ENGINEERING MODUL FORM 4
description
Transcript of ENGINEERING MODUL FORM 4
ENGINEERING TECHNOLOGYManufacturing > Communication > Transportation and Power > Construction
> Industrial Design
Produced by:
1. MUHAMMAD AMIR B. RAFIDI 2. MUHAMMAD SHAFIQ B AHMAD3. NURUL JANNAH BT RAMLI4. JASHIDATUL BT GHAZALI
A HYDROELECTRIC POWER STATION
POTENTIAL ENERGY
KINETIC ENERGY
MECHANICAL ENERGY
ELECTRICAL ENERGY
HYDROELECTRIC DAMS
In Perak alone, there are seven hydroelectric dams; Temenggor Dam – 382 MW Bersia Dam – 69 MW Kenering Dam – 108 MW Sungai Piah Dam – 70 MW Chenderoh Dam – 41 MW Jor Batang Padang Dam – 100 MW Who Dam – 150 MW
COMPARISON ON THE ADVANTAGES & DISADVANTAGES OF ELECTRICAL POWER
STATIONSTYPE OF STATIO
NLOCATION ADVANTAGES DISADVANTAGES
HYDRO • Upstream
• Lake
• Artificial
water reservoir
• Does not pollute the
environment• Does not release gases• No waste• Can control flooding• Provides water for
agriculture• Supplies water• Can be a recreational spot• Can be used as a site for
water sport• Provides fast energy
• Requires a large area
• Disturbs animal
habitats
• Flash flooding can
occur if uncontrolled
or the dam may burst