mty peak)

(iii) Renewal of ML : No.

(iv) Modernisation : No.

(d) Location / Site of the Project

:

(i) Name of the Villages : Balugaon, Longijoda, Ambamunda, Nakulbaspur,

Balugaon Khamar, Hensamul and Madanmohanpur

besides some uninhabited villages namely Malipada,

Manikagoda, Gengutia and Badarpasi.

Page 72: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 1, Page - 4

(ii) Tahasil : Talcher

(iii) District : Angul

(iv) State : Odisha

(e) Main consumer : Thermal Power Station.

1.3 SCOPE OF THE STUDY

TOR has been obtained for Lingaraj OC Expn.(Phase-II) (16.0 Mty) (i.e. 3.0

Mty incremental) 20.0 Mty (7.0 Mty incremental) vide letter No.J-11015/174/2010-

IA.II(M) dated 21.03.2012. The scope of studies broadly covers the following:

(a) Study area and project profile

(b) Present / existing environmental scenario

(c) Anticipated Impact Assessment and Mitigation Measures

(d) Analysis of alternative technology.

(e) Environmental Monitoring Programme.

(f) Additional studies

a. Risk Assessment and Management

b. Social Impact and R&R Action Plan

c. Greenbelt Development Plan

d. Public Consultation

e. Scope stability studies

(g) Project benefits

(h) Environmental cost benefit analysis

(i) Summary and conclusion

Page 73: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 1, Page - 5

1.4 SOURCES AND TYPE OF DATA

This report has been formulated using the various data from the following

sources:

Sl.No. Type of Data Source

1 Mining and economic parameters

Project Report for Lingaraj OCP Expansion (Phase-III) (Normative 16.0 Mty, 3.0 Mty incremental) (Peak capacity 20 Mty) December 2009.

2 Base line air , water & effluent quality and noise level data

Baseline data generated by M/s.Richardsons & Cruddas (1972) Ltd., Chennai … 78. Pre-monsoon season March 2013 to June 2013.

3 Socio-economic details of core and buffer zones

Collection of site specific data by M/s.Richardsons & Cruddas (1972) Ltd., (A Govt. of India U/T), Chennai-98 and Census of India 2011.

4 Taxonomic enumeration of flora and fauna of core and buffer zones

Information from the study carried out for Lingaraj OCP Expn. (Phase-III) (Talcher Coalfield) by M/s.Richardsons & Cruddas (1972) Ltd., (A Govt. of India U/T), Chennai-98.

5 Surface hydrology and hydrogeology

Report on Hydrology of Talcher Coalfield (East), by CMPDI(HQ), Ranchi and information from Central Ground Water Board, Bhubaneswar.

6 Climatic and micro-meteorological data

Long-term data obtained from IMD, Bhubaneswar for Angul IMD Observatory have been used and micro-meteorological data by M/s.Richardsons & Cruddas (1972) Ltd., (A Govt. of India U/T), Chennai-98.

7 Details of village-wise project affected persons and families

Area Office, Lingaraj Area of MCL.

8 Land use/cover details of Talcher coalfield

Data based on IRS-1D/LISS-III from CMPDI (HQs), Ranchi.

9 Baseline data on soil quality

M/s.Richardsons & Cruddas (1972) Ltd., (A Govt. of India U/T), Chennai-98.

10 Slope stability study Report on slope stability study for Lingaraj OCP Expansion (Phase-III) was done by CMPDI (HQs), Ranchi.

Page 74: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 1

Chapter – 2

PROJECT DESCRIPTION 2.1 STUDY AREA PROFILE 2.1.1 LOCATION OF THE BLOCK (PLATE NO.IA & IB)

Existing (13.0 Mty)

For Project (16.0 Mty) (i.e.3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental)

Coalfield Talcher Talcher Tahasil Talcher Talcher District Angul Angul Latitudes 20o 57• 39Ž & 20o 58• 18Ž N 20o 57• 39Ž & 20o 58• 18Ž N Longitudes 85o 09• 33Ž & 85o 12• 12Ž E 85o 09• 33Ž & 85o 12• 12Ž E Topo sheet No. 73 H/1 73 H/1 2.1.2 COMMUNICATION (Plate IV)

Sl. No. Item Existing (13.0 Mty)

For Project (16.0 Mty) (i.e.3.0 Mty

incremental) (Peak 20.0 Mty i.e.

7.0 Mty incremental)

1. Nearest revenue town

Talcher

Same as 13.0 Mty

2. Nearest road � 2 km all weather road to Talcher. � 25 km to District HQs at Angul.

3. National highways

� NH-23 passes through Talcher and connects to NH-42.

� NH-42 is 15 km via Talcher.

4. Connection to the state capital

153 km to Bhubaneswar via NH-23, NH-42 & NH-5.

5. Connection to the company HQs

200 km to Sambalpur via NH-23, NH-42 & NH-6.

6. Nearest railhead

Talcher railway station on branch line of East Coast Railway is at a distance of about 6 km.

7. Airport Biju Pattanaik Airport in Bhubaneswar is at a distance of about 160 km.

Page 75: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 2

2.1.3 TOPHOGRAPHY (PLATE-III)

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental) � The area is gently undulating.

� The general slope is towards north.

� The elevation of the area varies from

85 m to 120 m above MSL.

� Same as 13.0 Mty except a few small

isolated raised ground near the

southern and south eastern block

boundaries may be noticed which are

formed by conglomerates or the

gravel ridges bordering the adjoining

Talcher colliery.

2.1.4 PROJECT BOUNDARY

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental)

North Fault F11 … F11 is taken as the

floor boundary Existing surface boundary is adopted.

East Incrop of Seam-II and Fault F1-F1

Existing surface boundary is adopted.

South Surface boundary is fixed at 15 m

from the common boundary

against underground mines where

permission is given. In the western

part, surface boundary is fixed

after leaving a 25 m barrier from

the underground working. Floor

boundary is based on the surface

boundary adopted and rationa-

lisation along faults.

Surface boundary is fixed at 15 m

from the common boundary against

underground mines where

permission is given. In the western

part, surface boundary is fixed after

leaving a 25 m barrier from the

underground working. Floor boundary

is based on the surface boundary

adopted and rationalisation along

faults.

Page 76: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 3

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental)

West Surface boundary is marked after

leaving a minimum surface barrier

of 60m against Bhubaneswari OCP

infrestructure (planned).

Surface boundary is marked after

leaving a minimum surface barrier of

60m against Bhubaneswari OCP

infrestructure (planned).

2.1.5 SURFACE DRAINAGE PATTERN AT MINE SITE (PLATE-III)

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental)

Local drainage is controlled by a small

seasonal nullahs flowing generally

towards north and discharging into the

north- south flowing Brahmani river

(Plate No. III). The Brahmani river

passes at a distance of roughly 3 km

east of the project area..

Local drainage is controlled by a small

seasonal nullahs flowing generally

towards north and discharging into the

north- south flowing Brahmani river

(Plate No. III). The Brahmani river

passes at a distance of roughly 3 km

east of the project area..

There are few man- made ponds at

places which are utilized by the local

population for irrigation and domestic

purposes.

2.1.6 EMBANKMENT AND / OR WEIR CONSTRUCTION

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental) There is no construction of embankment

/ weir.

There is no construction of

embankment / weir.

Page 77: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 4

2.1.7 DISTANCE FROM WATER BODIES Existing 13.0 Mty Proposed for 16.0 Mty

(i.e. 3.0 Mty incremental) (Peak 20.0 Mty i.e. 7.0 Mty incremental)

Distance from

River bank@ and Other water bodies sea/creek/ lake/ nullah, etc. (specify)

River bank@ and Other water bodies sea/creek/ lake/ nullah, etc. (specify)

Mining lease boundary

1. Bangaru jhara 2. Brahmani River 3. Nandira Jhara 4. Singhada Jhara 5. Satyabadisagar Pond

2.40 km 3.00 km 6.25 km 12.50 km Extinct

1. Bangaru jhara 2. Brahmani River 3. Nandira Jhara 4. Singhada Jhara 5. Satyabadisagar pond

2.4 km 3.00 km 5.20 km 12.50 km Extinct

2.1.5 CLIMATE Long-term meteorological data collected from IMD, Bhubaneswar for Angul

IMD station have been referred for preparation of the following table:

Table-2.1 : Climatic Data from IMD Station, Angul

Item Parameters Particulars

Rainfall

Range 743 to 1550.18 mm, as recorded over a period of 21 years.

Annual average 1256.56 mm. More than 77% of the rain occurs during the monsoon season, i.e. June to September.

Temperature range (monthly mean of daily temperature)

Minimum 5.5OC (Nov., 1996)

Maximum 44.1OC (May, 2009)

Relative humidity range (monthly mean of daily RH

Minimum 31%

Maximum 88%

Wind speed range (monthly mean of daily wind speed)

Max at 8:30 hr 6 km/hr

Min at 8:30 hr 2 km/hr

Max at 17:30 hr 8 km/hr

Min at 17:30 hr 1 km/hr

Page 78: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 5

Site specific continuously monitored micro-meteorological data through

autographic weather monitoring instrument during pre-monsoon period have been

summarized in the following tables:

Table-2.2: Site Specific Micro-meteorological Data for Wind Speed and Temperature

Month Wind Speed (kmph) Temperature (OC)

Mean Max. % of Calm Min. Max.

March 2013 9.7 22.9

1.16

21.0 40.0

April 2013 10.5 23.5 21.0 42.0

May 2013 7.2 18.5 22.0 42.0

Table-2.3: Site Specific Micro-meteorological Data for Relative Humidity

and Rainfall

Month

Relative Humidity (%) Rainfall (mm)

Mean Highest Lowest Total 24 hrs Highest

No. of Rainy Days

March 2013 58.2 84.0 26.0 0 0 0

April 2013 55.0 88.0 20.0 10 2 5

May 2013 52.8 98.0 22.0 49 40 4

Wind rose diagram for March to June, 2013 based on 16 points of compass i.e N,

NNE, NE, etc. based on 24 hourly data is given in Fig.-2.1.

Page 79: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 6

FIG. – 2.1 WIND ROSE OF THE PROJECT SITE DUIRNG 15th MARCH, 2013 TO 12th JUNE, 2013

Page 80: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 7

2.1.6 LOCATION OF ML AREA IN SEISMIC ZONE

(a) Severity (Richter scale) : Zone-II and no earth quake has occurred during last 10 years

(b) Impact, i.e. damage to

� Life : No

� Property : No

� Existing mine : No

2.2 PROJECT PROFILE 2.2.1 TYPE OF THE PROJECT

It is a running opencast project.

2.2.2 JUSTIFICATION FOR EXPANSION OF THE PROJECT

The overall demand of coal on MCL, based on coal linkage SLC (LT) by the

end of XI plan has been assessed to be 158.34 Mt against availability of 138.40 Mt.

Thus there is a gap of 19.94 Mt of coal.

(Fig. in Mt.)

Demand Availability Gap

Talcher coalfield 107.06 90.97 16.09

Ib Valley coalfield 51.28 47.43 3.85

Total : 158.34 138.40 19.94

There is possibility of recommending more additional linkages over and

above the already recommended linkages. The production from the proposed

Lingaraj OC Expn. Project will go towards meeting the gap between demand and

availability. Demand of coal from this coalfield is likely to rise further since more

number of TPS may be linked to this coalfield.

Page 81: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 8

2.2.3 DESCRIPTION OF CORE ZONE

Core zone of existing Project (13.0 Mty) Core zone of proposed project (16.0 Mty) / as above

i) The core zone of existing project covers

partly and/or fully the land from 7

villages namely, Balugaon, Longijoda,

Ambamunda, Nakulbaspur, Balugaon

Khamar, Hensamul and

Madanmohanpur.

i) The core zone of existing project

covers partly and/or fully the land

from 7 villages namely, Balugaon,

Longijoda, Ambamunda,

Nakulbaspur, Balugaon Khamar,

Hensamul and Madanmohanpur.

ii) No additional village or families will

be affected from the above villages

due to the expansion project.

2.2.4 DESCRIPTION OF BUFFER ZONE

Buffer zone of existing Project (13.0 Mty) Buffer zone of proposed project (16.0 Mty)/ as above

i) The buffer zone i.e. area within 10 km

radius from the periphery of the project

boundary has been developed into an

industrial belt comprising of opencast

mines, underground mines and various

other industries.

ii) Kalinga, Ananta, Bharatpur, South

Balanda and Jagannath opencast mines

besides Talcher, Nandira and Deulbera

U/G mines are located in the buffer

zone. Other industries situated in and

around the buffer zone of this project are

Talcher Heavy Water Plant and Talcher

Thermal Power Station (NTPC), Talcher.

iii) The buffer zone of this project 8 (eight)

reserve forests, namely, Kandhal,

Paturia, Petachira, Genguita, Rakas,

Kauchiakhol, Mukundanali and

Kahneijena (only south-east part).

i) Kalinga, Ananta, Bharatpur, South

Balanda and Jagannath opencast

mines besides Talcher, Nandira and

Deulbera U/G mines are located in the

buffer zone. Other industries situated

in and around the buffer zone of this

project are Talcher Heavy Water Plant

and Talcher Thermal Power Station

(NTPC), Talcher.

ii) The buffer zone of this project 8 (eight)

reserve forests, namely, Kandhal,

Paturia, Petachira, Genguita, Rakas,

Kauchiakhol, Mukundanali and

Kahneijena (only south-east part).

Besides the above, some patches of

village forests are also located within

the buffer zone of this project.

iii) The population, sex composition,

average family size & overall literacy

Page 82: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 9

Buffer zone of existing Project (13.0 Mty) Buffer zone of proposed project (16.0 Mty)/ as above

Besides the above, some patches of

village forests are also located within the

buffer zone of this project.

iv) The population, sex composition,

average family size & overall literacy

level are 1,24,765 persons, 892

females/1000 males, 6 and 65.03%

respectively.

v) There are no places of religious,

historical and archaeological importance

in the buffer zone.

level are 1,51,107 persons, 897

females/1000 males, 6 and 73.4%

respectively.

iv) There are no places of religious,

historical and archaeological

importance in the buffer zone.

2.2.5 GEOLOGY (PLATE NO.IIA, IIB1, IIB2 & IIC)

Existing for 13.0 Mty Proposed for 16.0 Mty as

above

Geological reports (GR) "Revised Geological Report on Coal Exploration of Lingaraj Block, Talcher Coalfield", Orissa; prepared by CMPDI, RI-III in June 2000.

Same as 13.0 Mty project.

Metres drilled 23458.95 23458.95

No. of boreholes 185 185

Borehole density (number of boreholes per sq.km)

37 37

Strike The general strike is in the E-W direction with northerly dip. The strike gradually swings to NE-SW and N-S in certain parts which becomes NW-SE in north-eastern part of the block. The block is structurally very complex, excepting in the northern part which is exceptionally simple and free of faults.

The general strike is in the E-W direction with northerly dip. The strike gradually swings to NE-SW and N-S in certain parts which becomes NW-SE in north-eastern part of the block. The block is structurally very complex, excepting in the northern part which is exceptionally simple and free of faults.

Dip The dip of coal seams in eastern part is moderate (3O to 10O) while it becomes steeper (15O) in the remaining area.

The dip of coal seams in eastern part is moderate (3O to 10O) while it becomes steeper (15O) in the remaining area.

Page 83: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 10

Existing for 13.0 Mty Proposed for 16.0 Mty as above

Faults (No.) 33 33

No. of coal seams to be worked

12 coal seams, viz. Seam(s)- II (Bottom), II, III, IVA, IVB, V, VIA, VIB, VII, VIII, IX, X, XI, XII and XIII.

12 coal seams, viz. Seam(s)- II (Bottom), II, III, IVA, IVB, V, VIA, VIB, VII, VIII, IX, X, XI, XII and XIII.

Mineable coal reserves (Mt) 348.81 (as on 1.4.2005) 348.81 (as on 1.4.2005)

Table-2.4 Geological Sequence of Talcher Coalfield

Gro

up

Age Formation

Thickness (m)

Lithology From To

Recent Alluvium, laterite 2 37 Soil, Sub-soil

LOWER

GONDWANA

Lower Triassic to Upper Permian

Kamthi and Barren measures

- 250+

Fine to medium grained sandstone, carb shale, coal bands with grayish sandstone, pink clay and pebbly sandstone at top

Lower Permian

Barakar - 500+

Fine to medium coarse sandstone, shale, coal seams with conglomerate at base.

Karharbari - 300+

Medium to coarse grained sandstone, shale and coal seams (seam-I)

Upper Carboniferrous to lower Permian

Talcher - 325+

Diamicite, fine to medium grained, greenish sandstone, shale, rhythmite, turbidite etc

Unconformity

Pre-Cambrian

Archaeans Granites, granite gneiss amphibolite, migmatite, quartzite, pegmatite.

Page 84: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 11

Table 2.5 Average thickness of seams

Seam Thickness (in m.)

Average Min. – Max. XIII 3.20 1.61 - 4.93 XII 2.65 1.22 … 5.00 XI 4.24 1.23 … 4.24 X 2.01 0.50 … 3.85 IX 1.91 0.50 … 3.18

VIII 2.05 0.20 … 5.31 VII 5.87 1.88 … 8.60

VI B 4.68 0.69 … 7.25 VI A 5.81 2.62 … 14.43

V 11.14 5.09 … 15.36 IV B 2.28 0.64 … 5.18 IV A 11.44 6.15 … 17.04

Local Seam 1.64 0.05 … 3.23 III 13.56 7.76 … 17.29 II 35.96 32.39 … 46.16

II Bottom 2.23 0.23 … 4.75 I Bottom

(Karharibari formation)

2.85 0.59 … 5.10

Table – 2.6 Average thickness of Partings

Strata

(Parting between) Thickness (in m.)

Average Min. Max. Top OB 15.95 2.26 23.96

Parting XIII … XII 15.91 15.13 22.35 Parting XII … XI 15.91 4.15 24.72 Parting XI … X 9.79 4.00 21.09 Parting X … IX 12.42 5.60 26.55

Parting IX … VIII 12.12 7.38 18.63 Parting VIII … VII 9.2 6.84 19.00 Parting VII … VIB 13.8 6.93 24.42 Parting VIB … VIA 4.9 1.48 12.53 Parting VIA … V 11.4 5.09 15.36 Parting V … IVB 2.28 1.00 5.18

Parting IVB … IVA 10.58 0.87 10.99 Parting IVA … III 9.00 2.00 23.30 Parting III … II 3.30 0.12 5.90 Parting II - IIB 1.77 0.19 9.00

Page 85: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 12

2.2.5.1 DESCRIPTION OF COAL SEAMS

Seam XIII : The seam-XIII is the youngest coal seam in Lingaraj block occurring within Barakar Formation and is overlain by seam-XII with a parting of 15.13m. (CMTL-59) to 22.35m. (LCD-27). The thickness of the seam-XIII varies from 1.61m.(LCD-27) to 4.93m. (CMTL-59).

Seam XII The seam-XII is underlain by seam-XI with a parting of 4.15m. (LCD-34) to 24.72m. (CMTL-263) and is overlain by seam-XIII with a parting of 15.13m. (CMTL-59) to 22.35m. (LCD-27). The thickness of the seam-XII varies from 1.22m (CMTL-322) to 5.00m. (CMTL-263).

Seam XI : The seam-XI is underlain by seam-X with a parting of 4.00m. (CMTL-18) to 21.09m. (CMTL-317) and is overlain by seam-XII with a parting of 4.15m. (LCD-34) to 24.72m. (CMTL-263). The thickness of the seam-XI varies from 1.23m.(CMTL-317) to 4.24m. (CMTL-18). However, it normally ranges between 2.20m. to 3.4m.

Seam X : The seam-X is underlain by seam-IX with a parting of 5.60m. (CMTL-257) to 26.55m. (CMTL-62) and is overlain by seam-XI with a parting of 4.00m. (CMTL-18) to 21.09m. (CMTL-317). The thickness of the seam varies from 0.50m.(CMTL-328) to 3.85m. (CMTL-257), this normally ranges between 1.7m. & 2.2m.

Seam IX : The seam-IX is underlain by seam-VIII with a parting of 7.38m. (CMTL-62) to 18.63m. (CMTL-79) and is overlain by seam-X with a parting of 5.60m. (CMTL-257) to 26.55m. (CMTL-62). The thickness of the seam-IX varies from 0.50m.(CMTL-62) to 3.18m. (CMTL-324).

Seam VIII : The seam-VIII is underlain by seam-VII with a parting of 6.84m. (LCD-32) to 19.00m. (CMTL-325) and is overlain by seam-IX with a parting of 7.38m. (CMTL-62) to 18.63m (CMTL-79). The thickness of the seam-V varies from 0.20m. (CMTL-359) to 5.31m. (CMTL-147).

Seam VII : The seam-VII is underlain by seam-VIB with a parting of 6.93m. (CMTL-257) to 24.42m. (LCD-32) and is overlain by seam-VIII with a parting of 6.84m. (LCD-32) to 19.00m. (CMTL-325). The thickness of the seam-VII varies from 1.88m.(CMTL-317) to 8.60m. (CMTL-254).

Seam VIB : The seam-VIB is underlain by seam-VIA with a parting of 1.48m. (CMTL-30) to 12.53m. (CMTL-320) and is overlain by seam-VII with a parting of 6.93m. (CMTL-257) to 24.42m. (LCD-32). The thickness

Page 86: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 13

of the seam-VIB varies from 0.69m.(CMTL-30) to 7.25m. (CMTL-60).

Seab VI A : The seam-VIA is underlain by seam-V with a parting of 3.09m. (CMTL-255) to 32.25m. (CMTL-325) and is overlain by seam-VIB with a parting 1.48m. (CMTL-30) to 12.53m. (CMTL-320). The thickness of the seam-VIA varies from 2.62m.(CMTL-317) to 14.43m. (CMTL-30).

Seam V : The seam-V is underlain by seam-IVB with a parting of 3.55m. (CMTL-167) to 14.45m. (CMTL-96) and is overlain by seam-VIA with a parting 3.09m. (CMTL-255) to 32.25m. (CMTL-325).

Seam IV B : Seam-IVB is underlain by seam IVA with a parting of 0.87m. (CMTL-93) to 10.99m. (CMTL-27) and is overlain by seam V with a parting of 3.55m. (CMTL-167) to 14.45m. (CMTL-96). The seam-IVB varies in thickness from 0.64m. (CMTL-119) to 5.18m. (CMTL-30). However, it normally ranges from 1.4m. to 3.2m.

Seam IV A : Seam-IVA is underlain by seam III with a parting of 2.83m. (CMTL-255) to 22.78m. (CMTL-334) and is overlain by seam IVB with a parting of 0.87m. (CMTL-93) to 10.99m. (CMTL-27). The thickness of the seam are varies from 6.15m. (CMTL-99) to 17.04m. (CMTL-62). However, it generally ranges between 9m. & 14m. over the major part of the area.

Seam III : Seam-III is underlain by seam-II with a parting of 0.12m (CMTL-28) to 5.90m (CMTL-231). The minimum and maximum depths of the floor of the seam are 9.90m (LCD-21) and 210.86m (CMTL-321) respectively. Seam-III varies in thickness from 7.76m (METAX-35) to 17.29m (CMTL-252) inclusive of all dirt bands

Seam II : Seam-II is most attractive and bottom most seam of the quarriable packet in Lingaraj property. This seam is underlain by seam-II bottom with a parting of 0.19m (CMTL-57) to 9.00m (LCD-12) and is overlain by seam-III with a parting of 0.12m (CMTL-28) to 5.90m (CMTL-231). Thickness of the seam in full thickness area varies from 32.39m to 46.16m on inclusion of all dirt bands. However, after excluding dirt bands more than 1m in thickness, the same ranges between 31.75m & 45.14m.

Seam II (Bottom)

: Seam-II bottom is the lower split of seam-II and has been given separate entity in view of the intervening parting occurring between them. Seam-II Bottom is overlain by seam-II with a parting of 0.19m (CMTL-57) to 9.00m (LCD-12). Thickness of seam, normally ranges between 1-3m. over the major part of block.

Page 87: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 14

2.3 MINE TARGET, LIFE AND RESERVE

An annual target of 16.0 Mty (Peak 20.0 Mty) is proposed. Balance mine at

this target works out to be 20 years (as on 1.4.2009).

Particulars Existing (13.0 Mty) Proposed 16.0 Mty (peak 20.0 Mty)

Mine target (Mt) 13 16 / 20 Year of achieving targeted production

Year … 2 Year - 2

Project life (Years) 28 (from 1.4.2005) 21 (from 1.4.2010) Reserve (Mt) 345.33 (from 1.4.2005) 321 (from 1.4.2010) Overburden (M.cum.) 246.36 (from 1.4.2005) 222.23 (from 1.4.2010) External OB dump About 58.46 M.cum. of

overburden (from the year one i.e. 1.4.05 to the 6th year i.e. 31.4.10) was dumped externally.

About 8.18 M.cum. of overburden from initial two years of operation was dumped externally.

2.4 MINE DETAILS

Present status of the project

1. Project report of Lingaraj OC Expn. (16.0 Mty) (peak 20 Mty) has been approved by MCL Board of Directors in its 116th meeting held on 06.02.2010 at Kolkata.

2. Forest clearance has been obtained for 186.311 ha of forest land for the existing and proposed (13.0 Mty to 16 Mty) (peak 20.0 Mty) project (Annexure VI).

3. No additional forest land for diversion is required for the expansion project.

4. The rehabilitation of the existing project will be completed by 2014-15.

5. No additional families will be affected due to expansion project i.e. 13 Mty to 16 Mty (peak 20 Mty)

6. An area of 28 ha of additional land is required over and above the approved provisions of Lingaraj OCP Expansion. The same is in possession of MCL.

Status of mine It is running opencast mine.

Page 88: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 15

For 13.0 Mty For 16.0 Mty (Peak 20.0 Mty) (i.e. 7.0 Mty

incremental)

Mining technology Considering the geo-mining conditions, shovel-dumper system of mining has been envisaged. However, blastless mining (e.g. contractual surface miners), where dust generation is minimal and negligible will be adopted in this project.

Existing shovel dumper mining is envisaged to continue for expansion project as the area is affected with multiple faults (33 nos.)

Coal winning, OB removal and transportation

For coal winning and transportation, shovel-dumper system and blast free mining (e.g. contractual (4 no.) surface miners) are used. For OB removal and transportation, shovel-dumper system is deployed (Annexure IV).

Existing shovel dumper system will be followed for the expansion project. Incremental coal production by blast free method using additional surface miner (2 No.). Existing shovel dumper system will be continued. It is envisaged to deploy 100 T and 50 T rear dumpers towards additional requirement to reduce fleet size. Both 50 T and 100 T dumpers are deployed in conjunction with 4.3 hydraulic backhoe. While 9.5 cum. Hydraulic shovel dumper would work with 100 T near dumper.

Page 89: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 16

2.5 GEOMINING CHARACTERISTICS Geo-mining characteristics of Lingaraj OC Expn. Project (16.0 Mty / 20.0 Mty)

is given below :

Sl. No. Particulars Unit Value (16 / 20 Mty Project)

1. Quarry floor area Ha 389.80 2. Quarry surface area Ha 528.36 3. Mineable reserves Mt 321.50

(as on 1.4.2010) 4. Waste volume M.cum. 222.23

(as on 1.4.2010) 5. Stripping ratio Cum/t 0.69 6. No. of seams / sections No. 15 7. Target production capacity Mty 16/20 Mty (Peak) 8. Life Year 21 9. Quarry floor gradient a) Range Degree 2 … 28 b) Average Degree 14

10. Strike length along floor M 3429 11. Strike length along surface M 3630 12. Dip-rise length along surface M 1526 13. Quarry depth

a) Maximum M 272.50 b) Minimum M 45

14. Perimeter M 11503.55

2.6 GRADE OF COAL (Mt)

Grade 13.0 Mty Project 16 Mty / 20 Mty (Peak) D 8.96 8.55 E 131.72 127.70 F 176.59 160.87 G 28.06 24.38

2.7 OTHER PARAMETERS OF THE PROJECT

Main Consumer 13.0 Mty Project 16 Mty/20 Mty (Peak)

Kaniah STPS / Basket Linkage

Kaniah STPS / Basket Linkage

Manpower (No. of persons) 13.0 Mty 16.0 Mty (i.e. 3.0 Mty incremental)

1425 1690

Page 90: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 17

Pumping and drainage Existing 13.0 Mty

Sufficient number of pumps including special

type of slurry pump provided for dewatering of

mine.

For 16.0 Mty (Peak 20.0 Mty) (i.e. 7.0 Mty

incremental)

In the expansion the area and the maximum

depth of the mine are almost same as that of

approved earlier. Hence, no additional provision

for pumps, pipes and fittings etc.

Power supply Existing 13.0 Mty

Presently the power is being received from Nandira

132/33 kV sub-station of MCL by single circuit over

head line. For Lingaraj OC Expansion project (13.0

Mty), the power has been received by double circuit

overhead lines at 33 kV from above 132 / 33 kV

substation of MCL after necessary strengthening of

existing circuit for feeding to the project sub-station

(Annexure III).

For 16.0 Mty (Peak 20.0 Mty) (i.e. 7.0 Mty

incremental)

For Lingaraj OCP 16 Mty (peak 20 Mty) the same

double circuit overhead line at 33 kV from 132/33 kV

sub-station shall continue.

CHP & despatch arrangement

Existing 13.0 Mty Proposed prodn. 16. 0 Mty (Peak 20 Mty)

� Presently ROM coal is being crushed to (-)200

The proposed system will be consisting of the following sub-systems :

Page 91: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 18

mm size through 6 nos. feeder breaker circuits. Out of the above circuits, 2 No. are located near the quarry mouth and the remaining 4 No. are located at quarry bed.

� After crushing, coal is loaded into 6 sets of 2 x 100 t overhead hoppers.

� Coal from the hopper is then transported by contractor’s trucks and unloaded at the wharf wall siding located near to the proposed MGR bulb of NTPC.

� Further some quantity of coal is transported to jagannath 5 & 6 sidings.

� The existing wharf wall siding has been taken off from the dedicated tracks of the NTPC.

� Coal stored on the wharf wall platform is loaded by payloaders. Trucks from CHP weighed over 40 t capacity road weigh bridges.

� Coal after being loaded into the wagons is again weighed by in – motion rail weigh bridges installed close by. Coal sampling is done manually.

� No coal handling plant (CHP) has been provided for incremental of 3 Mty production as coal cut to (-) 100 is available contractually. Similarly, coal transport is done contractually.

i) Crushing complex (Feeder breaker circuits existing) ii) Secondary crushers

(Proposed )

iii) Belt conveyor system iv) Storage

v) Tramp metal detectors and magnetic separators vi) Rapid loading system

vii) Weighment

viii) Sampling

ix) Other associated systems like power supply, illumination, control & communication, chute & dust suppression, fire fighting & plant cleaning system and other materials handling equipment along with related civil structural. Existing arrange-ment of coal evacuation is proposed to be continued for initial three years. From the 4th year rapid loading system facility is proposed to be utilized.

Page 92: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 19

Workshops and stores

Existing 13.0 Mty Proposed prodn. 16. 0 Mty (Peak 20 Mty)

Workshop and stores facilities exist.

In addition to the existing additional equipment of high capacity for HEMM workshop and E&M workshop have been provided. Additional Rs.50 lakh for P&M for HEMM. The additional provision has been made for multi jet washing machine, air compressor, greasing units welding sets etc.

Civil construction (colony, service buildings and roads)

� Residential colony

Residential Colony exist for Lingaraj OC Expn.

Project (13.0 Mty).

An additional provision of Rs.857.75 lakh

towards 188 no. of quarters have been provided

for 265 manpower for Lingaraj OC Expn. Project

(16.0 Mty Peak- 20.0 Mty).

� Service buildings

Additional provision of Rs.798.81 lakh towards

service buildings is made beyond target year.

This consists of Field Workshop which will be

required at a new location to reduce the lead.

� Roads

Additional provisions of Rs.38.75 lakh for 1.254

km of colony road and Rs.977.82 lakh for 100T

dumpers haul road of 2.0 km length have been

provided in the project report. Besides this an

amount of Rs.498.45 lakh for 50 T dumpers haul

road of 2.0 km length beyond target year has

been given in the project report.

An additional amount of Rs.22.32 lakh towards

0.607 km of colony road has been provided.

Page 93: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 20

Water demand and supply arrangement (in MLD) (Annexure II)

Water demand For 13.0 Mty

For 20 Mty (i.e. 7.0 Mty

incremental)

Total

Potable 2.700 0.160 2.860

Industrial & fire fighting

2.300 0.570 2.870

Total : 5.000 0.730 5.730

Water supply arrangement

Potable water demand is being met through the

Integrated Water Supply Scheme (IWSS) of

Talcher coalfield. The same arrangement will

also be continued for expansion project.

Additional provision of Rs. 205.27 lakh has

been kept for potable water supply.

Industrial water demand is being met through

mine water. The same arrangement will be

continued for expansion project.

Water requirement details Potable Demand (Fig. in Mld)

Sl. No.

Classification Water Demand 13.0 Mty Addl. for

7.0 Mty Total

(20.0 Mty) 1. Water demand for

residential population 1.480 0.141 1.621

2. Water demand for non-residential population 0.955 0.005 0.960

3. Water demand in service building 0.265 0.014 0.279

Total : 2.700 0.160 2.860

Industrial Demand (Fig. in Mld)

Sl. No.

Classification Water Demand

13.0 Mty Addl. for 7.0 Mty

Total (20.0 Mty)

1. Water requirement for washing of dumpers / trucks, etc and floor washing

0.335 0.175 0.510

2. Water required for dust suppression in industrial premises

0.300 0.150 0.450

3. Water required for road watering

1.465 0.115 1.580

Page 94: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 21

4. Water required for fire fighting

0.200 0.130 0.330

Total : 2.300 0.570 2.870

2.7.1 COAL PRODUCTION AND OB REMOVAL SINCE INCEPTION OF MINE

Year Coal Achieved (MT OB Achieved (MM3.)

1991 … 1992 0.1 0.500 1992 … 1993 0.118 0.808 1993 … 1994 0.08 0.131 1994 … 1995 0.84 1.16 1995 … 1996 2.468 2.200 1996 … 1997 3.514 2.775 1997 … 1998 4.786 3.260 1998 … 1999 4.952 4.034 1999 … 2000 5.001 5.061 2000 … 2001 5.916 5.817 2001 … 2002 6.324 5.926 2002 … 2003 7.000 6.210 2003 … 2004 8.74 6.147 2004 … 2005 10.293 6.670 2005 … 2006 10.86 6.73 2006 … 2007 10.83 7.65 2007 … 2008 11.09 5.44 2008 … 2009 12.90 6.92 2009 … 2010 13.00 7.52 2010 … 2011 11.85 6.60

2011 … 2012 11.59 7.06 2012 … 2013 11.56 6.56 2013 … 2014 7.17 6.09

Total : 160.982 111.269

2.8 PROPOSED PRODUCTION SCHEDULE, OB REMOVAL AND BACKFILLING

Year of Operation

Coal Extraction (Mt)

OB Removal (Mm3)

Stripping Ratio (m3/t) Backfilling

(Mm3)

External Dump Mining

Yr 1 14.00 13.75 0.98 9.18 4.57

Page 95: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 22

Year of Operation

Coal Extraction (Mt)

OB Removal (Mm3)

Stripping Ratio (m3/t) Backfilling

(Mm3)

External Dump Mining

Yr 2 16.00 14.58 0.91 10.97 3.61

Yr 3 16.00 14.43 0.90 14.43 --

Yr 4 16.00 14.40 0.90 14.40 --

Yr 5 16.00 14.23 0.89 14.23 --

Yr 6 16.00 14.05 0.88 14.05 --

Yr 7 16.00 13.48 0.84 13.48 --

Yr 8 16.00 12.84 0.80 12.84 --

Yr 9 16.00 10.84 0.68 10.84 --

Yr 10 16.00 9.74 0.61 9.74 --

Yr 11 16.00 9.17 0.57 9.17 --

Yr 12 20.00 9.06 0.56 9.06 --

Yr 13 16.00 9.06 0.55 9.06 --

Yr 14 16.00 9.28 0.59 9.28 --

Yr 15 16.00 9.14 0.56 9.14 --

Yr 16 16.00 9.18 0.57 9.18 --

Yr 17 16.00 9.09 0.55 9.09 --

Yr 18 16.00 9.03 0.57 9.03 --

Yr 19 16.00 8.95 0.37 8.95 --

Yr 20 14.00 7.83 0.48 7.83 --

Yr 21 1.50 0.10 0.69 0.10 --

TOTAL : 321.50 222.23 0.69 214.05 8.18

2.9 LAND REQUIREMENT

(A) DETAILS OF LAND

(Area in ha)

Sl. No. Item

For existing 13.0 Mty Addl. land for incremental production (3.0 Mty)

Total for 16.0 Mty

Forest Non-forest Total Forest Non-forest Total

Forest Non-forest Total

1. Quarry excavation 109.679 401.172 510.851 4.18 23.82 28.00* 113.859 424.992 538.851

2. Blasting danger zone (safety zone) and magazine (excluding area

76.632 504.287 580.919 -- -- -- 72.452 480.467 552.919

Page 96: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 23

Sl. No. Item

For existing 13.0 Mty Addl. land for incremental production (3.0 Mty)

Total for 16.0 Mty

Forest Non-forest Total Forest Non-forest Total

Forest Non-forest Total

of Ob dump, road diversion and infrastruc-ture)

3. OB dump area (external) -- 256.030 256.030 -- -- -- -- 256.030 256.030

4. Infrastructure (workshop, CHP, project office, railway siding etc.)

-- 51.800 51.800 -- -- -- -- 51.800 51.800

5. Rationalisation of project boundary and diversion of existing coal transporta-tion road.

-- 10.410 10.410 -- -- -- -- 10.410 10.410

Mining lease area (1 to 5)

186.311 1223.699 1410.01 4.18 23.82 28.00* 186.311 1223.699 1410.01

6. Residential colony -- 6.000 6.000 -- -- -- -- 6.000 6.000

7. Rehabilitation colony -- 77.190 77.190 -- -- -- -- 77.190 77.190

Outside Lease area (6 to 7)

-- 83.190 83.190 -- -- -- -- 83.190 83.190

Total : 186.311 1306.889 1493.20 4.18 23.82 28.00* 186.311 1306.889 1493.20 *There is no change in the mining lease area only an additional area of 28 ha

in quarry area will be increased from the safety zone of Lingaraj OCP. (B) LAND SHOWING FOREST & NON-FOREST

(Area in ha)

Sl. No. Item

For existing 13.0 Mty

Addl. land for incremental production

3.0 Mty

Total for 16.0 Mty

Within mining lease area

1. Forest 186.311 -- 186.311

2. Non-forest 1223.699 -- 1223.699

Sub-total : 1410.01 -- 1410.01

Outside the mining lease area

3. Forest -- -- --

4. Non-forest 83.190 -- 83.190

Sub-total : 83.190 -- 83.190

Grand Total : 1493.20 -- 1493.20

Page 97: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 24

(C) LAND USE DETAILS FOR OPENCAST PROJECT (Area in ha)

Sl.No. Land use Within ML Area (ha)

Outside ML Area (ha)

Total Area (ha)

1. Agricultural land 828.699 -- 828.699 2. Forest land 186.311 -- 186.311 3. Waste land 306.72 83.190 306.72 4. Grazing land Nil Nil Nil 5. Surface water bodies 45.00 -- 45.00 6. Settlements 43.28 -- 43.28 7. Others (Specify) -- -- -- Total : 1410.01 83.190 1493.200

(D) LAND USE/COVER CLASSIFICATION (Based On IRS-ID / LISS–III) Sl. No.

Type of Land Total for 20.0 Mty

Area in ha % 1. Settlement :

Urban 1066 2.40

Rural 1362 3.07

Industrial 602 1.36

2. Dense forest 2821 6.36

3. Open forest 1037 2.34

4. Scrubs 14753 33.25

5. Plantation 00 --

6. Plantation on OB dump 693 1.56

7. Orchard 00 --

8. Agriculture land 15244 54.35

9. Waste up land 2904 6.54

10. Fly ash pond 370 0.83

11.

Mining area :

Coal quarry 748 1.69

Coal stock 49 0.11

Quarry filled with water -- --

Barren over dump 512 1.15

12. Surface water bodies 1455 3.28

13. Sand body 760 1.71

Total : 44376 100

Page 98: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 25

(E) STATUS OF LAND ACQUISITION (FOR THE EXPN. PROJECT)

Types of Land Area in ha � Within Mining Lease Area

Forest 186.311 Tenancy & Govt. Land 1223.699

Sub-total : 1410.01 � Outside Mining Lease Area

Govt. Non-forest Land 83.190 Grand Total : 1493.20

2.10 DETAILS OF EQUIPMENT & RATIONAL FOR SELECTION OF EQUIPMENT

� Existing mine uses departmental 5 cum electric rope shovel (4 nos.),

3.7 cum (2 no.) electric hydraulic shovel, 4.3 cum electric hydraulic

backhoe(2 nos.) and 2.7 … 2.8 cum hydraulic backhoe(4 nos.) with 50 T

rear dumpers(49 nos.) for OB removal. Coal is extracted by

outsourcing agency by blast free technology (use of surface miner).

Considering presence of:

(i) Multiple coal seams (13 nos.)

(ii) Highly faulted structure (33 faults)

(iii) Step gradient (10o to 15o)

It is proposed to provide hydraulic excavator to offer more flexible

operation. 9.5 cum-hydraulic shovels and rear dumpers 100T are

envisaged towards the requirement of additional equipment. 9.5 cum

hydraulic shovels would be mainly deployed to extract top overburden

alongwith upper thick parting strata viz. partings above seam VII, seam

VIII and seam IX. Coal is proposed to be extracted by outsourcing

using blast free mining.

In this expansion project, additional requirement is assessed over the

above existing HEMM. This requirement is based on the production

schedule prepared, productivity of existing and proposed HEMM. The

details of total and phased requirement for the project with break-up of

existing and additional HEMM are given in the below table.

Page 99: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 26

HEMM WITH PHASING

SL. NO.

EQUIPMENT NAME

SIZE/

SPECIFI-CATIONS

TOTAL PROVISION FOR EXPN. PR(16 MTY)

EXISTING H.E.M.M.

ADDITIONAL REQUIREMENT

(For 3 MTY Incremental)

PHASING OF ADDNL.

HEMM

Yr 1 Yr 2

COAL (IN Mt) 14.00 16.00

OVERBURDEN (IN MCum) 13.75 14.58

A: OVERBURDEN NO. NO. NO. NO. NO

1 ELECTRIC HYD. SHOVEL 9.5 cum. 1 0 1 1 0

2 ELECTRIC ROPE SHOVEL 5.0 cum. 4 4 0 0 0

3 ELECTRIC HYD. SHOVEL 3.7 cu.m. 2 2 0 0 0

4 ELECTRIC HYD. BACKHOE 4.3 cu.m. 2 2 0 0 0

5 HYD.BACK HOE 2.7-2.8 cu.m. 4 4 0 0 0

6 REAR DUMPER 100 T 9 0 9 6 3

7 REAR DUMPER 50 T 82 49 33 26 7

8 DOZER WITH RIPPER ATTACHMENT 860 HP 1 11 1

9 DOZER 400-410 HP 10 10 0 0 0

10 DOZER 300-320 HP 6 2 4 2 2

11 ELECTRIC RBH DRILL 250 mm 2 0 2 1 1

12 ELECTRIC RBH DRILL 160 mm 9 5 4 4 0

13 RIPPER ATTACHMENT 1 0 1 1 0

0

B: COAL PRODUCTION 0

1 ELECTRIC RBH DRILL 160 mm 3 3 0

2 ROTARY DRILL 100-115 mm 1 1 0

3 DOZER 300-320 HP 2 2 0

SUB-TOTAL (B)----> 0

0

C: COMMON 0

1 DIESEL HYD. BACKHOE 0.9 cu.m. 1 1 0 0 0

2 CRANE 30 T 1 1 0 0 0

3 CRANE 20 T 1 1 0 0 0

4 CRANE 10 T 1 1 0 0 0

5 CRANE 8 T/ 9.5 T 3 3 0 0 0

6 FRONT END LOADER 5.7 cu.m. 1 1 0 0 0

7 FRONT END LOADER 2.0-2.3 cu.m. 3 3 0 0 0

8 WATER SPRINKLER 28 KL 4 2 2 0 2

9 WATER SPRINKLER 650 HP 4 4 0 0 0

10 WATER TANKER (CONVERTED)

LW-35, HM-1035 5 5 0 0 0

11 WHEEL DOZER 380 HP 1 1 0 0 0

Page 100: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 27

12 WHEEL DOZER 300 HP 1 1 0 0 0

13 WHEEL DOZER 460 HP 1 11 1

14 MOTOR GRADER 280 HP 3 3 0 0 0

15 MOTOR GRADER 145 HP 2 2 0 0 0

16 TYRE HANDLER 2 1 1 0 1

17 FORK LIFTER (G 300DC) 1 1 0 0 0

18 FIRE TENDER TATA 2 2 1 1

19 DIESEL BOWSER TATA 2 2 1 1

20 ROAD ROLLER 1 1 1 0

21 ROAD SWEEPER 1 1 1

Beyond Target year -

TOTAL

PROVISION Yr 4

S.NO. EQUIPMENT NAME SIZE/SPEC. NO. NO.

1 REAR DUMPER 100 T 2 2

2.11 VEHICULAR TRAFFIC DENSITY (OUTSIDE THE ML AREA) Type of vehicles No. of vehicles per day (a) Existing for

13.0 Mty*

: Two wheelers

Light Moter Vehicle

Heavy Vehicles (Tippers)

713

625

121

(b) After the proposed

activity for

incremental prodn.

: Two wheelers

Light Moter Vehicle

Heavy Vehicles (Tippers)

845

731

180

2.12 MINERAL(S) TRANSPORTATION (OUTSIDE THE ML AREA)

Existing (13.0 Mty) Incremental (7.0 Mty) Total for 20.0 Mty Qty.

(in TPD) Percentage

(%) Qty.

(in TPD) Percentage

(%) Qty.

(in TPD) Percentage

(%) (a) Road : 5000 13 3394 16 9697 16 (b) Rail : 34394 87 17818 84 50909 84 (c) Conveyors : -- -- -- -- -- -- (d) Ropeway : -- -- -- -- -- -- (e) Waterways : -- -- -- -- -- -- (f) Pipeline : -- -- -- -- -- -- (g) Others (specify) : -- -- -- -- -- -- Total : 39394 100 21212 100 60606 100

Page 101: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 28

2.13 COAL SAMPLE ANALYSIS REPORT

(Richardson & Cruddas (1972) Ltd.,Test Report dtd.14.06.2013) Details of samples (As stated)

Hg (ppm)

As (ppm)

Ash (on air dry basis)

%(w/w)

Pb (ppm)

Cr (ppm)

Co (ppm)

Cu (ppm)

Sulphur (on air dry basis)

%(w/w)

Moisture in analysis sample (on air dry basis)

%(w/w)

Total moisture

(as received

basis) Coal Sample Lingaraj OCP, Talcher C/F.

ND (DL: 1.0)

ND (DL: 1.0)

29 16 36 22 68 0.61 7.94 10.99

2.14 STRENGTHENING OF EXISTING TRANSPORTATION ROAD

Due to steep gradient of mine floor faults and present access road it is not

possible to lay the main haul road on mine floor. After decoaling upto seam II Bottom

in northern part it is proposed to extend the existing haul road duly filling the

decoaled area. Lower seams have to be brought to the nearest road level by

interbench ramps. Flank level roads are proposed to connect the various working

benches. Overburden from various benches would be transported along the bench

and connecting ramps to nearest level flank road either to external or internal dump.

Approved project report provided 50T rear dumpers for transportation of both

coal and overburden. In this expansion report, it is envisaged to deploy 100T and 50T

rear dumpers towards additional requirement to reduce the overall fleet size. Both

50T and 100T dumpers are deployed in conjunction with 4.3 hydraulic backhoe, while

9.5cum hydraulic shovels would work with 100T rear dumpers only.

About Rs.977.82 lakhs provision has been kept for making 100T dumpers

haul road to about 2.0 km length. Apart from this an amount of Rs.498.45 lakh for

50T dumpers haul road length of 2.0 km length.

2.15 LITIGATION / PENDING CASES

There is no case pending in court.

2.16 DETAILS OF WELFARE FACILITIES

The following facilities have been provided for Lingaraj OCP Expn.

Sl.No. Items For 16.0 Mty (Peak 20.0 Mty)

1. Canteen 100 Seaters … 2 no. 353.5 m2 2. First Aid Center … 2 no. 34 m2 3. Rest Shelter … 2 no. 78 m2

Page 102: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 29

Sl.No. Items For 16.0 Mty (Peak 20.0 Mty)

4. Training Center … 1 no. 341 m2 5. 11 bedded Hospital … 1 no. 595 m2 6. 6 bedded Dispensary … 1 no. 280 m2 7. Workers Institute … 1 no. 341 m2 8. Officers Club … 1 no. 350 m2 9. Officers Rest House … 1 no. 276 m2

10. Staff Rest House … 1 no. 284 m2 11. Bank Building … 1 no. 56 m2 12. Cycle Shed … 1 no. 43 m2 13. Shopping Center … 2 no. 386 m2 14. Community Center … 1 no. 450 m2 15. Scooter stand … 1 no. 100 m2 16. Post Office … 1 no. 56 m2 17. Experts Hostel … 1 no. 246 m2 18. Primary Schools … 2 no. 277 m2 19. Garage … 1 no. 75 m2 20. Parking space for contractual vehicles … 1 no. 150 m2 21. Rest shelter for contractual workers … 1 no. 78 m2 22. Rest shelter for contractual operators … 2 no. 60 m2 23. Toilet … 2 no. 60 m2 24. Urinal (4 seator) … 2 no. 60 m2

2.17 OCCUPATIONAL HEALTH ISSUES Initial medical examination is mandatory prior to joining employment to MCL.

Screening is done at entry level and there after every 5 years. Periodically Medical

Examination (PME) is necessary for each and every employee of MCL. Baseline

health status was taken by M/s.IATES for Lingaraj OCP. The impact zone of

Bhubaneswari OCP and Lingaraj OCP is almost same. Bhubaneswari OCP is

adjacent mine of Lingaraj OC Expn. Project.

About 10% of population from different villages having different economic

condition was selected for health check up.

Villagers from Balugaon, Longijoda, Ambamunda, Nakulbaspur, Balugaon Khamar,

Hensamul and Madanmohanpur villages attended the health check up camp. Mainly

dieses like Bronchitis, Hypertension, Weakness, Loss of appetities, Bodyache, T.

Page 103: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 30

corporis, Osteoarthritis, Asthma were noticed. Proper prescription and medicine

were given with advices. Details of occupational health service are given below:

Occupational Health Surveillance

Name of the area Name of the different Projects Period

Number of employees

medically examined

No. employees found to be affected

with occupational diseases

Lingaraj Area Lingaraj OCP, Lingaraj area and IWSS

01.04.2011 to 30.09.2011

70 Nil

01.10.2011 to 31.03.2012

254 Nil

01.04.2012 to 30.09.2012

361 Nil

01.10.2012 to 31.03.2013

196 Nil

2.17.1 Details of Health Care facilities available at Lingaraj area, MCL

There are two medical unit in Lingaraj Area, MCL. One is Deulbera Hospital,

located at Deulbera colony and other is Lingaraj township dispensary located at

Lingaraj Township Colony. Both medical units caters to the health needs of 2025

workers with 12150 population approximately of Lingaraj area, Deulbera colliery,

IWSS, Handidhua colliery and nearby employees residing there. 24 hours

emergency diagnostic and community health services / treatment has been provided.

Patient 4 (four) bed strength to meet the emergency care is available. The serious

cases are referred to N.S. Central Hospital, Talcher. The certified report is annexed

in Annexure-VIII.

2.18 DIVERSION/RECHANNELING OF NALLAH/CANAL/RIVER/ROAD No Diversion/Rechanneling of nallah/canal/river/road 2.19 USE OF NATURAL RESOURCES

� This is an opencast mine. No timber is used for the operation of the mine.

� The minimum water requirement has been assessed as the water demand for this project and necessary approval for drawing the water from the competent authority will be obtained.

Page 104: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 2, Page - 31

� The minimum Land has been considered for the mining activities for this project.

� Optimum Electrical Energy requirement has been assessed in the project report.

� Fuel consumption has been assessed for the Coal & OB as per norms.

2.20 ECONOMIC PARAMETERS

� Initial capital outlay (Rs. Crore)

:

For 13.0 Mty

For 20.0 Mty (Peak) (i.e. 7.0 Mty incremental)

330.91

52.25

� EMP capital investment (Rs. Crore) : 27.45 34.97

� Total cost of mine closure (Rs. Crore) (With compound interest as per new guide line).

: 45.31 198.94

Page 105: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 1

Chapter–3

DESCRIPTION OF ENVIRONMENT 3.1 PRESENT ENVIRONMENTAL SCENARIO

The present environmental scenario has been described in this chapter in

respect of ambient air quality, water and effluent quality, noise level measurement,

land use/cover pattern, socio-economic scenario, bio-diversity, hydrogeology and

places of religious, historical archaeological importance.

3.2 AMBIENT AIR QUALITY

Baselined data w.r.t ambient air quality had been generated by

M/s.Richardsons & Cruddas (1972) Ltd., Chennai … 78. Pre-monsoon season March

2013 to June 2013. The above data has been given in this chapter with the following

objectives:

� To assess the present air quality in the buffer zone to provide the basis

for study of short-term as well as long-term trends of pollutant

concentration when the mine will reach its full production capacity.

� To provide the baseline data for subsequent development of air

pollution prevention and control programme. The present ambient air

quality assessment deals with the following items:

� Inventory of existing pollution sources

� Present ambient air quality study

3.2.1 INVENTORY OF EXISTING POLLUTION SOURCES

The existing pollution sources along with the pollutants are given belows:

Table-3.1: Inventory of existing pollution sources

Source Major

Pollutants

(A) From existing OCPs/OCMs

Drilling, blasting, transportation, loading and unloading of OB and coal, OB dump formation, OB dump and coal stack surfaces, movement of vehicles, operation of HEMMs besides fire in coal faces and coal stacks

PM10, PM2.5, SO2 and NOX

Page 106: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 2

Source Major

Pollutants

(B) From existing U/G mines

Exhaust mine air besides loading, unloading and transportation of coal

PM10, PM2.5,

(C) Non-mining activities

Road traffic, Talcher Thermal Power Plant (NTPC) & burning of fuel for domestic purposes

PM10, PM2.5, SO2 and NOX

The mining and other industrial activities along with non-mining activities like

road traffic, burning of coal for domestic and commercial purposes, etc. are the

potential sources of the ambient air pollution in the area. No specific study has been

conducted to quantify the pollution from non-mining sources.

3.2.2 PRESENT AMBIENT AIR QUALITY STUDY

Present air quality data have been generated as per the guidelines of CPCB

and in line with Point No.21(b) of the Questionnaire (Proforma for Environmental

Appraisal of Mining Projects). Twenty four (24) hourly data have been generated for

each parameter i.e. PM10, PM2.5, SO2 and NOX at each monitoring station for two

days in a week for four consecutive weeks in a month for three months i.e. March

2013 to May 2013.

� Location of air sampling stations

To assess the ambient air quality, sampling stations were fixed on the basis

of meteorological parameters like predominant wind direction and wind

speeds besides physiography of the area. The locations of air sampling

stations are shown in Plate No.-XA and the details are given in the Table-

3.2.

Page 107: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 3

Table-3.2: Description of Air Sampling Spots

Sl. No.

Location Code

Name of Location Direction w.r.t Centre

of Core Zone

Aerial Distance (w.r.t the Mine

boundary)

1. CA1 Core Zone, Project office -- --

2. CA2 Core Zone, Langijoda village -- --

3. CA3 Core Zone,Ambamunda Village -- --

4. BA1 Buffer Zone,Talabeda Village NE 0.5

5. BA2 Buffer Zone,Hensamul Village W 0.75

6. BA3 Buffer Zone,Talcher town SE 0.5

7. BA4 Buffer Zone,Kandhal village N 1.5

8. BA5 Buffer Zone,Ghantapada village S 1.6

� Methodology and instruments used for air quality analysis

It is given in the following table:

Table 3.3: Methodology & Instruments used for Air Quality Analysis

Sl.No.

Parameters Method Instruments

1 PM10, PM2.5 IS:5182 (Part-IV) (Gravimetric method)

Respirable dust samplers, electronic balance, oven, etc.

2 SO2 IS:5182 (Part-II) (Sodium tetrachloromercurate method, also known as improved West and Gaeke Method) (Photometric method)

Milton-Roy Spectrophotometer.

3 NOX IS:5182 (Part-VI) (Jacob & Hoccheiser Modified Method) (Photometric method)

-do-

� Parameters for monitoring

The following parameters were monitored for assessment of air quality :

� Particulate matter (PM10)

� Particulate matter (PM2.5)

� Sulphur dioxide (SO2)

� Nitrogen oxides (NOX)

� Heavy mental (Hg, As, Se, Pb, Cr, Cu, etc.) (As and when required)

Page 108: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 4

� Frequency of air sampling

Air samples were collected as per guidelines of CPCB at 24 hourly intervals for two

days in a week for four (4) consecutive weeks in a month for all the three months i.e.,

March, April & May 2013.

� Results

The analytical results of air samples are given in Table-3.4 to 3.10 and depicted

graphically in Fig.-3.1 to 3.5. The analytical results are also summarised below in the

following table:

(A) Summary of Ambient Air Quality Data for March to May 2013

AAQ Station Concentration (µg/m3)

PM10 PM2.5 SO2 NOX

Project office (Corezone)(CA1)

Maximum 136 38 16.4 25.7

Minimum 110 26 9.4 10.9

98 Percentile 134 37 16.4 25.6

Average 123.8 30.9 13.6 20

Permissible Limit 100 60 80 80

Langi jorha village (Corezone) (CA2)

Maximum 132 32 20.2 26

Minimum 98 24 9 11

98 Percentile 130 31 20 24.6

Average 116.8 27.4 13.8 17.9

Permissible Limit 100 60 80 80

Talabeda Village (Residential Area) (BA1)

Maximum 112 28 16.5 18.3

Minimum 86 20 5.9 7.6

98 Percentile 110 28 15.3 18.2

Average 98.8 23.7 10.2 12.7

Permissible Limit 100 60 80 80

Hensamul Village (Residential Area) (BA2)

Maximum 130 28 18.9 23.4

Minimum 96 20 10.2 10.4

98 Percentile 124 28 18.6 22.3

Average 110.8 25.1 13.9 15.5

Page 109: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 5

AAQ Station Concentration (µg/m3)

PM10 PM2.5 SO2 NOX Permissible Limit 100 60 80 80

Amhanunda village (Corezone) (CA3)

Maximum 112 26 11.6 14.8

Minimum 74 20 7.2 6.8

98 Percentile 108 26 11.4 14.6

Average 89.2 22.3 9.1 10.8

Permissible Limit 100 60 80 80

Talchar town (Residential Area) (BA3)

Maximum 80 24 11.2 24

Minimum 64 16 5.2 6.8

98 Percentile 78 24 11.2 23.1

Average 70.7 19.5 8.6 15.5

Permissible Limit 100 60 80 80

Kandhal village (Residential Area) (BA4)

Maximum 84 21 11.6 12.6

Minimum 60 16 4.2 8.5

98 Percentile 84 21 11.4 12.5

Average 75.7 18.8 8.1 10.6

Permissible Limit 100 60 80 80

Ghantapada village (Residential Area) (BA5)

Maximum 64 16 8.2 12.5

Minimum 54 12 5.1 8.6

98 Percentile 64 16 8.2 12.4

Average 58.5 14.2 6.5 10.5

Permissible Limit 100 60 80 80 (B) Heavy Metals

Air Sample of Lingaraj OCP (in ppm)

Hg As Se Pb Cr Co Cu Ni Zn Mn

ND 2.34 0.78 17.22 78.83 31.71 4163.18 790.78 1985.65 306.77

ND : Not Dectected.

