Transcript of Energy Storage - 12: Gilles Rocchia, Socomec
1
Nice Grid innovation
Islanding experience on LV Grid
Paris, November 19th, 2015
Gilles ROCCHIA - Marketing Strategy Director
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
3
An independent manufacturer providing
expert solutions for the power
performance of LV electrical networks
SOCOMEC Group
The benefit of a specialist
production sites
9subsidiaries
21
years
93
product references
18,000customers
30,000
employees
3,100
M€ turnover
427
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
4
SOCOMEC Group
4 fields of expertise
Power Control & Safety Managing power and protecting individuals and property
Solar Power Guaranteeing the safety and durability of photovoltaic (PV) facilities
Energy Efficiency Improving building and facility energy efficiency
Critical Power Ensuring the availability of high-quality power for critical applications
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
5
Introduction to storage assets
Four grid storage assets have been installed
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
6
LV On grid storage assets
The two low voltage grid storage assets 33 kW / 106 kWh
Converter: SOCOMEC SUNSYS PCS² TR33
Battery: SAFT
Located on the LV feeder at 400 m of the secondary substation
commissioned in NOV & DEC 2014
PRIMARY SUBSTATI
ONHV/MV
SECONDARY
SUBSTATION MV/LV
400 m
106kWh
33kW
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
7
Introduction to storage assets
The islanding Storage System
250 kW / 600 kWh
Converter: SOCOMEC SUNSYS PCS² TR66
Battery: SAFT
Connected to a dedicated LV feeder
commissioned in MARCH 2015
PRIMARY SUBSTATI
ONHV/MV
SECONDARY
SUBSTATION MV/LV
102 m
600kWh
250kW140kWc
90kWc
16 m
102 m
15 m 200kWc
174kVA
76 m66kVA
124 m57kVA
45 m111kVA
PV 430kWc
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
8
The islanding
A new innovation experienced
1ON grid modeManage consumption and production peaks thanks to energy storage system.
2OFF grid modeThanks to PCS, LV grid works alone with local PV production and the batteries energy.
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
9
The islanding
SUNSYS PCS2 from 33 to 100 kW
CUSTOMER BENEFITS : Energy shifting, peak shaving and grid stabilizing
(active and reactive power) functions with the same product
Modular, flexible and scalable
Highly efficient
Compatible with different battery technologies (e.g. lead-acid, lithium-ion) and ultra-capacitor energy storage systems
98% efficiency
3 level technology
Dynamic Power Control feature
PRODUCT APPLICATIONS
Ultra high efficiency &
smart energy management
From 33kW to 100kWLow Voltage / Medium Voltage
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
10
The islanding
Solution description
4 x SUNSYS PCS²250 kW
4 SUNSYS PCS² TR66 IM
250 kW / 600 kWh
Installed in the secondary substation MV/LV
With Smart Islanding Controller
90 kWc PV + Load
140 kWc PV
200 kWc PV
Load (57kVA)
Load (66kVA)
Load (111 kVA)
Not used
600 kWh
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
11
-10 -
10 20 30 40 50 60
Grid Active Power (kW)
The Scheduled Islanding (06/10/2015)
First Feed Backs
402403404405406407408409
P/P Voltage (U12-VAC)
49.9549.9649.9749.9849.9950.0050.0150.02
Frequency (Hz)
Grid disconnection P=0
5 hours of islanding
F & φ Synchronization
U Synchronization
Microgrid connection
Islanding Period
KPI#7 – Voltage deviation during islanding – Relative standard deviation (%) ≤ 10% (according to EN 50160)
Transition TO Islanding Transition FromV1 V2 V3 V1 V2 V3 V1 V2 V3
1,70% 2,17% 1,69% 0,68% 0,63% 0,81% 0,62% 0,99% 0,56%
KPI#8 – Frequency deviation during islanding- Relative standard deviation (%) ≤ 1% (according to EN 50160)
Transition TO Islanding Transition From0,04% 0,10% 0,14%
KPI#9 - Total harmonic distortion – THD(%)
≤ 8%Transition TO Islanding Transition From
V1 V2 V3 V1 V2 V3 V1 V2 V3
2,99 2,47 2,59 2,33 1,62 1,46 2,15 1,84 1,75
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
12
-150
-100
-50
0
50
100
Micro-Grid Active Power (kW)
The Unforeseen Islanding (07/10/2015)
First Feed Backs
KPI#7 – Voltage deviation during islanding – Relative standard deviation (%) ≤ 10% (according to EN 50160)
Transition TO Islanding Transition FromV1 V2 V3 V1 V2 V3 V1 V2 V3
N/A N/A N/A 0,15% 0,17% 0,10% 0,65% 0,73% 0,67%
KPI#8 – Frequency deviation during islanding- Relative standard deviation (%) ≤ 1% (according to EN 50160)
Transition TO Islanding Transition FromN/A 0,01% 0,18%
KPI#9 - Total harmonic distortion – THD(%)
≤ 8%Transition TO Islanding Transition From
V1 V2 V3 V1 V2 V3 V1 V2 V3
N/A N/A N/A 2,20 1,27 1,45 2,47 1,62 1,82
0100200300400500
P/P Voltage (VAC)
0.0010.0020.0030.0040.0050.0060.00
Frequency (Hz)
Grid failure
PV inverters reconnections
Black Start sequence (<15sec)
Grid Failure Timer
2 hours of islanding
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
13
Conclusion
Islanding has just been tested successfully in CARROS
Islanding duration reached 5 hours on October 6th
Islanding is good solution to restore power supply after a grid
outage and to sustain supply during several hours
Islanding experience on LV Grid – Nice Grid innovationGilles ROCCHIA – 11/19/2015 – Trilateral Energy Storage Workshop
14