AV
S
<-->
A1.1
Cover Sheet w/ notes, symbols, and index.
no scale
Contacts
Site View
Sheet Index
Symbols
EB
PSU Capital Projects and Construction.
University Svcs. Bldg.
617 SW Montgomery St. #302
Portland, OR 97201
(503) 725-3738
Ron Blaj - Director
Steve Rounds - Asst. Director
Gail Hamilton - Const Mgr. PSU Crews.
Quinn Soifer - Project Manager
James Schmidt - Architectural Intern
Tom Arnich - Architect
PSU Network -Teleco OIT
Todd King - Tech. Services Bldg.
2121 SW 4th Ave. #400
Portland, OR 97201
Office: 503-725-4434
Cell: 360-903-8777
Doug McCartney - AV Services
Office: 503-725-9110
ARCHITECTURAL
(13 - sheets)
Dated: 5 / 8 / 2015
A1.1 - 1.2 General Info. / Specifications
A2.0 Existing Plan
A2.1 Demo Plan
A2.2 Floor Plan
A2.3 Reflected Ceiling Plan
A2.4 - 2.7 Furniture / Equipment Plans
A3.1 - 3.2 Sections / Details
A4.1 Schedules
A5.1 Interior Elevations
STRUCTURAL ENG.
(1 sheet)
Dated 5 / 8 /15
S1 General Notes / Details
MECHANICAL / ELECTRICAL / PLUMBING
(8 - sheets)
Dated: 05 / 8 / 2015
G1 – General Notes and Symbols
M2.0 – Mechanical Demolition
M2.1 – Mechanical New Work
E2.0 – Electrical Demolition
E2.1 – Electrical New Work – Power
E2.2 – Electrical New Work – Lighting
P2.1 – Plumbing New Work
P2.2 – Plumbing New Work – Lab Gasses
North-East View
CODE NOTES
1. Remodel PSU Labs @ Engineering Bldg.
2. 2014 OSSC. (Refer ZGF LSS 2.8 - 5 / 1/ 06)
3. TYPE 1 Construction
4. Group B Lab Occupancy
5. Existing Fire Sprinklers
6. Floor Remodel area = 1277+ 504 = 1800 sf +/-
7. Existing Bldg. = 5 Stories, Basmt, 2- Parking Levels
8. Total Bldg. Floor Area Gross = 26,000 sf +/-
9. Typ. Occupant Floor Area = 1800 sf / 50 sf per
occupant = 36 occupants
10. 36 Occ. = < 50 req'd = 1 exit req'd : (2) exits if less
than 500
11. 100' max. com. path egress (sect.1014.3)
12. 300' max. access travel (sect.1016.1)
13. Codes - All work to conform to latest applicable codes
for City of Portland, including ADA stnds.,Ceiling
stnds, Environmental and Waste management
regulations.
Cover Sheet
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
ENGINEERING BLDG.
Vicinity MapNo Scale
SW
4
TH
A
VE
.
SW HARRISON ST.
Location / Egress Planscale: 1 /32 " = 1'- 0"scale: 1 /16 " = 1'- 0"
Code / General Notes
5/08/2015
RM. 550 & 560 - ENGINEERING BUILDING - LAB REMODEL / EQUIPMENT MOVE
P O R T L A N D S T A T E U N I V E R S I T Y
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Main Egress Path
to (3) Exit stairs.
SW PEDESTRIAN TRAIL
ELEV.
Bldg. / Property Manager
NAI - Norris, Beggs, & Simpson
David Miller
617 SW Montgomery St. #202
Portland, OR 97201
Office: 503-725-9751
Mech / Electrical Engineer
Insite Group Inc.
Consulting Engineers
Chris Wierman
Office: (503) 222-2044
310 SW 4th Ave. Suite #1120
Portland , OR 97204
Structural Engineer
ABHT Structural Engineers.
Clinton Ambrose
Office: 971-222-4378
224 NW 13th Ave #325
Portland, OR 97209
City of Portland-BDS
Facility Permit Program
1900 SW 4th Ave. #5000
Portland, OR 97201
Scott Burris - Inspector
Office: 503-823-0668
Jeff Galvin - Fire Marshal
Office: 503-823-4032
PSU Planning & Design
Ernest Tipton AIA
Assist. Director
PSU Facilities Planning and
Campus Design
Office: 503-725-4318
PSU Campus Public Safety
503-725-4407- Non-Emergency
503-725-4404 - Emergency
Client
Engineering Bldg.
