Engineering and Commercial Infrastructure - Water Services April 2017

Transcript of Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial...

Page 1: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

Engineering and Commercial Infrastructure -

Water Services

April 2017

Page 2: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 2

Engineering & Commercial Infrastructure Monthly Review > April 2017

OVERVIEW ............................................................................................................................. 3 

SAFETY ................................................................................................................................ 4 

1.1.  Incident Statistics ........................................................................................................ 4 1.2.  Lost Time Injuries ........................................................................................................ 4 

FINANCE .............................................................................................................................. 5 

2.1.  Water and Wastewater Financial Fund Report ........................................................... 5 2.2.  Operating Result for Water and Waste Water Fund .................................................... 6 2.3.  Capital Expenditure for Water and Waste Water Fund ............................................... 6 2.4.  Accrued Water Operating Revenue Less Expenditure ................................................ 7 2.5.  Accrued Wastewater Operating Revenue less Expenditure........................................ 7 2.6.  Capital Expenditure Performance ............................................................................... 8 

CUSTOMER SERVICES ................................................................................................... 8 

3.1.  Requests ..................................................................................................................... 8 3.2.  Request Types ............................................................................................................ 9 3.3.  Plumbing Applications ................................................................................................. 9 3.4.  Trade Waste Approvals ............................................................................................. 10 3.5.  Annual Trade Waste Activity ..................................................................................... 10 3.6.  Building Over Adjacent Sewers ................................................................................. 11 3.7.  Scientific and Analytical Services .............................................................................. 11 3.8.  Community Engagement ........................................................................................... 12 3.9.  Leak Detection Notifications ...................................................................................... 13 

ASSET MANAGEMENT.................................................................................................. 14 

4.1.  Surface Water Raw Water Storage Capacities ......................................................... 14 4.2.  Annual Water Consumption vs Allocation by Source ................................................ 15 4.3.  Water Consumption by Locality ................................................................................. 15 4.4.  Significant Projects .................................................................................................... 16 

REGULATORY COMPLIANCE ..................................................................................... 19 

5.1.  Drinking Water Compliance ....................................................................................... 19 5.2.  Wastewater Compliance ........................................................................................... 20 5.3.  Backflow Testing ....................................................................................................... 20 

 

Page 3: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 3

Engineering & Commercial Infrastructure Monthly Review > April 2017

OVERVIEW

This report is for Water Services activities for April 2017. Significant items in this period include:

Water Services recorded no LTIs in April 2017 which extends the period for no LTIs to 22

months.

Water Services continued to clean up after Cyclone Debbie with key staff members meeting

for debrief sessions discussing Lessons Learned.

An officer attended a Legionella Management Masterclass Conference in Brisbane during the

month where information was shared on implementing and planning water safety

management practices around waterborne pathogens.

Key Water Services staff participated in a Business Plan Workshop in preparation for the

upcoming Business Plan update.

The delivery of the Capital Program remains a focus and assessment of any carry over

projects is occurring to align with the 2017/2018 budget adoption.

Director Engineering & Commercial Infrastructure

 

Page 4: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 4

Engineering & Commercial Infrastructure Monthly Review > April 2017

SAFETY

1.1. Incident Statistics

The incident statistic details a summary of the Water Services safety incident performance. Water Services aspires to achieve zero harm with a stretch target of zero injuries.

1.2. Lost Time Injuries

Water Services aspires to achieve zero Lost Time Injuries by improving safety performance by developing a proactive safety culture and implementing best practice safety management across all business areas

The table below shows the Lost Time Injuries over previous years

The following incident was recorded in April 2017:1 x Non Treatment Injury from hitting objects with part of a body

