CYPRESS-KLEIN UTILITY DISTRICT
Engineering Better Communities… One Project at a Time
ENGINEERING REPORT MARCH 13, 2017
1) SANITARY SEWER EVALUATION PHASE II The televising work is complete. We present Pay Estimate No. 1 from Cleanserve in the amount of $14,057.50. The work appears to have been completed in accordance with plans and specifications and payment to the contractor is recommended at this time. We have evaluated the televised sections and present a summary memo of findings, including repair prioritizations, rehabilitation recommendations and cost estimates for review and consideration. 2) 6995 LOUETTA RD. TRACT (GREG HUCKABAY) We have been asked by Mr. Huckabay to prepare a letter requesting service from MUD 24 for the tract that is located with Cy-Klein UD but will be served with water and wastewater from MUD 24 (email attached). With Board approval we will prepare the letter and send it to the MUD 24 Engineer. 3) WWTP TPDES PERMIT RENEWAL As authorized last month, we are moving forward with the renewal application which is due to the TCEQ by August. 4) MAINTENANCE TAX ELECTION Nothing new to report. 5) WATER PLANT EVALUATIONS Attached is the request for authorization to conduct the required water tank evaluation for the 420,000 gallon ground storage tank (GST) at Water Plant No. 2 (hatch inspection). 6) LONG TERM CAPITAL PROJECT PLAN The Long Term Capital Project Plan (copy attached) is revised to reflect work completed and authorized.
1
-
CYPRESS-KLEIN UD ENGINEERING REPORT MARCH 13, 2016 PAGE 2 OF 2
Engineering Better Communities… One Project at a Time
CONSTRUCTION PROJECTS UNDER WARRANTY
PROJECT ONE YEAR WARRANTY DATE
EST Rehabilitation October 5, 2017
_______________________________
Prepared by Patrick L. Newton, P.E. TBPE Registration No. F-1697
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
TBPE Registration No. F-1697
Memorandum
DATE: March 8, 2017
TO: Cypress Klein UD Board of Directors
FROM: Daniela Tasso
RE: 2016 Phase II Sanitary Sewer Televising Evaluation
AEI JOB NO: 053-089-007
Cypress-Klein Utility District (the “District”) has authorized the evaluation of the existing sanitary sewer lines from the 2016 Phase II Sanitary Sewer Televising. Approximately 10,230 feet of 6-inch, 8-inch, 18-inch and 24-inch sanitary sewer pipe was televised. All televised sanitary sewer lines were evaluated and prioritized. A televising log was created for Phase II which shows the line priority and proposed rehabilitation techniques. The table below shows the priority level used in the evaluation process.
Priority Description 1 - Severe Heavy inflow/infiltration, cracks, sags, offsets,
protruding services, and debris
2 - Moderate Medium inflow/infiltration, cracks, sags, offsets, protruding services, and debris
3 - Minor Small cracks, sags, offsets, and debris
In addition to prioritizing each line, preliminary rehabilitation recommendations were given to each line segment. Recommendations include external service repairs, point repairs and obstruction removals. The Phase II sanitary sewer lines were constructed in 1973 with age the system has deteriorated significantly. We recommended the installation of cured in place pipe (CIPP) because it helps stabilize the pipe, seal joints and service connections, prolongs the life of the entire line segment, and alleviates inflow and infiltration issues. A preliminary opinion of probable cost was performed for Phase II and is shown in the table below. Each estimate contains a 20% contingency.
Phase IIA $211,000
Phase IIB $236,000
12
-
Item No. Unit Qty Unit Cost Total Cost1 LS 1 $10,000 $10,000
2 LF 1,700 $20 $34,000
3 LF 3,390 $25 $84,750
4 EA 2 $2,000 $4,000
5 EA 6 $2,500 $15,000
6 EA 2 $1,000 $2,000
7 EA 7 $1,500 $10,500
8 EA 9 $350 $3,150
9 LF 5,090 $2.50 $12,725
Subtotal $176,000
Contingency (20%) $35,000
Total $211,000Notes:
- Costs are based on recent bid tabulations and are subject to change.
External Service Repair on 8-inch sanitary sewer pipe to a depth of 0 – 10 feet
including removal and replacement of 6-inch lateral service connection with a
full-bodied tee or wye fitting, trench safety, bypass pumping, trench dewatering,
bedding, backfilling and any surface restoration with like material.
Internal obstruction removal from sanitary sewer, including protruding services
and concrete debris all sizes, all depths
Televise 6" and 8" sanitary sewer lines for 1-year warranty at 11 months
Install 8" liner, cured in place, including cleaning, root removal, pre-TV
inspection, and post-TV inspection
Point repair in 6” sanitary sewer, to a depth of 0’-10’, up to 15’ in length including
trench safety, dewatering, bedding, backfilling, by-pass pumping, service
reconnections, and all surface restoration
Point repair in 8” sanitary sewer, to a depth of 0’-10’, up to 15’ in length including
trench safety, dewatering, bedding, backfilling, by-pass pumping, service
reconnections, and all surface restoration
External Service Repair on 6-inch sanitary sewer pipe to a depth of 0 – 10 feet
including removal and replacement of 6-inch lateral service connection with a
full-bodied tee or wye fitting, trench safety, bypass pumping, trench dewatering,
bedding, backfilling and any surface restoration with like material.
