ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016...
Transcript of ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016...
![Page 1: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/1.jpg)
ANSONIA VILLAGE PWSOH1900012
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953744EP001
Facility Name: ANSONIA VILLAGE
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 2: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/2.jpg)
ANSONIA VILLAGE PWSOH1900012
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ANSONIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
LEAD - 1030 AND COPPER - 1022 Not Required
2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: ANSONIA, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 3: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/3.jpg)
ANSONIA VILLAGE PWSOH1900012
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: ANSONIA, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 4: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/4.jpg)
ARCANUM VILLAGE PWSOH1900112
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953745EP001
Facility Name: ARCANUM VILLAGE
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 5: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/5.jpg)
ARCANUM VILLAGE PWSOH1900112
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ARCANUM,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
LEAD - 1030 AND COPPER - 1022 Not Required
2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: ARCANUM,VILLAGE OF DISTRIBUTION208 SOUTH MAIN STREET (FIREHOUSE)
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 6: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/6.jpg)
ARCANUM VILLAGE PWSOH1900112
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: ARCANUM,VILLAGE OF DISTRIBUTION605 NORTH MAIN STREET (GROCERY)
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 7: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/7.jpg)
BRADFORD VILLAGE PWSOH1900212
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953746EP001
Facility Name: BRADFORD WTP
Effective Date: 07/15/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 8: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/8.jpg)
BRADFORD VILLAGE PWSOH1900212
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BRADFORD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
LEAD - 1030 AND COPPER - 1022 Not Required
ASBESTOS - 1094 Not Required
2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BRADFORD, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 9: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/9.jpg)
BRADFORD VILLAGE PWSOH1900212
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: BRADFORD, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 10: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/10.jpg)
GETTYSBURG VILLAGE PWSOH1900512
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953747EP001
Facility Name: GETTYSBURG VILLAGE
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 11: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/11.jpg)
GETTYSBURG VILLAGE PWSOH1900512
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
ASBESTOS - 1094 Not Required
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 3/8/2016 and 3/14/2016at SMP: DS2011 Sample(s) Required between 6/8/2016 and 6/14/2016at SMP: DS2011 Sample(s) Required between 9/8/2016 and 9/14/2016
![Page 12: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/12.jpg)
GETTYSBURG VILLAGE PWSOH1900512
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 12/8/2016 and 12/14/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 3/8/2016 and 3/14/2016at SMP: DS2021 Sample(s) Required between 6/8/2016 and 6/14/2016at SMP: DS2021 Sample(s) Required between 9/8/2016 and 9/14/2016at SMP: DS2021 Sample(s) Required between 12/8/2016 and 12/14/2016
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 13: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/13.jpg)
GREENVILLE CITY PWSOH1900714
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953749EP001
Facility Name: GREENVILLE WTP
Effective Date: 05/13/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
Sample(s) Required betweenINORGANICS 1 and1/1/2016 5/31/2016Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 1/31/2016Sample(s) Required between1 and2/1/2016 2/29/2016Sample(s) Required between1 and3/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 4/30/2016Sample(s) Required between1 and5/1/2016 5/31/2016Sample(s) Required between1 and6/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 7/31/2016Sample(s) Required between1 and8/1/2016 8/31/2016Sample(s) Required between1 and9/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 10/31/2016Sample(s) Required between1 and11/1/2016 11/30/2016Sample(s) Required between1 and12/1/2016 12/31/2016
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2016 4/30/2016Sample(s) Required between1 and5/1/2016 5/31/2016Sample(s) Required between1 and6/1/2016 6/30/2016
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2016 5/31/2016
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2016 1/31/2016Paired Sample Set Required between1 and2/1/2016 2/29/2016Paired Sample Set Required between1 and3/1/2016 3/31/2016Paired Sample Set Required between1 and4/1/2016 4/30/2016Paired Sample Set Required between1 and5/1/2016 5/31/2016Paired Sample Set Required between1 and6/1/2016 6/30/2016Paired Sample Set Required between1 and7/1/2016 7/31/2016Paired Sample Set Required between1 and8/1/2016 8/31/2016Paired Sample Set Required between1 and9/1/2016 9/30/2016Paired Sample Set Required between1 and10/1/2016 10/31/2016Paired Sample Set Required between1 and11/1/2016 11/30/2016Paired Sample Set Required between1 and12/1/2016 12/31/2016
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at thesame time the TOC sample is taken.
![Page 14: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/14.jpg)
GREENVILLE CITY PWSOH1900714
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953749EP001/LT2001
Facility Name: GREENVILLE WTP
Effective Date: 05/13/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
Sample Set Required WEEKLYstarting June 5
TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. Both arerequired every week from January 1 to December 31 (reduced monitoring available from November to April). A week is defined asSunday through Saturday. Samples must be analyzed at a lab accepted by Ohio EPA for microcystins analysis.
