  • ENVIRONMENTAL IMPACT ASSESSEMENT /

    ENVIRONMENTAL MANAGEMENT PLAN REPORT

    ALONG WITH FORM- I, FORM- IA, CONCEPTUAL PLAN

    AND ANNEXURE

    (FOR ENVIRONMENTAL CLEARANCE)

    RESIDENTIAL PLOTTED COLONY

    (102.70 Acres)

    at

    VILLAGE NAURANGPUR, SECTOR- 78 & 79, DISTRICT -

    GURGAON, HARYANA

    APPLICANT ENVIRONMENTAL CONSULTANT

    M/S REVITAL REALITY PVT LTD

    1114, 11th floor, Hemkunth Chambers, 89, Nehru Place, New Delhi

    Email: [email protected]

    VARDAN ENVIRONET QCI/NABET ACCREDITED

    S. No. 158 D-142, Sushant Lok- III, Sec- 57,

    Gurgaon- 122001 E-Mail: [email protected] Phone No.: 9971684812; 9899651342

    mailto:[email protected]

  • INDEX

    S. No. Particulars Page No.

    1 Form I 1-16 2 Form I A 17-39 3 Conceptual Plan 40-82 4 Terms of Reference issued by MoEF & CC 83-87 5 Compliance of Terms of Reference 88-91

    EIA Report

    6 Chapter- 1 (Introduction) 1-7 7 Chapter-2 (Project Description) 8-36 8 Chapter-3 (Description of Environment) 37-97 9 Chapter-4(Anticipated Environmental Impacts & Mitigation Measures) 98-112

    10 Chapter- 5 (Specific Studies) 113-122 11 Chapter- 6 (Environmental Monitoring Program) 123-126 12 Chapter- 7 (Additional Studies) 127-140 13 Chapter- 8 (Project Benefits) 141-142 14 Chapter- 9 (Environmental Management Plan) 143-149 15 Chapter- 10 (Summary and Conclusion) 150-155 16 Chapter- 11 (Disclosure of Consultant) 156-157 17 Chapter- 12 (Corporate Environmental Responsibility) 158-159

    Annexures 1. License from DTCP 160 2. Board of Resolution 187 3. Perspective View of the project 189 4. Accreditation certificate of consultant from QCI/NABET 191 5. Affidavit from Project Proponent 193 6. NOC from forest Divisional Forest Officer, Gurgaon 203 7. Assurance for power supply DHBVN 205 8. Assurance for water supply 207 9. Receipt of External Development Charges paid to HUDA 209 10. Baseline Data (Lab Analysis Reports) 212 11. NOC from Administrator HUDA for supply of treated water for construction

    purpose 222

    12. Site Photographs 224 13. Electrical Standards and Codes 226 14. Health, Safety and Occupational Measures 231 15. Mitigation measures to control green house effect. 233 16. Codes of Earthquake 235 17. Risk Assessment Plan 237 18. Codes of Fire Fighting 240 19. Geo-Technical Investigation Report 244 20. Buffer Map of 2 km 282 21. Landscape Plan 284 22. Layout Plan 286 23. Service Layout Plan 288 24. Parking cum Traffic Circulation Plan 290 25. Undertaking regarding additional ToR Points 292

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    (I) BASIC INFORMATION

    S.No. Items

    1 Name of the Project

    2 Serial No. in schedule

    3 Proposed capacity/area/length/tonnage to be

    handled/command area/lease area/number of

    wells to be drilled

    4 New/Expansion/Modernization

    5 Existing capacity/Area etc.

    6 Category of project

    7 Does it attract the general

    please specify

    8 Does it attract the specific

    please specify

    9 i) Location of unit

    ii) Plot, Survey No, Khasra No.

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Details

    Residential plotted colony

    M/s Revital Reality Pvt. Ltd.

    8(b) Township & Area Developement P

    Notification 14/9/2006

    Proposed capacity/area/length/tonnage to be

    handled/command area/lease area/number of

    Total Plot Area [415612.154 m2 (102.70 Acres)

    Net Plot Area [3, 77, 805.80 m2 (93.3583 Acres)

    Total Built Up Area = 443997.81 m

    Total Ground Coverage : 107292.3405 m

    Total FAR : 2, 99, 157.422 m2

    New/Expansion/Modernization New

    Not Applicable

    B

    Does it attract the general condition? If Yes, No

    Does it attract the specific condition? If Yes, No

    Khasra No.

    Village- Naurangpur, District

    18/1, 14, 15, 16, 23/2, 24, 25, 21/1, 4/2, 27, 17, 21/2, 21/2,

    21/1, 21/3, 21/4, 21/5, 24/1, 1, 2, 24, 3, 8, 13/1, 14, 17, 7, 5/2,

    6/1, 114, 113, 19, 21/2, 22, 23, 1, 10/1, 3, 18, 2/1 , 1,

    15/1, 11/1, 6, 15/2, 10, 11/3, 10/2, 6/1, 11

    25/1, 4, 5/1, 7/3, 27, 2/1/1, 2/2/1, 2/3/1, 9/2, 12/1,

    18/2/1, 4/3/1, 4/2, 14/2, 15/1, 6/3, 25/2, 5/2, 6/2, 21,

    12, 19, 20/1, 2/1, 9/1, 10/1, 1/3, 1/2, 9/2, 1/1, 18/1,

    22, 23/1, 4, 6, 7/1, 15, 10, 11/

    17/2, 1/2, 2, 10/1, 4/1, 3, 8/2, 9, 12/1, 13, 19/1,

    10/3/2, 11/1/1, 6/2, 7/1, 11, 13/1, 9/2, 8, 9/1,

    13/2, 15/2, 17, 18, 19/1, 22/2, 4, 14, 15/1,

    10/2, 19/2, 22/1, 21, 11/1, 20/1, 20/2, 15,

    FORM-1

    Page 1

    Township & Area Developement Projects as per MoEF

    415612.154 m2 (102.70 Acres)]

    3, 77, 805.80 m2 (93.3583 Acres)]

    443997.81 m2

    107292.3405 m2

    2

    , District- Gurgaon

    18/1, 14, 15, 16, 23/2, 24, 25, 21/1, 4/2, 27, 17, 21/2, 21/2, 20,

    21/1, 21/3, 21/4, 21/5, 24/1, 1, 2, 24, 3, 8, 13/1, 14, 17, 7, 5/2,

    6/1, 114, 113, 19, 21/2, 22, 23, 1, 10/1, 3, 18, 2/1 , 1, 7/1, 11/2,

    15/1, 11/1, 6, 15/2, 10, 11/3, 10/2, 6/1, 11/2, 15/3, 16, 24/2,

    25/1, 4, 5/1, 7/3, 27, 2/1/1, 2/2/1, 2/3/1, 9/2, 12/1, 18/1/1,

    18/2/1, 4/3/1, 4/2, 14/2, 15/1, 6/3, 25/2, 5/2, 6/2, 21, 25, 5, 11/3,

    12, 19, 20/1, 2/1, 9/1, 10/1, 1/3, 1/2, 9/2, 1/1, 18/1, 7/2, 14, 18/2,

    22, 23/1, 4, 6, 7/1, 15, 10, 11/1, 22, 19, 20/1, 20/2, 16, 17/1,

    4/1, 3, 8/2, 9, 12/1, 13, 19/1, 11/2/1, 6/2, 15/4,

    10/3/2, 11/1/1, 6/2, 7/1, 11, 13/1, 9/2, 8, 9/1, 12/1, 6/2, 7, 12/2,

    13/2, 15/2, 17, 18, 19/1, 22/2, 4, 14, 15/1, 16/2, 23, 24, 11/1,

    21, 11/1, 20/1, 20/2, 15, 16, 25, 6/2, 4/2, 5, 6/2,

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    iii) Village

    iv) Tehsil

    v) District

    vi) State

    10 Nearest Railway station/Air

    distance in kms.

