Engineering and Construction Services Calculation ... purpose of this calculation is to provide a...

77

Transcript of Engineering and Construction Services Calculation ... purpose of this calculation is to provide a...

Page 1: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 2: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Calculation Number: TV-YT-GPC603884-002

Project/Plant: Plant Yates Ash Pond 3

Unit(s): Units 6-7

Discipline/Area: ESFS

Title/Subject: Slope Stability Analyses of Ash Pond 3 Dam Purpose/Objective: Analyze slope stability of the Ash Pond 3 Dam System or Equipment Tag Numbers:

NA Originator:

Stacey H. Simpson, P.E.

Topic Page Attachments

(Computer Printouts, Tech. Papers, Sketches, Correspondence) # of

Pages Purpose of Calculation 2 Attachment A - Boring Location Plan 3 Methodology 2 Attachment B - Boring Logs 58 Criteria and Assumptions 2 Attachment C - Laboratory Analyses 1

Input Data 3 Attachment D - Critical Section Profile Used in Analysis 1

Summary of Conclusions 4 Design Inputs/References 4 Body of Calculation 5

Total # of pages including cover sheet & attachments: 76

Rev. No. Description

Originator Initial / Date

Reviewer Initial / Date

Approver Initial / Date

0 Issued for Information SHS 10/05/16 JAL 10/10/16 JCP 10/10/16

Notes:

Contents

Revision Record

Engineering and Construction Services Calculation

Page 3: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 2 of 10 10/05/2016

Purpose of Calculation The Eugene A. Yates Power Plant (Plant Yates) was once a seven unit, coal fired, power generation facility. Currently Plant Yates Units 1-5 are in the process of demolition and Plant Yates Units 6 and 7 have been converted to natural gas. Ash Pond 3 was originally constructed in August 1976 and was designed, and constructed, for emergency storage with a dike crest of elevation 755 feet. The purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed by the EPA CCR rule.

Methodology The calculation was performed using the following methods and software: GeoStudio 2012 (Version 8.15.5.11777), August 2015 Release, Copyright 1991-2016, GEO-SLOPE International, Ltd. Strata (Version alpha, Revision 0.2.0), Geotechnical Engineering Center, Department of Civil, Architectural, and Environmental Engineering, University of Texas. The Morgenstern-Price analytical method with an entry-exit slip surface was used for slope stability calculation.

Criteria and Assumptions The slope stability models were run using the following assumptions and design criteria:

• Seismic site response was determined using a one-dimensional equivalent linear site response analysis. The analysis was performed using Strata and utilizing random vibration theory. The input motion consisted of the USGS published 2008 Uniform Hazard Response Spectrum (UHRS) for Site Class B/C at a 2% Probability of Exceedance in 50 years. The UHRS was converted to a Fourier Amplitude Spectrum, and propagated through a representative one dimensional soil column using linear wave propagation with strain-dependent dynamic soil properties. The input soil properties and layer thickness were randomized based on defined statistical distributions to perform Monte Carlo simulations for 100 realizations, which were used to generate a median estimate of the surface ground motions.

• The median surface ground motions were then used to calculate a pseudostatic seismic coefficient for utilization in the stability analysis using the approach suggested by Bray and Tavasarou (2009). The procedure calculates the seismic coefficient for an allowable seismic displacement and a probability exceedance of the displacement. For this analysis, an allowable displacement of 0.5 ft, and a probability of exceedance of 16% were conservatively selected, providing a seismic coefficient of 0.048g for use as a horizontal acceleration in the stability analysis.

• The soil properties used for the analysis (unit weight, phi angle, and cohesion) were

obtained from historic boring logs and laboratory results.

Page 4: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 3 of 10 10/05/2016

• The ash properties used for the analysis (unit weight, phi angle, and cohesion) were based on laboratory testing performed on undisturbed and remolded samples of ash from various plants, including Yates, and on engineering judgment.

• Historic piezometer readings and SCS Hydro Services piezometer readings were used to obtain current water elevations within the dike and the foundation soils.

• The Corps of Engineers (COE) EM 1110-2-1902 standard, October 2003, allows the use of

the phreatic surface established for the maximum storage condition (normal pool) in the analysis for the maximum surcharge loading condition. This is based on the short term duration of the surcharge loading relative to the permeability of the embankment and the foundation materials. This method is used in the analysis for the impoundments at this facility with surcharge loading.

• The current required minimum criteria (factors of safety) were taken from the Structural

Integrity Criteria for Existing CCR Surface Impoundments, 40 CFR 257.73, published April 17, 2015.

• The critical section was selected at location having the apparent maximum dam height.

The cross-section of the Ash Pond 3 dam was modeled using the following sources: 1) A 2010 level profile survey extending from the pond surface on the upstream face

of the dam to the river surface on the downstream face of the dam performed by Southern Company Services (SCS).

2) Critical section developed for a slope stability analysis performed in 2000 to evaluate the effects of a proposed dam raise.

3) Historical drawing H-9065, showing the typical section of the proposed dam construction including foundation elevation.

Input Data

• Soil Properties: Soil properties were obtained from historic boring logs and laboratory tests that include soil classification, consolidated undrained triaxial shear tests, unconsolidated undrained triaxial shear tests, unit weight determination, and standard Proctor density testing. The following effective stress values were used in the analyses.

Soil Description Unit Weight, pcf Effective Stress Parameters

Cohesion, psf Phi Angle, degrees

Existing Fill 125 280 37

Residual Soil 121 330 29

Saprolite/PWR 125 0 38

Ash 98 0 28

Page 5: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 4 of 10 10/05/2016

• Phreatic Surface: The phreatic surface was determined using piezometers installed in 1997 and in 2010 along the crest of the dam.