![Page 15: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/15.jpg)
GREENVILLE CITY PWSOH1900714
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953749LT2001
Facility Name: GREENVILLE WTP
Effective Date: 05/13/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 and6/5/2016 6/11/2016Sample(s) Required between1 and6/19/2016 6/25/2016Sample(s) Required between1 and7/3/2016 7/9/2016Sample(s) Required between1 and7/17/2016 7/23/2016Sample(s) Required between1 and7/31/2016 8/6/2016Sample(s) Required between1 and8/14/2016 8/20/2016Sample(s) Required between1 and8/28/2016 9/3/2016Sample(s) Required between1 and9/11/2016 9/17/2016Sample(s) Required between1 and9/25/2016 10/1/2016Sample(s) Required between1 and10/9/2016 10/15/2016Sample(s) Required between1 and10/23/2016 10/29/2016Sample(s) Required between1 and11/6/2016 11/12/2016Sample(s) Required between1 and11/20/2016 11/26/2016Sample(s) Required between1 and12/4/2016 12/10/2016Sample(s) Required between1 and12/18/2016 12/24/2016
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 and must be collectedat the same time as the raw total microcystins sample. SAMPLES MUST BE SHIPPED OVERNIGHT ON ICE ON THE DAY OFCOLLECTION AND ARRIVE AT OHIO EPA DIVISION OF ENVIRONMENTAL SERVICES BY NOON MONDAY THROUGH THURSDAYONLY!
Sample(s) Required betweenLT2 MONITORING 1 and1/4/2016 1/8/2016Sample(s) Required between1 and2/1/2016 2/5/2016Sample(s) Required between1 and3/7/2016 3/11/2016Sample(s) Required between1 and4/4/2016 4/8/2016Sample(s) Required between1 and5/2/2016 5/6/2016Sample(s) Required between1 and6/6/2016 6/10/2016Sample(s) Required between1 and7/4/2016 7/8/2016Sample(s) Required between1 and8/1/2016 8/5/2016Sample(s) Required between1 and9/5/2016 9/9/2016Sample(s) Required between1 and10/3/2016 10/7/2016Sample(s) Required between1 and11/7/2016 11/11/2016Sample(s) Required between1 and12/5/2016 12/9/2016
Monitor for: Cryptosporidium - 2078, E-coli count - 3014, Turbidity - 0100
Sample(s) Required betweenLT2 MATRIX SPIKE SAMPLE 1 and1/4/2016 1/8/2016
![Page 16: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/16.jpg)
GREENVILLE CITY PWSOH1900714
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: GREENVILLE, CITY OF DISTRIBUTION Facility Class: CLASS 1
30LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
15TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/201615 Sample(s) Required between 2/1/2016 and 2/29/201615 Sample(s) Required between 3/1/2016 and 3/31/201615 Sample(s) Required between 4/1/2016 and 4/30/201615 Sample(s) Required between 5/1/2016 and 5/31/201615 Sample(s) Required between 6/1/2016 and 6/30/201615 Sample(s) Required between 7/1/2016 and 7/31/201615 Sample(s) Required between 8/1/2016 and 8/31/201615 Sample(s) Required between 9/1/2016 and 9/30/201615 Sample(s) Required between 10/1/2016 and 10/31/201615 Sample(s) Required between 11/1/2016 and 11/30/201615 Sample(s) Required between 12/1/2016 and 12/31/2016
15TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/201615 Sample(s) Required between 2/1/2016 and 2/29/201615 Sample(s) Required between 3/1/2016 and 3/31/201615 Sample(s) Required between 4/1/2016 and 4/30/201615 Sample(s) Required between 5/1/2016 and 5/31/201615 Sample(s) Required between 6/1/2016 and 6/30/201615 Sample(s) Required between 7/1/2016 and 7/31/201615 Sample(s) Required between 8/1/2016 and 8/31/201615 Sample(s) Required between 9/1/2016 and 9/30/201615 Sample(s) Required between 10/1/2016 and 10/31/201615 Sample(s) Required between 11/1/2016 and 11/30/201615 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: GREENVILLE, CITY OF DISTRIBUTION601 WAGNER STREET (EDISON)
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2011 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2011 Sample(s) Required between 8/8/2016 and 8/14/2016
![Page 17: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/17.jpg)
GREENVILLE CITY PWSOH1900714
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: GREENVILLE, CITY OF DISTRIBUTION601 WAGNER STREET (EDISON)
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 11/8/2016 and 11/14/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: GREENVILLE, CITY OF DISTRIBUTION1348 SEBRING WARNER ROAD
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2021 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2021 Sample(s) Required between 8/8/2016 and 8/14/2016at SMP: DS2021 Sample(s) Required between 11/8/2016 and 11/14/2016
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS203
Facility Name: GREENVILLE, CITY OF DISTRIBUTION5105 COUNTY HOME
Facility Class: CLASS 1
at SMP: DS2031DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2031 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2031 Sample(s) Required between 8/8/2016 and 8/14/2016at SMP: DS2031 Sample(s) Required between 11/8/2016 and 11/14/2016
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS204
Facility Name: GREENVILLE, CITY OF DISTRIBUTION1425 KITCHEN-AID WAY
Facility Class: CLASS 1
at SMP: DS2041DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2041 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2041 Sample(s) Required between 8/8/2016 and 8/14/2016at SMP: DS2041 Sample(s) Required between 11/8/2016 and 11/14/2016
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 18: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/18.jpg)
A AND R UNION CITY PARK MHP PWSOH1900812
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953750EP001
Facility Name: A AND R UNION CITY PARK MHP
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 19: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/19.jpg)
A AND R UNION CITY PARK MHP PWSOH1900812
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: A AND R UNION CITY PARK MHP DISTRIBUTION
5LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: A AND R UNION CITY PARK MHP DISTRIBUTIONADDRESS NOT KNOWN
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 20: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/20.jpg)
NEW MADISON VILLAGE PWSOH1900912
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953751EP001
Facility Name: NEW MADISON VILLAGE OF
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 21: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/21.jpg)
NEW MADISON VILLAGE PWSOH1900912
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: NEW MADISON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
LEAD - 1030 AND COPPER - 1022 Not Required
ASBESTOS - 1094 Not Required
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: NEW MADISON,VILLAGE OF DISTRIBUTION406 SOUTH MAIN STREET
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 22: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/22.jpg)
NEW MADISON VILLAGE PWSOH1900912
