Transcript of Energy Workshop Low Carbon Liverpool 25 July 2013.
![Page 1: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/1.jpg)
Energy Workshop
Low Carbon Liverpool
25 July 2013
![Page 2: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/2.jpg)
2
Presentation structure
1. Questions / Prompts
2. Background to help discussions:
• Why bother? - Drivers and fitting into a wider master planning process
• Key issues and what needs to be done - How phasing, mix, and scale of development affects technology options
• Energy profiling through to recommended solutions • On-going project activity in the City Region
![Page 3: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/3.jpg)
Questions / Prompts
![Page 4: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/4.jpg)
1. Can we plan and deliver our own energy supply?
2. If we should plan, for how long - 5, 10, 15, 20 - 50 years +?
3. Should it be done now or only when legislation requires it? – eg, Code Level 6 and emphasis on Allowable Solutions
4. Who are/ should be our energy champions?
5. Are we ‘Smart Ready’?
6. Should we be integrating the delivery of infrastructure?
7. Are we making the most of the opportunities that are emerging?
![Page 5: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/5.jpg)
Why bother?
![Page 6: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/6.jpg)
6
Key drivers of infrastructure
![Page 7: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/7.jpg)
7
A minefield of policy drivers across all sectors
![Page 8: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/8.jpg)
8
It’s a long process that needs planning
![Page 9: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/9.jpg)
9
Key players all delivering different infrastructures
![Page 10: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/10.jpg)
Key issues and what needs to be done
![Page 11: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/11.jpg)
11
![Page 12: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/12.jpg)
12
![Page 13: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/13.jpg)
13 13
Ensuring effective delivery
• Need to consider energy as part of any area or development.
• Must be able to identify energy opportunities and commission projects.
• Requires understanding in order to ask the right questions, understand recommendations and choose the optimum solution.
![Page 14: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/14.jpg)
14 14
If you don’t look at an area strategically how do you know you’ve identified all the opportunities?
![Page 15: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/15.jpg)
15 15
About understanding the challenges on a site/ area level
![Page 16: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/16.jpg)
16 16
There are many issues and variables to consider
Heat networks
Programmes
Areas of change
Priority projects
Carbon compliance
Growth options
Allowable solutions
Network losses
Mix and phasing
Storage
Age and efficiency of buildings
Land capacity and availability
Constraints and measurements
Connections
Spatial Policy
Programme Technical
![Page 17: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/17.jpg)
“There are too many debates. Too much Word, not enough Excel”
Hans Rosling 2013
![Page 18: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/18.jpg)
18 18
Viability is critical
• The key issue is viability which is driven by:
• Load diversity (eg, mix of uses)• Presence of anchor loads• Scheme development costs - from concept through to financial
close • Revenue potential from electricity and heat sales• Avoided building energy system costs• Scheme operating costs
![Page 19: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/19.jpg)
19 19
Its not just about the planners
• Energy champions are needed
• Champions can be found in a variety of departments:- Housing and Estates teams
- Regeneration and Planning
- Environment and Sustainability
- Infrastructure and Highways
• May need organisational changes or new joint working structures
![Page 20: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/20.jpg)
20 20
There should be clear objectives
• Integrated approach reflected in all policy and strategy
• Awareness, knowledge and political commitment
• Projects identified at an early stage
• Links with relevant external agencies and organisations
• Evidence base is regularly reviewed and updated
• Identify and secure funding
• Record, review and comment on specific opportunities which arise
![Page 21: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/21.jpg)
21 21
Energy Profiling
Energy Centre
Market, Leisure Centre
Retail unit, Cinema
Counciloffices
ResidentialSupermarket
Offices
Hotel
PhaseCompletion
DateBuilding
Gross Floor Area (m2)
Phase 1 Jun-17
Market, Retail, Leisure
Centre, Restaurants,
Cinema and Car Park
17,250
Phase 2 Apr-18Council Offices,
Restaurant, Unit 8 & 96,536
Phase 3 Aug-18 Food store 10,350
Phase 4 Dec-18 Offices, Residential 10,297
Future
PhaseJan-19 Retail 292
Total 44,725
![Page 22: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/22.jpg)
22
![Page 23: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/23.jpg)
23 23
Locating the Energy Centre
Retail unit, Cinema
Market, Leisure Centre
Energy Centre
Counciloffices
Supermarket
Offices
Hotel
![Page 24: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/24.jpg)
24 24
Recommended approachws
![Page 25: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/25.jpg)
Activity across the City Region
![Page 26: Energy Workshop Low Carbon Liverpool 25 July 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062314/56649e3f5503460f94b2f78c/html5/thumbnails/26.jpg)
26 26
Some examples
• Alexandra Dock 150MWe biomass plant, application awaited by PINS under the NSIP planning regime
• Stobart Park/3MG 20MWe CHP plant recently approved by Halton
• 10.6MWe EfW CHP in St Helens application under consideration
• Pre-application and EIA Screening for solar parks in Sefton (20MW) and St Helens (5MW)
• Pre-application and EIA Screening for 3.3MWe biomass CHP in St Helens
• Knowsley Industrial Park heat networks – OJEU for technical advisor