Summary of Conclusions The following table summarizes the factors of safety resulting from the slope stability analyses. The results indicate the safety factors of the Ash Pond 3 dam meet or exceed the minimum criteria set forth in the structural integrity criteria for existing CCR surface impoundments, 40 CFR 257.73.

Factor of Safety Summary Table

Loading Condition Minimum Calculated Safety Factor

Minimum Required Safety Factor

Long-term Maximum Storage Pool (Static) 2.7 1.5 Maximum Surcharge Pool (Static) 2.5 1.4 Seismic 2.4 1.0

Design Inputs/References • Bray, J. D. and Travasarou, T., Pseudostatic Coefficient for Use in Simplified Seismic

Slope Stability Evaluation, Journal of Geotechnical and Environmental Engineering, American Society of Civil Engineers, September 2009

• GPC Drawing H-9065, Plant Yates Emergency Ash Pond Plan and Sections • GPC Drawing H-9068, Plant Yates Emergency Ash Pond Elevation Excavation with 1976

boring locations • SCS Boring Logs 1976 and 1977 • 2000 Summary of Laboratory Testing of AP-3 Dike Soils

Page 6: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 5 of 10 10/05/2016

Body of Calculation

Page 7: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

2.7

AshExisiting Fill

Saprolite/PWR

Residual Soil Saturated

Name: Existing Fill Unit Weight: 125 pcfCohesion': 280 psfPhi': 37 °Piezometric Line: 1

Name: Ash Unit Weight: 98 pcfCohesion': 0 psfPhi': 28 °Piezometric Line: 1

Name: Residual Soil Unit Weight: 121 pcfCohesion': 330 psfPhi': 29 °Piezometric Line: 1

Name: Saprolite/PWR Unit Weight: 125 pcfCohesion': 0 psfPhi': 38 °Piezometric Line: 1

Name: Bedrock Piezometric Line: 1

Rock

ASH POND 3Long Term Maximum Storage Pool

PLANT YATES

Distance-80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200

Ele

vatio

n

650

660

670

680

690

700

710

720

730

740

750

760

770

780

Ele

vatio

n

650

660

670

680

690

700

710

720

730

740

750

760

770

780

Page 8: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

2.5

AshExisiting Fill

Saprolite/PWR

Residual Soil Saturated

Name: Existing Fill Unit Weight: 125 pcfCohesion': 280 psfPhi': 37 °Piezometric Line: 1

Name: Ash Unit Weight: 98 pcfCohesion': 0 psfPhi': 28 °Piezometric Line: 1

Name: Residual Soil Unit Weight: 121 pcfCohesion': 330 psfPhi': 29 °Piezometric Line: 1

Name: Saprolite/PWR Unit Weight: 125 pcfCohesion': 0 psfPhi': 38 °Piezometric Line: 1

Name: Bedrock

Rock

ASH POND 3Maximum Surcharge Pool

PLANT YATES

Distance-80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200

Ele

vatio

n

650

660

670

680

690

700

710

720

730

740

750

760

770

780

Ele

vatio

n

650

660

670

680

690

700

710

720

730

740

750

760

770

780

Page 9: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

2.4

AshExisiting Fill

Saprolite/PWR

Residual Soil Saturated

Name: Existing Fill Unit Weight: 125 pcfCohesion': 280 psfPhi': 37 °Piezometric Line: 1

Name: Ash Unit Weight: 98 pcfCohesion': 0 psfPhi': 28 °Piezometric Line: 1

Name: Residual Soil Unit Weight: 121 pcfCohesion': 330 psfPhi': 29 °Piezometric Line: 1

Name: Saprolite/PWR Unit Weight: 125 pcfCohesion': 0 psfPhi': 38 °Piezometric Line: 1

Name: Bedrock Piezometric Line: 1

Horizontal Seismic Coefficient.: 0.048

Rock

ASH POND 3Seismic

PLANT YATES

Distance-80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200

Ele

vatio

n

650

660

670

680

690

700

710

720

730

740

750

760

770

780

Ele

vatio

n

650

660

670

680

690

700

710

720

730

740

750

760

770

780

Page 10: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 6 of 10 10/05/2016

ATTACHMENTS

Page 11: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 7 of 10 10/05/2016

Attachment A - Boring Location Plan

Page 12: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 13: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 14: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 15: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 8 of 10 10/05/2016

Attachment B - Boring and Piezometer Logs

Page 16: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 17: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 18: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 19: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 20: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 21: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 22: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 23: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 24: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 25: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 26: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 27: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 28: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 29: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 30: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 31: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 32: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 33: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 34: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 35: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 36: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 37: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 38: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 39: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 40: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 41: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 42: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 43: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 44: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 45: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 46: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 47: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 48: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 49: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 50: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 51: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 52: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 53: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 54: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 55: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 56: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 57: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 58: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 59: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 60: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 61: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 62: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 63: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 64: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 65: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 66: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 67: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 68: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 69: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 70: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 71: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 72: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 73: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 74: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 9 of 10 10/05/2016

Attachment C - Laboratory Analyses

Page 75: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed
Page 76: Engineering and Construction Services Calculation ... purpose of this calculation is to provide a slope stability assessment of the Plant Yates Ash Pond 3 dam under conditions prescribed

Plant Yates Ash Pond 3 Dam Slope Stability Analysis TV-YT-GPC603884-002

Rev. 0 Page 10 of 10 10/05/2016

Attachment D – Critical Section Profile Used in Analysis