Enhancing the future

52

Transcript of Enhancing the future

Page 1: Enhancing the future
Page 2: Enhancing the future

RAPIDI N F R A S T R U K T U R

MISSION

Our mission is to build and organize infrastructure and industrial plant toenhance the future.

VISIONTo become center of excellence for engineering, construction, and projectmanagement, achieving extraordinary result by incorporating leanphilosophy and state-of-the-art technology

Collaboration for Excellence

Page 3: Enhancing the future

HOW WE DELIVER OUR VALUES

P R O J E C TO W N E R

P R O J E C TI N T E G R A T O R

V E N D O R S P E C I A L I S TC O N T R A C T O R

C O N V E N T I O N A L I N T E G R A T E D

P R O J E C T O W N E R

P M C

E P C C O N T R A C T O R

V E N D O R S U B - C O N T R A C T O R

Page 4: Enhancing the future

FOR EXAMPLE…

ConventionalProject Scheme

(in million USD)

IntegratedProject Delivery

(in million USD)

MPC 2

EPC

Engineering 5 5

Procurement 55 55

Construction 15 15

Project Management 10 10

Contingency 2 0

Profit 10 0

PPh 3 0

Subtotal 102 85

Contingency 10 27

TOTAL 112 112

Profit sharing

Using Integrated Project Delivery System enable significant improvement which cannot be implemented using the Conventional Project Scheme. We are able to minimize the vertical management chain and ‘flatten’ the organization chart. With the right leadership, this will improve the response time and agility of the project delivery team, also less time and effort for plan-do-check-action iterative cycle.

“Integrated project scheme will be 15% more efficient than conventional project scheme”

Page 5: Enhancing the future

SECTOR EXPERTISE

P E T R O C H E M I C A L

W A T E RT R E A T M E N T

S U G A RF A C T O R Y

O I L A N DG A S

O P E R A T I O N A N DM A I N T E N A N C E

P O W E RG E N E R A T I O N

Page 6: Enhancing the future

QUALITY ASSURANCE

Page 7: Enhancing the future

LEGALITIES

Page 8: Enhancing the future

LEGALITIES

Page 9: Enhancing the future

CERTIFICATE

Page 10: Enhancing the future

CERTIFICATE

Page 11: Enhancing the future

OURSERVICES

OPERATIONAL & MAINTENANCE SERVICESEffective Operational & Maintenance practice is the best method to promote reliability,safety, and energy efficiency in our client’s operating plant. Poor management andresource planning on this area would cause time and energy waste. Energy losses fromsteam, water and air leaks, uninsulated lines, and other losses from poor maintenance areoften ignored since operational activities functions just fine.

Our experiences in O&M services includes:• Robotic Borescope Service• Bolt Torque• Preservation Works• Confined Space Works

PRE-COMMISSIONING, COMMISSIONING & START-UPCommissioning & start-up is a phase between construction and operational phase of anindustrial facility. Highly multi-disciplined, systematic, and professional methodology iscritical to escort our client’s facility to their operational phase. It is important for us tomanage this phase with the highest regard of safety, technical efficiency, schedule, andbudget.

Our expertise in various industry and technology implementation helps us to provide ourclients with system-wise commissioning management and execution. Developing a moretime-efficient start-up program with reliable method and supervisory from our engineers.

Page 12: Enhancing the future

OURSERVICES

PROJECT MANAGEMENT SERVICESProject Management ConsultancyCost-overrun, progress lagging, and massive re-work usually haunts majority of construction project around

the globe. This was an impact of poor project management coordination, low data input or analytics, and

excessive administration and bureaucracy in project management. Construction industry does not realize this

habit and low efficiency, as the procedure and systems they have had been implemented for decades, even

though it is in dire need of a fresh change.

Rapid emerge as a disruptive idea in the middle of a stagnant industry, granting alternative approach of

project management system to optimize manpower dan administrative functions, cutting through

unnecessary bureaucracy to boost productivity and reduce costs.

