ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS THOMAS POLAINER – PROJECT MANAGER

Transcript of ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS … · ENERGY SYSTEMS FOR THE INTELLIGENT USE OF...

ENERGY SYSTEMS FOR THE INTELLIGENT USE

OF BIOMASS FUELS

ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS

THOMAS POLAINER – PROJECT MANAGER

URBAS Introduction & Overview

2

URBAS Maschinenfabrik

Ges.m.b.hFounded 1929

No. of Employees

Manufacturing Facility

Market Sectors and

Capabilities.

Approx. 450

35,000m2

Energy Technology

Steel Construction

Hydroelectric

Livestock Facilities

Energy Technology Warm Water ≤ 110°C

Hot Water > 110°C

Steam

Combined Heat and Power (CHP)

Introduction to URBAS CHP - Plants

3

WOODGAS CHPSTEAM CHP

Introduction to URBAS Woodgas CHP

4

16

Y

EA

RS

D

EV

EL

OP

ME

NT

2001 – Research and development

( 70kWel + 150kWth )

2008 – first customer plant ( 2 x 120kWel + 290kWth )

Series production – 2010

Output range 100 – 400kWel – 2017

Development of output ranges

and market expansion – Future

In house planning and manufacturing.

� Years of expertise and experience combined

with a dedicated workforce enable URBAS

to complete all design, planing and

manufacturing process in house.

Benefits

� Outstanding flexibilty to meet customer

demands.

� Possibility to offer Turn key solutions.

� Fast and reliable reaction times in case of

system shutdowns.

� Largely independant from third parties in

relation to supply of spare and service parts.

5

URBAS concept- Modular Construction

6

7

URBAS concept- Modular Construction

8

URBAS concept- Modular Construction

9

URBAS concept- Modular Construction

10

URBAS concept- Modular Construction

11

URBAS concept- Modular Construction

12

URBAS concept- Modular Construction

Correct Biomass for Gasification.

� The correct biomass fuel is essential for long term

functionality and efficiency of the Woodgas CHP.

Forest woodchip.: 100%

Bark.: 5%

Sapwood.: 30%

Moisture Content.: 5 < w < 15 %

Heating Value.: 4,2 – 4,8kWh/kg

Granulation.: 40% 110-130mm

60-100% 60-110mm

20% 20-60mm

5% < 20mm

Solution

� URBAS supply drying and screening systems which enable

the user to operate the plant on fresh materials without

the need for extra unwanted manipulation of material.

13

Energy and efficiency

14

URBAS – Reference Projects

15

22 comissioned plants

4 currently in progress

Project Location Prijedor, Bosnia

Herzegovina

Client Name &

Sector

Toplana AD PrijedorDistrict Heating

Project Facts Type of Installation Woodgas CHP

System Outputs 250kWel

550kWth

Fuel Details 100% Forest woodchip.

Chipped and screened directly on site.

Rated Net Efficiency 78%

Lead Time (Order to site) 5 Months

Construction Period 3.5 Months

Date Commissioned Dec. 2015

Construction Contract Type Turn Key

Operation and Maintenance

Contract Type

Annual service on demand

URBAS – Reference Project: Prijedor

16

URBAS – Reference Project: Mals

17

Project Location Mals, Italy

Client Name &

Sector

FHW MalsDistrict heating

Project Facts Type of Installation Woodgas CHP

System Outputs 2 x 150kWel

2 x 280kWth

Fuel Details 100% Forest woodchip.

Chipped with Screw chipper and screened.

Rated Net Efficiency 79%

Lead Time (Order to site) 6 Months

Construction Period 4 Months

Date Commissioned Feb. 2015

Construction Contract Type Sub Contractor

Operation and Maintenance

Contract Type

Annual service on demand

URBAS – Reference Project: Vals

18

Project Location Vals, Italy

Client Name &

Sector

FHW ValsDistrict heating

Project Facts Type of Installation Woodgas CHP

System Outputs 296kWel

550kWth

Fuel Details 100% Forest woodchip.

Chipped on site with Screw chipper and screened.

Rated Net Efficiency 79%

Lead Time (Order to site) 6 Months

Construction Period 4 Months

Date Commissioned Jan. 2014

Construction Contract Type Sub Contractor

Operation and Maintenance

Contract Type

Annual service on demand

URBAS – Reference Project: Genboku

19

Project Location Tokushima, Japan

Client Name &

Sector

Genboku CO.,LTDPower plant

Project Facts Type of Installation Woodgas CHP

System Outputs 250kWel

530kWth

Fuel Details 100% Forest woodchip.

Chipped on site with Screw chipper.

Rated Net Efficiency 78%

Lead Time (Order to site) 7 Months

Construction Period -

Date Commissioned Planned for November 2017

Construction Contract Type Sub Contractor

Operation and Maintenance

Contract Type

Maintenance carried out by Sub Company

Any questions?

20

Q&A

Thank you!

URBAS Maschinenfabrik GmbH

Th.-Billroth-Strasse 7, A-9100

Völkermarkt

Telefon: +43 (0) 4232/2521-0

Telefax: +43 (0) 4232/2521-55

e-mail: urbas(at)urbas.at

Contact

http://www.urbas.at