Page 110: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 6

Table-3.4 Ambient Air Quality Data

Core Zone : Project Office - Corezone (CA1) (March – May, 2013)

Month Date of

Sampling Concentration

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

15.03.2013 125 28 10.2 11.6

16.03.2013 117 29 12.3 10.9

19.03.2013 126 31 10.8 25.3

20.03.2013 122 27 9.5 21.6

27.03.2013 110 26 10.8 20.5

28.03.2013 132 31 9.4 23.5

03.04.2013 121 30 12.6 24.6

04.04.2013 115 35 15.2 25.6

April

08.04.2013 126 31 12.7 12.0

09.04.2013 134 34 13.5 15.6

17.04.2013 130 30 15.9 14.3

18.04.2013 110 29 16.4 12.8

27.04.2013 112 35 16.4 16.4

28.04.2013 122 31 15.9 20.8

03.05.2013 123 28 14.6 21.9

04.05.2013 125 26 13.4 22.8

May

07.05.2013 129 30 15.0 23.5

08.05.2013 127 38 14.9 24.6

16.05.2013 134 36 15.3 23.8

17.05.2013 128 31 14.6 25.7

24.05.2013 132 28 12.0 16.8

25.05.2013 136 26 12.8 16.5

30.05.2013 115 35 15.9 25.4

31.05.2013 119 37 16.4 23.8

Page 111: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 7

Table-3.5 Ambient Air Quality Data

Core Zone : Langi joda village - corezone (CA2) (March – May, 2013)

Month Date of

Sampling Concentration

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

15.03.2013 108 26 10.2 11.2

16.03.2013 112 28 11.3 11.0

19.03.2013 110 27 16.9 15.3

20.03.2013 114 28 15.8 20.5

27.03.2013 132 32 10.5 19.6

28.03.2013 130 30 11.6 18.3

03.04.2013 126 31 15.6 17.3

04.04.2013 118 30 12.4 15.2

April

08.04.2013 114 28 12.3 16.2

09.04.2013 98 24 13.2 15.2

17.04.2013 112 30 14.2 14.0

18.04.2013 110 25 11.5 14.6

27.04.2013 116 24 10.2 12.3

28.04.2013 114 26 9.0 18.2

03.05.2013 110 24 9.5 19.0

04.05.2013 124 26 10.2 18.4

May

07.05.2013 116 26 9.4 22.1

08.05.2013 112 28 14.6 26.0

16.05.2013 114 28 15.3 20.6

17.05.2013 124 30 19.8 20.4

24.05.2013 125 26 20.2 15.6

25.05.2013 124 24 20.0 20.9

30.05.2013 121 28 18.6 22.8

31.05.2013 120 28 19.5 24.6

Page 112: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 8

Table-3.6 Ambient Air Quality Data

Core Zone : Ambamunda village (CA3) (March – May, 2013)

Month Date of

Sampling Concentration (µg/m3)

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

18.03.2013 78 20 8.3 8.4

19.03.2013 94 22 8.2 9.2

27.03.2013 86 20 9.3 6.8

28.03.2013 84 21 8.6 7.2

01.04.2013 100 24 7.4 10.5

02.04.2013 88 22 8.2 11.2

10.04.2013 102 24 7.2 14.2

11.04.2013 112 26 8.4 14.6

April

19.04.2013 108 22 8.2 14.8

20.04.2013 87 20 9.4 12.6

25.04.2013 88 22 8.3 10.8

26.04.2013 90 24 10.4 9.2

01.05.2013 88 23 10.6 10.2

02.05.2013 87 22 10.9 11.2

09.05.2013 88 22 11.2 10.6

10.05.2013 94 26 11.6 11.2

May

14.05.2013 86 22 11.4 8.4

15.05.2013 84 22 8.9 10.2

22.05.2013 86 22 8.8 11.2

23.05.2013 88 23 9.6 14.6

28.05.2013 90 24 9.3 14.2

29.05.2013 80 21 8.4 10.1

June 06.06.2013 74 20 8.2 8.6

07.06.2013 78 20 7.8 8.9

Page 113: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 9

Table-3.7 Ambient Air Quality Data

Buffer Zone : Talabeda Village (BA1) (March – May, 2013)

Month Date of

Sampling Concentration (µg/m3)

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

15.03.2013 94 22 7.8 7.6

16.03.2013 95 21 9.5 9.5

19.03.2013 104 24 8.6 15.6

20.03.2013 102 26 10.3 14.2

27.03.2013 98 24 5.9 13.5

28.03.2013 112 28 8.2 14.0

03.04.2013 98 22 8.3 10.6

04.04.2013 96 24 9.5 11.8

April

08.04.2013 102 26 12.3 8.3

09.04.2013 110 28 14.6 9.2

17.04.2013 98 24 15.3 7.6

18.04.2013 86 20 10.2 15.6

27.04.2013 89 21 8.6 18.2

28.04.2013 92 22 9.2 17.6

03.05.2013 94 24 16.5 17.2

04.05.2013 96 24 10.5 18.3

May

07.05.2013 98 22 14.3 15.2

08.05.2013 100 24 9.8 14.0

16.05.2013 98 24 8.2 12.3

17.05.2013 96 22 7.9 8.6

24.05.2013 98 22 9.1 9.1

25.05.2013 102 24 9.0 10.5

30.05.2013 104 26 8.6 14.3

31.05.2013 108 24 12.6 12.6

Page 114: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 10

Table-3.8 Ambient Air Quality Data

Buffer Zone : Hensamul Village (BA2) (March – May, 2013)

Month Date of

Sampling Concentration (µg/m3)

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

18.03.2013 112 28 10.2 10.6

19.03.2013 110 26 11.6 11.6

27.03.2013 98 22 12.5 12.4

28.03.2013 116 28 12.5 15.6

01.04.2013 118 28 13.5 12.0

02.04.2013 120 25 15.9 14.6

10.04.2013 114 24 18.6 20.6

11.04.2013 116 26 14.6 21.5

April

19.04.2013 120 24 18.5 20.1

20.04.2013 116 26 12.9 21.2

25.04.2013 118 26 17.6 22.3

26.04.2013 108 24 12.0 21.6

01.05.2013 96 22 15.6 21.2

02.05.2013 98 20 18.9 23.4

09.05.2013 112 24 12.3 11.2

10.05.2013 96 25 15.0 13.4

May

14.05.2013 100 26 11.0 12.6

15.05.2013 98 25 10.6 14.8

22.05.2013 96 26 12.5 10.4

23.05.2013 112 25 13.4 13.2

28.05.2013 114 24 14.6 14.2

29.05.2013 116 28 10.5 12.6

June 06.06.2013 124 24 16.3 10.8

07.06.2013 130 27 11.9 11.2

Page 115: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 11

Table-3.9 Ambient Air Quality Data

Buffer Zone : Talcher town (BA3) (March – May, 2013)

Month Date of

Sampling Concentration (µg/m3)

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

18.03.2013 68 19 5.2 6.8

19.03.2013 74 20 6.8 7.6

27.03.2013 71 19 7.2 10.2

28.03.2013 68 18 8.6 11.2

01.04.2013 74 19 10.2 10.6

02.04.2013 70 20 8.6 11.6

10.04.2013 68 18 10.2 12.3

11.04.2013 64 18 8.6 11.8

April

19.04.2013 66 16 7.5 10.6

20.04.2013 72 18 8.2 12.2

25.04.2013 64 18 8.1 13.2

26.04.2013 66 16 10.2 14.6

01.05.2013 72 19 11.2 20.1

02.05.2013 74 20 5.8 20.8

09.05.2013 76 22 6.9 18.6

10.05.2013 78 24 11.2 17.4

May

14.05.2013 74 22 6.3 18.2

15.05.2013 76 20 10.3 16.3

22.05.2013 80 24 11.2 17.8

23.05.2013 72 22 7.2 20.1

28.05.2013 72 22 10.2 20.6

29.05.2013 68 20 8.6 22.0

June 06.06.2013 64 18 8.9 23.1

07.06.2013 66 17 10.2 24.0

Page 116: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 12

Table-3.10 Ambient Air Quality Data

Buffer Zone : Kandhal village (BA4) (March – May, 2013)

Month Date of

Sampling Concentration (µg/m3)

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

15.03.2013 79 19 6.2 10.2

16.03.2013 82 21 10.2 11.2

19.03.2013 80 20 11.6 10.6

20.03.2013 78 19 4.2 11.4

27.03.2013 76 18 5.6 10.3

28.03.2013 84 20 4.8 9.6

03.04.2013 84 20 9.6 10.2

04.04.2013 84 21 8.3 11.6

April

08.04.2013 80 21 8.2 8.5

09.04.2013 76 19 9.2 10.2

17.04.2013 78 20 10.2 9.4

18.04.2013 68 19 6.8 9.8

27.04.2013 64 18 7.2 10.2

28.04.2013 60 17 7.5 11.6

03.05.2013 72 18 7.8 10.6

04.05.2013 74 17 6.4 12.3

May

07.05.2013 76 18 7.2 12.6

08.05.2013 74 16 8.2 12.5

16.05.2013 78 18 8.5 10.6

17.05.2013 76 18 8.7 11.2

24.05.2013 81 19 6.7 10.4

25.05.2013 74 20 11.4 9.6

30.05.2013 70 18 10.2 10.2

31.05.2013 68 16 9.4 9.4

Page 117: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 13

Table-3.11 Ambient Air Quality Data

Buffer Zone : Ghantapada village (BA5) (March – May, 2013)

Month Date of

Sampling Concentration (µg/m3)

PM10 µg/m3

PM2.5

µg/m3 SO2

µg/m3 NOx

µg/m3

March

18.03.2013 60 14 5.5 11.0

19.03.2013 62 15 5.6 10.3

27.03.2013 64 14 7.9 12.5

28.03.2013 64 16 6.2 9.5

01.04.2013 58 14 6.8 8.6

02.04.2013 60 12 8.2 11.2

10.04.2013 61 14 7.6 12.0

11.04.2013 58 12 5.6 8.9

April

19.04.2013 60 14 5.5 9.2

20.04.2013 58 14 5.9 8.6

25.04.2013 62 16 5.8 9.8

26.04.2013 60 15 7.6 10.3

01.05.2013 56 15 7.6 10.5

02.05.2013 58 14 6.4 12.4

09.05.2013 55 14 5.1 12.0

10.05.2013 54 12 6.3 11.6

May

14.05.2013 56 14 5.8 10.5

15.05.2013 58 12 6.2 9.8

22.05.2013 60 14 5.3 9.7

23.05.2013 58 14 6.8 8.6

28.05.2013 55 14 8.2 10.0

29.05.2013 54 15 7.3 12.0

June 06.06.2013 56 16 7.3 11.6

07.06.2013 58 16 6.4 11.8

Page 118: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

14

Am

bie

nt

Air

Qua

lity

Dat

a (P

M10

& P

M2.

5)

(Pro

ject

Off

ice

Cor

ezon

e (C

A1)

020406080100

120

140

160

15.03.2013

16.03.2013

19.03.2013

20.03.2013

27.03.2013

28.03.2013

03.04.2013

04.04.2013

08.04.2013

09.04.2013

17.04.2013

18.04.2013

27.04.2013

28.04.2013

03.05.2013

04.05.2013

07.05.2013

08.05.2013

16.05.2013

17.05.2013

24.05.2013

25.05.2013

30.05.2013

31.05.2013

Dat

e

Concentration (µg/cu.m)

PM

10P

M2.

5P

erm

issi

ble

Lim

it, P

M10

Per

mis

sibl

e L

imit

, PM

2.5

Fig

.-3.

1

Page 119: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

15

Am

bie

nt A

ir Q

ualit

y D

ata

(PM

10 &

PM

2.5)

(L

ong

ijoda

Vill

age

Co

rezo

ne

(CA

2)

020406080100

120

140

15.03.2013

16.03.2013

19.03.2013

20.03.2013

27.03.2013

28.03.2013

03.04.2013

04.04.2013

08.04.2013

09.04.2013

17.04.2013

18.04.2013

27.04.2013

28.04.2013

03.05.2013

04.05.2013

07.05.2013

08.05.2013

16.05.2013

17.05.2013

24.05.2013

25.05.2013

30.05.2013

31.05.2013

Dat

e

Concentration (µg/cu.m)

PM

10P

M2.

5P

erm

issi

ble

Lim

it, P

M10

Per

mis

sib

le L

imit

, PM

2.5

Fig

.-3.

2

Page 120: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

16

Am

bie

nt A

ir Q

ual

ity D

ata

(PM

10 &

PM

2.5)

(A

mb

amu

nd

a V

illag

e C

ore

zon

e (C

A3)

020406080100

120

18.03.2013

19.03.2013

27.03.2013

28.03.2013

01.04.2013

02.04.2013

10.04.2013

11.04.2013

19.04.2013

20.04.2013

25.04.2013

26.04.2013

01.05.2013

02.05.2013

09.05.2013

10.05.2013

14.05.2013

15.05.2013

22.05.2013

23.05.2013

28.05.2013

29.05.2013

06.06.2013

07.06.2013

Dat

e

Concentration (µg/cu.m)

PM

10P

M2.

5P

erm

issi

ble

Lim

it, P

M10

Per

mis

sib

le L

imit,

PM

2.5

Fig

.-3.

3

Page 121: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

17

Am

bie

nt

Air

Qu

alit

y D

ata

(PM

10)

(Fo

r o

ther

AA

Q S

tati

on

s) (

Res

iden

tial

Are

a)

020406080100

120

140

06.03.09

07.03.09

13.03.09

14.03.09

19.03.09

20.03.09

26.03.09

27.03.09

03.04.09

04.04.09

09.04.09

10.04.09

16.04.09

17.04.09

23.04.09

24.04.09

04.05.09

05.05.09

11.05.09

12.05.09

18.05.09

19.05.09

25.05.09

26.05.09

Dat

e

Concentartion (µg/cu.m)

Tal

abed

a vi

llag

eH

ensa

mu

l vill

age

Tal

cher

To

wn

Kan

dh

al v

illag

eG

han

tap

ada

villa

ge

Per

mis

sib

le L

imit

(Res

iden

tial

Are

a)

Fig

.-3.

4

Page 122: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

18

Am

bie

nt

Air

Qu

alit

y D

ata

(P

M2.

5)(F

or

oth

er A

AQ

Sta

tio

ns)

(Res

iden

tia

l Are

a)

020406080100

120

06.03.09

07.03.09

13.03.09

14.03.09

19.03.09

20.03.09

26.03.09

27.03.09

03.04.09

04.04.09

09.04.09

10.04.09

16.04.09

17.04.09

23.04.09

24.04.09

04.05.09

05.05.09

11.05.09

12.05.09

18.05.09

19.05.09

25.05.09

26.05.09

Dat

e

Concentartion (µg/cu.m)

Tal

abed

a vi

llag

eH

ensa

mu

l vill

age

Am

bam

unda

vill

age

Talc

her

To

wn

Kan

dhal

vill

age

Gha

nta

parh

a vi

llag

eP

erm

issi

ble

Lim

it(R

esid

enti

al A

rea)

Fig

.-3.

5

Page 123: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

19

Am

bie

nt

Air

Qu

alit

y D

ata

(SO

2)(F

or

all A

AQ

Sta

tion

s)

020406080100

120

06.03.09

07.03.09

13.03.09

14.03.09

19.03.09

20.03.09

26.03.09

27.03.09

03.04.09

04.04.09

09.04.09

10.04.09

16.04.09

17.04.09

23.04.09

24.04.09

04.05.09

05.05.09

11.05.09

12.05.09

18.05.09

19.05.09

25.05.09

26.05.09

Dat

e

Concentartion (µg/cu.m)

Pro

ject

Off

ice

Lon

gijo

da v

illag

eT

alab

eda

villa

ge

Hen

sam

ul v

illag

eA

mba

mu

nda

vill

age

Tal

cher

To

wn

Kan

dha

l vill

age

Gh

anta

parh

a v

illag

eP

erm

issi

ble

Lim

it

Fig

.-3.

6

Page 124: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

20

Am

bie

nt

Air

Qu

alit

y D

ata

(NO

x)(F

or

all A

AQ

Sta

tion

s)

020406080100

120

06.03.09

07.03.09

13.03.09

14.03.09

19.03.09

20.03.09

26.03.09

27.03.09

03.04.09

04.04.09

09.04.09

10.04.09

16.04.09

17.04.09

23.04.09

24.04.09

04.05.09

05.05.09

11.05.09

12.05.09

18.05.09

19.05.09

25.05.09

26.05.09

Dat

e

Concentartion (µg/cu.m)

Pro

ject

Off

ice

Long

ijod

a vi

llage

Tal

abed

a vi

llage

Hen

sam

ul v

illag

eA

mb

amun

da v

illag

eT

alch

er T

own

Kan

dhal

vill

age

Gh

anta

par

ha v

illag

eP

erm

issi

ble

Lim

it

Fig

.-3.

7

Page 125: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 21

� Observations

� 24 hourly concentration levels for PM10, SO2 and NOX are within the limits of

the Standards for Coal Mines, September, 2000 [GSR 742 (E)] for the air

quality monitoring station in core zone.

� The average concentration levels (24 hrly.) for PM10, PM2.5, SO2 and NOx for

other stations representing Residential Area are within the limits of the

National Ambient Air Quality Standards (NAAQS) except PM10 at Hensamul.

Although this village in the buffer zone of Lingaraj OCP but it falls in the Core

Zone of Bhubaneswari OCP.

3.3 WATER QUALITY

� Water quality study

Water quality of various inland surface water and ground water sources in

and around this project has been assessed by M/s.Richardsons & Cruddas

(1972) Ltd., Chennai … 78. The findings have been incorporated in this

chapter.

� Location of sampling stations

10 sampling stations covering surface water, ground water and mine water

were selected in the core and buffer zones of the project. The locations of

water sampling stations have been shown in Plate No.-XB and details are

given below:

Table-3.13: Details of Water Sampling Stations Sl. No.

Location Code

Details of Location

1. WD1 Tubewell Water, Hensamul Village

2. WD2 Tubewell Water, Dera Village

3. WD3 Dugwell Water, Talabera Village

4. WD4 Dugwell Water, Kandhal Village

5. WD5 Tubewell Water, Rehrat Village

6. WS1 Brahmani River, Near project site

7. WS2 Pond Water, Hensamul village

8. WS3 Pond water, Talabera

9. WE1 Mine discharge, Lingaraj OCP

Page 126: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 22

� Frequency of sampling

Water samples were collected from the above villages for analysis. � Methodology and instruments used for water analysis

Water samples were collected for physical, chemical and bacteriological

parameters taking suitable precautions. The methodology and instruments

used for water analysis are given in Table-3.11.

Table-3.11 : Methodology & Instruments used for Water and Effluent Quality Analysis

Sl. No.

Parameters Methods/Instruments

1 pH Electrometric/pH meter

2 Turbidity Nephlometric/Nephloturbidity meter

3 Total suspended solids, total dissolved solids, oil & grease and mineral oil

Gravimetric/oven, electronic balance

4 BOD BOD test and titration/BOD incubator, pipette, burette, etc.

5 COD Reactor digestion and titration/reactor digester

6 Coliform MPN test/LTEK MPN kit.

7 Calcium, chloride, hardness, alkalinity

Titrimetric/pipette, burette, etc.

8 Cadmium, copper, iron, lead, manganese, mercury, nickel, total chromium & zinc

Selective absorption/atomic absorption spectro-photometer.

9 Ammonical nitrogen, arsenic, colour, dissolved phosphate, fluoride, hexavalent chromium, nitrate nitrogen, phenolics, selenium, sulphate, sulphide, total residual chlorine, total Kjeldahl nitrogen & boron.

Photometric/DR 2000

� Results

The results of analyses of water samples are given in Table-3.12 to 3.15.

Page 127: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 23

Table-3.12 DRINKING WATER QUALITY DATA

Date of Sampling : 07-06-13

Area : Talcher Project : Lingaraj OC Expn. Project Name of the Stn. : 1. WD1 : Tubewell Water, Hensamul Village

2. WD2 : Tubewell Water, Dera Village 3. WD3 : Dugwell Water, Talabera Village

Sl. No. Parameter WD1 WD2 WD3

IS: 10500-1991

Norms 1 pH 7.2 7.12 7.22 6.5 – 8.5

2 Colour Hazen Unit, Max. <5 <5 <5 10

3 Temperature (oC) 29.0 29.5 30.5 -

4 Turbidity NTU Max. 6 9 5 10

5 Total suspended solids mg/l,Max. <2 <2 <2 -

6 Total dissolved solids mg/l,Max. 456 352 408 500

7 Total volatile solids mg/l,Max. - - - -

8 Dissolved Oxygen mg/l,Max. 4.0 4.0 4.8 -

9 BOD - 3 days, 27oC mg/l,Max. - - - -

10 COD mg/l,Max. 18 15 15 -

11 Oil & grease mg/l,Max. Nil Nil Nil -

12 Residual chlorine mg/l,Max. Nil Nil Nil 0.2

13 Chloride (as CI), mg/l,Max. 88 52 84 250

14 Flouride (as F) , mg/l,Max. 1.2 0.12 0.01 1.0

15 Sulphate (as SO4) , mg/l,Max. 36 17 30 200

16 Sulphide (as S) , mg/l,Max. Nil Nil Nil -

17 Cyanide (as CN) , mg/l,Max. Nil Nil Nil 0.05

18 Insecticides/pesticides, mg/l,Max. Nil Nil Nil Absent

19 Phenols (as C6H5OH) , mg/l,Max. <0.001 <0.001 <0.001 0.001

20 Chromium (as Cr) , mg/l,Max. <0.01 <0.01 <0.01 0.05

21 Copper (as Cu) , mg/l,Max. <0.01 <0.01 <0.01 0.05

Page 128: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 24

Sl. No. Parameter WD1 WD2 WD3

IS: 10500-1991

Norms 22 Selenium (as Se) , mg/l,Max. <0.01 <0.01 <0.01 0.01

23 Arsenic (as As) , mg/l,Max. <0.01 <0.01 <0.01 0.05

24 Barium (as Ba) , mg/l,Max. <0.01 <0.01 <0.01 -

25 Cadmium, mg/l,Max. <0.01 <0.01 <0.01 0.01

26 Nickel (as Ni) , mg/l,Max. <0.01 <0.01 <0.01 -

27 Boron (as B) , mg/l,Max. <0.01 <0.01 <0.01 -

28 Mercury (as Hg) , mg/l,Max. <0.001 <0.001 <0.001 0.001

29 Silver (as Ag) , mg/l,Max. <0.01 <0.01 <0.01 -

30 Lead (as Pb) , mg/l,Max. <0.01 <0.01 <0.01 0.05

31 Zinc (as Pb) , mg/l,Max. 1.2 0.09 0.08 5

32 Alkalinity to phenolphth, mg/l,Max.alein Nil Nil Nil -

33 Alkalinity to methyl orange, mg/l,Max. 186 160 165 200

34 Iron (as Fe) , mg/l,Max. 0.02 0.12 0.06 0.3

35 Total Hardness, mg/l,Max. 196 170 156 300 36 Calcium (as Ca) , mg/l,Max. 68 39 54 75

37 Magnesium (as Mg) , mg/l,Max. 33 14 14 30

38 Total Nitrogen (as N) , mg/l,Max. Nil Nil Nil -

39 Percent sodium % 31.00 32.10 31.06 -

40 Coliform organisms MPN/100ml -0- -0- -0- Absent

41 Sodium (as Na) mg/l,Max. 52 46 34

42 Potassium (as K) mg/l,Max. 13 19 14

Page 129: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 25

Table-3.13 DRINKING WATER QUALITY DATA

Date of Sampling : 07-06-13

Area : Talcher Project : Lingaraj OC Expn. Project Name of the Stn. : 1. WD4 : Dugwell Water, Kandhal Village

2. WD5 : Tubewell Water, Rehrat Village

Sl. No. Parameter WD4 WD5 IS: 10500-1991

Norms 1 pH 7.08 7.86 6.5 – 8.5

2 Colour Hazen Unit, Max. <5 <5 10

3 Temperature (oC) 30.0 29.0 -

4 Turbidity NTU Max. 45 8 10

5 Total suspended solids mg/l,Max. <2 <2 -

6 Total dissolved solids mg/l,Max. 322 502 500

7 Total volatile solids mg/l,Max. - - -

8 Dissolved Oxygen mg/l,Max. 5.2 3.6 -

9 BOD - 3 days, 27oC mg/l,Max. - - -

10 COD mg/l,Max. 12 14 -

11 Oil & grease mg/l,Max. Nil Nil -

12 Residual chlorine mg/l,Max. Nil Nil 0.2

13 Chloride (as CI), mg/l,Max. 36 112 250

14 Flouride (as F) , mg/l,Max. 0.10 0.8 1.0

15 Sulphate (as SO4) , mg/l,Max. 16 56 200

16 Sulphide (as S) , mg/l,Max. Nil Nil -

17 Cyanide (as CN) , mg/l,Max. Nil Nil 0.05

18 Insecticides/pesticides, mg/l,Max. Nil Nil Absent

19 Phenols (as C6H5OH) , mg/l,Max. <0.001 <0.001 0.001

20 Chromium (as Cr) , mg/l,Max. <0.01 <0.01 0.05

21 Copper (as Cu) , mg/l,Max. <0.01 <0.01 0.05

22 Selenium (as Se) , mg/l,Max. <0.01 <0.01 0.01

Page 130: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 26

Sl. No. Parameter WD4 WD5 IS: 10500-1991

Norms 23 Arsenic (as As) , mg/l,Max. <0.01 <0.01 0.05

24 Barium (as Ba) , mg/l,Max. <0.01 <0.01 -

25 Cadmium, mg/l,Max. <0.01 <0.01 0.01

26 Nickel (as Ni) , mg/l,Max. <0.01 <0.01 -

27 Boron (as B) , mg/l,Max. <0.01 <0.01 -

28 Mercury (as Hg) , mg/l,Max. <0.001 <0.001 0.001

29 Silver (as Ag) , mg/l,Max. <0.01 <0.01 -

30 Lead (as Pb) , mg/l,Max. <0.01 <0.01 0.05

31 Zinc (as Pb) , mg/l,Max. 0.07 0.8 5

32 Alkalinity to phenolphth, mg/l,Max.alein Nil Nil -

33 Alkalinity to methyl orange, mg/l,Max. 156 202 200

34 Iron (as Fe) , mg/l,Max. 0.12 0.26 0.3

35 Total Hardness, mg/l,Max. 164 186 300 36 Calcium (as Ca) , mg/l,Max. 36 76 75

37 Magnesium (as Mg) , mg/l,Max. 15 44 30

38 Total Nitrogen (as N) , mg/l,Max. Nil Nil -

39 Percent sodium % 26.12 31.00 -

40 Coliform organisms MPN/100ml -0- -0- Absent

41 Sodium (as Na) mg/l,Max. 20 64 -

42 Potassium (as K) mg/l,Max. 12 15 -

Page 131: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 27

Table-3.14 SURFACE WATER QUALITY DATA

Date of Sampling : 07-06-13

Area : Talcher Project : Lingaraj OC Expn. Project Name of the Stn. : 1. WS1 : Brahmani River, Near project site

2. WS2 : Pond Water, Hensamul village 3. WS3 : Pond water, Talabera

Sl. No. Parameter WS1 WS2 WS3

IS:2296-1982 Tolerance

limits for Inand Surface water

(Class C) 1 pH 7.52 7.56 7.22 6.5 – 8.5

2 Colour Hazen Unit, Max. 14 14 5 300

3 Temperature (oC) 29.5 29.5 28.0 -

4 Turbidity NTU Max. 22 14 5 -

5 Total suspended solids mg/l,Max. 28 10 12 -

6 Total dissolved solids mg/l,Max. 612 402 302 1500

7 Total volatile solids mg/l,Max. - - - -

8 Dissolved Oxygen mg/l,Max. 5.2 4.9 5.2 4.0

9 BOD - 3 days, 27oC mg/l,Max. 2 2 - 3.0

10 COD mg/l,Max. 38 21 12 -

11 Oil & grease mg/l,Max. Nil Nil Nil -

12 Residual chlorine mg/l,Max. Nil Nil Nil -

13 Chloride (as CI), mg/l,Max. 162 66 65 600

14 Flouride (as F) , mg/l,Max. 0.21 0.20 0.12 1.5

15 Sulphate (as SO4) , mg/l,Max. 56 20 21 400

16 Sulphide (as S) , mg/l,Max. Nil Nil Nil -

17 Cyanide (as CN) , mg/l,Max. <0.01 <0.01 <0.01 0.05

18 Insecticides/pesticides, mg/l,Max. Nil Nil Nil Absent

19 Phenols (as C6H5OH) , mg/l,Max. <0.001 <0.001 <0.001 0.005

20 Chromium (as Cr) , mg/l,Max. <0.01 <0.01 <0.01 0.05

21 Copper (as Cu) , mg/l,Max. <0.01 <0.001 <0.001 1.5

Page 132: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 28

Sl. No. Parameter WS1 WS2 WS3

IS:2296-1982 Tolerance

limits for Inand Surface water

(Class C) 22 Selenium (as Se) , mg/l,Max. <0.01 <0.001 <0.001 0.05

23 Arsenic (as As) , mg/l,Max. <0.01 <0.001 <0.001 0.2

24 Barium (as Ba) , mg/l,Max. <0.01 <0.01 <0.01 -

25 Cadmium, mg/l,Max. <0.01 <0.001 <0.001 0.01

26 Nickel (as Ni) , mg/l,Max. <0.01 <0.01 <0.01 -

27 Boron (as B) , mg/l,Max. <0.01 <0.1 <0.1 -

28 Mercury (as Hg) , mg/l,Max. <0.001 <0.001 <0.001 -

29 Silver (as Ag) , mg/l,Max. <0.01 <0.01 <0.01 -

30 Lead (as Pb) , mg/l,Max. <0.01 <0.001 <0.001 0.1

31 Zinc (as Pb) , mg/l,Max. 1.2 0.85 0.808 15

32 Alkalinity to phenolphth, mg/l,Max.alein Nil Nil Nil -

33 Alkalinity to methyl orange, mg/l,Max. 165 125 115 -

34 Iron (as Fe) , mg/l,Max. 0.12 1.02 0.25 50

35 Calcium (as Ca) , mg/l,Max. 54 66 52 -

36 Magnesium (as Mg) , mg/l,Max. 26 18 10 -

37 Total Nitrogen (as N) , mg/l,Max. 3.6 2.2 2.2 -

38 Percent sodium % 39.12 30.55 30.2 -

39 Coliform organisms MPN/100ml 2100 <1100 <1100 5000

40 Sodium (as Na) mg/l,Max. 54 39 32 -

41 Potassium (as K) mg/l,Max. 28 17 16 -

# : Class "C" : Drinking water source with conventional treatment followed by disinfection.

Page 133: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 29

Table-3.15 EFFLUENT QUALITY DATA

Date of Sampling : 07-06-13 Area : Talcher Project : Lingaraj OC Expn. Project Name of the Stn. : 1. WE1 : Mine discharge, Lingaraj OCP

S. No Parameter Unit Result

General Standards for discharge of Effluents

into Inland Surface water GSR 422(E)

1. Colour & Odour Pt-Co 15 & Odourless - 2. Total Suspended Solids mg/l 2238 100

3. Particle size of suspended solids Shall pass 850 micron ISI sieve

100% are passing through 850 micron ISI

sieve

Shall pass 850 micron ISI sieve

4. Total Dissolved solids mg/l 454 -

5. pH - 7.56 5.5-9.0

6. Temperature oC 36.0 5°C above water temperature

7. Oil & Grease mg/l Nil 10 8. Total residual chlorine mg/l Nil 1.0 9. Ammonical Nitrogen (as N) mg/l 2.3 50

10. Kjeldahl nitrogen mg/l 1.12 100 11. Free ammonia (as NH3) mg/l Nil 5.0 12. BOD - 3 Days at 27oC mg/l 12 30 13. COD mg/l 74 250 14. Arsenic (as As) mg/l <0.01 0.2 15. Mercury (as Hg) mg/l <0.001 0.01 16. Lead (as Pb) mg/l <0.01 0.01 17. Cadmium (as Cd) mg/l <0.01 2 18. Hexavalent Chromium (as Cr6+) mg/l <0.001 0.10 19. Total Chromium mg/l <0.001 2.0 20. Copper (as Cu) mg/l <0.001 3 21. Zinc (as Zn) mg/l <0.01 5

Page 134: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 30

S. No Parameter Unit Result

General Standards for discharge of Effluents

into Inland Surface water GSR 422(E)

22. Selenium (as Se) mg/l <0.01 0.05 23. Nickel (as Ni) mg/l <0.01 3 24. Boron (as B) mg/l <0.01 - 25. Percent Sodium mg/l 37.2 - 26. Residual Sodium Carbonate mg/l Nil - 27. Cyanides (as CN) mg/l Nil 0.2 28. Chloride (as Cl) mg/l 102 - 29. Fluorides (as F) mg/l 0.16 2 30. Dissolved Phosphates (as PO4) mg/l 0.85 5.0 31. Sulphates (as SO4) mg/l 58 - 32. Sulphides (as S) mg/l Nil 2 33. Phenols (as C6H5OH) mg/l Nil 1.0

34. Bio-assay test 90%survival of

fish after 96 hours in 100%

effluent

100%survival of fish after 96

hours in 100% effluent

90%survival of fish after 96 hours in 100% effluent

35. Manganese (as mn) mg/l Nil 2.0 36. Iron (as Fe +2) mg/l 0.36 3.0 37. Vanadium (as V) mg/l Nil 0.2 38. Nitrate Nitrogen mg/l 1.86 10

� Observations

Ground Water (Tubewell water and Dugwell water)

Samples (WD1, WD2, WD3, WD4 and WD5 ) have been collected from

ground water sources. The analysis shows that various physical and chemical

parameters are within the permissible limits of Drinking Water Standards (IS:10,500-

1991) except fluoride and magnesium in Hensmul Village tube water i.e 1.2 mg/l and

33 mg/l respectively which is just marginally crossing the permissible limit which may

be due to geo-genic of the rock formation; turbidity in dug well water at kandhal

village is 45 NTU due to mining interference and is temporary phenomenon ; TDS,

alkalinity at Rehrat village to methyl orange and calcium are 502 mg/l, 202 mg/l and

76 mg/l respectively which is just marginally crossing the permissible limit.

Page 135: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 31

Surface Water (Pond water)

Samples, WS1, WS2 and WS3 were collected from pond waters of Hensamul

and Talabera villages respectively. The analysis show that various parameters are

within the limits of IS : 2296-1982 (Surface water, Class "C" : Tolerance limits for

surface waters used for drinking water source with conventional treatment followed

by disinfection).

3.4 Hydrogeology

Detailed hydro-geological investigation was not attempted at Talcher coalfield till

1981. Water level data were collected from exploratory boreholes by NCDC, GSI,

etc. The Central Ground Water Board had carried out pumping test in exploratory

drilling in 1973 at Anantaberini village. However, a detailed hydrogeological study was

carried out by the Hydrogeological Unit of CMPDI, Ranchi for Nandira block during

the period 1981 to 1984 covering eastern part of the Talcher coalfield. Subsequently,

a detailed hydrogeological study had been conducted by the Directorate of Mining &

Geology, Department of Steel and Mines, Govt. of Orissa for Gopalprasad block of

Talcher coalfield in 1990. The abstract of Hydrogeological studies carried out by

CMPDI, Ranchi in Talcher coalfield is given below:

(i) Detailed hydrological studies reveal that Singhara jhor proto-basin and

Bangaru jhor sub-basin are of 5th order streams draining into the Brahmani

river. The drainage density of Singhara jhor and Bangaru jhor basins are 1.75

and 1.52 km/sq.km and their stream frequencies are 2.09 and 1.83 per sq.km

respectively. Both the basins are morphometrically similar.

(ii) The annual total run-off in Singhara jhor is 332.45, 237.97 and 545.19 mm of

which the base flow accounts to 164.80, 90.91 and 167.25 mm in 1983, 1984

and 1985 respectively.

(iii) Ground water in the area occurs under both unconfined and confined

conditions. The weathered mantle, recent alluvium and laterites act as

unconfined aquifer or phreatic aquifer.

(iv) Hydrogeological studies at Talcher coalfield reveals that the following aquifers

are identified in the ascending order from the data of sub-surface geological

Page 136: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 32

and ground water exploration studies of the past. Exploratory data for coal and

ground water have also been analysed and interpretated to understand the

disposition of aquifers.

Table: Details of aquifers found in Talcher coalfield

Name of the aquifer Formations

Range of thickness

in m. Confining beds

Phreatic aquifer Detrital mantle, river Alluvium soils,

10 to 20

Upper Barakar aquifer

Barakar sandstones 5 to 40 Coal Seam-IX & shales.

Middle Barakar aquifer

Barakar sandstones 5 to 30 Coal Seam-VI & shales.

Lower Barakar aquifer

Barakar sandstones 10 to 50 Coal Seam-III & shales

Basal aquifer Basal Barakar conglomerates and sandstones. Karharbari sandstones.

60 to 120 Coal Seam-II & shales.

Karharbari aquifer

Karharbari sandstones > 30 Coal Seam-I & shales.

From the above table, the aquifers in Talcher coalfield have been broadly

classified as shallow and deep aquifer and have been referred as unconfined and

confined respectively representing their mode of occurrence. The division between

confined and unconfined is entirely gradational. The term semi-confined is used for

the intermediate condition.

In the Talcher coalfield, ground water occurs in the porous colluvial material

and weathered mantle as well as in the joints, fissures and fractures. These are met

at shallow depths in the partly weathered rocks and deep seated fresh rocks. Though

shale, coal, mud stones, etc. act as confining horizon when it is sandwiched with

water bearing strata but the very nature of these confining horizon permits

considerable vertical flow. As these confining horizons have very poor hydraulic

conductivity in horizontal directions, these horizons also act as barrier boundaries

when they get juxtaposed with water bearing horizon because of geological

disturbance.

The large pore space in the fine grained sedimentary rocks provide storage for

huge quantities of water. The porosity of fine grained sediments decreases with depth

of deeper depositional environment.

Page 137: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 33

Cemented sandstones and conglomerates have made sedimentary formation

hard and compact which offer very limited scope to be considered as aquifers in

themselves. When these formations are geologically disturbed by faulting, jointing and

fracturing, produces secondary porosity. This secondary porosity when it is saturated

with ground water, forms good aquifer.

As a rule, formations are found to become thinner and fine grained at

increasing distances from the source of sediments. These lateral gradation are of

great significance with respect to the occurrence and movement of ground water.

(v) The depth of water in pre-monsoon period ranges from less than 1.6 m (Jilinda

village) to about 10.70m (Ekadal village) below ground level in western parts

of and from less than 1.10 m (Deulbera village) to about 7.83 m (Kashipur

village) below ground level in the highly populated eastern parts of the

coalfield.

(vi) The depth of water in post-monsoon period ranges from less than 2.9 m

(Jilinda village) to about 11.50m (Kandhabarani village) below ground level in

western parts and from less than 1.60 m (Deulbera village) to about 13.5 m

(Kashipur village) below ground level in the highly populated eastern parts of

the coalfield.

(vii) The annual fluctuation of water levels range in 10 km buffer zone from

approximately 1 to 10 m in the area.

(viii) The water table configuration coincides with the topography of the area. The

altitude of water table in the western parts is 134 m and in the eastern parts is

101 m above mean sea level with an average hydraulic gradient of 0.3

percent.

(ix) The ground water in the area moves in the general direction of north-east from

south-west. There are a few localized ground water troughs and mounds and

the watershed boundaries in general coincide with the ground water divides.

(x) The average hydraulic conductivity of unconfined aquifer for the study area is

2.83 m per day. The discharge ranges from 0.54 to 94.00 cubic meters per

day. The drawdown varies from 0.37 to 3.20 m on an average pumping of 65

minutes. The specific capacity varies from 0.048 to 13.46 cum/hr/m of draw-

down. The specific yield of the area is 4 percent.

Page 138: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 34

(xi) For the confined aquifer, the peizometric head is at 170 m in the western and

80 m above mean sea level in the eastern parts. The piezometric head

fluctuation is around 1.4 meters annually.

(xii) The pumping tests conducted on the well tapping confined aquifers indicate

the transmissivity range of 1 to 20 sq.meters per day and the storativity ranges

from 4.5 x 10-4 to 7.8 x 10-4. The hydraulic conductivity of the aquifer ranges

from 0.1 to 1.5 meters per day. The discharge varies from 33 to 316 cubic

meters per day with a drawdown of 5 to 30 meters under pumping conditions.

(xiii) The recharge and discharge zones have been demarcated on the basis of

principles of fluid potential distribution. The auto-flow conditions exist

essentially in the discharge zone but the entire discharge zone is not an auto-

flow zone but for topography. The average auto-flow discharge is about 40

cubic meters per day.

(xiv) The evapo-transpiration as calculated was 673.55, 368.64 and 755.43 mm in

1983, 1984 and 1985 respectively. Ground water evapo-transpiration of the

area were estimated as 37.01, 36.18 and 54.29 mm in the ratios of 5.5, 10 and

7 percent to the total evapo-transpiration in 1983, 1984 and 1985 respectively.

Precipitation is the only source of ground water recharge and the values were

estimated as 230.81, 78.1 and 285.74 mm in 1983, 1984 and 1985

respectively.

The ground water temperature of unconfined aquifer varies from 22O to 30OC,

whereas of confined aquifers, it varies between 32O and 48OC.

� Present ground water scenario of 10 km radius of the area

Present ground water scenarios of the area are assessed from the open

dugwells used for domestic water consumption. The selected hydrograph stations in

and around Lingaraj OC Expn. Project are given in Fig.-3.9. The water level in these

wells represent hydraulic head of water table aquifers. The hydraulic heads of all

observed wells are calibrated to reduced level. The hydraulic head of all hydrograph

stations are connected to construct water table contour map. Water table contour

map for Lingaraj OC Expn. Project is given in Fig.-3.9.

It is observed from the Fig.-3.9 that the water table configuration of the area

coincides more or less with surface topography. The altitude of water table in the

western part of the project area is 130 m above MSL, which slopes down to 94m

Page 139: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 35

above MSL in the eastern part of the area and 71 m in the south eastern part of the

area.

The ground water level recorded for the pre-monsoon season from the open

dugwell in the buffer zone of the project area range from 1.0 to 11.7 m bgl whereas

the ground water level in the project area in Deulbera village (core zone) ranges from

1.9 to 10.2 m bgl. Similarly for the post-monsoon season, ground water level

recorded from the open dugwell in in the buffer zone of project area ranges from

1.62 to 10.7 m bgl whereas the ground water level in the project area in Deulbera

village (core zone) ranges from 1.25 to 3.67 m bgl.

It is also observed from the Fig.-3.9 and Fig.-3.10 Based on these contour

maps, there are a few localized ground water troughs and mounds and watershed

boundaries generally coincide with ground water divides. There is a ground water

divide orienting north-west to south-east between Manikamara (Krishnachandrapur)

to Dasanali villages. This groundwater divide acts as drainage divide of the area.

This ground water and drainage divide make a part of ground water movement as

well as a part of surface run-off towards the north-west contributing to Bangaru jhor

and balance flow towards Nandira jhar.

For the purpose of understanding impact of mining activity on groundwater in

the vicinity, a dug well from Deulbera village (core zone) has been selected for year

on year fluctuation study (figure-3.8). Based on the data, it can be inferred that over

the years ground water levels in Deulbera village (core zone) have minutely

decreased and thus mining activity has little influence on the groundwater. However

as observed from ground water levels in dugwell in village Natedi (buffer zone) show

increasing trends in groundwater level (figure 3.11).

Page 140: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 36

Figure 3.8-: Water Level Fluctuation (2000-2014), Deulbera Village (core zone), Talcher Coalfield

Page 141: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 37

Figure 3.9: Water Table contour map for 10 Km buffer zone of Lingaraj OC Expansion project 16 MTY (peak 20MTY) for Pre-monsoon season.

T 075 is the hydrograph stations

Contour lines of Reduced Levels of ground water

Page 142: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 38

Figure 3.10: Water Table contour map for 10 Km buffer zone of Lingaraj OC Expansion project 16 MTY (peak 20MTY) for Post-monsoon season.

T 075 is the hydrograph stations

Contour lines of Reduced Levels of ground water

Page 143: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 39

Figure 3.11-: Water Level Fluctuation (2000-2012), Natedi Village (buffer zone),

Talcher Coalfield

Page 144: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

40

DE

TA

ILS

OF

HY

DR

OG

RA

PH

ST

AT

ION

S IN

10

KM

BU

FF

ER

ZO

NE

OF

LIN

GA

RA

J O

C E

XP

(16

MT

Y/P

EA

K 2

0MT

Y)

AT

TA

LC

HE

R C

OA

LF

IEL

DS

,

AN

GU

L, O

RIS

SA

, PR

E-M

ON

SO

ON

DA

TA

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

met

er o

f w

ell

(m)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

(m)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T09

9 JA

DU

NA

TH

PU

R

May

, 20

12

In b

etw

een

hous

e of

S

ri K

aila

sh C

h P

radh

an&

Sri

Mag

uni

Deh

uri

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

75

0.65

13

.00

9.95

28

5.

4 17

0

T10

1 R

AN

GA

PU

R M

ay,

2012

Bet

wee

n th

e ho

use

of

Sri

San

jay

das

and

Sri

Giri

sh D

as

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

2.45

0.

65

9.85

6.

16

27

5.4

190

T14

8 S

UN

AK

HA

NI

May

, 20

12

In fr

ont s

ide

hous

e of

S

ri P

radi

p N

ayak

, ne

ar M

anga

la M

andi

r G

ovt.

Dug

wel

l S

tone

lini

ng

Low

lyin

g 2.

25

0.65

7.

65

7.00

In

suffi

cien

t wat

er

T10

7 JA

KA

M

ay,

2012

Nea

r th

e ho

use

of S

ri A

rtha

Pra

dhan

and

Sri

Milu

Sah

oo a

nd C

haru

S

ahoo

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

2.

20

0.40

10

.20

8.87

28

6.

4 11

90

T10

8 A

ND

HA

RIK

HO

LA

May

, 20

12

In fr

ont h

ouse

of S

ri D

asha

Pra

dhan

, Sri

Rah

asa

Pra

dhan

, R

abin

a P

radh

an

Gov

t. D

ug w

ell

Sto

ne li

ning

, B

rick

Par

apet

Lo

w ly

ing

2.35

0.

45

9.95

7.

70

27

6 10

00

T11

2 K

AD

AP

AR

HA

(G

odas

ila)

May

, 20

12

Hou

se o

f Sri

Chu

nia

Beh

era

and

Sar

at

Moh

apat

ra, v

illag

e ro

ad s

ide

Gov

t. D

ug w

ell

Sto

ne li

ning

E

leva

ted

2.00

0.

50

7.95

6.

80

27

5.5

400

T10

3 G

UR

UJA

NG

A

May

, 20

12

In fr

ont h

ouse

of S

ri B

inoy

kum

ar N

ath,

sri

Ant

arza

mi P

ani,

post

of

fice

near

the

met

allic

R

oad

Gov

t. D

ug w

ell

RC

C r

ing

(van

da)

Low

lyin

g 1.

85

0.35

9.

35

9.00

In

suffi

cien

t wat

er

Page 145: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

41

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

met

er o

f w

ell

(m)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

(m)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T10

2 B

RA

JAN

AT

HA

PU

R

May

, 20

12

In fr

ont h

ouse

of S

ri R

uma

Nay

ak, r

ight

si

de o

f the

hou

se/w

ell

Man

gala

Man

dir

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

95

0.60

11

.05

8.40

28

5.

6 16

0

T10

9 B

AS

ULE

I M

ay,

2012

Nea

r B

asul

ei

Bar

unes

war

Clu

b,

near

ele

ctric

T

rans

form

er

Gov

t. D

ug w

ell

Sto

ne li

ning

E

leva

ted

1.90

0.

65

7.60

5.

15

27

6.1

700

T07

2 K

AN

DH

AB

AR

AN

I M

ay,

2012

In fr

ont o

f hou

se o

f B

ero

Sah

oo &

B

alab

hadr

a S

ahoo

, at

Chh

ak

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

90

0.47

12

.00

11.5

In

suffi

cien

t wat

er

T07

0 E

KA

DA

L M

ay,

2012

In fr

ont o

f hou

se o

f B

ikal

a B

isw

al&

B

aish

idha

r P

radh

an

Gov

t. D

ug w

ell

Nan

da R

CC

rin

g P

lain

1.

25

0.65

15

.25

10.2

0 27

5.

4 71

0

T14

9

MA

NIK

AM

AR

A

(Kris

hnac

hand

ra-p

ur)

May

, 20

12

Bet

wee

n th

e vi

llage

M

anik

amar

a an

d K

rishn

a-ch

andr

apur

G

ovt.

Dug

wel

l N

anda

RC

C

linin

g P

lain

1.

45

0.55

9.

35

8.40

28

6.

1 40

0

T10

4 S

AT

AP

AT

IA

(Kan

kaliS

ai)

May

, 20

12

Bes

ide

the

villa

ge

conc

rete

roa

d, n

ear

Sat

sang

Mat

h G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

50

3.90

8.

30

1.00

27

6.

1 11

80

T11

0 K

ULE

I (P

uran

aSah

i)

May

, 20

12

Infr

ont h

ouse

of S

ri A

khay

a K

umar

Jan

a an

d B

icha

nda

Kr.

Ja

na, S

ri M

anm

ohan

Mah

aBho

i

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

95

0.85

9.

95

8.35

28

6.

2 55

0

T07

1 T

ILE

IPO

SH

I M

ay,

2007

In fr

ont o

f hou

se o

f Sri

Cha

krad

har

Pra

dhan

&

besi

de r

oad

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

2.

15

0.45

9.

40

8.95

In

suffi

cien

t wat

er

Page 146: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

42

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

met

er o

f w

ell

(m)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

(m)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T07

4 JO

RA

GA

RH

IA

May

, 20

07

In fr

ont o

f hou

se o

f Sri

Sar

oj P

radh

an &

Dili

p P

radh

an

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

85

0.60

11

.45

6.85

27

6.

7 61

0

T06

9 JI

LIN

DA

M

ay,

2007

In

sid

e th

e fie

ld, R

oad

side

(m

ooru

m+

Kho

a)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.25

0.

60

5.65

2.

90

28

6.2

600

T00

2 K

AN

DH

AL

May

, 20

07

Nea

r lo

wer

prim

ary

scho

ol (

Oris

sa B

oard

) G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

40

0.70

9.

65

7.60

28

5.

7 37

0

T00

4

BA

NA

MA

LIP

UR

(B

idya

dhar

pur

)

May

, 20

07

Nea

r K

ali M

andi

r,

infr

ont o

f hou

se o

f C

ham

pai D

ehur

i, ne

ar

NH

-23

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.45

0.

75

7.90

6.

65

27

5.7

450

T00

5 D

EU

LBE

RA

M

ay,

2007

In fr

ont o

f hou

se o

f Sri

Mag

ata

Nay

ak, i

n fr

ont o

f vill

age

club

(D

eulb

era)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.60

0.

50

6.70

1.

60

27

5.6

510

T00

5A S

IMLI

PA

L M

ay,

2012

E

ntra

nce

of V

illag

e,

Man

gala

Man

dir

Gov

t D

ug W

ell

NR

P

lain

2.

00

0.80

10

.50

8.18

27

6.

2 57

0

T01

3 K

HA

LPA

L M

ay,

2012

Hou

ses

betw

een

Sri

Sag

ar N

ayak

and

D

usha

san

Nay

ak

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 1.

80

0.40

11

.45

11.0

0 In

suffi

cien

t wat

er

T13

A

PA

RA

MH

AN

SP

UR

M

ay,

2012

B

esid

e ko

tha

ghar

(T

haku

r S

ahi)

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 1.

95

0.35

10

.95

9.90

28

6.

2 77

0

T00

1 LA

NG

IJO

RH

A

May

, 20

12

Dis

man

tele

d ho

use

betw

een

Nita

Sah

oo &

P

adm

ini P

radh

an

(Sho

p)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.95

0.

70

11.9

5 7.

90

28

6.5

480

T00

3 A

MB

AM

UN

DA

M

ay,

2012

In

fron

t of h

ouse

of S

ri G

adha

dhar

Pra

dhan

G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

52

0.55

7.

65

5.90

27

6.

1 60

0

T06

8 H

EN

SA

MU

L (N

uaS

ahi)

May

, 20

12

Roa

d si

de, i

nsid

e th

e fie

ld

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 2.

25

0.65

6.

85

4.50

28

6.

5 49

0

Page 147: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

43

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

met

er o

f w

ell

(m)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

(m)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T07

5 LA

KE

IPO

SH

I (C

N-1

4)

May

, 20

12

Infr

ont o

f Kot

hagh

ar

and

besi

de r

oad

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.60

0.

40

13.3

5 11

.37

28

6 55

0

T15

0 R

AK

AS

(B

ahal

) M

ay,

2012

In b

etw

een

plat

form

co

nstr

ucte

d un

der

IPD

P-9

3, B

hara

tpur

pr

ojec

t, In

fron

t of

hous

e of

Sri

Bas

anta

B

arik

Gov

t. D

ug w

ell

Bric

k lin

ing

+

ston

e lin

ing

Low

lyin

g 1.

95

0.45

11

.55

9.90

27

5.

6 47

0

T06

4 D

AN

AR

A

(CN

-25)

M

ay,

2012

In fr

ont o

f Biri

nchi

M

ahap

atra

, bes

ides

ro

ad

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

2.

25

0.55

9.

95

5.45

28

5.

6 19

0

T06

5 JA

MB

UB

AH

ALI

M

ay,

2012

N

ear

prim

ary

scho

ol

(UP

sch

ool)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.00

0.

45

9.50

4.

23

28

5.2

220

T01

2 D

EU

LBE

RA

M

ay,

2012

In fr

ont o

f hou

se o

f Sri

Mag

ata

Nay

ak, i

n fr

ont o

f vill

age

club

(D

eulb

era)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.60

0.

50

6.70

6.

20

Insu

ffici

ent w

ater

T01

2A T

ALC

HE

R

TO

WN

(A

raS

ai)

May

, 20

12

Nea

r R

adha

kish

ore

Man

dir,

vill

age

Ara

Sai

, W

ard

no. 7

G

ovt.

Dug

wel

l B

rick

linin

g Lo

w ly

ing

3.00

0.

80

11.0

0 8.

60

28

6 65

0

T01

4 K

HA

IRM

UN

DA

M

ay,

2012

In b

etw

een

hous

e of

S

ri A

ntar

jam

i Bis

wal

&

Kis

han

Juva

k S

angh

a G

ovt.

Dug

wel

l B

rick

linin

g P

lain

1.

85

0.40

8.

90

8.50

In

suffi

cien

t wat

er

T01

1 S

AR

AN

G

May

, 20

12

(Vill

age

Sar

ang

Roa

d si

de),

In b

etw

een

hous

e of

Sri

B.B

. M

ohan

ty, a

nd S

ri S

esob

huiy

a

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.50

0.

35

9.10

5.

85

27

6.2

500

T05

7 K

AS

HIP

UR

(B

ebor

taM

und

a)

May

, 20

12

Sid

e of

Hou

se o

f Sri

Pur

na C

hand

ra

Pat

tana

ik

Gov

t. D

ug w

ell

Bric

k Li

ning

Lo

w ly

ing

2.00

0.

40

14.0

0 13

.50

Insu

ffici

ent w

ater

Page 148: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

44

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

met

er o

f w

ell

(m)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

(m)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T00

6 B

AG

HU

AB

AL

May

, 20

12

In fr

ont o

f hou

se o

f H

urda

nand

a S

ahoo

, vi

llage

roa

d si

de

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.00

0.

40

10.2

0 9.

80

Insu

ffici

ent w

ater

T05

3 G

HA

NT

AP

AR

HA

M

ay,

2012

N

ear

road

sid

e an

d M

anga

la M

andi

r G

ovt.

Dug

wel

l B

rick

linin

g P

lain

3.

00

0.75

15

.25

10.2

0 28

6.

1 10

00

T05

5 T

EN

TU

LEI

May

, 20

12

In fr

ont o

f Hou

se o

f Sri

Cha

tura

Sah

oo,

Man

gala

Man

dir

Gov

t. D

ug w

ell

Nan

da (

RC

C)

and

Sto

ne

Pla

in

1.60

0.

45

7.75

6.

45

27

6.6

700

T05

2 K

AR

AR

HA

PA

LLI

May

, 20

12

In b

etw

een

hous

e of

T

haru

Bhu

tia a

nd

Hun

si B

hutia

G

ovt.

Dug

wel

l R

CC

P

lain

2.

25x2

.25

(sq

) 0.

60

7.50

6.

90

Insu

ffici

ent w

ater

T05

4 B

AR

HA

SIN

GA

RH

A

May

, 20

12

In fr

ont o

f hou

se o

f Sri

Giri

sh C

hand

ra

Sah

oo, A

kram

Beh

era

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.10

0.

55

8.45

5.

45

27

5.8

160

T05

8 B

AR

HA

JOR

AR

HA

M

ay,

2012

Wel

l bet

wee

n ho

use

of S

ri S

udha

kar

Beh

era

and

Birb

ar

Beh

era

(Vill

age

road

si

de)

Gov

t. D

ug w

ell

Sto

ne L

inin

g P

lain

2.

25x2

.25

(sq

) 0.

55

10.8

0 6.

50

28

6.3

1290

T05

9 S

AN

AJO

RA

RH

A

(Kar

napu

r)

May

, 20

12

In fr

ont o

f hou

se o

f Sri

Bam

dev

Beh

era,

vi

llage

roa

d si

de

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

1.75

0.

55

9.95

7.

35

28

6.4

1510

T04

6

KU

KU

RH

AN

GA

(K

ukud

anga

)

May

, 20

12

Nea

r po

nd, w

ell

situ

ated

rig

ht s

ide

of

the

field

G

ovt.

Dug

wel

l S

tone

/ rin

g (n

and)

lini

ng

Low

lyin

g 2.

35

0.30

6.

95

3.55

28

5.

9 71

0

T05

0

BA

LAR

AM

AP

RA

SA

D

(Mad

haG

har

Sai

)

May

, 20

12

In fr

ont o

f sid

e of

ho

use

of S

ri S

ures

h N

ayak

& T

amen

dra

Nay

ak (

Roa

d S

ide)

Gov

t. D

ug w

ell

Sto

ne L

inin

g Lo

w ly

ing

2.10

0.

75

7.70

7.

10

28

5.8

290

T06

2 T

EN

TU

LIE

M

ay,

2012

In fr

ont h

ouse

of S

ri G

okul

a N

anda

Nay

ak

(vill

age

road

sid

e)

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

2.60

0.

40

5.60

3.

95

28

4.9

460

Page 149: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

45

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

met

er o

f w

ell

(m)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

(m)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T03

1 A

CH

ALA

PU

R

(Sal

agar

iya)

May

, 20

12

In fr

ont o

f hou

se o

f S

atya

badi

Sam

al,

Gya

ni S

amal

G

ovt.

Dug

wel

l S

tone

Lin

ing

Pla

in

2.10

0.

45

7.90

7.

45

Insu

ffici

ent w

ater

T00

8 JA

GA

NN

AT

HP

UR

M

ay,

2012

Fro

nt s

ide

hous

e of

S

ri B

irend

ra D

hara

(U

P s

choo

l and

E

leva

ted

Sch

ool o

n th

e w

ay)

appr

ox 1

50m

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 3.

70

0.30

7.

65

2.10

27

6

400

T00

7 B

AN

TO

L M

ay,

2012

V

illag

e ro

ad s

ide

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 2.

15

0.55

8.

00

6.25

27

6.

1 84

0

T00

9 S

AN

TH

AP

AR

HA

M

ay,

2012

Hou

se b

etw

een

Sri

Jala

dhar

Deh

ury

and

Sri

Dha

nesw

ar S

amal

(v

illag

e ro

ad s

ide)

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 1.

85

0.80

9.

35

8.80

27

6.

0 55

0

T01

9 D

AS

AN

ALI

M

ay,

2012

In fr

ont o

f dou

l-m

anda

p ch

hak

and

in

fron

t of h

ouse

of

Son

iya

Sam

al

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

2.20

0.

65

12.7

10

.35

23

5.9

1190

T06

3 N

AT

IDI

May

, 20

12

UP

sch

ool c

ampu

s G

ovt

Dug

wel

l R

CC

H

igh

2.65

0.

70

8.50

7.

80

Insu

ffici

ent w

ater

T06

7 T

HE

RA

MP

UR

M

ay,

2012

N

ear

UP

sch

ool,

road

si

de

Gov

t D

ug w

ell

Sto

ne li

ning

P

lain

2.

60

0.45

9.

00

7.62

W

ell n

ot in

use

T01

0 JA

TIA

M

ay,

2012

In fr

ont s

ide

hous

e of

S

ri B

inod

Sah

oo,

Bha

gwat

Tha

kur

ghar

G

ovt.

Dug

wel

l S

tone

lini

ng

Pla

in

1.85

0.

55

9.20

5.

45

22

6.1

220

Page 150: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

46

DE

TA

ILS

OF

HY

DR

OG

RA

PH

ST

AT

ION

S IN

10

KM

BU

FF

ER

ZO

NE

OF

LIN

GA

RA

J O

C E

XP

(16

MT

Y/P

EA

K 2

0MT

Y)

AT

TA

LC

HE

R C

OA

LF

IEL

DS

,

AN

GU

L, O

RIS

SA

, PO

ST

-MO

NS

OO

N D

AT

A

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

me

ter

of

wel

l (m

)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

incl

ud

ing

p

arap

et(m

)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T09

9 JA

DU

NA

TH

PU

R

Dec

, 20

12

In b

etw

een

hous

e of

S

ri K

aila

sh C

h P

radh

an&

Sri

Mag

uni

Deh

uri

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

75

0.65

13

.00

4.27

21

5.

9 60

0

T10

1 R

AN

GA

PU

R D

ec,

2012

Bet

wee

n th

e ho

use

of

Sri

San

jay

das

and

Sri

Giri

sh D

as

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

2.45

0.

65

9.85

3.

57

21

5.6

270

T14

8 S

UN

AK

HA

NI

Dec

, 20

12

In fr

ont s

ide

hous

e of

S

ri P

radi

p N

ayak

, nea

r M

anga

la M

andi

r G

ovt.

Dug

wel

l S

tone

lini

ng

Low

lyin

g 2

.22

0.65

7.

65

5.90

21

5.

5 20

0

T10

7 JA

KA

D

ec,

2012

Nea

r th

e ho

use

of S

ri A

rtha

Pra

dhan

and

Sri

Milu

Sah

oo a

nd

Cha

ruS

ahoo

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

2.

20

0.40

10

.2

4.40

21

6.

1 13

30

T10

8 A

ND

HA

RIK

HO

LA

Dec

, 20

12

In fr

ont h

ouse

of S

ri D

asha

Pra

dhan

, Sri

Rah

asa

Pra

dhan

, R

abin

a P

radh

an

Gov

t. D

ug w

ell

Sto

ne li

ning

, B

rick

Par

apet

Lo

w ly

ing

2.35

0.

45

9.95

4.

30

21

6.4

1220

T11

2 K

AD

AP

AR

HA

(G

odas

ila)

Dec

, 20

12

Hou

se o

f Sri

Chu

nia

Beh

era

and

Sar

at

Moh

apat

ra, v

illag

e ro

ad s

ide

Gov

t. D

ug w

ell

Sto

ne li

ning

E

leva

ted

2.00

0.

50

7.95

4.

66

21

6.3

1410

T10

3 G

UR

UJA

NG

A

Dec

, 20

12

In fr

ont h

ouse

of S

ri B

inoy

kum

ar N

ath,

S

hri A

ntar

zam

i Pan

i, po

st o

ffice

nea

r th

e m

etal

lic R

oad

Gov

t. D

ug w

ell

RC

C r

ing

(van

da)

Low

lyin

g 1.

85

0.35

9.

35

5.44

21

6.

0 33

0

T10

2 B

RA

JAN

AT

HA

PU

R

Dec

, 20

12

In fr

ont h

ouse

of S

ri R

uma

Nay

ak, r

ight

si

de o

f the

hou

se/w

ell

Man

gala

Man

dir

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

95

0.60

11

.05

7.30

21

6.

4 34

0

Page 151: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

47

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

me

ter

of

wel

l (m

)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

incl

ud

ing

p

arap

et(m

)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T10

9 B

AS

ULE

I D

ec,

2012

Nea

r B

asul

ei

Bar

unes

war

Clu

b,

near

ele

ctric

T

rans

form

er

Gov

t. D

ug w

ell

Sto

ne li

ning

E

leva

ted

1.90

0.

65

7.60

3.

15

21

6.4

1380

T07

2 K

AN

DH

AB

AR

AN

I D

ec,

2012

In fr

ont o

f hou

se o

f B

ero

Sah

oo &

B

alab

hadr

a S

ahoo

, at

Chh

ak

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

90

0.47

12

.00

6.98

21

6.

0 65

0

T07

0 E

KA

DA

L D

ec,

2012

In fr

ont o

f hou

se o

f B

ikal

a B

isw

a l&

B

aish

idha

r P

radh

an

Gov

t. D

ug w

ell

Nan

da R

CC

rin

g P

lain

1.

25

0.65

15

.25

10.7

21

5.

6 66

0

T14

9

MA

NIK

AM

AR

A

(Kris

hnac

hand

ra-p

ur)

Dec

, 20

12

Bet

wee

n th

e vi

llage

M

anik

amar

a an

d K

rishn

a-ch

andr

apur

G

ovt.

Dug

wel

l N

anda

RC

C

linin

g P

lain

1.

45

0.55

9.

35

4.74

21

5.

9 59

0

T10

4 S

AT

AP

AT

IA

(Kan

kaliS

ai)

Dec

, 20

12

Bes

ide

the

villa

ge

conc

rete

roa

d, n

ear

Sat

sang

Mat

h G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

50

3.90

8.

30

1.97

21

6.

3 11

60

T11

0 K

ULE

I (P

uran

aSah

i)

Dec

, 20

12

Infr

ont h

ouse

of S

ri A

khay

a K

umar

Jan

a an

d B

icha

nda

Kr.

Ja

na, S

ri M

anm

ohan

M

ahaB

hoi

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

95

0.85

9.

95

3.58

22

6.

3 15

70

T07

1 T

ILE

IPO

SH

I D

ec,

2012

In fr

ont o

f hou

se o

f Sri

Cha

krad

har

Pra

dhan

&

besi

de r

oad

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

2.

15

0.45

9.

40

3.40

21

5.

8 39

0

T07

4 JO

RA

GA

RH

IA

Dec

, 20

12

In fr

ont o

f hou

se o

f Sri

Sar

oj P

radh

an&

Dili

p P

radh

an

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

1.