Our solution includes, but not limited to:

• Lean construction philosophy and technology• Resource/ contractor management to achieve project on time, on budget & on schedule• Integrate all multidiscipline in the site project• Manage simultaneous operation• Manage system completion and system-wise management

Hazard and Operability Study (HAZOP)Our project management service puts heavy concern on safety and operability of our result of work. We

provide extensive study on the hazard and operability for our clients, before the execution of the projects. Our

team consists of a range of multi-disciplinary team and a number of highly-experienced leaders, with more

than 20 years of domestic and overseas experience.

Our expertise on Geothermal, Oil & Gas, Petrochemical and Food Industry is critical to deliver a time

effective HAZOP study, providing our client with a comprehensive risk assessment result.

Page 13: Enhancing the future

OURSERVICES

COLLABORATIVE CONSTRUCTIONConstruction IntegratorConstructing industrial facilities is an art of combination between simultaneous multi-

discipline works, such as; civil, steel structure, mechanical erection, piping installation,

electrical, and instrument works. Our proficiency in interface management ensures our

clients to gain exemplary benefit on time management, resource management, and project

scheduling.

We manage all our work with lean philosophy, executing simultaneous operations

(SYMOPS) and system-wise completion by committing to our procedures and safety

measurements, ensuring flawless delivery of our work to our clients.

Construction IT ServiceDigitalization is one of the most important aspect in today’s construction industry. A

megaproject would employ thousands of construction workers and hundreds of works

registered only for one working shift. Our RFID (Radio-Frequency Identification) for

manpower, equipment, and material management would provide our clients with the

necessary efficiency evaluation of their resources.

Our CDR (Construction Dashboard Reporting) will optimize progress control work by

digitizing the process of construction progress data gathering. Said data then processed and

analyzed to produce extensive reports on construction progress, delayed or early work, and

recommendation to speed-up work progress based on data analytics.

Page 14: Enhancing the future

OURSERVICESPROJECT STUDY, ENGINEERING, and EVALUATION

Before the crucial construction phase of industrial facility, development stages such as project study,

engineering phase, and research evaluation must be conducted to ensure flawless construction and

operational phase. To ensure the quality delivered to our clients, we provide our expertise for in-house

engineering work.

Considering the importance of engineering and study phase in our industry, we always achieve on-time

delivery and outstanding quality on our engineering and research works. Providing study results about

technical, design, and commercial service for our client to support either preliminary study or

construction activity.

Page 15: Enhancing the future

BATAM

TANJUNGCARAT

BOJONEGORO

BALIKPAPAN

SUMBA

BINTUNI

PROJECT PORTFOLIOS

ENERCO RPO TDAE PROCESSING PLANT (Pipeline)Project Owner : PT Enerco RPO InternationalProject Value : USD 3,200,000Service Period : May 2018 – Dec 2018

PRE-FEASIBILITY STUDY ON METHANOL PROJECTGRISSIK CORRIDOR FOR RUKUN RAHARJA, TBKClient : Rukun RaharjaService Period : July 2020 – Sept 2020

PERTAMINA JTB EVAPORATOR & CRYSTALISATION UNIT -PMTMain Contractor : Rekind-JGC JOProject Value : USD 2,500,000Schedule : Nov 2019 – Nov 2020

DJARUM GROUPMURIA MANIS SUGAR PLANT – PMTProject Owner : PT Muria Sumba ManisProject Value : USD 4,200,000Schedule : Feb 2020 – Dec 2021

PERTAMINA RDMP RU V WATER TREATMENT PLANT – PMTLOCAL PARTNER FOR FOREIGN SUPPLIER COMPANYMain Contractor : RDMP JOProject Value : USD 18,500,000Service Period : Febr 2020 – Dec 2021

