Christopher KellyK1000740
Environmental Practice Report
![Page 2: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/2.jpg)
Storey Road
Gathering Room 1
Hall/AntiroomGathering Room 2
Kitchen
Lift
Plant Room
Bin/Service
Area
![Page 3: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/3.jpg)
N
Site Model Sun Path11:00 Morning Light
![Page 4: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/4.jpg)
Building Regulations
Part A Structure• Part B Fire Safety
• Part C Site Preparation• Part D Toxic substances
• Part E Resistance to the passage of sound• Part F Ventilation
• Part G Hygiene• Part H Drainage
• Part J Combustion appliances• Part K Protection from falling
• Part L Conservation of fuel and Power• Part M Access• Part N Glazing
• Part P Electrical safety
Code for Sustainable Homes
![Page 5: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/5.jpg)
S
Key:
T
Smoke Detector
Socket Outlet
One Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating Pipe
Electrical Wire
MA
B
M
FB
FAN
Power SupplyPS
Rain Water TankT
![Page 6: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/6.jpg)
Heating
![Page 7: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/7.jpg)
Ground Floor Underfloor Heating, Scale 1:100
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Building Regulations:Part L Conservation, Fuel and Power and Part B, Fire Safety
Hot-water System
Wet underfloor heating systems deliver their heat evenly across rooms improving the buildings thermal mass resulting in less sudden changes in temperature.
Underfloor heating uses lower tempertures warming from the ground upwards. This warms your feet and keeps your head cool. This maximises human comfort. A condensing combination boiler works efficiently
with these low temperatures. Double glassing will be used on the windows to reduce heat loss,
MA B
![Page 8: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/8.jpg)
TerraceW/C
Storage
W/C
Lift
First Floor Underfloor Heating, Scale 1:100
![Page 9: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/9.jpg)
Water Supply
![Page 10: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/10.jpg)
Gathering Room 2
Kitchen
Plant Room
Bin/Service Area
B
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Ground Floor Tap Water SupplyScale: 1:50
The thickness of the pipes will be 22mm at the boiler and reduce to 15mm at the taps.
![Page 11: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/11.jpg)
W/C
Storage
W/C
TerraceW/C
Storage
W/C
Lift
First Floor Tap Water SupplyScale 1:50
The toilets and sinks are placed back to back with a false wall for the services to run through. Reducing the need for more piping.
![Page 12: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/12.jpg)
TerraceW/C
Storage
W/C
Lift
Tap Water Supply SectionScale: 1:50
![Page 13: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/13.jpg)
TerraceW/C
Storage
W/C
Lift
Tap Cold Water Supply SectionScale: 1:50
![Page 14: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/14.jpg)
TerraceW/C
Storage
W/C
Lift
Tap Warm Water Supply SectionScale: 1:50
![Page 15: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/15.jpg)
Tap Water SupplyScale: 1:200
![Page 16: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/16.jpg)
Tap Water SupplyScale: 1:100
![Page 17: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/17.jpg)
Rain Water Collection and Re-use
![Page 18: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/18.jpg)
Gathering Room 2
Kitchen
Plant Room
Bin/Service Area
TP
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Re-used Rain WaterGround Floor
Scale: 1:50
This system uses collected rain water to flush the toilets, to reduce water usage. This helps meet the code for sustainable
Homes Requirements
The rain water is collected from the roof into a storage tank and pumped when needed into the toilets.
![Page 19: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/19.jpg)
W/C
Storage
W/C
T
P
TerraceW/C
Storage
W/C
Lift
Re-used Rain WaterFirst Floor
Scale: 1:50
![Page 20: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/20.jpg)
TerraceW/C
Storage
W/C
Lift
Re-used Rain WaterSection
Scale: 1:50
![Page 21: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/21.jpg)
TerraceW/C
Storage
W/C
Lift
Re-used Rain WaterSection
Scale: 1:50
![Page 22: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/22.jpg)
Drainage
![Page 23: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/23.jpg)
Gathering Room 2
Kitchen
Plant Room
Bin/Service Area
T
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Drainage Ground Floor PlanScale: 1:50
![Page 24: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/24.jpg)
W/C
Storage
W/C
TerraceW/C
Storage
W/C
Lift
Drainage First Floor PlanScale: 1:50
A single stack 150 mm diameter drainage system.