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: NEW MADISON,VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 23: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/23.jpg)
NORTHTOWNE COMMUNITIES LLCOH1901012
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953752EP001
Facility Name: NORTHTOWNE COMMUNITIES LLC
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 24: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/24.jpg)
NORTHTOWNE COMMUNITIES LLCOH1901012
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: NORTHTOWNE APARTMENTS DISTRIBUTION
LEAD - 1030 AND COPPER - 1022 Not Required
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: NORTHTOWNE APARTMENTS DISTRIBUTIONADDRESS NOT KNOWN
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 25: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/25.jpg)
SHERWOOD FOREST MHP PWSOH1901112
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953753EP001
Facility Name: SHERWOOD FOREST MHP
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 26: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/26.jpg)
SHERWOOD FOREST MHP PWSOH1901112
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SHERWOOD FOREST MHP DISTRIBUTION Facility Class: CLASS 1
10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SHERWOOD FOREST MHP DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 27: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/27.jpg)
SHERWOOD FOREST MHP PWSOH1901112
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: SHERWOOD FOREST MHP DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 28: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/28.jpg)
UNION CITY VILLAGE PWSOH1901212
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953754EP001
Facility Name: UNION CITY VILLAGE
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Sample(s) Required betweenINORGANICS 1 and1/1/2016 5/31/2016Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2016 5/31/2016
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2016 5/31/2016
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and1/1/2016 5/31/2016
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
![Page 29: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/29.jpg)
UNION CITY VILLAGE PWSOH1901212
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: UNION CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
LEAD - 1030 AND COPPER - 1022 Not Required
2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: UNION CITY, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 30: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/30.jpg)
UNION CITY VILLAGE PWSOH1901212
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: UNION CITY, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 31: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/31.jpg)
VERSAILLES VILLAGE PWSOH1901312
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953755EP001
Facility Name: VERSAILLES WATER DEPARTMENT
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 32: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/32.jpg)
VERSAILLES VILLAGE PWSOH1901312
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: VERSAILLES, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
ASBESTOS - 1094 Not Required
3TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20163 Sample(s) Required between 2/1/2016 and 2/29/20163 Sample(s) Required between 3/1/2016 and 3/31/20163 Sample(s) Required between 4/1/2016 and 4/30/20163 Sample(s) Required between 5/1/2016 and 5/31/20163 Sample(s) Required between 6/1/2016 and 6/30/20163 Sample(s) Required between 7/1/2016 and 7/31/20163 Sample(s) Required between 8/1/2016 and 8/31/20163 Sample(s) Required between 9/1/2016 and 9/30/20163 Sample(s) Required between 10/1/2016 and 10/31/20163 Sample(s) Required between 11/1/2016 and 11/30/20163 Sample(s) Required between 12/1/2016 and 12/31/2016
3TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20163 Sample(s) Required between 2/1/2016 and 2/29/20163 Sample(s) Required between 3/1/2016 and 3/31/20163 Sample(s) Required between 4/1/2016 and 4/30/20163 Sample(s) Required between 5/1/2016 and 5/31/20163 Sample(s) Required between 6/1/2016 and 6/30/20163 Sample(s) Required between 7/1/2016 and 7/31/20163 Sample(s) Required between 8/1/2016 and 8/31/20163 Sample(s) Required between 9/1/2016 and 9/30/20163 Sample(s) Required between 10/1/2016 and 10/31/20163 Sample(s) Required between 11/1/2016 and 11/30/20163 Sample(s) Required between 12/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
![Page 33: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/33.jpg)
VERSAILLES VILLAGE PWSOH1901312
2016 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: VERSAILLES, VILLAGE OF DISTRIBUTION16 MARKER ROAD
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: VERSAILLES, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 34: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/34.jpg)
ALBERT HURLEY CAMP 1
2016 MONITORING SCHEDULE
OH1930112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
04/15/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ALBERT HURLEY CAMP 1 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 35: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/35.jpg)
ALBERT HURLEY CAMP 1
2016 MONITORING SCHEDULE
OH1930112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ALBERT HURLEY CAMP 1Ground Water
1953756
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 36: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/36.jpg)
OLD ANNIE OAKLEY
2016 MONITORING SCHEDULE
OH1930412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OLD ANNIE OAKLEY DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 37: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/37.jpg)
OLD ANNIE OAKLEY
2016 MONITORING SCHEDULE
OH1930412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OLD ANNIE OAKLEYGround Water
1953757
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 38: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/38.jpg)
ANTHONY WAYNE SCHOOLOH1930512
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953758EP001
Facility Name: ANTHONY WAYNE SCHOOL
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 39: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/39.jpg)
ANTHONY WAYNE SCHOOLOH1930512
2016 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ANTHONY WAYNE SCHOOL DISTRIBUTION
LEAD - 1030 AND COPPER - 1022 Not Required
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016
![Page 40: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/40.jpg)
BGS RESTAURANT PWS
2016 MONITORING SCHEDULE
OH1931012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPARKYS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 41: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/41.jpg)