PERTAMINA RDMP CRUDE OIL TANK COMPLEX - PMTMain Contractor : RDMP JOProject Value : USD 8,000,000Schedule : Mar 2019 – Jun 2021

BP TANGGUH LNG PLANTProject Owner : BP p.l.c.Project Value : USD 15,000,000Schedule : Nov 2019 – Dec 2022

PMT for:- Piping

Direct work for:- Structure- Borescope- Bolt Torque- Preservation- Commissioning

PERTAMINA JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE Main Contractor : Rekind-JGC JOProject Value : USD 3,000,000Schedule : Jan 2021 – Sept 2021

CILEGON

VESSEL AND TANK FABRICATION PMTClient : PT TIMASProject Value : USD 160,000Schedule : Jun 2021 – Dec 2021

ENERCO RPO TDAE PROCESSING PLANT (O&M)Project Owner : PT Enerco RPO InternationalProject Value : USD 300,000Service Period : Jan 2020 – Jun 2021

ENERCO RPO TDAE PROCESSING PLANT (PMT)Project Owner : PT Enerco RPO InternationalProject Value : USD 1,500,000Service Period : May 2018 – Jun 2021

Page 16: Enhancing the future
Page 17: Enhancing the future

PERTAMINA RDMP RU V WATER TREATMENT PLANTLOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY (slide 1/2)

Project Value Capacity Schedule Location

USD 18,500,000 3,500 MTPH February 2020 – July 2021 Balikpapan, Indonesia

Scope Stakeholder

Rapid assists the project owner to acquire an improved capacity and quality for their desalination plant with a better price. This is achievable by engineering and designing the suitable technology and process to comply with the standard of our client. We then assist the project owner until the delivery of the technology on-site to ensure perfect delivery and quality to our client.

Scope:• Fabricate and supply Sea Water Desalination, Reverse Osmosis,

De-mineralization and Re-mineralization system• Specialized in carbon steel, super duplex stainless steel, glass

reinforced epoxy (GRE), and fiber-reinforced plastic materials• Project schedule control• Technical assist in project execution design phase

RDMP JOMain Contractor

Aquatech SA – Rapid Infrastruktur Indonesia JOEngineering, Fabrication, and Supply Vendor

PT PertaminaOwner

Subcontractors

Page 18: Enhancing the future

PERTAMINA RDMP RU V WATER TREATMENT PLANTLOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY (slide 2/2)

FABRICATED ITEMS

SWRO, BWRO,ERD

Sea Water Desalination, Brackish Water Reverse Osmosis, De-mineralization and Re-mineralization System, and Energy Recovery Device using the most current and reliable technology.

DOSING PACKAGE

• Consists of 48 skid package• 12 hypo dosing and poly

dosing units, including pumps• 7 CS- SS Vessels weighing 12.4

Tonnes, using SA 516 Gr 70 and SA 240 Gr. 316

• Remineralization Vessel weighing 43.3 Tonnes using SA 240 Gr. 316

• Sludge Thickener

PIPE RACK FABRICATION

Fabricating and installing frame, rack, and piping for the skids and the whole system, also its instruments such as valves. Also uses special grade corrosive

resistance Super Duplex Stainless Steel

GLASS REINFORCED

EPOXY

This facility’s piping system also using GRE pipe due to its properties that can withstand high temperature, excellent chemical and corrosion resistance, also able to handle seawater.

Page 19: Enhancing the future

Project Value Capacity Schedule Location

USD 8,000,000 15,000 MT (3 tanks) March 2019 – June 2021 Balikpapan, Indonesia

Scope Stakeholder

Rapid provides consulting service to our client starting from proposal ontoproject execution phase. We provide technical and commercial assistance toensure the project runs without any issue on technical execution and projectcashflow.

We help top level management in decision making to avoid delays in projectexecution, since the pandemic hit our project site in the middle of ourworking schedule.

