Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX
-
Upload
yardley-pittman -
Category
Documents
-
view
32 -
download
3
description
Transcript of Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX
![Page 1: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/1.jpg)
Entergy AFC Stakeholder Meeting
February 16, 2005
Houston, TX
![Page 2: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/2.jpg)
Overview
Objectives and today’s agenda
Scope of AFC issues
Discussion on stakeholder ranking of issues
Open discussion on issues (Transparency issues)
Issue #11: Peak hour model & posting of additional non- peak hourly models
Issue #14: Reveal reservation holder to source owner, list reservations by source including control areas
Issue #15: Additional information to understand transmission service denials (include issue#13 on .con, .mon, & .trn)
![Page 3: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/3.jpg)
Overview
Open discussion on issues continued (Transparency issues)
Issue #12: Discuss and clarify use of CBM in AFC
Issue #10: Discuss approach for reviewing what is provided in the “Big File” and how this file can possibly be modified to provide more helpful information (Breakout group?)
Update/discussion on second scenario analyzer
Next Steps
![Page 4: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/4.jpg)
Objectives
• Improve the AFC process through stakeholder input
• Draw from stakeholder experience in other regions
• Ensure there is a consistent understanding of the AFC process by all participating stakeholders
• Make changes to the AFC process to improve the overall quality and transmission customer satisfaction where possible
![Page 5: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/5.jpg)
Ground Rules
• Ongoing dockets at FERC will prevent the discussion of certain information and issues– Initially limited to those issues outlined in FERC’s AFC Order– Issues discussed can be expanded if FERC agrees to Entergy’s
proposal to conduct an audit of the AFC process as opposed to conducting a hearing
• The overall set of recommendations will be synthesized to determine which changes can be implemented as well as the overall implementation costs, and the time required to make the changes.
• The final set of recommendations chosen for implementation will be reviewed with stakeholders including the timeline for implementation and the projected cost to implement, as well as any required regulatory approvals
![Page 6: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/6.jpg)
• Should each issue be discussed in an open forum with all stakeholders?, or
• Should certain issues be identified for discussion by small breakout groups who will report back to the larger group?
• Should specific time limits be placed on each issue discussion or speakers to ensure that a single issue or speaker does not monopolize the meeting schedule?
• Others?
Stakeholder Meeting Process
![Page 7: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/7.jpg)
Ranking of Issues Identified for DiscussionIssue ID Sub-Issue A B C Avg. Rev.
Seq.
Flowgate Selection and Modification
1 criteria used to identify flowgates 17 5 10 10.7 11
2 info that may be provided to support flowgate selection (including TDF) 14 4 11 9.7 9
3 detailed procedure used for adding/deleting flowgates 10 1 12 7.7 5
Counterflow Development and Use
4 criteria used to develop counterflow percentages 7 6 15 9.3 7
5 info and/or assumptions that support the counterflow percentages 12 7 14 11.0 12
6 meaning of each term in the counterflow formula 16 8 13 12.3 14
Interchange Development and Use
7 interchange information used 15 10 17 14.0 18
8 detailed methodology for calculating interchange information 1 11 16 9.3 8
9 ETR’s efforts to improve information with neighboring control areas 2 9 18 9.7 10
Transparency Regarding TSR Approval and Denial
10 information provided in the “Big File” and discuss the possibility of adding sink identification and participation factor file for all models
4 14 2 6.7 3
11 Identify peak hour used in peak hour models and review options for posting more non-peak hourly power flow models (i.e. “most recent set”)
3 2 5 3.3 1
12 use of CBM in the AFC analysis 6 15 3 8.0 6
13 .CON, .MON and .TRN including their relevance to AFC analysis and value to stakeholders
18 13 6 12.3 15
14 possibility of identifying reservation holder to generator owner, reservations in effect out of a source including control areas
5 3 4 4.0 2
15 additional info available to evaluate service request denials 8 12 1 7.0 4
Second Scenario Analyzer
16 features associated with second Scenario Analyzer 9 18 7 11.3 13
17 inclusion of only confirmed reservations in second Scenario Analyzer 13 16 8 12.3 16
18 inclusion of the number of and info. on new reservations not processed
11 17 9 12.3 17
![Page 8: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/8.jpg)
Issue #11
Identify peak hour used in peak hour models and review options for posting more non-peak hourly power flow
models
![Page 9: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/9.jpg)
Power Flow Models Posted on OASIS
Entergy Transmission currently provides the following models on the OASIS:
Study Horizon
Time Frame Posted Models
Operatingall hours of current day
and all hours of next day after 12:00 p.m.
daily peak model
Planningend of Operating Horizon – Day 31
daily peak model
Studyend of Planning
Horizon – Month 18monthly peak
model
![Page 10: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/10.jpg)
AFC Power Flow Model Information
Peak Projected Hour
Currently evaluating the feasibility of indicating the peak projected hour for all posted operating and planning horizon model
Recommendation: Change PSSE_16Feb2005.raw to PSSE_16Feb2005_1600.raw
![Page 11: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/11.jpg)
AFC Power Flow Model Information
Off Peak Power Flow Models
Currently infeasible to provide all hourly models in the operating and planning horizons
Discussion on limitations
Discussion on what is useful to Stakeholders
Stakeholder recommendations
![Page 12: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/12.jpg)
Issue #14
Discuss possibility of identifying reservation holder to generation owner, reservations in effect out of a source
including control area
![Page 13: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/13.jpg)
Identifying Reservation Holders on Confirmed Reservations
• FERC S&CP
• The Standards and Communications Protocols for OASIS.
• Currently the “transstatus” query (Query Requests link on OASIS) does not have a input variable for a source or sink.