85

0.60

11

.45

5.96

21

5.

7 40

0

T06

9 JI

LIN

DA

D

ec,

2012

In

side

the

field

, Roa

d si

de (

moo

rum

+K

hoa)

G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

25

0.60

5.

65

1.60

21

6.

1 29

0

T00

2 K

AN

DH

AL

Dec

, N

ear

low

er p

rimar

y G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

40

0.70

9.

65

3.10

21

5.

9 57

0

Page 152: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

48

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

me

ter

of

wel

l (m

)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

incl

ud

ing

p

arap

et(m

)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

2012

sc

hool

(O

rissa

Boa

rd)

T00

4

BA

NA

MA

LIP

UR

(B

idya

dhar

pur

)

Dec

, 20

12

Nea

r K

ali M

andi

r,

infr

ont o

f hou

se o

f C

ham

pai D

ehur

i, ne

ar

NH

-23

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.45

0.

75

7.90

4.

60

21

5.8

610

T00

5 D

EU

LBE

RA

D

ec,

2012

In fr

ont o

f hou

se o

f Sri

Mag

ata

Nay

ak, i

n fr

ont

of v

illag

e cl

ub

(Deu

lber

a)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.60

0.

50

6.70

1.

10

21

5.6

560

T00

5A S

IMLI

PA

L D

ec,

2012

E

ntra

nce

of V

illag

e,

Man

gala

Man

dir

Gov

t D

ug W

ell

Sto

ne li

ning

P

lain

2.

00

0.80

10

.50

3.66

21

6.

2 17

10

T01

3 K

HA

LPA

L D

ec,

2012

Hou

ses

betw

een

Sri

Sag

ar N

ayak

and

D

usha

san

Nay

ak

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 1.

80

0.40

11

.45

4.10

21

6.

4 11

30

T01

3A P

AR

AM

HA

NS

PU

R

Dec

, 20

12

Bes

ide

koth

agha

r (T

haku

r S

ahi)

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 1.

95

0.35

10

.95

3.54

21

6.

1 70

0

T00

1 LA

NG

IJO

RH

A

Dec

, 20

12

Dis

man

tele

d ho

use

betw

een

Nita

Sah

oo &

P

adm

ini P

radh

an

(Sho

p)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.95

0.

70

11.9

5 3.

40

21

6.2

250

T00

3 A

MB

AM

UN

DA

D

ec,

2012

In

fron

t of h

ouse

of S

ri G

adha

dhar

Pra

dhan

G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

52

0.55

7.

65

3.29

21

6.

3 71

0

T06

8 H

EN

SA

MU

L (N

uaS

ahi)

Dec

, 20

12

Roa

d si

de, i

nsid

e th

e fie

ld

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 2.

25

0.65

6.

85

2.20

21

6.

0 10

80

T07

5 LA

KE

IPO

SH

I (C

N-1

4)

Dec

, 20

12

Infr

ont o

f Kot

ha g

har

and

besi

de r

oad

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

1.60

0.

40

13.3

5 8.

87

21

5.8

780

T15

0 R

AK

AS

(B

ahal

) D

ec,

2012

In b

etw

een

plat

form

co

nstr

ucte

d un

der

IPD

P-9

3, B

hara

tpur

pr

ojec

t, In

fron

t of

hous

e of

Sri

Bas

anta

Gov

t. D

ug w

ell

Bric

k lin

ing

+

ston

e lin

ing

Low

lyin

g 1.

95

0.45

11

.55

5.00

20

6.

1 39

0

Page 153: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

49

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

me

ter

of

wel

l (m

)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

incl

ud

ing

p

arap

et(m

)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

Bar

ik

T06

4 D

AN

AR

A

(CN

-25)

D

ec,

2012

In fr

ont o

f Biri

nchi

M

ahap

atra

, bes

ides

ro

ad

Gov

t. D

ug w

ell

Sto

ne li

ning

P

lain

2.

25

0.55

9.

95

6.90

21

5.

8 42

0

T06

5 JA

MB

UB

AH

ALI

D

ec,

2012

N

ear

prim

ary

scho

ol

(UP

sch

ool)

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.00

0.

45

9.50

3.

77

21

5.8

570

T06

6 D

ER

A

Dec

, 20

12

Just

bes

ide

Der

a F

oot

ball

grou

nd

Gov

t. D

ug w

ell

Nan

da R

CC

rin

g P

lain

2.

50

0.75

7.

30

5.48

21

5.

5 37

0

T01

2 D

AM

OL

Dec

, 20

12

Ang

an B

ari K

endr

a G

ovt.

Dug

wel

l B

rick

linin

g P

lain

2.

15

0.35

10

.50

5.00

21

6.

3 13

80

T01

2A T

ALC

HE

R

TO

WN

(A

raS

ai)

Dec

, 20

12

Nea

r R

adha

kish

ore

Man

dir,

vill

age

Ara

Sai

, W

ard

no. 7

G

ovt.

Dug

wel

l B

rick

linin

g Lo

w ly

ing

3.00

0.

80

11.0

0 4.

30

21

5.8

530

T01

4 K

HA

IRM

UN

DA

D

ec,

2012

In b

etw

een

hous

e of

S

ri A

ntar

jam

i Bis

wal

&

Kis

han

Juva

k S

angh

a G

ovt.

Dug

wel

l B

rick

linin

g P

lain

1.

85

0.40

8.

90

2.00

22

6.

1 10

30

T01

1 S

AR

AN

G

Dec

, 20

12

(Vill

age

Sar

ang

Roa

d si

de),

In b

etw

een

hous

e of

Sri

B.B

. M

ohan

ty, a

nd S

ri S

eso

bhui

ya

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.50

0.

35

9.10

3.

96

21

6.1

770

T05

7 K

AS

HIP

UR

(B

ebor

taM

unda

)

Dec

, 20

12

Sid

e of

Hou

se o

f Sri

Pur

na C

hand

ra

Pat

tana

ik

Gov

t. D

ug w

ell

Bric

k Li

ning

Lo

w ly

ing

2.00

0.

40

14.0

0 7.

83

21

6.5

10

Page 154: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

50

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

me

ter

of

wel

l (m

)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

incl

ud

ing

p

arap

et(m

)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T00

6 B

AG

HU

AB

AL

Dec

, 20

12

In fr

ont o

f hou

se o

f H

urda

nand

a S

ahoo

, vi

llage

roa

d si

de

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.00

0.

40

10.2

0 2.

47

21

6.0

300

T05

3 G

HA

NT

AP

AR

HA

D

ec,

2012

N

ear

road

sid

e an

d M

anga

la M

andi

r G

ovt.

Dug

wel

l B

rick

linin

g P

lain

3.

00

0.75

15

.25

6.36

21

5.

8 59

0

T05

5 T

EN

TU

LEI

Dec

, 20

12

In fr

ont o

f Hou

se o

f Sri

Cha

tura

Sah

oo,

Man

gala

Man

dir

Gov

t. D

ug w

ell

Nan

da (

RC

C)

and

Sto

ne

Pla

in

1.60

0.

45

7.75

2.

00

21

5.0

530

T05

2 K

AR

AR

HA

PA

LLI

Dec

, 20

12

In b

etw

een

hous

e of

T

haru

Bhu

tia a

nd

Hun

si B

hutia

G

ovt.

Dug

wel

l R

CC

P

lain

2.

25x2

.25

(sq)

0.

60

7.50

3.

60

21

6.2

1140

T05

4 B

AR

HA

SIN

GA

RH

A

Dec

, 20

12

In fr

ont o

f hou

se o

f Sri

Giri

sh C

hand

ra S

ahoo

, A

kram

Beh

era

Gov

t. D

ug w

ell

Bric

k lin

ing

Pla

in

2.10

0.

55

8.45

3.

50

21

6.4

1470

T05

8 B

AR

HA

JOR

AR

HA

D

ec,

2012

Wel

l bet

wee

n ho

use

of

Sri

Sud

haka

r B

eher

a an

d B

irbar

Beh

era

(Vill

age

road

sid

e)

Gov

t. D

ug w

ell

Sto

ne L

inin

g P

lain

2.

25x2

.25

(sq)

0.

55

10.8

0 2.

70

21

6.4

1620

T05

9 S

AN

AJO

RA

RH

A

(Kar

napu

r)

Dec

, 20

12

In fr

ont o

f hou

se o

f Sri

Bam

dev

Beh

era,

vi

llage

roa

d si

de

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

1.75

0.

55

9.95

3.

30

21

6.5

160

T04

6 K

UK

UR

HA

NG

A

(Kuk

udan

ga)

Dec

, 20

12

Nea

r po

nd, w

ell

situ

ated

rig

ht s

ide

of

the

field

G

ovt.

Dug

wel

l S

tone

/ rin

g (n

and)

lini

ng

Low

lyin

g 2.

35

0.30

6.

95

1.80

21

5.

7 63

0

T05

0

BA

LAR

AM

AP

RA

SA

D

(Mad

haG

har

Sai

)

Dec

, 20

12

In fr

ont o

f sid

e of

ho

use

of S

ri S

ures

h N

ayak

& T

amen

dra

Nay

ak (

Roa

d S

ide)

Gov

t. D

ug w

ell

Sto

ne L

inin

g Lo

w ly

ing

2.10

0.

75

7.70

2.

10

21

5.9

980

T06

2 T

EN

TU

LIE

D

ec,

2012

In fr

ont h

ouse

of S

ri G

okul

a N

anda

Nay

ak

(vill

age

road

sid

e)

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

2.60

0.

40

5.60

2.

51

20

5.6

770

Page 155: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

51

Wel

l N

o

Vill

age

Nam

e

Per

iod

o

f S

tud

y L

oca

tio

n

Pri

vate

or

Go

vt./

Ow

ner

n

ame

Typ

e o

f W

ell

Wel

l Lin

ing

Ph

ysic

al

top

og

ra-

ph

ical

se

ttin

g

Dia

me

ter

of

wel

l (m

)

Hei

gh

t o

f P

arap

et

fro

m

Gro

un

d

(m)

To

tal

dep

th

incl

ud

ing

p

arap

et(m

)

Dep

th t

o

wat

er

bel

ow

g

rou

nd

le

vel (

m)

Tem

per

atu

re

(Deg

C

)

pH

T

DS

T03

1 A

CH

ALA

PU

R

(Sal

agar

iya)

Dec

, 20

12

In fr

ont o

f hou

se o

f S

atya

badi

Sam

al,

Gya

ni S

amal

G

ovt.

Dug

wel

l S

tone

Lin

ing

Pla

in

2.10

0.

45

7.90

2.

10

21

6.1

1570

T00

8 JA

GA

NN

AT

HP

UR

D

ec,

2012

Fro

nt s

ide

hous

e of

Sri

Bire

ndra

Dha

ra (

UP

sc

hool

and

Ele

vate

d S

choo

l on

the

way

) ap

prox

150

m

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 3.

70

0.30

7.

65

3.07

20

5.

8 70

T00

7 B

AN

TO

L D

ec,

2012

V

illag

e ro

ad s

ide

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 2.

15

0.55

8.

00

5.65

21

5.

9 22

0

T00

9 S

AN

TH

AP

AR

HA

D

ec,

2012

Hou

se b

etw

een

Sri

Jala

dhar

Deh

ury

and

Sri

Dha

nesw

ar S

amal

(v

illag

e ro

ad s

ide)

Gov

t. D

ug w

ell

Bric

k lin

ing

Low

lyin

g 1.

85

0.80

9.

35

6.10

21

6.

1 67

0

T01

9 D

AS

AN

ALI

D

ec,

2012

In fr

ont o

f dou

l-m

anda

p ch

hak

and

in

fron

t of h

ouse

of

Son

iya

Sam

al

Gov

t. D

ug w

ell

Sto

ne li

ning

Lo

w ly

ing

2.20

0.

65

12.7

0 5.

65

21

5.9

220

T06

3 N

AT

IDI

Dec

, 20

12

UP

sch

ool c

ampu

s G

ovt

Dug

wel

l R

CC

H

igh

2.65

0.

70

8.50

7.

46

20

5.4

460

T06

7 T

HE

RA

MP

UR

D

ec,

2012

N

ear

UP

sch

ool,

road

si

de

Gov

t D

ug w

ell

Sto

ne li

ning

P

lain

2.

60

0.45

9.

00

5.50

21

5.

8 11

30

T01

0 JA

TIA

D

ec,

2012

In fr

ont s

ide

hous

e of

S

ri B

inod

Sah

oo,

Bha

gwat

Tha

kur

ghar

G

ovt.

Dug

wel

l S

tone

lini

ng

Pla

in

1.85

0.

55

9.20

4.

29

21

6.3

1210

Page 156: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 3, Page - 52

3.5 NOISE LEVEL MEASUREMENT

� Noise level assessment

The present ambient noise level assessment for the project covering both

core and buffer zones has been carried out during March to May, 2009. The

results of noise level measurement have been incorporated in this chapter.

� Location of noise level measurement stations

Four spots/stations were selected for measuring the noise levels. The

locations of noise level measurement stations are shown in Plate No.-XA

and details are given below :

Table - 3.13 : Details of Noise Level Measurement Stations

Sl. No.

Location Code

Name of Location Direction w.r.t Centre

of Core Zone

Aerial Distance (w.r.t the Mine

boundary)

1. CA1 Core Zone, Project office -- -- 2. CA2 Core Zone, Langi joda village -- -- 3. CA3 Core Zone, Ambanunda Village -- -- 4. BA1 Buffer Zone, Talaberha Village NE 0.5 5. BA2 Buffer Zone, Hensamul Village W 0.75 6. BA3 Buffer Zone, Talchar town SE 0.5 7. BA4 Buffer Zone, Kandhal village N 1.5 8. BA5 Buffer Zone, Ghantaparha village S 1.6

� Frequency of noise level measurement

Once in day-time (6:00 AM to 10:00 PM) and once in night-time (10:00 PM to

6:00 AM) in each month of March to May 2013.

� Methodology and instrument used for noise level measurement

Noise level was measured in A-weighted sound level i.e. dB(A) using a noise

level meter.

� Results

The noise level measurements from above stations are given in Table-3.14.

Page 157: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 3

, Pag

e -

53

Tab

le -

3.1

4 :

N

ois

e L

evel

Mea

sure

men

t D

ata

P

roje

ct :

Lin

gar

aj O

C E

xpjn

. Pro

ject

M

on

th :

Mar

ch t

o M

ay, 2

013

[d

B(A

) Le

q.]

Sl.

No

Dat

e P

roje

ct O

ffice

Cor

e Z

one

(N1)

La

ngi J

orha

Vill

age

core

zon

e (N

2)

Tal

aber

ha V

illag

e (

N3)

H

ensa

mul

Vill

age

(N4)

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

1.

Mar

ch

55.2

75

51

.7

70

55.4

75

53

.5

70

43.8

55

40

.2

45

44.6

55

42

.1

45

2.

Apr

il 57

.3

75

54.0

70

58

.7

75

56.5

70

44

.1

55

41.0

45

45

.7

55

40.8

45

3.

May

57

.8

75

51.0

70

54

.7

75

52.7

70

45

.9

55

40.6

45

48

.4

55

42.6

45

M

ax.

57.8

54.0

58.7

56.5

45.9

41.0

48.4

42.6

M

in.

55.2

51.0

54.7

52.7

43.8

40.2

44.6

40.8

[dB

(A)

Leq.

]

Sl.

No

Dat

e A

mha

nuda

Vill

age

Cor

e Z

one

(N

5)

Tal

cher

Tow

n (N

6)

Kan

dhal

Vill

age

(B

N5)

G

hant

apar

ha V

illag

e (B

N6)

D

ay

Tim

e P

erm

i-ss

ible

lim

it

Nig

ht

time

Per

mi-

ssib

le

limit

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

Day

T

ime

Per

mi-

ssib

le

limit

Nig

ht

time

Per

mi-

ssib

le

limit

1.

Mar

ch

45.1

75

40

.5

70

56.7

55

51

.3

45

41.2

55

36

.3

45

44.2

55

39

.6

45

2.

Apr

il 44

.5

75

38.7

70

58

.6

55

51.0

45

43

.7

55

37.5

45

43

.5

55

38.3

45

3.

M

ay

44.4

75

39

.2

70

58.0

55

51

.0

45

40.2

55

37

.4

45

42.2

55

36

.5

45

M

ax.

45.1

40.5

58.6

51.3

43.7

37.5

44.2

39.6

M

in.

44.4

38.7

56.7

51.0

40.2

36.3

42.2

36.5

Page 158: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 54

� Observation

Noise level measurements from various stations as mentioned above, are

within the limits of the prescribed standards for both day-time and night-time

except Talcher Town.

3.6 LAND USE/COVER PATTERN 3.6.1 LAND USE/COVER CLASSIFICATION

The land use/cover classification (Plate No.-V) for the buffer zone of the

project based on satellite data interpretation has been given in Table-3.15.

Sl. No. Type of Land

For 20 Mty (Peak) Area in ha %

1. Settlement : Urban 1066 2.40 Rural 1362 3.07 Industrial 602 1.36

2. Dense Vegetation 2821 6.36 3. Open Vegetation 1037 2.34 4. Scrubs 14753 33.25 5. Avenue Plantation 0 0.00 6. Crop Land 15244 34.35 7. Waste Upland 2904 6.54 8. Ash Land 370 0.83 9. Mining area :

Coal Quarry 748 1.69 Coal Stock 49 0.11 Barren OB Dump 512 1.15 Plantation on OB Dump 693 1.56

10. Surface water bodies 1455 3.28 11. Sand body 760 1.71

Total : 44376 100

N.B. : Previously buffer zone was considered from center of the core zone. Later it changed from the periphery of the mine. So there is change in land use in buffer zone.

MCL has been carrying out massive afforestation in the vacant leasehold

areas as well as the reclaimed land of various mines/projects. This is adding to the

green cover in the area.

Page 159: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 55

3.7 SOCIO-ECONOMIC SCENARIO The Socio-Economic study of project is done by M/s. Richardson & Cruddas

(1972) Ltd., Chennai, a Government of India Undertaking company.

Baseline data on Socio-economic study in 10 km radius of the proposed project were

collected by surveying Households, Check sampling, Block Offices and District

offices.

3.7.1 HOUSEHOLD SAMPLE SURVEY

The sample households have been selected by multistage sampling method.

There are total of 97 villages within the 10 km radius and out of that 13 villages were

surveyedfor the household survey. Four village (Ambamunda, Langijoda, Balugan,

Deulabera) is found in core zone area and other 9 villages are selected in buffer

zone. Wherever possible, the data pertaining to both the villages have been also

used for interpretation.

Other than household survey, village profile has been made with the help of

interview guide. Caste information, economic activities, information and health status

have been estimated based on the village profile questionnaire.

3.7.2 METHODOLOGY

While deciding the number of sample households a minimum of 5 houses and

maximum of 35 houses were interviewed. On the basis of Household sample survey,

inferences are made about occupation, health aspects, religion, community, income,

expenditure, family size and environmental problems of the study area.

3.7.3 PRESENT STATUS AND VALIDATION OF HOUSEHOLDS IN CORE ZONE

All the four villages are surveyed in core zone of project area. According to

census 2011 a total of 405 household are found in this village and out of that 88

households are taken consisting of 508 individuals with 266 male and 242 female.

The male/ female ratio is 909 females per thousand male in the primary data,

whereas this figure is 884 in the Census 2011.

a. Family size

The average family size is 5 in the primary data.

b. Age and Sex composition (0-6 Age Group)

Page 160: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 56

The percentage composition of 0-6 age group is 61, which is 12.0% of

the total population while it is 180, which is 10 % in the Census 2011.

c. Religion and Community

According to the primary data the SC population are 16.5% and ST

population 8.0%.

According to Census 2011 the percentage of SC population is 7.70%.

d. Literates

The literacy rate is 79.1% according to primary data and according to

Census 2011 this figure is 73.4%.

e. Occupational structure

According to primary source the total population is 508, out of which

39(7.7%) people are private worker and 39(7.7%) people are MCL and

Govt. worker.

According to Census data number of main worker is 25.3%.

f. Housing Pattern

Based on household sample survey the houses are mostly tiles roofed

with earth floor and brick & cash walls.

g. Income level (Yearly)

Income status of household in project area:

S.No. Income Slab %

1. less than 12000 -

2. 12000 - 24000 4.5

3. 24000 - 60000 12.5

4 60000 - 120000 38.7

5 More than 120000 44.3

Total 100.0

Source- Primary data

h. Cropping Pattern

Based on household sample survey, the crops are mainly rice and

vegetables. The source of irrigation is mainly rain water and well.

Page 161: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 57

i. Infrastructural facilities

(i) Drinking Water

Based on household sample survey and census data the drinking

water source in the village is mainly open well, hand pumps and

MCL tankers.

(ii) Educational Institutions

Based on the household sample survey and census data, most of

the villages in the study area, Middle school is available for

education.

(iii) Health care facilities

Based on household sample survey primary dispensary is not

available. The nearest town Talcher where health centers is

available for people in this study area.

(iv) Power supply

Based on the household sample survey and census data the

villages in the study area are 100% electrical power supply.

v) Transportation

Based on the household sample survey, most of the villages in the

study area are having bus facilities.

(vi) Communication

Based on the household sample survey, most of the villages in the

study area are not having post office and telegraph facilities. The

nearest post office available is at Talcher.

(vii) Alcohol and other Toxicants

Based on the household sample survey, the higher percentage of

male backward population is found to be addicted to alcohol and

other toxicants in most of the villages in the study area.

(viii) Fuel used for cooking

Based on the household sample survey the villages in the study

area, fuel used for cooking coal 28.4%, firewood 14.8% and LPG

56.4%.

Page 162: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 58

(ix) Type of Toilets

Based on the household sample survey the villages in the study

area, 34% houses are without toilet. They use the open land for

this purpose.

(x) Historical or heritage

Based on the household sample survey the area has no historical

or heritage identity.

3.7.4 PRESENT STATUS AND VALIDATION OF HOUSEHOLDS IN BUFFER ZONE

9 villages are surveyed in buffer zone out of 95 villages in 10 km radius of

project area. According to census 2011 a total of 2316 household are found in the

nine villages and out of that 162 households are taken consisting of 887 individuals

with 468 male and 419 female. The male/ female ratio is 895 females per thousand

male in the primary data, whereas this figure is 944 in the Census 2011.

a. Family size

The average family size is 5 to 6 according to the primary data.

Age and Sex composition (0-6 Age Group)

The percentage composition of 0-6 age group is 103, which is 11.6% of the total

population while it is 16644 which is 11.0 % in the Census 2011.

b. Religion and Community

According to the primary data the SC population is 23.4% and ST population 9.0%.

According to Census 2011 the percentage of SC population is 19.0.%. The

percentage of ST population is 7.7%.

d. Literates

The literacy rate is 79.1% according to primary data and according to Census 2011

this figure is 73.4 %.

e. Occupational structure

According to primary source the total population is 887, out of which 137(15.4%)

people are private worker and 24(2.7%) people are cultivators, 5(0.5%) are Agri.

Workers and 46(5.1%) MCL and Govt. worker.

According to Census data number of main worker is 25.3 %

Page 163: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 59

f. Housing Pattern

Based on household sample survey and census data the houses are mostly tiles

roofed with earth floor and brick & cash walls.

g. Income level (Yearly)

Income status of household in project area:

S.No. Income Slab %

1. less than 12000 0.6

2. 12000 - 24000 4.3

3. 24000 - 60000 19.1

4 60000 - 120000 47.5

5 More than 120000 28.4

Total 100.0

Source- Primary data

h. Cropping Pattern

Based on household sample survey and census data the crops are mainly rice and

vegetables. The source of irrigation is mainly rain water and well.

i. Infrastructural facilities

(i) Drinking Water

Based on household sample survey and census data the drinking water

source in the village is mainly open well, hand pumps and MCL tankers.

(ii) Educational Institutions

Based on the household sample survey and census data, most of the villages

in the study area, Middle school is available for education.

(iii) Health care facilities

Based on household sample survey and census data, primary dispensary is

available. The nearest town Talcher where health care facilities and hospitals

are available for people in this study area.

(iv) Power supply

Based on the household sample survey and census data the villages in the

study area are 100% electrical power supply.

Page 164: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 60

(v) Transportation

Based on the household sample survey and census data, most of the villages

in the study area are having bus facilities.

(vi) Communication

Based on the household sample survey, most of the villages in the study area

are not having post office and telegraph facilities. The nearest post office

available is at Talcher.

(vii) Alcohol and other Toxicants

Based on the household sample survey, the higher percentage of male

backward population is found to be addicted to alcohol and other toxicants in

most of the villages in the study area.

(viii) Fuel used for cooking

Based on the household sample survey the villages in the study area, fuel

used for cooking coal 19.7%, firewood 42.0% and LPG 38.3%.

(ix) Type of Toilets

Based on the household sample survey the villages in the study area, 73.4%

houses are without toilet. They use the open land for this purpose.

(x) Historical or heritage

Based on the household sample survey the area has no historical or heritage

identity.

Summary

Hindu is the major religion and about 25% of the total population belongs to SC & ST

population. The average family size is 5 in the primary data.The villages in the core

zone and buffer zone are having primary amenities and infrastructural facilities. The

literacy rate was found to be about 75%. The area has no historical or heritage

identity. While comparing the house hold survey results with census data 2011 the

observation are found to be validated.

Page 165: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 61

TABLE No. 1.2 Household sample survey villages

Project : Lingraj expn. OCP

Sl. No. Village Name No. of

Households Sample size

Core zone

1 Langijoda 116 31

2 Amabamunda 14 11

3 Belugan 275 35

4 Deulabera 35 11

Sub Total: 440 88

Buffer zone

1 Rakas 145 15

2 Naraharipur 297 21

3 Kandhal 248 21

4 Arakhapal 115 11

5 Ekadal 289 25

6 Talabeda 127 11

7 Sarang 24 5

8 Tentuloi 812 32

9 Gopinathpur 259 21

Sub Total: 2316 162

Total: 2756 250

Page 166: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 62

TABLE No. 1.3 Sample Survey Results - Household Size

Project: Lingaraj expn. OCP

Sl.No. Sample Village

Number of Persons in the Family

< 3 3 4 5 6 7 8 > 9

Core zone

1 Langijoda 0 0 3 8 7 8 5 0

2 Amabamunda 0 1 3 4 2 1 0 0

3 Belugan 0 4 3 8 6 9 4 1

4 Deulabera 1 1 2 2 3 1 1 0

Sub Total: 1 6 11 22 18 19 10 1

Buffer zone

1 Rakas 0 2 3 2 4 3 1 0

2 Naraharipur 0 1 2 4 5 7 2 0

3 Kandhal 1 2 3 4 6 4 1 0

4 Arakhapal 0 1 3 2 3 2 0 0

5 Ekadal 0 2 3 8 4 6 2 0

6 Talabeda 0 2 4 3 1 1 0 0

7 Sarang 0 0 3 1 1 0 0 0

8 Tentuloi 0 1 4 7 8 7 5 0

9 Gopinathpur 1 1 5 6 5 3 0 0

SubTotal: 2 12 30 37 37 33 11 0

Total 3 18 41 59 55 52 21 1

Page 167: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 63

TABLE No. 1.4 Sample Survey Results – Age, Structure and Sex

Project: Lingaraj expn. OCP

SN Sample Village

Age & Sex

0-6 7-15 16-25 26-50 51-80 >80

M F M F M F M F M F M F

Core Zone

1 Langijoda 12 10 15 13 30 29 28 26 14 12 1 0

2 Amabamunda 5 3 7 7 8 3 9 8 2 2 0 0

3 Belugan 12 10 15 16 30 31 28 26 19 20 1 0

4 Deulabera 5 4 7 6 7 7 8 6 3 3 0 0

SubTotal: 34 27 44 42 75 70 73 66 38 37 2 0

Buffer Zone

1 Rakas 8 7 6 5 8 7 10 9 11 9 1 0

2 Naraharipur 7 7 8 8 21 19 18 17 10 10 1 0

3 Kandhal 6 5 10 10 12 11 21 20 9 7 1 0

4 Arakhapal 7 5 5 6 7 5 7 6 5 4 0 0

5 Ekadal 8 7 12 11 23 21 22 20 9 7 0 0

6 Talabeda 4 4 4 5 7 5 5 6 6 4 0 0

7 Sarang 2 2 3 2 2 3 4 3 1 1 0 0

8 Tentuloi 7 6 14 14 35 34 28 26 14 11 2 0

9. Gopinathpur 6 5 9 7 18 17 16 15 8 6 0 0

SubTotal 55 48 71 68 133 122 131 122 73 59 5 0

Total 89 75 115 110 208 192 204 185 111 96 7 0

Page 168: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 64

TABLE No. 1.5

Sample Survey Results –Community Project: Lingaraj expn. OCP

Sl.No. Sample Village

Population

Total Population

Total ST

Male ST

Female ST

Total SC

Male SC

Female SC

Core Zone

1. Langijoda 190 0 0 0 45 22 23

2. Amabamunda 54 0 0 0 10 6 4

3. Belugan 208 41 21 20 20 11 9

4. Deulabera 56 0 0 0 9 5 4

SubTotal: 508 41 21 20 84 44 40

Buffer Zone

1. Rakas 81 0 0 0 35 18 17

2. Naraharipur 126 5 3 2 40 21 19

3. Kandhal 112 3 2 1 9 4 5

4. Arakhapal 57 0 0 0 16 8 8

5. Ekadal 140 12 5 7 44 23 21

6. Talabeda 50 5 2 3 13 6 7

7. Sarang 23 0 0 0 4 2 2

8. Tentuloi 191 45 22 23 38 20 18

9. Gopinathpur 107 10 4 6 9 4 5

SubTotal: 887 80 38 42 208 106 102

Total 1395 121 59 62 292 150 142

Page 169: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 65

TABLE No. 1.6

Sample Survey Results – Educational Level of Households Project: Lingaraj expn. OCP

Sl. No.

Sample Village

Education Level

Primary Higher

Secondary Graduate

(UG)

Post Graduate

(PG)

Rese-arch

M F M F M F M F M F

I. Core zone

1 Langijoda 50 45 20 15 7 2 2 0 0 0

2 Amabamunda 25 23 5 4 2 0 0 0 0 0

3 Belugan 55 45 27 23 5 3 3 0 0 0

4 Deulabera 18 17 6 4 1 0 0 0 0 0

Sub Total 148 125 58 46 15 5 5 0 0 0

II. Buffer zone

1 Rakas 25 15 13 7 2 1 1 0 0 0

2 Naraharipur 29 15 15 10 3 2 1 0 0 0

3 Kandhal 30 21 20 19 7 2 1 0 0 0

4 Arakhapal 15 11 8 7 1 1 0 0 0 0

5 Ekadal 35 30 15 11 5 2 2 0 0 0

6 Talabeda 15 13 7 5 1 0 1 0 0 0

7 Sarang 7 5 4 2 0 0 0 0 0 0

8 Tentuloi 59 55 38 29 7 5 3 0 0 0

9 Gopinathpur 20 20 10 8 4 1 1 0 0 0

SubTotal: 233 185 130 98 30 14 10 0 0 0

Total 381 310 188 144 45 19 15 0 0 0

Page 170: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 66

TABLE No. 1.7

Sample Survey Results – Occupation

Project: Lingaraj expn. OCP

S. No.

Name of Village

MCL Govt. Private Cultivation Agri.

M F M F M F M F M F

I. Core zone

1 Langijoda 9 1 2 0 5 2 0 0 0 0

2 Amabamunda 5 1 0 0 4 4 0 0 0 0

3 Belugan 12 2 2 1 10 4 0 0 0 0

4 Deulabera 4 0 0 0 8 2 0 0 0 0

Sub Total 30 4 4 1 27 12 0 0 0 0

II. Buffer zone

1 Rakas 2 0 3 0 10 3 0 1 1 0

2 Naraharipur 3 0 2 1 15 5 1 1 0 0

3 Kandhal 4 0 3 1 14 3 2 1 0 0

4 Arakhapal 2 0 1 0 9 2 2 1 0 0

5 Ekadal 3 0 2 1 16 3 2 1 1 1

6 Talabeda 2 1 1 0 8 1 0 0 0 0

7 Sarang 0 0 0 0 5 1 6 1 0 0

8 Tentuloi 3 0 4 1 19 5 2 1 1 1

9 Gopinathpur 2 0 2 2 15 3 1 1 0 0

Sub Total 21 1 18 6 111 26 16 8 3 2

Total 51 5 22 7 138 38 16 8 3 2

Page 171: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 67

TABLE No. 1.8 Sample Survey Results – Type of Wall, Roof and Floor

Project: Lingaraj expn. OCP

Sl.

No. Sample Village

Wall Roof Floor

Brick Earth Tiles Terrace Earth Cement

I. Core zone

1 Langijoda 26 5 21 10 5 26

2 Amabamunda 10 1 6 5 1 10

3 Belugan 30 5 23 12 5 30

4 Deulabera 8 3 8 3 3 8

Sub Total 74 14 58 30 14 74

II. Buffer zone

1 Rakas 13 2 11 4 2 13

2 Naraharipur 15 6 16 5 8 13

3 Kandhal 19 2 12 9 2 19

4 Arakhapal 9 2 7 4 5 6

5 Ekadal 22 3 17 8 7 18

6 Talabeda 10 1 6 5 3 8

7 Sarang 4 1 4 1 2 3

8 Tentuloi 27 5 24 8 14 18

9 Gopinathpur 18 3 14 7 7 14

SubTotal: 137 25 111 51 50 112

Total 211 39 169 81 64 166

Page 172: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 68

TABLE No. 1.9 Sample Survey Results – Monthly Family Income

Project: Lingaraj expn. OCP

Sl. No.

Sample Village Approx. Monthly Income (in Rupees)

< 1000 1000 –

2000 2000 -5000

5000 -10000

> 10000

I. Core zone

1 Langijoda 0 0 2 17 12

2 Amabamunda 0 0 2 3 6

3 Belugan 0 4 5 9 17

4 Deulabera 0 0 2 5 4

Sub Total 0 4 11 34 39

II. Buffer zone

1 Rakas 0 0 1 9 5

2 Naraharipur 0 0 5 10 6

3 Kandhal 0 0 3 10 8

4 Arakhapal 0 0 3 5 3

5 Ekadal 1 4 5 9 6

6 Talabeda 0 0 2 5 4

7 Sarang 0 0 1 4 0

8 Tentuloi 0 2 7 15 8

9 Gopinathpur 0 1 4 10 6

SubTotal: 1 7 31 77 46

Total 1 11 42 111 85

Page 173: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 69

TABLE No. 1.10

Sample Survey Results – Source of water supply for Drinking, Bathing and water scarcity

Project: Lingaraj expn. OCP

Sl. No. Sample Village Hand Pump

Open well

Nalla / River

Water Scarcity MCL

Major Season

al No Tanker

I. Core zone

1 Langijoda Yes No No Summer Yes

2 Amabamunda Yes No No Summer Yes

3 Belugan Yes No No Summer Yes

4 Deulabera Yes No No Summer Yes

II. Buffer zone

1 Rakas Yes Yes No Summer Yes

2 Naraharipur Yes No No Summer Yes

3 Kandhal Yes Yes No Summer Yes

4 Arakhapal Yes Yes No Summer Yes

5 Ekadal Yes Yes No Summer No

6 Talabeda Yes Yes No Summer Yes

7 Sarang Yes Yes Yes Summer No

8 Tentuloi Yes Yes No Summer No

9 Gopinathpur Yes Yes Yes Summer No

Page 174: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 70

TABLE No. 1.11

Sample Survey Results – Civil Amenities

Project: Lingaraj expn. OCP

Sl. No.

Sample Village

School Shopping Town Mines / Factory (near by area)

Type Distance (Km) Place Distance

(Km) Place Distance (Km)

I. Core zone

1 Langijoda Pry. School 0 Talchar 5 Km Coal Mines 1 - 2

2 Amabamunda Pry. School 0 Talchar 12 Km Coal Mines 1 - 2

3 Belugan Pry. School 0 Talchar 5 Km Coal Mines 1 - 2

4 Deulabera Pry. School 0 Talchar 5 Km Coal Mines 1 - 2

II. Buffer zone

1 Rakas Pry. School 0 Talchar 18 Km Coal Mines 1 - 5

2 Naraharipur Pry. School 0 Talchar 12 Km Coal Mines 0 - 2

3 Kandhal Pry .School 0 Talchar 8 Km Coal Mines 0 - 3

4 Arakhapal Pry School 0 Talchar 12 Km Coal Mines 0 - 5

5 Ekadal Pry. School 0 Talchar 15 Km Coal Mines 0 - 5

6 Talabeda Pry. School 0 Talchar 5 Km Coal Mines 0 - 5

7 Sarang Pry .School 0 Talchar 18 Km NTPC 0 - 8

8 Tentuloi Pry .School 0 Talchar 8 Km NTPC 0 - 8

9 Gopinathpur Pry .School 0 Talchar 8 Km NTPC 5 -10

Page 175: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 71

TABLE No. 1.12

Sample Survey Results – Civil Amenities

Project: Lingaraj expn. OCP

Sl. No.

Sample Village Police station Hospital

Place Distance (Km) Place Distance

(Km) I. Core zone

1 Langijoda Talchar 5 Km Talchar 5 Km

2 Amabamunda Talchar 12 Km Talchar 12 Km

3 Belugan Talchar 5 Km Talchar 5 Km

4 Deulabera Talchar 5 Km Talchar 5 Km

II. Buffer zone

1 Rakas Talchar 18 Km Talchar 18 Km

2 Naraharipur Talchar 12 Km Talchar 12 Km

3 Kandhal Talchar 8 Km Talchar 8 Km

4 Arakhapal Talchar 12 Km Talchar 12 Km

5 Ekadal Talchar 15 Km Talchar 15 Km

6 Talabeda Talchar 5 Km Talchar 5 Km

7 Sarang Talchar 18 Km Talchar 18 Km

8 Tentuloi Talchar 8 Km Talchar 8 Km

9 Gopinathpur Talchar 8 Km Talchar 8 Km

Page 176: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 72

TABLE No. 1.13 Sample Survey Results –

Environmental Perception of Community Problems Project: Lingaraj expn. OCP

Sl. No.

Sample Village Caste Problem

Problem of Theft/ Robbery

Feudalism/ Bonded Labour

Yes No Yes No Yes No

I. Core zone

1 Langijoda 2 29 4 27 0 31

2 Amabamunda 0 11 2 9 0 11

3 Belugan 2 33 5 30 0 35

4 Deulabera 1 10 2 9 0 11

Sub Total 5 83 13 75 0 88

II. Buffer zone

1 Rakas 2 13 3 12 1 14

2 Naraharipur 2 19 4 17 0 21

3 Kandhal 3 18 5 16 2 19

4 Arakhapal 1 10 2 9 0 11

5 Ekadal 4 21 5 20 0 25

6 Talabeda 2 9 3 8 0 11

7 Sarang 0 5 1 4 0 5

8 Tentuloi 3 29 6 26 2 30

9 Gopinathpur 3 18 4 17 0 21

SubTotal: 20 142 33 129 5 157

Total 25 225 46 204 5 245

Page 177: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 73

TABLE No. 1.14 Sample Survey Results – Road and Health Problems

Project: Lingaraj expn. OCP

Sl. No.

Sample Village Road Problem Health Problem

Yes No Yes No

I. Core zone

1 Langijoda 6 25 8 23

2 Amabamunda 3 8 6 5

3 Belugan 10 25 14 21

4 Deulabera 3 8 5 6

Sub Total 22 66 33 55

II. Buffer zone

1 Rakas 9 6 6 9

2 Naraharipur 8 13 5 16

3 Kandhal 3 18 4 17

4 Arakhapal 4 7 5 6

5 Ekadal 8 17 10 15

6 Talabeda 1 10 3 8

7 Sarang 4 1 2 3

8 Tentuloi 12 20 11 21

9 Gopinathpur 5 16 4 17

SubTotal: 54 108 50 112

Total 76 174 83 167

Page 178: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 74

TABLE No. 1.15

Sample Survey Results – Water and Pollution Problems

Project: Lingaraj expn. OCP

Sl. No.

Sample Village Water Problem Pollution Problem

Yes No Yes No

I. Core zone

1 Langijoda 20 11 28 3

2 Amabamunda 7 4 9 2

3 Belugan 20 15 30 5

4 Deulabera 6 5 8 3

Sub Total 53 35 75 13

II. Buffer zone

1 Rakas 10 5 11 4

2 Naraharipur 16 5 21 0

3 Kandhal 14 7 10 11

4 Arakhapal 7 4 6 5

5 Ekadal 19 6 9 16

6 Talabeda 9 2 8 3

7 Sarang 4 1 2 3

8 Tentuloi 25 7 15 17

9 Gopinathpur 17 4 3 18

SubTotal: 121 41 85 77

Total 174 76 160 90

Page 179: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 75

TABLE No. 1.16

Sample Survey Results – Type of Toilet

Project: Lingaraj expn. OCP

Sl. No.

Sample Village Toilet No Toilet (outside

open yard)

I. Core zone

1 Langijoda 20 11

2 Amabamunda 8 3

3 Belugan 22 13

4 Deulabera 8 3

Sub Total 58 30

II. Buffer zone

1 Rakas 9 6

2 Naraharipur 4 17

3 Kandhal 15 6

4 Arakhapal 4 7

5 Ekadal 11 17

6 Talabeda 8 3

7 Sarang 1 4

8 Tentuloi 13 19

9 Gopinathpur 8 13

SubTotal: 73 89

Total 131 119

Page 180: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 76

TABLE No. 1.17 Sample Survey Results – Fuel used for cooking

Project: Lingaraj expn. OCP

Sl. No.

Sample Village L.P.G Firewood Coal

I. Core zone

1 Langijoda 15 5 11

2 Amabamunda 7 2 2

3 Belugan 20 5 10

4 Deulabera 8 1 2

Sub Total 50 13 25

II. Buffer zone

1 Rakas 5 4 6

2 Naraharipur 8 5 8

3 Kandhal 11 5 5

4 Arakhapal 6 4 1

5 Ekadal 10 10 5

6 Talabeda 5 4 2

7 Sarang 1 4 0

8 Tentuloi 11 17 4

9 Gopinathpur 5 15 1

SubTotal: 62 68 32

Total 112 81 57

Page 181: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 77

TABLE No. 1.18 Sample Survey Results – Power supply

Project: Lingaraj expn. OCP

Sl. No.

Sample Village Yes No

I. Core zone

1 Langijoda Yes

2 Amabamunda Yes

3 Belugan Yes

4 Deulabera Yes

II. Buffer zone

1 Rakas Yes

2 Naraharipur Yes

3 Kandhal Yes

4 Arakhapal Yes

5 Ekadal Yes

6 Talabeda Yes

7 Sarang Yes

8 Tentuloi Yes

9 Gopinathpur Yes

Page 182: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 78

Table 1.19 Summary of sample survey at Core Zone

Sl.No. Description Total

1. EDUCATIONAL FACILITIES

Primary School 3

Middle School 1

Secondary School -

Others -

2. MEDICAL FACILITIES

Primary Dispensary -

Primary Health Centre -

Hospital -

3. POWER SUPPLY 3

Elect. for Irrigation -

Domestic Use 2

Industrial and Commercial -

4. DRINKING WATER

Well 3

Tank 3

Tube Well 3

Hand Pump

River Nallah -

Canal -

5. COMMUNICATION

Pucca Road -

Kucha Road -

Railway -

Foot path -

Bus Stop -

6. POST AND TELEGRAPH -

Post Office -

Telegraph Office -

Page 183: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 79

Table 1.20 Summary of sample survey at Buffer zone

Sl.No. Description Total

1. EDUCATIONAL FACILITIES

Primary School 8

Middle School 6

Secondary School 1

Others 0

2. MEDICAL FACILITIES

Primary Dispensary 1

Primary Health Centre 1

Hospital

3. POWER SUPPLY 9

Elect. for Irrigation -

Domestic Use 4

Industrial and Commercial -

4. DRINKING WATER

Well 9

Tank 7

Tube Well -

Hand Pump 9

River Nallah -

Canal -

5. COMMUNICATION -

Pucca Road -

Kucha Road -

Railway -

Foot path -

Bus Stop 2

6. POST AND TELEGRAPH -

Post Office 3

Telegraph Office -

Page 184: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 80

Table 1.21 Summary of sample survey at Core Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 508

Male 266 (52.4)

Female 242 (47.6)

2 Schedule Caste

Male 44 (8.7)

Female 40 (7.8)

Total Schedule Caste 84 (16.5)

3 Schedule Tribe

Male 21 (4.1)

Female 20 (3.9 )

Total Schedule Tribe 41 (8.0)

4 Others 383 (75.4)

5 Total Literates 402 (79.1)

Male 226 (84.9)

Female 176 (72.7)

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 508

2 Total Worker Population 78 (15.3)

3 Male Working Population 61 (12.0)

4 Female Working Population 17 (3.3)

5 Private Workers 39 (7.7)

6 MCL & Government Workers 39 (7.7)

7 Non Workers 430 (84.6)

8 Cultivators 0

9 Agricultural Labourers 0

Page 185: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 81

Table 1.22 Summary of sample survey at Buffer Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 887

Male 468 (52.8 )

Female 419 (47.2)

2 Schedule Caste

Male 106 (12)

Female 102 (11.5)

Total Schedule Caste 208 (23.5)

3 Schedule Tribe

Male 38 (4.3)

Female 42 (4.7)

Total Schedule Tribe 80 (9.0)

4 Others 599 (67.5)

5 Total Literates 702 (79.1)

Male 405 (86.5)

Female 297 (70.8)

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 887

2 Total Worker Population 212 (23.9)

3 Male Working Population 169 (19.0)

4 Female Working Population 43 (4.9)

5 Private Workers 137 (15.4)

6 MCL & Government Workers 46 (5.2)

7 Non Workers 675 (677.1)

8 Cultivators 24 (2.7)

9 Agricultural Labourers 5 (0.6)

Page 186: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 82

Table 1.23 Summary of census 2011 at Buffer Zone

Sl.No. Description Total

1. EDUCATIONAL FACILITIES

Primary School 71

Middle School 25

Secondary School 12

Others 1

2. MEDICAL FACILITIES

Primary Dispensary 11

Primary Health Centre 2

Hospital -

3. POWER SUPPLY 68

Elect. for Irrigation -

Domestic Use -

Industrial and Commercial -

4. DRINKING WATER

Well 69

Tank 60

Tube Well -

Hand Pump 67

River Nallah 12

Canal 7

5. COMMUNICATION

Pucca Road -

Kucha Road -

Railway 1

Foot path -

Bus Stop 28

6. POST AND TELEGRAPH

Post Office 15

Telegraph Office 1

Page 187: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 83

Table 1.24 Summary of census 2011 at Core Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 1805

Male 958 (53.0 )

Female 847(47.0)

2 Schedule Caste

Male 116 (6.4)

Female 126 (6.9)

Total Schedule Caste 242 (13.4)

3 Schedule Tribe

Male 108 (5.9 )

Female 100 (5.6)

Total Schedule Tribe 208 (11.5)

4 Others 1355 (75)

5 Total Literates 1295 (71.7)

Male 755 (78.8)

Female 540 (63.7 )

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 1805

2 Total Worker Population 540 (30)

3 Male Working Population 486 (26.9)

4 Female Working Population 54 (3.0)

5 Main Workers 474 (26.3)

6 Marginal Workers 66 (3.7)

7 Non Workers 1265 (70.0 )

8 Cultivators 13 (0.7)

9 Agricultural Labourers 58 (3.2)

Page 188: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 84

Table 1.25 Summary of census 2011 at Buffer Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 151107

Male 79,675 (52.7)

Female 71,432 (47.3)

2 Schedule Caste

Male 14736 (9.7)

Female 14014 (9.3)

Total Schedule Caste 28750 (19.0)

3 Schedule Tribe

Male 5949 (3.9)

Female 5761 (3.8)

Total Schedule Tribe 11710 (7.7)

4 Others 110647 (73.2)

5 Total Literates 111051 (73.4)

Male 62850 (78.9)

Female 48201 (67.5)

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 151107

2 Total Worker Population 49501 (32.8)

3 Male Working Population 42210 (28.0)

4 Female Working Population 7291 (4.8)

5 Main Workers 38272 (25.3)

6 Marginal Workers 11229 (7.4)

7 Non Workers 101606 (67.2)

8 Cultivators 2159 (1.4)

9 Agricultural Labourers 1140 (0.75)

Page 189: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 85

3.8 SOIL QUALITY STUDY

Soil quality study for Lingaraj OC Expn. Project (16.0 Mty, 20.0 Mty peak)

(core and buffer zones) was carried out by Richardson & Cruddas (1972) Ltd. on

behalf of MCL in the month of May 2013. Report on primary baeline data on soil

quality is annexed (Annexure-IX).

3.9 INFORMATION ON BIO-DIVERSITY

3.9.1 METHODOLOGY FOR THE STUDY OF FLORA AND FAUNA

Page 190: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 86

Flora and fauna studies were carried out during May 2013 to assess the list of

terrestrial plant and animal species that occurs in the core area and the buffer area from

proposed project site. Separate lists of all plant species of the core and buffer areas

were prepared based on the plant species encountered during the study period. All

observed Flora and Fauna species were counter checked with the list of Odisha state

critically endangered species and endangered species of flora and fauna. All observed

avi-fauna were counter checked with the IUCN Red list updated 2011 which contains

list of 147 threatened birds which include 14 critical, 15 endangered, 54 vulnerable and

64 near threatened species. Aquatic environment study was carried out by observing

any macrophytes grow in and around or floating or emergent condition on the lentic

(stagnant) or lotic (running) water bodies of the buffer zone.

3.9.2 STUDY OF FLORA AND FAUNA IN CORE ZONE

Table 1 : List of herb species observed in the scrubland core zone

S.No Botanical Name Local name

1 Tridax procumbens Bisalykaranai

2 Mimosa pedica Lajakuli

3 Evalvulous alsinoides Bichhamalia

4 Cyanodon dactylon Duba

5 Sida cardifolia Biskhabari

6 Sida rhomboids Bajramuli

7 Euphorbia hirta Chitakutei

8 Cleome viscose Banasorisa

9 Phyllanthus niruri Badiamala

Table 2: List of shrub species observed in the scrubland core zone S.No Botanical Name Local name

1 Zizyphus jujuba Barakoli

2 Calotropis gigantea Arakh

3 Zizyphus xylopyra Kantei

4 Randia uliginosa

5 Ipomea crassicaunis Amari

6 Jatropha gossypifolia Rabjada

7 Gardenia turgid Khakad

8 Strychnos nuxvomica Kuchila

Page 191: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 87

S.No Botanical Name Local name

9 Vitex nigundo Nirgundi

10 Lantana camara Nagairi

11 Diospirous melanoxylon Kendu

Table 3 : List of shrub species observed in the scrubland core zone

S.No Botanical Name English name Local name

1 Mangifera indica Mango Amba

2 Madhuca indica Butter tree Mahula

3 Phoenix regia Date palm Khajuri

4 Borassus flabellifer Palm Tala

5 Azadiracta indica Neem Nimba

Table: 4. List of Agricultural plant species found in the core zone

S.No Botanical Name Local name

1 Allium cepa Piaja

2 Allium sativum Rasuna

3 Arachis hypogaea Badam

4 Brassica campestris Sorisha

5 Dolichos biflorus Kolatha

6 Vigna mungo Biri

7 Vigna radiata Mung

Table: 5. List of vegetable and commercial crops cultivated in the core zone

No. Botanical Name Local Name

1 Abelmoschus esculentus Bhendi 2 Brassica botrytis Phula kobi 3 Brassica oleracia capitata Bandha kobi 4 Capsicum annum Miricha

5 Carica papaya Amruta bhanda 6 Cucurbita maxima Kakharu 7 Cucurbita sativa Kakudi

Page 192: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 88

No. Botanical Name Local Name

8 Dolichos lablab Simba 9 Lacluca sativa Letuce saga

10 Lycopersicum esculentum Tomato

11 Momordica charantia Kalara 12 Moringa oleifera Sajana 13 Musa paradisiaca Kadali 14 Solanum melangena Baigana 15 Trigonella foenum graecum Methhi

Table: 6. Trees observed in the core zone

S.No Botanical Name English Name Local Name

1 Artocarpus integrifolia Jackfruit Panasa

2 Borassus flabellifer Palm Tala

3 Caesalpinia pulcherrima Dwarf gold mohur Radhachuda

4 Cassia tora Foetid Sassia Chakunda

5 Dendrocalamus strictus Bamboo Baunsa

6 Ficus bengalensis Papal Aswastha

7 Ficus hispida Hairy fig Dimri

8 Madhuca longifolia Butter tree Mahula

9 Mangifera indica Mango Amba

10 Melia azadirachta Big neem Mahanimba

11 Michelia champaca Champak Champa

12 Moringa oleifera Drumstick Sajana

13 Phoenix dactylifera Date palm Khajuri

14 Polyalthia longifolia Mast tree Debadaru

15 Psidium guava Guava Pijuli

16 Tamarindus india Tamarind Tentuli

17 Zizyphus jujuba Indian plum Barakoli

Page 193: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 89

Table: 7. List of herbaceous species recorded in the forests of core zone SI.No. Species Common name Local name

1 Andrographis paniculata Green chirayta Bhuin nimba 2 Aristida setacea Grass Khadika ghass 3 Atylosia scarabaeoides Banakolathi 4 Ageratum conyzoides Goat weed Pokasungha

5 Convolvulus alsinoides Dwarf Morning-glory Ghasha 6 Cyperus rotundus Grass Mutha 7 Evolvulus nummularius Round leaf Bichhamalia 8 Eragrostis viscose Grass Jhadughasha 10 Hemidesmus indicus Indian sarsaparilla Sugandhi 11 Panicum humile Grass Ghasha

12 Sida cordifolia Flannel weed Bisiripi 13 Sida rhomboidea Angled Sida Bajramuli

Table: 8. List of shrubs recorded in the forests of core zone SI.No. Species English name Local name

1 Buchanania lanzan Almondette Chara

2 Diospyros melanoxyfon Coromandel ebony Kendu

3 Phoenix acaulis Date palm Khajuri

4 Woodfordia fruticosa Red Bell Bush Dhatki

5 Zizyphus numularis Wild jujube Kantei

6 Combretum decandrum Bejuco clavo Atundi

7 Vitex negundo Chaste Tree Nirgundi

8 Lantana camara Lantanas Nagaairi

Table: 9. Tree species recorded in the forests of core zone

S.No Botanical Name English Name Local Name

1 Borassus flabellifer Palmyra palm Tala 2 Buchanania lanzan Chironji Tree Chara 3 Butea monosperma Flame of forest Palasha 4 Cleistanthus collinus Karada

5 Diospyros melanoxylon Coromandel ebony Kendu 6 Gardenia turgida Gardenia Kakhada 7 Holarrhena antidysenterica Sain Kurei 8 Phoenix regia Hill date palm Khajuri 9 Semecarpus anacardium Dhobi nut Bhalia 10 Shorea robusta Sal Sal

Page 194: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 90

S.No Botanical Name English Name Local Name

11 Syzigium cumini Jambul Jamun 12 Terminalia bellerica Beleric myrobalan Bahada 13 Terminalia tomentosa Indian Laurel Asana 14 Woodfordia fruticosa Red Bell Bush Dhatki Table: 10. List of herbaceous species recorded from scrublands in the core

zone SI.No. Species Common name Local name

1 Andrographis paniculata Green chirayta Bhuin nimba 2 Aristida setacea Grass Khadika ghass 3 Atylosia scaraboicles Banakolathi 4 Ageratum conyzoides Goat weed Pokasungha 5 Convulvulus alsinoides Dwarf Morning-glory Ghasha 6 Cyperus rotundus Grass Mutha 7 Croton sparsiflorus Indra marisha 8 Evolvulus nummularis Round leaf Bindweed Bichhamalia 9 Eragrostis viscose Grass Jhadughasha 10 Hemidesmus indicus Indian sarsaparilla Sugandhi 11 Panicum humile Grass Ghasha 12 Sida cordifolia Flannel weed Bisiripi 13 Sida rhomboidea Angled Sida Bajramuli 14 Tephrosia purpurea Fish Poison Bana nila 15 Chrysopogon aciculatus Golden beard grass Guguchia

Table: 11. List of shrub species recorded in the scrublands of core zone SI.No. Species Common name Local name

1 Buchanania lanzan Almondette Chara

2 Diospyros melanoxyion Coromandel ebony Kendu

3 Gardenia turgida Gardenia Kakhada

4 Holorrhena antidysenterica Bitter Oleander Kurei

5 Phoenix acauiis Hill date palm Khajuri

6 Woodfordia fruticosa Red Bell Bush Dhatki

7 Zizyphus numularis Wild jujube Kantei

Page 195: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 91

Table: 12. List of aquatic flora recorded from the core region

SI No. Species Common name Local name 1. Ipomoea crassicaulis Amari 2 Ipomoea aquatica Chinese spinach Kalama 3. Nymphea alba White Lotus Dhala kain 4. Nymphea stellata Dwarf Lily Nila kain 5. Nymphea nouchali Blue water lily Lai kain 6 Hydrilla verticillata Hydrilla Chingudi dala

During the period of survey in the core zone, no endangered or endemic

species could be noticed. The natural vegetation sites were scrublands and forest

patches.

Aquatic and Terrestrial Fauna in the Core Zone The fishes, amphibians and water snakes are the major aquatic fauna. The

terrestrial fauna includes common invertebrates and vertebrates. No wild animals like

Bear, Boar, Tiger, Leopard and Elephants are found in the core zone.

Table: 13. List of aquatic and terrestrial invertebrate fauna recorded from the

core region

Annelids

1 Dichogaster bolaui Earthworm Terrestrial 2 Drawida calebii -do- Terrestrial 3 Drawida willsi -do- Terrestrial 4 Hiridinaria granulose Leech Aquatic 5 Lampito mauritti Earthworm Terrestrial 6 Lennogaster pusillus -do- Terrestrial 7 Ocnerodriltus occidentalis -do- Terrestrial 8 Octochaetona surensis -do- Terrestrial 9 Perionyx miliardi -do- Terrestrial

Arthropods

1 Acalymma sp. Beetle Terrestrial 2 Alicides sp. Butterfly Terrestrial 3 Anax junius Dragon Fly Terrestrial 4 Araneus sp. Garden spider Terrestrial 5 Bacillus rossii Grasshopper Terrestrial 6 Carausisus sp. Stick insect Terrestrial

Page 196: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 92

7 Danus sp Common butterfly Terrestrial 8 Dytiscus marginaiis Diving beetle Terrestrial 9 Isotorne sp. Common collembola Terrestrial

10 Julus sp. Common millipede Terrestrial 11 Lepisma sp. Common silver fish Terrestrial 12 Odontoermes sp. Termite Terrestrial 13 Oecanthus sp. Tree cricket Terrestrial 14 Scolopendra sp. Common centipedes Terrestrial 15 Scorpio sp. Scorpion Terrestrial

Molluscs

1 Limnaea sp. Stagnalis Aquatic 2 Pita globusa Aquatic 3 Relix sp. Terrestrial 4 Umax sp. Terrestrial

Table: 14. List of aquatic and terrestrial vertebrate fauna recorded from the core region

Amphibia. Scientific Name Common Name Schedule

1 Bufo melanostictus Indian toad Schedule IV

2 Bufo stomaticus Toad Schedule IV

3 Microhyla sp. Laurent Hills rice frog Schedule IV

4 Polypedates maculatus Himalayan tree frog Schedule IV

5 Ramanella variegata Termite Nest Frog Schedule IV

6 Rana cyanophyctis Water skipper Schedule IV

7 Rana hexadactyla Green pond frog Schedule IV

8 Rana tigrina Indian Bull Frog Schedule

Reptiles 1 Bungarus coerulens Common krait Schedule IV 2 Bungarus fasciatus Banded krait Schedule IV 3 Calotes versicolar Garden lizard Schedule IV 4 Chameleon sp Bahurupi Schedule II 5 Naja tripudians Common cobra Schedule IV 6 Natrix piscator Water snake Schedule IV 7 Testudo elegans Tortoise(Land) Schedule IV 8 Varanus salvator Monitor lizard Schedule I 9 Zamenis mucosus Rat snake Schedule II

Page 197: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 93

Birds 1 Acridotheres tristis Myna Schedule IV 2 Ardea alba Large Egret Schedule IV 3 Brachypternus bengalensis Wood pecker Schedule II 4 Bulbulcus ibis Cattle egret Schedule IV 5 Columbia IMa Pigeon Schedule IV 6 Coturnix coturnix Common crow Schedule IV 7 Cuculus microptens Cuckoo Schedule IV 8 Cypis bengalensis Vulture Schedule IV 9 Eudynamis scolopacea Indian cuckoo Schedule IV

10 Milvus migrans Common kite Schedule IV 11 Milvus migrans Common pariah kite Schedule IV 12 Mofpastes cafer Bulbul Schedule IV 13 Passer domesticus Common sparrow Schedule IV 14 Pavo cristatus Common peafowl Schedule I 15 Psittacula columboides Parrot Schedule IV

Mammals

1 Bos domesticus Cow Schedule IV

2 Canis aureus Jackal Schedule-II

3 Canis familiaris Dog Schedule IV

4 Capra domesticus Chelli Schedule IV

5 Felis chaus Jungle cat Schedule IV

6 Felis domesticus Cat Schedule IV

7 Funambulus pennati Gunduchi musa Schedule IV

8 Funanbulus pennati Squirrel Schedule IV

9 Herpestis edwardsi Mongoose Schedule IV

10 Macaca muilata Monkey Schedule IV

11 Melursus ursinus Wild cat Schedule IV

12 Munticus muntjack Kutra Schedule III

13 Orytologus cunicutus Rabbit Schedule IV

14 Pteropus medius Bat Schedule IV

15 Rattus rattus Musa Schedule IV

16 Sus sucrofa Wild pig Schedule III

Page 198: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 94

3.9.3 BUFFER ZONE OF LINGARAJ OCP Arakhpal

The site is located at 4.5m from the project site and the village Arakhpal

surrounded by tree patches agriculture fields as well as water bodies.

Table: 15. Herbaceous Vegetation in the Arakhpal site

SN Species English name Local name 1 Andrographis paniculata Green chirayta Bhuin nimba

2 Atylosia scaraboides Banakolatha

3 Asparagus racemosus Satabari

4 Convulvulus alsinoides Dwarf morning glory Ghasha

5 Curculigo orchinoides Talamuli

6 Cyperus rotundus Grass Mutha

7 Evolvulus nummularius Round leaf blindweed Bichhamalia

8 Eragrostis viscose Grass Jhadughasha

9 Ocimum zygantia Wild basil Banatulasi

10 Panicum humile Grass Ghasha

11 Phaseolus triloba Wild bean Jangalimuga

12 Sida cordifolia Flannel weed Bisiripi

13 Tephrosia purpurea Fish poison Bana kolathi

Table: 16. Shrub species in the Arakhpal site SN Scientific name English name Local name

1 Calotropis gigantea Giant Milk weed Arakh 2 Diospirous melanoxylon Koromandal ebony Kendu 3 Gardenia turgida Gardenia Khakad 4 Ipomea crassicaulis Amari 5 Jatropha gossypifolia Rabjada 6 Lantana camara Lantanas Nagairi 7 Strychnos nux-vomica Kuchila 8 Vitex nigundo Chaste tree Nirgundi

Page 199: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 95

Table: 17. Tree species including road side trees recorded in Arakhpal

SN Scientific name English name Local name

1 Anogeissus latifolia Dhatura 2 Anthocephalus cadamba Kadam Kadamba

3 Azadiracta indica Neem Nimba 4 Borassus flabellifer Palm Tala 5 Cleistanthus collinus Karada 6 Diospyrus melanoxylon Kendu 7 Ficus bengalensis Banayan Bara 8 Madhuca indica Mahua

9 Mangifera indica Mango Amba 10 Shorea robusta Sal 11 Syzygium cummuni Jamun Jamu

Table: 18. Aquatic vegetation in the Arakhpal site

SN Scientific name English name Local name

1 Calotropis gigantea Giant Milk weed Arakh 2 Ipomea crassicaulis Amari 3 Jatropha gossypifolia Rabjada 4 Gardenia turgida Gardenia Khakad 5 Strychnos nux-vomica Kuchila

6 Vitex nigundo Nirgundi

7 Lantana camara Nagairi Bajeshwar and Kandhaberani area

Eucalyptus and kaju plantation observed near to Kandaberani village. The

area of eucalyptus plantation was found to be approximately 18,000m2 areas, where

there is exclusive plantation of exotic eucalyptus hybrid species.