Don Mueller
Jun Jiao
Lester Lampert
( Total = 22 sheets at 34" x 22" size )
EXITSTAIR
EXITSTAIR
EXITSTAIR
SW FOURTH AVENUE
LOVEJOY PARK / FOUNTAIN
CITY TOWER
(2) exist. "B" occupancy Labs to remain.
Rm 550 = 1227 sf@50sf/occ. = 25
Rm 560 = 504 sf @50sf / occ.= 11
Total 36 occupants.
135'80'
(1) hr. fire rated corridor
with 20 min fire rated
door assemblies.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A1 - EB550-60 - General.dwg, 5/8/2015 7:19:21 AM, DWG To PDF.pc3
A1.2
Specification
Spec. Notes
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
A.General Items
A.1. General and Code Notes -- See Cover Sheet.
A.2. Contract Documents and Work - Conform to PSU
General Conditions of Contract and Bid Documents.
A.3. Area / Location of Work -- See drawings.
A.4. All Products shall be installed per manufacturer's
specifications and recommendations. Products listed
shall be as noted. Approved equals shall be allowed
by contractor submitted substitution request form
prior to Bid Invitation deadline. Provide product
submittals samples for PSU to review prior to
ordering product. Product Review approval does not
imply or change the contract documents without an
approved change request and change order.
A.5. See Schedules --- for color / finish / material / room
/roof / door schedules for more specification
information.
A.6. Dimensions & Existing Conditions -- All drawing
dimensions shall have preference over scale. Verify
all dimensions and Existing Conditions prior to
commencement of work. Notify PSU of any
discrepancy.
A.7. Structural Engineer Approvals - Penetrations of
Structure by Contractor, including anchoring, coring,
scraping, cutting or removal is not permitted unless
approved by PSU Structural Engineer.
B.Demolition
B.1. General Demo --- Remove existing walls, doors,
frames, finishes, electrical, mechanical, and other
building items as required to accommodate new
construction. Remove all abandoned mech., elect.,
and plumbing lines in area of work. Verify all existing
structure and protect. Protect all egress paths and
exits.
C.Walls
C.1. Wall Finish -- Smooth texture or to match existing
surrounding surfaces.
C.2. Existing + New Wall Blocking, Patching / Painting --
Block, Patch and Prep and Paint as required to
include at new and existing gypsum brd / plaster and
framing, demo work, cabinetry, woodwork, all new
mechanical and electrical work. Contractor to install
hidden fire retardant or metal framing blocking at all
wall mount accessories.
D.Doors / Windows
D.1. None Required.
E. Door Hardware
E.1. None Required.
F. Signage
F.1. Signage -- BY PSU -- New floor and building interior
signage per code, ADA, and PSU standard
requirements .
G.Access Control
G.1. None Required
H.Metal Cabinetry / Woodwork
H.1. New Metal Cabinetry Island --- Provided by PSU,
assembled and installed by contractor to be
coordinated and adjacent to new hoods.
Manufacturer VWR or approved equal, 8' length
metal cabinetry island and shelves above back to
back units with 5'+/- wide p. resin counter top with
under-counter sitting space each side. See interior
elevations.
H.2. Rework Existing Metal Cabinetry - To accommodate
new undercounter refrigerator and new sinks. All new
finishes to match existing. See details.
H.3. WB -- Wood Base --- None Required.
I. Flooring / Base / Surfaces
I.1. See Schedules.
I.2. Floor Hole Patching --- Verify with Structural
Engineer. For max. 4" dia holes use 6" dia. x 16 ga.
galv metal plate and epoxy. Fill with 1 hr. rated fire
safing and caulk.
I.3. Floor / Wall Preparation -- Prepare, fill and level all
surfaces as required for new finishes for equal
smooth level transitions with existing surfaces. Use
finish manufacturer's approved products and
specifications.
I.4. Tile Floors ,Walls, and Grout -None Required
I.5. Wall Base - Rubber base by Roppe or approved
equal, 4" ht., match existing base color.
I.6. Floor Transitions - Vinyl between different floor
surfaces , Johnsonite or approved equal, conform to
ADA requirements.