BGS RESTAURANT PWS
2016 MONITORING SCHEDULE
OH1931012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: B & G CAFEGround Water
1953760
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 42: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/42.jpg)
THIRD BASE BAR
2016 MONITORING SCHEDULE
OH1932512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THIRD BASE BAR DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 43: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/43.jpg)
THIRD BASE BAR
2016 MONITORING SCHEDULE
OH1932512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THIRD BASE BARGround Water
1953766
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 44: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/44.jpg)
E AND R PUB
2016 MONITORING SCHEDULE
OH1933212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: E & R PUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 45: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/45.jpg)
E AND R PUB
2016 MONITORING SCHEDULE
OH1933212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: E & R PUBGround Water
1953767
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 46: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/46.jpg)
TURTLE CREEK GOLF COURSE
2016 MONITORING SCHEDULE
OH1934112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TURTLE CREEK GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 47: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/47.jpg)
TURTLE CREEK GOLF COURSE
2016 MONITORING SCHEDULE
OH1934112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TURTLE CREEK GOLF COURSEGround Water
1953771
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 48: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/48.jpg)
MARSHALLS SERVICE PWS
2016 MONITORING SCHEDULE
OH1935212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MARSHALLS SERVICE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 49: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/49.jpg)
MARSHALLS SERVICE PWS
2016 MONITORING SCHEDULE
OH1935212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MARSHALLS AMOCO SERVICE STATIONGround Water Facility Class: CLASS A
1960074
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 50: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/50.jpg)
MISSISSINAWA VALLEY HIGHOH1935712
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953773EP001
Facility Name: MISSISSINAWA VALLEY LOCAL SCH DIST OFFIC
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
![Page 51: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/51.jpg)
MISSISSINAWA VALLEY HIGHOH1935712
2016 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MISSISSINAWA VALLEY HIGH DISTRIBUTION Facility Class: CLASS 1
LEAD - 1030 AND COPPER - 1022 Not Required
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016
![Page 52: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/52.jpg)
SILVER SPUR BAR AND RESTAURANT
2016 MONITORING SCHEDULE
OH1935912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SILVER SPUR BAR & REST. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 53: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/53.jpg)
SILVER SPUR BAR AND RESTAURANT
2016 MONITORING SCHEDULE
OH1935912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SILVER SPUR BAR AND RESTAURANTGround Water
1953774
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 54: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/54.jpg)
JACKIES PLACE PWS
2016 MONITORING SCHEDULE
OH1937312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: JACKIES PLACE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 55: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/55.jpg)
JACKIES PLACE PWS
2016 MONITORING SCHEDULE
OH1937312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: JACKIES PLACEGround Water
1953778
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 56: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/56.jpg)
RED AND RUTHS TAVERN PWS
2016 MONITORING SCHEDULE
OH1937412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RED AND RUTHS TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 57: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/57.jpg)
RED AND RUTHS TAVERN PWS
2016 MONITORING SCHEDULE
OH1937412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RED AND RUTHS TAVERNGround Water
1953779
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 58: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/58.jpg)
WHITE SPRINGS GOLF CLUB
2016 MONITORING SCHEDULE
OH1939612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
04/15/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WHITE SPRINGS GOLF CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 59: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/59.jpg)
WHITE SPRINGS GOLF CLUB
2016 MONITORING SCHEDULE
OH1939612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WHITE SPRINGS GOLF CLUBGround Water
1953784
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 60: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/60.jpg)
WILDCAT WOODS CAMPGROUND
2016 MONITORING SCHEDULE
OH1939712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
04/15/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WILDCAT WOODS CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 61: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/61.jpg)
WILDCAT WOODS CAMPGROUND
2016 MONITORING SCHEDULE
OH1939712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WILDCAT WOODS CAMPGROUNDGround Water
1953785
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 62: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/62.jpg)
WOODLAND HEIGHTS ELEMENTARY SCHOOLOH1940012
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1953786EP001
Facility Name: WOODLAND HTS ELEM SCH
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and6/1/2016 10/31/2016
![Page 63: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/63.jpg)
WOODLAND HEIGHTS ELEMENTARY SCHOOLOH1940012
2016 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WOODLAND HEIGHTS ELEM SC DISTRIBUTIONFacility Class: CLASS 1
10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WOODLAND HEIGHTS ELEM SC DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: WOODLAND HEIGHTS ELEM SC DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 64: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/64.jpg)
FORT JEFFERSON METHODIST CHURCH PWS
2016 MONITORING SCHEDULE
OH1940812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FT JEFFERSON METH CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 65: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/65.jpg)
FORT JEFFERSON METHODIST CHURCH PWS
2016 MONITORING SCHEDULE
OH1940812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FT JEFFERSON METH CHURCHGround Water