A species list of herbs, liana, shrubs and trees found in and around Bajeshwar

and Kandhaberani villages of the buffer zone area have been presented in following

tables.

Page 200: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 96

Table: 19. List of herbaceous species recorded in the Bajeshwar and Kandaberani area

SI.No. Species Common Name Local Name

1 Ageratum conyzoides Goat weed Pokasungha

2 Andrographis paniculata Green Chirayta Bhuin nimba

3 Aristida setacea Grass Khadika ghass

4 Atylosia scaraboides Banakolathi

5 Convulvulus alsinoides Dwarf morning glory Ghasha

6 Cyperus rotundus Grass Mutha

7 Eragrostis viscose Grass Jhadughasha

8 Evolvulus nummularius Round leaf blindweed Bichhamalia

9 Hemidesmus indicus Indian sarsaparilla Sugandhi

10 Panicum humile Grass Ghasha

11 Sida cordifolia Flannel weed Bisiripi

12 Sida rhomboides Angled sida Bajramuli

Table: 20. List of Liana species recorded in the Bajeshwar and Kandaberani

area

SI.No. Species Common Name Local Name

1 Butea parviflora Bastard teak Lata palasha

2 Combretum decandrum Atundi

3 Dioscorea glabra Pita alu

4 Smilax macrophylla Raja danti

Table: 21. List of shrub species recorded in the Bajeshwar and Kandaberani

area of the buffer zone

SI.No. Species Common Name Local Name

1 Buchanania lanzan Almondette Chara 2 Calatropis procera Arakha 3 Combretum decandrum Atundi 4 Diospyros melanoxylon Coromandel ebony Kendu 5 Lantana camara Lantana Nagaairi 6 Phoenix acaulis date palm Khajuri 7 Vitex negundo Nirgundi 8 Woodfordia fruticosa Dhatki 9 Ziziphus numularis Wild jujube Kantei

Page 201: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 97

Table: 22. List of tree species recorded in the Bajeshwar and Kandaberani area of the buffer zone

SI.No. Species Common Name Local Name

1 Borassus flabellifer Palm Tala 2 Buchanania lanzan Almondette Chara 3 Butea monosperma Flame of the forest palasha 4 Cleistanthus collinus Karada 5 Diospyros melanoxylon Coromandel ebony Kendu 6 Gardenia turgida Gardenia Kakhada 7 Holorrhena antidysenterica Sain Kurei . 8 Ipareya arborea Slow match tree Kumbhi 9 Phoenix regia Hill date palm Khajuri 10 Semecarpus anacardium Dhobi nut Bhalia 11 Shorea robusta Sal Sal 12 Syzigium cumini Java plum Jamun 13 Terminalia bellarica Beleric myrobalan Bahada 14 Terminalia chebula Myrobalan Haridan

15 Terminalia tomentosa Sain Asana 16 Woodfordia fruticosa Red Bell Push Dhatki

Bangurinala near Sirigida and Sarella area

In this site there is no forest patch. A Mango tree groove located in the site has

seven tree species with Mangifera indica as the dominant plants.

Table: 23. List of herbaceous species recorded in the Bangurinala near Sirigida

and Sarella area SI.No. Species Common Name Local Name

1 Andrographis paniculata Green chirayta Bhuin nimba

2 Asparagus racemosus Grass Satabari

3 Atylosia scaraboides Banakolatha

4 Convulvulus alsinoides Dwarf morning glory

5 Curculigo orchinoides Talamuli

6 Cyperus rotundus Grass Mutha

7 Eragrostis viscose Grass Jhadughasha

8 Evolvulus nummularius Round leaf Blind weed Bichhamalia

9 Ocimum zygantia Wild basil Banatulasi

10 Panicum humile Grass Ghasha

Page 202: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 98

SI.No. Species Common Name Local Name

11 Phaseolus triloba Wild bean Jangalimuga

12 Sida cordifolia Flannel weed Bisiripi

13 Tephrosia purpurea Fish poison Bana kolathi

Table: 24. List of Shrubs species recorded in the Bangurinala near Sirigida and

Sarella area SI.No. Species Common Name Local Name

1 Calotropis gigantea Giant Milk weed Arakh

2 Diospirous melanoxylon Koromandal ebony Kendu

3 Gardenia turgida Gardenia Khakad

4 Ipomea crassicaulis Amari

5 Jatropha gossypifolia Rabjada

6 Lantana camara Lantanas Nagairi

7 Strychnos nux-vomica Kuchila

8 Vitex nigundo Chaste tree Nirgundi

Table: 25. List of Trees species recorded in the Bangurinala near Sirigida and

Sarella area SI.No. Species Common Name Local Name

1 Azadiracta indica Neem Nimba

2 Borassus flabellifer Palm Tala

3 Cassia siamia Siamese senna Chakunda

4 Dalbergia sisoo Sisam Sisoo

5 Ficus bengalensis Pipal Aswastha

6 Madhuca indica Butter tree Mahula

7 Mangifera indica Mango Amba

8 Phoenix dactylifera Date Palm Khajuri

9 Pongamia piñata Indian beech Karanja

10 Shrea robusta Sal Sala

11 Terminalia arjuna Arjuna

Page 203: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 99

Kandhal – Chagharia and Scotlanpur area Table: 26. List of herbaceous species recorded in the Kandhal – Chagharia and Scotlanpur area SI.No. Species Common Name Local Name

1 Ageratum conyzoides Pokasungha

2 Andrographis paniculata Bhuin nimba

3 Aristida setacea Grass Khadika ghass

4 Asparagus racemosus Grass Satabari

5 Atylosia scaraboides Banakolathi

6 Convulvulus alsinoides Dwarf morning glory Ghasha

7 Croton sparsiflorus Crotons Indra marisha

8 Curculigo orchinoides Tala muli

9 Cyperus rotundus Grass Mutha

10 Eragrostis viscose Grass Jhadughasha

11 Evolvulus nummularius Round leaf blind weed Bichhamalia

12 Hemidesmus indicus Indian sarsaparilla Sugandhi

13 Mimosa pudika Touch me not Lajakuli

14 Ocimum zygantia Wild basil Banatulasi

15 Panicum humile Grass Ghasha

16 Phyllanthus niruri Bhuin aanla

17 Sida cordifolia Flannel weed Bisiripi

18 Sida rhomboides Angled sida Bajramuli

Table: 27. List of shrubs species recorded in the Kandhal – Chagharia and

Scotlanpur area SI.No. Species Common Name Local Name

1 Buchanania lanzan Almondette Chara

2 Diospyros melanoxylon Coromandel ebony Kendu

3 Phoenix acaulis Hill date palm Khajuri

4 Woodfordia fruticosa Red bell bush Dhatki

5 Ziziphus jujuba Wild jujube Buro

6 Holorrhena antidysenterica Bitter oleander Kurei

7 Gardenia turgida Gardenia Kakhada

8 Annona squamosa Custard apple Atta

9 Streblus aspera sahada

10 Strychnos nuxvomica Kochila

Page 204: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 100

Table: 28. List of Liana species recorded in the Kandhal – Chagharia and Scotlanpur area

SI.No. Species Common Name Local Name

1 Dioscorea glabra Pita alu

2 Smilax macrophylla Raja danti

Table: 29. List of trees species recorded in the Kandhal – Chagharia and

Scotlanpur area SI.No. Species Common Name Local Name

1 Adina cordifolia Kurum

2 Anacardium occidentalis Cashew Kaju

3 Azadiracta indica Neem Nimba

4 Borassus flabellifer Palm Tala

5 Buchanania lanzan Chara

6 Butea monosperma Flame of the forest Palasha

7 Chloroxylon swetinoides Bheru

8 Cleistanthus collinus Karada

9 Diospyrus melanoxylon Kendu

10 Eigel marmellos Bela

11 Emblica officianalis Amla

12 Feronia limonia Wood apple Kaintha

13 Ficus bengalensis Banayan Bara

14 Madhuca indica Mahua

15 Mangifera indica Mango Amba

16 Phoenix dactylifera Date Palm Khajuri

17 Shorea robusta Sal

18 Tamarindus indica Tamarind Tentuli

19 Terminalia tomentosa Sahaj

Table: 30. List of aquatic flora recorded in the Kandhal – Chagharia and

Scotlanpur area SI.No. Species Common Name Local Name

1 Nymphea alba White water lily Dhala Kain

2 Pistia sp.

3 Lemna sp. Duck weed

4 Azolla sp Duck weed

5 Hydrilla Hydrilla Chingudia dala

Page 205: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 101

Table: 31. List of aquatic and terrestrial invertebrate fauna recorded from the buffer zone

Annelids

1 Dichogaster bolaui Earthworm Terrestrial 2 Drawida calebii -do- Terrestrial 3 Drawida willsi -do- Terrestrial 4 Hiridinaria granulose Leech Aquatic 5 Lampito mauritti Earthworm Terrestrial 6 Lennogaster pusillus -do- Terrestrial 7 Ocnerodriltus occidentalis -do- Terrestrial 8 Octochaetona surensis -do- Terrestrial 9 Perionyx miliardi -do- Terrestrial

Arthropods

1 Acalymma sp. Beetle Terrestrial 2 Alicides sp. Butterfly Terrestrial 3 Anax junius Dragon Fly Terrestrial 4 Araneus sp. Garden spider Terrestrial 5 Bacillus rossii Grasshopper Terrestrial 6 Carausisus sp. Stick insect Terrestrial 7 Danus sp Common butterfly Terrestrial 8 Dytiscus marginaiis Diving beetle Terrestrial 9 Isotorne sp. Common collembola Terrestrial 10 Julus sp. Common millipede Terrestrial 11 Lepisma sp. Common silver fish Terrestrial 12 Odontoermes sp. Termite Terrestrial 13 Oecanthus sp. Tree cricket Terrestrial 14 Scolopendra sp. Common centipedes Terrestrial 15 Scorpio sp. Scorpion Terrestrial

Molluscs

1 Limnaea sp. Stagnalis Aquatic 2 Pita globusa Aquatic 3 Relix sp. Terrestrial 4 Umax sp. Terrestrial

Table: 32. List of aquatic and terrestrial vertebrate fauna recorded from the

Buffer zone Fishes

Scientific Name Common Name Schedule 1 Anabas sp. Kau Schedule IV 2 Catla catla Catla Schedule IV 3 Channajachua Cheng Schedule IV 4 Cirrihana mrigal Mrigal Schedule IV 5 Labeo calabasu Blackish rohu Schedule IV 6 Labeo rohita Rohu Schedule IV 7 Mustus vittatus Tengna Schedule IV

Page 206: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 102

8 Ophicephalus marulius Murret Schedule IV 9 Ophicephalus punctatus Gadei Schedule IV

Amphibia.

Scientific Name Common Name Schedule 1 Bufo melanostictus Indian toad Schedule IV 2 Bufo stomaticus Toad Schedule IV 3 Microhyfla sp. Laurent Hills rice frog Schedule IV 4 Polypedates maculates Himalayan tree frog Schedule IV 5 Ramnella variegata Termite Nest Frog Schedule IV 6 Rana cyanophyctis Water skipper Schedule IV 7 Rana hexadactyla Green pond frog Schedule IV 8 Rana tigrina Indian Bull Frog Schedule

Reptiles

1 Bungarus coerulens Common krait Schedule IV 2 Bungarus fasciatus Banded krait Schedule IV 3 Calotes versicolar Garden lizard Schedule IV 4 Chameleon sp Bahurupi Schedule II 5 Chitra indica Turtle (aquatic) Schedule IV 6 Naja tripudians Common cobra Schedule IV 7 Natrix piscator Water snake Schedule 8 Python molurus Python Schedule I 9 Testudo elegans Tortoise(Land) Schedule II

10 Varanus salvator Monitor lizard Schedule I 11 Zamenis mucosus Rat snake Schedule II

Birds

1 Acridotheres tristis Myna Schedule IV 2 Ardea alba Large Egret Schedule IV 3 Brachypternus bengalensis Wood pecker Schedule II 4 Bulbulcus ibis Cattle egret Schedule IV 5 Columbia IMa Pigeon Schedule IV 6 Coturnix coturnix Common crow Schedule V 7 Cuculus microptens Cuckoo Schedule IV 8 Cypis bengalensis Vulture Schedule IV 9 Eudynamis scolopacea Indian cuckoo Schedule IV 10 Milvus migrans Common kite Schedule IV 11 Milvus migrans Common pariah kite Schedule IV 12 Mofpastes cafer Bulbul Schedule IV 13 Passer domesticus Common sparrow Schedule IV 14 Pavo cristatus Common peafowl Schedule I 15 Psittacula columboides Parrot Schedule IV 16 Streptopeflica sp. Dove Schedule IV

Page 207: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 103

Mammals 1 Bos domesticus Cow Schedule IV 2 Canis aureus Jackal Schedule-II 3 Canis familiaris Dog Schedule IV 4 Capra domesticus Chelli Schedule IV 5 Elephas maximus Elephant Schedule-II 6 Felis chaus Jungle cat Schedule IV 7 Felis domesticus Cat Schedule IV 8 Funambulus pennati Gunduchi musa Schedule IV 9 Funanbulus pennati Squirrel Schedule IV 10 Herpestis edwardsi Mongoose Schedule IV 11 Macaca muilata Monkey Schedule IV 12 Melursus ursinus Wild cat Schedule IV 13 Munticus muntjack Kutra Schedule III 14 Orytologus cunicutus Rabbit Schedule IV 15 Pteropus medius Bat Schedule IV 16 Rattus rattus Musa Schedule IV 17 Sus sucrofa Wild pig Schedule III

3.9.5 GENERAL REMARK

Elephants are the only migratory mammals in the area coming from distant

places during forest fire. However, it is not a common migratory route for wild

animals.In the project area, forest area was noticed as fragmented patches due to

human habitation pressure in both core and buffer zone. The nature of the forest is

open canopied dry deciduous type. At many places, the forest because of biotic;

interference has been converted to scrubland. Biotic pressure has also affected the

natural wild life fauna of the area. The area as revealed from the survey does not

support any rare and endangered flora and fauna.

The area as revealed from the survey does not support any rare and

endangered flora and fauna.

3.9.6 BROAD PLAN FOR CONSERVATION OF THE FAUNA WHICH USED THE HABITAT OF THE STUDY AREA

The report reveals the presence of few wild animals in core and buffer zones

under different Schedules of the Wild life (Protection) Act 1972. All such animals are

found in other parts of the State. The area does not have any endangered species.

Page 208: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter …3 , Page - 104

However, for conservation important species present under different Schedules,

broad management strategies have been suggested.

The records of faunal species collected during the survey were based on

both direct and indirect evidences. As per the informal discussions with the local

people, the schedule I and II fauna such as Golden jackel, Canis aureus, Juncle cat,

Felis chaus, and Phyton, Python molurus were not very frequently seen in the Project

area.

No threatened or endangered flora species are located within the core and

buffer zone of the project area.

Faunal Impacts were assessed in regard to the following issues. Habitat Loss

and Wildlife Migration Patterns. No significant habitat loss is anticipated Potential

wildlife crossing zones were not identified by experts of Ecology, Flora and Fauna.

There was no residential birds or wild mammals evidenced by the absence of nests

of birds resting or hiding places of mammals. Observed avi-fauna in the core area

were common birds.

Page 209: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 1

Chapter–4

ANTICIPATED ENVIRONMENTAL IMPACTS &

MITIGATION MEASURES 4.1 ASSESSMENT OF IMPACT AND CONTROL MEASURES ON

AIR QUALITY

INTRODUCTION

The impacts of mining and its allied activities have been assessed in respect

of air, water, noise, land resources, socio-economic bio-diversity, etc.

4.1.1 AIR POLLUTION IMPACT ASSESSMENT

Dust (PM10 and PM2.5) is the major emission from mining activities in coalfield

area. Impact has been predicted for air quality taking PM10 and PM2.5 into

consideration in and around the project area. The impact assessment has been

carried out considering with the following points:

(i) Calculation of rate of generation of PM10 and PM2.5 using empirical

formulae and emission factors for different mining operations developed

by USEPA & Environment Australia:2001

(ii) Air quality impact prediction (AQIP) using Industrial Source Complex

Short Term Model (ISCST3) (Revised), USEPA, Seattle, Washington.

(iii) The AQIP modeling has been carried out for the peak capacity of 20.0

MTY (incremental 8.43 Mty).

4.1.2 CALCULATION OF RATE OF GENERATION OF AIR POLLUTION FROM LINGARAJ OC EXPN PROJECT USING EMPIRICAL EQUATION

Activity-wise emission rates have been estimated using the above mentioned

empirical formulae and emission factors. The formulae have been used to evaluate

the emission rate for the mining activities and locations e.g. drilling, haul road,

transportation road, loading, unloading, and dozing on dumps, etc. Based on the

Page 210: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 2

above study, rate of generation of PM10 from Lingaraj OC Expn Project considering

for the project of 20.0 MTPA capacity has been calculated.

4.1.3 PARTICULATE EMISSION FACTOR FOR MINING OPERATIONS

The details of equipment, their capacity and population are given in the following table: OB removal

Sl. No. Particulars Total

Nos. Existing

Requirement for

incremental production

1. Diesel Hyd. Shovel 1 -- 1

2. Elect. Rope shovel 5 cum. 4 4 --

3. Elect. Hyd. Shovel 3.7 cum. 2 -- 2

4. Elect. Hyd. Back 4.3 cum. 2 2 --

5. Hyd. Back Hoe (2.7-2.8) cum 4 4 --

6. Rear dumper 100 T 9 -- 9

7. Rear dumper 50 T 82 49 33

8. Dozer with ripper attachment 860 HP

1 -- 1

9. Dozer (400 … 410 HP) 10 10 --

10. Dozer (300 … 320HP) 2 2 --

11. Electric RBH Drill 250 mm 2 -- 2

12. Electric RBH Drill 160 mm 9 5 4 Coal Extraction

Sl. No. Particulars Total

Nos. Existing

Requirement for

incremental production

1. Electric RBH Drill 160 mm 3 3 -- 2. Rotary Drill 100-115 mm 1 1 -- 3. Dozer 300-320 HP 2 2 --

Page 211: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 3

Common

Sl. No. Particulars Total

Nos. Existing

Requirement for

incremental production

1. Diesel Hyd. Back Hoe 0.9 cum 1 1 -- 2. Crane 30T 1 1 -- 3. Crane 20T 1 1 -- 4. Crane 10T 1 1 -- 5. Crane 8T/9.5T 3 3 -- 6. Front End Loader 5.7 cum 1 1 -- 7. Front End Loader 2.0-2.3 cum 3 3 -- 8. Water Sprinkler 28 KL 4 2 2 9. Water Sprinkler 650 HP 4 4 -- 10. Water Tanker (Converted) LW-35,

HM-1035 5 5 --

11. Wheel Dozer 460 HP 1 -- - 12. Wheel Dozer 380 HP 1 1 -- 13. Wheel Dozer 300 HP 1 1 -- 14. Motor Grader 280 HP 3 3 -- 15. Motor Grader 145 HP 2 2 -- 16. Tyre Handler 2 1 1 17. Fork Lifter (G 300 DC) 1 1 -- 18. Fire Tender 2 -- 2 19. Diesel Bowser 2 -- 2 20. Road Roller 1 -- 1 21. Road sweeper 1 -- 1

4.1.4 AIR QUALITY IMPACT PREDICTION (AQIP) OF PM10 AND PM2.5 USING

ISCST3 MODEL

Air quality impact prediction (for PM10 and PM2.5) for this mine was carried out

using •ISCST3 ModelŽ considering area sources. The model was applied to

Incremental production of 8.43 Mty (i.e. from 11.57 MTPA to 20.0 MTPA) for

without control measures and with control measures.

The average PM10 and PM2.5 at baseline stations, predicted incremental

PM10 and PM2.5 concentration and absolute PM10 and PM2.5 at various receptors are

given in the following table:

Page 212: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 4

(Values in µg/cu. m)

Baseline Stations

Distance from

boundary and

direction from

center of Core Zone

Measured PM10 (Averag

e)

Measured PM2.5

(Average)

Predicted absolute PM10

using AQIP

Predicted absolute PM2.5

Without control

measures

With control

measures

Without control

measures

With control measur

es

(i) (ii) (iii) (IV) (V) (VI)

Project office Core zone

Core zone 123.75 30.9

240.75 182.75 75.9 52.9

Langi jorha village corezone Core zone 116.83

27.4 116.83 116.83 27.4 27.4

Amhanunda village Core zone 89.17 23.7 90.17 89.17 23.7 23.7

Talaberha Village NE, 0.5 km 98.75 25.1 129.75 119.75 36.1 30.1

Hensamul Village W, 0.75 km 110.75 22.3 110.75 110.75 22.3 22.3

Talchar town SE, 0.5 km 70.71 19.5 70.71 70.71 19.5 19.5

Kandhal village N, 1.5 km 75.67 18.8 84.67 79.67 21.8 20.8

Ghantaparha village S, 1.6 km 58.54 14.2 58.54 58.54 14.2 14.2

Other Receptors Predicted incremental

Naraharipur Core zone -- -- 5 --- 1 0

Madanmohanpur North, 0.8

km -- --

11 10 3 1

Raghunathpur NW, 2.6 km -- --

1 -- -- --

It may be observed from the above table that the concentration levels can be

brought down through control measures to contain the PM10 levels well within the

permissible limit.

4.1.5 RESULTS AND DISCUSSIONS

The AQIP analysis using ISCST3 revealed that the absolute PM10 levels of

Lingaraj OC Expn Project for 8.43 Mty incremental capacity (i.e. from 11.57 MTPA

to 20.0 MTPA) will be 84.67 µg/cu.m at Kandhal Village (1.5 km, N) without control

measures, whereas the same will be 79.67 µg/cu.m with control measures and the

absolute PM2.5 levels of Lingaraj OC Expn Project for 8.43 Mty incremental capacity

Page 213: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 5

(i.e. from 11.57 MTPA to 20.0 MTPA) will be 21.8 µg/cu.m at Kandhal Village (1.5

km, N) without control measures, whereas the same will be 20.8 µg/cu.m with control

measures It may be observed from the above table that the concentration levels can

be brought down through control measures to contain the PM10 levels well within the

permissible limit. Isopleths of PM10 and PM2.5concentrations at various receptor

locations (i.e. habitats) super imposed on the study area map (Plate No.VI) of core &

buffer zone without and with mitigative measures have been shown in Plate No.

XA1, XA2, XA3 and XA4, respectively.

4.1.7 AIR POLLUTION CONTROL MEASURES

Appropriate air control measures are being adopted and will be adopted to

maintain the ambient air quality within the stipulated standard. The control measures

will be adopted for various operations like drilling operation, blasting operation,

loading and transport, coal handling plant, fires at coalfaces and coal stock yard, OB

dump(s) and workshop and stores, etc.

� Drilling Operation

All drills will be equipped with dust extraction.

� Blasting operation

The operation shall be conformity to the extent laws with more closure

control of blasting parameters.

� Loading & transporting

� Surfacing all service roads by asphalt.

� Un-metaled roads shall be kept free of ruts.

� Provision has been made for instant shower system.

� Development of greenbelt.

� Provision of silo system.

Page 214: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 6

� Coal handling plant & transportation system

� Suppression of dust by fixed sprinklers in all critical points.

� Covered conveyor belts.

� Provision for Silo loading has been proposed.

� Total coal will be transported to silo from the CHP directly by

covered conveyor belts.

� Provision of dry fog system at feeder breaker of all the CHPs.

� Fires at coalfaces, coal stock yard

� Provision of adequate fire fighting.

� Storage of water at all critical points.

� Regular supervision.

� OB dumps

� Blanketing with OB materials to put off the oxygen supply

� Workshop & store

� Proper ventilation system.

Table-4.3 : Details of Control Measures

Sl. No.

Description of Pollution Control Measures

13.0 Mty

For incremental production of 7.0 Mty

(20Mty Peak)

1. Dust extraction in drill machines

Existing 9 nos. of drill has been equipped with dust extractors and wet drilling. Installation of Non-Visible Emission (NVE) assembly in all drills.

Addl. 6 nos. of drill will be equipped with installation of non-visible emission NVE assembly in all the drills dust extractors.

2. CHP (a) Fixed sprinklers at CHP, haul road, &

Auto-start, time cycle control, fine nozzle mounted. Fixed sprinkler provided at

Additional 50 nos. have been proposed for addi-tional production.

Page 215: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 7

Sl. No.

Description of Pollution Control Measures

13.0 Mty

For incremental production of 7.0 Mty

(20Mty Peak)

railway siding. (b) Enclosure at various points.

1. Access trench (9 nos. - 450m)

2. CHP (20 nos. 500m). 3. Deulbera siding (10 nos.

… 275m) 4. HEMM workshop (7

nos.-280 m) 5. NTPC siding (20 nos. …

1440 m). 6. Time office (5 nos. …

100m) Belt conveyer and coal bunker.

Installation of dry fog system for all CHPs. Installation of instant shower.

3. Mobile water sprinkler for haul roads, transportation roads (2 km)

8 nos. (28 kl), 6 nos. (20kl) dumper converted mobile sprinklers.

2 nos. (28 kl) addl. will be procured. As and when required contractual mobile water sprinklers will be engaged.

4. Black topping roads, colony roads, approach road to service buildings and to projects

11.3 km Up keeping of black topping of roads and proper maintenance will be adhered.

5. Cleaning / sweeping of dust from coal trans-portation road

Heavy duty truck mounted vacuum cleaner (Mechanical road sweeper) for cleaning of road, (1 no) has been deployed.

The same heavy duty truck mounted vacuum cleaner (Mechanical road sweeper) for cleaning of road will be continued.

6. Greenbelt cover develop-ment : 1. Block plantation 2. Avenue plantation

1. 46975 nos. plants have been planted. 2. 22768 nos. plants have been planted.

Plantation 821288 will be done

7. Coal transportation Coal is transported from CHP to railway siding by dumpers/tippers with tarpaulin.

The total coal will be transported directly from CHP to silo by covered conveyor system.

8. Eco-friendly introduction of surface miner

4 nos. Surface miner : 2 nos.

9. Quick evacuation of coal from Talcher coalfield.

-- Construction of 43.5 km concrete freight corridor and road over bridge is under process.

Page 216: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 8

4.2 ASSESSMENT OF IMPACT AND CONTROL MEASURES ON HYDROLOGY & HYDRO-GEOLOGY

The surface water has intricate relationship between precipitation and ground

water. Knowledge of mining impact on ground water is requisite while deciding and

designing to protect surface water bodies. Predicted mining impact on water is

broadly classified as:

4.2.1 QUANTITATIVE IMPACT & CONTROL MEASURES ON WATER

� Proposed changes and impacts on hydrology

The following changes in hydrology have been assessed:

� Siltation and chocking of water courses resulting in scarcity of surface

water and flooding problem in the area.

� Reduction and changes in storm run-off or surface run-off water

courses.

� Declining of ground water level resulting early drying-up of surface

water bodies like ponds, lakes and stream flows.

The following control measures have been assessed for the above said

changes on hydrology:

4.2.1.1 CONTROL MEASURES FOR DISRUPTION OF NATURAL DRAINAGE NETWORK LOCATED IN THE CORE ZONE

� Control measures for disruption of natural drainage net work

located in the core zone No major drainage fall under the premises of Lingaraj OCP and none

will be disrupted due to expansion project. However some tributaries to

Bangaru jhar may be affected as they come in the area of expansion.

The total catchment area of the Bangaru jhar before entering into the

mining area is estimated at 12.50 km2. The general gradient of the

Bangaru jhar is estimated as 1:286 in the proposed expansion project.

The run-off water from the stream will be diverted progressively during

mining operation permission from the flood and irrigation diversion,

Department of Water Resources, Govt. of Odisha is under process for

diversion of Bangaru jhor stream.

Page 217: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 9

4.2.1.2 CONTROL MEASURES TO PROTECT SURFACE WATER BODIES FROM SILTATION AND CHOKING OF WATER COURSES RESULTING IN SCARCITY OF SURFACE WATER AND FLOODING PROBLEM IN THE AREA

The foot drain & catch drain are being made for smooth disposal of storm

water from external overburden dump, which is extremely essential to avoid gully

formation on the dump body and also siltation problem of the nearby natural drains.

These drain collects run-off from dump and direct it to settling tank / sedimentation

pond before discharge to nearby natural water courses. Sedimentation tank is

periodically cleaned to avoid siltation of the drainage.

Drainage arrangement for internal OB dumps collect run-off through foot

drain and divert it to mine sump for pumping. During mining period, the drainage

pattern of the reclaimed area will be such that the run-off will be diverted to final void

of the quarry as a measure for water harvesting. To both external and internal

dumps besides biological reclamation, the grass plantation is being made to prevent

the movement of loose sediments from these dumps. The TSS 100m at upstream

and downstream of the mine discharge is recorded during routine monitoring is given

below:

Table 4.4: Total suspended solid at upstream and down-stream of mine discharge

SEPTEMBER 2014

Area Project Monitoring Station Date of Sampling

TSS

Lingaraj Lingaraj OCP

100m U/S of the pt. of confluence of mine disc. Water with Brahmani river

08-09-14 37

100m D/S of the pt. of confluence of mine disc. Water with Brahmani river

08-09-14 41

Lingaraj Lingaraj OCP

100 m U/S of the pt. of confluence of mine disc. Water with Brahmani river

24-09-14

38

100 m D/S of the pt. of confluence of mine disc. Water with Brahmani river

24-09-14 42

Page 218: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 10

4.2.1.3 CONTROL MEASURES TO PROTECT SURFACE WATER BODIES FROM REDUCTION AND CHANGES IN STORM RUN-OFF OR SURFACE RUN-OFF WATER COURSES

Garland drain is provided around the excavation boundary to guard against

mine inundation due to rainfall run-off or storm run-off (Plate-VIII). Drains are

provided around coal dumps to collect run-off for diverting into sedimentation pond

before discharge into natural water course. Open masonry drains are provided for

handling the run-off from the built-up area. Mine water generated from mining area

by direct rainfall will be pumped time to time for safe mine operation after meeting the

internal requirement. The mine water in the excavation or quarry area is estimated

for monsoon and lean season as 2.05 and 1.81 Mm3/annum respectively. The mine

water in the excavation or quarry area is the average make-up water due to direct

precipitation and seepage from strata and surrounding, etc. The existing main

pumps pump out water in different stages of excavation based on considering a day

of peak rainfall in monsoon in excess of the capacity of the sump. The pumped mine

water will be discharged to the natural drain during monsoon after treatment to avoid

reduction of storm run-off in stream flow for downstream users.

4.2.1.4 CONTROL MEASURES TO PROTECT DECLINING OF GROUND WATER LEVEL FROM EARLY DRYING UP OF SURFACE WATER BODIES LIKE PONDS, LAKES & STREAM FLOW

There is an intricate relationship between surface water and ground water. In

the monsoon time, till the aquifer attains its original ground water level, the surface

water bodies like stream flow, ponds & lakes recharge the aquifer. As soon as the

ground water recoups and attains its level, the groundwater contributes water to the

surface water bodies. After post-monsoon period, this process is reversed again as

the ground water level gets lowered from the original level. This recharge and

discharge system of the area brings surface water and ground water relationship

complicated. The water balance studies of this area unties the above said intricate

relationship of surface and ground water.

Declining of ground water level due to mining is generally to the limited extent

around excavation or quarry area. The phenomenon of lowering of water level is

temporary. The annual replenishable rainfall recharge balance of 146.47 Mm3/annum

in this area signifies that the rainfall recharge recoups ground water level every year.

Page 219: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 11

Backfilling once reached to its predetermined level seepage from the excavation

zone will considerably be reduced; thereby declining of ground water will also be

reduced around the mine. The effort will be made to store mine make-up water in

different sumps or lower benches of the mine as a measure for rain water harvesting.

Zero discharge concept is being / will be adopted for domestic and industrial effluent

by recycling of the same. The treated excess mine water during monsoon period will

be discharged to nearby natural drain for recharging the ground water in the same

basin of the area.

4.2.2 QUALITATIVE IMPACT ON WATER

Mining and its related activities create water quality problems. These

problems are identified and the likely sources of water pollution from this project

along with the type of pollutants are follows:

(a) Sanitary (domestic) estimated quantity … 2.28 Mld.

(b) Industrial wastewater from workshop -- Suspended solids, oil & grease.

(c) Waste water from mine -- Suspended solids of coal, clay and oil.

(d) Surface run-off passing through coal stockpiles -- Suspended solids

(e) Storm water from leasehold area and built-up area -- Suspended solids.

4.2.2.1 EFFECTIVE WATER POLLUTION CONTROL MEASURES ON QUALITY WILL BE TAKEN AT THE PROPOSED LINGARAJ OC EXPN. PROJECT KEEPING THE FOLLOWING POINTS IN VIEW

� Sufficient safeguards during the planning stage to make the project eco-

friendly from water pollution control point of view.

� Recycling of wastewater after appropriate treatment to achieve "zero

discharge" to the extent possible at some sources.

� Conforming to the limits of the Environment (Protection) Amendment

Rules, 2000 (•Schedules-VIŽ, General Standards for discharge of

environmental pollutants, Part-A : Effluents) for quality of the treated

effluent.

Page 220: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 12

4.2.2.2 SANITARY(DOMESTIC) WASTEWATER

This expansion project will generate additional waste water quantity of 128

m3/day. The total water requirement for domestic use is estimated as 2860 m3/day.

The necessary fund of rupees twenty seven lakh and thirteen thousand has been

given for this expansion project. About 80% of this consumption will contribute to

sanitary wastewater which will be treated mainly for total suspended solids (TSS) and

bio-chemical oxygen demand (BOD). Therefore, depending upon the pollution load in

the domestic effluent, a suitable treatment scheme with sedimentation tank for TSS

and aeration facilities for BOD is proposed (Fig.-4.1) and will be commissioned for

the project. Treated water will be utilised for watering the plants. Domestic Effluent

Treatment Plant (DETP) has been provided for the colony as well as for the survice

building.

4.2.2.3 INDUSTRIAL WASTEWATER FROM WORKSHOP

This expansion project will generate an additional quantity of 140 m3/day.

The necessary additional fund of rupees twenty one lakh forty four thousand has

been awared for effluent treatment plant. This industrial wastewater treatment plant

consists of pre and post-settling chambers/tanks and oil and grease trap (OGT). The

treated effluent from this plant (Fig.-4.2) is collected in a tank for recycling the same

for industrial use resulting in ‘zero discharge’ . The sludge collected from the settling

chamber is disposed off as landfill in the decoaled area. Oil and grease manually

reclaimed from the trap is stored in drums safely for disposal through auction. Oily

sludge is disposed off in the impervious layer lined pit.

Fig: Oil & Grease Trap

4.2.2.4 FLOW CHART OF WATER BALANCE

The water requirement for domestic and industrial is given in the water

balance flow chart.

Page 221: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 13

Figure 4.1: Water Balance Flowchart

Water Balance Statement based on Peak Demand (Lingaraj OCP)

Water supply scheme and treated effluent from the project

Potable Water Supply for Residential Colony & Service Buildings

Industrial Effluent Treatment Plant

Fire Fighting and Dust Suppression

5730 m3/day Potable water consumption Industrial consumption

2860 m3/day 510 m3/day 2360 m3/day

Domestic Treatment Plant

Losses

572 m3/day 2288 m3/day Treated clear water for reuse

Treated clear water for watering of plantation area

Sludge for landfill or farmyard manure

1602 m3/day

408 m3/day

Page 222: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 14

Figure:-4.2 Flow chart showing treatment of Industrial effluent water, mine

discharge water and domestic effluent water

4.2.2.4 WASTE WATER FROM MINE

Mine discharge water is collected in a sump pit located in the mine floor from

where it is pumped out and diverted to mine discharge treatment plant (Fig.-4.1)

(MDTP) which is consisting of oil and grease trap and sedimentation pond(s) with

chemical dozing arrangement to arrest suspended solids and oil and grease. Then,

treated water is used for dust suppression in haul road and CHP besides washing of

dumpers and/or dozers in workshop. The sludge collected from the pond(s) is

utilized as landfill in the decoaled area. The oily sludge from oil and grease trap(s) is

disposed off in the impervious layer lined pit. Oil and grease recovered manually

from the trap(s) will be stored in drums safely for disposal through auction. Effort are

being made to keep the balance make up water in the lower benches of the mine as

a measure for “Rain Water Harvesting” . In unusual situations during monsoon,

mine discharge 13934.42 m3/day will be allowed to go as recharge / run-off in the

same basin of the area.

Page 223: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 15

4.2.2.5 SURFACE RUN-OFF

(a) From OB dump

The surface run-off from the dump bodies is collected in garland drains of

appropriate size provided at the foot. The foot drain will carry water to a

sedimentation pond from where the overflow is directed into natural drain through

controlled discharge outlets. The overflow will be monitored regularly for TSS to

enable corrective actions before water meets the natural water ways.

(b) From coal dumps

Drains are provided around the coal dumps to collect run-off for diverting into

sedimentation ponds before discharge into natural water courses.

4.2.2.6 STORM WATER

The area slopes generally towards north east to east. To prevent inrush of

precipitation run-off from the outside area to the quarry, storm water drains of

suitable dimensions are provided at appropriate locations with outlets to natural water

courses. Settling tanks/ponds are provided in the storm water drains at convenient

locations to take care of suspended solids. Both storm water drains and settling

tanks/ponds are cleaned periodically to avoid choking of drains & malfunctioning of

tanks/ponds.

Open masonry drains of appropriate dimensions with outlets to nearby

natural water courses are provided for handling the run-off from the built-up area.

The above drains are cleaned periodically to avoid choking.

4.2.3 WATER BALANCE

The project falls in the eastern part of Talcher Coalfield. Water balance of the

above project cannot be studied in isolation without considering water balance of the

area as a whole. Here, water balance for the area has been highlighted in addition to

water balance for the project.

Page 224: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 16

4.2.3.1 WATER BALANCE FOR EASTERN PART OF TALCHER COALFIELD

(a) Water balance

Water balance for the area is based on the hydro-geological studies

conducted in the eastern part of Talcher Coalfield by the Hydro-geological Unit of

CMPDI, Ranchi. It is a quantitative statement of the balance between total water

gains and losses during a particular period of time for the area concerned. Water

balance considers all waters, surface and sub-surface, entering or leaving or stored

within a basin. Further, water entering a basin is equated to water leaving a basin,

plus or minus the changes in the basin storage. For water balance study, the

equation used is:

Pa = Ru + ET � �S g Where: Pa = Precipitation, mm

Ru = Stream flow, mm

ET = Evapo-transpiration, mm

�S g = Change in ground water storage, mm

Using the above equation, the annual water balance of Talcher Coalfield

(East) is given below:

Table 4.5:- Annual water balance of Talcher Coalfield (East)

Year Input (mm) Output (mm)

Pa Ru ET � �S g

1983 (Jul.-Dec.)

977.00 332.45 673.55 (+) 29.00

1984 655.60 237.97 368.65 (-) 49.00

1985 1236.45 545.19 755.43 (+) 64.20

Note: (+) Sign indicates surplus in ground water storage (-) Sign indicates deficit in ground water storage

(b) Water table in the area

The depth of water in pre-monsoon period ranges from less than 1.6 m

(Jilinda village) to about 10.70m (Ekadal village) below ground level in western parts

Page 225: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 17

and from less than 1.10 m (Deulbera village) to about 7.83 m (Kashipur village) below

ground level in the highly populated eastern parts of the coalfield.

The depth of water in post-monsoon period ranges from less than 2.9 m

(Jilinda village) to about 11.50m (Kandhabarani village) below ground level in western

parts and from less than 1.60 m (Deulbera village) to about 13.5 m (Kashipur village)

below ground level in the highly populated eastern parts of the coalfield.

Further, the annual fluctuation of water levels range in 10 km buffer zone from

approximately 1 to 7 m in the area

(c) Observations

Considering rainfall, the changes in ground water storage from the above

table and water table of the area, the following observations are made:

� As the average rainfall in the area is 1257 mm, there would be a surplus

in the ground water storage as evident from the annual water balance

given in Table-4.4. So the possibility of drastic fluctuation of water table

is minimum.

� Withdrawal of water from mines in general and opencast mines in

particular has least impact on the ground water storage except in a

drought condition when the annual rainfall comes down to a level of

655.60 mm as it has happened in 1984.

� A number of U/G and opencast OC mines are in operation for past

couple of years and there is no adverse effect in the area till date.

4.2.3.2 WATER BALANCE IN THE BUFFER ZONE (WITHIN 10 KM RADIUS) OF THE PROJECT

The water balance study was carried out on the basis of land use details of the core

and buffer zones of the project and the information from the report of the Ground

Water Resource Estimation Committee (June, 1997). The water balance study is

given in the following paragraphs:

(a) Estimate for ground water availability (by rainfall infiltration method)

� Demographic & geographic details

i. Geographical area of buffer zone (Gb) [related to

land use / cover map of buffer zone of Lingaraj Expn.]

: 443.76 km2

Page 226: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 18

ii. Geographical area of core zone (Gc) : 14.10 km2

iii. Forest area (Fa) : 186.11 km2

iv. Total cultivable area (Cv) : 152.44 km2

v. Irrigated agricultural land : 16.55 km2

vi. Unirrigated area (Cu) : 135.88 km2

vii. Cultivable wasteland (Cw) : 32.74 km2

viii. Water spread area (Ws)

# River : 14.54 km2

# Stream : 2.35 km2

# Ponds & lakes : 5.52 km2

ix. Built-up area : 30.30 km2

x. Mining area : 20.02 km2

xi. Total population of buffer zone [updated upto 2001] : 1,51,107

xii. Total cattle population (@ of 4.35 per family) [Based on Angul Dist. Statistical Hand Book, 1995]

: 1,31,463

� Hydrogeological parameters

i. Average annual rainfall (R) : 1.257 m

ii. Water level fluctuation in the representative wells (Z) [as per CMPDI]

: 6 to 10 m

iii. Infiltration index of the area (Ii) [based on report of the Ground Water Resource Estimation Committee, June 1997]

# Weathered granite, gneiss and schist with low clay content

: 8 %

# Barakar formation (semi-consolidated) : 12 %

# Talchir and Karharbari formations (consolidated)

: 6 %

iv. Specific yield of the area in the buffer zone (Sy) [based on CMPDI investigation]

: 4 %

v. Seepage from water spread area (Sws) [based on CGWB & GEC reports]

: 0.210m/annum

vi. Losses due to evapo-transpiration [based on CGWB, GEC report and Circular Memo no. HG 7/1832/78 dated 05/7/1978 from the Office of the CE, PWD, Ground Water, Chennai-17]

: 15 %

vii. Seepage from river, streams, etc. (Srs) [based on CGWB, GEC report and Circular Memo no. HG 7/1832/78 dated 05/7/1978 from the Office of the CE, PWD, Ground Water, Chennai-17]

: 0.0211 m/day

viii. Return flow from irrigated area for wet crop : 0.67 m/crop

Page 227: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 19

like paddy, etc. (Rf) (Based on GEC report, June,1997)

viii. More than 20% slope area (Metamorphic & Barakar)

: 8.46 km2

(b) Hydrologic budget for the buffer zone

� Annual groundwater recharge estimate

� Estimation of groundwater recharge through rainfall infiltration (Rarf) (a) Recharge through rainfall in Barakar formations Rg = A x R x Ii Where A = 267.04 km2 R = 1.257 m Ii = 12 % So, Rg = 40.28 Mm3 (b) Recharge through rainfall in consolidated sedimentary formations Rg = A x R x Ii Where A = 112.02 km2 R = 1.257 m Ii = 6 % So Rg = 8.49 Mm3

(c) Recharge through metamorphic rocks Rg = A x R x Ii Where A = 24.41 km2

R = 1.257 m

Ii = 8 %

So Rg = 2.45 Mm3

Total annual recharge through rainfall infiltration (Rarf) [a+b+c] = 51.22 Mm3

Page 228: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 20

� Estimation of groundwater recharge through other sources (Raos) (a) Recharge through water spread area Rg = A x Sws Where A = 5.52 km2 Sws = 0.210 m/annum So Rg = 1.16 Mm3 (b) Recharge through Streams (Ss) Rg = A x Ss Where A = 2.35 km2 Ss = 1.899 m/annum So Rg = 4.46 Mm3 (c) Recharge through river (Sr) Rg = A x Sr Where A = 14.54 km2 Sr = 3.80 m/annum So Rg = 55.25 Mm3 (d) Recharge through mine discharge Rg = Ma x Ii Where Ma: Annual mine discharge from all 10 mines (including Lingaraj OC mine) = 18.49 Mm3 Ii : Infiltration index for mine dewatered discharge = 20% So Rg = 3.70 Mm3 Total annual recharge from other sources (Raos) [a+b+c+d] = 64.57 Mm3 Therefore, total annual recharge in the buffer zone = Rarf+Raos = 115.79 Mm3

� Estimation of mine inflow as mine water (Ramw) Estimated average annual mine inflow = 30.68 Mm3 (direct precipitation + strata seepage) for all 10 mines around the project Therefore, total annual recharge in the buffer zone =Rarf + Raos + Ramw= 146.47 Mm3

Page 229: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 21

� Inventory of ground water utilization

i. Ground water required (Di) for irrigating 16.55 km2 (1655 ha) of agricultural land @ 10,000 l/day/ha for 120 days (20% goes as seepage)$

: 1.58 Mm3

ii. Ground water required (Dh) for human population of 1,51,107 @ 60 l/day/capita for 365 days $$

: 3.30 Mm3

iii. Ground water required (Df) for forest area of 186.11 km2 (18611 ha) @ 2000 l/day/ha for 120 days $

: 4.46 Mm3

iv. Ground water required (Dc) for cattle population of 1,31,463 @ 20 l/day for 365 days $

: 0.96 Mm3

v. Mine discharge to natural drain : 18.49 Mm3

vi. Mine water industrial use : 5.63 Mm3

vii Ground water losses (Dso) due to sub-surface out-flow & evapo-transpiration (As per GEC norms)

: 14.64 Mm3

Total water discharge (losses) : 49.06 Mm3 $ Source : Forest Research Institute, Madhya Pradesh $$ As per GEC Norms.

� Net groundwater availability for industrial or any other purposes

Net ground water available for industrial or any other purposes = Total annual average ground water recharge - (total water utilization + total net draft from the surrounding area) = 146.47 … 49.06 = 97.41 Mm3

� Groundwater availability for unirrigated and cultivable wasteland

i. Unirrigated area (Cu) : 13,588 ha

ii. Cultivable wasteland (Cw) : 3,274 ha

iii. Total (Cu+Cw) : 16,862 ha

iv. Water required for irrigating 16,862 ha of land @ 10,000 l/day/ha for 120 days

: 20.23 Mm3

v. Out of 20.23 Mm3 of water used for irrigation of unirrigated and cultivable wasteland, 20% is again recharged into the aquifer. Hence, the required net water for application is (0.8 x 20.23)

: 16.18 Mm3

vi. Assuming additional future irrigation of 16,862 ha of hitherto unirrigated (Cu) and cultivable wasteland (Cw), the net discharge from the ground water aquifer will be (=49.06+16.18)

: 65.24 Mm3

Page 230: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 22

vii. Surplus water available per annum from the groundwater after meeting the future requirements for unirrigated and cultivable wasteland is (=146.47 … 65.24)

: 81.23 Mm3

(c) Hydrologic budget for the core zone

� Annual rainfall recharge (Rg) in core zone area Rg = A x R x Ii Where A = 14.10 km2 R = 1.257 m Ii = 12 % So Rg = 2.12 Mm3

� Inventory of groundwater discharge Losses due to sub-surface out-flow and evapo- transpiration @ 10% of Rg = 2.12 x 0.10 = 0.21 Mm3 Estimated mine dewatering as mine seepage = 1.87 Mm3 Total draft = 2.08 Mm3 Balance ground water in the core zone is (=2.12-2.08) = 0.04 Mm3

From the above water balance studies, it is observed from the

hydrogeological set-up of the Lingaraj OCP that the estimated annual averages mine

inflow rate is 1.87 Mm3/annum as strata seepage whereas the recharge for core zone

is 2.12 Mm3. From the above water balance studies, it is estimated that there is

surplus water available per annum from ground water annual recharge after catering

to the future requirement in the buffer zone and core zone, hence there is no impact

of mining is predicted.

Page 231: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 23

Table 4.6: Water balance & management for Lingaraj OCP expn. project (16.0 Mty/peak 20. Mty 0)

Figures in Mm3/annum

Inflow Outflow

Source In rainy season

In lean season

Purpose In rainy season

In lean season

Avg. make-up water in the quarry due to: Avg. treated mine discharge water for:

Direct precipitation, and seepage from strata & surrounding, etc.

2.05 1.81 Industrial use and fire fighting

0.35 0.70

Maximum effort will be made to keep the balance water in different sumps or low-lying area of the project. In unusual situations during monsoon, mine discharge water will be allowed to go as recharge / run-off in the same basin of the area

1.70 1.11

Total: 2.05 1.81 2.05 1.81

The waste water from mine will be collected in a sump pit located in the mine floor

from where it will be pumped out and diverted to a sedimentation pond to arrest suspended

solids. Then, clear water will be recycled for industrial use like, fire fighting and dust

suppression in haul road besides washing of dumpers or dozer in workshop or diverted to the

nearby water course. The pumping of mine water during mining in different coal projects in

general and Lingaraj OC Expn. Project, in particular will not adversely affect the ground

water regime in the surrounding area due to availability of sufficient replenishable annual

ground water recharge in the area.

(d) Ground water resource balance (Talcher & Angul blocks)

Talcher (Mm3/annum)

Angul (Mm3/annum)

i. Total ground water resource 64.86 97.64

ii. Utilizable resource for irrigation 49.62 74.70

iii. Utilizable resource for drinking purpose 9.73 14.65

Page 232: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 24

Talcher (Mm3/annum)

Angul (Mm3/annum)

iv. Gross annual draft 3.75 10.75

v. Annual net draft 2.62 7.53

vi. Balance ground water resource 52.51 75.47 @ Source: Central Ground Water Board, South Eastern Region, Bhubaneswar

4.2.4 IMPACT OF OPENCAST AND UNDERGROUND COAL MINES ON

GROUND WATER RESOURCE WITH IN THE BUFFER ZONE

Lingaraj OC Expn. project is situated in the south-eastern part of the Talcher

Coalfield (Plate No.I). The topography of the area is gently undulated. The general

slope is towards north. The elevation of the area varies from 85 to 120 m above

MSL. Local drainage is controlled by a small seasonal nullah flowing generally

towards north and discharging into the north-south. The Brahmani river passes at a

distance of roughly 3 km east of the project area.

The mean temperature recorded at IMD, Angul during winter season varies

from 6.7 to 34.9oC (December to February) whereas mean temperature during pre-

monsoon cyclone season ranges from 10.6 to 45.5oC (March to May). Generally,

humidity is highest in the month of August and least in the month of March or April.

The average relative humidity varies from 31 to 88%. The average annual rainfall of

the area as recorded for a period from 1980 to 2012 is about 1257 mm.

The geological exploration of Lingaraj block reveals that the Talchir formation

is not encountered in the block. Khararbari formation is represented of medium to

coarse grained pale, yellowish massive sandstones, loosely cemented by claying

matrix, thin shale bands and coal seams (Seam-I). Almost entire column of Barakar

formation is available in the block. The basal conglomeritic horizon is overlain by a

thick sequence of fine to course grained grayish feldspathic sand stones, gray to dark

gray shales, carbonaceous shales, thick coal seams, etc. Twelve coal seams of the

coalfield one available in these horizons. These coal seams are Seam-II to XIII in

ascending order.

The strike of the bed in Lingaraj block is in east-west direction. It takes NW

swing and finally to NE-SE in eastern part in the southern part of the block. The dip

of the strata varies from 3o to 12o towards north. Structurally the area is traversed by

33 steeply dipping (75o) normal faults traversing the block. The throw of these faults

Page 233: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 25

varies widely from less than 5.0 m to 250m. In general, strike of faults is in along E-

W and NW-SE.

All the 12 seams namely Seam(s) - II (Bot), II, III, IVA, IVB, V, VIA, VIB, VII,

VIII, IX, X, XI, XII and XII are mineable. Mineable reserve in this block is estimated

as 348.81 Mt. The ultimate working depth of the mine is about 273m.

Hydro-geological set-up of area The Hydrogeological Unit of CMPDI has studied hydrogeological set-up of Talcher

coalfield. In this area, the ground water occurs in the porous granular alluvial material and

weathered mantle as well as in the joints, fissures and fractures. These structures make the

porosity of the sediment to decrease with depth due to cemented nature of sandstone and

conglomerates. Ground water in the area occurs under both unconfined and confined

hydraulic conditions. The weathered mantle, recent alluvium act as unconfined aquifer or

phreatic aquifer.

The confined aquifer named in the order of superposition as Karharbari, Basal,

Lower Barakar, Middle Barakar and Upper Barakar aquifers. These aquifers mainly consist of

conglomerates and sandstones, which are interbedded with shales and coal seams as

aquitards and aquicludes.

The determination of aquifer characteristics of unconfined aquifer was carried out

by the pumping tests in dug wells by CMPDI around Lingaraj OC project. It is noted from the

pumping test data that the non-pumping water level ranges from 3.48 to 4.44 m.bgl. The

draw-down varies from 1.18 to 2.55 m and discharge ranges from 28 to 33 m3/day. The

specific capacity ranges from 0.504 to 1.45 m2/hr/m of draw-down. The average hydraulic

conductivity of unconfined aquifer is 2.13 m/day. The specific yield of the aquifer material is

4%.

Aquifer parameters for confining porous media were computed by analyzing the

pumping test data of the exploratory wells of CGWB and CMPDI around Lingaraj OC expn.

project. It is noted from the pumping test data that the piezometric head is 7.4m below

ground level. The transmissivity of the confining aquifer ranges between 1.64 to 20.18

m2/day and the storativity is 0.00078. The discharge varies from 33 to 31 m3/day with a draw-

down of 5 to 19.65 m. The average hydrauilic conductivity of the aquifer is 0.892 m/day.

Page 234: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 26

Water demand & management for the project

Peak water demand for this project has been assessed as 2860 m3/day for potable

and 5730 m3/day for industrial and fire fighting. Potable water is drawn from the Brahmani

river through the Integrated Water Supply Scheme (IWSS) of Talcher Coalfield. Water

demand for industrial and fire fighting is met from the treated mine discharge water.

Mine discharge

Three underground working mines, one abandoned underground mine and six

opencast working mines surround the project. The mining operation has created huge voids

of depressions. These voids or depressions are acting like micro-basins which form as

storehouse of water. This water has to be dewatered from time to time or constantly for safe

mining operation as "mine discharge water". This mine water is the combined water storage

of rainfall run-off and recharge, which is stored either in the working or abandoned mines and

decoaled voids and/or underground goaves. The mine water discharge for both underground

and opencast mines is presently estimated as 18.49 Mm3/annum for the buffer zone of the

project.

Average quantity of final discharge to natural drain is about 13934 m3/day in unusual

situations in rainy season. In general, every effort will be made to totally recycle/reuse the

treated effluents to the extent possible by keeping the make of water in different sumps or

low-lying area.

Water balance study

Water balance study was carried out within the area of 10 km radius from Lingaraj

OC project. The abstract of water balance is given below for impact analysis.

� Hydro-geological budget for buffer zone (including core zone)

(i) Estimation of ground water recharge through rainfall infiltration

Total annual recharge from all sources : 146.47 Mm3

(a) Recharge through formation : 51.22 Mm3 (b) Recharge through other sources : 64.57 Mm3

(c) Recharge as mine inflow (for all 10 mines) : 30.68 Mm3

(ii) Estimation of annual ground water draft : 65.24 Mm3

(a) Present ground water draft : 49.06 Mm3 (b) Future ground water draft : 16.18 Mm3

Page 235: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 27

Estimation of ground water balance : 81.23 Mm3 (Total annual recharge from all sources -- Annual ground water draft)

� Hydrologic budget for core zone Annual rainfall recharge : 2.12 Mm3 Annual estimated ground water draft : 2.08 Mm3

Estimation of ground water balance : 0.04 Mm3 (Annual rainfall recharge -- Annual ground water draft)

From above water balance studies, it is estimated that there is a surplus water

available per annum from ground water recharge after catering to the future requirement in

the buffer zone and core zone.

Impact of mining on hydro-geological regime

Lingaraj OC Expn. Project is surrounded by four underground and five opencast

mines within the area of 10 km radius from the project. This area is sustained by an average

annual rainfall of 1257 mm. The annual rainfall recharge and ground water draft are

estimated as 146.47 Mm3 and 65.07 Mm3 respectively for this area. Considering the hydro-

geological set-up of the area, the ground water or strata seepage for all the mines is

estimated as 18.69 Mm3. The estimated annual mine inflow including this project is 30.68

Mm3. It is observed that the mine water of 18.49 Mm3 is dewatered as the mine discharge

water to the natural drain. This mine inflow water is the mine operation induced or

accelerated additional rainfall recharge besides rainfall recharge (146.47 Mm3) to the area.

This mine inflow water has to be dewatered periodically or constantly for safe mining

operation. Moreover, it is found from the water balance study that the annual replenishable

rainfall recharge comes to about 81.71 Mm3 (Fig.-4.3) after considering mine discharge,

domestic as well as cultivation requirements of the area. The estimated maximum radius of

influence from the available hydrogeological parameters is 795m. The cumulative impact of

mine withdrawal / mine discharge and zone of influence for the area were studied from water

level data from regular monitoring of water level in the open dug well of the core zone (nearer

to the mine) at Deulbera village. The water level data plot is given in Fig.4.4-4.5 Hydrologic

budget of the core zone reveals that the extraction of ground water by mining is less than the

annual rainfall recharge.

Page 236: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 28

Conclusions

The following conclusions are drawn from the above study:

-- Mining operation has created voids or depressions, which are inducing

or accelerating rainfall recharge and run-off in the mining area.

-- After considering mine discharge, domestic as well as cultivation

requirements, the annual replenishable rainfall recharge comes to

about 81.71 Mm3/annum.

-- Maximum effort will be made to recycle or reuse the treated effluents

totally to the extent possible by keeping the make of water in different

sumps or low lying area of the project. In unusual situations during

monsoon, mine discharge water is allowed to go as recharge/ run-off in

the same basin of the area.

-- No adverse impact on water level of open dug well is observed due to

cumulative withdrawal of mine water.

Page 237: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 4

, Pag

e -

29

F

igu

re 4

.3 :

Flo

wch

art

sho

win

g w

ater

bal

ance

sta

tem

ent

for

the

area

wit

hin

10

km r

adiu

s fr

om

Lin

gar

aj O

C E

xp 2

0.0

Mty

P

roje

ct M

ine

wat

er f

or

ind

ust

rial

use

[ 5

.63

Mm

3 ]

AT

MO

SP

HE

RE

Eva

po

rati

on

Lo

sses

[

83.6

7 M

m3

/ an

nu

m ]

Su

rfac

e R

un

-off

or

Str

eam

Flo

w

[ 31

3.86

Mm

3 / a

nn

um

]

Dep

ress

ion

Sto

rag

e lik

e P

on

ds

& L

akes

[

13.8

Mm

3 / a

nn

um

]

Gro

un

dw

ater

rec

har

ge

as S

ho

rtag

e [1

46.4

7 M

m3

/ an

nu

m]

Fu

ture

wat

er r

equ

irem

ent

for

un

irri

gat

ed &

cu

ltiv

able

was

te la

nd

[ 1

6.61

Mm

3 ]

Wat

er f

or

Do

mes

tic

Req

uir

emen

t [

2.73

Mm

3 ]

Wat

er f

or

Cat

tle

Po

pu

lati

on

[ 0

.79

Mm

3 ]

Wat

er f

or

Fo

rest

Cu

ltiv

atio

n [

4.4

6 M

m3

]

Wat

er f

or

Irri

gat

ion

[ 1

.58

Mm

3 ]

Min

e d

isch

arg

e to

nat

ura

l dra

in [

18.

49 M

m3

]

Su

b-s

urf

ace

Ou

tflo

w [

14.

47 M

m3

]

Bal

ance

Gro

un

dw

ater

Rec

har

ge

[ 81

.71

Mm

3 ]

An

nu

al R

ain

fall

[ 55

7.80

Mm

3 / a

nn

um

]

R e c y c l i n g

Bra

hm

ani

Riv

er

Ou

tflo

w

Infl

ow

No

te

Min

e di

scha

rge

from

Tal

cher

, Han

didu

a,

Deu

lber

a &

Nan

dira

U/G

min

es;

Jaga

nnat

h, S

outh

Bal

anda

, Bha

ratp

ur,

Ling

araj

,Lin

gara

j&K

alin

ga

Page 238: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 4

, Pag

e -

30

F

igu

re:

4.4

Pre

mo

nso

on

& P

ost

mo

nso

on

Gro

un

d w

ater

Lev

els

S

tati

on

: D

eulb

era

villa

ge

Du

g w

ell (

0.44

Km

wes

t o

f so

uth

eas

t b

ou

nd

ary)

So

urc

e :

CM

PD

I Ro

uti

ne

En

viro

nm

enta

l Mo

nit

ori

ng

Cel

l

Page 239: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 31

4.3 NOISE QUALITY 4.3.1 NOISE IMPACT ASSESSMENT

The major adverse impacts during pre-mining and mining phases are

generation of obnoxious levels of noise & vibrations which also spread in

neighbouring communities.

The other impacts are occupational health hazards, damage to structures,

disruption in wildlife, etc.

� NOISE PRODUCING SOURCES

The sources of noise will be:

� Drilling operation in coal and OB.

� Blasting for overburden and coal.

� Operation of HEMMs

� Operation of equipment in CHP, workshop, etc.

The noise associated with mining activities may be classified into three types: � Continuous

� Intermittent

� Impulse

� IMPACT OF NOISE

The workmen associated with the operation of HEMMs, etc. will experience a

noise level above stipulated 90 dB (A) [DGMS Circular, No.18 (Tech.) of

1975] for more than 4-4.5 hours per shift. Unless suitable mitigatory

measures are taken, high noise pollution will have impact on the workmen. It

is worthwhile to mention that intermittent and impulse noises are considered

to be less dangerous than continuous noise due to the short exposure

duration except under the situation when the level exceeds 115 dB (A).

Page 240: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 32

4.3.2 NOISE POLLUTION CONTROL MEASURES

The following measures shall be taken:

� Proper designing of plant & machinery by providing in-built mechanisms

like silencers, mufflers and enclosures for noise generating parts and

shock absorbing pads at the foundation of vibrating equipment.

