ENDLESS INVESTMENT OPPORTUNITES IN
PUBLIC INFRASTRUCTURE AND SERVICES
2014 -2015
February 14, 2014
NEW INTERNATIONAL AIRPORT OF CHINCHERO – CUSCO
Location: Cusco.
Description: The project comprises the concession
to design, build, finance, operate and maintain the
new international airport of Chinchero – Cusco
(AICC)
� Estimated investment (VAT not included): US$
658 million
� Type of concession: Co-financed
� Concession period: 40 years
Estimated award date: II QT 2014.
CALLED
GENERAL SAN MARTÍN PORT TERMINAL
Panamericana Sur highwayRoad Network N° 6
CALLED Location: Ica
Description: The project comprises the concession todesign, build, finance, operate and maintain of theGeneral San Martín Port Terminal. Initial works:
�Dredging
�Multi-purpose dock
�Yard for bulk cargo and other cargo
�Support facilities
�Electricity interconnection
�2 mobile cranes
�Yard equipment
�Other equipment for general loading
� Estimated investment (VAT not included): US$102.4 million
� Type of concession : Self-sustaining
� Concession period: 30 years.
Estimated award date: I Quarter 2014.
BRAZIL
PACIFIC OCEAN
BRAZIL
THE AMAZON WATERWAY
Location: Loreto and Ucayali.
Description: The project comprises the implementation of
works and actions to improve the navigability and transit of
pasenger and cargo on the Amazonas, Marañón, Huallaga
and Ucayali rivers.
� Dredging on critical areas (Malos Pasos) and on the access
to the Port of Iquitos.
� GPS information system on the route of the navigation
channel.
� Installation of level measuring stations with transmission
of information.
� System of monitoring of navigability conditions.
� Cleaning system.
• Estimated investment (VAT not included): US$ 65
million
• Type of concession : Co-financed
• Concession period: 20 years.
Estimated date of award: II Quarter 2014.
CALLED
LINE 2 AND BRANCH LINE OF FAUCETT AV. - GAMBETTA AV. OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO
Location: Lima and Callao.
Description: The project comprises the
concession to design, build, finance, supply of
electromechanical equipment, acquire rolling
equipment, operate and maintain Line 2 of the
electric mass transportation system, it will
have an approximated extension of 35 km and
will cross 13 districts of Metropolitan Lima.
� Estimated investment (VAT not included):US$ 5.701 million (1, 2 and 3 stage)
� Type of concession: Co-financed
Estimated award date : I Quarter 2014.
CALLED
LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO
Location: Lima and Callao.
Description: The project comprises the concession to
design, finance, build, provision of electromechanical
equipment, purchase of rolling stock, operation and
maintenance of Line 3 and Line 4.
� Estimated investment: Under evaluation
� Type of concession : Co-financed
� Concession Period: 35 years
Line 3 Line 4
32 Km 30 Km
2015 2015Estimated award date
Approximate length
TO BE CALLED
LEYENDA
Ferrocarril CentralFerrocarril Huancayo HuancavelicaFerrocarril Sur
Location: Junín and Huancavelica.
Description: Project oriented to the transportation of passengers
and cargo, which comprises the execution of the following works
along the 128 Km of the existing railway:
� Railway upgrade
� Changes to the tracks in critical sectors
� Purchase of rolling stock
� Reinforcement of 15 railway bridges
� Extension of 38 tunnels for standard gauge rolling stock
(1,435 mm)
� Upgrades to the signaling and telecommunication systems
� Draining works
The project includes the interoperability with Ferrocarril Central
(railway service with standard gauge of 25 ton per axle) for the
connection of high Andes regions with the port of Callao and the
Santa Anita market.
Estimated investment: Under evaluation
Type of concession : Co-financed
Concession Period: 30 years
Estimated award date: I Quarter 2015
HUANCAYO - HUANCAVELICA RAILWAY
TO BE CALLED
FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA
Location: Arequipa
Description: A private initiative for the design,
construction, electromagnetic equipment, systems,
rolling stock, financing, operation and maintenance of
a 14 Km fast mass transportation system on an
elevated track.
• Estimated Investment: Studies in progress
• Type of concession : Co-financed
• Estimated award date: 2015
UNDER EVALUATION
Location: Junín, Huancavelica, Ayacucho and Apurímac.