I.7. Resin Floor Coating System - Silikal Flake, 62-SLF-M
or approved equal. 1 /4" min. MMA intregal flooring
sytem with 4" ht. wall base application, acid resistant
system , including patch repair, moisture treatment,
primer, membrane, flake coating, and top coat.
Standard Color - #3 , white with black and grey flake
blend.
J. Paint / Coatings / Colors/ Sealants
J.1. Colors --- See Schedules. Provide (3) 8-1 /2 x 11"
draw-down samples of each color on material for
review.
J.2. Products
J.2.1. TYPE - A -- Acro Pure, Miller or approved
equal, water based, Satin sheen unless noted
otherwise. Primer and (2) finish coats. Satin
sheen.
J.2.2. TYPE - B -- 100% Acrylic for use on metal,
PPG Pitt. Tech. Breakthrough or approved
equal, water base, Satin sheen. Primer and
(2) finish coats
J.2.3. TYPE - C -- Clear Flat Finish, Waterborne
Varnish, Emtech EM 8000cv, EM8428, Pre
Cat Waterborne Conversion Varnish, by
Target Coatings or approved equal, clear
natural coating for wood. (4) coats.
J.2.4. Match finish for reworked metal cabinetry. See
cabinetry section and details.
J.3. General Locations
J.3.1. General Painting, Gypsum Board / Plaster
Walls and Ceilings -- TYPE A
J.3.2. Exposed Natural Wood Work including Doors,
Trim or Base -- TYPE C
J.3.3. Existing painted Wood Work with Existing Oil
Based Paint including Doors, Frames, Trim ,
or Base. -- TYPE B
J.3.4. Metal Doors, Frames, Metal Work, Metal
Ceiling grids, or Railings -- TYPE B
J.3.5. Interior Hollow Metal Frames for Doors and
Windows. -- TYPE B
J.3.6. Interior Joint Sealers -- Silicone GE, Dow, or
approved equal. Sanitary type at bathrooms.
J.4. General Notes : Paint all Areas of Work including
exposed areas / surfaces remaining after-demolition,
including exposed mechanical ductwork and electrical
conduit + wiremold and exposed low voltage wiring.
Prepare, fill and level all surfaces as required for new
finishes for equal smooth level transitions with
existing surfaces. Use finish manufacturer's approved
products and specifications.
J.5. Mullion Filler Strip - None Required
K. Furnishings
K.1. White Boards -- Claridge or approved equal. Deluxe
white porcelain enamel steel marker brd. with satin
anodized alum. trim and tray. White # 75 low gloss.
K.2. Systems Furniture - None Required
K.3. Move Existing Equipment - By General Contractor or
PSU as noted on drawings.
K.4. Move Existing Furniture - By PSU with locations
shown per drawings. Existing furniture and chairs in
Engineering bldg rm 550 and 560 to remain and be
protected by Contractor.
K.5. Window Blackout Roller Shades - Blackout
Curtains.com or approved equal Fire Retardant, vinyl
embedded in fiberglass , 100% blackout opacity, R8
manual shade with blackout. Include stainless steel
bead chain, aluminum roller tube with black aluminum
front, end and back fascias, side and sill channels,
with synthetic pile inserts to eliminate light leakage.
Heat welded and enclosed pocket for Hem bar. Verify
existing window conditions for dimensions including
spacing of vertical side channels on window mullions.
Secure to wall structure.
K.6. Laser Curtains - PL Systems Inc. or approved equal
Laser Curtain model T2, double track assembly with
over-lapping curtains at required openings, and 11" +
valence above velcro attach to track assembly , black
color, Modacrylic flame retardant ,self-extinguishing,
light proof fabrics and vinyl backing. Grommet
attachment of Fabric to carrier and 2" floor overlap,
with 2' wide horizontal overlap + velcro at required
exits. Track assembly to include a double 16 ga.
extruded anodized aluminum 1-1 /4" wide track open
at bottom to receive carriers, with end stops as
required and velco attachment to end walls. Curtain to
provide complete Laser light protection. Secure to
structure above. Approx. curtain weight of 50# /ft.
shall be verified by contractor prior to purchase.
L. Appliances / Equipment --
L.1. Fire Cabinets. - See Mechanical Drawings.
L.2. Hoods and Base cabinet w/ toe kick space - See
Mechanical Drawings. PSU to provide. General
contractor to install.
L.3. Metal Cabinetry Island - Adjacent to Hoods. See "H"
portion of these specs.