Data is at 30 April 2017

0

1

2

3

4

5

6

7

8

Nu

mb

er o

f In

cid

ents

Total Incidents Lost Time Injuries

Total Recordable Injuries All Injuries

No Lost Time Injuries were sustained in April 2017

Data is at 30 April 2017

0

1

2

3

4

5

0

10

20

30

40

50

60

70

80

90

No

of

LT

Is

No

. of

Day

s L

ost

Lost Time Injuries

Water Total Days Lost Water Total LTIs

LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost LTI Days Lost

Administration

Business Services

Planning & Sustainability

Water Network 2 79 4 9 3 71 0 0 0 0

Water Treatment

Infrastructure Delivery

Water Services 2 79 4 9 3 71 0 0 0 0

2016‐17Department 2012‐13 2013‐14 2014‐15 2015‐16

Page 5: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 5

Engineering & Commercial Infrastructure Monthly Review > April 2017

FINANCE

2.1. Water and Wastewater Financial Fund Report

 

 

For April 2017

Operating Result AMD Budget YTD Budget YTD Actual YTD Variance %

Water

6.01 - Commercial Infrastructure Management

(38,313,700) (38,289,606) (38,240,864) 48,742 100%

6.02 - Planning & Sustainability 824,253 704,101 660,126 (43,975) 94%

6.03 - Infrastructure Delivery279,782 229,108 223,493 (5,615) 98%

6.04 - Water Networks

6,371,448 5,280,918 4,817,583 (463,335) 91%

6.06 - Business Services

17,059,369 6,087,615 5,952,620 (134,995) 98%

6.07 - Water Treatment 5,393,203 4,492,133 4,016,565 (475,568) 89%

Total Water (8,385,645) (21,495,732) (22,570,478) (1,074,746) 105%

Waste Water

6.01 - Commercial Infrastructure Management

(41,593,570) (41,574,640) (41,678,000) (103,361) 100%

6.02 - Planning & Sustainability 722,906 586,805 510,897 (75,908) 87%

6.03 - Infrastructure Delivery 259,486 213,570 158,551 (55,019) 74%

6.04 - Water Networks 4,805,271 4,034,782 4,302,771 267,989 107%

6.06 - Business Services 17,524,020 5,154,091 5,026,000 (128,091) 98%

6.07 - Water Treatment 6,369,452 5,410,468 4,774,144 (636,324) 88%

Total Waste Water (11,912,436) (26,174,923) (26,905,638) (730,714) 103%

TOTAL OPERATIONAL (20,298,081) (47,670,655) (49,476,115) (1,805,460) 104%

3 - Water 7,054,076 4,016,127 3,598,141 (417,986) 90%

4 - Sewerage 7,219,574 4,695,768 4,275,572 (420,196) 91%

TOTAL CAPITAL 14,273,650 8,711,895 7,873,713 (838,181) 90%

Key: % Variance from YTD Budget

Actuals more than 10% over YTD Budget

Actuals between 5% and 10% over YTD Budget

Actuals between 5% over and 10% under YTD Budget

Actuals between 10% and 50% under YTD Budget

Actuals more than 50% under YTD Budget

Forecast to spend 87% of total budget.

$85k increase in operating revenue offset by $14k increase in wages and $32k timing difference in expenses.

$45k saving aginst wages (1.5 vacancies). $2k timing difference in expenses offset by $3k plant hire expenses not budgeted for.

Wages $16k more than budget - allowances not allocated against capital. $16k timing difference in expenses and $5k timing difference in plant hire.

$212k decrease in operating revenue (primarily recoverable works). $204k saving against wages (5 vacancies). $180k timing difference in expenses of which $80k is committed. $187k timing difference in plant hire. $105k difference in internal transfers.

$213k increase in operating revenue & $102k increase in operating expenses (mainly MiWater related). $32k timing difference in wages. and $7k internal transfers not budgeted for.$54k increase in operating revenue (lab fees). $188k saving in wages (4 vacancies). $303k difference in expenses of which $180k is committed. $7k timing difference in internal plant hire and $78k less in internal transfers ($44k more in lab revenue offset by $123k expenses more - $95k sludge removal & $28k expenses).