Description: The project comprises the execution of
upgrade and rehabilitation works (117 km), initial
periodic maintenance (160 km); and subsequent
maintenance and operation of 651 Km, in order to
reach and maintain the levels services established on
the railway route.
�Estimated investment: The sector is conducting the
final engineering studies.
�Type of concession : Co-financed
�Concession period: 25 years
Estimated date of award: I Quarter 2015.
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4
TO BE CALLED
Location: Cusco and Puno.
Description: The project comprises the regular initial
maintenance, and operation and maintenance of all the
Section (422 km), in order to obtain the required level of
service.
� Estimated Investment: The sector is updating the
upgrading and improvement costs
� Type of concession: Co-financed
� Concession period: 25 years.
Estimated award date : II Quarter 2015.
TO BE CALLED
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5
Location: Ica and Arequipa
Description: Private initiative for the concession to
build, operate and maintain the following
infrastructure: Vía de Evitamiento de Ica, Second road
Ev. Ica - Ov. Ocucaje, Vía de Evitamiento de Palpa, Vía
de Evitamiento de Nazca and section Nazca - DV.
Quilca.
� Estimated investment: Under evaluation.
�Type of concession: Self sustaining
Estimated award date: 2015
PANAMERICANA SUR HIGHWAY: SECTION ICA- DV. QUILCA
UNDER EVALUATION
CONCESSIONS IN URBAN AREAS PERIPHERAL RING ROAD
Location: Lima and Callao
Description: Private initiative for the
construction, financing, operation and
maintenance of a highway from Av. Elmer
Faucett to Av. Circunvalación (approx. 33 Km),
according to the technical parameters and
service levels established.
• Estimated Investment: Studies in progress
• Type of concession : Co-financed
• Estimated award date: IV Quarter 2014
Ring road
UNDER EVALUATION
220 kV MOYOBAMBA -IQUITOS TRANSMISSION LINE AND ASSOCIATED SUB STATIONS
Location: Loreto and San Martín.
Description: The project comprises the concession to
design, finance, build, operate, and maintain a
transmission line with an approximated length of 600
km and capacity of 145 MVA, in order to incorporate
the city of Iquitos to the National Interconnected
System.
� Estimated Investment (VAT not included): US$ 434
million
� Type of concession: Self-sustaining
� Concession period: 30 years plus the construction
period (52 months)
Estimated award date: II Quarter 2014.
CALLED
Moyobamba
Iquitos
600 Km
PACIFIC OCEAN
BRAZIL
220 KV LA PLANICIE INDUSTRIALES TRANSMISSION LINE AND ASSOCIATED SUBSTATIONS
Location: Lima
Description: The project comprises the concession to
design, finance, build, operate, and maintain the
transmission line with a length of 16.6 km and two
circuits with 400 MVA capacity each. The last 5 km of
the line will be underground.
�Estimated investment (VAT not included): US$ 56.6
million
�Type of concession : Self-sustaining
�Concession period: 30 years plus the construction
period (22 months approximately).
Estimated award date: II Quarter 2014
CALLED
220 KV FRIASPATA - MOLLEPATA TRANSMISSION LINE AND 220/60 KV ORCOTUNA SUBSTATION
CALLED
Location: Huancavelica, Ayacucho, Junín.
Description: The project comprises the concession to
design, finance, build, operate and maintain the following
projects:
a) Mollepata – Friaspata transmission line of 90.5 k.m.
and 192 MVA capacity and associated sub stations.
b) 220/60 kV new Orcotuna substation with 50 MVA
capacity.
Both projects will allow to meet the energy demand in
the regions involved.
� Estimated investment (VAT not included): US$ 43.5
million
� Type of concession : Self-sustained.
� Concession period: 30 years plus the construction
period (25 months approximately)
� Estimated award date: II Quarter 2014
Mollepata
Friaspata
SE Orcotuna
Location: Nationwide.
Description: Supply of power and energy to the National
Interconnected Power System (SEIN) through new
hydroelectric power stations to meet the demand of
400/400/300 MW from 2018 on. The energy sale will be
guarantee by contracts.
• Estimated investment: Under evaluation• Type of concession : Self-sustained
Estimated date of award: III Quarter 2014
1100 Mw ELECTRICITY SUPPLY
TO BE CALLED
ENERGY SECURITY AND SOUTHERN GAS PIPELINE
Location: Cusco, Arequipa and Moquegua.