Scope:• Project management for 3882 Tonnes of crude oil tank construction• Plan project execution for additional complementary scope such as;

insulation clip support, walkway and platform, painting, and hydrotest• Cost and project schedule control

RDMP JOMain Contractor

PT Pertamina (Persero) RU VOwner

PT Cahaya Hidup PrimakaryaContractor

PT Rapid Infrastruktur IndonesiaContractor

PERTAMINA RDMP RU V CRUDE OIL TANK COMPLEX - PMT

Page 20: Enhancing the future

OUTSIDE VIEW OF CRUDE OIL TANK INSIDE VIEW OF CRUDE OIL TANK

Page 21: Enhancing the future

DJARUM GROUP MURIA SUMBA MANIS SUGAR PLANT -PMT

Project Value Capacity Schedule Location

USD 4,000,000 6,000 TCD Feb 2020 – Dec 2021 Sumba, IndonesiaScope Stakeholder

Developing one of the major investments from our client which is 6000-12000 TCD sugarmilling and refining plant. This project is in need for a high-performing managementteam. Therefore, Rapid collaborate with Muria Sumba Manis team to lead, manage,review, rearrange agreements and scope of works between sub-contractors, vendors, andtechnology licensor. We function as project integrator across discipline and stakeholders.

We achieved 200% construction progress after the implementation of our projectmanagement system, bringing the project closer to achieve the targeted schedule.

Project Management Services • Project status and progress evaluation• Commissioning and Start-up assist• Contract settlement process• Crash program design to speed up the project• Refinery sugar is available to be processed from sugar cane and raw sugar• Construct and commissioning boiler STG powered with bagasse and coal• Design, construct and commissioning coal handling system, raw sugar handling

system, and bagging system

PT Muria Sumba ManisOwner

PT Rapid Infrastruktur Indonesia

Project Integrator

Subcontractors• PT Swadaya Graha

• PT Tatamulia Nusanra indah• PT Weltes Energi Nusantara• PT Syamsir Karya Pertama• Statec Binder GmbH.

Engineering and Procurement Vendor• Isgec Heavy Engineering Ltd.

Page 22: Enhancing the future

PROCESS EQUIPMENTS VESSELS AND PIPING

POWER PLANT AREA BOILER PIPINGWATER TREATMENT PROCESSPOND

Page 23: Enhancing the future

ENERCO RPO TDAE PROCESSING PLANT - PMT

Project Capitalization Capacity Schedule Location

USD 1,500,000 180,000 MTPY May 2018 – June 2021 Batam, Indonesia

Scope Challenges StakeholderEnerco is the pioneer of TDAE plant in Indonesia with its own unique technology. This brings additional challenge as we have no predecessor in constructing the TDAE Plant.

We managed to complete the construction of the plant on-time, on-budget, and proudly exceeds the designed performance.

Project Management and Consultancy Services • Status and progress project evaluation• Bidding process• Commissioning and start-up phase assist• Technical marketing assist• Regular maintenance lead

• Initial schedule from October 2017 - April2019 (18M)

• Status as per April 2018: progress 26% (lag16%)

• Dispute with sub-contractors in term ofscope of work and budget.

• Assisting CESCO for chemical cleaning

Result of hard-work

• LTI Zero• Mechanical Completion achieved on end

March 2019PT Timas

Subcontractor

PT Enerco RPO InternationalOwner

PT Rapid Infrastruktur IndonesiaContractor

PT Energy Management IndonesiaContractor

Page 24: Enhancing the future

BIRD EYE VIEW OF ENERCO RPO PLANT TOPSIDE VIEW OF ENERCO RPO PLANT

Page 25: Enhancing the future

PIPE PAINTING CLOSER VIEW OF THE PLANT

Page 26: Enhancing the future

PERTAMINA JTB EVAPORATOR & CRYSTALISATION UNIT PMT

Project Value Capacity Schedule Location

USD 2,500,000 52,000 MTPY Nov 2019 - Nov 2020 Bojonegoro, Indonesia

Scope Stakeholder

Rapid assists our clients to provide a solution to semi-solid waste treatment in Pertamina JTB Gas Processing Plant.