Cypress-Klein Utility DistrictPreliminary Opinion of Probable Cost
Phase IIA Sanitary Sewer Rehabilitation
DescriptionMove-in and set-up including all bonds, insurance, and permits
Install 6" liner, cured in place, including cleaning, root removal, pre-TV
inspection, and post-TV inspection
13
-
Item No. Unit Qty Unit Cost Total Cost1 LS 1 $10,000 $10,000
2 LF 670 $20 $13,400
3 LF 4,130 $25 $103,250
4 LF 240 $95 $22,800
5 LF 100 $125 $12,500
6 EA 1 $2,000 $2,000
7 EA 5 $2,500 $12,500
8 EA 2 $1,500 $3,000
9 EA 11 $350 $3,850
10 LF 4,800 $2.50 $12,000
11 LF 240 $3.50 $840
12 LF 100 $4.00 $400
Subtotal $197,000
Contingency (20%) $39,000
Total $236,000Notes:
- Costs are based on recent bid tabulations and are subject to change.
External Service Repair on 8-inch sanitary sewer pipe to a depth of 0 – 10
feet including removal and replacement of 6-inch lateral service connection
with a full-bodied tee or wye fitting, trench safety, bypass pumping, trench
dewatering, bedding, backfilling and any surface restoration with like
material. Internal obstruction removal from sanitary sewer, including protruding
services and concrete debris all sizes, all depths
Televise 6" and 8" sanitary sewer lines for 1-year warranty at 11 months
Televise 18" sanitary sewer lines for 1-year warranty at 11 months
Televise 24'' sanitary sewer lines for 1-year warranty at 11 months
Install 8" liner, cured in place, including cleaning, root removal, pre-TV
inspection, and post-TV inspection
Install 18" liner, cured in place, including cleaning, root removal, pre-TV
inspection, and post-TV inspection
Install 24" liner, cured in place, including cleaning, root removal, pre-TV
inspection, and post-TV inspectionPoint repair in 6” sanitary sewer, to a depth of 0’-10’, up to 15’ in length
including trench safety, dewatering, bedding, backfilling, by-pass pumping,
service reconnections, and all surface restoration
Point repair in 8” sanitary sewer, to a depth of 0’-10’, up to 15’ in length
including trench safety, dewatering, bedding, backfilling, by-pass pumping,
service reconnections, and all surface restoration
Install 6" liner, cured in place, including cleaning, root removal, pre-TV
inspection, and post-TV inspection
Cypress-Klein Utility DistrictPreliminary Opinion of Probable Cost
Phase IIB Sanitary Sewer Rehabilitation
DescriptionMove-in and set-up including all bonds, insurance, and permits
14
-
SECTION 2& RACQ
UET CLUBWIMBLE
DON ESTATES
WIMBLEDON PA
RK SUBDIVISIO
N
SECTION THRE
EWIMBLE
DON FOREST
SECTIONS 1 & 2WIMB
LEDON FOREST
HARRI
S COU
NTY M
.U.D. NO
. 316
WIMBLEDON ES
TATES
COURT ESTATE
SWIMBLE
DON CENTRE
COURTWIMBLED
ON CENTRE
WIMBLEDON CREEK
VILLAS(PRIVATE UTILITIES)
15
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoRectangle
dtassoLine
dtassoLine
dtassoLine
dtassoText BoxSevere
dtassoText BoxModerate
dtassoText BoxMinor
-
SECTION 2& RACQ
UET CLUBWIMBLE
DON ESTATES
WIMBLEDON PA
RK SUBDIVISIO
N
SECTION THRE
EWIMBLE
DON FOREST
SECTIONS 1 & 2WIMB
LEDON FOREST
HARRI
S COU
NTY M
.U.D. NO
. 316
WIMBLEDON ES
TATES
COURT ESTATE
SWIMBLE
DON CENTRE
COURTWIMBLED
ON CENTRE
WIMBLEDON CREEK
VILLAS(PRIVATE UTILITIES)
16
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoLine
dtassoRectangle
dtassoLine
dtassoLine
dtassoText BoxPhase IIA
dtassoText BoxPhase IIB
dtassoLine
dtassoLine
-
From: Greg HuckabayTo: Patrick NewtonSubject: Re: DennisDate: Tuesday, March 7, 2017 4:10:13 PM
Thank you. I got a hold of him today and I emailed and called Sarah to get a hold of attorney with mud 24 to get aagreement worked out. Dennis also mentioned that you would need to send a request to mud 24 for utilities for the 5acre tract. This tract has approx 55,000 sq ft of warehouse space.