$42k saving inwages (1.5 vacancies). $37k timing difference in expenses offset by $3k plant hire not budgeted for.$29k saving in wages (1 vacancy). $15k timing difference in expenses and $11k timing difference in plant hire.

Water and Waste Water Fund Financial Report

Comments

$129k decrease in operational revenue (usage charges) offset by $8k timing difference in wages, $34k timing difference in expenses and $38k difference in internal transfer income for bulk water sales.

Forecast to spend 93% of total budget.

$91k decrease in operating revenue (primarily recoverable works). $68k decrease in wages (1 vacancy). $111k increase in expenses ($103k TC Debbie). $2k increase in plant hire. $4k decrease in internal transfers.$140k increase in operating revenue. $21k timing difference in wages. $32k incerase in internal transfer expenses (mainly lab testing).

$72k increase in operating revenue. $67k saving in wages (1 vacancy). $483k saving in expenses (mainly against Downer contract) of which $78k is committed. $4k timing difference in plant hire and $9k more in internal transfers.

Page 6: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 6

Engineering & Commercial Infrastructure Monthly Review > April 2017

2.2. Operating Result for Water and Waste Water Fund

 

 

 

2.3. Capital Expenditure for Water and Waste Water Fund

 

 

The Water & Sewerage Operational actuals remains on track against the budget. The current Goods and Services are below YTD budget however that is because not all operational funds have been accrued against the reporting period. Any savings are being reviewed as part of the March quarterly budget review.   

(60,000,000)

(50,000,000)

(40,000,000)

(30,000,000)

(20,000,000)

(10,000,000)

-July August September October November December January February March April May June

Operating Result

YTD Budget YTD Actual

-

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

July August September October November December January February March April May June

Capital Expenditure

YTD Budget YTD Actual

Page 7: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 7

Engineering & Commercial Infrastructure Monthly Review > April 2017

2.4. Accrued Water Operating Revenue Less Expenditure

The following shows the estimation of the accrued revenue less expenditure. Capital revenue has been excluded

2.5. Accrued Wastewater Operating Revenue less Expenditure

The following shows the estimation of the accrued revenue less expenditure. Capital revenue has been excluded

Annual variance for operating surplus based on current budgeted cost structure is projected at $196K above budget.

This variance is mainly due to projected capital costs expensed of $240K and finance costs of $15K included in calculations and offset by a $464K saving in employee cost.

Financial data is up to April 2017.

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

18,000,000

20,000,000

Rev

enu

e le

ss e

xpen

dit

ure

(m

arg

in)

Operational Hours

Budget - Water Accrual Actual - Water Accrual Proj. Accrual Actuals - Water

The annual operating surplus is projected to be $150K below budget which will somewhat offset any positive variances within the Water business.

Revenue is projected to be $285K above budget which is driven by $126K higher rates and $132K higher internal transfer income.

Operating expenses are forecast to be $436K above budget mainly due to projected capital costs expensed of $423K and $20K of finance costs included.

Financial data is up to April 2017.

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

Rev

enu

e le

ss e

xpen

dit

ure

(m

arg

in)

Operational Hours

Budget - Sewerage Accrual Actual - Sewerage Accrual Proj. Accrual Actuals - Sewarage

Page 8: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 8

Engineering & Commercial Infrastructure Monthly Review > April 2017

2.6. Capital Expenditure Performance

The following trend provides a high level overview of the capital expenditure to monitor actual expenditure against forecast expenditure. The forecast expenditure profile is based on the original Water and Sewerage Capital Program projects budget and delivery schedule.

CUSTOMER SERVICES

3.1. Requests

This chart details the customer requests received and recorded via pathways that relate to the Water Business. The target is to have 90% of all customer requests closed at any one point in time

.

Capital YTD expenditure actuals resulted in a 55% spend of Total Budget.

Including committals 84% of total budget has been spent.

Currently forecast to spend 90% of total budget.

The remaining funds are budgeted to be spent in 2017/2018.

Financial data is up to April 2017.