Using the technology provided & engineered by Rapid, our client could easily dispose their waste in dry-solid form, complying with national regulation.

Project Management and Consultancy Services • Technical and commercial assist for vendor in since

bidding phase• Risk matrix analysis• Cost control• Provide a cutting-edge engineering solution• Project schedule control• Technical assist in project execution design phase

PT Pertamina EP CepuOwner

PT Rapid Infrastruktur IndonesiaContractor

PT Energy Management IndonesiaContractor

Alfa Laval CorporationFabricator

Page 27: Enhancing the future
Page 28: Enhancing the future

ENERCO RPO TDAE PROCESSING PLANT - PipelineProject Value Pipeline Constructed Schedule Location

USD 3,200,00012 km

17,432 DIMay 2018 – Dec 2018 Batam, Indonesia

Scope Pipeline Details Stakeholder

Pipeline Construction• Constructing 17.432 Dia-inch

carbon steel pipeline from Rubber Processing Plant to Jetty

• Working on Horizontal Directional Drilling (HDD) on the underground pipeline

• Installing pipe sleeper on the surface pipeline

• 12“ Pipeline DAE 3 km

• 12” Pipeline TDAE 3 km

• 12” Pipeline HACE 3 km

• 12” Pipeline Fire Water 3 km

PT Citra Tubindo EngineeringSubcontractor

PT Enerco RPO InternationalOwner

PT Rapid Infrastruktur IndonesiaContractor

Page 29: Enhancing the future

FIRE WATER, DAE, TDAE, AND HACE PIPELINES

ENERCO JETTY ANOTHER LOOK OF ENERCO JETTY

PIPELINEPIPELINE TO JETTY PIPELINE

Page 30: Enhancing the future

JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide 1/3)

Project Value Work Volume Schedule Location

USD 3,000,0006.79 Km9,397 DI

January 2021 – September 2021 Bojonegoro, Indonesia

Scope Stakeholder

Rapid is responsible to manage pipeline works, starting from site preparation onto commissioning. We employ high-performing project management team to tackle any technical and social issue which may arise in executing this project.

We deliver by collaborating with our partners on electrical and instrumentation works, ensuring perfect quality of works to project owner.

Scope:• Site Preparation and Civil Work• Pipeline Works• River & Road Crossing Works• Pre-commissioning & Testing• Mechanical Installation• Electrical & Instrument Works

Rekind-JGC JOMain Contractor

PT Pertamina EP CepuOwner

PT Bojonegoro Bangun SaranaContractor

PT Rapid Infrastruktur IndonesiaContractor

Page 31: Enhancing the future

We’re working on this project from

site preparationuntil

pre-commissioning

Gathering Pipeline consists of

1.53 km 20” Pipeline5.26 km 18” Pipeline

With total

9,397 DI

SPECIFICATION HIGHLIGHTS

Coated with

3-Layer Polypropylene

Coatingeasier to fabricate, and more

corrosion resistant and heat resistant than carbon steel

Using rare material

INCOLOY 825That’s easier to fabricate, and more corrosion resistant and

heat resistant than carbon steel

Welded with both

GTAW and SMAW

JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide 2/3)

Page 32: Enhancing the future

Mechanical Works• 47 pcs Spool Bolting• 525 EA of Valves (Gate, Ball,

Globe, Check, DBB, Control Valves) sizes ranging from ½” up to 18”

• 3 Pig signal

JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide 3/3)