    11 Nearest town, City, Distt. Head Quarter

    with distance in kms.

    12 Village Panchayat, Zila P

    Corporation, Local body(Complete postal

    addresses with telephone nos. to be given)

    13 Name of Applicant

    14 Regd. Address

    15 Address for correspondence(1):

    Name

    Designation

    Address

    Pin Code

    E mail

    Telephone

    Mobile

    Fax No.

    Address of correspondence(2):

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    7/1, 14/1/2, 15/1, 16/2, 2/2, 9/1, 12/2,

    11/2/2, 20/2/1

    Village- Naurangpur, District

    -----

    Gurgaon

    Haryana

    Airport along with Garhi Harsaru Jundction Railway Station

    North -West

    Distt. Head Quarter along Manesar Approx. 3.2 Km, Sou

    Parishad, Municipal

    Local body(Complete postal

    addresses with telephone nos. to be given)

    Municipal Corporation

    Opposite General Civil Hospital

    Gurgaon- 122001, Haryana

    Phone: 18001801817

    Email: [email protected]

    M/s Revital Reality Pvt. Ltd.

    1114, 11th Floor, Hemkunth Chambers, 89, Nehru Place, New

    Delhi-19

    Address for correspondence(1): M/s Revital Reality Pvt. Ltd.

    1114, 11th Floor, Hemkunth Chambers,

    89, Nehru Place, New Delhi-

    Mr. A.shok Vardhan Singh

    Authorized Signatory

    Supertech House, B 28-29, Sector

    201307

    [email protected]

    [email protected]

    0120-4572600

    +91 - 8588837646

    0120-466991

    Address of correspondence(2): Environment Consultant

    M/s Vardan EnviroNet

    (Accredited from QCI/NABET)

    D-142,SushantLok-III, Golf Course Extension Road,

    Gurgaon, Haryana

    FORM-1

    Page 2

    7/1, 14/1/2, 15/1, 16/2, 2/2, 9/1, 12/2, 3/1, 4/1/1, 10/2/1, 11/1/2,

    Naurangpur, District- Gurgaon

    Garhi Harsaru Jundction Railway Station Approx. 10 km in

    South-Wast

    Opposite General Civil Hospital

    , Haryana

    Floor, Hemkunth Chambers, 89, Nehru Place, New

    Floor, Hemkunth Chambers,

    -110019

    29, Sector-58, Noida

    [email protected]

    [email protected]

    (Accredited from QCI/NABET)

    Golf Course Extension Road,

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    16 Detail of alternative site, if any

    these sites should be shown on a topo

    17 Interlinked Project

    18 Whether separate application for

    project has been submitted

    19 If, Yes Date of Submission

    20 If no , reason

    21 Whether proposal involves

    under: if yes, details of same and status to given

    a) Forest (conservation) Act 1980?

    b) Wild life protection Act 1972

    c) CRZ notification 1991?

    22 Whether there is any Govt. order/policy

    relevant/relating site?

    23 Forest land involved(hectares)

    24 Whether there is any litigation pending against

    the project and / or land in which is project is

    proposed to be setup:

    a) Name of court

    b) Case No.

    c) Orders/directions of Court,

    its relevance with the proposed project.

    (II) ACTIVITY:

    1. Construction, operation or decommissioning of the Project involving actions, which will cause physical

    changes in the locality (topography, land use, changes in water bodies, etc.)

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Tel No. 0124-4291036

    Email: [email protected]

    Detail of alternative site, if any. Location of

    these sites should be shown on a topo-sheet.

    This is a residential plotted colony

    already been awarded by Director Town and Country Planning.

    Hence, Not applicable in this case

    There is not any interlinked project

    Whether separate application for interlinked

    Not Applicable. In view of item No. 17 above

    Not Applicable. In view of item No. 17 above

    Not Applicable. In view of item No. 17 above

    Whether proposal involves approval/clearance

    under: if yes, details of same and status to given

    Forest (conservation) Act 1980?

    Wild life protection Act 1972?

    ?

    No. The unit does not fall in any notified reserved forest area

    No. The proposed project

    protected area.

    No. The unit does not fall in any Notified coastal

    zone.

    Whether there is any Govt. order/policy 1. Town and Country Planning Department

    2. Assurance of water supply

    (hectares) No Forest land is involved in

    Whether there is any litigation pending against

    the project and / or land in which is project is

    Orders/directions of Court, if any and

    its relevance with the proposed project.

    There is no litigation pending against the project and

    Therefore, Information required against

    applicable.

    Construction, operation or decommissioning of the Project involving actions, which will cause physical

    (topography, land use, changes in water bodies, etc.)

    FORM-1

    Page 3

    [email protected]

    residential plotted colony project for which license has

    by Director Town and Country Planning.

    this case.

    There is not any interlinked project.

    In view of item No. 17 above

    . In view of item No. 17 above

    In view of item No. 17 above

    No. The unit does not fall in any notified reserved forest area.

    proposed project site does not fall in any wildlife

    No. The unit does not fall in any Notified coastal regulation

    1. Town and Country Planning Department

    Assurance of water supply from HUDA

    involved in the proposed project.

    There is no litigation pending against the project and land.

    Information required against point a, b & c is not

    Construction, operation or decommissioning of the Project involving actions, which will cause physical

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    S.No. Information/Checklist

    Confirmation

    1.1 Permanent or temporary change in land use,

    land cover or topography including increase in

    intensity of land use(with respect to local land

    use plan)

    1.2 Clearance of existing land, vegetation and

    building?

    1.3 Creation of new land uses?

    1.4 Pre-construction investigations e.g. bore house, soil

    testing?

    1.5 Construction works?

    1.6 Demolition works?

    1.7 Temporary sites used for construction works or

    Housing of construction workers?

    1.8 Above ground building, structures or

    Earthworks including linear structures, cut and

    fill or excavations

    1.9 Underground work including mining or

    tunneling?

    1.10 Reclamation works?

    1.11 Dredging?

    1.12 Offshore structures?

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Yes/ No Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    Permanent or temporary change in land use,

    land cover or topography including increase in

    intensity of land use(with respect to local land Yes

    Land has been allotted for

    Gurgaon-Manesar Master Plan

    residential plotted colony will be constructed on the

    barren land of the proposed project site.

    Clearance of existing land, vegetation and

    Yes

    There is no structure present on the

    fully vacant. The existing vegetation at site

    wild grasses and weeds which shall be cleared at the

    time of construction. The proposed project has green

    area development plan;

    species shall be planted within the project area.

    Yes

    The proposed site is vacant

    weeds. The land shall be used for the construction of

    residential plotted colony

    investigations e.g. bore house, soil Yes

    Soil investigation was carried out and the results

    were found satisfactory.

    Yes

    The Construction activities

    the project premises; there will be no physical

    outside the project boundary.

    No Project site is vacant land.

    required.