L.4. Gas Cylinders - PSU to provide, General contractor to
install.
L.5. Gas Cylinder Wall Racks - USA or approved equal,
gas cylinder bracket for (3) cylinders. Chain model #
GB105FS, 11ga. hot rolled steel, powder paint finish,
support edges with steel reinf. vinyl edge guarding.
Wall mounted, 36"W x 2.25"D x 4.25"H. Provide
brackets at top and bottom at each exposed cylinder.
L.6. Chemical Refrigerator - Undercounter VWR model
97049-790 - AGA Marvel white with glass door.
34"h.x24"w.x24"d.
M. Insulation, Acoustical, Fire Caulk, and Safing
M.1. Wall Insulation Batts -- None Required.
M.2. Fire Caulking / Fire Safing --Manuf. 3M, STI, or
approved equal -- 1-hr. rated include at penetrations
at floors, roof, fire rated walls, concrete block
walls,stairway or shaft walls, fire corridors, mechanical
/electrical rooms, and vertical pipe and duct chases
thru floors.
M.3. Ceiling Insulation -- None Required.
M.4. Fire Doors / Smoke Gaskets -- None Required
N. Ceilings
N.1. New Suspended Acoustical Ceiling Tiles - Add to
accommodate existing work. Replace damaged or
stained existing Suspended Ceiling Tiles to match
existing. Armstrong or approved equal to match
existing.
N.2. Existing Ceiling Grids - To Remain. To accommodate
new work. Retrofit or repair to existing or new grid
components and support to be Heavy Duty type
material and installation to conform to City of Portland
latest standards. Armstrong or approved equal to
match existing.
O. Audio Visual
O.1. AV Equipment / Anchors and Cabeling -- None
Required.
P. Telco
P.1. Telephone and Computer Network Cabling and WIFI
-- See Electrical Engineer's dwgs. and specifications.
General contractor to provide and install.
P.2. PSU Equipment - Verify locations of network printer
and AV requirements with Electrical engineer's
drawings.
Q.Lighting / Electrical
Q.1. Electrical and Lighting --- See Electrical Engineer's
drawings for more information. Protect existing as
required. Provide new lighting as indicated on
drawings.
Q.2. Pathway & Boxes - Contractor to provide all boxes at
ceiling, walls, and floors, conduit, and pathway as
req'd. to include Electrical, Audio Visual, Telco,
Alarms, ADA door actuator, and other devises.
Q.3. Exit and Emergency -- Contractor to complete
Construction so as to provide minimum exit, egress,
audible strobe alarms, and emergency lighting as
required by City of Portland, including (1) footcandle
min at floor during construction. All doors, exits, and
hardware, to meet min.code requirements of the
City of Portland for exits and ADA clearances.
Q.4. Systems Furniture -- None Required .
Q.5. PSU Equipment - Verify locations of network printer
and AV requirements with Electrical engineer's
drawings.
R.Mechanical / Air Grilles
R.1. Mechanical -- See Mechanical Engineer's drawings
for mechanical items.
R.2. Balance HVAC system--- Contractor to Balance per
code requirements and submit an Engineer's
approved report for PSU Mechanical Engineer review
and approval.
S.Plumbing
S.1. Plumbing -- See Mechanical Engineer's drawings for
plumbing items
T. Fire - Systems
T.1. Fire Alarm / Sprinkler Systems. -- Refer to Elect.
Engineer drawings and specifications for additional
requirements. Contractor to Submit to city fire marshal
and provide PSU with City of Portland fire marshal
signed and dated approved fire system drawings.
Provide new work to conform to NFPA and include
demolition, relocation, materials and labor for a
complete code compliant installation.
T.2. Fire Sprinkler Heads - Provide New Quick Response
Fire Sprinkler head assembly to replace existing
throughout area of work. Verify existing. Move fire
sprinkler / heads or add new to accommodate new
work per code and approval of Fire Marshall. Match
existing finished sprinkler heads and plates.
U. ALTERNATE BID ITEMS -
U.1. ABI #1 - Resin Floor Coating System
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
ABI # 1
See Bid Forms and plans
for more ABI information.
ABI # 1
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A1 - EB550-60 - General.dwg, 5/8/2015 7:19:24 AM, DWG To PDF.pc3
A2.1
Demolition Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /4 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
1. Typical Notes - See Specifications Sheet.
2. Existing Countertops - Cabinetry - Protect and to remain.
Modify counter tops for new sinks.