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

18,000,000

20,000,000

Exp

end

itu

re (

$)

Operational Hours

YTD Actual Capital Expenditure YTD Actual + Committals Capital ExpenditureForecast Cash Flow Capital Amd BudgetAmd Budget Cash Flow

0%

20%

40%

60%

80%

100%

0

50

100

150

200

250

300

350

400

450

500

% C

lien

t R

equ

ests

Co

mp

lete

d

To

tal C

lien

t R

equ

ests

Monthly Client Requests Received % of total Client Requests Completed

Completion Target %

91% of Client Requests completed in April 2017.

Data is at 30 April 2017

Page 9: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

 Page 9

Engineering & Commercial Infrastructure Monthly Review > April 2017

3.2. Request Types

The following chart displays a summary of the customer request types received for the month.

3.3. Plumbing Applications

In accordance with the Plumbing and Drainage Act a plumbing application is required for all new plumbing installations or modifications to existing plumbing. A plumbing application must be lodged to Local Government. Water Services has a regulatory time frame of 20 business days to assess a plumbing application. An internal target of 5 business days has been set for all residential plumbing applications.

Number of requests received in April was 385 which is an increase from March where 328 requests were received. The majority of the requests are for Water Leak Service - 200 requests.

Data is at 30 April 2017.

0200400600800100012001400160018002000

0

50

100

150

200

250S

ewer

age

blo

ckag

e/sp

ill

Sew

era

ge o

dou

r

Sew

er M

isce

llan

eou

s

Sew

er -

Man

hol

es

Sub

sid

ence

in G

roun

d

Dirt

y w

ater

/Clo

udy

wat

er

Fire

Hyd

rant

/S

erv

ice

Va

lve

No

Wa

ter

/ Low

Wat

er

Pub

lic A

men

ities

/ R

ec F

acili

ties

Wat

er

Lea

k S

ervi

ce

Wat

er

- S

top

cock

Mal

func

tioni

ng

Wat

er

Lea

k M

ain

Wat

er

Met

er

Bro

ken

/Lea

king

Wat

er

Od

our/

Tas

te/S

mel

l

Wat

er

Mis

cella

neo

us

Yea

rly

Tre

nd

To

tal R

equ

ests

To

tal C

lien

t R

equ

ests

Monthly Client Service Requests Yearly Client Service Request Trend

Application numbers are up by approximately 13% over the six month period. Approval turnaround times have increased to three days, however still remain well within set timeframes.

Data is at 30 April 2017

0

2

4

6

0

50

100

Ap

pro

val

Tim

e (D

ays)

Ap

plic

atio

ns

Information Requests Sent Total Approved Plumbing Applications

Average Approval Time Target Plumbing Approval Turn around Time

Page 10: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 10

Engineering & Commercial Infrastructure Monthly Review > April 2017

3.4. Trade Waste Approvals

The program for undertaking trade waste assessment and licensing of all applicable businesses that discharge trade waste is ongoing. As part of the Trade Waste Assessment process a temporary Trade Waste Approval is put in place while the formal approval process is undertaken. The table below summarises the number of Trade Waste Approvals for the Mackay Region.

3.5. Annual Trade Waste Activity

Annual targets are set for the Trade Waste team with respect to licensing Trade Waste Businesses. The target has been set at 250 new licensed businesses and audits completed by June 2017. The following chart shows the Actual Approvals, Temporary Approvals and Audits achieved and the number of the target remaining.

102

125

108 24

132

0% 20% 40% 60% 80% 100%

Target Trade Waste Approvals & Audits Completed

YTD Audits Remaining Audits YTD Approvals

Temporary Approvals Remaining Approvals

5 Approvals issued and 5 Audits conducted during April 2017.

The target is 250 combined Approvals and Audits for 2016/2017 financial year

Data is at 30 April 2017

Total Approved

Businesses

Temporary Approvals In

Place

New Approved Businesses for

the Month

Mackay South 754 21 4

Mackay North 69 2 1

Sarina 56 0 0

Mirani/Marian 30 1 0

Total 909 24 5

5 new businesses were identified for the month of April.