    Temporary sites used for construction works or

    No

    All the construction activity including stocking of

    raw materials will be confined within the project site

    only. No temporary shelters for labour

    Local labors from nearby area will be hired.

    Sanitation facilities will be developed at site.

    Above ground building, structures or

    Earthworks including linear structures, cut and Yes

    Excavation will be carried out for foundation of

    buildings only. The excavated soil will be used in

    backfilling and other area development

    Underground work including mining or No

    No underground work

    required except excavation of earth.

    No No reclamation work is

    No No dredging is required.

    No No offshore structure is

    FORM-1

    Page 4

    approximate quantities/ rates,

    wherever possible) with source of information data

    Land has been allotted for residential purpose under

    Manesar Master Plan-2031. Hence, a

    colony will be constructed on the

    barren land of the proposed project site.

    re is no structure present on the site. The site is

    The existing vegetation at site consists of

    wild grasses and weeds which shall be cleared at the

    time of construction. The proposed project has green

    area development plan; the local and indigenous

    species shall be planted within the project area.

    The proposed site is vacant consisting wild grass and

    weeds. The land shall be used for the construction of

    olony.

    investigation was carried out and the results

    were found satisfactory.

    onstruction activities will be confined within

    the project premises; there will be no physical change

    outside the project boundary.

    Project site is vacant land. Hence, demolition is not

    All the construction activity including stocking of

    raw materials will be confined within the project site

    shelters for labour are proposed.

    from nearby area will be hired.

    Sanitation facilities will be developed at site.

    Excavation will be carried out for foundation of

    The excavated soil will be used in

    backfilling and other area development activities.

    No underground work including mining/ tunneling is

    required except excavation of earth.

    is required.

    required.

    is required.

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    1.13 Production and manufacturing processes?

    1.14 Facilities for storage of goods or materials?

    1.15 Facilities for treatment or disposal of solid

    waste or liquid effluents?

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Production and manufacturing processes? No

    No production/ manufacturing process

    the proposed project is a

    storage of goods or materials?

    Yes

    Raw material will be stored at site in a covered area.

    Cement will be separately stored under cover in

    bales. Sand will be stacked neatly under tarpaulin

    cover. Bricks and steel will be laid in open.

    treatment or disposal of solid

    Yes

    Solid Waste:

    The solid waste generated from the project will be in

    the form of:

    Domestic Waste:

    Approximately 9520 kg/day

    estimated to be generated from the project

    this will be collected from designated locations and

    segregated into inorganic and organic wastes.

    inorganic non-biodegradable wastes will be sold to

    authorize vendors for recycling and the

    biodegradable wastes will be disposed according to

    MSW (Management& H

    Hazardous Waste

    No hazardous waste will be produced from project

    activities.

    Liquid effluents

    During construction phase, sewage will be treated

    through septic tank. The waste

    phase will be treated up to tertiary level in a STP

    having the capacity of

    sewage will be reused for flushing

    development. The rest of the treated water will be

    given to the nearby construction

    purpose only. Dewatered/

    from the STP plant will be used as manure for

    landscape development & tree plantation

    FORM-1

    Page 5

    manufacturing process is involved as

    the proposed project is a residential plotted colony.

    Raw material will be stored at site in a covered area.

    Cement will be separately stored under cover in

    bales. Sand will be stacked neatly under tarpaulin

    cover. Bricks and steel will be laid in open.

    The solid waste generated from the project will be in

    kg/day domestic solid waste is

    estimated to be generated from the project activity;

    this will be collected from designated locations and

    gregated into inorganic and organic wastes. The

    biodegradable wastes will be sold to

    vendors for recycling and the

    astes will be disposed according to

    & Handling) Rules, 2000.

    No hazardous waste will be produced from project

    During construction phase, sewage will be treated

    . The wastewater in operation

    phase will be treated up to tertiary level in a STP

    having the capacity of 1926 KLD and the treated

    age will be reused for flushing and landscape

    . The rest of the treated water will be

    onstruction site for construction

    Dewatered/ dried sludge generated

    from the STP plant will be used as manure for

    scape development & tree plantation.

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    1.16 Facilities for long term housing of operational

    workers?

    1.17 New road, rail or sea traffic during

    construction of operation?

    1.18 New road, rail, air waterborne or other

    transport infrastructure including new or

    altered routes and stations, ports, airport etc?

    1.19 Closure or diversion of existing transport

    routes or infrastructure leading to changes in

    traffic movements?

    1.20 New or diverted transmission lines or

    pipelines?

    1.21 Impoundment, damming, culverting,

    realignment or other changes to the hydrology

    of watercourses or aquifers?

    1.22 Stream crossings?

    1.23 Abstraction or transfers of water from ground

    or surface waters?

    1.24 Changes in water bodies or the land surface

    affecting drainage or run-off?

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Facilities for long term housing of operational

    No

    Local labour will be hired from nearby areas during

    construction phase. So, t

    permanent facilities for long

    operational workers.

    New road, rail or sea traffic during

    No

    The site has good connectivity to

    roads, paths will be developed for vehicular

    movements of construction material during

    construction phase whereas internal tracks and paths

    will be developed for traffic circulation (to avoid any

    congestion) during operational phase.

    New road, rail, air waterborne or other

    transport infrastructure including new or

    altered routes and stations, ports, airport etc?

    No

    The site is well connected through the road network.

    The nearest highway is

    approximately 2.7 km towards

    Closure or diversion of existing transport

    routes or infrastructure leading to changes in No

    Since the site is well connected to NH

    high traffic density; not required the

    closure of existing traffic routes.

    New or diverted transmission lines or No

    There will not be any new/

    or pipeline around the proposed project

    Impoundment, damming, culverting,

    other changes to the hydrology No

    No impoundment, damming,

    or other changes to the hydrology of surface

    watercourses is proposed.

    No There is no stream running across the site.

    Abstraction or transfers of water from ground No

    Total water requirement

    include 1066 KLD for fresh water requirement &

    KLD for recycled water requirement

    752 KLD will be used for flushing an

    be used for landscape development.

    construction phase, wa

    STP treated water. During operation

    will be supplied through

    Changes in water bodies or the land surface No

    Runoff will increase due to increased paved surface.

    However, increased runoff will be managed by well

    designed rainwater harvesting system and storm

    water management plan.

    FORM-1

    Page 6

    will be hired from nearby areas during

    construction phase. So, there will be no need to create

    permanent facilities for long-term housing of

    connectivity to NH-8. Only internal

    paths will be developed for vehicular

    movements of construction material during

    construction phase whereas internal tracks and paths

    will be developed for traffic circulation (to avoid any

    operational phase.

    The site is well connected through the road network.

    The nearest highway is NH-8 at a distance of

    km towards North-West.

    well connected to NH-8 which has

    ; not required the diversion or

    closure of existing traffic routes.

    There will not be any new/ diverted transmission line

    ne around the proposed project.

    No impoundment, damming, culverting, realignment

    or other changes to the hydrology of surface

    watercourses is proposed.

    no stream running across the site.

    Total water requirement will be 1920 KLD, which

    KLD for fresh water requirement & 854

    KLD for recycled water requirement out of which

    752 KLD will be used for flushing and 102 KLD will

    be used for landscape development. During

    construction phase, water demand will be fulfilled by

    During operational phase, water

    will be supplied through HUDA.

    Runoff will increase due to increased paved surface.

