![Page 1: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/1.jpg)
Energy Conservation Program
Annual Report to the
Milford Board of Education
Jim Whitaker Pat Bradbury Jim Richetelli
December 11, 2017
Energy Conservation
Program
Annual Report to the
Milford Board of Education
Jim Whitaker Pat Bradbury Jim Richetelli
December 11, 2017
1
![Page 2: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/2.jpg)
Program History
December 2010: MPS enters 4-year contract
with Cenergistics (formerly E.E.I.)
Customized energy conservation program
focused on behavioral and cultural change
Contract paid for by dollars saved in utility costs
2
![Page 3: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/3.jpg)
Primary Goals
Create a positive educational environment
Maintain and improve safety and comfort
Eliminate energy waste
Save money to be redeployed to programs to
enhance student learning and success
Achieve an “energy conservation culture”
3
![Page 4: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/4.jpg)
Electric Comparison
January 2011–June 2017
(Since start of program) July 2016– June 2017
(Fiscal year)
7,013,498
4,892,337
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
Expected Actual
Usa
ge (
kW
h)
44,913,739
32,296,146
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
50,000,000
Expected Actual
4
![Page 5: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/5.jpg)
Natural Gas Comparison
620,112
478,800
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
Expected Actual
Usa
ge (
CC
F)
4,361,581
3,287,265
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
Expected Actual
January 2011–June 2017
(Since start of program)
July 2016– June 2017 (Fiscal year)
5
![Page 6: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/6.jpg)
Environmental Benefits
We have reduced our consumption by:
12.6 million kWh of Electricity
1,074,316 CCFs of Natural Gas
The Greenhouse Gas Reductions equate to:
Preventing the release of 9,142
Metric Tons of CO2 into the atmosphere
Removing 1,905 automobiles
for an entire year
234,409 tree seedlings
grown for 10 years
6
![Page 7: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/7.jpg)
‘Expected vs. Actual’ Energy Expenditures
Year Expected Expenditure*
Actual Expenditure
Savings Assuming no fluctuation
Savings Adjusted for Weather & Price
Fluctuation
2010-2011 $2,283,282 $2,157,658 $125,624 $82,813
2011-2012 $2,283,282 $1,637,057 $646,225 $528,401
2012-2013 $2,283,282 $1,481,939 $801,343 $624,485
2013-2014 $2,283,282 $1,650,796 $632,486 $653,112
2014-2015 $2,283,282 $1,820,775 $462,507 $747,687
2015-2016 $2,283,282 $1,552,214 $731,068 $554,048
2016-2017 $2,283,282 $1,519,203 $764,079 $518,864
TOTAL $15,982,974 $11,819,642 $4,163,332 $3,709,410
Minimum Expected vs. Actual Expenditures
* 2009-2010 Base Year Energy Expenditures = $2,283,282 7
![Page 8: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/8.jpg)
Energy Program Costs
Year Cenergistic Salary Energy Cap Total
2010-2011 $63,300* $21,915* $13,950** $99,165
2011-2012 $253,200 $74,000 $2,093 $329,293
2012-2013 $253,200 $75,093 $2,093 $330,386
2013-2014 $253,200 $78,326 $2,093 $333,619
2014-2015 $189,900 $79,840 $2,093 $271,833
2015-2016 $ 00 $80,689 $2,093 $82,782
2016-2017 $ 00 $82,506 $2,093 $84,599
TOTAL $1,012,800 $492,369 $26,508 $1,531,677
* Reflects 3 months
**Includes purchase of software program
8
![Page 9: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/9.jpg)
Net Energy Savings
January 2011 – June 2017
Savings $3,709,410
Cost of Program $1,531,677
Net Savings $2,177,733
9
![Page 10: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/10.jpg)
MPS Exceeds Cenergistic Expectations
At the start of the program, Cenergistic projected savings by year.
To date, our net savings of $2,177,733 has exceeded what
Cenergistic projected would take more than 10 years to achieve.
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000Cenergistic Projection
Milford Achieved
10
![Page 11: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/11.jpg)
EPA Awards & Recognitions
2011: EPA Low Carbon IT Campaign
2012: EPA Energy Star Partner
2013 & 2016: EPA Energy Star Certified
2014: Power of Change ‘Top Building’ Award
2016: UI Energy Star Achievement Award
11
![Page 12: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/12.jpg)
Teamwork Makes it Happen
Board of Education
Community
Maintenance Staff
Information Systems
Custodians
Faculty & Staff
Students
Parents
12
![Page 13: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/13.jpg)
Energy Infrastructure Initiatives
In 2015, our contract with Cenergistics was
fulfilled.