3. Service Drop Structure Above - Modify as required for new
ht. clearances.-See details.
4. Ceiling Modifications - Verify with ceiling plan to
accommodate new demo work including mechanical,
electrical, plumbing, and curtain assembly.
5. Modify cabinetry at new refrigerator location.
6. Modify cabinetry at new sink locations
7. Prep. concrete floor - as required for new flooring. Grind
bolt sleeves as required. Verify location and quantity.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:27 AM, DWG To PDF.pc3
A2.2
Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /4 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
1. Typical Notes - See Specifications Sheet.
2. Wall Types - See Diagramatic Bldg Section on Detail Sheet.
3. New Laser Curtain - Suspended from Roof Structure above.
PLS Group or approved equal. Black fire retardant,
manually pulled on Manufacturer track. Meet NFPA fire-
retardant standards with signed certificate.
4. Window Blackout Blinds - Secured to wall - min lap windows
all around - verify existing dimensions. Blackout
Curtains.com or approved equal. R8 Roller Shade w/
Blackout. Black fire-retardant, manually pulled on
Manufacturer roller shades with chain in a perimeter metal
channel framework. Meet NFPA fire-retardant standards
with signed certificate.
5. Equipment Anchors - anchor vertical reactor to floor per
structural engineer requirements. See equipment plan for
approx. location.
6. New Sinks - Sawcut existing counter tops as required for
new sinks. Verify size and locations. See Plumbing
drawings.
7. Existing Built-in - Counter tops and cabinets to remain.
8. Racks - for gas cylinders. Sawcut / remove gyp. brd. and
provide sheet metal backing 16 ga x 18" high x stud widths
secured for rack backing at top and bottom area of gas
cylinders. See Equipment dwgs.
See Spec. Notes
THRU
LASER CURTAIN
Patch / Paint asreq'd for newutilities.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:28 AM, DWG To PDF.pc3
A2.3
Ceiling Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /4 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
1. Typical Notes - See Specifications Sheet.
2. Overhead Utility Rack - See Diagramatic Bldg Section on
Detail Sheet.
3. New Laser Curtain - Suspended from Roof Structure above.
PLS Group or approved equal. Black fire retardant,
manually pulled on Manufacturer track. Meet NFPA fire-
retardant standards with signed certificate.
4. Lighting - Revise to accommodate for new work. w/ New 1x4
fixtures and new can lights.See Elect. Engineer dwg.
5. Fire Sprinkers - Revise and Add to accommodate new work
per code and specifications. Match existing type. N = New,
E= Existing, R = Relocated , D = Demo
6. Mechanical - Relocate existing mech. difusers - see Mech
Eng.dwgs.
7. Suspended Ceiling - Existing - replace damaged or stained
tiles with new.
See Spec. Notes
THRU
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:29 AM, DWG To PDF.pc3
A2.4
Equipment / Furniture
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /4 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
See systems furniture
designer plans and
spec book items for
more information.
1. Roughing Pump
2. Black Magic Vertical Reactor
3. ICP CVD Water Chiller
4. ICP CVD Controls / Power Rack
5. ICP CVD Vertical Reactor
6. Muffle Furnace
7. Carbonite Split Tube Furnace
8. Roughing Pump
9. Carbonite Split Tube Furnace
10. High Power Laser (ablation)
11. Roughing Pump
12. Tek-Vac Tube Furnace
13. Tek -Vac Pumping Station
14. Roughing Pump
15. MEPS Probe Station
16. MEPS Control / Power Rack
17. Probe Station Water Chiller
18. Lakeshore Magnetic Probe Station
19. Lakeshore Control / Power Rack
20. Raman Spectometer / Microprobe
21. Raman Control / Power Desk
22. Shimadzu UV-Vis Spectro-Photometer
23. Shimadzu Control Computer
24. Newport UV Lamp Controller
25. Newport UV Arc Discharge Lamp
26. Newport Computer Control
27. Vacuum Oven
28. Wafer Hot Plates
29. Centrifuge
30. Spin Coater
31. Laboratory Digital Scale
32. Sonic Probe and Controller
33. UHV System
Equipment List
1. Typical Notes - See Specifications Sheet.
2. Tables - Existing Relocated -- 2' x 6' verify +/-
3. Chairs - Existing Relocated
4. White Board - 4' x 4' Secure to Structure or Wall.
5. Gas Cabinets - Fire Rated - See Plumbing Eng. dwgs for
specification and requirements.