Data is at 30 April 2017

Page 11: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 11

Engineering & Commercial Infrastructure Monthly Review > April 2017

3.6. Building Over Adjacent Sewers

Building over Adjacent Sewer applications are lodged where the construction of a structure is proposed within close proximity of a sewer main. The application is assessed against Queensland Development Code Mandatory Part 1.4 with council reviewing applications that do not comply with acceptable solutions identified in the code. Building Over Sewer Applications are assessed within a target timeframe of 20 business days.

 

3.7. Scientific and Analytical Services

Scientific and Analytical Services provides laboratory analysis in accordance with National Association of Testing Authorities (NATA) Standards to both Mackay Regional Council and external customers. A summary of the laboratory activities are detailed below.

There were no new BOAS referrals receivedin April 2017. PlumbingInspectors continue to field enquiries and provide information on infrastructure.

Data is at 30 April 2017

0

2

Ap

plic

atio

ns

BOAS Applications

0

5000

10000

15000

20000

25000

30000

0

200

400

600

800

1000

1200

Tes

t P

erfo

rmed

Sam

ple

s

Samples Analysed Test Performed

A higher number of samples tested due to issues and checks relating to Cyclone Debbie for both potable water and waste water.

Data is available to 30 April2017

Page 12: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 12

Engineering & Commercial Infrastructure Monthly Review > April 2017

3.8. Community Engagement

This section monitors Water Services engagement on the services provided. The following chart shows the number of media releases, media updates and the number of people that were reached by the Media Releases on Facebook

The following chart shows the number of likes and positive comments, the number of neutral comments and the number of negative comments received on Facebook from Media Releases and Media updates for Water Services

There were three Media Updates for April 2017:- Works at Mount Pleasant Reservoir- Works on Smalley Beach Road, Cape Hillsborough- Laboratory trainee scores fulltime role.

Data is at 30 April 2017

0

50000

100000

150000

200000

250000

300000

0

1

2

3

4

5

6

7

8

9

10

Re

ach

on

Fac

ebo

ok

(Peo

ple

)

Re

lea

ses

Media Releases Media Update Facebook People Reached

The likes on Facebook were mainly in regard to a post on cyclone clean-up and limiting water usage to essential usage only

Data is at 30 April 2017

0

100

200

300

400

500

600

700

Fac

ebo

ok

Fee

db

ack

Likes Neutral Negative

Page 13: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 13

Engineering & Commercial Infrastructure Monthly Review > April 2017

The following chart shows the cumulative number of myh20 registrations for the reporting period

    

3.9. Leak Detection Notifications

Leak Detection notifications are sent to customers, when the leak identified is greater than 10 litres per hour. Follow up notices are sent to residents, monthly for a three month period after the initial notification

The target number of myh20 registrations for the 2016/17 financial year is 12,500.

There were 118 new registrations during the month of April 2017.

Data is at 30 April 2017

0

2000

4000

6000

8000

10000

12000

Nu

mb

er

of

Myh

2o R

eg

istr

atio

ns

myh2o registrations myh20 Target Registrations 2016/2017

The number of new leaks identified during April for residential customers was 1742 and for non-residential customers was 203 which is an increase over the previous month for both categories. Consequently, the number of meters with leaks at the end of the reporting period has increased for both residential and non-residential customers. The number of leaks ceased during the period for both categories also increased. We are currently investigating the reason for this significant spike in leaks and whether this can be attributed in any way to TC Debbie.

0

500

1000

1500

2000

Nu

mb

er o

f L

eaks

Meters with Leaks (End of Period) - Res Meters with Leaks (End of Period) - Non ResNew Leaks in Period - Res New Leaks in Period - Non ResLeaks Ceased During Period - Res Leaks Ceased During Period - Non Res

Page 14: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 14

Engineering & Commercial Infrastructure Monthly Review > April 2017

The average leak days for current leaks shows the average number of days a leak exists before any action by the customer to rectify the cause of the leak. The average leak days for ceased leaks shows the average number of days that the leak exists before the leak is repaired.