Electrical Works• 17,60 km FO Cable size 48C• 9,20 km Power Cable 3C-95

mm2• 5,12 km Power Cable 3C-70

mm2• Cathodic Protection installed

on the pipeline to prevent rust and corrotions

Page 33: Enhancing the future

PIPE STRINGING PIPE LINEUP PIPE LOWERING

PIPE NEAR THE FACILITY

Page 34: Enhancing the future

PIPE WELDING WELD INSPECTION GTAW WELD

WELD RESULTS

WELDING PREP

Page 35: Enhancing the future

Project Value Work Volume Schedule Location

USD 900,000 15,000 DI 15 November 2019 - 31 May 2020 Papua, Indonesia

Scope of Work Stakeholder

Rapid was given the responsibility to lead the project management on LNG cold section piping work, to evaluate monthly progress and speed up the construction to achieve targeted schedule.

We review and rearrange project execution plan for direct and indirect manpower to increase productivity and achieve on-time delivery.

Scope:• Progress management • Material controlling• Construction supervision• Manpower supply

BP TANGGUH LNG PLANT- Piping

Chiyoda-Saipem-Tripatra-Suluh Ardhi Engineering JO Main Contractor

PT Rapid Infrastruktur IndonesiaContractor

BP P.L.COwner

Page 36: Enhancing the future
Page 37: Enhancing the future

ENERCO RPO TDAE PROCESSING PLANT OPERATION & MAINTENANCE

Project Value Capacity Schedule Location

USD 300,000 180,000 MTPY January 2020 – June 2021 Batam, Indonesia

Scope Stakeholder

Rapid supports Enerco TDAE Plant even further after the completion of the plant, Supporting operational and maintenance activity to ensure every aspect of engineered process and mechanical performance runs without any crucial issue.

Scope:• Upgrading and provide improvement for convenience plant

operation and maintenance• Network of manufacturing facilities and service centers, which

provides support for operation and maintenance activities• 24/7 services manpower support to run the plant safely and finish

every job incident free• Confined space maintenance work

PT Rapid Infrastruktur IndonesiaContractor

PT Enerco RPO InternationalOwner

Page 38: Enhancing the future

HEAT EXCHANGER CLEANINGPREPARATION FOR CLEANING COLUMN

(CONFINED SPACE)

Page 39: Enhancing the future

HEAT EXCHANGER (HE) DISASSAMBLING

HEAT EXCHANGER TUBINGLIFTED

WORKERS USING HAZMAT SUIT TO CLEAN THE HE

HEAT EXCHANGER DISASSAMBLING PULLING OUT HE TUBING

Page 40: Enhancing the future

Project Value Schedule Location

USD 15,000,000 Nov 2019 – present Papua, Indonesia

Scope of Work Stakeholder

BP Tangguh LNG Expansion Project was located in a very remote area which makes logistics becomes one of the main determining factors for the project success. Therefore, it is essential to avoid re-work and preserve equipment integrity.

Rapid brings additional value by delivering precise work on our maintenance and support for our client’s facilities, ensuring no issue will rise once the plant is fully operational. borescope inspection & bolt tightening service are some examples of our supporting services, delivering excellence on our client’s assets commissioning phase.

BP TANGGUH LNG PLANT (slide 1/2)

Chiyoda-Saipem-Tripatra-Suluh Ardhi Engineering JO Main Contractor

PT Rapid Infrastruktur IndonesiaContractor

BP P.L.COwner

Page 41: Enhancing the future

PRESERVATION1 January 2020 – 31 January 2021

COMMISSIONING1 July 2020 – 30 June 2021

BORESCOPE7 December 2019 – 31 August 2021

BOLT TORQUEING15 November 2019 – 30 November 2020

Scope of Work• Condition monitoring for

valve, pipe, and instrument devices

• Steel structure erection for Train 3 and brownfield area

Scope of Work• Pipe visual inspection• Repair recommendation• Assistance for

commissioning activity• Flange Management based

in torque standard

Scope of Work• Pipe inner layer camera-

assisted inspection • Making report of the pipe

inspection• Recommending action plan

based on the inspection

Scope of Work• Flange Management based

in torque standard• Pre-checking flange, bolt,

and gasket condition• Tightening bolt in a

sequence using a minimum of three torquing passes and the maximum bolt stress as defined in the reference documents