    However, increased runoff will be managed by well-

    designed rainwater harvesting system and storm

    water management plan.

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    1.25 Transport of personnel or materials for

    construction, operation or decommissioning?

    1.26 Long-term dismantling or decommissioning

    or restoration works?

    1.27 Ongoing activity during decommissioning

    which could have an impact on the

    environment?

    1.28 Influx of people to an area in either temporarily

    or permanently?

    1.29 Introduction of alien species?

    1.30 Loss of native species or genetic diversity?

    2. Use of Natural resources for construction or operation of the Project (such as land, water,

    especially any resources which are non

    S.No. Information/Checklist confirmation

    2.1 Land especially undeveloped or agricultural

    land (ha)

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Transport of personnel or materials for

    operation or decommissioning? Yes

    Transport of personne

    and operation phase are envisaged.

    space within the project site for loading and

    unloading of materials will be provided.

    Adequate parking space will be provided during

    operational phase of the project

    the premises.

    term dismantling or decommissioning No

    No Long term dismantling or decommissioning or

    restoration work will be involved.

    Ongoing activity during decommissioning

    which could have an impact on the No

    No decommissioning activity is

    impact on the environment by the proposed project

    supposed.

    in either temporarily

    No

    Local laborers from nearby area will be employed

    during the construction phase. In the operation phase,

    most of the expected occupants will be from the

    surrounding areas. Hence, the project will lead to a

    redistribution of occupants within the city. Thus, no

    significant influx of people is envisaged.

    No

    The landscaping will be carried out with mainly local

    species with a few ornamental varieties of flora that

    are well suited to the local conditions

    Loss of native species or genetic diversity? No There will be no significant impact on the native

    species or genetic diversity.

    Use of Natural resources for construction or operation of the Project (such as land, water,

    especially any resources which are non-renewable or in short supply):

    Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    especially undeveloped or agricultural No

    Proposed site is having wild grasses which shall be

    cleared and residential plotted

    constructed on vacant land

    plant species shall also

    project site.

    FORM-1

    Page 7

    el/ material during construction

    are envisaged. Adequate parking

    space within the project site for loading and

    unloading of materials will be provided.

    Adequate parking space will be provided during

    operational phase of the project for the residents of

    No Long term dismantling or decommissioning or

    be involved.

    decommissioning activity is involved, Hence, No

    impact on the environment by the proposed project is

    Local laborers from nearby area will be employed

    during the construction phase. In the operation phase,

    most of the expected occupants will be from the

    surrounding areas. Hence, the project will lead to a

    ution of occupants within the city. Thus, no

    significant influx of people is envisaged.

    The landscaping will be carried out with mainly local

    species with a few ornamental varieties of flora that

    the local conditions.

    There will be no significant impact on the native

    species or genetic diversity.

    Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy,

    Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    Proposed site is having wild grasses which shall be

    residential plotted colony shall be

    vacant land. Local and indigenous

    also be planted at proposed

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    2.2 Water (expected source & competing users)

    unit: KLD

    2.3 Minerals (MT)

    2.4 Construction material stone, aggregates,

    and/soil (expected source MT)

    2.5 Forests and timber (source MT)

    2.6

    Energy including electricity and fuels (source,

    competing users) Unit: fuel (MT), energy

    (MW)

    2.7 Any other natural resources (use appropriate

    standard units)

    3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human

    health or the environment or raise concerns about actual or perceived risks to human health.

    S.No.

    Information/Checklist confirmation

    3.1 Use of substance or materials, which are

    hazardous (as per MSIHC rules) to human

    health or the environment (flora, fauna

    and water supplies)

    3.2 Changes in occurrence of disease or affect

    disease vectors (e.g. insect or water borne

    diseases)

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Water (expected source & competing users) Yes

    Total water requirement for the proposed will be

    1920 KLD which include

    requirement and 854

    water requirement.

    Yes Minerals such as sand and aggregates will be

    required during the construction phase.

    stone, aggregates,

    Yes

    All materials for construction will be arranged

    through selected suppliers.

    Yes

    All material forests and timber will be provided by

    selected suppliers. However

    used to minimize the use of timber.

    Energy including electricity and fuels (source,

    fuel (MT), energy Yes The total demand load is estimated

    Power will be supplied by

    Any other natural resources (use appropriate No

    No other natural resource wil

    project except the mentioned

    Use, storage, transport, handling or production of substances or materials, which could be harmful to human

    health or the environment or raise concerns about actual or perceived risks to human health.

    Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    Use of substance or materials, which are

    rules) to human

    health or the environment (flora, fauna

    Yes The proposed project is a

    plotted colony project. H

    chemicals (as per MSIHC

    occurrence of disease or affect

    disease vectors (e.g. insect or water borne

    No Suitable drainage and waste management measures

    (with frequent spray of insecticides etc.) will be

    adopted in both the construction and operational

    phase such that there will be no stagnation of water

    or accumulation of waste. This will effectively

    restrict the reproduction and growth of disease

    vectors.

    FORM-1

    Page 8

    Total water requirement for the proposed will be

    KLD which include 1066 KLD for Fresh water

    854 KLD for recycled/treated

    Minerals such as sand and aggregates will be

    required during the construction phase.

    All materials for construction will be arranged

    suppliers.

    All material forests and timber will be provided by

    selected suppliers. However, steel frames etc shall be

    used to minimize the use of timber.

    total demand load is estimated 11500 KVA.

    Power will be supplied by DHBVN.

    No other natural resource will be involved in the

    t the mentioned above.

    Use, storage, transport, handling or production of substances or materials, which could be harmful to human

    health or the environment or raise concerns about actual or perceived risks to human health.

    Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    The proposed project is a development of residential

    project. Hence, storage of hazardous

    s per MSIHC Rules) is not expected.

    Suitable drainage and waste management measures

    (with frequent spray of insecticides etc.) will be

    adopted in both the construction and operational

    phase such that there will be no stagnation of water

    or accumulation of waste. This will effectively

    t the reproduction and growth of disease

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    3.3 Affect the welfare of people e.g. by

    changing living conditions?

    3.4 Vulnerable groups of people who could be

    affected by the project e.g. hospital

    patients, children, the elderly etc

    3.5 Any other causes

    4. Production of solid wastes during construction or operatio

    S.No. Information/Checklist confirmation

    4.1 Spoil, overburden or mine wastes

    4.2 Municipal waste (domestic and or

    commercial wastes)

    4.3 Hazardous wastes (as per Hazardous

    Waste Management Rules)

    4.4 Other industrial process wastes

    4.5 Surplus product

    4.6 Sewage sludge or other sludge from

    effluent treatment

    4.7 Construction or demolition wastes

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Affect the welfare of people e.g. by Yes Socio-economic standard of people will improve due

    to increased employment opportunities provided by

    this project. This will lead

    will also set a standard for future developments in

    the area.

    Vulnerable groups of people who could be

    affected by the project e.g. hospital

    ents, children, the elderly etc

    No Impacts of this type are not expected.

    No No other causes are involved except the mentioned

    above.

    Production of solid wastes during construction or operation or decommissioning (MT/month)

    confirmation Yes/No Details thereof (with approximate

    rates, wherever possible) with source of

    information data

    Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be

    generated.

    estic and or Yes The total municipal solid waste to be generated is

    approximately 9520 kg/day

    biodegradable wastes will be sold to

    vendors for recycling and the biodegradable

    will be disposed according to

    Handling) Rules, 2000.