6. Gas Cylinders / Racks - Cylinders by PSU - Contractor to
provide and install racks secured to wall. Gas piping - see
Plumbing Eng. drawings.
7. Short Gas Cylinders - Cylinders by PSU - Contractor to
secure to floor and wall.
8. Laboratory Equipment - See Specs and List.
9. Laser Curtain
10. Equipment Moves - See specifications note sheet for more
information:
10.1. Equipment to go through the hatch: #4, 14, 20, and one
33-UHV system. Equipment item 20 may be
dissassembled unless taking it through the hatch at the
same time of the others is easier to coordinate.
10.2. Equipment moved by PSU staff: #24, 25, 22/23, 27, 31,
32, 00 (both).
32
31
30
29
27
28
26
25
24
23
22
20
21
15
14
16
17
18
19
05
04
03
02
01
06 07 08 09 10 11 12 13
33
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:30 AM, DWG To PDF.pc3
A2.5
New Items
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /4 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
A. Laser Blackout Curtain at interior - Encloses pillar and surrounds probe stations and Raman
Spectrometer ( requires darkness and adjustable light.) Foot-switch along with wall switch to
control lights within curtained area required. Four openings with and ability to fully retract all
sides.
A.1. Blackout Blinds at Exterior Windows. -
B. Service Drop #1 - Existing Structure Above - This drop serves Vertical Reactor and requires
compressed air, Ar,N
2
, He,CO
2
,H
2
, CH
4
,C
2
H
2
,O
2
,NH
3
. Electrical requirements per equipment
list. (2) data required.
C. Service Drop #2 - Existing Structure Above - This drop is used for general workspace and for
directing gas service to all tube furnaces and requires: compresssed air, Ar,N
2
, He,CO
2
,H
2
,
CH
4
,C
2
H
2
,O
2
,NH
3
. General electrical req'd. (2) Data required.
D. Service Drop #3 - Existing Structure Above - This drop serves the probe stations and Raman
spectrometer. It requires: compressed air, Ar,N
2
,O
2
,NH
3
. Electrical requirements listed in cut
sheets. (3) data required.
D.1. Service Drop #5 - Existing Structure Above - Verify requirements with MEP Engineer Dwgs.
E. Sink #1 - Deep basin sink with eye wash adjacent (left side preferred). Spigot for Type 3 water
required. Soap and paper towel dispenser required.
F. Sink #2 - Shallow basin sink for general use and hand washing with adjacent eyewash station.
Spigot for Type 3 water required. Soap and paper towel dispenser required.
G. Sink #3- double deep basin sink with sediment trap with adjacent eye wash sstation. Spigot for
Type 3 water required. Soap and paper towel dispenser required.
H. Tank Farm (9 tanks) - Ar,N
2
, He,CO
2
,H
2
, CH
4
,C
2
H
2
,O
2
,NH
3
. Stainless steel lines required for all
gases, with check valves at service points.
I. Cryogen Storage (2 tanks) - LN
2
and LHe wall anchoring points for secure storage.
J. Type 3 Water Source - DI (Type 3) water at separate spigots each sink.
K. 6' w. Back to Back Dynamic Barrier Fume Hoods - Requires Ar, N
2
, CH
4
, and O
2
, Type 3 water,
vacuum, flammable and corrosive storage required below hoods.
L. Laboratory Island - Island connected to hoods located under server drop #4. Requires Ar, N
2
,
CH
4
, and O
2
. Shelving in center of island required for sample and chemical storage.
M. Service Drop #4 - Existing Structure Above - Raise as required for hood clearances. Requires
Ar, N
2
, CH
4
, and O
2
, and vacuum line. The vacuum line will be served by a remote roughing
pump (on/off at wall switch)
N. Under Counter Chemical Refrigerator - Storage for temperature sensitive chemicals. Must lock
and be controlled by digital feedback.
New Items - Program list
xx
E
B
C
D
D1
M
K
L
N
G
I
H
J
F
A
A1
A1A1
O
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:32 AM, DWG To PDF.pc3
A2.6
Equipment Spec.