Description: The project comprises the concession to
design, finance, build, operate, maintain and transfer
of a natural gas distribution system. The project
includes 2 sections:
a) Construction of natural gas pipelines and liquid gas
pipelines from Malvinas plant to the Connection point
(CP) and then to the Chinquintirca plant.
b) Natural gas pipeline from (CP) runs through Cusco and
Arequipa and reach of the south coast of the country.
This comprises the following works:
� Route 1: natural gas pipeline from the CP to
Cusco
� Route 2: Continuance of the gas pipeline to Ilo
and Mollendo.
Estimated Investment (VAT not included): US$ 3,722
million
Type of concession: Self - sustained
Estimated award date: II QT 2014
CALLED
Malvinas
Chiquintirca
Camisea
CUSCO
PUNO
AREQUIPA
Mollendo MOQUEGUA
TACNAIlo
Quillabamba
PC
SUPPLY SYSTEM OF LNG FOR DOMESTIC MARKET
Location: Lima.
Description: The project comprises the concession to design,
finance, build, operate and maintain a supply system of liquid
natural gas with a capacity of 130,000 M3 in emergency
situations for up to 7 days.
� Estimated Investment (VAT not included): US$ 250 million.
� Type of concession: Self-sustaining.
� Concession term: 20 years plus the build period (30 months).
� Estimated award date: IV Quarter 2014
CALLED
CHILLÓN RIVER WATER SUPPLY WORKS
Location: Lima.
Description: The project comprises the concession to design,
finance, build, operate and maintain of dam works
(approximately 40 MM cubic meters) of Chillón river basin.
� Estimated investment (VAT not included):US$ 45 million
� Type of concession: Self- sustaining
� Concession term: 20 to 30 years
Estimated award date: IV Quarter 2014.
POR CONVOCAR
TO BE CALLED
Canta
Matucana
Ancón
Location: Junín and Lima.
Description: The project comprises the concession to
design, finance, build, operate and maintain of the
following infrastructure works:
� Extension capacity of Pomacocha and Huallacocha
Bajo dams (approx. 100 MM cubic meters ).
� Diversion works of Pomacocha – River Blanco (approx.
10 km of trans Andean tunnel).
� Water purification plant (5 m3/s), and
� Southern conduction line Ramal Sur (approx. 25,6 km)
from Huachipa to Villa del Triunfo districts, three
tunnels of 4.2 k.m., 4.5 k.m., and 2.5 k.m.; and 6
support reservoirs of 24,000 cubic meters.
�Estimated Investment (VAT not included): US$ 400
million
�Type of concession: Self -sustained
�Concession term: 20 to 30 years
Estimated award date: IV Quarter 2014.
POR CONVOCAR
P
H
Water Purificatio
n Plant
Southern conduction line
Blanco RiverRimac
River
Trans Andean tunnel
MAIN WORKS AND CONDUCTION OF DRINKABLE WATER SUPPLY FOR LIMA
TO BE CALLED
MANAGEMENT OF THE INSTITUTO NACIONAL DE SALUD DEL NIÑO – SAN BORJA
Location: Lima.
Description: The project comprises in the provision, by a
private operator, of the following services:
� Maintenance of buildings, facilities and
electromechanical equipment associated with
infrastructure, landscaping and parking
� Maintenance of the clinical and not-clinical equipment
� Operation and maintenance of general services
(laundry, kitchen, cleaning service and security and
hospital waste management)
� Operation and maintenance of the diagnose support
(clinical pathology and sterilization center)
� Technical assistance services for acquisition
� Type of concession: Co-financed
� Contract term: 10 years.
Estimated award date: II Quarter 2014.
CALLED
Location: Lima, Piura, Lambayeque, Arequipa and Huaraz.
Description: The project comprises the concession to
design, build, equip, operate, maintain complementary
services in the following hospitals:
1. Sergio Bernales MINSA
2. Dos de Mayo MINSA
3. Hospital Piura Essalud
4. Hospital Chiclayo Essalud
5. Hospital Arequipa Essalud
6. Hospital Chimbote Essalud
� Estimated investment: Studies in progess
Estimated award date: 2015
BUILD, EQUIP AND COMPLEMENTARY SERVICES IN ESSALUD AND MINSA HOSPITALS
TO BE CALLED
INTEGRAL MANAGEMENT OF SOLID WASTE FROMHOSPITALS IN METROPOLITAN LIMA AND CALLAO
Location: Lima and Callao
Description: A private initiative involving the construction,
operation and maintenance of a modern hospital waste
treatment plant for the appropriate management of this
type of waste (hazardous-biocontaminated/special-
hazardous/regular) from MINSA hospitals and institutes.