    Hazardous wastes (as per Hazardous NO No Hazardous Waste is been expected from the

    proposed project.

    No Not applicable as this is a

    No Not applicable as this is a

    Sewage sludge or other sludge from Yes Sludge generated from the STP plant will be dried and

    later will be used as manure for

    development.

    demolition wastes Yes The construction waste will consist of excess earth

    and construction debris along with cement bags, steel

    in bits and pieces, insulating and packaging materials

    etc.

    FORM-1

    Page 9

    economic standard of people will improve due

    to increased employment opportunities provided by

    this project. This will lead to better quality of life and

    will also set a standard for future developments in

    Impacts of this type are not expected.

    No other causes are involved except the mentioned

    n or decommissioning (MT/month)

    Details thereof (with approximate quantities/

    rates, wherever possible) with source of

    No such spoil, overburden or mine wastes will be

    solid waste to be generated is

    kg/day. The inorganic non-

    biodegradable wastes will be sold to authorized

    vendors for recycling and the biodegradable wastes

    will be disposed according to MSW (Management &

    No Hazardous Waste is been expected from the

    as this is a residential plotted colony.

    Not applicable as this is a residential plotted colony.

    Sludge generated from the STP plant will be dried and

    later will be used as manure for landscape

    The construction waste will consist of excess earth

    and construction debris along with cement bags, steel

    in bits and pieces, insulating and packaging materials

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    4.8 Redundant machinery or equipment

    4.9 Contaminated soils or other materials

    4.10 Agricultural wastes

    4.11 Other solid wastes

    5. Release for pollutants or any hazardous, toxic or

    S.No. Information/Checklist confirmation

    5.1 Emissions from combustion of fossil fuels

    from stationary or mobile sources

    5.2 Emissions from production processes

    5.3 Emissions from materials

    including storage or transport

    5.4 Emissions from construction activities

    including plant and equipment

    5.5 Dust or odors from handling of materials

    including construction materials,

    and waste

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Recyclable waste construction materials will be sold

    to authorized recyclers. Unusable and excess

    construction debris will be disposed at designated

    places in tune with the local norms.

    Redundant machinery or equipment No Redundant machinery will not be generated.

    Contaminated soils or other materials No Contaminated soils or other materials will not be

    generated.

    No No agricultural wastes will be generated.

    No No other solid waste would be generated.

    Release for pollutants or any hazardous, toxic or noxious substances to air (Kg/hr).

    Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    Emissions from combustion of fossil fuels

    mobile sources

    Yes The project does not envisage any major air

    pollution sources except

    generated from the vehicular

    check by regular check up of vehicles

    plants will be used in tree plantation to reduce the

    impact of pollution.

    Emissions from production processes No No production processes

    residential plotted colony project.

    be no such emissions.

    Emissions from materials handling Yes Small quantities of fugitive emissions are envisaged

    during transport and handling of construction

    materials. Such emissions will be temporary and

    controlled by the use of sprinkling and other viable

    techniques like covering of loose material.

    Emissions from construction activities

    Yes This will be restricted to the construction phase and

    the construction site only.

    Dust or odors from handling of materials

    construction materials, sewage

    Yes Dust is anticipated during loading and unloading of

    construction material and excavation of upper earth

    surface. These will however be temporary in nature,

    which will be controlled by providing water

    FORM-1

    Page 10

    Recyclable waste construction materials will be sold

    recyclers. Unusable and excess

    construction debris will be disposed at designated

    places in tune with the local norms.

    Redundant machinery will not be generated.

    Contaminated soils or other materials will not be

    wastes will be generated.

    No other solid waste would be generated.

    Details thereof (with approximate quantities/ rates,

    wherever possible) with source of information data

    The project does not envisage any major air

    pollution sources except vehicles. The pollution

    generated from the vehicular movement will be

    check by regular check up of vehicles. Local native

    in tree plantation to reduce the

    No production processes is involved as it is a

    colony project. Hence, there will

    Small quantities of fugitive emissions are envisaged

    during transport and handling of construction

    materials. Such emissions will be temporary and

    controlled by the use of sprinkling and other viable

    ike covering of loose material.

    This will be restricted to the construction phase and

    the construction site only.

    Dust is anticipated during loading and unloading of

    construction material and excavation of upper earth

    surface. These will however be temporary in nature,

    which will be controlled by providing water

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    5.6 Emissions from incineration of waste

    5.7 Emissions from burning of waste

    (e.g. slash materials, construction debris)

    5.8 Emissions from any other sources

    6. Generation of Noise and Vibration, and Emissions of Light and Heat:

    S.No. Information/Checklist confirmation

    6.1

    From operation of equipment e.g. engines,

    ventilation plant, crushers

    6.2

    From industrial or similar processes

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    sprinklers. Tarpaulin cover will be provided on

    stored loose materials to reduce the dust emission.

    Emissions from incineration of wastes No Not applicable. There will not be any incineration of

    waste is proposed.

    Emissions from burning of waste in open air

    (e.g. slash materials, construction debris)

    No Open burning of biomass/

    prohibited on site as this is a construction of

    residential project.

    Emissions from any other sources No Not Applicable

    and Vibration, and Emissions of Light and Heat:

    Information/Checklist confirmation Yes/No

    Details thereof (with approximate quantities/

    rates, wherever possible) with source of

    information data

    From operation of equipment e.g. engines,

    Yes

    The machinery to be used for construction will be

    of high standard and will adhere to international

    standard. These standards itself take care of noise

    control/vibration control and air emission

    Hence, insignificant impacts due to construction

    machinery are envisaged. Apart from this, the

    construction activities will be restricted to day time

    only. All the machinery will be of highest standard

    of reputed make and will comply with standard

    From industrial or similar processes No

    No industrial processes will be carried

    proposed project ex

    construction equipments/

    maintenance of machineries will reduce the

    generation of noise and vibration. All the workers

    will be equipped with

    phase.

    FORM-1

    Page 11

    Tarpaulin cover will be provided on

    stored loose materials to reduce the dust emission.

    t applicable. There will not be any incineration of

    pen burning of biomass/ other material will be

    as this is a construction of

    Details thereof (with approximate quantities/

    rates, wherever possible) with source of

    The machinery to be used for construction will be

    of high standard and will adhere to international

    standard. These standards itself take care of noise

    control/vibration control and air emission control.

    Hence, insignificant impacts due to construction

    machinery are envisaged. Apart from this, the

    construction activities will be restricted to day time

    All the machinery will be of highest standard

    of reputed make and will comply with standard.

    No industrial processes will be carried out in the

    proposed project except running of various

    nstruction equipments/ machinery. Proper

    maintenance of machineries will reduce the

    generation of noise and vibration. All the workers

    will be equipped with PPEs during construction

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    6.3

    From construction or demolition

    6.4 From blasting or piling

    6.5

    From construction or operational traffic

    6.6

    From lighting or cooling systems

    6.7

    From any other sources

    7. Risks of contamination of land or water from releases of pollutants into the ground of into sewers, surface waters,

    groundwater, coastal waters or the sea:

    S.No. Information/Checklist confirmation

    7.1 From handling, storage, use or spillage of

    hazardous materials

    7.2 From discharge of sewage or other effluents

    to water or the land (expected mode and

    place of discharge)

    7.3 By deposition of pollutants emitted to air

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    From construction or demolition Yes

    Due to various construction activities, there

    short-term noise impacts in the immediate vicinity

    of the project site. The construction activities will

    include the following noise generating activities:

    Concreting, mixing & operation of DG sets.

