Energy Management: 2011/2012 - ULisboa · Energy Management: 2011/2012 Class# T03 Energy Markets...

34
Energy Management: 2011/2012 Class# T03 Energy Markets Prof. Miguel Águas [email protected]

Transcript of Energy Management: 2011/2012 - ULisboa · Energy Management: 2011/2012 Class# T03 Energy Markets...

Energy Management: 2011/2012

Class# T03

Energy Markets

Prof. Miguel Á[email protected]

Energy management

Class# T08: Energy Markets Slide 2 of 53

ELECTRICITY

Energy management

Class# T08: Energy Markets Slide 3 of 53

National electricity generation

TECHNOLOGY DISAGREGATION (2010)

Reservoirs 6.473 3.444 2.397 2.403

Run-ofriver 8.396 6.079 2.182 2.179

Pumping -512 -540

TOTAL 14.357 29% 8.983 21% 4.579 26% 4.582 33%

Wind 9.025 4.002 3.702 1.894

Cogeneration 7.312 5.435 1.696 1.362

Mini-Hydric 1.380 698 410 373

Photovoltaics 208 20 122 11

TOTAL 17.925 36% 10.155 24% 5.930 33% 3.640 26%

Coal 6.554 11.662 1.776 1.776

Natural gas CC 10.700 10.494 3.829 2.166

Other 46 1.268 1.821 1.877

TOTAL 17.300 35% 23.424 55% 7.426 41% 5.819 41%

TOTAL PRODUCTION 49.582 42.562 17.935 14.041

Import balance 2.623 7.488

TOTAL DEMAND 52.205 50.050

1,4% /y 8,5% /y

2007

TYPE

Demand increase: Power increase:

Hydric

Special

Thermal

2010 2007

ENERGIA (TWh) POWER (MW)

2010

Energy management

Class# T08: Energy Markets Slide 4 of 53

National electricity generation

- Tap. Outeiro (1,0 GW – Natural gas)

- Lares (0,9 GW – Natural gas)

- Pego (0,6 GW – Coal)

- Pego (0,8 GW – Natural gas)

- Ribatejo (1,2 GW – Natural gas)

- Setúbal (0,9 GW – Fuel-oil)

- Sines (1,2 GW – Coal)

Source: REN (www.ren.pt)

THERMAL POWER PLANTS IN 2010

Energy management

Class# T08: Energy Markets Slide 5 of 53

National electricity generation

WIND ENERGY IN 2010

Energy management

Class# T08: Energy Markets Slide 6 of 53

National electricity consumption

Production by technologies

Source: Informação mensal do sistema electroprodutor – Dez 2010, REN (www.ren.pt)

Energy management

Class# T08: Energy Markets Slide 7 of 53

National electricity consumption

Load diagram on theannual peak demand

Source: Dados Técnicos – 2010 – REN (www.ren.pt)

Tipical Summer profile

Tipical Fall profile

Energy management

Class# T08: Energy Markets Slide 8 of 53

National electricity consumption

CONSUMPTION PER LEVEL OF VOLTAGE (2010)

CARACTERIZAÇÃO DA PROCURA DE ENERGIA ELÉCTRICA EM 20102005 ERSE (www.erse.pt)

MATAT

MT

BTE

BTN

IP

Voltage level Consumption

(MWh/c)

MAT - Very high voltage > 110 kV 1.612 3% 56 28.786

AT - High voltage > 45 kV 6.092 13% 207 29.430

MT - Medium voltage > 1 kV 14.568 30% 22.946 635

BTE (>= 41,4 kW) 230 V; P >= 41,4 kW 3.749 8% 34.203 110

BTN (< 41,4 kW) 230 V; P < 41,4 kW 20.393 42% 6.123.895 3,3

Public lighting 230 V 1.590 3% 50.825 31

48.004 6.232.132

Hig

h

(> 1

kV

)

Low

(< 1

kV

)

Segment

TOTAL

46%

54%

Annual consumption

(GWh/year)

0,4%

99,6%

Number of

consumers

Energy management

Class# T08: Energy Markets Slide 9 of 53

Electricity market liberalization

Regulated market:Fix tariffs per segment

Liberalized market:Tariffs flexibilityConsumption profile forecast is important

Consumers move to the liberalized market by:- Better price- Better commercial support

Regulated market tends to disapear:- UK : several years without regulated tariff- Spain: regulated tariff vanish in 2010- Portugal: in 2012 only BTN remains with tariffs

Energy management

Class# T08: Energy Markets Slide 10 of 53

Electricity market liberalization

Electricity cost in the liberalized market

The Supplier contracts electricity to be provided in 2 days, and informs the grid operator (REN) on the amount and hourly profile of the electricity that will be injected in the national grid:

Injected = Forecasted consumption + Grid losses

After the consumption, REN, calculated the effective consumption of the Supplier clients and charge by the deviation.