1953789
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 66: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/66.jpg)
ST LOUIS CATHOLIC CHURCH
2016 MONITORING SCHEDULE
OH1941512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST LOUIS CATHOLIC CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 67: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/67.jpg)
ST LOUIS CATHOLIC CHURCH
2016 MONITORING SCHEDULE
OH1941512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAINT LOUIS CATHOLIC CHURCHGround Water
1953790
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 68: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/68.jpg)
ST JOHN LUTHERAN CHURCH
2016 MONITORING SCHEDULE
OH1941612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST JOHN LUTHERAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 69: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/69.jpg)
ST JOHN LUTHERAN CHURCH
2016 MONITORING SCHEDULE
OH1941612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAINT JOHN LUTHERAN CHURCHGround Water
1953791
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 70: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/70.jpg)
ARROWHEAD CAMPGROUND
2016 MONITORING SCHEDULE
OH1942012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ARROWHEAD CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 71: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/71.jpg)
ARROWHEAD CAMPGROUND
2016 MONITORING SCHEDULE
OH1942012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ARROWHEAD CAMPGROUNDGround Water
1953793
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 72: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/72.jpg)
CASTINE CHURCH OF THE BRETHREN PWS
2016 MONITORING SCHEDULE
OH1942212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CASTINE CHURCH OF THE BR DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 73: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/73.jpg)
CASTINE CHURCH OF THE BRETHREN PWS
2016 MONITORING SCHEDULE
OH1942212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CASTINE CHURCH OF THE BRETHRENGround Water Facility Class: CLASS A
1953794
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 74: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/74.jpg)
HILLGROVE FEDERATED CHURCH
2016 MONITORING SCHEDULE
OH1942612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HILLGROVE FEDERATED CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 75: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/75.jpg)
HILLGROVE FEDERATED CHURCH
2016 MONITORING SCHEDULE
OH1942612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HILLGROVE FEDERATED CHURCHGround Water
1953797
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 76: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/76.jpg)
PITSBURG PIZZA AND GRILL
2016 MONITORING SCHEDULE
OH1942712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PITSBURG PIZZA & GRILL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 77: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/77.jpg)
PITSBURG PIZZA AND GRILL
2016 MONITORING SCHEDULE
OH1942712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PITSBURG PIZZA & GRILLGround Water
1953798
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 78: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/78.jpg)
PITSBURG CHURCH OF THE BRETHREN PWS
2016 MONITORING SCHEDULE
OH1943012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PITSBURG CH OF BRETHREN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 79: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/79.jpg)
PITSBURG CHURCH OF THE BRETHREN PWS
2016 MONITORING SCHEDULE
OH1943012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PITSBURG CHURCH OF BRETHRENGround Water
1953799
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 80: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/80.jpg)
PLEASANT VIEW MISSIONARY CHURCH
2016 MONITORING SCHEDULE
OH1943512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PLEASANT V. MISSION CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 81: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/81.jpg)
PLEASANT VIEW MISSIONARY CHURCH
2016 MONITORING SCHEDULE
OH1943512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PLEASANT V MISSION CHURCHGround Water Facility Class: CLASS A
1953801
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 82: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/82.jpg)
TRINITY LUTHERAN CHURCH
2016 MONITORING SCHEDULE
OH1943712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TRINITY LUTHERAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 83: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/83.jpg)
TRINITY LUTHERAN CHURCH
2016 MONITORING SCHEDULE
OH1943712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TRINITY LUTHERAN CHURCHGround Water
1953803
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 84: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/84.jpg)
GRACE METHODIST CHURCH WORSHIP CENTER
2016 MONITORING SCHEDULE
OH1943812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GRACE METHODIST CHURCH WORSHIP CENTER DIGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 85: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/85.jpg)
GRACE METHODIST CHURCH WORSHIP CENTER
2016 MONITORING SCHEDULE
OH1943812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GRACE METHODIST CHURCH WORSHIP CENTERGround Water
1953804
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 86: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/86.jpg)
COTTONWOOD LAKES CAMPGROUND
2016 MONITORING SCHEDULE
OH1944012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COTTONWOOD LAKES CAMPGRO DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 87: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/87.jpg)
COTTONWOOD LAKES CAMPGROUND
2016 MONITORING SCHEDULE
OH1944012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COTTONWOOD LAKES CAMPGROUNDGround Water
1953805
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 88: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/88.jpg)
GORDON UNITED METHODIST CHURCH
2016 MONITORING SCHEDULE
OH1944412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GORDON UNITED METH. CHUR DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 89: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/89.jpg)
GORDON UNITED METHODIST CHURCH
2016 MONITORING SCHEDULE
OH1944412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GORDON UNITED METH CHURCHGround Water
1953807
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 90: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/90.jpg)
ST. NICHOLAS CATHOLIC CHURCH
2016 MONITORING SCHEDULE