    Construction plant and heavy vehicle

    movement.

    No No blasting or mechanized piling will be done.

    From construction or operational traffic Yes

    Some noise will be generated from vehicular

    movement in the construction and operational

    phase but that will be mitigated with

    development.

    From lighting or cooling systems No

    No significant noise impact will result from

    lighting or cooling systems.

    No There will be no other sources for noise &

    vibration generation except the mentioned above.

    Risks of contamination of land or water from releases of pollutants into the ground of into sewers, surface waters,

    groundwater, coastal waters or the sea:

    Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/

    rates, wherever possible) with source of

    information data

    From handling, storage, use or spillage of No There will be no handling, storage, use or spillage

    of any type of hazardous material.

    From discharge of sewage or other effluents

    to water or the land (expected mode and

    No There will be no discharge of untreated sewage on

    land or into water bodies. Adequate treatment of

    sewage will be carried out

    capacity of 1926 KLD

    Recycled water will be re

    landscaping and rest of the recycled water

    given to nearby construction sites

    purpose only.

    By deposition of pollutants emitted to air No There will be no deposition of pollutants emitted

    FORM-1

    Page 12

    Due to various construction activities, there will be

    term noise impacts in the immediate vicinity

    of the project site. The construction activities will

    include the following noise generating activities:

    Concreting, mixing & operation of DG sets.

    Construction plant and heavy vehicle

    No blasting or mechanized piling will be done.

    Some noise will be generated from vehicular

    movement in the construction and operational

    phase but that will be mitigated with landscape

    No significant noise impact will result from

    systems.

    There will be no other sources for noise &

    vibration generation except the mentioned above.

    Risks of contamination of land or water from releases of pollutants into the ground of into sewers, surface waters,

    Details thereof (with approximate quantities/

    rates, wherever possible) with source of

    There will be no handling, storage, use or spillage

    of any type of hazardous material.

    There will be no discharge of untreated sewage on

    land or into water bodies. Adequate treatment of

    sewage will be carried out in STP having the

    1926 KLD within the project premises.

    will be re-used for flushing and

    of the recycled water will be

    nearby construction sites for construction

    There will be no deposition of pollutants emitted

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    into the land or into water

    7.4 From any other sources

    7.5 Is there a risk of long term build up of

    pollutants in the environment from these

    sources?

    8. Risk of accidents during construction or operation of the Project, which could affect human health or the

    environment

    S.No. Information/Checklist confirmation

    8.1 From explosions, spillages, fires etc from

    storage, handling, use or production of

    hazardous substances

    8.2 From any other causes

    8.3 Could the project be affected by natural

    disasters causing environmental damage

    (e.g. floods, earthquakes, landslides,

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    to air into the land or into water by any source.

    No No other sources are involved except the

    mentioned above.

    Is there a risk of long term build up of

    pollutants in the environment from these No

    There will be no such

    Risk of accidents during construction or operation of the Project, which could affect human health or the

    Information/Checklist confirmation Yes/No Details thereof (with approximate

    quantities/ rates, wherever possible) with

    source of information data

    From explosions, spillages, fires etc from

    storage, handling, use or production of

    Yes This is a residential project and does not involve

    major hazardous construction activity. Hence

    chances of explosions, spillages, fires etc. are

    minimal.

    During construction, suitable personal protective

    equipment will be provided to all construction

    workers as required under

    norms. Awareness & Training about safety norms

    will be provided to all the supervisor and

    construction workers involved in construction

    activities.

    To deal with any fire related accident, fire fighting

    facility of single handed hydrant

    reel, and portable fire extinguisher shall be

    provided.

    No No other causes are involved except the mentioned

    above.

    Could the project be affected by natural

    disasters causing environmental damage

    (e.g. floods, earthquakes, landslides,

    No The project falls under seismic active Zone IV

    according to the Indian Standard Seismic Zoning

    Map.

    FORM-1

    Page 13

    into the land or into water by any source.

    No other sources are involved except the

    There will be no such risk in the coming future.

    Risk of accidents during construction or operation of the Project, which could affect human health or the

    Details thereof (with approximate

    wherever possible) with

    source of information data

    project and does not involve

    major hazardous construction activity. Hence

    chances of explosions, spillages, fires etc. are

    During construction, suitable personal protective

    equipment will be provided to all construction

    workers as required under the health & safety

    norms. Awareness & Training about safety norms

    will be provided to all the supervisor and

    construction workers involved in construction

    To deal with any fire related accident, fire fighting

    facility of single handed hydrant valve, long hose

    reel, and portable fire extinguisher shall be

    No other causes are involved except the mentioned

    The project falls under seismic active Zone IV

    according to the Indian Standard Seismic Zoning

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    cloudburst etc)?

    9. Factors which should be considered (such as

    effects or the potential for cumulative impacts with other existing or planned activities in the locality.

    S.No. Information/Checklist confirmation

    9.1 Lead to development of supporting

    facilities, ancillary development or

    development stimulated by the project

    which could have impact on the

    environment e.g.

    Supporting infrastructure

    (roads, power supply, waster

    or wastewater treatment, etc.)

    housing development

    extractive industries

    supply industries

    other

    9.2 Lead to after-use of the site, which could

    have an impact on the environment

    9.3 Set a precedent for later developments

    9.4 Have cumulative effects due to proximity

    to other existing or planned projects with

    similar effects

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    Suitable seismic coefficient will be adopted in

    horizontal and vertical direction respectively,

    while designing the structure.

    There is no possibility of flood as per records

    available on the proposed project site.

    Factors which should be considered (such as consequential development) which could lead to environmental

    effects or the potential for cumulative impacts with other existing or planned activities in the locality.

    Information/Checklist confirmation Yes/No Details thereof (with approximate qua

    rates, wherever possible) with source of

    information data

    Lead to development of supporting

    facilities, ancillary development or

    stimulated by the project

    which could have impact on the

    Supporting infrastructure

    (roads, power supply, waster

    or wastewater treatment, etc.)

    housing development

    Yes

    Yes

    Yes

    No

    No

    No

    The proposed project is for

    lead to development of supporting services and

    infrastructure in and around the area.

    The project will have positive impact on the

    ancillary infrastructure like road, markets, public

    health, amenities, conveyance facilities etc.

    The project is proposed

    residential plotted colony

    Not Applicable

    Not Applicable

    Not Applicable

    use of the site, which could

    have an impact on the environment No Not Anticipated

    developments No Not Applicable

    Have cumulative effects due to proximity

    to other existing or planned projects with No Not Applicable

    FORM-1

    Page 14

    coefficient will be adopted in

    horizontal and vertical direction respectively,

    while designing the structure.

    There is no possibility of flood as per records

    available on the proposed project site.

    consequential development) which could lead to environmental

    effects or the potential for cumulative impacts with other existing or planned activities in the locality.

    Details thereof (with approximate quantities/

    rates, wherever possible) with source of

    The proposed project is for residential use; it may

    lead to development of supporting services and

    infrastructure in and around the area.

    The project will have positive impact on the

    ancillary infrastructure like road, markets, public

    health, amenities, conveyance facilities etc.

    The project is proposed for the development of

    olony only.