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /4 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
01
1. Roughing Pump
2. Black Magic Vertical Reactor
3. ICP CVD Water Chiller
4. ICP CVD Controls / Power Rack
5. ICP CVD Vertical Reactor
6. Muffle Furnace
7. Carbonite Split Tube Furnace
8. Roughing Pump
9. Carbonite Split Tube Furnace
10. High Power Laser (ablation)
11. Roughing Pump
12. Tek-Vac Tube Furnace
13. Tek -Vac Pumping Station
14. Roughing Pump
15. MEPS Probe Station
16. MEPS Control / Power Rack
17. Probe Station Water Chiller
18. Lakeshore Magnetic Probe Station
19. Lakeshore Control / Power Rack
20. Raman Spectometer / Microprobe
21. Raman Control / Power Desk
22. Shimadzu UV-Vis Spectro-Photometer
23. Shimadzu Control Computer
24. Newport UV Lamp Controller
25. Newport UV Arc Discharge Lamp
26. Newport Computer Control
27. Vacuum Oven
28. Wafer Hot Plates
29. Centrifuge
30. Spin Coater
31. Laboratory Digital Scale
32. Sonic Probe and Controller
33. UHV System
Equipment
02 03
04,5
04,5
04,506 07 08 09 10
11
20,21
31
12
22,23
32
13
24
14,15,16
25
00
17
22,23
18,19
27
00
33 No Photo -
See existing site
location.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:34 AM, DWG To PDF.pc3
A2.7
Existing Equipment
SB-1 Basement Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 1 /8 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
5/08/2015
1. Roughing Pump
2. Black Magic Vertical Reactor
3. ICP CVD Water Chiller
4. ICP CVD Controls / Power Rack
5. ICP CVD Vertical Reactor
6. Muffle Furnace
7. Carbonite Split Tube Furnace
8. Roughing Pump
9. Carbonite Split Tube Furnace
10. High Power Laser (ablation)
11. Roughing Pump
12. Tek-Vac Tube Furnace
13. Tek -Vac Pumping Station
14. Roughing Pump
15. MEPS Probe Station
16. MEPS Control / Power Rack
17. Probe Station Water Chiller
18. Lakeshore Magnetic Probe Station
19. Lakeshore Control / Power Rack
20. Raman Spectometer / Microprobe
21. Raman Control / Power Desk
22. Shimadzu UV-Vis Spectro-Photometer
23. Shimadzu Control Computer
24. Newport UV Lamp Controller
25. Newport UV Arc Discharge Lamp
26. Newport Computer Control
27. Vacuum Oven
28. Wafer Hot Plates
29. Centrifuge
30. Spin Coater
31. Laboratory Digital Scale
32. Sonic Probe and Controller
33. UHV System
Equipment
Exist. Lab
Exist. Lab
Exist. Lab
Exist. Lab
Exist. Lab
1. Hatch location to ground surface. This will be needed
for equipment item # x,x,x,x which will not fit in the
elevator.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A2 - EB550-60 - Plan.dwg, 5/8/2015 7:19:35 AM, DWG To PDF.pc3
LASERFIRE CORRIDOR
ROOF AREA ROOF AREA
HOODS STAIR
ROOF DECK
5TH FLOOR
1- HR. 2- HR. SHAFT
ROOF DECK
5TH FLOOR
HOODSSTAIRFIRE CORRIDOR
ROOF AREA
1- HR.
section - south- north
1 /4 " = 1' - 0"
section - west-east
1
-
2
-
Protect existing
structure and
utilities. Obtain core
drill or anchor
location approval.
Line of existing
bldg. wall.
Line of suspended
ceiling
A3.1
Plan Notes
1. See specification sheet for notes.
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
Sections
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
1 /4 " = 1' - 0"
For other notes and info
see plans, detail sheets
and section below.
Line of suspended
ceiling
Verify walls that
extend to structure
above
Existing Concrete
slab on metal
cellular deck. Verify
utility locations in
open cells.
GRIDS - TYP.
Existing Roofing &
Insulation on
concrete slab on
cellular deck.
Typ. Bracing and
support at laser
curtain. See details.
Laser Curtain.
GRIDS - TYP.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A3 - EB550-60 - Sections-Details.dwg, 5/8/2015 7:19:36 AM, DWG To PDF.pc3
+/- verify
A3.2
Details
1 - 1 /2" = 1'-0"
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
1. See specification sheet and room / finish schedules. Information
shown is general and diagramatic.