The Board has supported using a portion of
that savings for Energy Infrastructure upgrades:
2015-2016 $124,000
2016-2017 $ 50,000
2017-2018 $ 50,000
13
![Page 14: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/14.jpg)
Energy Infrastructure Initiatives
Jonathan Law Joseph A. Foran
Exterior Lighting: LED upgrade
In-building Lighting: LED
upgrade:
Main entrance, Sr. Cafe., Both gyms, Gym hallway, Football locker room, Boys/Girls locker rooms, Stairwells
Expanded Control Strategies: (for
gym and auditorium occupancy
controls) using Optimal
start/stop programming and CO2
integration.
Exterior Lighting: LED upgrade
In-building Lighting: LED
upgrade:
Gym, Cafe, Media Center, Pool, Auditorium, Courtyard, Stairwells
Expanded Control Strategies:
(for gym and auditorium
occupancy controls) using
Optimal start/stop
programming and CO2
integration.
2015-2016
14
![Page 15: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/15.jpg)
Financial Analysis
2015-2016
Energy Infrastructure Initiatives
Project Cost $190,253
UI Incentive $128,253
Cost to MPS $ 62,000
• Estimated Return on
Investment (ROI): 2.4 years
• Energy savings each year
• Reduction in maintenance
time and labor cost.
Project Cost $268,701
UI Incentive $206,701
Cost to MPS $ 62,000
• Estimated Return on
Investment (ROI): 2.2 years
• Energy savings each year
• Reduction in maintenance
time and labor cost.
Jonathan Law Joseph A. Foran
15
![Page 16: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/16.jpg)
Energy Infrastructure Initiatives
Lighting Upgrade to latest high efficiency
LED technology
Foran HS – Hall and gym redesign
J. Law HS – Hallways
Harborside MS – Gym, Stage, Halls, Media Center, Computer Lab
and Parking Lot
East Shore MS – Hallways & Gym
2016-2017 & 2017-2018
16
![Page 17: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/17.jpg)
Financial Analysis
2016-17 & 2017-18
Energy Infrastructure Initiatives
Project Cost $165,199
UI Incentive $ 67,447
Cost to MPS $ 97,752
• Estimated Return on Investment
(ROI): 3.9 years
• Energy savings each year
• Reduction in maintenance time
and labor cost.
Foran, J. Law, Harborside & East Shore
17
![Page 18: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/18.jpg)
‘Repair or Replace’ Projects
As repairs or replacement of items that use
energy arise, energy efficient products are
incorporated.
Energy efficient exhaust fans and roof top heating units
replace older versions, when needed.
Exterior light timers replaced with astronomical digital
timers, when needed.
Broken light fixtures replaced with LED fixtures.
18
![Page 19: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/19.jpg)
On the Horizon
Solar
19
![Page 20: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/20.jpg)
What’s next? - SOLAR!
MPS is committed to continuing to reduce energy consumption and saving money
Solar energy makes sense
- New roofs on school
- Government and Utility incentives make it affordable
No up-front capital costs
MPS/City will lease the roof space for 20 years – solar is installed and the units maintained by the developer
MPS purchases the energy at a reduced cost
20
![Page 21: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/21.jpg)
SOLAR
MPS issued an RFP for a
Solar Energy Developer/Partner
Received responses from 8
nationwide developers
Interviewed 5 firms
Second interview with 2 finalists
21
![Page 22: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/22.jpg)
SOLAR
Selected Davis Hill
Development/Skyview Ventures
Selection based on:
Depth of experience
Strong recommendations
Experience working in other Connecticut
municipalities and school districts
22
![Page 23: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/23.jpg)
SOLAR
• City and utility approvals obtained
• Contracts negotiated and signed
• Installation to begin early Spring 2018
• Jonathan Law
• East Shore
• Harborside
• Mathewson
• Pumpkin Delight
• Orchard Hills
• The Academy
• Systems expected to be energized Summer 2018
• Plans to install solar at all other MPS buildings 23
![Page 24: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/24.jpg)
Preliminary Site Designs
East Shore Middle School 24
![Page 25: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/25.jpg)
Preliminary Site Designs
Mathewson Elementary 25
![Page 26: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/26.jpg)
Preliminary Site Designs
Jonathan Law High School 26
![Page 27: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/27.jpg)
Preliminary Site Designs
The Academy 27
![Page 28: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/28.jpg)
Preliminary Site Designs
Pumpkin Delight 28
![Page 29: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/29.jpg)
Preliminary Site Designs
Orchard Hills 29
![Page 30: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/30.jpg)
Preliminary Site Designs
Harborside 30
![Page 31: Energy Conservation Program Energy Conservation Program...Dec 11, 2017 · Customized energy conservation program focused on behavioral and cultural change Contract paid for by dollars](https://reader036.fdocuments.us/reader036/viewer/2022062508/602222e11846b17d034e942d/html5/thumbnails/31.jpg)