  

ASSET MANAGEMENT

4.1. Surface Water Raw Water Storage Capacities

Water Services sources water from a combination of surface water and groundwater sources. With the exception of Middle Creek Dam the storage facilities are owned and operated by SunWater. Middle Creek Dam is under Council’s control. The water stored in each of the storages is detailed below.

There is a downward trend for Average Leak Days (Current Leaks) for residential customers, however, a slight increase for non-residential customers. The gap for current leak days between non-residential and residential is 88 days. The Average Leak Day Leaks (Ceased Leaks) show that the residential customer has the leaks repaired within 12 days on average, whereas the non-residential customer takes 34 days to have leaks repaired on average. Considerable effort is undertaken with non-residential customers to encourage attention to fix the identified leaks.Data is at 30 April 2017

0

50

100

150

200

250

Nu

mb

er o

f D

ays

Average Leak Days (Current Leaks) - ResAverage Leak Days (Current Leaks) - Non ResAverage Leak Days (Ceased Leaks) - ResAverage Leak Days (Ceased Leaks) - Non Res

2,8

00

3,9

85

6,1

08

1,1

20

491,

490

147,

556

0%

20%

40%

60%

80%

100%

Mirani Weir MarianWeir

DumbletonWeir

MiddleCreek Dam

Peter FaustDam

TeemburraDam

% V

olu

me

Sto

red

Volume Stored

ML

ML

ML

ML M

L

ML

Mirani Weir, Dumbleton Weir, Middle Creek Dam and Teemburra Dam are at capacity. Marian Weir and Peter Faust Dam are below capacity.

Data is at 2 May 2017

Page 15: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 15

Engineering & Commercial Infrastructure Monthly Review > April 2017

4.2. Annual Water Consumption vs Allocation by Source

Water Services has a water allocation or water license for each water source. The water allocation and year to date water consumption for each of the water sources is detailed below.

** Calen Water Usage figures are not based on Water Allocation, but show the amount of water usage for the area to date.

4.3. Water Consumption by Locality

Water Services supplies water to both residential and commercial water customers throughout the Mackay Region. The average water consumption in each of the three major community centres is detailed below. The water consumption is presented as litres per equivalent population per day. This chart provides a summary of water consumption including commercial water use.

249,28561649120251061353092601816367

48.420160001095236300100

9549022

270062

150352304660

460

0% 50% 100%

Calen Water Usage **Dumbleton

Nebo Rd BoresPlane Creek

Sarina BoresMirani Bore

Marian BoresMarwood Bores

Bloomsbury BoreProserpine River

Eton BoresBally Keel BoreKoumala Bores

Armstrong Beach BoreFinch Hatton Bore

Gargett BoresMarian Weir

Wa

ter

Vo

lum

e (

ML

)

YTD Water Consumed Allocation

At the current rate of consumption across the water sources, the annual allocations should not be exhausted by the end of the 16/17 FY.

Data is at 30 April 2017

Water consumption for Mackay, Mirani and Sarina in April 2017 has reduced compared to the corresponding time in 2016.

Data is at 30 April 2017

0

50

100

150

200

250

300

350

400

450

500

0

100

200

300

400

500

600

700

800

900

Wat

er C

on

sum

pti

on

(l/

p/d

)

Rai

nfa

ll (m

m)

Rainfall Sarina L/P/DMackay L/P/D Mirani L/P/DTarget Consumption

Page 16: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 16

Engineering & Commercial Infrastructure Monthly Review > April 2017

4.4. Significant Projects

Water Services undertakes a range of projects across the water business. Projects take the form of Capital works projects, planning studies and investigations. Information for the significant projects in Water Services is provided in the table below and was current as at 30 April 2017. Significant Projects are assessed on the following criteria: Dollar Amount, Risk and/or Community Interest

Council Project Management Phases 1. Planning (Plan) 2. Design (Des) 3. Procurement (Proc) 4. Construction (Con)

Indicators On Track Potential Issue Definite Issue

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

Sewerage Network Refurbishments (Relining)

Proc 100% Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$1,126,583

The Assessment Panel recommendation is not to proceed with accepting any offer due to unacceptable non-conformances to the Form of Contract that could not be resolved to MRC satisfaction. The Tender will therefore be readvertised with adjustments to provide for separable portions to attract a broader range of offers. The works now won't be delivered until FY 17/18.