Deviation = Consumption + Grid losses – Injection

Additionally, the Supplier must pay for the use of the grid.

The price components are:

Cost = Production + Grid losses + Grid use

Energy management

Class# T08: Energy Markets Slide 11 of 53

Electricity market liberalization

Electricity spot market

Source: OMEL (www.omel.es)

Energy management

Class# T08: Energy Markets Slide 12 of 53

Electricity market liberalization

Current importance of the liberalized market in Portugal

Fonte: Resumo informativo Mercado Liberalizado em Dez/08 – ERSE (www.erse.pt)

0

10

20

30

40

50

60

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Jan

-10

Fe

v-1

0

Ma

r-1

0

Ab

r-1

0

Ma

i-1

0

Jun

-10

Jul-

10

Ag

o-1

0

Se

t-1

0

Ou

t-1

0

No

v-1

0

De

z-1

0

Jan

-11

Fe

v-1

1

Ma

r-1

1

Ab

r-1

1

Ma

i-1

1

Jun

-11

Jul-

11

Av

era

ge

ele

ctri

city

pri

ce a

t O

ME

L (€

/MW

h)

Lib

era

lize

d m

ark

et

con

sum

pti

on

(%

)

OMEL price

Residential

Non residential

Nacional

Energy management

Class# T08: Energy Markets Slide 13 of 53

Regulated tariffs

Low voltage tariff structure

The bill has 2 components:

• Energy: The price depends on the Tariff type and Metering cycle

• Contrated power: Fix amount that depends of physical maximum power installed and Metering type

Contract options :

• Contracted power (in kVA)

• Tariff type: Simples, Bi-horária e Tri-horária

• Metring cycle (only for Bi-horária and Tri-horária): Daily cycle and weekly cycle

Energy management

Class# T08: Energy Markets Slide 14 of 53

Regulated tariffs

Fonte: ERSE (www.erse.pt)

PERIODS IN DAILY AND WEEKLY CYCLE

Energy management

Class# T08: Energy Markets Slide 15 of 53

Regulated tariffs

Source: ERSE (www.erse.pt) - 2011

Energy management

Class# T08: Energy Markets Slide 16 of 53

Regulated tariffs

EXAMPLE: An house with tariff “simples” and Contract power of 6,9 kVA presented a month

consumption of 200 kWh.

a) What will be the bill of that month ?

b) If the contract was in taridd “bi-horária”, what should be the % of the consumtion in off peak hours ?

Constant

10,44 + 200 x 0,1326 = 37 €

Bi-horária

10,44 + 200 x (0,1448 x (1-P)+ 0,0778 x P)

So Bi-horária < Constant if

P > 18%

In this case, 18% means 36 kWh at off-peak

hours, or a constant power of 120 W

Energy management

Class# T08: Energy Markets Slide 17 of 53

Tarifas reguladas

Structure of the regulated tariff for medium, high and very high voltage.

The bill has three components:

• Fixed term: often negligible

• Energy: The unit price depends on the Price Option and Cycle Counting

• Power::

• Contracted power: is the biggest Maximum Power of the last 12 months, where the Maximum

Power is the maximum power in periods of 15 minutes, in the all month.

• Power at peak hours: Peak hours consumption / Monthly peak hours considered by ERSE

Price Options: Curta, Média ou Longa utilização

Cycle counting: Daily cycle, week cycle and week cycle optional

Note 1: The prices vary each trimester

Nota 2: The counting has 5 periods: ponta, cheia, vazio normal e super vazio

Energy management

Class# T08: Energy Markets Slide 18 of 53

Tarifas reguladas

Fonte: ERSE (www.erse.pt) - 2011

Energy management

Class# T08: Energy Markets Slide 19 of 53

Regulated Tariffs

Contracted power

Contracted power: is the biggest Maximum Power of the last 12 months, where the Maximum Power is the

maximum power in periods of 15 minutes, in the all month.

0

50

100

150

200

250

300

350

400

450

500

Jan

-08

Fe

v-0

8

Ma

r-0

8

Ab

r-0

8

Ma

i-0

8

Jun

-08

Jul-

08

Ag

o-0

8

Se

t-0

8

Ou

t-0

8

No

v-0

8

De

z-0

8

Jan

-09

Fe

v-0

9

Ma

r-0

9

Ab

r-0

9

Ma

i-0

9

Jun

-09

Jul-

09

Ag

o-0

9

Se

t-0

9

Ou

t-0

9

No

v-0

9

De

z-0

9

Po

we

r (k

W)

Tomada

Contratada

Energy management

Class# T08: Energy Markets Slide 20 of 53

FUELS

Energy management

Class# T08: Energy Markets Slide 21 of 53

National consumption per type of fuel

Source: DGEG (www.dgge.pt)

Energy management

Class# T08: Energy Markets Slide 22 of 53

Portuguese natural gas market

Grid

•49%: By pipeline, entering

at Campo Maior (from

Argelia).