� Routine maintenance of equipment.

� Enclosures for crusher house, etc.

� Rational deployment of noise generating plant and machinery.

� Greenbelts around the quarry, infrastructure sites, service building area

and township besides avenue plantation on both sides of the roads to

maintain noise level at night time within the limit for the inhabited

localities situated at a very close proximity.

� Locating township away from noise centre.

� HEMMs with sound proof cabins.

� Chute linings in CHP.

� Provision of isolation for vibrating equipment (both fixed and mobile)

foundation.

� Personal protective devices to all the persons working in high noise

areas.

� Regular monitoring of noise levels at various points.

4.4 RISKS AND HAZARDS

Risks and hazards arise mainly from blasting and mine occupational activities

and are well established.

4.4.1 IMPACT ON BLASTING VIBRATION

Blasting may affect the mineworkers as well as people residing in the vicinity

of mine and dependent upon the type & quantity of explosives used pit geology,

topography and confinement of the blast.

Page 241: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 33

� Measures for safe blasting

Due attention will be given to the following factors:

(a) All provisions of Coal Mines Regulations will be followed.

(b) Overcharging will be avoided and quantity of explosive will be decided

as per conditions imposed by DGMS.

(c) Stemming material to be used is sand. However, the drill cuttings and

chips of triangular shape can be used as an effective stemming material

with proper packing.

(d) Use of millisecond delay detonators that are initiated by shock tube

initiation system, between rows and between holes in the same row.

(e) Blasting will be done in day time during the shift change over period as

per requirement. However, the frequency of blasting will depend upon

the availability of land (tenancy in particular), DGMS permission for use

of explosive, meteorological condition, geo-mining condition and

method of mining.

(f) Before blasting is done, warning sound is given so that people can

move to safe places.

4.4.2 BLASTING AND VIBRATION CONTROL MEASURES

� Proper conformation to measures for safe blasting as mentioned above,

to avoid damage to any structure or annoyance to the people in the

colony area or neighbouring villages.

� Proper design factor will be taken while constructing various structures

for stability against vibration.

� A blasting danger zone will be kept around the periphery of the quarry.

This zone will be kept free from village habitation and community

infrastructure and thus impact of vibration after blasting on the surface

structures is avoided.

Page 242: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 34

� Controlled blasting will be done near built-up areas and surface

features, as and when required.

� Adoption of present day technology of use of site mixed slurry (SMS)

explosives.

4.5 IMPACT ON SOCIO ECONOMIC PROFILE

The major adverse impact is the displacement and rehabilitation /

resettlement of affected people including change in culture, heritage & related

features. The crime and illicit activities also prop-up due to sudden economic

development of the area.

4.5.1 SOCIAL IMPACT

� POPULATION GROWTH

Skilled manpower required for the project may not be available in the area.

Only semi-skilled and unskilled workers will be available from the local

population. So people will migrate to this segment both from within and

outside the district as well as the state due to creation of new employment

opportunities.

� EDUCATIONAL FACILITIES

A number of educational institutes are already there in the buffer zone and its

neighbourhood. The facilities already provided in the neighbouring projects

will cater to the need of this project. So migration of population will not strain

the local educational facilities already available. Further, the educational

institutes owned by MCL are also accessible to local population.

� HEALTHCARE FACILITIES

The coal company has a number of healthcare centres including a well

equipped Regional Hospital and a specialised “referral” hospital in the

coalfield area. Provision of healthcare facilities have been provided in the

project report. Healthcare facilities have been provided in the neighbouring

projects. The above facilities will cater to the need of employees of this

project. The local people can also avail these healthcare facilities.

Page 243: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 35

� ECONOMIC IMPACT

� Loss of agricultural land � General improvement of economy of the area � Increase in revenue of the state exchequer

� IMPACT ON VILLAGE HABITATION

The project area (including the expansion project) comprising of excavation

zone, infrastructure sites, ext. OB dump area and safety zone for blasting

covers partly and/or fully 7 (seven) inhabited villages namely, Balugaon,

Balugaon-Khamar, Langijoda, Ambamunda, Nakulbaspur, Hensamul and

Madanmohanpur besides some uninhabited villages. These families will be

resettled and rehabilitated socially, culturally and economically along with

other displaced such as major married sons, unmarried daughters of 30

years of age, etc., as per latest Norms of Govt. of Orissa, May 2006. Details

of project affected families and project affected persons are given below:

S.No. Name of village Project affected families

Project affected persons

Remarks

1 Balugaon 264 508 ---- 2 Langijoda 421 441 ---- 3 Talabeda Nil 341 ---- 4 Majirurihota Nil 40 ---- 5 Gengutia Nil 216 ---- 6 Dadara Nil 63 ---- 7 Dhempakuta Nil 66 ---- 8 Manikagoda Nil 48 ---- 9 Malipoda Nil 124 ----

10 Badapasi Nil 24 ---- 11 Debalayapur Nil 50 ---- 12 Balugaon Khamar 209 516 ---- 13 Ambamunda 124 74 ---- 14 Nakulabaspur 144 ---- 15 Madanmohanpur 116 189 ---- 16 Khandhulbahal Nil 6 ---- 17 Daulbera Nil 182 ---- 18 Remun Nil 12 There is no R&R for this

village 19 Hensamul Nil 361 This village in covered under

R&R of Bhubaneswari and Ananta OCP

20 Kandhal Nil 67 There is no R&R for this village

Total 1134 3472

Page 244: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 36

However, the exact number of project affected families will be known after

due enumeration by the Project Authority.

4.5.2 SOCIO-ECONOMIC CONTROL MEASURES

� Project affected families will be resettled and rehabilitated socially,

culturally and economically along with other displaced families such as

major married sons, unmarried daughters of 30 years of age,

divorcee/deserted women/widows, physically handicapped and / or

mentally retarded persons irrespective of age and sex, unmarried

brothers/sisters whose parents are not alive, homestead less families

(unobjectionable encroachers) and landless families (unobjectionable

encroachers) as per latest ‘Norms of Govt. of Orissa’ .

� Resettlement colony will be provided with all infrastructure facilities like

roads, dug wells, tube wells, play ground, schools, community center,

dispensary, shopping center, etc.

� Suitable compensation will be offered to the families from whom land

including homestead land will be acquired. In all circumstances

compensation will be paid before actual displacement. All the payments

will be made by account payee cheques.

� Cash grant in lieu of job may be given.

� Vocational training will be provided.

� Interest free financial assistance will be provided where necessary.

� Monetary benefits to physical handicapped and mentally retarded

persons for self-relocation of site elsewhere will be provided.

� Incentive to displaced families for timely vacation of land will be

provided.

� Peripheral developmental activities like education, roads, bridge, water

supply, health, etc. are will be provided. A lump sum amount (in

Rs.lakhs) will be kept annually for peripheral development activities.

Page 245: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 37

� Supply of drinking water in nearby villages during summer season will

be provided.

4.6 IMPACT ON BIO-DIVERSITY

The major adverse impacts due to pre-mining and mining phases are loss of

habitat, biodiversity, flora & fauna, fisheries & other aquatic life, migration of wildlife

and overall disruption of the ecology of the area.

4.6.1 IMPACT ON FLORA

� Forest land in the core zone in the expansion project (particularly in the

excavation area) will be diverted for mining. The forest land for diversion

is 186.311ha.

� The combined impact of operating coal mines and proposed coal

projects may influence the forest land in the buffer zone.

� Due to biotic interference and forest fire, even the reserve forests in the

area are not found to harbor many species of floral population. The

reserve forests are found to be in degraded conditions.

� Both core and buffer zones are found to be free from ecologically

sensitive and biologically rich areas/habitats, such as national parks,

sanctuaries, biosphere reserves and areas rich in genetic resources.

� There are no rare, threatened and endangered plant species in the

buffer zone.

4.6.2 IMPACT ON FAUNA

� The population of fauna, especially mammals, is found to be low. So

there will be no adverse impact on the fauna existing in the project

impact area as they will migrate to the nearby forests.

� The area is not the migratory route for any wild animal.

Page 246: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 38

� There are no rare, threatened and endangered faunal species in the

buffer zone except Rana tigrina and Varanus which is also found in the

other parts of the district and state.

4.6.3 CONTROL MEASURES

4.6.3.1 CONTROL MEASURES TO REDUCE THE IMPACT ON FLORA

� The enhancement of forest area occurs due to measures like biological

reclamation of backfilled area, arboriculture / afforestation,

compensatory afforestation creation of greenbelt and avenue plantation.

� Water body created by the final voids is beneficial to flora as the area is

prone to water scarcity.

� This project will have no detrimental impact on diversity of floral species

within terrestrial and aquatic habitats.

4.6.3.2 CONTROL MEASURES TO REDUCE IMPACT ON FAUNA

� The balance in the regional population will be maintained in natural

course, owing to existing undisturbed forest areas in the vicinity of the

project. The increase in green cover due to implementation of various

measures like biological reclamation of backfilled area, arboriculture /

afforestation adopted by the mine establishment will be an added

bonus, though expected in distant future.

� The mine is a •zero-dischargeŽ one. If required, water is discharged

only after suitable treatment. No adverse impact on downstream aquatic

life of surface water courses is expected.

� The project is not likely to have impact on the faunal species diversity

within the terrestrial and aquatic habitats.

4.7 IMPACT ON LAND USE AND LANDSCAPE

4.7.1 IMPACT ON LAND USE PATTERN

The major direct impacts on existing land use during the pre-mining phase

area the removal of vegetation and resettlement of displaced population. There may

also be landuse changes with respect to agriculture, fisheries, recreation sites,

housing, forestry areas, etc. Land reclamation / restoration of mined out lands may

Page 247: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 39

give rise to enhanced beneficial land use. There will be change in land use for the

expansion project.

There exists major environment impacts due to landscape disruption

particularly visuals (unsightly huge dumps, voids, mine structures, subsidence, mine

fires, etc.). During mining and post-mining phases drastic changes in landscape with

landforms take place. The major associated impacts are soil-erosion, loss of top soil,

change in complete geology, creation of huge dumps & voids, disposal of wastes,

deforestation, etc.

Irrespective of the type of mining used for extracting coal, mining invariably

results in enormous land disturbance … e.g. large scale excavation, removal of top

soil, dumping of solid wastes, cutting of roads, creation of derelict land, etc. Opencast

mining has more potential impact on land than underground mining. With improved

technology, opencast coal mining is being used extensively because of its cost

effectiveness and productivity; though it results in large-scale land disturbance. The

alteration in land use pattern due to infrastructure is not to be considered as true

change as these facilities can be utilized for some other purposes after the mining

operation is over. The alteration in land use pattern due to activities of quarrying and

external dumping of OB materials may be considered as true change in land use

pattern.

4.7.2 LAND REQUIREMENT

(Area in ha)

Sl. No. Item

For existing 13.0 Mty Addl. land for incremental production (3.0 Mty)

Total for 16.0 Mty

Forest Non-forest Total Forest Non-forest Total

Forest Non-forest Total

1. Quarry excavation* 109.679 401.172 510.851 4.18 23.82 28.00 113.859 424.992 538.851

2. Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

76.632 504.287 580.919 -- -- -- 72.452 480.467 552.919

3. OB dump area (external) -- 256.030 256.030 -- -- -- -- 256.030 256.030

4. Infrastructure (workshop, CHP, project office, railway siding etc.)

-- 51.800 51.800 -- -- -- -- 51.800 51.800

5. Rationalisation of project boundary and diversion of

-- 10.410 10.410 -- -- -- -- 10.410 10.410

Page 248: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 40

Sl. No. Item

For existing 13.0 Mty Addl. land for incremental production (3.0 Mty)

Total for 16.0 Mty

Forest Non-forest Total Forest Non-forest Total

Forest Non-forest Total

existing coal transporta-tion road.

Mining lease area (1 to 5)

186.311 1223.699 1410.01 4.18 23.82 23.00 186.311 1223.699 1410.01

6. Residential colony -- 6.000 6.000 -- -- -- -- 6.000 6.000

7. Rehabilitation colony -- 77.190 77.190 -- -- -- -- 77.190 77.190

Outside Lease area (6 to 7)

-- 83.190 83.190 -- -- -- -- 83.190 83.190

Total : 186.311 1306.889 1493.20 4.18 23.82 23.00 186.311 1306.889 1493.20 *There is no change in the mining lease area only an additional area of 28 ha

in quarry area will be increased from the safety zone of Lingaraj OCP.

4.7.3 CONTROL MEASURES TO RESTORE LAND USE & LANDSCAPE

� Solid waste generated due to coal extraction will be backfilled. There

will be no externally dumping. The external OB dump has already been

technical reclaimed and biological reclaimed.

� During the process, the geometrical shape of the dumps is altered to

make it amenable to effective biological reclamation and also to provide

safety and stability.

� The face slopes of the dump will be maintained at the natural angle of

repose of the material and at overall slope angle of 28o.

� Suitable drainage arrangement for smooth disposal of storm water.

� Appropriate garland drain is to be provided to collect run-off.

� Backfilled area is to be reclaimed bio-logically and technically.

� Topsoil shall be progressively and concurrently utilized during physical/

technical reclamation of backfilled area, thus obviating the necessity of

storage of topsoil separately.

� Arboriculture is to be carried out in the vacant areas.

� Proper afforestation / plantation are to be carried out for greenbelt

development.

Page 249: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 41

4.8 IMPACT ON TRAFFIC MOVEMENT & CONTROL MEASURES

Coal transportation will take place from CHP to rapid loading system (RLS)

through CCT. Both coal transportation road and the siding are located within the

mine lease area. Therefore, effect of traffic movement within the mining lease area is

negligible on residential area.

The following control measures are adopted and shall be continued:

� Plantation on both sides of the roads on the surface.

� Proper maintenance of road to remove ruts and potholes.

� Proper illumination of roads including haul road.

4.8.1 VISUAL/AESTHETIC IMPACTS & CONTROL MEASURES

The following visual impacts are anticipated:

� Due to excavation of coal and OB as well as transportation, the area

may have spots of eyesore, unless proper mitigatory measures are

adopted.

� Water logging may occur due to changes in the drainage pattern of the

area.

� Loss in aesthetic value of the surrounding environment.

The following control measures are adopted and shall be continued:

� Physical and biological reclamation of mined out land to the extent

possible to ameliorate the environment.

� Regular supervision to detect the spots of eyesore and to remove the

same immediately.

4.9 IMPACTS ON PUBLIC HEALTH

Various respirable and water-borne diseases are cause of concern for public

health and safety in mining areas due to high intensity dust nuisance and pollution of

water bodies and contaminated water supply. Health care centers (medical centers)

Page 250: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 4, Page - 42

are usually distantly located and provision of medical facilities by project developers

results in beneficial impact. There is a general cause of concern for safety due to

blasting/ explosions, noise & vibrations, etc.

4.9.1 CONTROL MEASURES ON PUBLIC HEALTH

Better sanitation, medical facilities and other infrastructural facilities, there is

likelihood of the reduction in disease. However, regular medical check up of

employees particular those put on risky and occupational hazards should be done

periodically.

4.9.2 WELFARE MEASURES FOR EMPLOYEES

Necessary infrastructure facilities like parting, rest area, canteen, etc. have

been provided for the welfare of the employees.

Sl.No. Items Area (in Sq.m.)

In Service Building

1. Staff Rest House 284

2. Officers Guest House 276

3. Rest Shelter 63

4. Scooter / Cycle Shed 250

5. Guarage 800

6. Canteen 245

In Workshop Complex

1. Canteen 200

2. Dumper parking area 600

3. Vehicle Parking Area 600

Page 251: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 5, Page - 1

Chapter – 5

ANALYSIS OF ALTERNATIVE TECHNOLOGY 5.1 INTRODUCTION

Coal industry in India has expanded enormously over the years in terms of

volume of production and is poised to grow rapidly in future also to meet the over

increasing energy demand.

In order to meet growing energy demand, opening of new coal mines and

expansion of existing mines are being planned.

The mining operation like drilling, blasting, extraction, transportation, crushing

and other associated activities are carried out in opencast mining. Mining operations

may affect the environment & ecology, unless carefully planned and controlled.

There is a need for balance between mining and environmental requirement.

5.2 MINING TECHNOLOGY FOR ENVIRONMENTAL

MANAGEMENT

In mega opencast mining projects, large tracts of agriculture, forest or other

land are required for excavation thus cause depleting of the forest cover and fertile

land and consequently the ecology & environment of the region. There will be air,

water and noise pollution due to various mining activities like excavation,

transportation, coal beneficiation plant, CHP, workshop, etc.

Considering the working of 13 coal seams and structure with multiple faults

(33 nos.), it is envisaged to continue the present shovel-dumper mining system.

Inclined system of working in the eastern part where moderate seam gradient exist

would be continued. However, it would be necessary to switchover to level slicing in

the remaining area because of steep gradient. For the incremental coal, 3.0 Mty is

proposed to be outsourced by blast-free mining.

Page 252: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 5, Page - 2

Considering presence of (i) multiple coal seams [13 nos.], (ii) highly faulted

structure [33 faults], (iii) steep gradient [10o to 15o], it is proposed to provide hydraulic

excavators to offer more flexible operation. 9.5 cum hydraulic shovels and rear

dumpers 100T are envisaged towards the requirement of additional equipment. 9.5

cum hydraulic shovels would be mainly deployed to extract top overburden alongwith

upper thick parting stratas viz. partings above seams VII, seam VIII & seam IX. Coal

is proposed to be extracted by outsourcing using blast free mining.

Ther different alternative technology are described below:

� Dip rise mining

� Deployment of surface miner

� Blasting technology

� In pit crushing and conveying

� Deployment of high capacity HEMM

� Dip Rise Mining

Depending on the Geo-mining condition dip-rise method of working may be

considered wherever applicable for maximization of internal dumps resulting in less

requirement of land for external overburden dumps.

� Deployment of Surface Miner

Blast free technology (Deployment of Surface Miner), which contributes to

eco-friendly mining, has been been proposed for Lingaraj OC Expn. Project. Surface

miner eliminates the dust/noise generating operations like drilling, blasting, crushing

etc.

� Blasting Technology

The controlled blasting technology will allow the opencast working closer to

the nearby habitations and as a result the requirement of the safety zone will also be

reduced along with the overall requirement of land for mining.

Page 253: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 5, Page - 3

� In pit crushing and conveying

Many of the future opencast mines would require excavation and

transportation of large volume of coal & overburden keeping pollution level within

permissible limit. In-pit crushing and conveying system using mobile/ semi-mobile

crushers may have to be considered with suitable dust suppression arrangements as

an alternative to dumper transport.

� Deployment of high capacity HEMM

Higher capacity HEMM are being planned to use in large capacity mines to

reduce equipment density in the mine, which will result less air and noise pollution.

Page 254: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 6, Page - 1

Chapter – 6

ENVIRONMENTAL MANAGEMENT SYSTEM AND MONITORING ORGANIZATION

6.1 ENVIRONMENTAL MANAGEMENT SYSTEM 6.1.1 INTRODUCTION

Environmental management system is a system for maintaining and

reviewing the sustainable development in the environment. It is the part of the overall

management system which includes on organization structure, planning activities

responsibilities, practices, procedures process and resources for developing,

implementing, achieving, reviewing and maintaining the environmental policy.

6.1.2 AIMS OF ENVIRONMENTAL MANAGEMENT SYSTEM

� Identification and control of aspects, impacts and risks.

� Establishing an environmental policy, objectives and targets including

compliance with legislation.

� Indentifying environmental opportunities.

� Monitoring and continual improvement of environmental performance.

6.1.3 PROCEDURES FOR IMPLEMENTATION

� For the implementation of the Environmental Management System

within an organization, the first step is to define the environmental

policy.

� The top management of the organization should define and document

its environmental policy.

� The second step is to conduct initial environmental reviews like

legislative and regulatory requirement, an identification of significant

environmental aspects, an examination of all existing environmental

management practices and procedures and an evaluation of feedback

from the investigation of the previous incidents to assess the company•s

environmental conditions.

Page 255: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 6, Page - 2

6.2 MONITORING ORGANISATION

6.2.1 CORPORATE LEVEL

Mahanadi Coalfields Limited (MCL), the owner of this project, has an

Environment Department headed by a General Manager (Envt.) at its HQs. The

department provides necessary support that is required for environmental

management of various mining projects under the jurisdiction of the company.

6.2.2 AREA LEVEL

The MCL has been divided into a number of administrative units known as

Area each headed by a CGM/GM. The CGM/GM(s) of the Area(s) coordinate the

rehabilitation scheme, land reclamation, plantation, compensatory afforestation and

other environmental control measures including environmental quality monitoring in

consultation with the State Govt., Environmental Cell(s) of Area(s) and MCL (HQs),

Orissa Forest Development Corporation (OFDC), State Forest Dept., Staff Officer

(Environmental Management & Control) and SO(L&R) of the Area. The Staff Officer

(Environmental Management & Control) gets the necessary ministerial and other

infrastructure facilities including a vehicle for movement for effective implementation

of various measures from the office of CGM/GM of the Area.

6.2.3 PROJECT LEVEL

The environmental management activities of the project are carried out under

the overall supervision of the Project Officer. Following persons are provided for

execution of the activities:

(a) Project Manager … Overall control of coal production, overburden

removal, land reclamation, safety and security of the mine and the

persons working therein, R&R activities, etc. He provides all the

financial and technical support for carrying out the above activities.

Page 256: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 6, Page - 3

(b) Project Safety Officer- Responsible for safety of the mine and

workers, control of air pollution, water pollution, noise pollution, ground

vibration etc.

(c) Project Civil Engineer … Responsible for construction and

maintenance of effluent treatment plants, black topping & metalling of

roads & haul roads, cleaning and overall house keeping of the CHPs,

railway siding, construction and maintenance of check dams, garland

drains, fixed sprinkler at haul road, railway siding, etc.

(d) Project E&M Engineer … Responsible for dust suppression

arrangement of CHP, surrounding area, etc.

(e) Project Excavation Engineer … Responsible for providing the water

tankers, dozers, scrapers, etc. for air pollution control activities and land

reclamation activities.

(f) Project Survey Officer … R&R related activities and measurement of

land for reclamation, providing plan for next years plantation activities,

monitoring assistance, etc.

(g) Project Environment Engineer … He advises the Project Manager /

Project Officer on environmental management activities. He also

arranges for biological reclamation and other plantation activities

through OFDC.

The organizational structures for mine as well as environmental management

and environmental monitoring are given in Fig.-6.1 & Fig.-6.2 respectively.

Page 257: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 6

, Pag

e -

4

EX

IST

ING

OR

GA

NIS

AT

ION

AL

ST

RU

CT

UR

E O

F E

NV

IRO

NM

EN

TA

L M

AN

AG

EM

EN

T

Di

rect

or (T

echn

ical /

Proj

ect &

Plan

ning

)

Gene

ral M

anag

er (E

nviro

nmen

t.)

Cons

erva

tor of

For

est

Engin

eers

(Env

ironm

ent &

Civi

l) Sr

.Sur

vey O

fficer

(For

est)

CGM/

GM (L

inga

raj A

rea)

Staff

Offic

er (C

ivil)

Staff

Offic

er (E

&M)

Staff

Offic

er (S

urve

y) wi

th ad

dl. C

harg

e of F

ores

t St

aff O

fficer

(Med

ical)

Staff

Offic

er (S

afety)

St

aff O

fficer

(Per

sonn

el)

Staff

Offic

er (E

nviro

nmen

t)

Staff

Offic

er (M

ining

) St

aff O

fficer

(Sec

urity

) St

aff O

fficer

(Exc

avati

on)

Staff

Offic

er (F

inanc

e)

Staff

Offic

er (M

ateria

l Man

agem

ent)

Staff

Offic

er (S

ystem

) St

aff O

fficer

(Tra

ining

) Pr

ojec

t Offi

cer L

inga

raj O

CP)

Proje

ct En

ginee

r (Ci

vil) w

ith ad

dl. ch

arge

of E

nviro

nmen

t Pr

oject

Engin

eer (

Finan

ce)

Proje

ct En

ginee

r (Mi

ning)

Pr

oject

Engin

eer (

Safet

y) Pr

oject

Secu

rity O

fficer

Pe

rsonn

el Ma

nage

r Me

dical

Offic

er

Proje

ct En

ginee

r (E&

M)

Proje

ct En

ginee

r (Ex

cava

tion)

Pr

oject

Surve

y Offic

er w

ith ad

dl. C

harg

e of F

ores

t Pr

oject

Mana

ger(S

tore)

Pr

oject

Engin

eer (

Civil

) Pr

oject

Engin

eer (

Civil

) Pr

oject

Engin

eer (

Civil

)

Corporate Level Area Level Project Level

Fig

.- 6

.1

Page 258: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 6, Page - 5

6.3 MONITORING AND CONTROL

For air, water and noise pollution control measures, the samples are

collected and tested round the year with appropriate frequency at strategic places. In

case, it is found that any of the parameters exceeds the tolerance limits then

corrective measures are suggested by CMPDI to MCL for implementation. The

monitoring schedule and the parameters to be monitored are given below:

6.3.1 AIR POLLUTION MONITORING

This includes the identification of major dust and gaseous sources and

estimation of their levels of emission. The monitoring network consists of the

following two types of stations with different objectives:

Organisational Structure for Environmental Monitoring

CMPDI, RI-VII & Laboratory [CMPDI(HQs)]

In-Charge, Env. Monit. Cell, Talcher C/F

Sampling Staff

Analyses of samples at CPCB approved Laboratory

at CMPDI (HQs), Ranchi

Result of analysis

Monthly Monitoring Report to Project Officer,

( Lingaraj OC Expn. OCP) CGM, Talcher Area &

GM (Envt.), MCL (HQs).

Fig.- 6.2

Page 259: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 6, Page - 6

� Permanent air pollution monitoring stations

Permanent stations are established for the project to monitor the air quality.

Monitoring is carried out for two days in a month (one day in each fortnight) at

each location. Air samples are analyzed for PM10, PM2.5, SO2 and NOX.

� Temporary air pollution monitoring station

Temporary stations are established as and when required to identify the

source of dust and gaseous emissions. The air samples are analyzed for

parameters as mentioned above.

6.3.2 WATER QUALITY MONITORING

The following frequency is maintained for water and effluent quality

monitoring for each station:

� Drinking water quality monitoring

Once in a month for 27 parameters as per IS: 10500-1991.

� Effluent quality monitoring

� Once in a fortnight for 4 parameters;

� Once in a year for 23 parameters.

6.3.3 GROUND WATER LEVEL MONITORING

From nearby wells located at appropriate locations, ground water level will be

monitored 4 times in a year (i.e. April/May, August, November & January).

6.3.4 NOISE LEVEL MONITORING

Noise level is monitored for once in day time and once in night time in each

fortnight from each station.

Page 260: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 1

Chapter – 7

ADDITIONAL STUDIES

The following additional studies have been considered for this project:

(i) Disaster Management

(ii) R&R Action Plan

(iii) Corporate Social Responsibility

(iv) Habitat Management / Wild Life Conservation Cost

(v) Public Consultation

(vi) Rain Water Harvesting

(vii) Slope stability Study

(viii) Impact on riparian system within the 10 kms radius of the mining

7.1 DISASTER MANAGEMENT (RISK ASSESSMENT & MANAGEMENT)

7.1.1 INTRODUCTION

Keeping in view the three basic principles i.e. prevention, preparedness (both

pro-active and reactive) and mitigation of effect through rescue, recovery, relief and

rehabilitation; a comprehensive blue print for risk assessment and management has

been drawn-up for the project incorporating the following:

� Identification and assessment of risks.

� Recommendation of measures to prevent damage to life and property

against such risks.

The following disasters / accidents may occur during normal operations of the

mine.

� Slope failure

� Dangers due to handling and use of explosives and accidents due to

fly-rocks following a faulty heavy blast

� Hazards associated with use of electricity

Page 261: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 2

� Dust hazards

� Fire hazards due to spontaneous heating of coal in stockpiles and

exposed benches

� Fire hazards in stores and workshops where inflammable and highly

inflammable materials are stored and used

� Danger of inundation from surface and/or ground water, rain water

� Road accidents

� Natural calamities/disasters

7.1.2 SLOPE FAILURE IN MINE PIT

Slope failures are affected by the following factors:

� Slope geometry

� Geological Structure

� Lithology

� Ground Water

� Mining method & equipment

� Dynamic forces.

� Shear strength of road and cohesion

� Angle of friction

The exposed ends of the coal seams and OB will be left with a safe slope to

avoid slope failure and collapse of benches. Similarly, at the end of mining operation,

safe terminal slope will be provided to avoid pit failure.

7.1.3 HAZARD AND RISK ASSESSMENT OF OB DUMPS

Hazard of OB dump failure is mainly governed by following factors :

� Height of benches

� Slope of benches

� Nature of materials

� Drainage facilities

Page 262: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 3

7.1.4 PRECAUTION TO BE TAKEN TO REDUCE RISK OF OB DUMP

� Bench will be made < 30m in each tier.

� Angle of repose for each dump to be 37o and overall slope to be 28o.

� Slope of ground should be mild and should not have adverse effect.

� Garland drain to be made around OB dump area.

� Technical & biological reclamation.

� Toe wall around the OB dumps.

7.1.5 BLASTING

For proper blasting and minimizing the adverse side effects due to blasting,

viz. noise, ground vibration, back-breaks, air blast, fly rocks, etc., the following

precautions have been suggested to avoid dangerous situations:

� A safety zone for blasting has been provided around the quarry.

� Before blasting is done, warning sound will be given so that people can

move to safe places.

� Controlled blasting with site mixed slurry. Use of millisecond delay

detonators that are initiated by shock tube initiation system, between

rows and between holes in same row.

� Optimisation of quantity of explosive in a blast hole.

� Blasting shall be carried out in conformity of extant laws with closer

control of blasting parameters including blasting results like desire

fragmentation, permitted vibration, etc.

� Blasting will be made in day time only.

7.1.6 EXPLOSIVE HANDLING

The present day technology of blasting with site mixed slurry (SMS) explosive

shall be used with milli second delay detonators that are initiated by shock tube

initiation system. SMS is stored by the supplier as per GOI Notification. Further,

Page 263: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 4

transport and charging are also done by the supplier on the spot. Only priming will be

done by the project authority. For storage of explosives meant for priming,

detonating fuse and detonators, one service magazine has been provided.

7.1.7 SAFETY RULES

Mining operations follow statutory mine safety rules administered by the

Directorate General of Mine Safety (DGMS), Chief Controller of Explosives and

others. Planning and design of electrical installations will take into account the

existing electricity rules to obviate the hazards due to use of electricity.

For creating safety awareness and imparting education on safe practices, the

following steps shall be taken:

� Holding annual safety weeks.

� Imparting basic and refresher training to new and old employees

respectively as per Vocational Training Rules.

7.1.8 MINE INUNDATION

Provisions in Coal Mine Regulations shall be followed. The mine pit would

receive water from three sources namely, direct precipitation over excavated area,

surface run-off from the surrounding area and seepage from the strata. During heavy

rainstorms, there may be a situation when mine may get flooded. This may cause

loss of human life and equipment, etc. All the necessary precautions will be taken

against such eventuality through out the life of the project.

7.1.9 FIRE

Adequate fire fighting arrangement has been provided. Adequate number of

fire extinguishers will be provided for stores and other service buildings. While

calculating total water demand for the project, provision for fire fighting has also been

made.

Page 264: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 5

7.1.10 ROAD ACCIDENTS

Sufficient arrangements for illumination of roads including haul roads will be

made. Road crossings has been properly planned and designed to prevent vehicular

accidents.

7.1.11 ILLUMINATION AND COMMUNICATION

Sufficient lighting as per standards will be provided at all the required places,

i.e. working faces, OB dump area, haul road, coal transfer points, loading points,

CHP, workshop, etc., to avoid accidents and to create efficient working conditions.

Provisions for efficient communication systems (both internal and external) to allow

communication link amongst various work centers to help avoid accidents and handle

emergencies will be made.

7.1.12 OTHER MISCELLANEOUS MEASURES

Following facilities will be there in the project:

� Provision of well equipped workshops for maintaining HEMMs and other

equipment properly for avoiding their failures as well as the risk of

accidents.

� Provision of stores for spare parts for quick maintenance.

7.1.13 TRAINING

Coal industry has set up a number of training institutes for imparting training

to its employees. These trainings are meant to raise awareness amongst workers for

performing their duties properly with safety.

Further, the personnel directly responsible for handling emergencies are

given training for making them better equipped for discharging the responsibilities.

Mock drills for checking the risk management preparedness are carried out regularly.

Page 265: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 6

7.1.14 MEDICAL AID

For guarding against occupational and community health hazards, the

following measures are being taken:

� Steps to control respirable dust, improve workplace environment and

reduce noise nuisance.

� Periodic Medical Examination (PME) of workers.

� Rehabilitation and treatment of workers affected and suffering from

early stages of occupational diseases associated with coal mining.

� Availability of improved medical facilities.

Healthcare facilities (dispensaries/hospitals) have been provided in this

project. A specialized "referral" hospital has been established in Talcher coalfield

area to offer proper treatment to employees of Mahanadi Coalfields Limited (MCL).

The doctors and medical professionals are given sufficient training for handling

emergencies.

7.1.15 CONCLUSION

With adoption of above preventive measures, the operation of this opencast

mine will be safe as well as environment friendly.

7.2 SOCIAL IMPACT, R&R ACTION PLAN

7.2.1 RESETTLEMENT AND REHABILITATION The core zone of expansion project comprising excavation zone,

infrastructure. Safety zone for blasting and covers partly / fully the land additionally

from 7 villages namely, Balugaon, Balugaon-Khamar, Langijoda, Ambamunda,

Nakulbaspur, Hensamul and Madanmohanpur besides some uninhabited villages.

Page 266: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 7

About additional 1134 families will be additionally affected involving 3472

persons due to expansion project.

S.No. Name of village Project affected families

Project affected persons

Remarks

1 Balugaon 264 508 This village got shifted completely by 2007.

2 Langijoda 421 441 ---- 3 Talabeda Nil 341 ---- 4 Majirurihota Nil 40 ** 5 Gengutia Nil 216 ---- 6 Dadara Nil 63 ** 7 Dhempakuta Nil 66 ** 8 Manikagoda Nil 48 ** 9 Malipoda Nil 124 **

10 Badapasi Nil 24 ** 11 Debalayapur Nil 50 ** 12 Balugaon Khamar 209 516 ---- 13 Ambamunda 124 74 ---- 14 Nakulabaspur 144 ---- 15 Madanmohanpur 116 189 ---- 16 Khandhulbahal Nil 6 At present this village is under

Bhubaneswari OCP 17 Daulbera Nil 182 ---- 18 Remun Nil 12 There is no R&R for this

village 19 Hensamul Nil 361 This village in covered under

R&R of Bhubaneswari and Ananta OCP

20 Kandhal Nil 67 There is no R&R for this village

Total 1134 3472 ** No hutment exist in this village. R&R benefits are given on the basis of agricultural land acquired. This is revenue village/mouza having no hamlet(Basti). These displaced families will be resettled and rehabilitated socially, culturally

and economically along with other displaced alongwith other displaced families such

as major married sons / unmarried daughter of 30 years of divorcee / deserted

women / widows, physically handicaped and / or mentally retarted persons

irrespective of age and sex, unmarried brothers / sisters whose parents are not alive,

homestead less families (unobjectionable encroachers) and landless families

(unobjectionable encroachers) as per latest •Norms of Govt. of Orissa•.

Page 267: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 8

7.2.2 PRESENT STATUS OF REHABILITATION

Name of Village

Displaced families offered

resettlement

Eligible for employment / cash

compensation in lieu of employment

Employment provided / Cash compensation

offered

Under Consideration

Balugan 264 192 188 02 "A" category & 02 "C"

category

Lanjigoda 421 335 323 07 "A" category & 05 "C"

category

Talabeda I

Nil 2 2

Talabeda II

Talabeda III

Majirurihota Nil 18 18

Gengutia - I Nil 81 81

Gengutia - II

Dadara Nil 2 2

Dhempakuta Nil 7 7

Manikagoda Nil 8 8

Mallipada Nil 26 26

Debalayapur Nil 14 14

Badapasi Nil 18 18

Balugan Kumar 209 233 195 10 "A" category & 28 "C"

category

Ambamunda 124 111 90

20 "A" category & 01 "C" category Nakulbaspur

Madanmohanpur 116 69 64 02 "A" category & 03 "C"

category

Khandualbahal Nil 6 6

Deulbera Nil 1 1

TOTAL 1134 1123 1043 80

7.3 CORPORATE SOCIAL RESPONSIBILITY

7.3.1 Corporate Social Responsibility (CSR) policy of CIL:

1. Objectives : The main objective of CSR policy is to lay down guidelines for

the coal companies to make CSR a key business process for sustainable

Page 268: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 9

development for the Society. It aims at supplementing the role of the govt. in

enhancing welfare measures of the society based on immediate and long term

social and environmental consequences of their activities.

2. Areas to be Covered : The poor and needy Section of the Society living in

and around coalfields and different parts of India normally to be covered. The

responsibility of the subsidiary shall be to execute CSR within the radius of 15

Kms for every project and Areas including Head quarters. Further Board of

Directors of Subsidiary Companies can approve specific cases of projects

beyond mining areas with in respective State.

3. Scope : (i) Education (ii) Water Supply (iii) Health Care (iv) Environmental

(v) Social empowerment (vi) Infrastructure of village (vii) Sports and Culture

(viii) Generation of employment & setting up Co-operative Society (ix)

Infrastructure Support, etc.

4. Source of Fund : It is guided by CSR policy of MCL/CIL. Fund is allocated on

2% of the average net profit of the Company for the three immediate preceding

financial years or @ Rs.2/- per tonne of the coal produced in the previous

financial year whichever is higher.

The estimated amount for CSR will be Rs.796.66 lakh for the year 2014-15. This

amount will be met from revenue budget.

7.3.2 Corporate Social Responsibility Of MCL:

MCL has undertaken social corporate responsibility in various spheres.

Different peripheral development and community development works have been

carried out.

-- Nature of PD and CD Works undertaken by MCL

(A) Drinking Water Supply

(i) Renovation / installation of handpump

(ii) Renovation / construction of well

(iii) Renovation / digging of ponds

(iv) Water supply through pipe line in some villages around the mining

area.

Page 269: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 10

(B) Education

(i) Construction / repair of educational building.

(ii) Providing additional facilities, furniture, lab instruments, etc.

(C) Rural Health Care

(i) Organizing camps for eye operations / post operation care /

welfare camps.

(ii) Providing medical instruments to the village hospitals

(iii) Providing medical facilities to the rural population through mobile

medical van.

(D) Roads

(i) Construction and repair of rural roads.

(ii) Construction and repair of roads connecting mining area

(iii) Construction and repair of culverts

(iv) Construction and repair of bridges

(E) Recreation centres

(i) Construction of community centers

(ii) Providing financial aid to the various social institutions

(iii) Preparation of play grounds & organising sports.

(F) Environment

(i) Plantation of various species in the nearby villages of mining area

(ii) Distribution of saplings … fruit bearing plants, medical plants &

avenue plants

(G) Other miscellaneous heads

(i) Street lighting

(ii) Providing facilities to various institutions

(iii) Providing facilities to district administration offices

Page 270: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 11

EXPENDITURE INCURRED:

SL. NO. HEAD 2011-12 2012-13 2013-14 2014-15

1 Education 0.00 1.80 17.17 36.51 2 Water 74.97 92.34 120.12 143.49 3 Health 0.00 0.38 0.00 0.51

4 Communication (Road) 208.43 259.06 166.87 33.78

5 Others 2.70 3.61 328.85 17.34 6 Environment 2.67 22.20 11.30 10.75 7 Recreation 8.36 0.00 10.67 0.17

Total 297.13 379.39 654.98 242.54

WATER HARVESTING STRUCTURE NEW POND / WIDENING DEEPENING, ETC

Sl.No. Name of the Village Capacity of the Pond

1 Simlipal 16000 m3

2 Kusumpal 12000 m3

3 Biharipur 16000 m3

4 Balunga Khamar 40000 m3

5 Talabeda 24000 m3

*SEDIMENTATION POND NEAR SIDING … 03 NOS.

*ROOF TOP RAIN WATER HARVESTING SYSTEM … 06 POINTS IN

SERVICE BUILDING.

Page 271: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 12

7.4 HABITAT MANAGEMENT / WILD LIFE CONSERVATION COST

Lingaraj OC Expn. (20.0 Mty) is the nearby project of Bhubaneswari OC

Expn. (20.0 Mty). Habitat improvement plan of sournding areas for next five years of

Bhubaneswari OC Expn. has been carried out by Addl. Principal CCF (Wild life) &

Chief Wildlife Warden, Orissa vide their letter No.3590 / 3 WL (Cons) 33/04 dated 6th

July 2004.

As per guideline, Govt. of Orissa Forest & Environment Deptt. Vide letter

No.10F(Cons.) 81/2004…6495/F&E dated 23.04.2008 have issued instruction to

release @ Rs.20,000/- per ha mine lease area basis towards the cost of wild life

management plan in the mining lease area where occurance of wild life is observed

in M.L. area. For wild life & forest measure will be taken for a period of 5 years

initially. An amount Rs.50.00 lakhs will be required to deposite. However the total

cost will be Rs.282.002 lakhs (@ Rs.20,000/- per ha for the total mine lease area of

1410.01 ha).

7.5 PUBLIC CONSULTATION / HEARING Public hearing meeting was held on 09.09.2014 for 16.0 Mty (Peak-20.0 Mty)

project. The meeting was chaired by ADM, Angul District and Regional Officer,

SPCB. The points raised by the public during the public hearing meeting and

comments of project proponent in the presence Addl. District Magistrate and

Regional Officer, SPCB, Angul are as follows :

Public hearing

(a) Date of Advertisement 06.08.2014 (b) Newspapers in which the

advertisement appeared The New Indian Express & Sambad

(c) Date of public hearing (DD/MM/YY)

09-09-14

(d) Public Hearing Panel chaired by & members present

The public hearing panel was chaired by Sri Sushanta Kumar Barik, Additional District Magistrate, Angul. The members present were : 1. Dr. Binod Bihari Das, Regional Officer, SPCB 2. Sri G.P.Mohapatra, Senior Manager, (Personal)

Lingaraj, OCP

Page 272: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 13

(e) No. of people attended the public hearing meeting and number of people from the lease area

200 no. of people attended the meeting from nearby villages. Only 32 no. of people signed the attendance sheet. 13 nos. of persons had delivered their views

(f) Summary/details of public hearing in tabular form

Issues raised by the Public

Name of the person who raised the concern

Action taken/ compliance as on

31.12.2014

Action proposed to be taken

Reclamation of the mine void after removing coal and OB dump management and land/ soil pollution

Rangadhar Nayak Chaitanya Pradhan Bauribandhu Bez Purnachandra Sahoo Padmacharan Samal

Reclamation of mine void and external OB dump is done on regular basis. Till now the area of mine void reclaimed biologically is 21.80 Ha out of a total excavated area of 275.85 Ha. Similarly, till now external OB dump area biologically reclaimed is 65.09 Ha out of a total external OB dump area of 256.030 Ha.

Out of total mine void of 538.85 ha, 292.14 ha of void will be filled with over burden. The remaining 246.71 ha of void will be left out as water body for harvesting rain water as well as for filling over burden material from neighbouring developing mine.

Top soil Management

Rangadhar Nayak Chaitanya Pradhan

This is a running mine. Hence top soil is concurrently excavated and spreaded over the technically reclaimed area/ OB dump. However top soil storage is made temporarily whenever space is not available for spreading the same and biologically conserved by planting grass, legumes, agaves etc.

A detail top soil management plan considering the present condition of mine is under process at CMPDIL.

Fly ash dumping by M/S NALCO Ltd and M/S Bhusan Steel Ltd.

Rangadhar Nayak Bauribandhu Bez Purnachandra Sahoo

At present no fly ash from any industry is being dumped in this mine.

There is no proposal of fly ash dumping in the mine.

Page 273: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 14

Air pollution Bauribandhu Bez Padmacharan Samal Chaitanya Pradhan Purnachandra Sahoo Ranjan Kumar Pradhan Kasinath Sethi

1. Dust suppression at CHP feeder breaker by water spraying through perforated pipe and mist sprayer.

2. Covering of CHP feeder breaker, belt conveyor, coal bunker by G.I. sheet to prevent propagation of dust.

3. Dust suppression on road by water spraying through high capacity mobile water sprinkler (14 nos. on roll).

4. Dust suppression on road, railway siding, CHP areas, workshop and site office areas by water spraying through automatic fixed water sprinklers(71 nozzles)

5. Installation of Non-Visible Emission (NVE) assembly in all drills.

6. Plantation in and around infrastructure and workings and also road side. Total plantation made till now 329609 nos.

7. Fire fighting for any spontaneous

1. Installation of dry fog system for dust suppression at all the CHPs.

2. All the permanent coal transportation roads will be made of rigid concrete pavement and installation of fixed water sprinkler/ atomizer beside the road.

3. Transportation of coal from CHP to railway siding Silo by belt conveyor there by avoiding road transportation.

4. Producing maximum coal (about 90%) by surface miner which is considered to be one of the most eco-friendly equipment. By using surface miner drilling and blasting are completely eliminated. As water spraying is done along with the water injecting system hence there is no chances of dust generation during cutting and loading of coal.

5. Thickness and area of greenbelt

Page 274: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 15

heating of coal. Firefighting organization is in place for immediately dealing with any fire or spontaneous heating in mine.

8. Installation of Instant Shower System.

9. Trucks going outside the mine are covered by tarpaulin to prevent any spillage.

10. Overloading of trucks is avoided to prevent spillage of coal.

11. Coal production by Surface miner (4 nos.) to minimize the drilling, blasting thereby reducing the dust & heating /fire in coal seam/OB dump. In 2013-14 production through Surface Miner was 74.90% out of total production of 7.17 M.te. In this year Surface Miner Production is 82.59% up-to Dec. 2014 out of total production of 8.00 M.te.

12. Introduction of heavy duty truck mounted vacuum

will be further increased to prevent propagation of dust from the dust generation sources.

6. Using water atomizer the railway siding and other places to deal and control of the fugitive dust.

Page 275: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 16

cleaner (Mechanical Road Sweeper) for cleaning of road (1 no.).

13. Dispatch of coal is made mostly through Rail mode which is considered to be one of the most ecofriendly modes of transport. In 2013-14, dispatch through rail is 88.68% out of total dispatch of 7.18 M.te. In this year rail dispatch is 89.69% out of total dispatch of 5.88 M.te.

Water pollution

Rangadhar Nayak Bauribandhu Bez Padmacharan Samal Chaitanya Pradhan Purnachandra Sahoo Ranjan Kumar Pradhan Kasinath Sethi

1. Effluent treatment plant (ETP) for treatment of workshop effluent … 02 nos. The treated effluent is not allowed to go outside and totally reused for dust suppression.

2. Mine discharge treatment plant (MDTP or ST-1) for taking care of mine discharge and other discharges as well.

3. Catch drain around the OB dump and garland drain around the excavated area.

1. A thorough study is proposed to be made by scientific institution for overall water management/ pollution control measures of the mine. It is intended to make the mine zero discharge system. However, after study if it is found that zero discharge is not feasible then suitable and adequate control measures will be taken as per the study.

2. As mentioned above if after study

Page 276: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 17

Settling tank (ST-4) is provided for treatment of the OB dump washing which comes through the catch drain.

4. All the washings from Lingaraj railway siding and nearby coal stock come to another settling tank (ST-2) and are treated there before discharging outside.

5. All the washings from Deulbera railway siding and nearby coal stock come to another settling tank (ST-3) and are treated there before discharging outside.

6. Construction of Roof Top Rain water harvesting points (6 nos.), Earthen pond 9 nos. in the nearby villages, sedimentation ponds (03 nos.).

7. Main Mine sump (02 nos.) with total capacity of 28.35 lakh m3 for settling of suspended solid which is the only pollutant in coal mine effluent. No Acidic effluent is observed in this mine for which regular monitoring is done.

it is found that outside discharge will have to be made from the mine then real time monitoring system will be installed in all the outlets going out of the mine. In such cases, online connection to the server of Odisha State Pollution Control Board will be provided for instant transmission of data of the water monitoring as mentioned above.

Page 277: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 18

Rise in ambient temperature and Combating thermal pollution

Rangadhar Nayak Padmacharan

Samal

Occurrences of spontaneous heating/ fire in the mine/coal stocks are negligible which may contribute to rise in Ambient temperature. However the following actions have been taken for dealing with fire/spontaneous heating. (a) About 80% coal is

produced by cutting through surface miners, thereby reducing the cracks & loose coal which ultimately prevent oxygen to enter into the coal seams, thereby reducing fire/spontaneous heating in the coal seam.

(b) Coal stock has been continuously reduced to have the minimum exposure of coal to the air. On 1st April• 2012 coal stock was 20.69 lakhs te. which is reduced to 11.03 lakhs te. on 31st Oct. 2014.

(c) Firefighting arrangement is in place to deal with fire in the mine if any. A scheme/plan for control & dealing with fire is in place.

It is intended to increase the coal production by surface miner (which is considered as one of the eco-friendly system of mining) to about 90% of total production.

Page 278: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 19

Noise pollution due to drilling and blasting

Rangadhar Nayak Chaitanya Pradhan

There is no Noise/ vibration pollution in this Mine. The noise & vibration is negligible in this mine as about 80% coal production comes from surface miner where no drilling, blasting or crushing is required. Hence no vibration is occurred. Further rest about 20% coal production where drilling/ blasting is involved, delay detonators is used for reducing the vibration. The Plants & machineries including HEMM are having in-built noise pollution control measures. The noise level is also measured fortnightly in four monitoring stations around the mine. The monitoring reports show that noise level are always within the prescribe limit.

It is intended to increase the coal production by surface miner (which is considered as one of the eco-friendly system of mining) to about 90% of total production.

Ground water depletion

Purnachandra Sahoo Padmacharan Samal

Declining of ground water is temporary phenomenon and is limited in aerial extent around quarry area. After backfilling of the mine pit surrounding ground water level will be restored. Rain water harvesting system is already existing at six locations. Renovation and revitalization of near by nine (9) no. of ponds have been done.

Rain water harvesting system will be constructed and installed in all the residential buildings and other service buildings

Page 279: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 20

Plantation of fruit bearing trees

Rangadhar Nayak Chaitanya Pradhan

30% of trees planted in the mine are of fruit bearing varieties. Beside that every year fruit bearing sapling are distributed among the employees of Lingaraj OCP, Lingaraj Area and the local villagers to plant in their resident to make the area green. Total plantation made till date is 329609 nos. Plants are maintained for 5 years at the cost of MCL so that by this time the plants become self-sustaining to survive on their own.

Same will continue.

Employment opportunity for local Youth. Service or pollution grant to be provided to each resident of Talcher within 5 km radius of mine.

Rangadhar Nayak Padmacharan Samal Chaitanya Pradhan

Till 01.01.2015 a total number of 1043 persons have been offered permanent employment/cash compensation in lieu of employment/annuity in the project. Detail is given in R&R head.

Employment for 80 persons is under consideration.

Development of Nearby Villages.

Rangadhar Nayak Chaitanya Pradhan Ranjan Kumar Pradhan Prabhat Kumar Pradhan Shyma Pradhan

Total expenditure of developmental work in last 3 years: Kandhal G.P. = Rs. 16542816.36 Kankili G.P. = Rs. 10684185.16 Talcher G.P. = Rs. 62117055.51

Development will continue

Page 280: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 21

Water supply to nearby villagers

Bauribandhu Bez Padmacharan Samal Ranjan Kumar Pradhan Srikant Sahu Rangadhar Nayak Prabhat Kumar Pradhan Shyma Pradhan

Water to the nearby 37 villages and 18 municipality wards is supplied by tanker during the summer season i.e. from 16th February to 15th June. The work for water supply through pipe line to 19 nearby villages is being made through RWSS and is at the completion stage. Out of 19 villages, water supply arrangements to 11 villages have already been completed and water supply in those villages is in progress. However, for the rest 08 villages water supply will be made very soon. Till now Rs. 20 Crore has been deposited to RWSS for the said work. Besides the above arrangement/ work, water supply to the Talabera village under Kandhal GP is in progress.

The same will continue.

Public road maintenance to prevent accident

Ranjan Kumar Pradhan Kasinath Sethi Srikant Sahu

Total work done for construction and maintenance of road in last three years: 2011-12 = 208.43 Lakhs 2012-13 = 259.06 Lakhs 2013-14 = 166.87 Lakhs 2014-15 = 33.78 Lakhs

It is continuous process which is being done on regular basis.

Health and education facilities in the area. Health insurance of Rs. 5 lakhs to be provided to the residence of

Padmacharan Samal Prabhat Kumar Pradhan

Regular health camp is organized in nearby villages for free check up of the villagers and some medicines are also distributed free of cost. No. of health camps organized is as below: 2012-13 = 04 Health camps

The same practice will be continued. However, a medical college is proposed to be established at Talcher by 100% sponsorship by MCL.

Page 281: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 22

Talcher within 5 km radius of the mine.

2013-14 = 12 Health camps 2014-15 = 11 Health camps Regarding health insurance this is to mention that the environment surrounding the Lingaraj OCP is kept as good as possible by providing the environment mitigation measures as mentioned earlier in this report. Hence, health problems due to Lingaraj OCP cannot be accepted as mentioned by some people in the meeting. However, treatment facilities in N.S.Central Hospital are provided to the local villagers either at nominal cost (Rs. 2.00 per visit). Construction and maintenance of schools of nearby villages are made under CSR head. Expenditure in this head for three years is Rs. 56.37 lakhs. Besides that, 3 schools with classes up to 12th standard and one Nursing School are run by MCL with 100% sponsorship to increase the education level in the area.

Proper utilization of CSR fund

Rangadhar Nayak Chaitanya Pradhan Prabhat Kumar Pradhan Shyma

Proposals pertaining to CSR works are received through Gram Panchayate/ Panchayate Samiti/ Municipality directly or through BDO/Sub-Collector/Collector at

The same practice will continue.

Page 282: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 23

Pradhan different levels i.e. either at Project level/Area kevel or HQ level. All such proposals are put in front of CSR Committee for co-ordination & scrutiny. After no objection from CSR Committee, only agreed works are taken for CSR activities for estimation and tendering process. It is guided by CSR policy of MCL/CIL. Fund is allocated on 2% of the average net profit of the Company for the three immediate preceding financial years or @ Rs.2/- per tonne of the coal produced in the previous financial year whichever is higher.

Kandhal village panchayat should be considered as adopted village for all benefits.

Rangadhar Nayak Padmacharan Samal

Maximum benefit is given to the Kandhal Gram Panchayat by Lingaraj OCP. Total work done in Kandhal Gram Panchayat under CSR head is Rs. 12930180 (Rs. One crore twenty nine lakhs thirty thousand one hundred eighty) till August 2014. Besides that maximum employment (more than 90% of total 1043 employment) has been given to the persons from the Kandhal Gram Panchayat. However, provision exists under CSR policy of MCL for adopting nearby villages provided they satisfy certain criteria.

MCL will do its best to improve the existing living conditions in the kandhal village.

Page 283: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 24

Proper rehabilitation arrangement by making villages of displaced people.

Chaitanya Pradhan

As per the R&R policy of Govt. of India, displaced people are provided plots in the resettlement site having all basic infrastructure for colonial living. In the said policy there is also provision for interested displaced families to be settled in an area of their own choice by taking compensation in lieu of plots which is presently Rs. 725000 /- per family and increases with inflation index. Further, MCL is also providing the basic amenities like electricity, water, road and drainage system in the area where more than 20 displaced families are settled on their own choice. In addition to that, infrastructures etc. are constructed where displaced families are settled along with nearby villages.

More amenities will be provided by MCL to improve the living standards of the land oustees residing at R&R colonies.

Land acquisition should be made under LA Act and not under CB Act.

Chaitanya Pradhan Rangadhar Nayak

CB Act is enacted by the parliament specifically for acquisition of land by Govt. companies or PSUs where coal exists. This act has a provision for transfer of all rights including mining rights to the user agency at one go, where as in LA act when land is acquired for mining, a mining lease is required to be taken under MC Rules which lingers the process of acquisition and thereby delay the transfer of

No additional land is required.

Page 284: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 25

benefits to the affected people. However, the land under LA Act is also acquired where the land is required for development of infrastructures only.

People whose lands have been acquired should be brought under Swarna Yojana Package.

Rangadhar Nayak Chaitanya Pradhan

All persons who have been displaced after 15.05.2010 are covered under Swarna Yojana Package as per the conditions stipulated in the said package.

Action is already being done.

7.6 RAIN WATER HARVESTING

Rain water is naturally pure water except where it becomes acidic due to

industrial pollution.

The rapid exploitation of ground water as well as surface water due to the

industrial developmental projects, infrastructural development and increase in

population resulted in acute scarcity of fresh water availability in many regions of

India as well as States. Fresh water is very necessary for the living being on this

planet Earth. It has become necessary to conserve this valuable natural resource for

sustainable development. Conservation of this valuable natural resource can be done

by collecting this rain water scientifically and utilizing it either for drinking purpose,

irrigation purpose or ground water recharging purpose. Scientifically and technically

designed system which helps us to collect and utilize the rain water effectively

through various steps and collectively termed as Rain Water Harvesting System.

Ministry of Water Resource and its subordinate offices have taken various

steps to conserve this valuable natural resources through scientifically and technically

watershed management systems.

Page 285: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 26

Different Methods

(i) Roof-top catchment : The roof-top water collected can be made

drinkable after suitable treatment. The excess water that flows can be stored

in underground storage tanks. The water collected from this source is mostly

used for storage purposes to be used later for dust suppression on roads and

fire-fighting.

(ii) Check dams : Check dams can be constructed with locally available

materials. Different types are like Brush wood dam, loose rock dam and

woven wire dam. The main function of the check dam is to impede the soil

and water removed from the watershed. This structure is cheap, but lasts

about 2-5 years.

(iii) Percolation pond: The percolation pond is a multipurpose

conservation structure depending on its location and size. It stores water for

livestock and recharges the groundwater. It is constructed by excavating a

depression, forming a small reservoir or by constructing an embankment in a

natural ravine or gully to form an impounded type of reservoir.

7.7 SLOPE STABILITY

Lingaraj OC expansion project (Phase III) Normative 16.0 Mty (Peak 20.0

Mty) has been carried out by CMPDI (HQs) Ranchi. The abstract of the slope

stability report is given below:

7.7.1 Slope

Any structure either naturally occurred or artificially built when takes the

shape by increasing the height with horizon in reference to plane is called slope.

Slopes of the earth are of two types

1. Natural slopes

2. Artificial slopes

Page 286: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 27

Natural slopes are those that exist in natures and are formed by natural

causes and generally exist in hilly area.

Artificial slopes are created by man such as cutting of sides, construction of

dam, highway embankment, mining benches and OB dumps, etc.

7.7.2 Factors governing the Slope Stability

There are two main aspects of slope failure and they are natural and man

made disturbances. The seismic activities of the earth crust, rain, tornado and

geology come under the naturally occurred disturbance. The blasting, excavation,

dumping are the man made disturbance for slope instability. Following are the main

factors that influence the slope stability.

7.7.2.1 Geo physical parameters

(a) Shear strength parameters:-

This is the basic parameters and holds the key role to control the

stability of the slope but it is most difficult to comprehend it accurately.

The fundamental shear strength equation proposed by French engineer

Coulomb is S=C + � Tan (�).

(b) Bulk density of dump mass:

Bulk density of dump mass determines the weight of waste rock and ply

very important role in calculation of stability of the dump mass

(c) Base of the Dump

Base of the OB dump should be strong enough to bear the load of the

dump otherwise base failure may crop up.

(d) Grain size distribution of the dump material:

It indicates composition of dump material comprising of clay, silt, sand,

gravels and boulders. It influences the permeability, density, shear strength

parameters and other characteristics of the soil materials.

Page 287: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 28

(e) Plastic Limits

Atterberg limits determine the expansive and liquid properties of the

material. In case of expansive soil, shear strength properties drastically

changes when coming in contact with water.

(f) Co-efficient of permeability:

This parameter implies seepage properties of water and facilitate in

computation of seepage force exerting on dump materials

7.7.2.2 Hydro-Geological parameters…

The effect of Hydro-geology in determining stability of dump is as follows:

A. Shear strength parameters of dump materials get affected due to water

saturation during rainy season.

B. Accumulated water at the base gives buoyancy effect on dump

materials as well reduce cohesion and friction of dump and interface

materials.

C. Seepage of water exerts dragging force on the dump materials.

Seepage pressure acts below the pheratic line and in the direction of

flow. It can be calculated by

� knowing the pore water pressure or

� Drawing the pheratic line.

D. Rain water erode slope surface and create large rill and gullies on slope

surface which damage the slope profile and causes slope failure.

7.7.2.3 Geo-mining parameters

A Mine floor inclination

Mine floor inclination reduces the effective angle of repose of overlaid

OB dump such as shear strength of materials.

B Blasting affect create encourage

Blasting generate vibrations in the surrounding region that induces

acceleration imply dynamic forces which affect the stability of slope.

Page 288: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 29

C Profile of the dump

The profile of the dump, i.e height and berm guide the overall slope

angle of the dump. This should be less than angle of repose of the

materials.

D Location of dump

Location of dump site also play crucial role in the stability of the slope.

Base of dump must be strong and away from the quarry edge to avoid

base failure and differential settlement of dump or highwall.

E Surcharge

The surcharge load increases the horizontal & vertical load and

amplifies seismic effects. Thus affect the slope stability.

7.7.2.4 Dynamic forces:

(A) Seismic forces

Earthquake experience by a structure depends on its own dynamic

characteristics and ground motions such that random motion of ground,

vibration intensity, magnitude of the earthquake; depth of focus, distance

from the epicenter and the strata on which the structure stands.

Seismic force/coefficient � h is calculated as per the IS Code by following

two methods and higher value will be taken for slope stability calculation.

a) Seismic Coefficient Method,

b) Response Spectrum method

(B) Blasting Effect

(i) Peak particle Velocity

The types of explosive directly influence ground vibration that and

create PPV in the ground. This PPV affects the stability of slope.

Page 289: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 30

Following is the typical graph of blasting in Opencast mine.

It is found that PPV of less than 50 mm/s would have low probability to

damage the structural of residential buildings.

In the studies it is established that in our case 75% to 80% times blast

frequency comes in the range of 8-25 Hz.

(C) Moving force

Moving force is type of live load that comes from the vehicular

movement including the HEMM. These moving loads create the

dynamic/static load besides the breaking and acceleration jerks. This load

affects the slope stability.

7.7.3 Types of failure:

A slope may have various types of failures which depend upon the type of

materials, dump profile, dump base, etc. In our case, generally following types of

failure occurs:

A. Circular failure …

Circular failure generally occurs in high dump, soil having low shear

strength and base of dump material stronger than dump materials.

Page 290: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 31

B. Circular-cum-planar Failure …

It occurs when the shear strength of interface material between dump

and the mine floor is less than that of dump material and the dump is

standing on steep mine floor.

C. Base failure -

It occurs when the weak strata lies beneath the toe of the dump.

7.7.4 Calculation of FoS

This is a ratio of the stabilizing force to mobilisitation force developed at the

sliding surface. The factor of safety gives relative static state of the studied slope

about its mobilization at a glance.