Budget

Other Issues/ Risk

Sewerage Network Refurbishments (Manholes)

Con 65% Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$935,850

Contractors are continuing with manhole relining works. The Epoxy Relining Contract is expected to be completed by end of May and the CaAl Relining Contract to be completed by mid-June. Condition Assessment Inspection works for 600 manholes awarded with these works commencing in early May, and completed by end of June.

Budget

Other Issues/ Risk

Sewage Pump Station Resilience Upgrades

Con 80% Schedule Scheduled Completion Date:

1/09/2017

Original Budget:

$3,874,534

The construction is well under way since 12 September 2016 and despite a number of days lost to wet weather/Cyclone Debbie, works remain on Program. The contractor Roebuck Civil has completed 9 access improvements out of 9, has installed 18 ventpoles out of 28, has factory tested 20 switchboards, has installed and commissioned 14 switchboards on site out of 20, has relocated 6 antennas out of 6, has completed 5 wet well rehabilitations out of 5, has erected 3 elevated switchboard structures out of 3 and has refurbished 3 pump station top slabs out of 3.

Budget

Other Issues/ Risk

Water Main Replacements - Roads Driven

Des and Con

95% Design

70% Construction

Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$296,237

The 16/17 Capital project includes 3 water mains (WM) that require relocation prior to MRC road works. Construction of Curlew Street WM has been completed. Physical Works for Construction of Breen Street New Water Main has been completed. Construction of Vincent Street is scheduled to commence in May. Changes in the Civil Projects Program have resulted in two additional WMR projects - Forsyth Street (construction completed) and Holmes Avenue, Sarina (design completed, construction started mid-March and is currently ongoing) which were not budgeted for in the FY 16/17 budget. The forecast cost of these two projects is $260,000.

Budget

Other Issues/ Risk

Page 17: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 17

Engineering & Commercial Infrastructure Monthly Review > April 2017

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

Water Main Renewals (WMR)

Des and Con

80% Design

30% Construction

Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$1,277,650

Construction works have been completed in Gibson and Gardiner Streets and have commenced in Duncan Street, West Mackay. Bedford Road WM design has been completed and tender offers were received and evaluated. Roebuck Civil was awarded the contract with works to commence in May. Survey and initial design investigations have been completed for remaining WMR projects. Initial construction estimates indicate a potential budget shortfall on a number of WMR projects which will be reviewed on completion of final designs. The revised project cost estimates for this package of works it $1,675,000

Budget

Other Issues/ Risk

Water Meter Replacements and AMR retrofits

Con 55% Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$1,456,635

Replacement of commercial and domestic meters and AMR retrofits is progressing. Domestic AMR retrofits have been completed. Works have been slightly delayed due to recovery efforts following Tropical Cyclone Debbie but the project is on schedule for completion by end of June 2017. As a result of a reduction in the scope of works for a number of commercial water meters to be replaced, $720K surplus project funds were returned to reserves, in the December review.

Budget

Other Issues/ Risk

Shakespeare Street sewer realignment

Des 93% Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$147,483

Design has been submitted for review with a design workshop to be held in May. Based on the detailed design, both the cost and schedules are being reviewed. The recommended alignment through the affected properties has a number of constraints and indications are that works will extend into the 17-18 FY with an increase in forecast budget. A budget of $410,000 has been included in the FY17/18 capital program

Any change to this project will follow Council’s Enterprise Project Management Change Management Approval Process.