•51%: By GNL, at Sines

(from Nigeria)(Jul/09 – Jun/10)

Energy management

Class# T08: Energy Markets Slide 23 of 53

Gasoduto

Portuguese natural gas market

Energy management

Class# T08: Energy Markets Slide 24 of 53

Portuguese natural gas market

Gas characteristics

Natural gas is almost Methane (CH4),

depending on it s origin

Energy management

Class# T08: Energy Markets Slide 25 of 53

Portuguese natural gas market

Gas characteristics

HHV (High Heat Value) is

the main chemical

property of NG.

It s value, in Portugal,

depends of the location

(due to IGN) and time

along the year

Energy management

Class# T08: Energy Markets Slide 26 of 53

Portuguese natural gas market

Natural gas interface

NGI is the interface between

NG from Sines and NG from

Argelia. It s location is

usually in the zone

Lisboa-Leiria

Fonte: Transgás

Energy management

Class# T08: Energy Markets Slide 27 of 53

Portuguese natural gas market

Consumption profiles

Source: Dados técnicos - 2010, - REN (www.ren.pt)

Energy management

Class# T08: Energy Markets Slide 28 of 53

Portuguese natural gas marketGas proprieties

Source: Informação de Actualização Periódica - Jun/2010, - REN (www.ren.pt)

Energy management

Class# T08: Energy Markets Slide 29 of 53

Portuguese natural gas market

Consumption (2005)

Combined cycles 2,3 40%

Direct clients 1,3 22%

Distributors 2,2 38%

TOTAL 5,9

NATIONAL CONSUMPTION

2011 (bcm - US bilion of cm)

DISTRIBUTION (bcm)

Distributor 2005

Lisboagás 0,21 0,54

Lusitaniagás 0,15 0,73

Portgás 0,18 0,58

Setgás 0,05 0,17

Others 0,07 0,21 10%

TOTAL 0,66 2,22

57%

33%

GALP

EDP

2011

Energy management

Class# T08: Energy Markets Slide 30 of 53

Portuguese natural gas market

Cogeneration and industry consumption

0

500.000

1.000.000

1.500.000

2.000.000

2.500.000

3.000.000C

on

sum

o e

m 2

00

9 (

Nm

3)

Energy management

Class# T08: Energy Markets Slide 31 of 53

Portuguese natural gas market

Liberalization schedule

01/01/2006: Electricity producers (central stations);

01/01/2008: Clients with consumption > 1.000.000 Nm3 (~ 12 GWh/y);

01/01/2009: Clients with consumption > 10.000 Nm3 (~ 120.000 kWh/y);

01/01/2010: All clients.

Direct clients are consumers with annual consumption bigger than

2.000.000 Nm3 (~24 GWh/y)

Energy management

Class# T08: Energy Markets Slide 32 of 53

Portuguese natural gas market

Regulated tariff structure of segments with consumption > 100.000 m3

The natural gas bill has 3 components :

• Fix term: Depends on level of pressure and consumption dimension

• Energy: The unitary price depends on level of pressure and consumption

dimension

• Capacidade utilizada: Is the maximum consumption per day (kWh/day) in last 12

months

Note 1: Energy prices can change each trimester

Note 2: The energy is measured in 2 periods (bi-horária): peak (working days) and off-

peak

Energy management

Class# T08: Energy Markets Slide 33 of 53

Portuguese natural gas market

Regulated tariff (2011-2012)Clients with consumption > 2.000.000 m3/y

Clients with consumption > 10.000 m3/y

Energy management

Class# T08: Energy Markets Slide 34 of 53

Portuguese natural gas market

EXAMPLE: Consider a factory supplied in ”Média Pressão” with month consumption of 300.000 m3

and option “Diária”, where 80% in peak hours and a maximum daily consumption of 20.000 m3. Considering

HHV=12 kWh/m3, calculate the natural gas bill.

Bill = 815,14 + 12 x 300.000x (0,8x0,032233 + 0,2x0,031673) +

12x20.000x0,042505

Bill = 815,14 + 115.636 + 10.201 = 126.652 €(0,035 €/kWh)

Bill = 1% + 91% + 8%

(for 2009-2010 tariffs the same example has a cost of 0,029 €/kWh, -17%)