It has envisaged a factor of safety more than 1.10 in the design of slope

stability is safe if appropriate seismic acceleration is considered and more than 1.20

if seismic acceleration is not considered.

7.7.4.1 SLOPE ANALYSIS

Limit equilibrium method is widely used for slope stability analysis nowadays.

This method takes in to account the physical constraints under which the OB dumps

are generated and effect of both of dynamic and static acceleration. The effects of

tension cracks and varied hydrological conditions towards the stability are also

modeled.

Today large number of different suitable software/tools are available for the

analyzing the slope stability for the dump/ waste rock piles and highwall.

7.7.4.2 Software

One of the leading software for analyzing the stability of the slope is

GALENA, which is used here for analyzing slope stability. It is very powerful and

accurate slope stability software and incorporates the Bishop Simplified, the Spencer-

Wright and the Sharma method of analysis to determine the stability of slope The

Bishop method is used to determine the stability of slope of circular failure surface,

Page 291: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 32

the Spencer-Wright method is applicable for circular and non circular failure surface

and Sharma method is used for problem where non vertical slices are required.

7.7.4.3 Forces

(a) Seepage Pressure

Pore water pressure is determined by taking into account the actual shape of

phreatic line. Below the ground water table, analysis proceeds using the unit

weight of saturated soil � sat and uplift pressure; above the ground water table

the analysis assumes the inputted unit weight of soil � .

(b) Tension Cracks

Tensile cracks that appear on terrain surface are filled with water h, exerts

extra lateral pressure. Since, it is assumed that tensile cracks, if any will be

filled up immediately so affect of it is not taken in computations.

Fh

SLIP CIRCLE

SLOPE

TENSION CRACK

Fig-4.3 A

(c) Ground Acceleration

Horizontal acceleration Kh arises due to earthquake and blasting is calculated

and higher value has been taken for slope stability analysis. Horizontal

acceleration Kh coefficient taken for analysis is 0.016.

(d) Surcharge

Since, it is external dump so it is assumed that there will be no moving or

static surcharge either on the inclined slope or top of the slope. Hence no

surcharge affect is to be considered in the analysis of the slope stability,

(e) Shear Strength of materials

Shear strength of the soil, consisting Cohesion & Angle of repose is judicially

decided after study the result of physical Mechanical properties of Borehole

log, Back Analysis data of same type of mines. Since soil is heterogeneous

Page 292: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 33

materials, so few test of soil can not represent the whole mass dump.

Different soil test report shows the large variation in test results. So, after

giving the sensible thought on various existing report following value of shear

strength parameters have been chosen.

Cohesion … 53 pa, Angle of friction - 250. However detailed analysis of

Physico mechanical properties would be required for making the final report

for slope stability.

7.7.4.4 Method of analysis

More than 80% slope failure is either circular or near circular in nature. So

Modified (or Simplified) Bishop's method is used for slope analysis which is one of

the most suitable methods for circular slope failure. The method satisfies all

conditions of equilibrium, (i.e. horizontal force, vertical force and moment equilibrium

for each slice.

7.7.4.5 Analysis

Analysis has been done with the help of Galena software. Galena works by

creating a model that represent a slope. The basic data component is materials

profile, physical properties of profile, slope surface and tentative failure surface.

Generally circular failure occurs in loose material, so Bishop•s simplified method has

been used for the analysis of dump.

7.7.4.6 INPUT

A) Profile of dump –

External OB dump and highwall are the essential part of the Open Cast

Mining system particularly initial phase of mining operation.

Our intended object for the slope stability analysis is to check the stability of

the proposed external OB dump and highwall. This dump is located at south-eastern

side of quarry having the overall slope angle 240 and height is 225 m and maximum

height of high wall is 225 m and overall angle is 450 C. In first glance, as per vertical

& horizontal ratio of slope it seems to be stable.

Page 293: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 34

A) Model – I ( For Highwall Slope)

RESULT of Model – I (For Highwall Slope)

GALENA Version 5.02Project:

Analysis:

Lingraj OCP MCL

1

Highwall analysis of Lingraj OCP

File: Galena Lingraj.gmf

-100 -50 0 50 100 150 200 250 300 350 400 450 500

0

50

100

150

200

250 1 1

2 2

3 3

0.070

GALENA Version 5.02

Project:Highwall analysis of Lingraj OCP Lingraj OCP MCL

File: Galena Lingraj.gmf Central Mine Planning & Design Institute

Edited: Processed:2 Jan 2013 2 Jan 2013

Analysis:

Results

1

Multiple Stability AnalysisMethod:

Surface:

Bishop Simplified

Circular

Critical (minimum)Factor of Safety: 1.69

Soil

Weathered Rock

Hard Rock

-100 -50 0 50 100 150 200 250 300 350 400 450 500

-50

0

50

100

150

200

250

300

0.070

Page 294: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 35

Factor of safety of first 10 slip circle

B) Model – II ( For OB Dump Slope)

RESULT of Model – II ( For OB Dump Slope)

GALENA Version 5.02Project:

Analysis:

LINGRAJ OCP MCL

1

External OB Dump South Side

File: Galena LIngraj OB.gmf

-200 -100 0 100 200 300 400 500 600 700

-200

-150

-100

-50

0

50

100

150

200

250

1 1

2 2

3 3

0.070

GALENA Version 5.02

Project:External OB Dump South Side LINGRAJ OCP MCL

File: Galena LIngraj OB.gmf Central Mine Planning & Design Institute

Edited: Processed:2 Jan 2013 2 Jan 2013

Analysis:

Results

1

Multiple Stability AnalysisMethod:

Surface:

Bishop Simplified

Circular

Critical (minimum)Factor of Safety: 1.09

New OB Dunp Materials

Old OB Dump materials

Base materials

-200 -100 0 100 200 300 400 500 600 700-250

-200

-150

-100

-50

0

50

100

150

200

250

300

0.070

Page 295: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 36

Factor of safety of first 10 slip circle

7.7.4.8 Conclusions & Recommendations

7.7.4.8.1 Conclusion

1. Height of external cum internal dump is approximately 245m from floor

of seam to top of dump and average slope angle from toe to top is

about 230.

2. Maximum height of high wall is 245 and average slope angle from floor

of seam to surface is 450.

3. Analysis is done for various combination of slip circle between the top of

the dump and the base of dump. Minimum FoS comes to 1.09 which is

just lower then the desire value1.10.

4. Analysis is also done for various combination of slip circle between the

ground surfaces to the base of base of highwall. Minimum FoS comes

to 1.69.

5. Earthquake / blasting affect has been considered in the analysis.

6. Analysis is done for drained conditions. However affect of Pheretic line

has been taken for below the ground level.

7. Slope of given profile of highwall, at present situation is safe in all

conditions.

8. Slope stability of external dump cum internal dump at proposed profile

is susceptible condition so work should be done very carefully near the

Page 296: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 37

toe of dump. Space between toe of dump and any type of activities

should not be less than the height of dump at that place.

7.7.4.8.2 Recommendations

1. Top of the dump should be leveled with the provision of kerb all along the

dump with proper drainage arrangement at top as well as along the

slope which will prevent the formation of deep gully on dump slope.

2. The toe of the dump (bottom of coal rib) should not be eroded or cut at

any

point of time to avoid the failure of slope.

3. Formation of dumping should be done in square or circular shape as far

as possible.

4. Edge of dump should be in straight line or in large smooth curvature as

far as possible. Zig - zag dumping should be avoided as it poses the

some complication in stability of slope.

5. Top surface of OB dump should have transverse and longitudinal slope

of 1:50 spreading outward so as rain water can be evacuated easily (as

shown in the diagram below). Berm of 15 to 20 cm will be provided all

round the top of OB dump. This will prevent the water spillage on

inclined face of dump. Drain on inclined face and catch drain at each

layer should be provided to facilitate the water drainage.

G.L.

+15

+30

+45

+60

+75

+90

6m

6m

6m

+0

PROPOSED EXTERNAL O.B. DUMPG.L.

+75

+60

+45

+15

+30

19.9

19.9

19.9

19.9

19.9

19.9

96

96

TOP OF DUMPSlope 1:50 Slope 1:50

Drain

Drain

Typical cross - Section

6. Gabion wall and garland drain should be constructed and maintained to

trap the surface runoff coming from dump.

7. Plantation and grassing should be done on top and slope of the dump

respectively.

Page 297: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 38

8. Regular monitoring is required for development of tension crack,

Gullies, movement of soil mass, stagnation of water and any other

unusual occurrence.

9. A detailed study on slope stability should be done before starting the

project

7.7.4.9 Limitations

1. Soil is very complex and complicated matter due to availability in infinite

combination of soil mixing.

2. In nature, heterogeneous type of soil is found which has different

properties at different depth and places.

3. Accurate soil properties can not be tested in laboratory because no

theory can simulated the field conditions.

4. OB dump given for study is completely heterogeneous soil contains soft

clay to hard rock of different size varying from less than a millimeter to

more than a meter.

5. It is very difficult to take the soil sample from the deep inside the OB

dump.

6. Few testing of samples can not represent the whole mass of OB dump.

7. Judicious combination of theory and experience can help to arrive at

right conclusion.

8. It is very difficult to assess the accurate pore water pressure and

pheratic line of the dump.

9. All the software and calculation are based on homogeneous soil .

10. All normal failure conditions are checked for determination of FoS but

powerful nature can do something else.

11. In geo-technical engineering field there are many uncertain factors

needs further study. As a result, factor of safety determined may not be

very precise.

12. Only one section of the dump is analyzed for slope stability. However

more detail analysis is required for confirmation of results.

Page 298: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 39

7.8 Impact on riparian system within the 10 kms radius of the mining area be submitted.

Lingaraj OCP is located in Talcher Coalfield. It covers an area of 14.10 kms.

It is bounded by latitude 20o57•39Ž to 20o58•18ŽN and longtitude 85o09•33Ž to

85o12•12ŽE. It falls in the survey of India toposheet No.73 H/1 (Plate-III).

Geographical area of buffer zone around 10 kms radius of the mining area of Lingaraj

OCP is 443.76 km2.

The land use of the buffer zone area of 443.76 Km2 is as follows: Forest area : 186.11 Km2 Total cultivable area : 152.44 Km2

- Irrigated agricultural land : 16.55 Km2 - Un irrigated land : 135.88 Km2

Cultivable waste land : 32.74 Km2 Water spread area : 22.15 Km2

- River = 14.28 Km2 - Stream = 2.35 Km2 - Ponds & lakes = 5.52 Km2

Built-up area : 30.30 Km2 Mining area : 20.02 Km2

The demographic details of the buffer zone is as follows : 1 Total population in the buffer zone assessed 124,965 2 Total cattle population @ 4.35 per family

(Based on Angul dist. Statistical hand book) 108,545

3 Food habits Staple food Rice Other food crops Wheat, maize, kolatha,

potato, green, gram, black gram, horse gram, till, mustard, ground nut, etc.

Drinking water sources Sources of drinking water: River/streams, ponds/tanks wells and tube wells for the villagers

Economic profile Agriculture is the main stay in the occupation of the people living in the area. However, other professions like mining and quarrying have dominant role in the economic scene of the buffer zone.

Page 299: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 40

Land and agriculture Crop land constitutes 28.58% of the total area of the buffer zone

Cultivation is carried out mostly under rain fed conditions. Area under irrigation constitutes 10.86% of the total area in the buffer zone.

Buffer zone is by and large mono-cropped.

Farmers are mostly dependent on kharif paddy.

The occurrence of prominent water bodies around the Lingaraj OCP are as follows:

Sl. No. Water bodies Distance in km 1 Bangaru jhar 2.40 km 2 Brahmani River 3.00 km 3 Nandira jhar 6.25 km 4 Singhada jhar 12.50 km 5 Satyabadi sagar pond Extinct 6 Samal barrage 15.0 km

Impact on riparian system Among above mentioned water bodies, Samal barrage which is located

across the Brahmani river, is irrigating the land. The other drainages are passing

through coal bearing area are not irrigating land. These drainages are acting as

surface run-off drain in the area.

Rengali River Valley Development Project (RRVDP) consists of two parts and

those are (i) Dam and (ii) Barrage. The dam is located at village Rengali in the district

of Dhenkanal, Orissa at Latitude: 21° 17' 0" N. Longitude: 85° 02' 0" N, Toposheet

No. 73/G/3. The catchments area at dam site is 25250 square km. The objectives of

the dam are:

i. Controlling flood in the lower deltaic region covering an area of 2600 Sq.

Km.

ii. Generating 5 x 50 MW of Hydropower.

It is a dam of masonry gravity type with a length of 1040 m at the top and

Page 300: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 41

maximum height of 71 meters at the deepest bed level. There are 24 number of

radial crest gates of size 15.5 meters x 14.8 m to discharge maximum probable

flood of 55,550 cumecs have been routed to 46,960 cumecs. Top level of dam is

128.5 m (Dalua, 1991). Gross capacity of reservoir at full reservoir level is 4400

million cum. Live storage capacity at full reservoir level is 3452 million cum. The

main purpose of the dam is flood control since after joining with a branch of river

Baitarani and forming a net of branches in the delta it creates flood havoc and

becomes the river of sorrow for major part of the Cuttack and Puri delta area.

Rengali dam through which maximum discharge of 55,550 cumecs is probable

during any flood, has been able to reduce to 46,960 cumecs out of it due to

construction of 24 redial crest gates. Maximum water level in the dam is 125.40

metres, full reservoir level is 123.50 metres and dead storage level is 109.7 metres.

It has been able to moderate its flood over an area of 2,500 Sq. Km. Brahmani and

Baitarani delta. Next priority for Rengali Dam is power generation with installed

capacity of 250 MW. Figure1: Index map of Rengali Multipurpose Dam Project

Page 301: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 42

Samal Barrage is part of the Rengali Irrigation Project. Samal barrage is located

34 km down stream of Rengali dam. It intercepts two tributaries of river Brahmani i.e

Tikira and Samakoi, the objective of Samal Barrage is to provide irrigation to about

3.72 lakh hectares of agricultural land in the state of Odisha. The barrage is 560 m

long with provision for road and bridge over it. It has its own provision for reservoir to

store water and to discharge it through its canal. The left main canal irrigate 1.38 lakh

hectares in Dhenkanal, Cuttack, Keonjhar and Balasore districts, similarly the right

main canal irrigate 0.70 lakh hectare in Dhenkanal and Cuttack district.

Table 2. B: Salient Features of Samal Barrage, Odisha.

Salient Features of Samal Barrage 1 Nearest City Talcher 2 District Anugul 3 Name of River Brahmani 4 Basin Brahmani & Baitarani 5 Year of Completion 1994 6 Purpose Irrigation 7 Design Flood (Cumec) 24632.00 8 Spillway capacity (Cumec) 28.80 9 Width of the river (m) 480.00 10 Length of Barrage and Anicut (m) 560.50 11 Length of Raft (m) 9.00 12 Length of upstream divide wall (m) 81.00 13 No. of bays ( i.e no. of Opening) 17 nos. 14 Width of the bay (m) 67.00 15 No. of Spillway gates 17 nos. 16 Thickness of Pier (m) 0.20 17 Crest Level (m) 67.00 18 Thickness of intermediate Pier (m) 3.50 19 Pond Level (m) 76.20 20 Storage capacity up to crest (MCM) 20.10 21 Storage Capacity at Pond level (MCM) 34.12 22 No. of Under sluice bay 7 nos. 23 Size of Under sluice bay (m) 204.00

However, the following changes has been assessed on hydrology and

hydrogeology due to mining and respective corrective measures are in vogue.

- Disruption of natural drainages network located in core zone is re-

aligned to the natural drainage slope. River/stream flow at any point of

time during mining will not be checked.

Page 302: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 43

- Siltation and choking of water courses resulting in scarcity of surface

water and flooding problem in the area is avoided by making foot drain

and catch drain in the overburden dumps. These drain collect run-off

from dump and direct it to settling tank/sedimentation pond before

discharge to nearby natural water courses. Periodically sedimentation

tanks are cleared.

- Reduction in storm run-off and surface run-off is controlled by the

formation of garland drain around excavation area and storm water

drain in infrastructure premises.

- Early drying up of surface water bodies like ponds, lakes and stream

flow by declining of ground water level is generally to the limited extent

around excavation or quarry area. The lowering of water level is

temporary phenomena. Backfilling once reached to its predetermined

level seepages from the excavation zone is considerably reduced,

thereby declining of ground water will also be reduced around the mine.

- The water balance study of the area has been made through rainfall

recharge. The total replenishable annual rainfall recharge in the area

has been assessed as 146.47Mm3. The water demand foreseeable in

the area around 10 km radius of the project for irrigating land, human

population, forest, cattle population, cumulative mine discharge and

industrial demand has been assessed as 34.05 Mm3/annum.

- The total annual rainfall run-off/stream flow in the drainages around 10

km radius of the area for downstream user is 320.80Mm3/annum. The

total available utilizable resource in the area is 112.47Mm3/annum. The

stage of ground water development in the area is 26.33% which is safe

category.

In view of above observations, the riparian system within 10 km radius of

mining area will not be affected.

Page 303: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 44

I. Monitoring of ground water at the depth equivalent to mine depth into

the 10 kms radius of the mine be submitted.

Monitoring of ground water at the depth equivalent to mine depth around 10

kms radius of the mine require piezometers. The location for construction of

piezometers around 10 kms radius is given in Plate-XI. The details of the

piezometers are given below. The ground water monitoring through

piezometers will be started by 2015-16.

PIEZOMETER DETAILS OF TALCHER COALFIELD

Type of Drilling Direct Rotary Dia. Of bore well 12 inch Dia. of bore well casing 6 inch Type of blank casing Galvanised MS blank casing Type of blank casing Galvanised MS slotted casing No. of bail plug 1 Cement sealing 3 m to 6 m Clay filling 0 m to 3 m and 6m to 9 m Well cap As per diagram in piezometer design

Piezometer no.

Total depth (meter)

Tentative location

Total length of blank casing (meter)

Total length of slotted casing (meter)

Gravel packing (meter)

No. of central guides

Depth at which central guides are to be fixed

From To

MTP 01 231 Inside the premises of Mandapal hospital 147 84 9 231 5 40m, 80m, 120m,

160m, 200m

MTP 02 231 Field workshop Lingaraj OCP (near field substation)

147 84 9 231 5 40m, 80m, 120m, 160m, 200m

MTP 03 231 Near Handidua level crossing 147 84 9 231 5 40m, 80m, 120m,

160m, 200m

MTP 04 231 Inside central nursery (beside golf hut), Jagannath area

147 84 9 231 5 40m, 80m, 120m, 160m, 200m

MTP 05 276 Outside Ananta OCP canteen 174 102 9 276 5 40m, 80m, 120m,

160m, 200m, 240m

MTP 06 276 Inside the premises of Kandhal high school 174 102 9 276 6 40m, 80m, 120m,

160m, 200m, 240m

MTP 07 276 BCML workshop (near northern edge of Bhubaneswari OCP)

174 102 9 276 6 40m, 80m, 120m, 160m, 200m, 240m

MTP 08 276 Inside Chakaddal high school (Ekdal village) 174 102 9 276 6 40m, 80m, 120m,

160m, 200m, 240m

MTP 09 276 Inside the premises of Joragarhia Panchayat high school

174 102 9 276 6 40m, 80m, 120m, 160m, 200m, 240m

MTP 10 150 Inside the premises of Danara high school 99 51 9 150 3 40m, 80m, 120m

Page 304: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 7, Page - 45

Piezometer no.

Total depth (meter)

Tentative location

Total length of blank casing (meter)

Total length of slotted casing (meter)

Gravel packing (meter)

No. of central guides

Depth at which central guides are to be fixed

From To

MTP 11 150 Inside the premises of Hingula area office 99 51 9 150 3 40m, 80m, 120m

MTP 12 150 In Betianalli village, opposite to Sindhu deori's house

99 51 9 150 3 40m, 80m, 120m

MTP 13 150 Inside the premises of Ambapal Natarha high school

99 51 9 150 3 40m, 80m, 120m

MTP 14 228 Inside the premises of Pirakhamam village primary school

144 84 9 228 5 40m, 80m, 120m, 160m, 200m

MTP 15 228 Beside Sujan Pradhan's house in Chottaberani village, near nalla.

144 84 9 228 5 40m, 80m, 120m, 160m, 200m

MTP 16 228 Backside of Hingula Mandir VIP guest house 144 84 9 228 5 40m, 80m, 120m,

160m, 200m

MTP 17 276 Inside the premises of market building (through gramin rojgar yojna), Kandhaberani village

174 102 9 276 6 40m, 80m, 120m, 160m, 200m, 240m

MTP 18 171 Inside the premisses of Chellia Prathamiki school 111 60 9 171 4 40m, 80m, 120m,

160m

MTP 19 171 Outside Golaghar sahi primary school, Bijigol (school constructed by NTPC)

111 60 9 171 4 40m, 80m, 120m, 160m

MTP 20 171

Inside the premises of Kansamunda village Uchhya vidyalaya (after crossing Kansamunda village)

111 60 9 171 4 40m, 80m, 120m, 160m

MTP 21 90 Between Chendipada weigh bridge and coal stock yard

63 27 9 90 2 40m, 80m

MTP 22 90

Inside the premises of the abundant office of Junior Engineer (MI Section, Chendipada) (in the safety zone of Chendipada OCP )

63 27 9 90 2 40m, 80m

MTP 23 90 Inside the premises of Vetenary hospital, Chendipada

63 27 9 90 2 40m, 80m

Page 305: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 8, Page - 1

Chapter – 8

PROJECT BENEFITS 8.1 INTRODUCTION

Lingaraj OC Expn. Project (20.0 Mty peak) (i.e. 7.0 Mty incremental) will

enhance the socio-economic activities in the adjoining areas. This will result in

following benefits :

� Improvement in Physical Infrastructure.

� Improvement in Social Infrastructure.

� Increase in Employment Potential.

� Contribution to the Exchequer (both State and Central Govt.).

� Post-mining Enhancement of Green Cover.

� Improvement of Electrical Power Generation and consequently rise in

electric power consumption there by improvement in overall economic

growth of the country.

8.2 IMPROVEMENT IN PHYSICAL INFRASTRUCTURE & COMMUNITY DEVELOPMENT

The expansion project will improve the physical infrastructure of the adjoining

areas. This would include the following :

� Improvement of road communication.

� Strengthening of existing community facilities through the Community

Development Programme being carried out by MCL.

� Greater availability of good quality power grade coal will result in

enhanced power generation to meet the energy demand of the country.

� Pumping of mine water may augment the water availability after due

treatment.

Page 306: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 8, Page - 2

� Gainful post-mining land utilization of mine lease area as highlighted in

the following table :

Sl. No.

Pre-mining Land Break-up for Mining Use Post-mining Land Use (Conceptual)

Particulars Area (in ha) Particulars Area

(in ha)

1. Quarry Excavation 538.851 Plantation (including in excavation area, external Ob dump area, railway siding, infrastruc-ture & colonies)

687.831

2. Blasting danzer zone 552.919 Water Body 80.96

3. OB dump (External) 256.030 Dip side slope & haul roads 165.749

4. Infrastructure 51.8 Undisturbed 442.339

5. Residential colony 83.19

Built-up area 116.32

6. Resettlement colony

7. Rationalisation of project boundary / Rly. Siding & Road diversion

10.41

Total : 1493.20 1493.20

� Skill development & capacity building like vocational training, income

generation programmes and enterpreneurship development program.

� Literacy programme, adult education, assists formation of Village

Working Group (VWG), mahila mandal, etc.

� Awareness programme and community activities, like health camps,

medical aides, family welfare camps, AIDS awareness programme,

immunization camp, sports & cultural activities, plantation, etc.

� MCL may adopt one village in every area to develop as a model village.

This village should be provided minimum infrastructure such as a

school building, a health center, a pond, worshiping place, play ground

and adequate tree plantation.

8.3 IMPROVEMENT IN SOCIAL INFRASTRUCTURE

There would be some obvious changes in various environmental paramterss

due to mining activity, increased economic activities and creation of new employment

Page 307: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 8, Page - 3

opportunity, infrastructural development, better educational and healthcare facilties.

Following are the specific impacts.

SOCIO-ECONOMIC

Overall there will be positive impact in socio-economic area due to increased

economic activities, creation of new employment opportunities, infrastructural

development and better educational and healthcare facilties. The impact in the Core

Zone and Buffer Zone is due to the following :

POPULATION DYNAMICS

Due to direct and indirect employment potential, there is scope of migration

of people into project area and in the peripheral regions, from nearby areas. Mining

activities, acceleration of the economic activities and urbanization along with creation

of new employment opportunities and business may change the population dynamics

of the area.

STANDARD OF LIVING

The people will come in contact with migrated people. This may encourage

higher aspirations among the people of the area. Accelerated economic activities

and urbanization may increase quality of life and standard of living.

HEALTH CARE FACILITIES

MCL will undertake awareness programme and community activities, like

health camps, medical aids, family welfare camps, AIDS awareness programme,

immunization camp, etc.

8.4 EMPLOYMENT POTENTIAL

There is a possibility of creation of direct and indirect employment

opportunities due to working of this mine. Overall, this will have positive impact on

socio-economic profile of the area.

Page 308: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 8, Page - 4

MCL will undertake skill development & capacity building programmes like

vocational training, income generation and entrepreneurship development.

8.5 OTHER TANGIBLE BENEFITS

Mahanadi Coalfields Limited is facing increasing demand of power grade

coal because of superior grade, long flame and other consumer friendly

characteristics. Continuing and augmentation of coal production from the mines of

MCL will help to bridge the gap of demand and supply of superior power grade coal

in India. To meet the growing demand of coal, especially in power sector, sponge

iron sector and brick and other small scale sectors, MCL has planned to increase its

production capacity.

The mine will also contribute to the Exchequer of State and Central

Government.

Development of any nation is measured by the consumption of the electric

power (per capita). Huge demand of power is taking place to sustain the economic

growth of the country, since our country is progressing at a growth rate of about 9%

per annum in the recent years. Coal being prime mover of thermal power generating

stations (more than 70% of electrical energy is generated by Thermal Power Stations

by burning the fossil fuel), the demand of coal has also increased very rapidly, forcing

the existing mines to produce more. The availability of electrical power meets the

rising demand of various industries thereby improvement in over all economic growth

of the country.

Page 309: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 9, Page - 1

Chapter – 9

ENVIRONMENTAL ECONOMICS 9.1 INTRODUCTION

The cost estimate for EIA-EMP of this project is given below along with the

break-up :

(Amount in Rs. lakh)

Sl.# Item Cost of original project

Addl. Cost of expn. project

Total Cost

(1) Resettlement and rehabilitation (including land)

899.41 ---- 899.41

(2) Eco-development cost -- Land reclamation cost 682.28 ---- 682.28 -- Anti-pollution measures cost 381.14 752.21 1133.35 -- Green belt including

compensatory afforestation 245.54 ---- 245.54

(3) Occupational Health 456.52 ---- 456.52 (4) Env. Pollution Monitoring 16.60 ---- 16.60 (5) Indigenous people's development

plan cost 25.00 ---- 25.00

(6) Miscellaneous cost like reclamation studies, EIA and EMP preparation, data generation, etc.

38.36 ---- 38.36

Total 2744.85 752.21 3497.06

N.B. : Biological reclamation cost and wild life conservation plan cost will be met from the revenue budget.

9.2 EXPENDITURE TO BE INCURRED TOWARDS CSR An amount Rs.5.00 per tonne of coal will be spent towards CSR cost. About

Rs. 16075.00 lakh will be spent towards CSR cost. This will be met from the revenue

budget. These amount will be spent during mine life.

9.3 COMPENSATORY AFFORESTATION COST

Forest land for existing Lingaraj OC Expn. (13.0 Mty) is 186.311 ha which

has been accorded forestry clearance. An amount of Rs.74.53 lakhs have been

provided for compensatory afforestation.

Page 310: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 9, Page - 2

9.4 HABITAT MANAGEMENT/WILD LIFE CONSERVATION COST

Lingaraj OC Expn. (20.0 Mty) is the nearby project of Bhubaneswari OC

Expn. (20.0 Mty). Habitat improvement plan of sounding areas for next five years of

Bhubaneswari OC Expn. has been carried out by Addl. Principal CCF (Wild life) &

Chief Wildlife Warden, Orissa vide their letter No.3590 / 3 WL (Cons) 33/04 dated 6th

July 2004.

As per guideline, Govt. of Orissa Forest & Environment Deptt. Vide letter

No.10F(Cons.) 81/2004…6495/F&E dated 23.04.2008 have issued instruction to

release @ Rs.20,000/- per ha mine lease area basis towards the cost of wild life

management plan in the mining lease area where occurrence of wild life is observed

in M.L. area. For wild life & forest measure will be taken for a period of 5 years

initially. An amount Rs.50.00 lakhs will be required to deposit. However the total

cost will be Rs.282.002 lakhs (@ Rs.20,000/- per ha for the total mine lease area of

1410.01 ha).

9.5 RAIN WATER HARVESTING

Due emphasis has been given for rain water harvesting. A lump sump

amount Rs.20.00 lakhs is to be provided for the infrastructural facilities for storage of

rain water for harvesting which will be made from revenue.

9.6 COMMUNITY DEVELOPMENT FOR PERIPHERAL VILLAGES

An amount of Rs.15.00 lakh at first instant has been provided towards

community development for peripheral villages within 1 km of from the peripheral of

the mine. This will be met from revenue expenditure. However, a lump-sum amount

will be spent for community development work for peripheral villages.

9.7 RESETTLEMENT AND REHABILITATION COST

� Out of 1133 PAFs, 973 are already rehabilitated & resettled and 154 are

to be resettled.

� An amount of Rs.899.41 lakh have been provided for the project

affected families as per latest Govt. of Orissa norms.

� Revised cost will be provided while updating the project report.

Page 311: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 9, Page - 3

9.8 BIOLOGICAL RECLAMATION COST

The cost involves land equipment cost, housing cost for land reclamation

personnel and biological reclamation in back filled area and OB dump area. Total

cost involved for biological reclamation is Rs. 822.26 lakh. An amount of 114.81 lakh

have already been spent towards biological reclamation.

9.9 MINE CLOSURE COST

As per guide line Rs.7.90 lakh per ha has to be considered for total mine

lease area. The estimated amount will be distributed with compound interest during

mine life or 21 years whichever is less. These costs will be met from the revenue

budget. This amount will be deposited in an Escrow account. The total amount for

the mine closure including compound interest comes to Rs.19893.89 lakhs.

9.10 REVENUE COST FOR EIA & EMP

The revenue cost for EIA & EMP has been worked out. This comes to about

Rs.19.58 per tonne of coal produced. The break-up of revenue cost is given below :

Revenue Cost for EIA & EMP Lingaraj OCP (20.0 Mty)

Cost Base : Oct., 2013

Sl.No. Particulars Annual operating cost / tonne Rs.

1. Salaries, Wages & Benefits 1.51 2. Stores (as per project costing norms) 5.56 3. Power 0.81 4. Biological reclamation 0.21 5. Mine closure planning 6.19 6. Misc. exp. (as per project costing norms) 0.77 7. Administrative charges 0.91 8. Int. on working capital @ 14.50% 0.77 9. Depreciation 2.85 Sub-Total : 19.58

10. Annual cost (mt) 20.00

Page 312: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 1

Chapter – 10

ENVIRONMENTAL MANAGEMENT PLAN

10.1 MINE CLOSURE PLAN

10.1.1 INTRODUCTION

� All coal mines shall adopt Mine Closure Plan comprising progressive

closure plan and final closure plan duly approved by the competent

authority as per circular No.55011-01-2009-CPAM, Govt. of India,

Ministry of Coal, dated 27th August, 2009.

� Coal projects who has been accorded approval of Mining Plan / Project

Report without mine closure plan are required to prepare and obtained

the approval of Mine closure plan within a period of 1 year as per the

circular.

10.1.2 OBJECTIVES OF MINE CLOSURE PLANNING

� To allow a productive and sustainable after-use of the site which is

acceptable to the mine owner and the regulatory authority;

� To protect public health and safety;

� To alleviate or eliminate environmental damage and thereby encourage

environmental sustainability;

� To minimize adverse socio-economic impacts.

10.1.3 VARIOUS ASPECTS OF MINE CLOSURE PLANNING

The mine closure planning broadly involves the following aspects:

(a) Technical aspects;

(b) Environmental aspects;

(c) Social aspects;

(d) Safety aspects;

(e) Financial aspects.

Page 313: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 2

10.1.4 MINE CLOSURE OBLIGATION

There is a need to define the liabilities, responsibilities and authorities of the

mine management, other regulatory bodies, Central and State Governments after

mine closure. Some obligations relating to the mine management are as follows:

(a) Health & Safety: Regulation Nos. 6, 61, 106, 112 of Coal Mines

Regulations, 1957 and its related DGMS Circulars;

(b) Environment

(i) Water (Prevention & Control of Pollution) Act, 1974;

(ii) Air (Prevention & Control of Pollution) Act, 1981;

(iii) Environmental (Protection) Act, 1986 and Environmental Protection

(Amendment) Rule, 2000;

(iv) DGMS Directives on Noise & Ground Vibration;

(c) Forest

Forest (Conservation) Act, 1980. (d) Rehabilitation

CIL's Policy and Orissa State Govt. Policy. Latest Policy / Norms of

Govt. of Orissa is followed for this project.

(e) Decommissioning/asset disposal, etc.

Decommissioning of infrastructure is done; the land occupied by the

infrastructure will be restored to some useful purpose. The salvaging

and shifting operation of mining machinery and other equipment will be

done considering the ground realities existing during the period 1 year

advance of final closure of the mine.

10.1.5 TYPES OF MINE CLOSURE PLAN

There are two types of mine closure plan :

- Progressive mine closure plan

- Final mine closure plan

Page 314: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 3

10.1.6 PROGRESSIVE MINE CLOSURE PLAN

This is a progressive plan for the purpose of providing protective reclamation

and rehabilitation measures in a mine or part there of.

10.1.7 FINAL MINE CLOSURE PLAN

This plan means for the purpose of decommissioning rehabilitation and

reclamation in the mine or part there of after cessation of mining and its related

activities that has been prepared in the manner to address all environmental aspects

taking into consideration.

The final mine closure activities would start towards the end of mine life, and

may continue even after the reserves are exhausted and / or mining is discontinued

till the mining area is restored to an acceptable level to create a self sustained

ecosystem.

10.1.8 ASPECTS FOR PREPARATION OF MINE CLOSURE PLAN

The following points will be incorporated while preparing mine closure plan.

TECHNICAL ASPECTS

1. Mine description

2. Reason for closure

3. Management of mined out land

a. Present land use

b. Final stage and post operation stage.

4. Management of top soil.

5. Management of wastes.

6. Management / decommissioning of infrastructure.

7. Management of disposal of mining machinery.

Page 315: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 4

ENVIRONMENTAL ASPECTS

1. Management of hydrology & hydrogeology during mine period and post

mining closure period.

2. Drainage arrangement for external OB dump.

3. Reclamation of dump(s) & adjoining areas.

4. Rehabilitation & resettlement.

5. Management of air quality.

SOCIAL ASPECTS

1. Redeployment of workforce

2. Management of community facilities

3. Management of association and consultation with stake holders.

SAFETY AND SECURITY ASPECTS

1. Disaster management

2. Care and maintenance during temporary discontinuance

3. Management of fire

FINANCIAL ASPECTS

COST OF MINE CLOSURE INVOLVES

1. Cost of reclamation of mined out area.

2. Cost of air quality protection measure.

3. Decommissioning cost of infrastructure

4. Cost of safety & security

5. Socio-economic cost

6. Cost of organization for executing the closure activities.

7. Cost of post project monitoring for five years.

Page 316: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 5

10.1.9 TECHNICAL ASPECTS

10.1.9.1 MINE DESCRIPTION

� Lingaraj OC Expn. is an ongoing project.

� Minable reserve is 321.50 Mt as on (1.4.2010).

� Life of the mine is 21 years as on (1.4.2010).

� The general topography of the block is comparatively less undulating /

almost flat.

� Higher capacity shovel-dumper system and blast free technology

(surface miner) has been proposed for expansion project in addition to

existing system.

10.1.9.2 REASON FOR CLOSURE

� Life of the mine is 21 years. Coal reserve (321.50 Mt) will be exhausted

within 21 years.

� Technical reclamation and biological reclamation of external OB dump

and backfilling will also be completed during mine life.

10.1.9.3 LAND RESOURCE MANAGEMENT

� Present land use

� The total mine lease area is 1410.01 ha and total land required is

1493.20 ha.

Pre-mining land use

Sl. No. Item

Total for 16.0 Mty

Forest Non-forest Total

1. Quarry excavation 113.859 424.992 538.851

2. Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

72.452 480.467 552.919

3. OB dump area (external) -- 256.030 256.030

4. Infrastructure (workshop, CHP, project office, railway siding etc.)

-- 51.800 51.800

5. Rationalisation of project boundary and diversion of existing coal transporta-tion road.

-- 10.410 10.410

Page 317: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 6

Pre-mining land use

Sl. No. Item

Total for 16.0 Mty

Forest Non-forest Total

Mining lease area (1 to 5)

186.311 1223.699 1410.01

6. Residential colony -- 6.000 6.000

7. Rehabilitation colony -- 77.190 77.190

Outside Lease area (6 to 7)

-- 83.190 83.190

Total : 186.311 1306.889 1493.20

Post-mining land use

Sl. No. Category

Land use (in ha)

Plantation Water body

Dip side slope &

haul road

Undis-turbed

Built-up area Total

1 Quarry excavation 292.141 80.96 165.749 --- 538.85

2 Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

110.58 442.34 552.92

3 OB dump area (external) 256.03 256.03

4 Infrastructure (workshop, CHP, project office, railway siding etc.)

10.36 41.44 51.8

5 Rationalisation of project boundary and diversion of existing coal transporta-tion road.

2.08 8.33 10.41

7 Residential colony 16.64 66.55 83.19

8 Resettlement site

Total 687.831 80.96 165.749 442.339 116.32 1493.200

N.B : Forest cover enhancement ratio = 687.831 / 186.311 = 3.69

Page 318: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 7

10.1.9.4 MANAGEMENT OF RECLAIMED LAND

There are several options available for land use pattern of the reclaimed land.

The following factors have been considered for selection of appropriate land use

pattern:

� Pre-mining land use pattern

� Topsoil/sub-soil quality

� Socio-economic parameters of the area

� Availability of technology for land reclamation

� Climatic conditions of the area

� Local flora.

The alternatives available for utilising the reclaimed land are :

Agricultural use

Afforestation

The option for using the reclaimed backfilled area for agricultural

purpose immediately is ruled out due to the following reasons :

� The reclaimed land is very different from its pre-mining conditions. It

cannot sustain crops as the soil has poor fertility status. So the

agriculture may prove uneconomic venture compared to afforestation.

� The development of soil regime for agriculture will take a considerable

time.

� Reclamation is proposed to be done progressively and concurrently with

mining operation. Carrying out agriculture within mining activity area by

releasing reclaimed area in a phase-wise manner, may not be advisable

from safety point of view.

In view of the above, it is suggested to utilise the reclaimed land for

afforestation purpose which will help improve the soil status i.e texture

and nutrient levels, etc.

Page 319: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 8

10.1.9.4 MANAGEMENT OF MINED-OUT VOID 10.1.9.4.1 SOLID WASTE GENERATION OF LINGARAJ OCP

222.23 Mm3 overburden (Solid Waste) will be generated. The life of mine is

21 years (as on 1.4.2010). On 2nd year production target will be achieved. Already

60.11 ha of internal OB dump area has been technically reclaimed. About 20.6ha of

internal dump has been biologically reclaimed. A volume of 8.18Mm3 will be

temporarily dumped externally for first two years of mine operation. Out of 256.03ha

of external OB dump area, about 55.09ha of land has been biologically reclaimed. All

the solid waste will be backfilled from the 1st year of operation in the expansion

project.

Year Total OB

(Mm3)

Backfilling (Mm3)

External dumping

(Mm3)

Year Total OB

(Mm3)

Backfilling (Mm3)

External dumping

(Mm3) 1 13.75 9.18 4.57 14 9.28 9.28 2 14.58 10.97 3.61 15 9.14 9.14 3 14.43 14.43 16 9.18 9.18 4 14.40 14.40 17 9.09 9.09 5 14.23 14.23 18 9.03 9.03 6 14.05 14.05 19 8.95 8.95 7 13.48 13.48 20 7.83 7.83 8 12.84 12.84 21 0.1 0.1 9 10.84 10.84 10 9.74 9.74 11 9.17 9.17 12 11.23 9.06 13 9.06 9.06

Total: 222.23 214.05 8.18

� LAND RECLAMATION

Land reclamation will be carried in two phases :

(1) Physically & technically.

(2) Biologically reclamation.

Page 320: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 9

Table 1: Stage – wise Land use and Reclamation Area (ha) S No.

Land use Category Present (1st Year)

5th Year 10th Year 20th Year

24th Year (end of Mine life)

Total Area in ha.

1. Backfilled Area (Reclaimed with Plantation) 20.60 22.91 48.0 137.0 63.631 292.141

2. Excavated Area (not reclaimed)/void

246.71 246.71**

3. External OB dump (Reclaimed with plantation)

55.09

200.94 (Grass Carpeting) 256.03

4. Reclaimed Top Soil dump Concurrently Reclaimed in Backfilled & External Dump Area

5. Green Belt Area (Safety Zone) 15.48 43.51 51.59 -- -- 110.58 6. Undisturbed Area (Brought under

plantation) (Rationalisation of project boundary)

-- -- 2.08 -- -- 2.08

7. Roads (avenue plantation) 14.23 12.461 - - - 26.691 8. Area around buildings (R&R site

and Residential colony) and Infrastructure

3.87 23.13 - - - 27.00

TOTAL 109.27 102.011 101.67 137.00 264.571 714.522 ** Not considered for reclamation. Table2: Stage-Wise Cumulative Plantation

Sl. No.

YEAR* Green Belt External Dump Backfilled area Others (Undisturbed

area/etc)

Total

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha) No. of trees

1. Existing 17.60 59325 65.09* 177125 21.80 64652 15.98 28507 120.47 329609 2. 1st year 43.51 108775 -- -- 13.89 34700 21.461 53652 78.831 197127 3. 5th year 4. 10th year 59.83 149575 -- -- 29.07 72675 7.97 19925 96.87 242175 5. 15th year

-- -- -- -- 82.98 207501 -- -- 82.98 207501 6. 20th year

7. 21st year (end of Mine life) -- -- 190.94

Grass Carpetin

g 38.571 17448

5 -- -- 229.511 174485 8. 21- 24th year (post mining)

Total : 120.94 317675 256.03 177125 186.311 554013 45.411 102084 608.662 1150897

* External dump area will be rehandled.

Page 321: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 10

Table 3: Post- Mining Land use Pattern of ML/Project Area (ha)

Sl. No.

Land Use during Mining Land Use (ha)

Plantation Water Body Public Use Undisturbed TOTAL 1. External OB Dump 256.03 - -- - 256.03

2. Top Soil Dump Concurrently Reclaimed in Backfilled & External Dump Area

3. Excavation 292.141 80.96 - 165.749 538.85 4. Roads - - - - - 5. Built up area 10.36 - 41.44 - 51.80 6. Green Belt 110.58 - - 442.34 552.92 7. Undisturbed Area (Rationalisation

of project boundary and diversion of existing coal transportation road)

2.08 - 8.33 - 10.41

TOTAL 671.191 80.96 49.77 608.089 1410.01

� TOP SOIL MANAGEMENT

This is an opencast mine. The topsoil from still unbroken area will be

scraped for progressive and concurrent utilisation during technical

reclamation of backfilled area, thus obviating the necessary of storage of

topsoil separately.

� AREA FOR RECLAMATION

(i) Land to be disturbed due to excavation : 538.851 ha

(ii) Area to be reclaimed after backfilling : 292.141 ha

(iii) Ext. OB dump area already technically & biologically reclamation

: 65.09 ha

(iv)

� DETAILS OF RECLAMATION TECHNIQUE

� Gradiant of terracee shall be gently sloping (1 in 50)

� Angle of slope angle is 28o.

� Top soil will be be spread over backfilled area.

Page 322: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 11

� FINANCIAL OUTLAY

(Amount Rs in Lakh)

Sl. No.

Particulars Total Amount

Amount already spent

Balance amount to be spent

1. Cost of biological reclamation

279.47 114.81 164.66

2. Cost of arboriculture 349.15 48.38 300.77

3. Cost of Anenue Plantation 36.30 28.33 7.97

Total : 664.92 191.52 473.40

N.B: The amount will be spent from the revenue budget.

10.1.9.5.2 The total waste management plan, OB dumping and reclamation

including conceptual mine closure of mine void furnished taking into

consideration the neighbouring large operating opencast mines

Bhubaneswari, Ananta, etc. in an integrated manner.

Total Waste Management Plan

Integrated OB management has been contemplated on the basis of the

following criteria.

1. Common mine boundary for the projects.

2. Accessibility of dumpers and dozers of the neighbouring projects.

3. Contiguous mine property of the proponent.

Keeping in view the above criteria, the following proposed projects come

under one cluster plan (Plate-IX B).

1. Lingaraj OC Expn. Project (Peak 20.0 Mty)

2. Ananta OC Expn. Project (Peak 20.0 Mty)

3. Bhubaneswari OC Expn. Project (20.0 Mty)

Page 323: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 12

OB Removal

Year wise details of overburden removal for Bhubaneswari OC Expn. Project

(20.0 Mty), Ananta OC Expn. Project (Peak 20.0 Mty) and Lingaraj OC Expn. Project

(Peak 20.0 Mty) has been given in the table below:

Combined Proposed Calendar programme of OB Removal (Waste Generation)

(Fig. in Mm3)

Year OB REMOVAL BHUBANESWARI EXPN. LINGARAJ EXPN. ANANTA EXPN.

Yr 1 1.00 13.75 14.78

Yr 2 3.00 14.58 23.00

Yr 3 5.00 14.43 27.50

Yr 4 9.00 14.40 30.00

Yr 5 12.50 14.23 30.00

Yr 6 12.50 14.05 30.00

Yr 7 13.50 13.48 30.00

Yr 8 13.50 12.84 30.00

Yr 9 13.50 10.84 29.00

Yr 10 13.50 9.74 27.00

Yr 11 13.50 9.17 27.00

Yr 12 13.00 9.06 27.00

Yr 13 13.00 9.06 27.00

Yr 14 13.00 9.28 31.00

Yr 15 13.00 9.14 36.50

Yr 16 13.00 9.18 37.00

Yr 17 13.00 9.09 37.00

Yr 18 13.00 9.03 37.00

Yr 19 13.00 8.95 37.00

Yr 20 13.00 7.83 40.00

Yr 21 11.90 0.10 40.00

Yr 22 7.72 40.00

Page 324: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 13

Year OB REMOVAL BHUBANESWARI EXPN. LINGARAJ EXPN. ANANTA EXPN.

Yr 23 4.06 40.00

Yr 24 0.21 40.00

Yr 25 31.73

Yr 26 10.33

TOTAL 251.39 222.23 809.84

It is observed from the table that total proposed OB removal from

Bhubaneswari OC Project (20.0 Mty) is 251.39 Mm3; Lingaraj OC Expn. Project is

222.23 Mm3 and Ananta OC Expn. Project is 809.84 Mm3.

OB dumping

During working of these mines void generated in these mines can only be

used for backfilling of its own overburden. Wide road all along the floor of the mine

from surface to quarry bottom has to be maintained for transport of coal, overburden,

machinery and manpower. Proper slopes have to be maintained towards both quarry

and dump edges. Towards dipside sufficient barrier has to be maintained between

dump slope and quarry working face. So during working phase of the mine its void

generation will be slow or it can be said that all the voids available cannot be filled up

completely due to operational and safety reasons.

The schedule of OB dumping considering neighbouring mines is given in the

below table :

Combined Proposed Calendar programme of OB Dumping (Waste Management Plan)

(Fig. in Mm3)

Year

Internal dump External dump

(BHUB. EXPN.)

(LINGARAJ EXPN.)

(ANANTA EXPN.)

OB FROM BHUBA-

NESWARI DUMPING INTO

ANANTA

(BHUB) (LINGARAJ)

Yr 1 9.18 14.78 1.00 4.57 Yr 2 10.97 23.00 3.00 3.61 Yr 3 14.43 27.50 5.00 Yr 4 14.40 30.00 9.00 Yr 5 2.25 14.23 30.00 5.80 4.45 Yr 6 3.64 14.05 30.00 6.41 2.45

Page 325: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 14

Year

Internal dump External dump

(BHUB. EXPN.)

(LINGARAJ EXPN.)

(ANANTA EXPN.)

OB FROM BHUBA-

NESWARI DUMPING INTO

ANANTA

(BHUB) (LINGARAJ)

Yr 7 6.46 13.48 30.00 2.15 4.89 Yr 8 8.90 12.84 30.00 0.69 3.91 Yr 9 9.88 10.84 29.00 3.62 Yr 10 13.50 9.74 27.00 Yr 11 13.50 9.17 27.00 Yr 12 13.00 9.06 27.00 Yr 13 13.00 9.06 27.00 Yr 14 13.00 9.28 31.00 Yr 15 13.00 9.14 36.50 Yr 16 13.00 9.18 37.00 Yr 17 13.00 9.09 37.00 Yr 18 13.00 9.03 37.00 Yr 19 13.00 8.95 37.00 Yr 20 13.00 7.83 40.00 Yr 21 11.90 0.10 40.00 Yr 22 7.72 40.00 Yr 23 4.06 40.00 Yr 24 0.21 40.00 Yr 25 31.73 Yr 26 10.33 TOTAL 199.02 214.05 809.84 15.05 37.32 8.18

Out of 251.39 Mm3 overburden proposed to be generated from

Bhubaneswari OC Project (20.0 Mty), 199.02 Mm3 OB is envisaged as internal dump

in the Bhubaneswari mined out void and 15.05 Mm3 OB is internally dumped in the

void of Ananta mine. The remaining 37.32 mm3 OB is proposed to be dumped

externally. The overburden of 214.05 Mm3 generated from the proposed Lingaraj OC

Project (Peak 20.0 Mty) will be internally dumped in the mined out void and the

remaining 8.18 Mm3 of OB will be dumped externally. The entire overburden of

809.84 Mm3 proposed to be generated from the Ananta OCP (Peak 20.0 Mty) will be

dumped internally in the decloaled area of the mine.

Page 326: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CM

PD

I

Job

No.

7061

11

Cha

pter

… 1

0, P

age

- 15

Tab

le:

Min

ed o

ut

void

uti

lizat

ion

Nam

e o

f M

ine

Vid

e av

aila

bili

ty

du

rin

g m

ine

life

Yea

r w

hen

ab

on

den

ed

Vo

lum

e o

f vo

id a

fter

re

han

dlin

g o

f ex

tern

al a

nd

inte

rnal

d

um

p

Vo

lum

e o

f vo

id a

fter

ex

hau

stio

n

Exc

avat

ion

in

ha

Vo

id

area

in

ha

Bac

kfill

ed

area

in h

a

Uti

lizat

ion

of

void

aft

er

exh

aust

ion

Ling

araj

OC

P

Suf

ficie

nt o

nly

for

own

over

burd

en

Afte

r 20

ye

ars

Reh

andl

ing

of o

wn

ext

dum

p 40

.11

M c

um.

Reh

andl

ing

of o

wn

int

dum

p ab

ove

grou

nd

leve

l: 15

Mcu

m.

Aro

und

356

Mcu

m m

ax

dept

h re

duce

d to

18

5 m

from

27

2.5m

.

538.

851

246.

71

292.

141

Dum

p fr

om

Ark

hapa

l A a

nd

Sak

higo

pal

bloc

ks.

Dum

ping

of

was

hery

re

ject

s.

Bhu

bane

swar

i O

CP

S

uffic

ient

onl

y fo

r ow

n ov

erbu

rden

A

fter

25

year

s R

ehan

dlin

g of

ow

n ex

t du

mp

37.3

2 M

cum

A

roun

d 19

7Mcu

m

max

dep

th

187.

5 m

462.

641

239.

99

225.

651

Dum

p fr

om

Ark

hapa

l A a

nd

Sak

higo

pal

bloc

ks.

Dum

ping

of

was

hery

re

ject

s.

Ana

nta

Exp

O

CP

S

uffic

ient

for

own

over

burd

en.

Som

e ov

erbu

rden

fr

om

bhub

anes

war

i m

ine

will

be

acco

mod

ated

Afte

r 26

ye

ars

.Reh

andl

ing

of o

wn

int

dum

p ab

ove

grou

nd

leve

l: 12

7.34

Mcu

m.

Aro

und

255

Mcu

m m

ax

dept

h 26

5m.

968.

062

235.

28

732.

852

Dum

p fr

om

othe

r di

p si

de

inde

pend

ent

bloc

ks.

Dum

ping

of

was

hery

re

ject

s.

Page 327: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 16

Lingaraj OC Expn. project is an on going project. The life for the expansion is

21 years (as on 1.4.2010). External OB dump area of 55.09 ha has been technically

& biologically reclaimed respectively. 222.23 Mm3 of OB will be removed for the

expansion project. All the over burdens will be backfilled. Backfilled will start from

the 1st year of operation. The final stage dump plan showing land reclamation is

given in Plate No.IX C. Calendar programme OB removal is given below :

Year of Operation OB Removal (Mm3) Backfilling (Mm3)

External Dump Mining

Yr 1 13.75 9.18 4.57

Yr 2 14.58 10.97 3.61

Yr 3 14.43 14.43 --

Yr 4 14.40 14.40 --

Yr 5 14.23 14.23 --

Yr 6 14.05 14.05 --

Yr 7 13.48 13.48 --

Yr 8 12.84 12.84 --

Yr 9 10.84 10.84 --

Yr 10 9.74 9.74 --

Yr 11 9.17 9.17 --

Yr 12 9.06 9.06 --

Yr 13 9.06 9.06 --

Yr 14 9.28 9.28 --

Yr 15 9.14 9.14 --

Yr 16 9.18 9.18 --

Yr 17 9.09 9.09 --

Yr 18 9.03 9.03 --

Yr 19 8.95 8.95 --

Yr 20 7.83 7.83 --

Yr 21 0.10 0.10 --

TOTAL : 222.23 214.05 8.18

Page 328: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 17

Land reclamation

This is carried out in two distrinct stages :

� Technical reclamation

� Biological reclamation

� Technical reclamation

External OB dumping

External OB dump area of 66.09 ha and 65.09 ha has been technically

& biologically reclaimed respectively. A quantity of 8.18 Mm3 of OB will

be dumped externally in the expansion project. The face of slope of

external dump has been maintained at the natural angle of repose and

over all slopes has been kept at an angle 28o. Drainage arrangement

have been provided around external OB dump area to avoid gully

formation. Garland drain with settling tanks have been provided to

collect run off sedimentation ponds in order to avoid silt.

Backfilling and reshaping of internal dump

The total area of quarry excavation for this project is 538.851 ha. Of this

275.85 ha (as on 31.12.2014) has been excavated and the balance

263.001 ha will be excavated. In Lingaraj OC Expn. Project (20.0 Mty

Peak), the overburden (222.23 Mm3) of expansion project will be

removed out of which 214.05 Mm3 overburden will be backfilled.

Major part of the quarry will be backfilled with overburden. The

backfilling will be carried out in a phased manner. Once the backfilling

has reached a certain predetermined reduced level, the plots will be

levelled, graded and cleared of large stone pieces lying on the surface.

The slope of the ground will be made very gentle as far as possible

(preferably less than 2%). The graded and levelled area will be divided

into small sectors and small check bunds will be constructed to retain

moisture and humus in the soil. The outer slope of each bench will be

kept at the natural angle of repose of the spoil material and at overall

slope angle of 28O considering all benches.

Page 329: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 18

Grass carpeting will be done during mining period. All the over burden

above ground level in the internal dump and in the external dump will be

rehandled and levelled in the mined out work.

Sl.

No.

Land Use

Category

Land use in ha.

Left out

void/

water

body

Afforested

or

arboricult

ure

Land to be

converted for

agriculture

(Conceptual)

Undisturbed

Builtup area

Total

1. Quarry excavation

area

246.71 186.311 105.83 ---- 538.851

2. Safety Zone for

blasting

---- 110.58 ---- 442.34 552.92

3. OB dump (external) ---- ---- 256.03 ---- 256.03

4. Infrastructure ---- 10.36 ---- 41.44 51.80

5. Rationalisation of

project bundary

---- 2.08 ---- 8.33 10.41

Total 246.71 309.331 361.86 492.11 1410.01

During post closure period out of total mining lease area of 1410.01 ha,

309.331 ha is available for plantation, 361.86 ha is available for

agriculture, and 246.71 ha is left for water body for water harvesting and

over burden material for future neighbouring nearby mines.

� Biological reclamation

Biological reclamation of mined out area is dealt in para 10.3.

For successful biological reclamation of the reclaimed area, preference

will be given to endemic species and mixed culture. The species will be

selected carefully from the following groups for quick reclamation :

� Nitrogen fixing tree species for fuel wood, timber and fodder

� Fruit bearing tree species

� Tree species with dense foliage for shade

Page 330: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 19

� Flowering and ornamental tree species.

The area likely to be available after technical reclamation at different

time horizon is indicated below:

1. External OB dump (66.09 ha area) has already been technically

reclaimed.

2. Upto end of mine life (i.e. upto 21 years) backfilling will be

continued for an area of 292.141 ha and 186.311 ha will be

available for plantation.

� Quarry and internal dumps

Having backfilled the decoaled area with overburden, internal dumps

will be reclaimed and then revegetated. The remaining void in the

quarry will be developed as water harvesting structure as well as

public utility lagoon which will serve following purposes :

� Source of supply of water for industrial and fire fighting purposes.

� Source of supply of potable water after necessary treatment.

� A place of bathing and washing for the local population.

� Pisciculture.

� For recharging the aquifer in the area.

For such purposes, the pathway to the reservoir is gently graded and

the depth of water is limited.

10.1.9.6 MANAGEMENT OF TOPSOIL

This is an opencast mine. The topsoil from still unbroken area will be scraped

for progressive and concurrent utilisation during technical reclamation of backfilled

area, thus obviating the necessity of storage of topsoil separately.

10.1.9.7 MANAGEMENT / DECOMMISSIONING OF INFRASTRUCTURE

The infrastructure like workshop, office buildings, residential colony, roads

and transmission lines, etc., will be provided for the project. Considering the ground

realities existing during the period just 1 year before mine closure plan for reutilization

in neighbouring mines or decommissioning will be made. If decommissioning of

Page 331: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 20

infrastructure is done, the land occupied by the infrastructure will be restored for

some useful purpose. The cost for decommissioning will be met from the 'Escrow

account' created for mine closure activities.

10.1.9.8 MANAGEMENT OF DISPOSAL OF MINING MACHINERY The salvaging and shifting operation of mining machinery and other

equipment will be planned considering the ground realities existing during the period

1 year advance of final closure of the mine.

10.1.10 ENVIRONMENTAL ASPECTS

10.1.10.1 MANAGEMENT OF HYDROLOGY & HYDROGEOLOGY DURING MINE PERIOD AND POST MINING CLOSURE PERIOD.

� During mining period

� Assessment of hydrology and hydro-geology of the area Investigations have been carried out in and around the area

comprising of core and buffer zones of this project. The matter

has been dealt.

� Estimation of ground water availability of the area Ground water availability of the area comprising of core and

buffer zones of this project has been assessed.

� Water demand, dewatering of the mine and waste water management

The above details have been given in this report. � Impact of the mine on ground water and surface water The impacts have been assessed and given in this report.

� During post-mine closure period

Surface flow pattern of precipitation run-off and mine water has been

discussed in this report.

Page 332: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 21

� Management of recharge areas

It is also observed from the contour maps, there are a few

localized ground water troughs and mounds and watershed boundaries

generally coincide with ground water divides. There is a ground water

divide orienting north-west to south-east between Manikamara

(Krishnachandrapur) to Dasanali villages. This groundwater divide acts

as drainage divide of the area. This ground water and drainage divide

make a part of ground water movement as well as a part of surface run-

off towards the north-west contributing to Bangaru jhara and balance

flow towards Nandira jhar.

Mining operation of this project will create voids or depressions, which

will induce / accelerate rainfall recharge and decrease run-off in the

mining area. Maximum effort will be made to recycle or reuse the

treated mine discharge water totally to the extent possible by keeping

the make of water in different sumps or low lying areas of the mine.

The remaining water will be discharged to the natural drainage for

ground water recharge in the same basin. The final voids of the quarry

will be left as a water reservoir for water harvesting and also recharging

the aquifer in the surrounding area.

For the purpose of understanding impact of mining activity on groundwater in

the vicinity, a dug well from Deulbera village has been selected for year on

year fluctuation study. Based on the data, it can be inferred that over the years

ground water levels in Deulbera village have marginally decreased and thus

mining activity has little influence on the groundwater.

� Acceptable surface and ground water flows

The drainage arrangement for smooth disposal of storm water from OB

dump will be made to avoid gully formation on the dump body and also

siltation problem of the nearby natural drains.

Page 333: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 22

10.1.10.5 DRAINAGE ARRANGEMENT FOR EXTERNAL OB DUMP & FOR INTERNAL DUMP

� Drainage arrangement for OB dumps

�� Catch drain

Catch drain of appropriate size has been provided on all terrace at

the foot of next bench to receive the storm water from upper bench.

� Foot drain / Garland drain

Garland drain have been provided through out OB dump along with

settling tanks. Water discharges to natural courses after the settling

tank.

� Drainage arrangement for internal OB dumps

A part of the quarry will be backfilled with overburden. The backfilling

will be carried out in a phased manner. Once the backfilling has

reached a certain predetermined reduced level, the plots will be levelled

graded and cleared of large stone pieces lying on the surface. The

slope of the ground will be made very gentle as far as possible

(preferably less than 2%). The graded and leveled area will be divided

into small sectors and small check bunds will be constructed to retain

moisture and humus in the soil. The drainage arrangements for

precipitation run-off are as follows:

� During working stage, the run-off will be collected from internal

dump by foot drain for diverting to mine sump for pumping.

� In the post-mining period, the drainage pattern of the reclaimed

area will be such that the run-off will be diverted to final void of the

quarry which will be developed as a water reservoir for water

harvesting and also recharging the aquifer in the surrounding

area.

There is an intricate relationship between surface water and ground

water. In the monsoon period, till the aquifer attains its original ground

water level, surface water bodies like stream, ponds & lakes recharge

Page 334: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 23

the aquifer. As soon as ground water recoups and attains its level, it

contributes again to surface water bodies. After post-monsoon period,

this process is reversed again as ground water level gets lowered from

the original level.

The mine dewatering brings down ground water level in the immediate

vicinity of the mine. Maximum effort will be made to recycle or reuse the

treated mine discharge water totally to the extent possible by keeping

the make up water in different sumps or low lying areas of the project.

In unusual situations during monsoon, mine discharge water will be

allowed to go as recharge/run-off in the same basin of the area.

As such, this area is having an average annual rainfall of 1256.56 mm.

This rainfall replenishes the annual ground water draft every year. This

will enhance the recharge of the aquifer in the area for mitigating the

lowering of ground water level in the area surrounding the mine.

10.1.10.6 RECLAMATION OF DUMP(S) & ADJOINING AREAS.

Biological reclamation have been done for different projects of the adjoining

area. Plantation on OB dump have been carried out in Hingula OCP (14.738 ha),

Balaram OCP (56.283 ha), Bharatpur OCP (124.048 ha), Jagannath OCP (164.260

ha), Lingaraj OCP (20.60 ha) and Balanda OCP (190.498 ha).