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
Blinds - Detail
No Scale
Laser Curtain - Info Detail
1 - 1 /2 " = 1' - 0"
Detail
1- 1 /2 " = 1' - 0"
Revised Utility Rack
3" = 1' - 0"
Laser Curtain - Track Detail
1- 1 /2 " = 1' - 0"
Detail
1- 1 /2 " = 1' - 0"
Detail
Detail
No Scale
no scale
See Structural Eng. Details for all Connections.
Vertical all-thread
supports to structural
deck above.
Sway bracing
Cont. Struct Channel
2 x fire retardant
blocking.
Susp. ceiling - break
trim, and secure for
track opening.
Manuf. track - secure with
thru-bolts per structural
engineer.
Double track at curtain
opening with typ. curtain and
fabric valence.
Susp. ceiling - break
trim, and secure for
track opening.
Shorten exist utility rack
metal unistrut supports.
Verify ht. with new
equipment and
cabinetry.
Re-connect U-bracket
metal mounting trim and
utility runs as req'd.
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A3 - EB550-60 - Sections-Details.dwg, 5/8/2015 7:19:36 AM, DWG To PDF.pc3
A4.1
Plan Notes
schedules
no scale
1. See specification sheet for notes.
2. See plans for recessed entries with low soffits above.
Door / Window / Room
Schedule
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
ABI # 1
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A4 - EB550-60 - Schedules.dwg, 5/8/2015 7:19:37 AM, DWG To PDF.pc3
Floor
Ceiling
+/- Verify
+/- V
erify
+/- Verify+/- Verify +/- Verify +/- Verify+/- Verify
+/- Verify
+/- V
erify
Floor
Ceiling
+/- Verify
+/- V
erify
ENTRY
+/- Verify+/- Verify
+/- Verify
P. Resin Chemicalresist. solid top,
Adjust. openmetal shelveswith metalsupportstandards,brackets, andedge lip,seismic T-mold
Metal cab.doors, w/drawers above
+ / -
adjustable shelves
+ /
-
+ /
-
2'-0"
Floor
Ceiling
REF
Rework exist metalcabinets to accomodatenew refrigerator provideand install new finishedmetal side panels tomatch as req'd.
Ceiling
30" +/- 3'-0" 3'-0"
Floor
Existing Metalcabinets anddrawers andchemical resistantsolid top
SINK
Rework / demo exist. metalcabinets to accommodatenew sink . Add cabinet doorsto match at locations whereremoval of existing drawersare required.
Ceiling
Varies 2' to 3'
Floor
Existing Metalcabinets anddrawers andchemical resistantsolid top
-
1
Laser Curtains1 /4 " = 1' - 0"
-
2
Window Blinds1 /4 " = 1' - 0"
A5.1
Plan Notes
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
Int. Elevations
5/08/2015
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR LAB REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
North Elevation
North Elevation East Elevation South Elevation
1. Typical Notes - See Specifications Sheet.
2. New Laser Curtain - Suspended from Roof Structure above.
3. Window Blackout Blinds - Secured to wall.
4. New Island Cabinets @ Hood.
5. Under-Counter Refrigerator
6. Typical Sink
-
4
Under-Counter Refrigerator at Existing Cabinets1 /4 " = 1' - 0"
-
5
Typical Sink at Existing Cabinets
South Elevation
-
3
New Cabinets @ Hoods1 /4 " = 1' - 0"1 /4 " = 1' - 0"
Typical Elevation North Elevation (South similar)Section
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\A5 - EB550-60 - Elevations.dwg, 5/8/2015 7:19:37 AM, DWG To PDF.pc3
S1
Structural Items
PSU Capital Projects & Construction
EBENGINEERING BLDG.
RM. 550 & 560INTERIOR OFFICE REMODEL
(Block 091)1930 SW 4TH Ave.
Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
5 / 08 / 15
Laser Curtain Support Detail
Drawing Notes
1. Coordinate Structural details with Architectural details and
plans.
2. All work and materials per latest City of Portland codes
and manufacturer's industry standards and specifications.
SK-1
-
Calculations
I:\Staff\Facilities\Projects\091_EB\EB_OPEN\2015_091_EB550-560-JunJaio-Lab\3-Arch\0.1-Bid Set - ACAD Dwgs\S1-EB550-560 - Structural.dwg, 5/8/2015 7:19:40 AM, DWG To PDF.pc3