BP TANGGUH LNG PLANT (slide 2/2)

Page 42: Enhancing the future

BORESCOPE MONITORING SETTING UP BORESCOPE MONITOR

Page 43: Enhancing the future

BP PLC TANGGUH SITE BORESCOPE PREPARATION

Page 44: Enhancing the future

SAFETY AWARD FOR RAPID INFRASTRUKTUR WORKERS FROM

CSTS JO

INSPECTING PIPE THROUGH MONITOR USING FLEXIBLE

BORESCOPE

Page 45: Enhancing the future
Page 46: Enhancing the future

ENGINEERING SERVICES FOR SUGAR FACTORY 6000 TCD

Project Value Capacity Schedule Location

USD 200,000 6,000 TCD June 2020 – December 2020 Jakarta, Indonesia

Scope Stakeholder

• Detailed engineering design in regards ofprocurement and construction phase for process,piping, mechanical, civil, structure, electrical,instrument and valve criticality construction

• Design engineering in regards of balance of plant tosupport sugar processing plant, such as coalhandling, raw sugar handling, automatic baggingsystem, and automatic fuel distribution

PT Rapid Infrastruktur IndonesiaEngineering Consultant

PT Muria Sumba ManisOwner

Page 47: Enhancing the future

3D OVERVIEW OF SUGAR MILL PLANT

DETAILS OF THE PROCESSING PLANT

STRUCTURAL 3D MODEL

Page 48: Enhancing the future

EVALUATION OF ENERCO TDAE PLANT FEASIBILITY AT 170,000 MTPY CAPACITY

Project Capitalization Capacity Schedule Location

USD 80,000 180,000 MTPY March 2020 – present Batam, Indonesia

Scope Stakeholder

Rapid collaborates with Institut Teknologi Bandung to conductan evaluation of design capacity of the TDAE Plant in severaloperational scenarios.

Our study proves through calculated simulation that anadditional capacity is available for utilization and added valueto our client

Scope:Evaluating plant current condition to perform at 170,000 MTPYCapacity. The evaluation had been done by simulation withprocess software such as HYSYS and HTRI. The result of thesimulation was compiled into a comprehensive report

PT Rapid Infrastruktur IndonesiaConsultant

PT LAPI ITBConsultant

PT Enerco RPO InternationalOwner

Page 49: Enhancing the future

PRE-FEASIBILITY STUDY ON METHANOL PROJECT IN GRISSIK CORRIDOR FOR RUKUN RAHARJA Tbk.

Schedule Location

July 2020 - September 2020 Tanjung Carat, Indonesia

Scope Stakeholder

Rapid collaborates with Institut Teknologi Bandung to evaluate the feasibility of a high-capacity methanol plant business plan prepared by Rukun Raharja Tbk.

We provided detailed technical opinion on preferred plant capacity, compatible technology, suitable project location, and appropriate methods to improve project economics.

Scope:• Condition and Petrochemical Industry Mapping Study in Indonesia• Study of raw material• Market and factory capacity study• Technology review• Data study, analysis, and calculation• Methanol transportation and storage study• Risk analysis and study business models• Regulatory and policy review

PT Rapid Infrastruktur IndonesiaConsultant

Rukun Raharja Tbk.Owner

Page 50: Enhancing the future
Page 51: Enhancing the future

E-mail: [email protected]@rapidinfrastruktur.com

Phone: +62 21-27819899

Talavera Office Park, Lt. 8 (Marketing)Lt. 12 (Operation)

Address:Jl T.B. Simatupang No. 23, RT.3/RW.1, Cilandak Barat, DKI Jakarta 12430

Website: www.rapidinfrastruktur.com

CONTACT US

Page 52: Enhancing the future