Part H - Drainage
The drainage pipes are all directed vertically down into the inspection chamber below ground level..
![Page 25: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/25.jpg)
TerraceW/C
Storage
W/C
Lift
Drainage SectionScale: 1:50
![Page 26: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/26.jpg)
TerraceW/C
Storage
W/C
Lift
Drainage SectionScale: 1:50
![Page 27: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/27.jpg)
Drainage SectionScale: 200
![Page 28: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/28.jpg)
Electricity
![Page 29: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/29.jpg)
TerraceW/C
Storage
W/C
Lift
Light, Plug Socket and Light Switch PositionsSection
Scale: 1:100
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
![Page 30: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/30.jpg)
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
FAN
Ground FloorPlug Socket Wiring
Scale: 1:100
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
Part P - Electrical Safety
As I am proposing a public building, a disabled lift is mandatory. This requires its own fuze box connected directly to the mains through the meter. There are four
more main circuits which go through a distribution board. These are lighting, ap-pliances, electric cooker and boiler.
All electrical wires will run through sleeves which create better access for mainte-nance and safety.
.
Lights20A
ElectricCooker30A
Boiler3A
Appliances30A
FB
Lights20A
ElectricCooker30A
Boiler3A
Appliances30A
![Page 31: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/31.jpg)
Gathering Room 2
Kitchen
Plant Room
Bin/Service Area
FAN
PS M FBGathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Ground FloorPlug Socket Wiring
Scale: 1:50
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
![Page 32: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/32.jpg)
TerraceW/C
Storage
W/C
Lift
FAN
FAN
First FloorPlug Socket Wiring
Scale: 1:100
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
![Page 33: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/33.jpg)
W/C
Storage
W/C
FAN
FAN
TerraceW/C
Storage
W/C
Lift
First FloorPlug Socket Wiring
Scale: 1:50
![Page 34: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/34.jpg)
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
FAN
Ground FloorLighting Wiring
Scale: 1:100
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
Discharge lamps will be used for the lighting.
![Page 35: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/35.jpg)
Gathering Room 2
Kitchen
Plant Room
Bin/Service Area
FAN
T
PS M FBGathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Ground FloorLighting Wiring
Scale: 1:50
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
![Page 36: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/36.jpg)
TerraceW/C
Storage
W/C
Lift
FAN
FAN
First FloorLighting Wiring
Scale: 1:100
S
Key:
T
Smoke DetectorSocket OutletOne Pole Switch
Condesing Combination Boiler
Manifold
Electricity Meter
Distribution Board
Control Valve
Ventillation Fan
Thermostat
Enclosed Luminaire
Hot Water Pipe
Cold Water Pipe
Waste Pipe
Heating PipeElectrical Wire
MA
B
M
FB
FAN
![Page 37: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/37.jpg)
W/C
Storage
W/C
FAN
FAN
TerraceW/C
Storage
W/C
Lift
First FloorLighting Wiring
Scale: 1:50
![Page 38: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/38.jpg)
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
F
PS M FB
Ground FloorAppliance Wiring
Scale: 1:100
![Page 39: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/39.jpg)
Ventilation
![Page 40: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/40.jpg)
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Ground FloorVentilation
Scale: 1:100
Part F - VentilationIt is required in a common space where people gather that 1/50 of the flooring has to have ac-
cess to rapid ventilation (window opening)
Some of the rapid ventilations openings in my proposal are above 1.75m which is above the re-quired height. During direct sunlight the temperature in the main gathering room would increase
as a result of the large windows. By opening the windows to allow circulation of air, the room can cool.
![Page 41: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/41.jpg)
Terrace W/C
Storage
W/C
Lift
First FloorVentilation
Scale: 1:100
![Page 42: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/42.jpg)
Fire
![Page 43: Enviromental Practice](https://reader035.fdocuments.us/reader035/viewer/2022062400/568c0e8a1a28ab955a90d4dc/html5/thumbnails/43.jpg)
Gathering Room 1
Hall/Antiroom
Gathering Room 2
Kitchen
Lift
Plant Room
Bin/Service Area
Ground Floor Fire Escape RoutesScale: 1:100
There are two exit routes out of the building in case of the event of a fire blocking one of the exits.