OH1945012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST.NICHOLAS CATHOLIC CH. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 91: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/91.jpg)
ST. NICHOLAS CATHOLIC CHURCH
2016 MONITORING SCHEDULE
OH1945012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ST. NICHOLAS CATHOLIC CHURCHGround Water
1953809
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 92: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/92.jpg)
STILLWATER BEACH CAMP
2016 MONITORING SCHEDULE
OH1945212 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: STILLWATER BEACH CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 93: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/93.jpg)
STILLWATER BEACH CAMP
2016 MONITORING SCHEDULE
OH1945212 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: STILLWATER BEACH CAMP STU 2Ground Water
1953811
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 94: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/94.jpg)
STILLWATER BEACH CAMP
2016 MONITORING SCHEDULE
OH1945212 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: STILLWATER BEACH CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 95: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/95.jpg)
STILLWATER BEACH CAMP
2016 MONITORING SCHEDULE
OH1945212 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: STILLWATER BEACH CAMP STU 1Ground Water
1962357
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 96: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/96.jpg)
STILLWATER VALLEY GOLF CLUB
2016 MONITORING SCHEDULE
OH1945312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: STILLWATER VALLEY GOLF C DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 97: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/97.jpg)
STILLWATER VALLEY GOLF CLUB
2016 MONITORING SCHEDULE
OH1945312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: STILLWATER VALLEY GOLF CLUBGround Water
1953812
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 98: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/98.jpg)
UNION CITY COUNTRY CLUB
2016 MONITORING SCHEDULE
OH1945612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: UNION CITY COUNTRY CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 99: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/99.jpg)
UNION CITY COUNTRY CLUB
2016 MONITORING SCHEDULE
OH1945612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: UNION CITY COUNTRY CLUBGround Water
1953813
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 100: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/100.jpg)
OAKLAND CHURCH OF THE BRETHREN
2016 MONITORING SCHEDULE
OH1945812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OAKLAND CHURCH OF THE BRETH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 101: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/101.jpg)
OAKLAND CHURCH OF THE BRETHREN
2016 MONITORING SCHEDULE
OH1945812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OAKLAND CHURCH OF THE BRETHREN - TPGround Water
1953814
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 102: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/102.jpg)
BIBLE FELLOWSHIP CHURCH
2016 MONITORING SCHEDULE
OH1945912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BIBLE FELLOWSHIP CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 103: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/103.jpg)
BIBLE FELLOWSHIP CHURCH
2016 MONITORING SCHEDULE
OH1945912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BIBLE FELLOWSHIP CHURCHGround Water
1953815
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 104: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/104.jpg)
KINGDOM HALL OF GREENVILLE
2016 MONITORING SCHEDULE
OH1946112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: KINGDOM HALL OF GREENVIL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 105: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/105.jpg)
KINGDOM HALL OF GREENVILLE
2016 MONITORING SCHEDULE
OH1946112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KINGDOM HALL OF GREENVILLEGround Water Facility Class: CLASS A
1953817
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 106: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/106.jpg)
LIGHTHOUSE CHRISTIAN CENTER
2016 MONITORING SCHEDULE
OH1946212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LIGHTHOUSE CHRISTIAN CTR DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 107: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/107.jpg)
LIGHTHOUSE CHRISTIAN CENTER
2016 MONITORING SCHEDULE
OH1946212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LIGHTHOUSE CHRISTIAN CTRGround Water
1953818
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 108: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/108.jpg)
PAK-A-SAK 38 PWS
2016 MONITORING SCHEDULE
OH1947012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PAK-A-SAK 38 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 109: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/109.jpg)
PAK-A-SAK 38 PWS
2016 MONITORING SCHEDULE
OH1947012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PAK-A-SAK 38Ground Water Facility Class: CLASS A
1953825
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 110: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/110.jpg)
HOLLANSBURG PARK/BALL DIAMOND PWS
2016 MONITORING SCHEDULE
OH1947212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HOLLANSBURG PARK/BALL DI DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 111: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/111.jpg)
HOLLANSBURG PARK/BALL DIAMOND PWS
2016 MONITORING SCHEDULE
OH1947212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HOLLANSBURG PARK BALL DIAMONDGround Water
1953826
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 112: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/112.jpg)
DARKE COUNTY NATURE EDUCATION CENTER
2016 MONITORING SCHEDULE
OH1947512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DARKE CO NATURE EDUCATIO DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 113: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/113.jpg)
DARKE COUNTY NATURE EDUCATION CENTER
2016 MONITORING SCHEDULE
OH1947512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DARKE CO NATURE EDUCATION CENTERGround Water
1953827
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 114: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/114.jpg)
BEECHWOOD GOLF COURSE-CLUBHOUSE
2016 MONITORING SCHEDULE
OH1947612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEECHWOOD GOLF COURSE-CLUBHOUSE DISTRIBUGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 115: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/115.jpg)
BEECHWOOD GOLF COURSE-CLUBHOUSE
2016 MONITORING SCHEDULE