10.1.10.7 REHABILITATION & RESETTLEMENT

1134 project affected families from 20 (twenty) inhabited villages namely,

Balugaon, Balugaon-Khamar, Langijoda, Ambamunda, Nakulbaspur, Hensamul and

Madanmohanpur besides some uninhabited villages involving 3472 project affected

persons will be rehabilitated in the rehabilitation colony. All civic amenities in the

rehabilitation colony will be provided

Page 335: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 24

10.1.10.8 MANAGEMENT OF AIR QUALITY

Management of air quality has been dealt in detail in report. After cessation

of mining and its related activities, there will be no effect on ambient air quality due to

this project. As the proper mitigatory measures for air pollution control measures will

be taken in the neighbouring mines, there will be no effect on the ambient air quality

after closure of mine.

10.1.10.9 MANAGEMENT OF WASTES

� NON-TOXIC SOLID WASTE

The solid wastes (222.23 Mm3) generated from the mine during the coal

production are non-hazardous and non-toxic in nature. The above solid wastes will be

disposed by backfilling the mined out area and then revegetating without causing any

siltation problem on surface water bodies.

� TOXIC WASTES

Toxic wastes like used oil, used batteries, oily sludge, besides filter and filter

materials containing oil during maintenance of vehicles will be generated from this

project.

Used oil will be stored in drums safely in store either for disposal through

auction to the authorized reprocessors or for use as lubricant in U/G mines. Used

batteries will be stored safely for auction to the authorized reprocessors. As regards

oily sludge besides filter and filter materials, the same will be disposed off in

impervious layer lined pits without causing environmental hazards.

10.1.11 SOCIAL ASPECTS

10.1.11.1 REDEPLOYMENT OF WORKFORCE

The peak workforce required for mine operations is in the first few years of

the mine when construction activities as well as operational activities achieve their

peak. This workforce slowly goes down with completion of development and when

only the operational work remains. Again, near the end of mine life say, 5 years

advance of closure, the activity of the mine starts getting reduced and therefore,

management will get opportunity to taper the operational manpower. After closure,

Page 336: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 25

skeleton service people will be left for continuing the actual closer operations. The

reduction of manpower will be effected by following options:

� Retraining and redeployment of younger groups upto 40 years of age.

� Transfer of experienced middle aged groups between 40-50 years to

the other projects.

� Implementation of VRS for age group of above 50.

� Retrenchment with suitable compensation after exhausting the above.

10.1.11.2 MANAGEMENT OF COMMUNITY FACILITIES The peripheral village community facilities developed by the Mine Authority

will be left to the Local Body / State Govt. for management.

10.1.11.3 MANAGEMENT OF ASSOCIATION AND CONSULTATION WITH STAKE HOLDERS

The effective implementation of the mine closure plan requires detailed

consultation with stake holders like employee, trade union, mine related business,

state and central govt. agencies, etc. Association and consultation of different stake

holders will make them actively involved, and thus smooth mine closure operation

may be possible.

10.1.12 SAFETY & SECURITY ASPECTS 10.1.12.1 DISASTER MANAGEMENT These aspects have been dealth in this report in detail. 10.1.12.2 CARE AND MAINTENANCE DURING TEMPORARY

DISCONTINUANCE

The guidelines/instructions from DGMS will be followed in case of

discontinuance of mine operation, if any.

10.1.12.3 MANAGEMENT OF FIRE

The measures for management of fire at coal faces in the mine and coal

stockyard as given in the Chapter-VI and VII of this report, will be adopted / to be

adopted and there will be no safety hazards for the neighbouring community after the

mine closure.

Page 337: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 26

10.1.12.4 TIME SCHEDULE FOR DIFFERENT ACTIVITES FOR MINE CLOSURE The details of time schedule (tentative) for all closure operation has been

described with bar chart.

Sl.No

Activity Time Frame Year 1st Phase 2nd Phase 3rd Phase 4th Phase Final

Phase Post Closure

Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PC1 PC2 PC3

A Dismantling of Structures Service Buildings 2 years Residential Buildings 2 & ½ years Industrial structures like CHP,

Workshop, field sub-station, etc.

2 & ½ years

B Permanent Fencing of mine void and other dangerous area

Random rubble masonry of height 1.2 metre including leveling up in cement concrete 1:6:12 in mud mortar

2 years

C Grading of highwall slopes Levelling and grading of

highwall slopes 2 years

D OB Dump Reclamation Handling/Dozing of OB Dump

and backfilling Throughout the life of the mine including 3 years after cessation of mining operation

Technical and Bio-reclamation including plantation and post care

Throughout the life of the mine including 3 years after cessation of mining operation

E Landscaping Landscaping of the open

space in the leasehold area for improving its esthetics and eco value

Throughout the life of the mine including 3 years after cessation of mining operation

F Plantation Plantation over cleared area

obtained after dismantling 2 years

Plantation around the quarry area and in safety zone

Throughout the life of the mine including 3 years after cessation of mining operation

Plantation over the external OB Dump

Throughout the life of the mine

Page 338: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 27

Sl.No

Activity Time Frame Year 1st Phase 2nd Phase 3rd Phase 4th Phase Final

Phase Post Closure

Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PC1 PC2 PC3

G Post Closure Env Monitoring / testing of parameters for three years

Air Quality 3 years Water Quality 3 years H Entrepreneurship

Development (Vocational/skill development training for sustainable income of affected people

Throughout the life of the mine

I Miscellaneous and other mitigative measures

Throughout the life of the mine including 3 years after cessation of mining operation

J Post Closure Manpower cost for supervision

3 years

PC1 : Post Closure Year 1 PC2 : Post Closure Year 2 PC3 : Post Closure Year 3

10.1.12.5 COST OF ORGANIZATION FOR EXECUTING THE CLOSURE ACTIVITIES AND POST-PROJECT MONITORING

Activity wise Progressive & Final Mine Closure cost distribution is given in

table below:

S.N ACTIVITY Mine Closure Cost (percentage weightage)

Remarks

A Dismantling of Structures To be included in final mine closure plan

Service Buildings 0.2 Residential Buildings 2.67 Industrial structures like CHP, Workshop, field

sub-station, etc. 0.3

B Permanent Fencing of mine void and other dangerous area

To be included in final mine closure plan Random rubble masonry of height 1.2 metre 1.5

Page 339: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 28

S.N ACTIVITY Mine Closure Cost (percentage weightage)

Remarks

including leveling up in cement concrete 1:6:12 in mud mortar

C Grading of highwall slopes To be included in final mine closure plan

Levelling and grading of highwall slopes 1.77

D OB Dump Reclamation Handling/Dozing of OB Dump and backfilling 88.66 71% for progressive

and 17.66% for final mine closure.

Technical and Bio-reclamation including plantation and post care.

0.4 Equal weightage throughout the life of the mine.

E Landscaping Landscaping of the open space in leasehold

area for improving its esthetics an eco value 0.3 Equal weightage

throughout the life of the mine.

F Plantation Plantation over cleared area obtained after

dismantling 0.5 To be included in

final mine closure plan

Plantation around the quarry area and in safety zone

0.2 Equal weightage throughout the life of the mine.

Plantation over the external OB Dump 0.02 Equal weightage throughout the life of the mine.

G Post Closure Env Monitoring / testing of parameters for three years

For three years after mine closure

Air Quality 0.22 Water Quality 0.2 H Entrepreneurship Development

(Vocational/skill development training for sustainable income of affected people

0.26 Equal weightage throughout the life of the mine.

I Miscellaneous and other mitigative measures

2.0 Equal weightage throughout the life of the mine.

J Post Closure Manpower cost for supervision

0.8 To be included in final mine closure plan

TOTAL 100.00

Page 340: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 29

10.1.13 FINANCIAL ASPECTS AND COST OF MINE CLOSURE The cost of the mine closure of the project will be estimated during the

formulation of project report / mine plan comprising of cost of relamation of mined out

area, cost of air quality protection measure, decommissioning cost of infrastructure,

cost of safety & security, socio-economic cost, cost of organization for executing the

closure activities, cost of post project monitoring for three years, rehabilitation of

mining machinery (disposal of mining machinery), arboriculture and land scaping

including biological reclamation and cost of barbed wire fencing all around working

area. The mine closure cost as mentioned above, for Lingaraj OC Expn.

Project (20.0 Mty) has been be considered Rs.7.90 lakh per ha [as per WPI (Mar,

2013)]. Annual closure cost has been computed considering the total leasehold area

as per guide line. The Money to be leived per hectare of mining lease is to be

deposited every year after commencement of any activity on the land for the mine

after opening an Escrow Account. Mining Company/owner including all Public Sector

Unertakings will deposite the yearly amount in a Schdeluded Bank. The details of the

final mine Closure Plan along with the details of the cost estimate for various mine

closure activites and Escrow Account shall be submitted to the Ministry of Coal for

approval. An amount equal to the annual cost is to be deposited each year

throughout the mine life compounded @ 5% annually. Annual closure cost is to be

computed considering the total leasehold area at the above mentioned rates and

dividing the same by the life of mine. When implementation of the final mine closure

scheme is undertaken by the mine owner starting five years before the scheduled

closure of mining operations, the Coal Controller may permit withdrawals (four years

before final mine closure date) from the Escrow Account propositionate to the

quantum of work carried out, as reimbursement. The withdrawn amount each year

shall not exceed 20% of the total amount deposited in the account.

10.1.14 COST OF MINE CLOSURE (ABANDONMENT COST)

The total mine lease area is 1410.01 ha project.

The total mine closure cost is Rs.19893.89 lakhs including compound

interest. This cost involves barbed wire fencing all around the working area,

dismantling of the structure / demolition and cleaning of sites, rehabilitation of mining

Page 341: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 30

machinery, plantation, physical / biological reclamation, landscaping, post-

environmental monitoring, supervision for 3 years, power cost, etc. The closure cost

will be updated with respect to WPI.

Amount to be deposited year wise in Escrow Account

Year Amount in Lakh Year Amount in Lakh 1 556.95 14 1050.22

2 584.80 15 1102.73

3 614.04 16 1157.86

4 644.74 17 1215.76

5 676.98 18 1276.54

6 710.83 19 1340.37

7 746.37 20 1407.39

8 783.69 21 1477.76

9 822.87

10 864.01

11 907.22

12 952.58

13 1000.20

Total : 19893.89 10.1.15 RELEASE OF FUND FOR MINE CLOSURE

As per the mine closure rule up to 80% of the total deposited amount

including interest accrued in the ESCROW account may be released after every five

years in the line with the periodic examination of the Closure Plan. Therefore the

released amount at every fifth year is as follows:

Year Amount in Lakh 1 2462.01 2 3770.66 3 6216.04 4 7984.60

Page 342: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 31

10.2 POST-OPERATIONAL STAGE LAND USE PLAN

Statements showing the pre-mining & post mining land uses for the project

are given in tables.

Pre-mining land use

Sl. No. Item

Total for 16.0 Mty

Forest Non-forest Total

1. Quarry excavation 113.859 424.992 538.851

2. Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

72.452 48.467 552.919

3. OB dump area (external) -- 256.030 256.030

4. Infrastructure (workshop, CHP, project office, railway siding etc.)

-- 51.800 51.800

5. Rationalisation of project boundary and diversion of existing coal transporta-tion road.

-- 10.410 10.410

Mining lease area (1 to 5)

186.311 1223.699 1410.01

6. Residential colony -- 6.000 6.000

7. Rehabilitation colony -- 77.190 77.190

Outside Lease area (6 to 7)

-- 83.190 83.190

Total : 186.311 1306.889 1493.20

Page 343: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 32

Post-mining land use

Sl. No. Category

Land use (in ha)

Plantation Water body

Dip side slope &

haul road

Undis-turbed

Built-up area Total

1 Quarry excavation 292.141 80.96 165.749 --- 538.85

2 Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

110.58 442.34 552.92

3 OB dump area (external)

256.03 256.03

4 Infrastructure (workshop, CHP, project office, railway siding etc.)

10.36 41.44 51.8

5 Rationalisation of project boundary and diversion of existing coal transporta-tion road.

2.08 8.33 10.41

7 Residential colony 16.64 66.55 83.19

8 Resettlement site

Total 687.831 80.96 165.749 442.339 116.32 1493.200

N.B : Forest cover enhancement ratio = 687.831 / 186.311 = 3.69

10.2.1 MANAGEMENT OF INFRASTRUCTURE

� Industrial Structures

As far as possible, industrial structures will be utilised by the adjacent

projects. However, if these structures are not found fit at the end of mine life, the

same will be dismantled and salvaged. The equipment will be removed and used

somewhere else. Every effort will be made to restore the area to economic utilisation

value as per the mine closure plan.

Page 344: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 33

� Service Buildings and Colony

In association with the appropriate agencies (Central/State/Social Organisation), these buildings will be utilised for some beneficial purposes to be identified for mine closure planning during one year before closure of the mine. The vacant land within the leasehold area will be afforested and made fit for purposeful usage.

10.3 AFFORESTATION AND COMPREHENSIVE GREENBELT DEVELOPMENT PROGRAMME (CONCEPTUAL)

10.3.1 BREAK-UP AREA ITEM-WISE

Sl. No. Particulars 13.0 Mty

Area (in ha) 16.0 Mty

area (in ha) (A) Total backfilled area

Total land for technical reclaimation 334.851 292.141 Land already technically reclaimed 20.60 21.80 Land to be technically reclaimed 314.251 270.341 Total land for biological reclaimation 334.851 292.141 Land already biologically reclaimed 20.60 21.80 Land to be biologically reclaimed 314.251 270.34*

(B) External dump 256.030 256.030 Area technical reclaimed 66.09 66.09 Area to be technical reclaimed 189.94 189.94 Area biological reclaimed 55.09 65.09 Area to be biological reclaimed 200.94 200.94

(C) Block plantation Safety zone 125.692 110.58 Infrastructure 10.360 10.36 Rationalisation of project boundary 9.910 2.08 Residential colony

16.638 16.64 Resettlement colony Total of (C) 152.70 139.66

(D) Avenue plantation Colony road

8.92 1.254 (Addl.) Approach road from mine to colony

Approach road from mine to magazine 5.41 0.607 (Addl.) Approach road to mine

Coal transportation road 6.50 4.0 (Addl.)

Total of (D) 20.83 5.861 * An area of 164.511 ha will be used for afforestation the remaining 105.83 ha will be used for

agriculture.

Page 345: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 34

10.3.2 AREA WISE PLANTATION AREALDY DONE

Sl. No. Particulars

20.0 Mty Area in ha No. of Saplings

1. Safety Zone 17.60 59325

2. Infrastructure

3. Residential colony 1.75 2975

4. Resettlement colony

Total (1 to 4) : 19.35 62300

5. OB dump area (Biologically reclaimed) 65.09 177125

6. Backfilled area (Biologically reclaimed) 21.80 64652

Grand total : 106.24 366377 AREA WISE PLANTATION TO BE DONE

Sl. No.

Particulars 20.0 Mty

Area in ha

No. of Saplings

1. Safety Zone 103.34 258350 2. Infrastructure

3. Residential colony 14.89 37225

4. Resettlement colony

Total (1 to 4) : 118.23 295575

5. OB dump area (Biologically tobe reclaimed) 256.03 *

6. Backfilled area (Biologically tobe reclaimed) 164.511 411278

Grand total : 706853 * Grass carpeting will be done during mining period and during mine closure period this land will be used for agriculture.

10.3.3 AREA WISE AVENUE PLANTATION ALREADY DONE

Year of operation

Area for plantation in ha. For 13.0 Mty

Colony Road (ha)

Aproach road

mines to colony

(ha)

Aproach road to project

(ha)

Aproach road to

magazine (ha)

Coal transpor-

tation road (ha)

Total Area (ha)

Total saplings

TOTAL 3.04 3.00 1.71 0.53 5.95 14.23 25532

Page 346: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 35

10.3.4 AREA WISE AVENUE PLANTATION TO BE DONE

Year of operation

Area for plantation in ha. for 20.0 Mty (i.e. 7.0 incremental)

Colony Road (ha)

Aproach road

mines to colony (ha)

Aproach road to project

(ha)

Aproach road to

magazine (ha)

Coal transpor-

tation road (ha)

Total Area (ha)

Total saplings

1 --- 0.627 --- 0.607 1.000 2.234 3575

2 --- 0.627 0.85 0.74 2.000 4.217 67.47

3 0.96 0.96 0.85 0.73 1.55 5.05 8080

4 --- 0.96 --- --- --- 0.96 15.36

5 --- --- --- --- --- --- ---

6 --- --- --- --- --- --- ---

TOTAL 0.96 3.174 1.70 2.077 4.55 12.461 19938

AREA WISE AVENUE PLANTATION TO BE DONE

[ Lingaraj OCP (20.0 Mty Peak) ]

Sl.N

o.

ITEM Duration in years

0 2 4 6 8 10

12

1 Avenue plantation in colony road

2 Mines to colony

3 Road to project

4 Road to magazine

5 Coal transportation road

Page 347: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 36

10.3.5 AREA WISE GREENBELT TO BE DONE (CONCEPTUAL)

(Area in ha) Year of

operation Area for plantation in ha. For Peak 20.0 Mty (i.e. 7.0 Mty incremental)

Safety zone / Infra-structure Residential colony/ Reset-tlement Colony

Total Area Total saplings

1 6.00 1.80 7.8 21450

2 7.51 1.80 9.31 25603

3 10.0 1.80 11.8 32450

4 10.0 1.80 11.8 32450

5 10.0 1.80 11.8 32450

6 10.0 1.80 11.8 32450

7 10.0 1.80 11.8 32450

8 15.12 1.00 16.12 44330

9 15.20 1.00 16.20 44550

10 11.59 0.29 11.88 32670

TOTAL 105.42 14.89 120.31 330853

AREA WISE GREENBELT TO BE DONE

[ Lingaraj OCP (20.0 Mty) ]

Sl.N

o.

ITEM

Duration in years

0 2 4 6 8 10

12

1 Greenbelt for safety zone area/ infrastructure

2 Greenbelt for colony/ resettlement colony

Page 348: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 37

10.3.6 AFFORESTATION PROGRAMME FOR INTERNAL DUMP

Year of Operation

Area for Plantation in ha for 13.0 Mty

Backfilled in ha for 7.0 Mty

(Incre.)

Area for Plantation in ha for 20.0 Mty

Backfilled area Total Saplings Backfilled

area

Backfilled area for

plantation in ha.

Total Saplings

Existing 21.80 64652 1 0.00 0 3.91 2.37 5922 2 0.00 0 3.00 1.82 4544 3 0.00 0 4.00 2.42 6058 4 0.00 0 6.00 3.64 9088 5 0.00 0 6.00 3.64 9088 6 0.00 0 7.00 4.24 10602 7 0.00 0 8.00 4.85 12117 8 0.00 0 11.00 6.66 16661 9 0.00 0 11.00 6.66 16661

10 0.00 0 11.00 6.66 16661 11 0.00 0 11.00 6.66 16661 12 0.00 0 11.00 6.66 16661 13 0.00 0 11.00 6.66 16661 14 0.00 0 11.00 6.66 16661 15 0.00 0 14.00 8.48 21204 16 0.00 0 14.00 8.48 21204 17 0.00 0 15.00 9.09 22719 18 0.00 0 17.00 10.30 25748 19 0.00 0 17.00 10.30 25748 20 0.00 0 16.00 9.69 24234 21 0.00 0 17.50 10.60 26506 22 0.00 0 14.50 8.78 21962 23 0.00 0 15.00 9.09 22719 24 0.00 0 15.43 10.08 25188

Total : 21.80 64652 270.341 164.51 411276 10.3.7 AFFORESTATION PROGRAMME FOR EXTERNAL DUMP External dump of 65.09 ha have been biologically reclaimed and 177125 nos.

of saplings have already been planted. There is no external dumping for the

expansion project for first two years only. All the additional overburden will be

backfilled.

Page 349: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 38

Progressive Afforestation Programme

[Lingaraj OCP (20.0 Mty)]

Sl.N

o. ITEM Duration in years

0 2 4 6 8 10

12

14

16

18

20

22

24

26

28

1 Internal dump a)

Backfilling b) Technical

Reclamation c) Biological

reclamation & maintenance

2 External dump a)

Backfilling b) Technical

Reclamation c) Biological

reclamation & maintenance

Page 350: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 39

10.4 TOP SOIL MANAGEMENT Top soil from broken-up area has been reclaimed in the external backfilled

area. Top soil from unbroken area will be scraped for progressive and concurrent

utilization during technical reclamation of backfilled area, thus obviating the necessity

of storage of top soil separately.

10.5 CONTROL MEASURES TO RESTORE LAND USE & LANDSCAPE � Solid waste which will be generated due to coal extraction will be

dumped internally. The internal dump will be reclaimed both biological

and technical.

� During the process, the geometrical shape of the dumps will be altered

to make it amenable to effective biological reclamation and also to

provide safety and stability.

� The face slope of external dump is to be maintained at the natural angle

of repose of the material and at overall slope angle of 28o.

� The face slope of internal dump also will be maintained at the natural

angle of repose of the material and at overall slope angle of 28o.

� Suitable drainage arrangement for smooth disposal of storm water.

� Appropriate garland drain is to be provided to collect run-off.

� Backfilled area will be reclaimed both bio-logically and technically.

� Topsoil shall be progressively and concurrently utilized during physical/

technical reclamation of backfilled area, thus obviating the necessity of

storage of topsoil separately.

� Arboriculture is and will be carried out in the vacant areas.

� Proper afforestation / plantation is to be carried out for greenbelt

development.

Page 351: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 40

10.6 CONTROL MEASURES FOR TRAFFIC MOVEMENT The following control measures are adopted and shall be continued :

� Frequent water sprinkling on haul roads and coal transportation roads.

� Plantation on both sides of the roads on the surface.

� Proper maintenance of road to remove ruts and potholes.

� Proper illumination of roads including haul road.

10.7 BIOTA CONSERVATION PLAN

� Mine lease area of Lingaraj OC Expn. Project (16.0 Mty) is 1410.01 ha and

buffer zone area is 44376 ha total is 45786.01ha.

� Buffer zone has forest land 3858.0 ha (Dense and open forest).

� Tropical dry deciduous forest is found in both core and buffer zones with

Shorea robusta (Sal) as dominant species. The associates of Sal are

found to be Azadirachta indica (Neem), Madhuca indica (Mahula),

Borassus flabellifer (Palm), etc.

� FLORA CONSERVATION PLAN

� Biological reclamation will be done with endemic species of different

varieties. Similar measures have been taken in other projects of the

area.

� Arboriculture for greenbelt development will be done in this project.

Greenbelt development has also been carried out for other

neighbouring projects of Talcher Coalfield.

� Compensatory afforestation for this project will be carried out. In other

projects of Talcher Coalfield, similar measures have also been taken.

� Avenue plantation will be done for each project in the area.

The above measures will help conserve the flora of the area.

Page 352: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 41

� FAUNA CONSERVATION PLAN

The report reveals the presence of following wild animals in core and buffer

zones under different Schedules of the Wild life (Protection) Act 1972. All

such animals are found in other parts of the State. The area does not have

any endangered species. However, for conservation following species

present under different Schedules, broad management strategies have been

suggested.

Schedule Scientific Name Common Name Core Zone Buffer Zone SC -I Varanus salvator Monitor lizard Yes Yes SC -I Python molurus Python Yes Yes SC -I Pavo cristatus Common peafowl Yes Yes SC -II Brachypternus bengalensis Wood pecker Yes Yes SC -II Chameleon sp Bahurupi Yes Yes SC -II Canis aureus Jackal Yes Yes SC -III Munticus muntjack Kutra Yes Yes SC -III Sus sucrofa Wild pig Yes Yes SC -IV Danus sp Common butterfly Yes Yes SC -IV Rana tigrina Indian Bull Frog Yes Yes SC-IV Rana hexadactyla yes yes SC-IV Rana cyanohryictis Water skipper yes yes SC -IV Naja tripudians Common cobra Yes Yes SC -IV Bungarus coerulens Common krait Yes Yes SC -IV Bungarus fasciatus Banded krait Yes Yes SC -IV Cuculus microptens Cuckoo Yes Yes SC -IV Cypis bengalensis Vulture Yes Yes SC -IV Bulbulcus ibis Cattle egret Yes Yes SC -IV Ardea alba Large Egret Yes Yes SC -IV Acridotheres tristis Myna Yes Yes SC -IV Funanbulus pennati Squirrel Yes Yes SC -IV Herpestis edwardsi Mongoose Yes Yes SC -IV Felis chaus Jungle cat Yes Yes

All such animals were found to be present both in core and buffer zones. Any

disturbance in core zone due to mining will force these animals to migrate to

the buffer zone. However, to protect all such animals in the buffer zone the

following broad conservation strategies should be adopted.

Page 353: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 10, Page - 42

a) Protection of existing forest patch of buffer zone and more afforestation

of locally available species in buffer zone to create suitable habitat.

b) Plantation of edible fruit bearing trees in buffer zone which will attract

squirrels, bats and rodents.

c) In buffer zone existing water sources including natural water holes

should be renovated to ensure 365 days year water availability for the

animals.

d) Fire protection and prevention measures should be undertaken,

particularly during summer

e) After the completion of mining in the core zone the species which were

available originally and native to the site should be extensively planted

to restore the original habitat.

As survey and interrogation from local public, it was ascertained that the area

does not belong to the migratory corridor of any endangered wild lives.

However, there is very rare and occasional migration of wild animals like

Bear from the distant forest during incidents of forest fire etc. There is no

such specific migratory route, which can delineate in the map. The study area

does not have any specific, typical and endangered plant species.

� CONSERVATION PLAN

The following conservation measures are adopted and will be

continued:

(i) Due to biological reclamation and greenbelt development for this

project and other projects in the area, habitats will be created for

fauna.

(ii) As ultimate voids of the quarry will be developed as water

reservoir and the area is having a number of large ponds, the

ground and avi-fauna will get water for drinking.

(iii) As technically reclaimed areas will be revegetated with endemic

species, the avi-fauna and ground fauna will get food and

shelters.

Page 354: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 1

Chapter – 11

SUMMARY & CONCLUSION 11.1 SUMMARISED DATA

Sl.# Particulars Unit 13.0 Mty 16.0 Mty (20 Mty peak i.e. 7.0 Mty

incremental) 1. Name of the project --- Lingaraj OC

Expn. Project (13.0 Mty)

Lingaraj OC Expn. Project (16.0 Mty) (Peak 20.0 Mty)

2. Location --- Talcher Coalfield, Angul district (Odisha).

Talcher Coalfield, Angul district (Odisha).

3. Main consumers --- Kaniah STPS / Basket Linkage

Kaniah STPS / Basket Linkage

4. Mineable reserves Mt 248.81 (as on 01/04/2005)

321.50 (as on 01/04/2010)

5. Seams to be worked --- 12 seams namely, Seams-

IIB, II, III, IV-A, IV-B, V, VI-A, VI-B,

VII, VIIII, IX, X, XI, XII and XIII.

12 seams namely, Seams-IIB, II, III, IV-A, IV-B, V, VI-A, VI-B, VII, VIIII, IX, X, XI, XII and XIII.

6. Proposed mining technology

--- Shovel-dumper system / Blastless mining (e.g. contractual surface miners)

Shovel-dumper system / Blastless mining (e.g. contractual surface miners)

7. Coal winning, OB removal and transportation

--- Coal: Shovel-dumper system & blastless mining (e.g. contractual surface miners) and contractual coal loading at face and transportation. OB:Shovel-dumper system

Same as existing system.

8. Volume of OB generation M.cum 244.05 222.23 (As on 01/04/10)

Page 355: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 2

Sl.# Particulars Unit 13.0 Mty 16.0 Mty (20 Mty peak i.e. 7.0 Mty

incremental) 9. Stripping ratio (overall) Cum/t 0.70 0.69

10. Grade of coal -- Mostly E & F Mostly E & F

11. Targeted sustainable output/year

Mty 13.0 20.0

12. Project life Year 28 21 (As on 1.4.2010)

13. Manpower Number 1425 [including 985 No. of existing manpower.

An additional 265

manpower will be

required for

incremental OB

departmental and

coal out sourcing

variant.

14. Additional External OB dump

No. 9 --

15. Land requirement �� Mining lease area

- Forest land - N/F (Govt. &

tenancy) land Total

� Residential colony and resettlement site

� Grand total

ha ha

ha

ha ha

186.311 1223.699

1410.01

83.190

1493.20

186.311 1223.699

1410.01

83.190

1493.20

16. Pumping & drainage --- Sufficient number of pumps include-ing special type of slurry pumps provided for dewatering of mine.

Sufficient number of pumps include-ing special type of slurry pumps provided for dewatering of mine.

17. Power supply --- The power will be received by double circuit

Presently power supply is being received from

Page 356: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 3

Sl.# Particulars Unit 13.0 Mty 16.0 Mty (20 Mty peak i.e. 7.0 Mty

incremental) overhead line at 33 kV from Nandira 132/33 kV sub-station of MCL after necessary strengthening of existing circuit for feeding to the project sub-station.

132/33 kV substation of MCL at Nandira. Double circuit overhead line has been proposed under master plan. The same double circuit overhead line at 33 kV from 132/33 kV sub-station shall considered

18. Coal handling plant & dispatch arrangement

--- Existing and the proposed coal hand-ling plants will be sufficient to meet the requirement.

Existing arrange-ment of coal evacuation is proposed to be continued for initial three years. From the 4th year rapid loading system facility is proposed to be utilized.

In addition to the existing additional equipment of high capacity for HEMM workshop and E&M workshop have been provided.

19. Workshops & stores --- Exists Exists

20. Civil construction (colony, ser-vice buildings & roads)

---

�� Residential colony and roads

Existing quarters of township of Deulbera and Handidhua which are closing U/G mines, will meet the additional requirement.

An additional provision of Rs.857.75 lakh towards 188 no. of quarters have been provided for 265 manpower for Lingaraj OC Expn.

Page 357: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 4

Sl.# Particulars Unit 13.0 Mty 16.0 Mty (20 Mty peak i.e. 7.0 Mty

incremental)

Project (16.0 Mty). Additional provisions of Rs.38.75 lakh for 1.254 km of colony road and Rs.977.82 lakh for 100T dumpers haul road of 2.0 km length have been provided in the project report. Besides this an amount of Rs.498.45 lakh for 50 T dumpers haul road of 2.0 km length beyond target year has been given in the project report.

�� Service buildings Additional facilities will be provided.

Additional provision of Rs.798.81 lakh towards service buildings is made beyond target year. This consists of Field Workshop which will be required at a new location to reduce the lead

21. Water demand Mld Potable: 2.70 Industrial and fire fighting : 2.30 Total water demand: 5.00

Potable : 2.86 Industrial and fire fighting : 2.87 Total : 5.73

22. Source of water --- Only potable water is drawn from the

Only potable water is drawn from the Brahmani river

Page 358: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 5

Sl.# Particulars Unit 13.0 Mty 16.0 Mty (20 Mty peak i.e. 7.0 Mty

incremental) Brahmani river through Integrated Water Supply Scheme (IWSS) of Talcher Coalfield. Water demand for industrial & fire fighting is met from the treated mine discharge water.

through Integrated Water Supply Scheme (IWSS) of Talcher Coalfield. Water demand for industrial & fire fighting is met from the treated mine discharge water.

23. Average annual rainfall mm 1277 1256.56

24. Mean temperature (IMD data) �� Maximum � Minimum

oC oC

45.5 6.7

44.1 5.5

25. Total initial capital investment

Rs.Crore 330.91 52.25

26. Total cost of mine closure Rs.Crore 45.31 198.93

27. Capital cost for environmental management

Rs.Crore 27.45 34.97

28. Environmental cost per tonne of coal produced

Rs./t 8.34 --

11.2 JUSTIFICATION FOR IMPLEMENTATION OF THE PROJECT

There is shortage in availability of coal to the tune of 18.24 Mt for Talcher

coalfield. Apart from this demand of coal is likely to rise further since more numbers

of TPS may be linked to this coalfield.

(Fig. in Mt.)

Demand Availability Gap Talcher coalfield 107.06 90.97 16.09

Ib Valley coalfield 51.28 47.43 3.85

Total : 158.34 138.40 19.94

The production from the proposed Lingaraj OCP Expansion (Phase-III) (16.0

Mty) (3.0 Mty incremental) will go towards meeting the gap between demand and

Page 359: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 6

availability. Therefore there will not be any problem in marketing coal from the

proposed expansion project. Coal produced from Lingaraj OCP Expansion

(Phase-III) (13.0 Mty) (3.0 Mty incremental) has been proposed to be linked to

Kaniah STPS/basket linkage.

11.3 EXECUTIVE SUMMARY

11.3.1 PURPOSE OF THE REPORT

Project Report of Lingaraj OCP was initially planned and approved in

February 1991 with target capacity of 5.0 Mty for a capital outlay of Rs.229.84 crore

for Departmental Variant. Coal from Lingaraj OCP was linked to Kaniah STPS as per

approved PR. Coal was proposed to be dispatched to the above STPS through the

merry-go-round (MGR) system.

Project Report for Lingaraj OCP Expansion (10.0 Mty) (5.0 Mty incremental)

was sanctioned in February 2003 by CIL Board for an additional capital of Rs.98.89

crores for coal outsourcing and OB departmental variant.

The existing Lingaraj OCP Expansion (Phase-II) 13.0 Mty (3.0 Mty

incremental) for an additional capital of Rs.2.18 crores was approved in June 2006 by

MCL Board for Coal and OB both outsourcing variant.

The proposed Lingaraj OCP Expansion (Phase-III) (16.0 Mty / 20.0 Mty

Peak) (3.0 Mty / 7.0 Mty incremental) is based on Revised geological report on

exploration of Lingaraj block June 2000. An area of about 28 ha only has been

proposed to be annexed in the southern side of the sanctioned mine boundary (i.e.

within safety zone of Lingaraj OC Expn. (13.0 Mty).

The project report of Lingaraj OC Expn. (16.0 Mty / 20.0 Mty Peak) has been

approved by MCL Board in its 116th meeting on 6/2/2010 at Kolkata.

Mining plan for Lingaraj OCP Expansion (Phase-III) 16.0 Mty was approved

vide letter No.34012/(4)/2011-COAM, Govt. of India, Ministry of coal dt.1st July 2011.

Page 360: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 7

Form-I and prefeasibility report for Lingaraj OCP Expansion (Phase-III) 13.0

Mty to 16.0 Mty (normative) and 20.0 Mty (Peak) was discussed in 21st Expert

Appraisal Committee (EAC) (Thermal & Coal Mining) on 29th March 2011.

After detailed deliberation, the committee had sought the following details :

1. Specific action plan drawn up for the project as it is located within the

critically polluted area of Angul.

2. Total waste management plan, OB dumping and reclamation including

conceptual mine closure of mine void, etc. should be furnished taking

into consideration the neighbouring large operating opencast mines,

Bhubaneswari, Ananta, etc. in an integrated manner.

Submission of the above details Terms of Reference (TOR) for Lingaraj OCP

Expansion (Phase-III) (16.0 Mty Normative & 20.0 Mty Peak) was obtained vide letter

No. J-11015/174/2010-IA.II(M), MoEF, Govt. of India, New Delhi 21st March 2012.

This EIA-EMP has been made by incorporating the compliance of the said

Terms of Reference (TOR).

An EIA-EMP report has been prepared incorporating the issues covered in

TOR.

11.3.2 STUDY AREA PROFILE (a) Location

Existing (13.0 Mty) For Project (16.0 Mty)

(i.e. 3.0 Mty incremental) Coalfield Talcher Talcher

Tahasil Talcher Talcher

District Angul Angul

Latitudes 20O 57• 39Ž & 20O 58• 18Ž N 20O 57• 39Ž & 20O 58• 18Ž N

Longitudes 85O 09• 33Ž & 85O 12• 12Ž E 85O 09• 33Ž & 85O 12• 12Ž E

Topo sheet No. 73 H/1 73 H/1

Page 361: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 8

(b) Communication

Sl. No. Item Existing (13.0 Mty)

For Project (16.0 Mty) (i.e.3.0 Mty

incremental) (Peak 20.0 Mty i.e.

7.0 Mty incremental)

1. Nearest revenue town

Talcher

Same as 13.0 Mty

2. Nearest road � 2 km all weather road to Talcher. � 25 km to District HQs at Angul.

3. National highways

� NH-23 passes through Talcher and connects to NH-42.

� NH-42 is 15 km via Talcher.

4. Connection to the state capital

153 km to Bhubaneswar via NH-23, NH-42 & NH-5.

5. Connection to the company HQs

200 km to Sambalpur via NH-23, NH-42 & NH-6.

6. Nearest railhead

Talcher railway station on branch line of East Coast Railway is at a distance of about 6 km.

7. Airport Biju Pattanaik Airport in Bhubaneswar is at a distance of about 160 km.

(c) Project Boundary

Existing 13.0 Mty Proposed for 16.0 Mty

(i.e. 3.0 Mty incremental) (Peak 20.0 Mty i.e. 7.0 Mty

incremental)

North Fault F11 … F11 is taken as the

floor boundary Existing surface boundary is adopted.

East Incrop of Seam-II and Fault F1-F1

Existing surface boundary is adopted.

South Surface boundary is fixed at 15 m

from the common boundary

against underground mines where

permission is given. In the western

Surface boundary is fixed at 15 m

from the common boundary against

underground mines where

permission is given. In the western

Page 362: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 9

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental)

part, surface boundary is fixed

after leaving a 25 m barrier from

the underground working. Floor

boundary is based on the surface

boundary adopted and

rationalisation along faults.

part, surface boundary is fixed after

leaving a 25 m barrier from the

underground working. Floor boundary

is based on the surface boundary

adopted and rationalisation along

faults.

West Surface boundary is marked after

leaving a minimum surface barrier

of 60m against Bhubaneswari OCP

infrestructure (planned).

Surface boundary is marked after

leaving a minimum surface barrier of

60m against Bhubaneswari OCP

infrestructure (planned).

(d) SURFACE DRAINAGE PATTERN AT MINE SITE (PLATE-III)

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental)

Local drainage is controlled by a small

seasonal nullahs flowing generally

towards north and discharging into the

north- south flowing Brahmani river

(Plate No. III). The Brahmani river

passes at a distance of roughly 3 km

east of the project area..

Local drainage is controlled by a small

seasonal nullahs flowing generally

towards north and discharging into the

north- south flowing Brahmani river

(Plate No. III). The Brahmani river

passes at a distance of roughly 3 km

east of the project area..

There are few man- made ponds at

places which are utilized by the local

population for irrigation and domestic

purposes.

Page 363: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 10

(e) Embankment and / or Weir Construction

Existing 13.0 Mty Proposed for 16.0 Mty (i.e. 3.0 Mty incremental)

(Peak 20.0 Mty i.e. 7.0 Mty incremental) There is no construction of embankment

/ weir.

There is no construction of

embankment / weir.

(f) Distance from water bodies

Existing 13.0 Mty Proposed for 16.0 Mty

(i.e. 3.0 Mty incremental) (Peak 20.0 Mty i.e. 7.0 Mty incremental)

Distance from

River bank@ and Other water bodies sea/creek/ lake/ nullah, etc. (specify)

River bank@ and Other water bodies sea/creek/ lake/ nullah, etc. (specify)

Mining lease boundary

1. Bangaru jhara 2. Brahmani River 3. Nandira Jhara 4. Singhada Jhara 5. Satyabadisagar Pond

2.40 km 3.00 km 6.25 km 12.50 km Extinct

1. Bangaru jhara 2. Brahmani River 3. Nandira Jhara 4. Singhada Jhara 5. Satyabadisagar pond

2.4 km 3.00 km 5.20 km 12.50 km Extinct

(i) Climate Long-term meteorological data collected from IMD, Bhubaneswar for Angul IMD

station have been referred for preparation of the following table:

Table-2.1 : Climatic Data from IMD Station, Angul

Item Parameters Particulars

Rainfall

Range 743 to 1550.18 mm, as recorded over a period of 21 years.

Annual average 1256.56 mm. More than 77% of the rain occurs during the monsoon season, i.e. June to September.

Temperature range (monthly mean of daily temperature)

Minimum 5.5OC (Nov., 1996)

Maximum 44.1OC (May, 2009)

Relative humidity range (monthly mean of daily RH

Minimum 31%

Maximum 88%

Page 364: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 11

Item Parameters Particulars

Wind speed range (monthly mean of daily wind speed)

Max at 8:30 hr 6 km/hr

Min at 8:30 hr 2 km/hr

Max at 17:30 hr 8 km/hr

Min at 17:30 hr 1 km/hr

Site specific continuously monitored micro-meteorological data through

autographic weather monitoring instrument during pre-monsoon period have

been summarized in the following tables :

Table-2.2 : Site Specific Micro-meteorological Data for Wind Speed and

Temperature

Month Wind Speed (kmph) Temperature (OC)

Mean Max. % of Calm Min. Max.

March 2013 9.7 22.9

1.16

21.0 40.0

April 2013 10.5 23.5 21.0 42.0

May 2013 7.2 18.5 22.0 42.0

Table-2.3 : Site Specific Micro-meteorological Data for Relative Humidity

and Rainfall

Month

Relative Humidity (%) Rainfall (mm)

Mean Highest Lowest Total 24 hrs

Highest

No. of Rainy Days

March 2013 58.2 84.0 26.0 0 0 0

April 2013 55.0 88.0 20.0 10 2 5

May 2013 52.8 98.0 22.0 49 40 4

Wind rose diagram for March to June, 2013 based on 16 points of compass i.e N, NNE, NE, etc. based on 24 hourly data is given in Fig.-2.1.

Page 365: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 12

FIG. – 2.1 WIND ROSE OF THE PROJECT SITE DUIRNG 15th MARCH, 2013 TO 12th JUNE, 2013

Page 366: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 13

11.3.3 PROJECT PROFILE

(a) Type of the Project

It is a running opencast project.

(b) Justifcation for Expansion of the Project

The overall demand of coal on MCL, based on coal linkage SLC (LT) by the end of XI

plan has been assessed to be 158.34 Mt against availability of 138.40 Mt. Thus there

is a gap of 19.94 Mt of coal.

(Fig. in Mt.)

Demand Availability Gap

Talcher coalfield 107.06 90.97 16.09

Ib Valley coalfield 51.28 47.43 3.85

Total : 158.34 138.40 19.94

There is possibility of recommending more additional linkages over and

above the already recommended linkages. The production from the proposed

Lingaraj OC Expn. Project will go towards meeting the gap between demand and

availability. Demand of coal from this coalfield is likely to rise further since more

number of TPS may be linked to this coalfield.

(c) Description of Core Zone

Core zone of existing Project (13.0 Mty) Core zone of proposed project (16.0 Mty) / as above

i) The core zone of existing project covers

partly and/or fully the land from 7

villages namely, Balugaon, Longijoda,

Ambamunda, Nakulbaspur, Balugaon

Khamar, Hensamul and

Madanmohanpur.

i) The core zone of existing project

covers partly and/or fully the land

from 7 villages namely, Balugaon,

Longijoda, Ambamunda,

Nakulbaspur, Balugaon Khamar,

Hensamul and Madanmohanpur.

ii) No additional village or families will

be affected from the above villages

due to the expansion project.

Page 367: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 14

(d) Description of Buffer Zone

Buffer zone of existing Project (13.0 Mty) Buffer zone of proposed project (16.0 Mty)/ as above

i) The buffer zone i.e. area within 10 km

radius from the periphery of the project

boundary has been developed into an

industrial belt comprising of opencast

mines, underground mines and various

other industries.

ii) Kalinga, Ananta, Bharatpur, South

Balanda and Jagannath opencast mines

besides Talcher, Nandira and Deulbera

U/G mines are located in the buffer

zone. Other industries situated in and

around the buffer zone of this project are

Talcher Heavy Water Plant and Talcher

Thermal Power Station (NTPC), Talcher.

iii) The buffer zone of this project 8 (eight)

reserve forests, namely, Kandhal,

Paturia, Petachira, Genguita, Rakas,

Kauchiakhol, Mukundanali and

Kahneijena (only south-east part).

Besides the above, some patches of

village forests are also located within the

buffer zone of this project.

iv) The population, sex composition,

average family size & overall literacy

level are 1,24,765 persons, 892

females/1000 males, 6 and 65.03%

respectively.

v) There are no places of religious,

historical and archaeological importance

in the buffer zone.

i) Kalinga, Ananta, Bharatpur, South

Balanda and Jagannath opencast

mines besides Talcher, Nandira and

Deulbera U/G mines are located in the

buffer zone. Other industries situated

in and around the buffer zone of this

project are Talcher Heavy Water Plant

and Talcher Thermal Power Station

(NTPC), Talcher.

ii) The buffer zone of this project 8 (eight)

reserve forests, namely, Kandhal,

Paturia, Petachira, Genguita, Rakas,

Kauchiakhol, Mukundanali and

Kahneijena (only south-east part).

Besides the above, some patches of

village forests are also located within

the buffer zone of this project.

iii) The population, sex composition,

average family size & overall literacy

level are 1,51,107 persons, 897

females/1000 males, 6 and 73.4%

respectively.

iv) There are no places of religious,

historical and archaeological

importance in the buffer zone.

Page 368: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 15

(e) Geology

Existing for 13.0 Mty Proposed for 16.0 Mty as above

Geological reports (GR) "Revised Geological Report on Coal Exploration of Lingaraj Block, Talcher Coalfield", Orissa; prepared by CMPDI, RI-III in June 2000.

Same as 13.0 Mty project.

Metres drilled 23458.95 23458.95

No. of boreholes 185 185

Borehole density (number of boreholes per sq.km)

37 37

Strike The general strike is in the E-W direction with northerly dip. The strike gradually swings to NE-SW and N-S in certain parts which becomes NW-SE in north-eastern part of the block. The block is structurally very complex, excepting in the northern part which is exceptionally simple and free of faults.

The general strike is in the E-W direction with northerly dip. The strike gradually swings to NE-SW and N-S in certain parts which becomes NW-SE in north-eastern part of the block. The block is structurally very complex, excepting in the northern part which is exceptionally simple and free of faults.

Dip The dip of coal seams in eastern part is moderate (3O to 10O) while it becomes steeper (15O) in the remaining area.

The dip of coal seams in eastern part is moderate (3O to 10O) while it becomes steeper (15O) in the remaining area.

Faults (No.) 33 33

No. of coal seams to be worked

12 coal seams, viz. Seam(s)- II (Bottom), II, III, IVA, IVB, V, VIA, VIB, VII, VIII, IX, X, XI, XII and XIII.

12 coal seams, viz. Seam(s)- II (Bottom), II, III, IVA, IVB, V, VIA, VIB, VII, VIII, IX, X, XI, XII and XIII.

Mineable coal reserves (Mt) 348.81 (as on 1.4.2005) 348.81 (as on 1.4.2005)

(f) Main consumers

Kaniah STPS / Basket Linkage and no. of other Thermal Power

Stations linked to this project.

Page 369: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 16

(g) Mining parameters

� Present status

1. Mining plan for Lingaraj OCP Expansion (Phase-III) 16.0 Mty

was approved vide letter No.34012/(4)/2011-COAM, Govt. of India,

Ministry of coal dt.1st July 2011.

2. The project report of Lingaraj OC Expn. (16.0 Mty / 20.0 Mty

Peak) has been approved by MCL Board in its 116th meeting on

6/2/2010 at Kolkata.

3. Forest clearance has been obtained for 186.311 ha of forest land

for the existing project (Lingaraj OC Expn. 13.0 Mty). No additional

forest land is required for expansion project.

4. The rehabilitation of the existing project will be completed by2014-

2015.

5. No Additional families will be affected due to expansion project i.e.

for 7.0 Mty incremental (Peak 20.0 Mty).

� Mining technology

Considering the geo-mining conditions, shovel-dumper system of mining

has been envisaged. However, blastless mining (e.g. contractual surface

miners), where dust generation is minimal and negligible will be adopted

in this project.

Existing shovel dumper mining is envisaged to continue for expansion

project as the area is affected with multiple faults (33 nos.)

� Coal wining, OB removal and transportation

For coal winning and transportation, shovel-dumper system and

blast free mining (e.g. contractual (4 no.) surface miners) are used.

For OB removal and transportation, shovel-dumper system is

deployed.

Existing shovel dumper system will be followed for the expansion

project. Incremental coal production by blast free method using

additional surface miner (2 No.).

Existing shovel dumper system will be continued. It is envisaged to

deploy 100 T and 50 T rear dumpers towards additional requirement

Page 370: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 17

to reduce fleet size. Both 50 T and 100 T dumpers are deployed in

conjunction with 4.3 hydraulic backhoe. While 9.5 cum. Hydraulic

shovel dumper would work with 100 T near dumper.

� Targeted output

The project will have a production of 20.0 Mty (Peak). � Life of the mine

The life of the mine has been estimated to be 21 years.

� Calendar programme

As per the calendar plan, the targeted capacity will be achieved in the

2nd year of project life.

� Volume of OB removal

The total volume of OB to be removed for this expansion project is

222.23 Mm3(As on 1.4.2010).

� Stripping ratio

The overall stripping ratio works out to be 0.69 cum/t for the expansion

project.

� Coal Sample Analysis Report

(Richardson & Cruddas (1972) Ltd., Test Report dtd.14.06.2013) Details of samples (As stated)

Hg (ppm)

As (ppm)

Ash (on air dry basis)

%(w/w)

Pb (ppm)

Cr (ppm)

Co (ppm)

Cu (ppm)

Sulphur (on air dry basis)

%(w/w)

Moisture in analysis sample (on air dry basis)

%(w/w)

Total moisture

(as received

basis) Coal Sample Lingaraj OCP, Talcher C/F.

ND (DL: 1.0)

ND (DL: 1.0)

29 16 36 22 68 0.61 7.94 10.99

� Mining Lease Area

Total mining lease area for 20.0 Mty Peak is 1493.20 ha including

186.311 ha of forest land. Land for resettlement and rehabilitation

colony is 83.190 ha.

Page 371: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 18

� Manpower

13.0 Mty 16.0 Mty (i.e. 3.0 Mty incremental)

1425 1690

An additional 265 manpower will be required for incremental OB

departmental and coal out sourcing variant.

� Pumping & drainage

In the expansion the area and the maximum depth of the mine are

almost same as that of approved earlier. Hence, no additional provision

for pumps, pipes and fittings etc.

� Power supply

Presently power supply is being received from 132/33 kV substation of

MCL at Nandira. Double circuit overhead line has been proposed

under master plan. The same double circuit overhead line at 33 kV from

132/33 kV sub-station shall considered.

Coal Handling & Dispatch Arrangement

� In the existing system ROM coal brought by dumpers / tipping truck and is

unloaded to feeder breaker circuit for crushing to -200 mm crushed coal is

elevated and stored in 2 x 100 t hoppers located near the discharge end of

conveyors.

� Coal thus stored is loaded into tipping trucks for onward transportation

either to the wharf wall siding of NTPC bulb or to Deulbera & Jagannath 5-

6 sidings. Coal stored near wharf wall siding is loaded into wagons by pay

loaders.

� In the proposed system there will be crushing complex, secondary crusher.

Belt conveyor system, storage, tramp metal detectors and magnetic

separators, rapid loading system, weight-ment and sampling.

� ROM coal brought by tipping trucks / dumpers shall be crushed to (-)200

mm size in the existing feeder breaker circuits. The existing conveyors

collecting coal from respective feeder breakers, presently feeding coal into

Page 372: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 19

the 2x100t storage hopper shall be extended and crushed coal will be fed

on to two Nos. of belt conveyors from existing feeder breaker circuits.

� Coal collected from these shall directly be fed to secondary crusher.

� Coal shall be collected by the conveyor underneath the secondary

crushers. The coal shall then be transported through a series of belt

conveyors and tripper conveyor to the main storage bunker. The tripper

conveyor shall distribute coal evenly in the semi ground bunker of 15000t

capacity. However the surface miner coal shall be transported by trucks

directly to the storage bunker and discharged into the bunker.

� Coal shall be reclaimed from underneath the main bunker by plough

feeders and fed on to reclaim conveyors which in turn will discharge the

coal into a Silo (2 Nos.) of 4000 t capacity each. Coal shall be loaded into

the wagons of NTPC rake by swing chutes to facilitate volumetric /

preweigh hopper loading. Wagons are weighed by electronic in-motion rail

weigh-bridges for record and billing purposes. The coal samples collected

by cutter type samplers at pre-determined intervals shall be sent to

laboratory for analysis.

� Surface miner coal shall be transported by trucks directly to storage bunker

and discharged into bunkers.

Workshops & stores

Two tier system and maintenance had been envisaged. The workshop

facilities created will cater the maintenance requirement of the incremental

production.

� Civil construction

Residential Colony An additional provision of Rs.857.75 lakh towards 188 no. of quarters have been provided for 265 manpower for Lingaraj OC Expn. Project (16.0 Mty Peak- 20.0 Mty

� Roads Additional provisions of Rs.38.75 lakh for 1.254 km of colony road and Rs.977.82 lakh for 100T dumpers haul road of 2.0 km length have been provided in the project report. Besides this an amount of Rs.498.45 lakh for 50 T dumpers haul road of 2.0 km length beyond target year has been given in the project report.

Page 373: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 20

An additional amount of Rs.22.32 lakh towards 0.607 km of colony road

has been provided.

� Water demand & supply arrangement The permanent water supply arrangement for the expansion project is proposed to be

linked with IWSS, Talcher Coalfield.

(in Mld)

Water demand For 13.0 Mty For 20 Mty (i.e. 7.0 Mty incremental)

Total

Potable 2.700 0.160 2.860

Industrial & fire fighting 2.300 0.570 2.870

Total : 5.000 0.730 5.730

Water supply arrangement

Potable water demand is being met through the Integrated Water Supply

Scheme (IWSS) of Talcher coalfield. The same arrangement will also be

continued for expansion project. Additional provision of Rs. 205.27 lakh has

been kept for potable water supply.

Industrial water demand is being met through mine water. The same

arrangement will be continued for expansion project.

� Economic Parameters

� Initial capital outlay (Rs. Crore)

:

For 13.0 Mty

For 20.0 Mty (Peak) (i.e. 7.0 Mty incremental)

330.91

52.25

� EMP capital investment (Rs. Crore) : 27.45 34.97

� Total cost of mine closure (Rs. Crore) (With compound interest as per new guide line).

: 45.31 198.94

11.3.4 ANALYSIS OF ALTERNATIVE TECHNOLOGY

The different alternative technologies are described below :

� Dip rise mining

Page 374: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 21

� Deployment of surface miner

� Blasting technology

� In pit crushing and conveying

� Deployment of high capacity HEMM

11.3.5 DESCRIPTION OF ENVIRONMENT

(A) AMBIENT AIR QUALITY

� Present air quality studies

Baseline air quality data have been generated during March, April &

May 2013. The average seasonal concentrations of PM10, PM2.5, SO2

and NOX as observed during monitoring are given below:

(A) Summary of Ambient Air Quality Data for March to May 2013

AAQ Station Concentration (µg/m3)

PM10 PM2.5 SO2 NOX

Project office (Corezone)

Maximum 136 38 16.4 25.7

Minimum 110 26 9.4 10.9

98 Percentile 134 37 16.4 25.6

Average 123.8 30.9 13.6 20

Permissible Limit 100 60 80 80

Langi jorha village (Corezone)

Maximum 132 32 20.2 26

Minimum 98 24 9 11

98 Percentile 130 31 20 24.6

Average 116.8 27.4 13.8 17.9

Permissible Limit 100 60 80 80

Talaberha Village (Residential Area)

Maximum 112 28 16.5 18.3

Minimum 86 20 5.9 7.6

98 Percentile 110 28 15.3 18.2

Average 98.8 23.7 10.2 12.7

Permissible Limit 100 60 80 80

Page 375: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 22

AAQ Station Concentration (µg/m3)

PM10 PM2.5 SO2 NOX

Hensamul Village (Residential Area)

Maximum 130 28 18.9 23.4

Minimum 96 20 10.2 10.4 98 Percentile 124 28 18.6 22.3

Average 110.8 25.1 13.9 15.5

Permissible Limit 100 60 80 80

Amhanunda village (Corezone)

Maximum 112 26 11.6 14.8

Minimum 74 20 7.2 6.8 98 Percentile 108 26 11.4 14.6

Average 89.2 22.3 9.1 10.8

Permissible Limit 100 60 80 80

Talchar town (Residential Area)

Maximum 80 24 11.2 24

Minimum 64 16 5.2 6.8

98 Percentile 78 24 11.2 23.1

Average 70.7 19.5 8.6 15.5

Permissible Limit 100 60 80 80

Kandhal village (Residential Area)

Maximum 84 21 11.6 12.6

Minimum 60 16 4.2 8.5

98 Percentile 84 21 11.4 12.5

Average 75.7 18.8 8.1 10.6

Permissible Limit 100 60 80 80

Ghantaparha village (Residential Area)

Maximum 64 16 8.2 12.5

Minimum 54 12 5.1 8.6

98 Percentile 64 16 8.2 12.4

Average 58.5 14.2 6.5 10.5

Permissible Limit 100 60 80 80 (B) Heavy Metals

Page 376: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 23

Air Sample of Lingaraj OCP

(in ppm) Hg As Se Pb Cr Co Cu Ni Zn Mn ND 2.34 0.78 17.22 78.83 31.71 4163.18 790.78 1985.65 306.77 ND : Not Dectected.

� Observations

� 24 hourly concentration levels for PM10, SO2 and NOX are within the limits of

the Standards for Coal Mines, September, 2000 [GSR 742 (E)] for the air

quality monitoring station in core zone.

� The average concentration levels (24 hrly.) for PM10, PM2.5, SO2 and NOx for

other stations representing Residential Area are within the limits of the

National Ambient Air Quality Standards (NAAQS) except PM10 at Hensamul.

Although this village in the buffer zone of Lingaraj OCP but it falls in the Core

Zone of Bhubaneswari OCP.

(B) WATER QUALITY

� Water quality studies

Water quality data have been generated during Pre-monsoon period

2013 (June 7th). The values of various important parameters as

observed during monitoring are given below:

Water quality data (important parameters)

Parameters

Values for

Tube

well W

ater,

He

nsam

ul Vi

llage

Tube

well

Wate

r, De

ra

Villa

ge

Dugw

ell W

ater,

Talab

era

Villa

ge

Dugw

ell W

ater,

Kand

hal V

illage

Tube

well

Wate

r, Re

hrat

Villa

ge

Brah

mani

Rive

r, Ne

ar

proje

ct sit

e Po

nd W

ater,

Hens

amul

villag

e

Pond

wate

r, Ta

laber

a

PH 7.2 7.12 7.22 7.08 7.86 7.52 7.56 7.22

Turbidity , mg/l 6 9 5 45 8 22 14 5

Chromium (as Cr6+) <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

Fluoride, mg/l 1.2 0.12 0.01 0.10 0.8 0.21 0.20 0.12

Page 377: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 24

Iron, mg/l 0.02 0.12 0.06 0.12 0.26 0.12 1.02 0.25

Lead, mg/l <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.001 <0.001

Phenolics (as C6H5OH) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

� Observations Ground Water (Tubewell water and Dugwell water)

The analysis shows that various physical and chemical parameters are within

the permissible limits of Drinking Water Standards (IS:10,500-1991) except fluoride in

Hensmul Village tube water i.e 1.2 mg/l which is just marginally crossing the

permissible limit which may be due to geo-genic of the rock formation; turbidity in dug

well water at kandhal village is 45 NTU due to mining interference and is temporary

phenomenon.

Surface Water (Pond water)

Samples, WS1, WS2 and WS3 were collected from pond waters of Hensamul and

Talabera villages respectively. The analysis show that various parameters are within

the limits of IS : 2296-1982 (Surface water, Class "C" : Tolerance limits for surface

waters used for drinking water source with conventional treatment followed by

disinfection).

(C) HYDROGEOLOGY

1. Detailed hydrological studies reveal that Singhara jhara proto-basin and

Bangaru jhara sub-basin are of 5th order streams draining into the Brahmani

river. The drainage density of Singhara jhara and Bangaru jhara basins are

1.75 and 1.52 km/sq.km and their stream frequencies are 2.09 and 1.83 per

sq.km respectively. Both the basins are morphometrically similar.

2. The annual total run-off in Singhara jhara is 332.45, 237.97 and 545.19 mm of

which the base flow accounts to 164.80, 90.91 and 167.25 mm in 1983, 1984

and 1985 respectively.

Page 378: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 25

3. Ground water in the area occurs under both unconfined and confined

conditions. The weathered mantle, recent alluvium and laterites act as

unconfined aquifer or phreatic aquifer.

4. For the purpose of understanding impact of mining activity on groundwater in

the vicinity, a dug well from Deulbera village (core zone) has been selected for

year on year fluctuation study. Based on the data, it can be inferred that over

the years ground water levels in Deulbera village (core zone) have minutely

decreased and thus mining activity has little influence on the groundwater.

However as observed from ground water levels in dugwell in village Natedi

(buffer zone) show increasing trends in groundwater level.

5. NOISE LEVEL MEASUREMENT

� Noise level measurement during monitoring

The ambient noise level measurement for the project has been carried

out during March to May 2013. The range of noise levels at different

spots as observed during monitoring, is given below :

Range of Noise Levels [dB (A) Leq.]

Time Noise Level Measurement [dB (A) Leq.] Coal Mine Area Residential Area Min. Max. Min. Max.

Day-time 39.6 58.7 40.2 58.6

Night-time 36.5 56.5 36.3 56.7 � Observation

Noise level measurements from various stations as mentioned above,

are within the limits of the prescribed standards for both day-time and

night-time.

(D) LAND USE/COVER PATTERN

Land use/cover pattern of the buffer zone of the project based on

satellite data interpretation, indicates dense forest of 6.36%, open forest

of 2.34%, plantation (including over OB dumps) of 1.47% and

agriculture land of 34.35%.