Budget

Other Issues/ Risk

Mt Pleasant Reservoir No. 1 Refurbishments

Con 2% Schedule Scheduled Completion Date:

30/06/2017

Original Budget:

$2,088,895

Contractor has commenced set-up and preliminary works on site. The reservoir has been drained and will remain empty until September while these works are underway.

Budget

Other Issues/ Risk

Page 18: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 18

Engineering & Commercial Infrastructure Monthly Review > April 2017

PROJECT PHASE PHASE %

COMPLETE INDICATORS

ORIGINAL BUDGET DETAILS

COMMENTS

Mirani Storage Plan / Des

35% Schedule Scheduled Completion Date:

30/06/2016

Original Budget:

$1,458,985

Negotiations with the landowner of the proposed site are still to be resolved. This aspect of the project is taking longer than originally estimated.

Quotes have been received for the remaining design scope, though finalisation of the scope and awarding of the remaining design work is reliant on determining the final dam location.

The current schedule has construction commencing mid-2018.

Budget

Other Issues/ Risk

 

 

Page 19: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 19

Engineering & Commercial Infrastructure Monthly Review > April 2017

REGULATORY COMPLIANCE  

5.1. Drinking Water Compliance

Safe Water supplies are provided in accordance with the requirements of the Water Supply Safety and Reliability Act and are measured against the Australian Drinking Water Quality Guidelines. Drinking Water samples are taken at the outlet of Water Treatment Plants and within the reticulation network. A summary of the performance is detailed below.

Higher number of potable water tests due to issues and extra checks relating to Cyclone Debbie. Eton Treated and Reticulation samples continue to have Se above 10 but below 15ug/L (limit of 15 ug/L). Measured values were between 10 -12ug/L. Nickel was detected above the health guidelines at the Paget sample site. This has been reported to the regulator. Investigations indicate that the tap not the water supply is the source of the nickel. Replacement of the tap is in progress.

This data is reported 1 month in arrears .

60

65

70

75

80

85

90

95

100

0102030405060708090

100110120130140150160

Co

mp

lian

ce (

%)

Tes

ts C

on

du

cted

Health Parameter Test Results

Drinking Water Test Completed Non Compliant Health Parameter Tests

% Compliance Target

Eton and Koumala continue to have high hardness levels (>200; range 350 to 430).

This data is reported 1 month in arrears..

0102030405060708090

100110120130140150160170

Tes

ts C

on

du

cted

Aesthetic Parameter Test Results

Drinking Water Test Completed Non-Complaint Aesthetic Parameter Tests

Page 20: Engineering and Commercial Infrastructure - Water …...Page 4 Engineering & Commercial Infrastructure Monthly Review > April 2017 SAFETY 1.1. Incident Statistics The incident statistic

 

  Page 20

Engineering & Commercial Infrastructure Monthly Review > April 2017

5.2. Wastewater Compliance

The discharges from wastewater treatment facilities are regulated by Development Approvals issued by the Department of Environment and Resource Management. The licence requirements differ based on the time the Development Approval was issued and the receiving environment associated with any discharges.

5.3. Backflow Testing

Backflow devices are installed on water services where there is a risk that water could return from a private property back into the Water Reticulation network. The requirement for backflow devices is regulated in accordance with the Standard Plumbing and Drainage Regulation.

All wastewater tests for samples logged at the time of reporting were compliant with the exception of a faecal coliform breach for Mirani effluent on 27 April 2017.

Please Note: as at 2 May sometest results are still to be released

Data is 30 April 2017

0

10

20

30

Tes

ts C

on

du

cted

Samples Tested Non Compliant tests

Wastewater Test Results

19 new devices were registered in April 2017

Data is 30 April 2017

0

10

20

30

40

50

60

70

80

90

0

5

10

15

20

25

Tes

ted

by

Co

un

cil

No

of

Dev

ices

Reg

iste

red

/Can

celle

d

Monthly Devices Registered Devices Cancelled Tested By Council