• Input variables do allow the ability to query all request for specific PORs/PODs, but to determine the specific source is time consuming.
![Page 14: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/14.jpg)
Identifying Reservation Holders on Unconfirmed Reservations
• FERC Commission requires the source and sink on a reservation to be masked until confirmation.
![Page 15: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/15.jpg)
Identifying Reservation Holders on Reservations
• NAESB committees dealing with OASIS issues
• Electronic Scheduling Subcommittee.
• OASIS Phase 1A task force
• ESS OASIS II task force
• Comments / Suggestions from Stakeholders
• What information is needed?
• Stakeholder recommendations
![Page 16: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/16.jpg)
Issue #15
Review and discuss what, if any, additional information is available or necessary to evaluate service request denials including discussion of issue #13 (.con, .mon, and .trn files
and their relevance to the AFC analysis and value to stakeholders)
![Page 17: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/17.jpg)
Issue #12
Discuss and clarify use of CBM in the AFC analysis
![Page 18: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/18.jpg)
CBM Use in AFC Calculation
• NERC Capacity Benefit Margin (CBM) Definition – “that amount of transmission transfer capability reserved by load serving entities to ensure access to generation from interconnected systems to meet generation reliability requirements”
• Although Entergy is entitled to set aside transmission capacity for CBM under the AFC process, Entergy is not currently including a CBM reservation in the AFC models
![Page 19: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/19.jpg)
Issue #10
Review and discuss the information provided in the “big file” and discuss possibility of adding sink identification and
participation factor file for all models
![Page 20: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/20.jpg)
Useful OASIS Links
Entergy Transmission maintains several data files on the OASIS site. The following links on the OASIS site contain information related to the AFC Process:
• Transmission Outage Information (updated near real-time)
• Transmission Limitations Summary (updated every minute)
• AFC Power Flow Models (Operating Horizon models updated every hour
Planning Horizon models updated every six hours Study Horizon models updated every week)
• AFC Flowgate Listing (updated as needed)
• Effective ATC Posting
• ‘BIG’ AFC Data File
![Page 21: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/21.jpg)
OASIS Link Locations
AFC Flowgate Listing AFC Power Flow Models Effective ATC Posting
‘BIG’ AFC Data File
AFC Flowgate Listing AFC Power Flow Models Effective ATC Posting
‘BIG’ AFC Data File
![Page 22: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/22.jpg)
AFC Postings Link
All flowgates currently monitored in AFCAll flowgates currently monitored in AFCAll flowgates currently monitored in AFCAll flowgates currently monitored in AFC
Effective ATC & ‘BIG’ AFC FileEffective ATC & ‘BIG’ AFC FileEffective ATC & ‘BIG’ AFC FileEffective ATC & ‘BIG’ AFC File
Study Horizon Models & Study Horizon Models & Study Horizon ‘BIG’ AFC FileStudy Horizon ‘BIG’ AFC File
Study Horizon Models & Study Horizon Models & Study Horizon ‘BIG’ AFC FileStudy Horizon ‘BIG’ AFC File
Operating and Planning Horizon ModelsOperating and Planning Horizon ModelsOperating and Planning Horizon ModelsOperating and Planning Horizon Models
Site address: https://www.entergytransmission.com/s/capability/AFC/AFC_Links.asp
![Page 23: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/23.jpg)
The ‘BIG’ AFC File
What is in the ‘BIG’ File?
• Response factors for the top 15 flowgates for about ~3,000 transfer paths
• Base flow and ratings for all flowgates
What timeframe is the data provided for?
• Data is provided for the Operating and Planning Horizons: hourly values for day 1 to 7 and daily values for days 8 to 31; Study Horizon data is stored in a separate file
How often is the file updated?
• The file is refreshed every hour for the current day. After 12:00 p.m., the file is refreshed every hour for the next day. The remaining data is refreshed every six hours.
![Page 24: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/24.jpg)
Sample of the ‘BIG’ File
begin= 2/1/2005 00:00 2/1/2005 01:00 2/8/2005 00:00 2/9/2005 00:00
end= 2/1/2005 01:00 2/1/2005 02:00 2/9/2005 00:00 2/10/2005 00:00
porpod= 9MILE/AECI
flowgate= 9MILE_PMAX 9MILE_PMAX 9MILE_PMAX 9MILE_PMAX
sensitivity= 1 1 1 1
flowgate= TBOGRN_WEBRC TBOGRN_WEBRC TBOGRN_WEBRC TBOGRN_WEBRC
sensitivity= 0.060561 0.0606702 0.0778449 0.0778449
flowgate= LTPLIV_RCWEB LTPLIV_RCWEB MICFRO_MCKFR MICFRO_MCKFR
sensitivity= 0.0657025 0.065873 0.2314835 0.2314835
fgpath= GRIMTZ_WDN
flow= 129 98 94 95
ttc= 206 206 206 206
fgpath= WILLVB_WEBRC
flow= 202 206 18 18
ttc= 289 289 289 289
Time FrameTime
Frame
Hourly Daily
Sen
siti
vity
of
To
p
15 F
low
gat
es
Sen
siti
vity
of
To
p
15 F
low
gat
es
Flowgate NameFlowgate Name
Transfer PathTransfer Path
Flow at Time Point &
Flowgate Rating
Flow at Time Point &
Flowgate Rating
Flo
wg
ate
Info
rmat
ion
Flo
wg
ate
Info
rmat
ion
![Page 25: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/25.jpg)
Second Scenario Analyzer
• Current button for analyzer
• New buttons for analyzers
![Page 26: Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX](https://reader034.fdocuments.us/reader034/viewer/2022042703/56812b37550346895d8f4743/html5/thumbnails/26.jpg)
Next Steps?