OH1947612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEECHWOOD GOLF COURSE-CLUBHOUSEGround Water
1960662
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 116: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/116.jpg)
CEDAR GROVE CHURCH
2016 MONITORING SCHEDULE
OH1947812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CEDAR GROVE CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 117: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/117.jpg)
CEDAR GROVE CHURCH
2016 MONITORING SCHEDULE
OH1947812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CEDAR GROVE CHURCHGround Water
1953828
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 118: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/118.jpg)
PALESTINE CHURCH OF CHRIST PWS
2016 MONITORING SCHEDULE
OH1947912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PALESTINE CH.OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 119: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/119.jpg)
PALESTINE CHURCH OF CHRIST PWS
2016 MONITORING SCHEDULE
OH1947912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PALESTINE CHURCH OF CHRISTGround Water
1953829
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 120: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/120.jpg)
LAZY R CAMPGROUND
2016 MONITORING SCHEDULE
OH1948012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
02/12/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAZY R CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 121: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/121.jpg)
LAZY R CAMPGROUND
2016 MONITORING SCHEDULE
OH1948012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAZY R CAMPGROUNDGround Water
1960075
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 122: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/122.jpg)
BEECHWOOD GOLF COURSE-MAINTENANCE PWS
2016 MONITORING SCHEDULE
OH1948212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEECHWOOD GOLF COURSE-MAINTENANCE DISTRIGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 123: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/123.jpg)
BEECHWOOD GOLF COURSE-MAINTENANCE PWS
2016 MONITORING SCHEDULE
OH1948212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEECHWOOD GOLF COURSE-MAINTENANCEGround Water
1960764
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 124: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/124.jpg)
GETTYSBURG COMMUNITY PARK
2016 MONITORING SCHEDULE
OH1948312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GETTYSBURG BALL PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 125: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/125.jpg)
GETTYSBURG COMMUNITY PARK
2016 MONITORING SCHEDULE
OH1948312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GETTYSBURG COMMUNITY PARKGround Water
1960993
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 126: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/126.jpg)
RUMPKE WASTE SERVICES
2016 MONITORING SCHEDULE
OH1948512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RUMPKE WASTE SERVICES DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 127: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/127.jpg)
RUMPKE WASTE SERVICES
2016 MONITORING SCHEDULE
OH1948512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RUMPKE WASTE SERVICESGround Water
1960649
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 128: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/128.jpg)
PAK-A-SAK 37 PWS
2016 MONITORING SCHEDULE
OH1948712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PAK-A-SAK 37 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 129: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/129.jpg)
PAK-A-SAK 37 PWS
2016 MONITORING SCHEDULE
OH1948712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PAK-A-SAK 37Ground Water Facility Class: CLASS A
1960705
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 130: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/130.jpg)
THE GATEHOUSE
2016 MONITORING SCHEDULE
OH1948912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THE GATEHOUSE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 131: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/131.jpg)
THE GATEHOUSE
2016 MONITORING SCHEDULE
OH1948912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THE GATEHOUSEGround Water
1960812
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 132: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/132.jpg)
FARMER BROWN PWS
2016 MONITORING SCHEDULE
OH1949212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FARMER BROWN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 133: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/133.jpg)
FARMER BROWN PWS
2016 MONITORING SCHEDULE
OH1949212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FARMER BROWN RESTAURANTGround Water
1960907
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 134: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/134.jpg)
GREENVILLE CHURCH OF GOD PWS
2016 MONITORING SCHEDULE
OH1949412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GREENVILLE CHURCH OF GOD DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 135: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/135.jpg)
GREENVILLE CHURCH OF GOD PWS
2016 MONITORING SCHEDULE
OH1949412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GREENVILLE CHURCH OF GODGround Water Facility Class: CLASS A
1961033
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 136: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/136.jpg)
SOLID ROCK APOSTOLIC CHURCH-BRADFORD PWS
2016 MONITORING SCHEDULE
OH1949912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SOLID ROCK APOSTOLIC CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 137: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/137.jpg)
SOLID ROCK APOSTOLIC CHURCH-BRADFORD PWS
2016 MONITORING SCHEDULE
OH1949912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SOLID ROCK APOSTOLIC CHURCHGround Water
1961444
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 138: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/138.jpg)
BURKETTSVILLE PARK PWS
2016 MONITORING SCHEDULE
OH1950012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BURKETTSVILLE PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 139: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/139.jpg)
BURKETTSVILLE PARK PWS
2016 MONITORING SCHEDULE
OH1950012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BURKETTSVILLE PARKGround Water
1961488
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 140: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/140.jpg)
GREENVILLE GRACE BRETHEREN PWS
2016 MONITORING SCHEDULE