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    (III) ENVIRONMENTAL SENSITIVITY

    S.No. Information/Checklist confirmation

    1. Areas protected under international

    conventions, national or local legislation

    for their ecological, landscape, cultural or

    other related value.

    2. Areas which are important or sensitive for

    ecological reasons

    watercourses or other water bodies, coastal

    zone, biospheres, mountains & forests

    3. Areas used by protected, important or

    sensitive species of flora or fauna for

    breeding, nesting, foraging, resting, over

    wintering, migration

    4. Inland, coastal, marine or underground

    waters.

    5. State, National boundaries

    6. Routes or facilities used by the public for

    access to recreation or other tourist,

    pilgrim areas.

    7. Defense installations

    8. Densely populated or built-up area

    9. Areas occupied by sensitive manmade land

    uses (hospitals, schools, places of worship,

    community facilities)

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    ENVIRONMENTAL SENSITIVITY

    Information/Checklist confirmation Name/Identity

    Aerial distance

    Proposed project location

    Areas protected under international

    conventions, national or local legislation

    for their ecological, landscape, cultural or Not Applicable

    There is no area under

    international

    or local legislation for their

    ecological, landscape, cultural or

    other related value.

    Areas which are important or sensitive for

    Wetlands,

    watercourses or other water bodies, coastal

    mountains & forests

    Not Applicable

    There is no area

    important or sensitive for

    ecological reasons.

    Areas used by protected, important or

    sensitive species of flora or fauna for

    breeding, nesting, foraging, resting, over

    Not Applicable

    There is

    species of flo

    the study area.

    Inland, coastal, marine or underground Not Applicable Not Applicable

    Not Applicable

    No State or International

    falls within the 15 km radius of the

    project site.

    Routes or facilities used by the public for

    access to recreation or other tourist,

    NH-8

    Approx

    Not Applicable Not Applicable

    up area Manesar Village

    Approximately

    project site in

    Areas occupied by sensitive manmade land

    uses (hospitals, schools, places of worship,

    S.

    No. Particulars Distance

    Hospitals

    1. Yashlok Medical

    Center 2.5 km

    FORM-1

    Page 15

    Aerial distance (within 15km.)

    Proposed project location

    boundary

    There is no area under

    international conventions, national

    or local legislation for their

    ecological, landscape, cultural or

    other related value.

    There is no area which is

    important or sensitive for

    ecological reasons.

    is no ecologically sensitive

    species of flora or fauna found in

    the study area.

    Not Applicable

    No State or International Boundary

    falls within the 15 km radius of the

    project site.

    Approx. 2.7 km in NW direction

    Applicable

    Approximately 3.6 km from

    project site in SE direction

    Distance Direction

    km NW

  • RESIDENTIAL PLOTTED COLONY M/S REVITAL REALITY PVT. LTD. VILLAGE- NAURANGPUR, SECTOR-

    DISTRICT- GURGAON, HARYANA

    Prepared by: Vardan EnviroNet, Gurgaon

    10. Areas containing important, high quality or

    scarce resources (ground water resources,

    surface resources, forestry, agriculture,

    fisheries, tourism, minerals)

    11. Areas already subjected to pollution or

    environmental damage. (Those where

    existing legal environmental standards are

    exceeded)

    12. Areas susceptible to natural hazard which

    could cause the project to present

    environmental problems (earthquakes,

    subsidence, landslides, erosion, flooding or

    extreme or adverse climatic conditions)

    - 78 & 79,

    Prepared by: Vardan EnviroNet, Gurgaon

    2. Life Care Hospital 3.6 km

    Temples

    1. Prachin Temple 2.2 km

    2. Siddhartha Teerth

    Jain Temple 2.4 km

    Banks

    1. Bank of Baroda 1.5 km

    2. ICICI Bank limited 3.0 km

    Areas containing important, high quality or

    scarce resources (ground water resources,

    surface resources, forestry, agriculture, Not Applicable

    Ground

    study area are depleting at very

    fast rate and

    resources.

    Areas already subjected to pollution or

    environmental damage. (Those where

    existing legal environmental standards are

    Not Applicable

    There is

    to pollution or environmental

    damage. All parameters of Air,

    Water and Noise etc. will be

    maintained within permissible

    limit specified by SPCB/

    proper mitigation measures.

    hazard which

    could cause the project to present

    environmental problems (earthquakes,

    subsidence, landslides, erosion, flooding or

    extreme or adverse climatic conditions)

    Not Applicable

    The site falls under the zone IV as

    per the Seismic Zone Map of India.

    There is no possibility of flood as

    per records available on the

    proposed project site

    FORM-1

    Page 16

    km SW

    km NE

    km NW

    km SW

    km SW

    Ground-water resources in the

    study area are depleting at very

    fast rate and declared as scarce

    resources.

    There is no area which is subjected

    to pollution or environmental

    damage. All parameters of Air,

    Water and Noise etc. will be

    maintained within permissible

    limit specified by SPCB/ CPCB with

    proper mitigation measures.

    The site falls under the zone IV as

    per the Seismic Zone Map of India.

    There is no possibility of flood as

    per records available on the

    proposed project site.

  • RESIDENTIAL PLOTTED COLONY M/S PARSVNATH DEVELOPERS LIMITED VILLAGE- SOHNA, SECTOR- 2,

    DISTRICT- GURGAON, HARYANA FORM 1A

    Prepared by: Vardan EnviroNet, Gurgaon Page 17

    CHECK LIST OF ENVIRONMENTAL IMPACTS

    (Project proponents are required to provide full information and wherever necessary attach

    explanatory notes with the Form and submit along with proposed Environmental Management

    Plan & Monitoring Programmed).

    SECTION 1- LAND ENVIRONMENT:

    (Attach panoramic view of the project site and the vicinity)

    1.1 Will the existing land use get significantly altered from the project that is consistent with

    the surroundings? (Land use must conform to the approved Master Plan/Development Plan of

    the area. Change of land use, if any and the statutory approval from the competent authority

    are submitted). Attach Maps of (i) site location, (ii) surrounding features of the site (within 500

    meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available

    attach only conceptual plans.

    No

    The project site is barren land. It is anticipated that the construction activities of the project will not

    have an adverse effect on the land use activities in the project area. The site is earmarked for

    residential development as per the Gurgaon-Manesar Master Plan - 2031. The tree plantation and

    landscape development will enhance the visual aesthetics of the area.

    Location Map, Map showing surrounding features of the site within 500 m and Contour Map

    indicating levels and contours are enclosed in the report.

    CONNECTIVITY

    S. No. Detail Distance Direction 1. Nearest Highway (NH-8) 2.7 Km North-West 2. Garhi Harsaru Jundction Railway Station 10 Km North-West 3. Indira Gandhi National Airport (IGI) 25 Km North-East

    1.2 List out all the major project requirements in terms of the land area, built up area,

    water consumption, power requirement, connectivity, community facilities, parking needs etc.