Greg Huckabay
> On Mar 7, 2017, at 2:17 PM, Patrick Newton wrote:>> 713-957-0788>> Thanks,>> Patrick L. Newton, P.E. > Senior Project Manager>> Please note our new address as of August 1st:> 11450 Compaq Center Dr> Suite 660> Houston, Texas 77070> (281) 350-7027> www.aeiengineering.com>>>>> -----Original Message-----> From: Greg Huckabay [mailto:[email protected]]> Sent: Tuesday, March 7, 2017 12:03 PM> To: Patrick Newton > Subject: Dennis>> Hey Patrick do you have Dennis with mud 24 phone number ? I have sent him emails have not gotten a reply. Leftmessages at their office. No reply either. Need to get application for service.>>> Greg Huckabay> 713-201-5450
17
mailto:[email protected]:[email protected]:[email protected]
-
From: Hugo GomezTo: Patrick NewtonCc: Pam Madrigal; Ross Crawford; Jeff Findlay; Ian BidingerSubject: Cypress Klein UD Water Plant Evaluation NotificationDate: Monday, March 6, 2017 4:30:36 PMAttachments: image001.png
image002.pngimage003.png
Patrick:
Cypress Klein UD is due for a Water Plant Evaluation in APRIL.
Water Plant No. 2 – 420,000 Gallon Ground Storage Tank: HATCH
Please request authorization to evaluate the tank(s) which includes a site inspection and written report.Thank you,
Hugo R. Gomez, E.I.T Graduate Engineer
11450 Compaq Center DrSuite 660Houston, Texas 77070(281) 350-7027
APPROVED AS IS: YES NO
CLIENT REP. INITIALS:
EXCEPTIONS:
________________________________________________________________
________________________________________________________________
________________________________________________________________
NOTES:
________________________________________________________________
________________________________________________________________
________________________________________________________________
18
mailto:/O=AEI/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=669F7FEE5BE242E68E3ACC1521214217-HUGO GOMEZmailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
-
Cypress-Klein Utility DistrictLong Term Capital Project Plan
Projected Year Project DescriptionEstimated Construction
Cost
2016 Sanitary Sewer Evaluation [Phase II] $14,870
2017 Sanitary Sewer Rehabilitation [Phase IIA] $145,000
2018 Sanitary Sewer Rehabilitation [Phase IIB] $145,000
2019 Abandon & Plug Water Well No. 1 & Demolish Obsolete Components $125,000
2017 - 2022 Sir William Lift Station Rehabilitation $150,000
2017 - 2022 Radley Lift Station Rehabilitation/Replacement $200,000
2017 - 2022 District Office Rehabilitation [Roofing, Siding, Parking, Interior] $75,000
2017 - 2027 WWTP Lift Station Rehabilitation $150,000
2017 - 2027 WWTP Full Recoat [Interior & Exterior] $200,000
2017 - 2027 WWTP North Plant Rehabilitation/Equipment Replacement $200,000
2017 - 2027 WWTP Bar Screen Replacement $250,000
2017 - 2027 WWTP South Plant Rehabilitation/Equipment Replacement $100,000
2020 Sanitary Sewer Evaluation [Phase III] $50,000
2021 Sanitary Sewer Rehabilitation [Phase IIIA] $215,000
2022 Sanitary Sewer Rehabilitation [Phase IIIB] $195,000
2023 Sanitary Sewer Rehabilitation [Phase IIIC] $240,000
2024 Sanitary Sewer Manhole Rehabilitation Phase I $100,000
2025 Sanitary Sewer Manhole Rehabilitation Phase II $100,000
2022 - 2027 EST Rehabilitation [Full Interior Recoat] (1)
$150,000
2022 - 2027 Water Well No. 2 Rehabilitation $150,000
2022 - 2027 Water Plant No. 2 - GST Rehabilitation (Exterior) $50,000
2022 - 2027 Water Plant No. 2 - HPT Rehabilitation $50,000
2022 - 2032 Water Well No. 3 Rehabilitation $150,000
2022 - 2032 Water Plant No. 3 - GST Rehabilitation $150,000
2022 -2032 Water Plant No. 3 - HPTs Rehabilitation $100,000
Subtotal $3,454,870
Contingencies (20%) $641,222
Engineering (15%) $480,917
TOTAL $4,577,009
Completed Projects
Completion Date Project Actual Cost
Feb 2013 Sanitary Sewer Evaluation [Phase I] $20,404
Feb 2014 Sanitary Sewer Rehabilitation [Phase IA - Wimbledon Estates Sect 1] $205,705
April 2014 WP 2 GST Roof Rehab & Interior Rehabilitation $55,149
August 2015 Sanitary Sewer Rehabilitation [Phase IB - Wimbledon Estates Sect 1] $248,760
October 2016 EST Rehabilitation [Exterior Recoat & Partial Interior] (1)
$193,200
This long term capital project plan is not a final document and it will be revised as needed. The projects and their costs are subject to change. Projects may be added, deleted or modified based on Board direction or any other circumstances.
Revised November 2016
Page 1 of 1
19
02.pdfCost estimate phase IIAcost estimate phase IIBcost estimateMemo 2017-03-07Rehab PhasesSheets and ViewsSanitary
RehabSheets and ViewsSanitary