OH1950112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GREENVILLE GRACE BRETHEREN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 141: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/141.jpg)
GREENVILLE GRACE BRETHEREN PWS
2016 MONITORING SCHEDULE
OH1950112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GREENVILLE GRACE BRETHRENGround Water
1961920
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 142: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/142.jpg)
BEAMSVILLE CHRISTIAN CHURCH PWS
2016 MONITORING SCHEDULE
OH1950212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEAMSVILLE CHRISTIAN CHURCHGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 143: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/143.jpg)
BEAMSVILLE CHRISTIAN CHURCH PWS
2016 MONITORING SCHEDULE
OH1950212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEAMSVILLE CHRISTIAN CHURCHGround Water
1962198
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 144: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/144.jpg)
ROSSBURG ACRES CAMPGROUND PWS
2016 MONITORING SCHEDULE
OH1950312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ROSSBURG ACRES CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 145: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/145.jpg)
ROSSBURG ACRES CAMPGROUND PWS
2016 MONITORING SCHEDULE
OH1950312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ROSSBURG ACRES CAMPGROUNDGround Water
1962199
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 146: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/146.jpg)
FRANKLIN MONROE SCHOOL NEW PWSOH1950512
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1962376EP001
Facility Name: FRANKLIN MONROE SCHOOL NEW
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2016 10/31/2016
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and6/1/2016 10/31/2016
![Page 147: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/147.jpg)
FRANKLIN MONROE SCHOOL NEW PWSOH1950512
2016 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: FRANKLIN MONROE SCHOOL NEW DISTRIBUTIONFacility Class: CLASS 1
10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016
1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: FRANKLIN MONROE SCHOOL NEW DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: FRANKLIN MONROE SCHOOL NEW DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
![Page 148: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/148.jpg)
BRUMBAUGH FRUIT FARM PWS
2016 MONITORING SCHEDULE
OH1950613 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BRUMBAUGH FRUIT FARM DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 149: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/149.jpg)
BRUMBAUGH FRUIT FARM PWS
2016 MONITORING SCHEDULE
OH1950613 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BRUMBAUGH FRUIT FARMGround Water
1962390
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 150: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/150.jpg)
NORTH STAR HARDWARE AND IMPLEMENT CO PWS
2016 MONITORING SCHEDULE
OH1950614 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NORTH STAR HARDWARE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 151: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/151.jpg)
NORTH STAR HARDWARE AND IMPLEMENT CO PWS
2016 MONITORING SCHEDULE
OH1950614 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NORTH STAR HARDWARE AND IMPLEMENT COGround Water
1962391
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 152: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/152.jpg)
ELDORA SPEEDWAY INFIELD WELL PWS
2016 MONITORING SCHEDULE
OH1950615 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 153: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/153.jpg)
ELDORA SPEEDWAY INFIELD WELL PWS
2016 MONITORING SCHEDULE
OH1950615 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ELDORA SPEEDWAY INFIELD WELLGround Water Facility Class: CLASS A
1962392
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 154: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/154.jpg)
ELDORA SPEEDWAY MAIN CONCESSIONS PWS
2016 MONITORING SCHEDULE
OH1950616 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between3 4/1/2016 and 4/30/2016Sample(s) Required between3 5/1/2016 and 5/31/2016Sample(s) Required between3 6/1/2016 and 6/30/2016Sample(s) Required between3 7/1/2016 and 7/31/2016Sample(s) Required between3 8/1/2016 and 8/31/2016Sample(s) Required between3 9/1/2016 and 9/30/2016Sample(s) Required between3 10/1/2016 and10/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 155: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/155.jpg)
ELDORA SPEEDWAY MAIN CONCESSIONS PWS
2016 MONITORING SCHEDULE
OH1950616 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ELDORA SPEEDWAY MAIN CONCESSIONSGround Water Facility Class: CLASS A
1962393
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 156: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/156.jpg)
ELDORA SPEEDWAY NORTH WELL PWS
2016 MONITORING SCHEDULE
OH1950617 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGU
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 157: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/157.jpg)
ELDORA SPEEDWAY NORTH WELL PWS
2016 MONITORING SCHEDULE
OH1950617 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 10/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ELDORA SPEEDWAY NORTH WELLGround Water Facility Class: CLASS A
1962394
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016
Well
Treatment* PressureTank Distribution
System
Where to Collect Samples For a Small Public Water System
EP00#
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
DS000
Raw Tap
RS00#,LT200#,or GWR00#
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
![Page 158: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/158.jpg)
HOWES HENS PWSOH1950618
ENTRY POINT MONITORING SCHEDULE
2016 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
1962395EP001
Facility Name: HOWES HENS
Effective Date: 01/01/2016
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
Sample(s) Required betweenINORGANICS 1 and6/1/2016 10/31/2016Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2016 5/31/2016
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and1/1/2016 5/31/2016
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016
![Page 159: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling](https://reader035.fdocuments.us/reader035/viewer/2022070901/5f4f4e392afa395c630342a0/html5/thumbnails/159.jpg)
HOWES HENS PWSOH1950618
2016 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2016Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: DISTRIBUTION
5LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 1/1/2016 and 6/30/20165 Sample(s) Required between 7/1/2016 and 12/31/2016
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016