  • RESIDENTIAL PLOTTED COLONY M/S PARSVNATH DEVELOPERS LIMITED VILLAGE- SOHNA, SECTOR- 2,

    DISTRICT- GURGAON, HARYANA FORM 1A

    Prepared by: Vardan EnviroNet, Gurgaon Page 18

    LAND REQUIREMENT Table 1: Area Statement

    S. No. Particulars Area ( m2)

    1 Project Name Residential plotted colony M/s Revital Reality Pvt. Ltd.

    2 Activity in the complex

    Residential Apartments, EWS Apartments, Commercial Area, Nursing Homes, Nursery School, Primary School, Clinic and Beauty Parlour

    3 Total Plot Area 415612.154 m2 (102.70 Acres)

    4 Net Plot Area 3, 77, 805.80 m2 (93.3583 Acres)

    5 Ground Coverage Detail 107292.3405 m2

    6 FAR Detail 2, 99, 157.422 m2

    7 Built-up Area Detail 443997.81 m2

    8 No. of Units 793 plots a Residential Units 435 b NPNL Units 199

    c EWS Units 159

    9 Surface Parking 324 ECS Basement Parking 420 ECS (Basement-1, Basement-2)

    10 Power Requirement & Sources 11500 KVA Source: Dakshin Haryana Bijli Vitran Nigam (DHBVN)

    11 No. of DG Sets 2 Nos. of DG Sets having Total Capacity of 630 KVA (1 x 250 KVA + 1 x 380 KVA)

    12 Water requirement & Sources

    Total Water Requirement:1920 KLD Fresh Water Requirement: 1066 KLD Treated/ Recycled Water Requirement: 854 KLD Source: HUDA

  • RESIDENTIAL PLOTTED COLONY M/S PARSVNATH DEVELOPERS LIMITED VILLAGE- SOHNA, SECTOR- 2,

    DISTRICT- GURGAON, HARYANA FORM 1A

    Prepared by: Vardan EnviroNet, Gurgaon Page 19

    13 Sewage Treatment & Disposal

    STP capacity :1926 KLD Sewage discharge: Total 854 KLD of water will be obtained after the recycling of wastewater out of which 752 KLD shall be utilized for the purpose of flushing, 102 KLD for landscape development and 591 KLD shall be supply to nearby construction sites for construction purpose only.

    14 Estimated Population Total: 25633 Persons

    15 Proposed Green Area @ 24.33 % 101247.36 m2

    16 Cost of the project Rs. 1134 Crores (Approx.) *FAR = Floor Area Ratio

    1.3 What are the likely impacts of the activity on the existing facilities adjacent to the site?

    (Such as open spaces, community facilities, details of the existing land use and disturbance to

    the local ecology).

    The project being a well planned activity will result in organized open spaces and green areas. About

    101247.36 m2 of the area is earmarked for landscaping. The project will have an overall positive

    impact on the existing land use and will not cause any disturbance to the local ecology. Hence,

    proposed activity shall have no impact on surroundings.

    1.4 Will there be any significant land disturbance resulting in erosion, subsidence &

    instability? (Detail of soil type slope analysis, vulnerability to subsidence, seismicity etc may be

    given).

    There shall be no land disturbance resulting in erosion, subsidence and instability as it is a flat land.

    The project site falls under the zone IV i.e., High Damage Risk Zone (MSK-VIII) as per Earthquake

    Hazard Map of Haryana. The project will be earthquake resistant taking into account the latest

    provisions of Indian Standards Codes.

  • RESIDENTIAL PLOTTED COLONY M/S PARSVNATH DEVELOPERS LIMITED VILLAGE- SOHNA, SECTOR- 2,

    DISTRICT- GURGAON, HARYANA FORM 1A

    Prepared by: Vardan EnviroNet, Gurgaon Page 20

    Source: Maps of India

    Figure-2: Earthquake Hazard Map of Haryana showing Project Site

    1.5 Will the proposal involve alteration of natural drainage system? (Give details on a

    contour map showing the natural drainage near the project site).

    The project does not intersect any natural drainage route. No perennial or non-perennial drainage

    system is found to exist in the project area or being obstructed by the project. The surroundings

    comprise an urbanized stretch. Well planned storm water drainage has been designed to take care of

    internal storm water drainage. Thus, no impact on the natural drainage system is anticipated.

    1.6 What are the quantities of earthwork involved in the construction activity-cutting,

    filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill

    materials from outside the site etc?)

    The only excavation work is involved in the proposed project for establishing the pillar of Residential

    Plotted Colony. The filling works will be done by the excavated material and no extra material will be

    used. All the topsoil excavated from construction activities shall be stored separately and used in

    PROJECT SITE

  • RESIDENTIAL PLOTTED COLONY M/S PARSVNATH DEVELOPERS LIMITED VILLAGE- SOHNA, SECTOR- 2,

    DISTRICT- GURGAON, HARYANA FORM 1A

    Prepared by: Vardan EnviroNet, Gurgaon Page 21

    landscape development within the project site. Hence, the need for movement of soil to and from the

    site is not anticipated.

    1.7 Give details regarding water supply, waste handling etc. during the construction period.

    Water requirement during construction phase will be met from STP treated water.

    Waste handling during the construction phase shall be done by the site contractor whose

    responsibility lies with collection and storage of construction and demolition waste generated

    on the site. All construction wastes generated during construction will be used within the site

    itself for filling the floors, roads, aggregate for mortar etc. to the extent feasible. Remaining

    will be sent to the agency for proper disposal.

    1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and

    wetlands are getting modified from the activity).

    No. The site area is a flat land and the surroundings are characterized by an urbanized stretch. No low

    lying areas or wetlands are found in the vicinity of the project site.

    1.9 Whether construction debris & waste during construction cause health hazard? (Give

    quantities of various types of wastes generated during construction including the construction

    labor and the means of disposal).

    No significant health hazard is associated with the proposed construction.

    During construction period, source of fugitive dust generation will be material handling and

    vehicular movement. Impact due to fugitive dust emission is negligible as water sprinklers will be

    used to suppress fugitive dust emission as and when generate. However, the impacts will be

    confined to laborers/workers particularly with regard to occupational exposure. Proper Personal

    Protective Equipments will be provided to the workers working in the potential areas (e.g. masks,

    ear plugs etc.).

    Careful design, planning and good site management would minimize waste of materials such as

    concrete, mortars and cement grouts. Construction wastes will be segregated as much as possible at

    site itself to increase the feasibility of recycling concrete and masonry as filling material and steel

    pieces as saleable scrap. Litter disposal and collection points will be established around the work

    sites. Empty packaging materials, drums, glass, tin, paper, plastic, pet bottles, wood, thermocol and

    other packaging materials, etc will be disposed through recyclers. The construction spoils will be

    temporarily stored at designated dumpsite located inside the site premises. Later on these wastes

  • RESIDENTIAL PLOTTED COLONY M/S PARSVNATH DEVELOPERS LIMITED VILLAGE- SOHNA, SECTOR- 2,

    DISTRICT- GURGAON, HARYANA FORM 1A

    Prepared by: Vardan EnviroNet, Gurgaon Page 22

    will be used for land filling / leveling work within the site premises. An estimate of the average

    composition of waste generated from the onsite construction activities given in Table-2.

    Table-2: Waste Composition - During Construction Phase

    S. No. Constituents Percentage Composition (%) 1 Soil, Sand and Gravel 35.80 2 Brick and Masonry 30.66 3 Concrete 23.24 4 Metal 5.10 5 Bitumen 2.10 6 Wood 2.10 7 Other 1.00 Total 100.00

    Source: TIFAC Report Utilization of Waste from Construction Industry, 2001

    SECTION-2 WATER REQUIREMENT

    2.1 Give the total quantity of water requirement for the proposed project with the breakup of

    requirement for various uses, how will the water requirement met? State the sources &

    quantities and furnish a water balance statement.