Page 379: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 26

(E) SOCIO-ECONOMIC SCENARIO OF CORE AND BUFFER ZONE [As per sample survey & Census of India, 20011]

Table :Summary of sample survey at Buffer Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 887

Male 468 (52.8 )

Female 419 (47.2)

2 Schedule Caste

Male 106 (12)

Female 102 (11.5)

Total Schedule Caste 208 (23.5)

3 Schedule Tribe

Male 38 (4.3)

Female 42 (4.7)

Total Schedule Tribe 80 (9.0)

4 Others 599 (67.5)

5 Total Literates 702 (79.1)

Male 405 (86.5)

Female 297 (70.8)

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 887

2 Total Worker Population 212 (23.9)

3 Male Working Population 169 (19.0)

4 Female Working Population 43 (4.9)

5 Private Workers 137 (15.4)

6 MCL & Government Workers 46 (5.2)

7 Non Workers 675 (677.1)

Page 380: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 27

Sl.No. Description Total study area (Percentage in

brackets)

8 Cultivators 24 (2.7)

9 Agricultural Labourers 5 (0.6)

Table : Summary of sample survey at Core Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 508

Male 266 (52.4)

Female 242 (47.6)

2 Schedule Caste

Male 44 (8.7)

Female 40 (7.8)

Total Schedule Caste 84 (16.5)

3 Schedule Tribe

Male 21 (4.1)

Female 20 (3.9 )

Total Schedule Tribe 41 (8.0)

4 Others 383 (75.4)

5 Total Literates 402 (79.1)

Male 226 (84.9)

Female 176 (72.7)

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 508

2 Total Worker Population 78 (15.3)

3 Male Working Population 61 (12.0)

4 Female Working Population 17 (3.3)

Page 381: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 28

Sl.No. Description Total study area (Percentage in

brackets)

5 Private Workers 39 (7.7)

6 MCL & Government Workers 39 (7.7)

7 Non Workers 430 (84.6)

8 Cultivators 0

9 Agricultural Labourers 0

Table :Summary of census 2011 at Core Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 1805

Male 958 (53.0 )

Female 847(47.0)

2 Schedule Caste

Male 116 (6.4)

Female 126 (6.9)

Total Schedule Caste 242 (13.4)

3 Schedule Tribe

Male 108 (5.9 )

Female 100 (5.6)

Total Schedule Tribe 208 (11.5)

4 Others 1355 (75)

5 Total Literates 1295 (71.7)

Male 755 (78.8)

Female 540 (63.7 )

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 1805

2 Total Worker Population 540 (30)

3 Male Working Population 486 (26.9)

Page 382: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 29

Sl.No. Description Total study area (Percentage in

brackets)

4 Female Working Population 54 (3.0)

5 Main Workers 474 (26.3)

6 Marginal Workers 66 (3.7)

7 Non Workers 1265 (70.0 )

8 Cultivators 13 (0.7)

9 Agricultural Labourers 58 (3.2)

Table : Summary of census 2011 at Buffer Zone

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 151107

Male 79,675 (52.7)

Female 71,432 (47.3)

2 Schedule Caste

Male 14736 (9.7)

Female 14014 (9.3)

Total Schedule Caste 28750 (19.0)

3 Schedule Tribe

Male 5949 (3.9)

Female 5761 (3.8)

Total Schedule Tribe 11710 (7.7)

4 Others 110647 (73.2)

5 Total Literates 111051 (73.4)

Male 62850 (78.9)

Female 48201 (67.5)

Sl.No. Description Total study area (Percentage in

brackets)

1 Population 151107

2 Total Worker Population 49501 (32.8)

Page 383: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 30

Sl.No. Description Total study area (Percentage in

brackets)

3 Male Working Population 42210 (28.0)

4 Female Working Population 7291 (4.8)

5 Main Workers 38272 (25.3)

6 Marginal Workers 11229 (7.4)

7 Non Workers 101606 (67.2)

8 Cultivators 2159 (1.4)

9 Agricultural Labourers 1140 (0.75)

FLORA AND FAUNA

The reserve forests in the buffer zone are found to be degraded due to

biotic interference and forest fire. Occurrence of dense forest is very rare.

Tropical dry deciduous open canopied forests with Shorea robusta (Sal) as

dominant species are found in the area. In the forest vegetation, associates

of Sal are found to be Madhuca indica (Mahula), Terminalia bellarica

(Bahada), etc. The area does not have any rare or endangered floristic

elements.

� Fauna

Fauna found in the area are a few. Wild animals found in the area are

Herpestis edwardsi (Mongoose), Funambulus pennati (Palm stripped

squirrel), Presbytis entellus (Hanuman), etc. Domestic animals seen in the

area are Canis familiarisis (Kukura), Bos domesticus (Gai), etc. Avi-fauna

found in the area are Milvus migrans (Common kite), Corvus splendens

(Crow), Tito alba (Pecha), etc. Reptilia seen in the area are poisonous

snakes like Bangarus fasciatus (Banded krait), etc., and non-poisonous

snakes. No endangered species are found in the area. The area is not the

migratory route of any animals.

Page 384: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 31

(F) PLACES OF RELIGIOUS, HISTORICAL AND ARCHAEOLOGICAL IMPORTANCE

There are no places of religious, historical and archaeological

importance in the core and buffer zones except small village temples.

11.3.6 ANTICIPATED IMPACT ASSESSMENT & MITIGATION MEASURES

(A) AIR POLLUTION IMPACT ASSESSMENT & MITIGATION MEASURES

i) Air Pollution Impact Assessment

The AQIP analysis using ISCST3 revealed that the absolute

PM10 levels of Lingaraj OC Expn Project for 8.43 Mty

incremental capacity (i.e. from 11.57 MTPA to 20.0 MTPA) will

be 84.67 µg/cu.m at Kandhal Village (1.5 km, N) without control

measures, whereas the same will be 79.67 µg/cu.m with control

measures and the absolute PM2.5 levels of Lingaraj OC Expn

Project for 8.43 Mty incremental capacity (i.e. from 11.57 MTPA

to 20.0 MTPA) will be 21.8 µg/cu.m at Kandhal Village (1.5 km,

N) without control measures, whereas the same will be 20.8

µg/cu.m with control measures It may be observed from the

above table that the concentration levels can be brought down

through control measures to contain the PM10 levels well within

the permissible limit. Isopleths of PM10 and PM2.5concentrations

at various receptor locations (i.e. habitats) super imposed on the

study area map (Plate No.VI) of core & buffer zone without and

with mitigative measures have been shown in Plate No. XA1,

XA2, XA3 and XA4, respectively.

ii) Air Pollution Control Measures

Appropriate air control measures are being adopted and will be adopted

to maintain the ambient air quality within the stipulated standard. The

control measures will be adopted for various operations like drilling

operation, blasting operation, loading and transport, coal handling plant,

Page 385: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 32

fires at coalfaces and coal stock yard, OB dump(s) and workshop and

stores, etc.

� Drilling Operation

All drills will be equipped with dust extraction.

� Blasting operation

The operation shall be conformity to the extent laws with more closure

control of blasting parameters.

� Loading & transporting

� Surfacing all service roads by asphat.

� Unmettaled roads shall be kept free of ruts.

� Provision has been made for instant shower system.

� Development of greenbelt.

� Provision of silo system.

� Coal handling plant & transportation system

� Suppression of dust by fixed sprinklers in all critical points.

� Covered conveyor belts.

� Provision for Silo loading has been proposed.

� Total coal will be transported to silo from the CHP directly by

covered conveyor belts.

� Fires at coalfaces, coal stock yard

� Provision of adequate fire fighting.

� Storage of water at all critical points.

Page 386: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 33

� Regular supervision.

� OB dumps

� Blanketing with OB materials to put off the oxygen supply

� Workshop & store

� Proper ventilation system.

Details of Control Measures

Sl. No.

Description of Pollution Control Measures

13.0 Mty

For incremental production of 7.0 Mty

(20Mty Peak)

1. Dust extraction in drill machines

Existing 9 nos. of drill has been equipped with dust extractors and wet drilling. Installation of Non-Visible Emission (NVE) assembly in all drills.

Addl. 6 nos. of drill will be equipped with installation of non-visible emission NVE assembly in all the drills dust extractors.

2. CHP (a) Fixed sprinklers at CHP, haul road, & railway siding. (b) Enclosure at various points.

Auto-start, time cycle control, fine nozzle mounted. Fixed sprinkler provided at 1. Access trench (9 nos. -

450m) 2. CHP (20 nos. 500m). 3. Deulbera siding (10 nos.

… 275m) 4. HEMM workshop (7

nos.-280 m) 5. NTPC siding (20 nos. …

1440 m). 6. Time office (5 nos. …

100m) Belt conveyer and coal bunker.

Additional 50 nos. have been proposed for addi-tional production. Installation of dry fog system for all CHPs. Installation of instant shower.

3. Mobile water sprinkler for haul roads, transportation roads (2 km)

8 nos. (28 kl), 6 nos. (20kl) dumper converted mobile sprinklers.

2 nos. (28 kl) addl. will be procured. As and when required contractual mobile water sprinklers will be engaged.

4. Black topping roads, colony roads, approach road to service buildings and to projects

11.3 km Up keeping of black topping of roads and proper maintenance will be adhered.

Page 387: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 34

Sl. No.

Description of Pollution Control Measures

13.0 Mty

For incremental production of 7.0 Mty

(20Mty Peak)

5. Cleaning / sweeping of dust from coal trans-portation road

Heavy duty truck mounted vacuum cleaner (Mechanical road sweeper) for cleaning of road, (1 no) has been deployed.

The same heavy duty truck mounted vacuum cleaner (Mechanical road sweeper) for cleaning of road will be continued.

6. Greenbelt cover develop-ment : 1. Block plantation 2. Avenue plantation

1. 46975 nos. plants have been planted. 2. 22768 nos. plants have been planted.

Plantation 330853 will be done

7. Coal transportation Coal is transported from CHP to railway siding by dumpers/tippers with tarpaulin.

The total coal will be transported directly from CHP to silo by covered conveyor system.

8. Eco-friendly introduction of surface miner

4 nos. Surface miner : 2 nos.

9. Quick evacuation of coal from Talcher coalfield.

-- Construction of 43.5 km concrete freight corridor and road over bridge is under process.

(B) IMPACT ASSESSMENT ON HYDROLOGY AND HYDRO-GEOLOGY

(i) Impacts

Mining and its related activities create water quality problems. These

problems are identified and the likely sources of water pollution from

this project along with the type of pollutants are follows:

(a) Sanitary (domestic) estimated quantity … 2.28 Mld.

(b) Industrial wastewater from workshop -- Suspended solids, oil & grease.

(c) Waste water from mine -- Suspended solids of coal, clay and oil.

(d) Surface run-off passing through coal stockpiles -- Suspended solids

(e) Storm water from leasehold area and built-up area -- Suspended solids.

Page 388: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 35

(ii) Control measures

� Sufficient safeguards during the planning stage to make the project eco-

friendly from water pollution control point of view.

� Recycling of wastewater after appropriate treatment to achieve "zero

discharge" to the extent possible at some sources.

� Conforming to the limits of the Environment (Protection) Amendment

Rules, 2000 (•Schedules-VIŽ, General Standards for discharge of

environmental pollutants, Part-A : Effluents) for quality of the treated

effluent.

(C) IMPACT OF NOISE QUALITY AND CONTROL MEASURES

(i) Impact on Noise Quality

Ambient noise level of the existing project is being monitored regularly.

Noise levels are within the limits of the prescribed standard except

Talcher Town. So the noise produced from this project will not have

auditory, non-auditory, masking effects, etc. as suitable mitigatory

measures are taken and will be taken.

(ii) Control Measures

The following measures are being taken and will be taken :

� Proper designing of plant & machinery by providing in-built

mechanisms like silencers, mufflers and enclosures for noise

generating parts and shock absorbing pads at the foundation of

vibrating equipment.

� Routine maintenance of equipment.

� Enclosures for crusher house, etc.

� Rational deployment of noise generating plant and machinery.

� Greenbelts around the quarry, infrastructure sites, service building

area and township besides avenue plantation on both sides of the

roads to maintain noise level at night time within the limit for the

inhabited localities situated at a very close proximity.

Page 389: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 36

� Locating township away from noise centre.

� HEMMs with sound proof cabins.

� Chute linings in CHP.

� Personal protective devices to all the persons working in high

noise areas.

� Coal production by deploying the eco-friendly surface miners,

which eliminates the noisy operations like drilling, blasting,

crushing etc.

� Regular monitoring of noise levels at various points.

(D) IMPACT OF BLASTING VIBRATION & CONTROL MEASURES

(ii) Impact on Blasting

Blasting may affect the mineworkers as well as people residing in the vicinity

of mine and dependent upon the type & quantity of explosives used pit

geology, topography and confinement of the blast.

(ii) Control Measures

� Proper conformation to measures for safe blasting to avoid

damage to any structure or annoyance to the people in the colony

area or neighbouring villages.

� Proper design factor will be taken while constructing various

structures for stability against vibration.

� A blasting danger zone will be kept around the periphery of the

quarry. This zone will be kept free from village habitation and

community infrastructure and thus impact of vibration after blasting

on the surface structures is avoided.

� Controlled blasting will be done near built-up areas and surface

features, as and when required with permission of DGMS.

� Adoption of present day technology of use of site mixed slurry

(SMS) explosives.

Page 390: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 37

(E) IMPACT ON LAND RESOURCE & CONTROL MEASURES

(i) Impact on Land Resource

The impact of opencast coal mine on land is the change in land use pattern.

The alteration in land use pattern due to infrastructure is not to be

considered as true change as these facilities can be utilized for some other

purposes after the mining operation is over. The alteration in land use

pattern due to activities of quarrying and external dumping of OB materials

may be considered as true change in land use pattern.

(ii) Control Measures

� Solid waste generated due to coal extraction will be backfilled.

Internal dump should be biological and technical reclaimed.

� During the process, the geometrical shape of the dumps is altered

to make it amenable to effective biological reclamation and also to

provide safety and stability.

� Suitable drainage arrangement for smooth disposal of storm

water.

� Appropriate garland drain is to be provided to collect run-off.

� Topsoil shall be progressively and concurrently utilized during

physical/ technical reclamation of backfilled area, thus obviating

the necessity of storage of topsoil separately.

� Arboriculture is to be carried out in the vacant areas.

� Proper afforestation / plantation is to be carried out for greenbelt

development.

Statements showing the pre-mining & post-mining land uses of the project

are given in Table-1 & 2.

Page 391: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 38

Pre-mining land use

Sl. No. Item

Total for 16.0 Mty

Forest Non-forest Total

1. Quarry excavation 113.859 424.992 538.851

2. Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

72.452 48.467 552.919

3. OB dump area (external) -- 256.030 256.030

4. Infrastructure (workshop, CHP, project office, railway siding etc.)

-- 51.800 51.800

5. Rationalisation of project boundary and diversion of existing coal transporta-tion road.

-- 10.410 10.410

Mining lease area (1 to 5)

186.311 1223.699 1410.01

6. Residential colony -- 6.000 6.000

7. Rehabilitation colony -- 77.190 77.190

Outside Lease area (6 to 7)

-- 83.190 83.190

Total : 186.311 1306.889 1493.20 * Not for diversion.

Post-mining land use

Sl. No. Category

Land use (in ha)

Plantation Water body

Dip side slope &

haul road

Undis-turbed

Built-up area Total

1 Quarry excavation 292.141 80.96 165.749 --- 538.85

2 Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

110.58 442.34 552.92

3 OB dump area (external)

256.03 256.03

Page 392: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 39

Post-mining land use

Sl. No. Category

Land use (in ha)

Plantation Water body

Dip side slope &

haul road

Undis-turbed

Built-up area Total

4 Infrastructure (workshop, CHP, project office, railway siding etc.)

10.36 41.44 51.8

5 Rationalisation of project boundary and diversion of existing coal transporta-tion road.

2.08 8.33 10.41

7 Residential colony 16.64 66.55 83.19

8 Resettlement site

Total 687.831 80.96 165.749 442.339 116.32 1493.200

N.B : Forest cover enhancement ratio = 687.831 / 186.311 = 3.69 Table 1: Stage – wise Land use and Reclamation Area (ha)

S No.

Land use Category Present (1st Year)

5th Year 10th Year 20th Year

24th Year (end of Mine life)

Total Area in ha.

1. Backfilled Area (Reclaimed with Plantation) 20.60 22.91 48.0 137.0 63.631 292.141

2. Excavated Area (not reclaimed)/void

246.71 246.71**

3. External OB dump (Reclaimed with plantation)

55.09

200.94 (Grass Carpeting) 256.03 311.12*

4. Reclaimed Top Soil dump Concurrently Reclaimed in Backfilled & External Dump Area

5. Green Belt Area (Safety Zone) 15.48 43.51 51.59 -- -- 110.58 6. Undisturbed Area (Brought under

plantation) (Rationalisation of project boundary)

-- -- 2.08 -- -- 2.08

7. Roads (avenue plantation) 14.23 12.461 - - - 26.691

8. Area around buildings (R&R site and Residential colony) and Infrastructure

3.87 23.13 - - - 27.00

TOTAL 109.27 102.011 101.67 137.00 319.661 769.612 ** Not considered for reclamation. * Area will be reclaimed after rehandling of the external dump during post-closure

period.

Page 393: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 40

Table2: Stage-Wise Cumulative Plantation Sl. No.

YEAR* Green Belt External Dump Backfilled area Others (Undisturbed

area/etc)

Total

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha)

No. of trees

Area (ha) No. of trees

1. Existing 17.60 59325 55.09* 177125 20.60 61652 15.98 28507 109.27 326609 2. 1st year 43.51 119653 -- -- 22.91 63003 35.591 97875 102.011 280531 3. 5th year 4. 10th year 51.59 141873 -- -- 48.00 132000 2.08 5720 101.67 279593 5. 15th year

-- -- -- -- 137.00 376750 -- -- 99.59 273873 6. 20th year 7. 21st year (end of

Mine life) -- -- 256.03 704083 63.631 174485 -- -- 319.661 879068 8. 21- 24th year (post mining)

Total : 112.70 320851 256.03 881208 292.141 808390 53.651 126382 769.612 2164084 * External dump area will be rehandled.

(F) IMPACT ON SOCIO-ECONOMIC PROFILE OF THE AREA (i) SOCIAL IMPACT

� POPULATION GROWTH

Skilled manpower required for the project may not be available in the area.

Only semi-skilled and unskilled workers will be available from the local

population. So people will migrate to this segment both from within and

outside the district as well as the state due to creation of new employment

opportunities.

� EDUCATIONAL FACILITIES

A number of educational institutes are already there in the buffer zone and its

neighbourhood. The facilities already provided in the neighbouring projects

will cater to the need of this project. So migration of population will not strain

the local educational facilities already available. Further, the educational

institutes owned by MCL are also accessible to local population.

� HEALTHCARE FACILITIES

The coal company has a number of healthcare centres including a well

equipped Regional Hospital and a specialised “referral” hospital in the

Page 394: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 41

coalfield area. Provision of healthcare facilities have been provided in the

project report. Healthcare facilities have been provided in the neighbouring

projects. The above facilities will cater to the need of employees of this

project. The local people can also avail these healthcare facilities.

� ECONOMIC IMPACT

� Loss of agricultural land � General improvement of economy of the area � Increase in revenue of the state exchequer

� IMPACT ON VILLAGE HABITATION

The project area (including the expansion project) comprising of excavation

zone, infrastructure sites, ext. OB dump area and safety zone for blasting

covers partly and/or fully 7 (seven) inhabited villages namely, Balugaon,

Balugaon-Khamar, Langijoda, Ambamunda, Nakulbaspur, Hensamul and

Madanmohanpur besides some uninhabited villages. These families will be

resettled and rehabilitated socially, culturally and economically along with

other displaced such as major married sons, unmarried daughters of 30

years of age, etc., as per latest Norms of Govt. of Orissa, May 2006. Details

of project affected families and project affected persons are given below :

S.No. Name of village Project affected families

Project affected persons

Remarks

1 Balugaon 264 508 This village got shifted completely by 2007.

2 Langijoda 421 441 ---- 3 Talabeda Nil 341 ---- 4 Majirurihota Nil 40 ** 5 Gengutia Nil 216 ---- 6 Dadara Nil 63 ** 7 Dhempakuta Nil 66 ** 8 Manikagoda Nil 48 ** 9 Malipoda Nil 124 **

10 Badapasi Nil 24 ** 11 Debalayapur Nil 50 ** 12 Balugaon Khamar 209 516 ---- 13 Ambamunda 124 74 ---- 14 Nakulabaspur 144 ---- 15 Madanmohanpur 116 189 ---- 16 Khandhulbahal Nil 6 At present this village is under

Bhubaneswari OCP

Page 395: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 42

17 Daulbera Nil 182 ---- 18 Remun Nil 12 There is no R&R for this

village 19 Hensamul Nil 361 This village in covered under

R&R of Bhubaneswari and Ananta OCP

20 Kandhal Nil 67 There is no R&R for this village

Total 1134 3472

** No hutment exist in this village. R&R benefits are given on the basis of agricultural land acquired. This is revenue village/mouza having no hamlet(Basti).

(ii) Socio Economic Control Measures

� Project affected families will be resettled and rehabilitated socially,

culturally and economically along with other displaced families such as

major married sons, unmarried daughters of 30 years of age,

divorcee/deserted women/widows, physically handicapped and / or

mentally retarded persons irrespective of age and sex, unmarried

brothers/sisters whose parents are not alive, homestead less families

(unobjectionable encroachers) and landless families (unobjectionable

encroachers) as per latest ‘Norms of Govt. of Orissa’ .

� Resettlement colony will be provided with all infrastructure facilities like

roads, dug wells, tube wells, play ground, schools, community center,

dispensary, shopping center, etc.

� Suitable compensation will be offered to the families from whom land

including homestead land will be acquired. In all circumstances

compensation will be paid before actual displacement. All the

payments will be made by account payee cheques.

� Cash grant in lieu of job may be given.

� Vocational training will be provided.

� Interest free financial assistance will be provided where necessary.

� Monetary benefits to physical handicapped and mentally retarded

persons for self-relocation of site elsewhere will be provided.

� Incentive to displaced families for timely vacation of land will be

provided.

� Peripheral developmental activities like education, roads, bridge, water

supply, health, etc. are will be provided. A lump sum amount (in

Rs.lakhs) will be kept annually for peripheral development activities.

Page 396: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 43

� Supply of drinking water in nearby villages during summer season will

be provided.

(G) IMPACT ON BIO-DIVERSITY AND CONTROL MEASURES

(i) Impact on Flora

� Forest land in the core zone in the expansion project (particularly in the

excavation area) will be diverted for mining. The forest land for

diversion is 186.311 ha.

� The combined impact of operating coal mines and proposed coal

projects may influence the forest land in the buffer zone.

� Due to biotic interference and forest fire, even the reserve forests in the

area are not found to harbor many species of floral population. The

reserve forests are found to be in degraded conditions.

� Both core and buffer zones are found to be free from ecologically

sensitive and biologically rich areas/habitats, such as national parks,

sanctuaries, biosphere reserves and areas rich in genetic resources.

� There are no rare, threatened and endangered plant species in the

buffer zone.

Impact on Fauna

� The population of fauna, especially mammals, is found to be low. So

there will be no adverse impact on the fauna existing in the project

impact area as they will migrate to the nearby forests.

� The area is not the migratory route for any wild animal.

� There are no rare, threatened and endangered faunal species in the

buffer zone except Rana tigrina and Varanus which is also found in the

other parts of the district and state.

Page 397: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 44

(ii) Control Measures to Reduce the Impact on Biodiversity

Control Measures to Reduce the Impact on Flora

� The enhancement of forest area occurs due to measures like

biological reclamation of backfilled area, arboriculture /

afforestation, compensatory afforestation creation of greenbelt and

avenue plantation.

� Water body created by the final voids is beneficial to flora as the

area is prone to water scarcity.

� This project will have no detrimental impact on diversity of floral

species within terrestrial and aquatic habitats.

Control Measures to Reduce Impact on Fauna

� The balance in the regional population will be maintained in

natural course, owing to existing undisturbed forest areas in the

vicinity of the project. The increase in green cover due to

implementation of various measures like biological reclamation of

backfilled area, arboriculture / afforestation adopted by the mine

establishment will be an added bonus, though expected in distant

future.

� The mine is a •zero-dischargeŽ one. If required, water is

discharged only after suitable treatment. No adverse impact on

downstream aquatic life of surface water courses is expected.

� The project is not likely to have impact on the faunal species

diversity within the terrestrial and aquatic habitats.

(H) EFFECTS OF TRAFFIC MOVEMENT AND CONTROL MEASURES

(i) Effects on Traffic Movement

Coal transportation will take place from CHP to rapid loading system

(RLS) through CCT. Both coal transportation road and the siding are

located within the mine lease area. Therefore, effect of traffic

movement within the mining lease area is negligible on residential area.

Page 398: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 45

� Ambient air on the both sides of the road will be affected due to

RPM, SPM, SO2 and NOX.

� Noise nuisance due to movement of HEMMs.

� Creation of ruts and potholes on the surface of the road.

� Road accidents.

(ii) Control Measures

The following control measures are adopted and shall be continued :

� Plantation on both sides of the roads on the surface.

� Proper maintenance of road to remove ruts and potholes.

� Proper illumination of roads including haul road.

(L) IMPACT ON LAND USE AND LANDSCAPE

� IMPACT ON LAND USE PATTERN

The major direct impacts on existing land use during the pre-mining phase

area the removal of vegetation and resettlement of displaced population. There may

also be landuse changes with respect to agriculture, fisheries, recreation sites,

housing, forestry areas, etc. Land reclamation / restoration of mined out lands may

give rise to enhanced beneficial land use. There will be change in land use for the

expansion project.

There exists major environment impacts due to landscape disruption

particularly visuals (unsightly huge dumps, voids, mine structures, subsidence, mine

fires, etc.). During mining and post-mining phases drastic changes in landscape with

landforms take place. The major associated impacts are soil-erosion, loss of top soil,

change in complete geology, creation of huge dumps & voids, disposal of wastes,

deforestation, etc.

Irrespective of the type of mining used for extracting coal, mining invariably

results in enormous land disturbance … e.g. large scale excavation, removal of top

soil, dumping of solid wastes, cutting of roads, creation of derelict land, etc. Opencast

mining has more potential impact on land than underground mining. With improved

Page 399: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 46

technology, opencast coal mining is being used extensively because of its cost

effectiveness and productivity; though it results in large-scale land disturbance. The

alteration in land use pattern due to infrastructure is not to be considered as true

change as these facilities can be utilized for some other purposes after the mining

operation is over. The alteration in land use pattern due to activities of quarrying and

external dumping of OB materials may be considered as true change in land use

pattern.

� LAND REQUIREMENT

(Area in ha)

Sl. No. Item

For existing 13.0 Mty Addl. land for incremental production (3.0 Mty)

Total for 16.0 Mty

Forest Non-forest Total Forest Non-forest Total

Forest Non-forest Total

1. Quarry excavation 109.679 401.172 510.851 4.18 23.82 28.00* 113.859 424.992 538.851

2. Blasting danger zone (safety zone) and magazine (excluding area of Ob dump, road diversion and infrastruc-ture)

76.632 504.287 580.919 -- -- -- 72.452 480.467 552.919

3. OB dump area (external) -- 256.030 256.030 -- -- -- -- 256.030 256.030

4. Infrastructure (workshop, CHP, project office, railway siding etc.)

-- 51.800 51.800 -- -- -- -- 51.800 51.800

5. Rationalisation of project boundary and diversion of existing coal transporta-tion road.

-- 10.410 10.410 -- -- -- -- 10.410 10.410

Mining lease area (1 to 5)

186.311 1223.699 1410.01 4.18 23.82 28.00* 186.311 1223.699 1410.01

6. Residential colony -- 6.000 6.000 -- -- -- -- 6.000 6.000

7. Rehabilitation colony -- 77.190 77.190 -- -- -- -- 77.190 77.190

Outside Lease area (6 to 7)

-- 83.190 83.190 -- -- -- -- 83.190 83.190

Total : 186.311 1306.889 1493.20 4.18 23.82 28.00* 186.311 1306.889 1493.20

*There is no change in the mining lease area only an additional area of 28 ha in quarry area will be increased from the safety zone of Lingaraj OCP.

Page 400: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 47

� CONTROL MEASURES TO RESTORE LAND USE & LANDSCAPE

� Solid waste generated due to coal extraction will be backfilled. There

will be no externally dumping. The external OB dump has already been

technical reclaimed and biological reclaimed.

� During the process, the geometrical shape of the dumps is altered to

make it amenable to effective biological reclamation and also to provide

safety and stability.

� The face slopes of the dump will be maintained at the natural angle of

repose of the material and at overall slope angle of 28o.

� Suitable drainage arrangement for smooth disposal of storm water.

� Appropriate garland drain is to be provided to collect run-off.

� Backfilled area is to be reclaimed bio-logically and technically.

� Topsoil shall be progressively and concurrently utilized during physical/

technical reclamation of backfilled area, thus obviating the necessity of

storage of topsoil separately.

� Arboriculture is to be carried out in the vacant areas.

� Proper afforestation / plantation are to be carried out for greenbelt

development.

11.3.7 ENVIRONMENTAL MONITORING PROGRAMME

For effective implementation of various environmental control measures and

subsequently monitoring the same, permanent environmental management

organisations are essential at corporate, area and project levels. The various

environmental attributes like air quality, water quality, effluent quality, noise level, etc.

will be monitored as per the following schedules:

For air quality Two days in a month at each station (once in a fortnight).

For water and effluent quality

Once in a month for each station (for drinking water quality), once in a fortnight (for 4 parameters) and once in a year (23 parameters) (for effluent quality)

For ground water level monitoring

4 times in a year (i.e., April/May, August, November & January)

For noise level Once in a day-time and once in a night-time in fortnight from each station.

Page 401: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 48

11.3.8 DISASTER MANAGEMENT (RISK ASSESSMENT AND MANAGEMENT)

A comprehensive blue print for risk assessment and management has been

drawn up incorporating the following :

� Identification and assessment of risks.

� Recommendation of measures to prevent damage to life and property

against such risks.

11.3.9 PROJECT BENEFITS

Lingaraj OC Expn. Project (20.0 Mty) will enhance the socio-economic

activities in the adjoining areas. This will result in following benefits :

� Improvement in Physical Infrastructure

� Improvement in Social Infrastructure

� Increase in Employment Potential

� Contribution to the Exchequer

� Prevention of Illegal Mining

� Post-mining Enhancement of Green Cover

11.3.10 ENVIRONMENTAL MANAGEMENT PLAN

(A) PROGRESSIVE MINE CLOSURE PLAN

All coal mines shall adopt Mine Closure Plan comprising progressive closure

plan and final closure plan duly approved by the competent authority as per circular

No.55011-01-2009-CPAM, Govt. of India, Ministry of Coal, dated 27th August, 2009.

Coal projects who has been accorded approval of Mining Plan / Project Report

without mine closure plan are required to prepare and obtained the approval of Mine

closure plan within a period of 1 year as per the circular.

A "Progressive Mine Closure Plan" has been drawn up taking into

consideration the following :

� Mine description

� Management of mined out land

� Management of hydrology and hydrogeology

� Management of air quality

� Management of wastes

� Management of topsoil

Page 402: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 49

� Management / decommissioning of infrastructure

� Management / disposal of mining machinery

� Safety & security

� Disaster management and risk assessment

� Care and maintenance during temporary discontinuance

� Redeployment of workforce.

� Management of community facilities.

� Cost of mine closure, etc.

(i) Time schedule for different activities for mine closure

Sl.No

Activity Time Frame Year 1st Phase 2nd Phase 3rd Phase 4th Phase Final

Phase Post Closure

Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PC1 PC2 PC3

A Dismantling of Structures Service Buildings 2 years Residential Buildings 2 & ½ years Industrial structures like

CHP, Workshop, field sub-station, etc.

2 & ½ years

B Permanent Fencing of mine void and other dangerous area

Random rubble masonry of height 1.2 metre including leveling up in cement concrete 1:6:12 in mud mortar

2 years

C Grading of highwall slopes

Levelling and grading of highwall slopes

2 years

D OB Dump Reclamation Handling/Dozing of OB

Dump and backfilling Throughout the life of the mine including 3 years after cessation of mining operation

Technical and Bio-reclamation including plantation and post care

Throughout the life of the mine including 3 years after cessation of mining operation

E Landscaping

Page 403: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 50

Sl.No

Activity Time Frame Year 1st Phase 2nd Phase 3rd Phase 4th Phase Final

Phase Post Closure

Phase 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PC1 PC2 PC3

Landscaping of the open space in the leasehold area for improving its esthetics and eco value

Throughout the life of the mine including 3 years after cessation of mining operation

F Plantation Plantation over cleared area

obtained after dismantling 2 years

Plantation around the quarry area and in safety zone

Throughout the life of the mine including 3 years after cessation of mining operation

Plantation over the external OB Dump

Throughout the life of the mine

G Post Closure Env Monitoring / testing of parameters for three years

Air Quality 3 years Water Quality 3 years H Entrepreneurship

Development (Vocational/skill development training for sustainable income of affected people

Throughout the life of the mine

I Miscellaneous and other mitigative measures

Throughout the life of the mine including 3 years after cessation of mining operation

J Post Closure Manpower cost for supervision

3 years

PC1 : Post Closure Year 1 PC2 : Post Closure Year 2 PC3 : Post Closure Year 3

Page 404: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 51

(ii) Cost of mine closure

The mine closure cost has been considered @ Rs 7.90 lakh / ha [as per

WPI (Mar, 2013)] for mine lease area. The total mine closure cost is

estimated Rs. 19893.89 lakhs including compound interest. The Money to be

leived per hectare of mining lease is to be deposited every year after

commencement of any activity on the land for the mine after opening an

Escrow Account. The major expenditure on final mine closure plan will be

incurred during last five years. Up to 20 % of the deposited amount from

Escrow Account can be released every year starting from 4th year before

mine closure date. Balance amount will remain as security. The Coal

Controller•s Organization shall release the fund from the Escrow Account

based on the progress made in closure activites for the mine.

(B) BIOTA CONSERVATION PLAN

� Mine lease area of Lingaraj OC Expn. Project (16.0 Mty) is 1410.01 ha and

buffer zone area is 44376 ha total is 45786.01ha.

� Buffer zone has forest land 3858.0 ha (Dense and open forest).

� Tropical dry deciduous forest is found in both core and buffer zones

with Shorea robusta (Sal) as dominant species. The associates of Sal

are found to be Azadirachta indica (Neem), Madhuca indica (Mahula),

Borassus flabellifer (Palm), etc.

� FLORA CONSERVATION PLAN

� Biological reclamation will be done with endemic species of different

varieties. Similar measures have been taken in other projects of the

area.

� Arboriculture for greenbelt development will be done in this project.

Greenbelt development has also been carried out for other

neighbouring projects of Talcher Coalfield.

� Compensatory afforestation for this project will be carried out. In other

projects of Talcher Coalfield, similar measures have also been taken.

Page 405: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 52

� Avenue plantation will be done for each project in the area.

The above measures will help conserve the flora of the area.

� FAUNA CONSERVATION PLAN

The report reveals the presence of following wild animals in core and buffer

zones under different Schedules of the Wild life (Protection) Act 1972. All

such animals are found in other parts of the State. The area does not have

any endangered species. However, for conservation following species

present under different Schedules, broad management strategies have been

suggested.

Schedule Scientific Name Common Name Core Zone Buffer Zone SC -I Varanus salvator Monitor lizard Yes Yes SC -I Python molurus Python Yes Yes SC -I Pavo cristatus Common peafowl Yes Yes SC -II Brachypternus bengalensis Wood pecker Yes Yes SC -II Chameleon sp Bahurupi Yes Yes SC -II Canis aureus Jackal Yes Yes SC -III Munticus muntjack Kutra Yes Yes SC -III Sus sucrofa Wild pig Yes Yes SC -IV Danus sp Common butterfly Yes Yes SC -IV Rana tigrina Indian Bull Frog Yes Yes SC-IV Rana hexadactyla yes yes SC-IV Rana cyanohryictis Water skipper yes yes SC -IV Naja tripudians Common cobra Yes Yes SC -IV Bungarus coerulens Common krait Yes Yes SC -IV Bungarus fasciatus Banded krait Yes Yes SC -IV Cuculus microptens Cuckoo Yes Yes SC -IV Cypis bengalensis Vulture Yes Yes SC -IV Bulbulcus ibis Cattle egret Yes Yes SC -IV Ardea alba Large Egret Yes Yes SC -IV Acridotheres tristis Myna Yes Yes SC -IV Funanbulus pennati Squirrel Yes Yes SC -IV Herpestis edwardsi Mongoose Yes Yes SC -IV Felis chaus Jungle cat Yes Yes

Page 406: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 53

All such animals were found to be present both in core and buffer zones. Any

disturbance in core zone due to mining will force these animals to migrate to

the buffer zone. However, to protect all such animals in the buffer zone the

following broad conservation strategies should be adopted.

a) Protection of existing forest patch of buffer zone and more afforestation

of locally available species in buffer zone to create suitable habitat.

b) Plantation of edible fruit bearing trees in buffer zone which will attract

squirrels, bats and rodents.

c) In buffer zone existing water sources including natural water holes

should be renovated to ensure 365 days year water availability for the

animals.

d) Fire protection and prevention measures should be undertaken,

particularly during summer

e) After the completion of mining in the core zone the species which were

available originally and native to the site should be extensively planted

to restore the original habitat.

As survey and interrogation from local public, it was ascertained that the area

does not belong to the migratory corridor of any endangered wild lives.

However, there is very rare and occasional migration of wild animals like

Bear from the distant forest during incidents of forest fire etc. There is no

such specific migratory route, which can delineate in the map. The study area

does not have any specific, typical and endangered plant species.

�� CONSERVATION PLAN

The following conservation measures are adopted and will be

continued:

(i) Due to biological reclamation and greenbelt development for this

project and other projects in the area, habitats will be created for

fauna.

(ii) As ultimate voids of the quarry will be developed as water

reservoir and the area is having a number of large ponds, the

ground and avi-fauna will get water for drinking.

Page 407: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 54

(iii) As technically reclaimed areas will be revegetated with endemic

species, the avi-fauna and ground fauna will get food and

shelters.

11.3.11 AFFORESTATION AND COMPREHENSIVE GREENBELT DEVELOPMENT PROGRAMME (CONCEPTUAL)

BREAK-UP AREA ITEM-WISE

Sl. No. Particulars 13.0 Mty

Area (in ha) 16.0 Mty

area (in ha) (A) Total backfilled area

Total land for technical reclaimation 334.851 292.141 Land already technically reclaimed 20.60 21.80 Land to be technically reclaimed 314.251 270.341 Total land for biological reclaimation 334.851 292.141 Land already biologically reclaimed 20.60 21.80 Land to be biologically reclaimed 314.251 270.34*

(B) External dump 256.030 256.030 Area technical reclaimed 66.09 66.09 Area to be technical reclaimed 189.94 189.94 Area biological reclaimed 55.09 65.09 Area to be biological reclaimed 200.94 200.94

(C) Block plantation Safety zone 125.692 110.58 Infrastructure 10.360 10.36 Rationalisation of project boundary 9.910 2.08 Residential colony

16.638 16.64 Resettlement colony Total of (C) 152.70 139.66

(D) Avenue plantation Colony road

8.92 1.254 (Addl.) Approach road from mine to colony

Approach road from mine to magazine 5.41 0.607 (Addl.) Approach road to mine

Coal transportation road 6.50 4.0 (Addl.)

Total of (D) 20.83 5.861 * An area of 164.511 ha will be used for afforestation the remaining 105.83 ha will be

used for agriculture.

Page 408: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 55

AREA WISE PLANTATION AREALDY DONE

Sl. No. Particulars

20.0 Mty Area in ha No. of Saplings

1. Safety Zone 17.60 59325

2. Infrastructure

3. Residential colony 1.75 2975

4. Resettlement colony

Total (1 to 4) : 19.35 62300

5. OB dump area (Biologically reclaimed) 65.09 177125

6. Backfilled area (Biologically reclaimed) 21.80 64652

Grand total : 106.24 366377 AREA WISE PLANTATION TO BE DONE

Sl. No. Particulars

20.0 Mty Area in

ha No. of

Saplings 1. Safety Zone 103.34 258350

2. Infrastructure

3. Residential colony 14.89 37225

4. Resettlement colony

Total (1 to 4) : 118.23 295575

5. OB dump area (Biologically tobe reclaimed) 256.03 *

6. Backfilled area (Biologically tobe reclaimed) 164.511 411278

Grand total : 706853

AREA WISE AVENUE PLANTATION ALREADY DONE

Year of operation

Area for plantation in ha. For 13.0 Mty

Colony Road (ha)

Aproach road

mines to colony

(ha)

Aproach road to project

(ha)

Aproach road to

magazine (ha)

Coal transpor-

tation road (ha)

Total Area (ha)

Total saplings

TOTAL 3.04 3.00 1.71 0.53 5.95 14.23 25532

Page 409: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 56

AREA WISE AVENUE PLANTATION TO BE DONE

Year of operation

Area for plantation in ha. for 20.0 Mty (i.e. 7.0 incremental)

Colony Road (ha)

Aproach road

mines to colony (ha)

Aproach road to project

(ha)

Aproach road to

magazine (ha)

Coal transpor-

tation road (ha)

Total Area (ha)

Total saplings

1 --- 0.627 --- 0.607 1.000 2.234 3575

2 --- 0.627 0.85 0.74 2.000 4.217 67.47

3 0.96 0.96 0.85 0.73 1.55 5.05 8080

4 --- 0.96 --- --- --- 0.96 15.36

5 --- --- --- --- --- --- ---

6 --- --- --- --- --- --- ---

TOTAL 0.96 3.174 1.70 2.077 4.55 12.461 19938

PROGRESSIVE AVENUE PLANTATION PROGRAMME [ Lingaraj OCP (20.0 Mty) ]

Sl.N

o.

ITEM Duration in years

0 2 4 6 8 10

12

1 Avenue plantation in colony road

2 Mines to colony

3 Road to project

4 Road to magazine

5 Coal transportation road

Page 410: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 57

AREA WISE GREENBELT TO BE DONE (CONCEPTUAL)

(Area in ha) Year of

operation Area for plantation in ha. For Peak 20.0 Mty (i.e. 7.0 Mty incremental)

Safety zone / Infra-structure Residential colony/ Reset-tlement Colony

Total Area Total saplings

1 6.00 1.80 7.8 21450

2 7.51 1.80 9.31 25603

3 10.0 1.80 11.8 32450

4 10.0 1.80 11.8 32450

5 10.0 1.80 11.8 32450

6 10.0 1.80 11.8 32450

7 10.0 1.80 11.8 32450

8 15.12 1.00 16.12 44330

9 15.20 1.00 16.20 44550

10 11.59 0.29 11.88 32670

TOTAL 105.42 14.89 120.31 330853

AREA WISE GREENBELT TO BE DONE

[ Lingaraj OCP (20.0 Mty) ]

Sl.N

o.

ITEM

Duration in years

0 2 4 6 8 10

12

1 Greenbelt for safety zone area/ infrastructure

2 Greenbelt for colony/ resettlement colony

Page 411: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 58

AFFORESTATION PROGRAMME FOR INTERNAL DUMP

Afforestation Programme / Plan Internal dumps (Tentative)

Year of Operation

Area for Plantation in ha for 13.0 Mty

Area for Plantation in ha for 7.0 Mty (Incre.)

Area for Plantation in ha for 20.0 Mty

Backfilled area

Total Saplings

Backfilled area

Total Saplings

Backfilled area

Total Saplings

Existing 20.60 61652 1 0.00 0 3.91 9775 3.91 9775 2 0.00 0 3.00 8478 3.00 8478 3 0.00 0 4.00 10750 4.00 10750 4 0.00 0 6.00 16000 6.00 16000 5 0.00 0 6.00 16500 6.00 16500 6 0.00 0 7.00 19000 7.00 19000 7 0.00 0 8.00 21750 8.00 21750 8 0.00 0 11.00 29500 11.00 29500 9 0.00 0 11.00 30250 11.00 30250

10 0.00 0 11.00 30250 11.00 30250 11 0.00 0 11.00 30250 11.00 30250 12 0.00 0 11.00 30250 11.00 30250 13 0.00 0 11.00 30250 11.00 30250 14 0.00 0 11.00 30250 11.00 30250 15 0.00 0 14.00 37750 14.00 37750 16 0.00 0 14.00 38500 14.00 38500 17 0.00 0 15.00 41000 15.00 41000 18 0.00 0 17.00 46250 17.00 46250 19 0.00 0 17.00 46750 17.00 46750 20 0.00 0 16.00 44250 16.00 44250 21 0.00 0 17.50 47750 17.50 47750 22 0.00 0 14.50 40625 14.50 40625 23 0.00 0 15.00 41125 15.00 41125 24 0.00 0 16.63 45328 16.63 45328

Total : 20.60 61652 271.541 742580 271.541 742580 AFFORESTATION PROGRAMME FOR EXTERNAL DUMP External dump of 55.09 ha have been biologically reclaimed and 137725 nos.

of saplings have already been planted. There is no external dumping for the

expansion project for first two years only. All the additional overburden will be

backfilled.

Page 412: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 59

PROGRESSIVE AFFORESTATION PROGRAMME S

l.No

. ITEM Duration in years

0 2 4 6 8 10

12

14

16

18

20

22

24

26

28

1 Internal dump a)

Backfilling b) Technical

Reclamation c) Biological

reclamation & maintenance

2 External dump a)

Backfilling b) Technical

Reclamation c) Biological

reclamation & maintenance

The various pollution tolerant plants have been given below to resist the

pollutant:

Sulphur dioxide (SO2) : Albizia lebbeck, Ailanthus excelsa, Alstonia

scholaris, Azadirachta indica, Ficus religosa,

Lagerstroemia flosreginae, Mimusops elengi,

Polylthia longifolia, Terminalia arjuna, Acer

platanoides, Quereus palustris, Q.rubra.

Oxides of Nitrogen (NOx) : Fagus orientalis, Quercus rubra, Robinia

pseudocacia, Alnus species, Sambues nigra

Dust Pollution : Alstonia macrophylla, Cassia siamea, Dalbergia

sissoo, Ficus benghalensis, F.infeetoria,

Mangifera indica, Peltophroum ferrugineum,

Polyalthia longifolia, Shorea robusta, Syzygium

cumuni, Teetona grandis, Alnus viridis, Picea

sp., Barya purpurascens, Salix planifolia.

Page 413: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Chapter … 11, Page - 60

Noise Pollution : Alstonia scholairs, Azadirachta indica, Butea

monosperma, Erythrina variegate, Grevillea

robusta, Pterospermum acerifolium, Tamarindus

indica, Terminalia arjuna, Acer negundo, Alnus

indica, Betula pendula, Cornus alba, Juniperus

chinensis, Populus feroinensis, syenga vulgaris,

Viburnum lanatana.

11.3.12 COST ESTIMATE

The EMP cost is Rs.34.97 crore.

Page 414: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – I, Page - 1

Annexure-I

Page 415: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – II, Page - 1

Annexure-II

Page 416: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – II, Page - 2

Annexure-II (Contd.)

Page 417: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 1

Annexure-III

Page 418: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 2

Annexure-III (Contd.)

Page 419: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 3

Annexure-III (Contd.)

Page 420: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 4

Annexure-III (Contd.)

Page 421: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 5

Annexure-III (Contd.)

Page 422: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 6

Annexure-III (Contd.)

Page 423: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 7

Annexure-III (Contd.)

Page 424: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 8

Annexure-III (Contd.)

Page 425: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 9

Annexure-III (Contd.)

Page 426: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 10

Annexure-III (Contd.)

Page 427: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – III, Page - 11

Annexure-III (Contd.)

Page 428: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IV, Page - 1

Annexure-IV

Page 429: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IV, Page - 2

Annexure-IV (Contd.)

Page 430: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IV, Page - 3

Annexure-IV (Contd.)

Page 431: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IV, Page - 4

Annexure-IV (Contd.)

Page 432: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VA, Page - 1

Annexure-VA

Page 433: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VA, Page - 2

Annexure-VA (Contd.)

Page 434: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VA, Page - 3

Annexure-VA (Contd.)

Page 435: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VA, Page - 4

Annexure-VA (Contd.)

Page 436: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VB, Page - 1

Annexure-VB

Page 437: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VB, Page - 2

Annexure-VB (Contd.)

Page 438: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VB, Page - 3

Annexure-VB (Contd.)

Page 439: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VB, Page - 4

Annexure-VB (Contd.)

Page 440: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VB, Page - 5

Annexure-VB (Contd.)

Page 441: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VB, Page - 6

Annexure-VB (Contd.)

Page 442: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VI, Page - 1

Annexure-VI

Page 443: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VI, Page - 2

Annexure-VI (Contd.)

Page 444: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VIII, Page - 1

Annexure-VIII

Page 445: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VIII, Page - 2

Annexure-VIII (Contd.)

Page 446: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VIII, Page - 3

Annexure-VIII (Contd.)

Page 447: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VIII, Page - 4

Annexure-VIII (Contd.)

Page 448: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – VIII, Page - 5

Annexure-VIII (Contd.)

Page 449: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IX, Page - 1

Annexure-IX

SOIL QUALITY DATA

Location : Barren Land, Core zone (S1) Date ; 31.05.2013

Sl. No.

Parameter

Depth, cm

0-30 30-60 60-100

1 pH 7.12 7.26 7.33

2 Temperature (oC) 33.0 33.5 33.0

3 Electrical conductivity (m-mhos/cm at 20C) 146 152 162

4 Nitrogen, kg/ha 255 260 276

5 Phosphorus, kg/ha 6.2 6.4 6.8

6 Potassium, kg/ha 169 192 186

7 Calcium, kg/ha 618 702 714

8 Magnesium, kg/ha 464 460 488

9 Organic matter (%) 2.2 2.6 2.6

10 Grain size distribution Sand Clay Silt

14 69 17

10 71 19

9

88 13

11 Sodium Absorption Ratio (SAR) 0.12 0.13 0.12

12 Natural Moisture content (%) 4.2 4.0 3.8

13 Field Capacity (%) - 5.6 -

14 Wilting Co-efficient (%) - 0.38 -

15 Available Water Storage Capacity (%) - 5.2 -

16 Bulk Density (gms /cc) 1.24 1.22 1.26

17 Cation exchange Capacity (cm/hr) 2.20 2.22 2.25

18 Infiltration rate (cm/hr) - 3.2 -

Richardson & Cruddas (1972) Ltd.

Page 450: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IX, Page - 2

Annexure-IX (Contd.)

SOIL QUALITY DATA

Location : Proposed OB dump, Core zone (S2) Date ; 31.05.2013

Sl. No.

Parameter Depth, cm

0-30 30-60 60-100

1 pH 7.14 7.52 7.46

2 Temperature (oC) 34.5 34.0 33.5

3 Electrical conductivity (m-mhos/cm at 20C) 302 348 356

4 Nitrogen, kg/ha 502 515 505

5 Phosphorus, kg/ha 6.1 6.2 6.2

6 Potassium, kg/ha 185 192 196

7 Calcium, kg/ha 802 842 816

8 Magnesium, kg/ha 305 315 302

9 Organic matter (%) 3.4 3.5 3.5

10 Grain size distribution Sand Clay Silt

24 56 20

18 52 30

14 50 36

11 Sodium Absorption Ratio (SAR) 2.4 2.5 2.6

12 Natural Moisture content (%) 3.1 2.8 2.9

13 Field Capacity (%) - 9.2 -

14 Wilting Co-efficient (%) - 0.7 -

15 Available Water Storage Capacity (%) - 5.6 -

16 Bulk Density (gms /cc) 1.22 1.25 1.28

17 Cation exchange Capacity (cm/hr) 1.23 1.25 1.26

18 Infiltration rate (cm/hr) - 4.8 -

Richardson & Cruddas (1972) Ltd.

Page 451: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IX, Page - 3

Annexure-IX (Contd.)

SOIL QUALITY DATA

Location : Existing OB Dump (S3) Date ; 31.05.2013

Sl.No. Parameter Depth, cm

0-30 30-60 60-100

1. pH 7.56 7.52 7.36

2. Temperature (oC) 35.5 35.0 34.5

3. Electrical conductivity (m-mhos/cm at 20C) 302 315 312

4. Nitrogen, kg/ha 410 402 412

5. Phosphorus, kg/ha 5.1 5.2 5.4

6. Potassium, kg/ha 156 162 162

7. Calcium, kg/ha 618 614 622

8. Magnesium, kg/ha 315 338 326

9. Organic matter (%) 2.3 2.3 2.4

10. Grain size distribution Sand Clay Silt

65 16 19

58 26 16

54 20 24

11 Sodium Absorption Ratio (SAR) 3.2 3.1 3.3

12 Natural Moisture content (%) 2.6 2.8 2.9

13 Field Capacity (%) - 7.4 -

14 Wilting Co-efficient (%) - 0.75 -

15 Available Water Storage Capacity (%) - 6.8 -

16 Bulk Density (gms /cc) 1.12 1.15 1.18

17 Cation exchange Capacity (cm/hr) 1.92 1.93 1.87

18 Infiltration rate (cm/hr) - 4.5 -

Richardson & Cruddas (1972) Ltd.

Page 452: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IX, Page - 4

Annexure-IX (Contd.)

SOIL QUALITY DATA

Location : Agricultural Land, Talaberha village (S4) Date ; 31.05.2013

Sl. No.

Parameter Depth, cm

0-30 30-60 60-100

1. pH 8.12 8.12 7.99

2. Temperature (oC) 31.5 31.0 30.5

3. Electrical conductivity (m-mhos/cm at 20C) 182 190 194

4. Nitrogen, kg/ha 502 522 520

5. Phosphorus, kg/ha 6.1 6.2 6.3

6. Potassium, kg/ha 185 202 212

7. Calcium, kg/ha 802 812 822

8. Magnesium, kg/ha 322 356 382

9. Organic matter (%) 3.0 3.2 3.1

10. Grain size distribution Sand Clay Silt

50 40 10

48 34 18

44 36 20

11 Sodium Absorption Ratio (SAR) 2.4 2.5 2.6

12 Natural Moisture content (%) 3.8 3.9 3.9

13 Field Capacity (%) - 9.1 -

14 Wilting Co-efficient (%) - 0.6 -

15 Available Water Storage Capacity (%) - 5.2 -

16 Bulk Density (gms /cc) 1.08 1.10 1.11

17 Cation exchange Capacity (cm/hr) 1.70 1.74 1.75

18 Infiltration rate (cm/hr) - 5.2 -

Richardson & Cruddas (1972) Ltd.

Page 453: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – IX, Page - 5

Annexure-IX (Contd.)

SOIL QUALITY DATA

Location : Barren Land, Hensamul village (S5) Date ; 31.05.2013

Sl. No.

Parameter Depth, cm

0-30 30-60 60-100

1 pH 7.18 7.26 7.30

2 Temperature (oC) 34.0 33.5 33.0

3 Electrical conductivity (m-mhos/cm at 20C) 150 152 160

4 Nitrogen, kg/ha 250 262 286

5 Phosphorus, kg/ha 6.1 6.1 6.2

6 Potassium, kg/ha 189 198 196

7 Calcium, kg/ha 610 612 614

8 Magnesium, kg/ha 465 462 484

9 Organic matter (%) 2.1 2.1 2.2

10 Grain size distribution Sand Clay Silt

12 62 16

16 61 23

14 56 30

11 Sodium Absorption Ratio (SAR) 0.12 0.13 0.12

12 Natural Moisture content (%) 4.2 4.0 3.8

13 Field Capacity (%) - 5.6 -

14 Wilting Co-efficient (%) - 0.38 -

15 Available Water Storage Capacity (%) - 5.2 -

16 Bulk Density (gms /cc) 1.24 1.22 1.26

17 Cation exchange Capacity (cm/hr) 2.20 2.22 2.25

18 Infiltration rate (cm/hr) - 3.2 -

Richardson & Cruddas (1972) Ltd.

Page 454: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 1

Annexure-X

Page 455: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 2

Annexure-X (Contd.)

Page 456: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 3

Annexure-X (Contd.)

Page 457: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 4

Annexure-X (Contd.)

Page 458: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 5

Annexure-X (Contd.)

Page 459: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 6

Annexure-X (Contd.)

Page 460: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 7

Annexure-X (Contd.)

Page 461: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 8

Annexure-X (Contd.)

Page 462: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 9

Annexure-X (Contd.)

Page 463: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 10

Annexure-X (Contd.)

Page 464: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 11

Annexure-X (Contd.)

Page 465: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 12

Annexure-X (Contd.)

Page 466: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 13

Annexure-X (Contd.)

Page 467: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 14

Annexure-X (Contd.)

Page 468: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – X, Page - 15

Annexure-X (Contd.)

Page 469: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – XI, Page - 1

Annexure-XI

FORM – V

ENVIRONMENTAL STATEMENT

Environmental statement for the financial year ending 31st Mar, 2014

Part – A i) Name & Address of the owner/ occupier :

of the industry operation or process (Name of the Project Officer/ Sub-Area Manager & Office address to be given) ii) Industry Category : Primary (Coal Mining Operation)

iii) Production Capacity (Coal production during the year 2013-14) : 7169925 Te.

iv) Year of establishment : 1991

v) Date of the last Environmental Statement submitted : September, 2013

Part – B

Water & Raw Material Consumption Note: Average Water Consumption (m3/ day) for the whole year is given. Raw material consumption is given per unit of coal produced. (I) Water Consumption (m3/ day): 1. Industrial/ Mining Consumption in m3/ day a Haul Road Dust Suppression 1650 b Dust Suppression at CHP 310 c Dust Suppression at Siding 350 d Fire Fighting 220 e Workshop 47 f Others 25 2. Domestic 900 3. Total in m3/ day 3502

Name of the Product Water Consumption per unit of product (ℓ/ t) 2012-13 2013-14 Coal 110.68 178.27

Shri Sanjay Kumar Jha, Project Officer, Lingaraj OCM. Post: Deulbera Colliery, Talcher, Dist: Angul, Orissa, Pin: 759102. .

Page 470: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – XI, Page - 2

Annexure-XI (Contd.)

(II) Raw Material Consumption (per tonne of coal): Name of Raw Material Consumption of Raw Material (per tonne of Coal

produced) 2012-13 2013-14 H.S. Diesel (ℓ/ t) 0.647 0.926 Petrol (ℓ/ t) – 0.00011 Lubricants (ℓ/ t) 0.0316 0.0263 Electricity (Units/ t) 2.17 2.399 Explosives (kg/ t) 0.201 0.364

Part – C

Pollution Discharged to Environment/ Unit of Output

(Parameter as specified in the ‘Consent’ issued) Pollutants Quantity of

pollutants discharged (mass/ day)

Concentrations of pollutants in discharges

(mass/ volume)

Percentage variation from

prescribed standards with

reasons Water (annual average)

TSS (mg/ℓ) Not possible to quantify

Mine Effluent

OGT Outlet

STP Outlet

Within the prescribed standard

32.03 22.64 - BOD mg/ℓ) – – - COD (mg/ℓ) 49.29 35.64 - pH 7.63 7.56 - O & G (mg/ℓ) <1.0 <1.0 - Air (Ambient air quality of one station near CGM Office – annual average) SPM (µg/m3)

Not possible to quantify

291.87 Within the prescribed

standard RPM (µg/m3) 164.52 SO2 (µg/m3) 26.96 NOx (µg/m3) 29.43

Part – D

Hazardous Wastes

As specified under Hazardous Wastes (Management & Handling) Rules, 1989.

Hazardous Waste Total Quantity (kg) During the previous

financial year (2012-13) During the current

financial year (2013-14) (a) From process (Burnt Oil recovered in workshop) 85070 ℓ 87100 ℓ

(b) From pollution control facilities (Oil recovery from Oil & Grease Trap and oily sludge)

(i) 380 ℓ (Oil) (ii) 195.08 m3 (Oily sludge)

(i) 127 ℓ (Oil) (ii) 250.78 m3 (Oily sludge)

Page 471: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – XI, Page - 3

Annexure-XI (Contd.) Part – E

Solid Wastes (other than hazardous)

Particulars Total Quantity During the previous

financial year (2012-13) During the current

financial year (2013-14) (a) From process (Top soil and Over burden) 6.56 Mm3 6.086 Mm3

(b) From pollution control facilities (STP & Sed– Pond Sludge) - -

(c) 1- Quantity recycled or re-utilized (OB back-filled) 6.56 Mm3 6.086 Mm3

2- Sold – – 3- Disposed – –

Part – F Please specify the characteristics (in terms of concentration & quantum) of hazardous as well as solid waste and indicate the disposal practice adopted for both these categories of wastes.

(I) Hazardous Wastes: Name of Hazardous Wastes Quantity generated in the

year 2013-14 Disposal Practices

Burnt Oil, etc. (ℓ) (from W/Shop)

87100 ℓ By auction to authorized parties

Oil & Grease (kg) (from ETP/ OGT)

127 ℓ By auction to authorized parties

Oily Sludge (tonne.) (from ETP/ OGT)

250.78 m3 Disposed into impervious lined pit

Battery (nos.) 283 By auction to authorized parties Note: A detailed note on disposal practices of the above should be given separately.

(II) Solid Wastes: Solid Waste Quantity generated in the

year 2013-14 Disposal Practices

Top Soil (m3) 45360 m3 Spread over backfilled area for plantation

OB (m3) 6041636 m3 Used to fill in quarry voids and external O.B.dumps

STP & Sed–Pond Sludge - Disposed on waste land Land Reclamation & OB disposal – progressive till March, 2014: Area (ha.) OB Volume/ Nos. of Plants 1) External OB dump 107.51 40.35 Mm3

2) Excavated land 254.32 108.44 Mm3 3) Land affected (1+2) 361.83 – 4) Backfilled (out of 2) 81.51 68.09 Mm3 5) Land physically reclaimed (out of 3) 85.69 – 6) Land biologically reclaimed ( out of 3) 85.69 238777 Nos.

Page 472: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – XI, Page - 4

Annexure-XI (Contd.) Part – G

Impact of pollution control measures on conservation of natural resources and consequently on cost of production.

In order to carry out mining in an eco-friendly manner, a detailed Environmental Management Plan (EMP) was prepared by Regional Institute – VII of CMPDIL. The main pollution control measures suggested in EMP along with the measures implemented so far have been summarized in the Table – 1.1 to 1.3.

Table – 1.1 Air Pollution Control Measures

Sl. No.

EMP Provisions Whether provided or not

Remarks

1 Watering and grading of all roads to minimize air-borne dust from vehicles. Provided

2 Biological reclamation of land. Provided 3 Green belt around mine & infrastructures. Provided 4 Drills fitted with dust control devices. Provided

5 Dust suppression/ dust extraction system to be provided in CHP.

Provided

6 Improved maintenance of plant & machinery. Provided 7 Mechanized coal transportation system. Provided

Table – 1.2

Water Pollution Control Measures

Sl. No.

EMP Provisions Whether provided or not

Remarks

1 Mine water is to be collected in central sump on dip side of pit. This will act as sedimentation lagoon. Provided

2 Run-off around reclamation area will be controlled by providing catch drains and sedimentation lagoon combination.

Provided

3

Surface run-off from external dump would be collected through a series of contour drains which would be connected to a water retention pond. The clear water from this pond will be discharged to natural water course.

Provided

4

Domestic waste water will be treated in screens, oxidation pond/ aerated lagoon. Sanitary waste to be disposed off into septic tank & soak-pit.

Septic tank & Soak pit

combination provided

5 Workshop effluents will be treated in oil & grease trap & sedimentation tank. Provided

Page 473: Environmental Impact Assessment and Environment Management Plan for LINGARAJ OCP …environmentclearance.nic.in/writereaddata/EIA/100220151... · 2015-02-10 · Final Stage Dump Plan

CMPDI

Job No.706111 Annexure – XI, Page - 5

Annexure-XI (Contd.)

Table – 1.3 Land Reclamation

Sl. No. EMP Provisions Whether

provided or not

Remarks

1 Top soil Management: Proper stripping, Storage, and Relocation of top soil.

Provided

2

Physical Reclamation of OB Dump: Proper reshaping and regarding of top surface, Providing drainage arrangements and top soil spreading for external and internal dumps.

Provided

3 Biological Reclamation: Plantation of suitable species of herbs, shrubs & indigenous trees over technically reclaimed dumps.

Provided

IMPACT OF POLLUTION CONTROL MEASURES ON COST OF PRODUCTION COST OF ENVIRONMENTAL MANAGEMENT DURING 2013-14 was Rs. 1.74 per tonne of Coal (approx).

Part – H Additional measures/ investment proposal for environmental protection

including abatement of pollution, prevention of pollution.

Head Amount Rs. (approx)

Environment Exp. 99.348 Lakh Dust suppression 87.626 Lakh Water Tax 16.957 Lakh Total 125.068 Lakh

Part – I Any other particulars for improving the quality of the environment.

Note: Please attach a plan showing the relevant features like Present Working/