The project will be executed on the basis of other existing
infrastructure public works owned by the Peruvian
Government.
� Estimated Investment: Studies in progress
� Type of concession: Co-financed
Estimated award date: 2015
TO BE CALLED
CABLECAR TO KUELAP
Location: Amazonas.
Description: The project comprises the concession to
design, finance, build, operate and maintain a cableway
system for a fast, safe and easy access to Kuelap Fortress.
The cable cars route will be 4,400 meters aimed to
overcome the distance of 965 meters between Tingo
Nuevo town and Kuelap fortress.
� Estimated investment (VAT not included): US$ 17.6
million
� Type of concession: Co- financed
� Concession term: 20 – 25 years
Estimated award date: II Quarter 2014.
CALLED
CHOQUEQUIRAO CABLE RAILWAY
Location: Apurímac and Cusco
Description: Concession of the design, financing,
construction, equipment, operation and maintenance of a
cable railway system to access the Choquequirao
Archaeological Park in a fast and comfortable way.
It will cross the Apurimac Canyon and will have 5.4 Km
long, divided in 2 sections (3.4 Km and 1.99 Km), and
capacity for 400 passengers/hour.
� Estimated investment (VAT not included): US$ 54.3
million
� Type of concession : Co-financed
� Concession period: 20-25 years
Estimated date of award: IV Quarter 2014
CALLED
PROVISION OF TECHNOLOGICAL SECURITY SERVICES IN PRISONS
Location: 33 Correctional Facilities nationwide
Description: A private initiative declared to be of interest,
created to upgrade the security in correctional facilities
through the application of the following technologies:
� Blockers of mobile phone signals and WiFi networks.
� Public use telephones under established security
conditions.
• Estimated Investment (VAT not included): US $ 4.1 million
• Type of concession : Self-sustaining
• Concession term: 25 years
Estimated award date: II Quarter 2014
CALLED
Location: Lima and Callao
Description: A private initiative for the provision of
Electronic Personal Monitoring services aiming at
decongesting the Peruvian correctional facilities through
the use of electronic tagging devices on prosecuted or
sentenced inmates that may have access to this benefit,
in their places of residence or under restricted transit
conditions.
� Estimated Investment: Under evaluation
� Type of concession : Self-sustaining
� Estimated award date: IV Quarter 2014
ELECTRONIC PERSONAL MONITORING
TO BE CALLED
Location: Lima and Cusco
Description: Relocation of 4 penal facilities located in urban areas
of Metropolitan Lima and Cusco, fulfilling the necessary
conditions for the treatment process of the inmates.
The Penal facilities considered are:
• Mujeres Chorrillos (Common) and Annex.
• Lurigancho
• Miguel Castro Castro.
• Cusco and EP Cusco Women
Estimated Investment: Under evaluation
Estimated award date: I Quarter 2015
RELOCATION OF PENAL FACILITIES
TO BE CALLED
Location: Lima
Description: The project proposes the construction of a
commercial center, housing, warehouses and parking lots in
the land of the current San Jorge Prison (Metropolitan Lima).
It also includes the construction and equipment of a new
prison for the transfer of inmates of San Jorge Prison into a
state owned property – to be defined.
� Estimated investment : Under evaluation
� Concession type: Self sustaining
Estimated award date: 2015
PENAL INFRASTRUCTURE AND URBAN RENEWAL “TINKUY PLAZA PROJECT”
UNDER EVALUATION
HUAYDAY AMBARA MINING PROSPECT
Location: La Libertad.
Description: The project involves a mining concession
with a total area of 2992 ha . There are coal stratums
identified as “clean anthracite” with probable
estimated reserves of 1.8 million MT that offers a high
potential for exploration.
Estimated investment (VAT not included): US$ 8
million
Estimated award date: II Quarter 2014
LUCMA
LA LIBERTAD
TO BE CALLED
COMPREHENSIVE AGRICULTURAL, WATER AND MINING PROJECT IN PIURA
Location: Piura
Description: This project will be performed in two
stages :
� First stage: Design, financing, construction,
operation and maintenance of an ore benefit
Plant which shall process the gold ore extracted
by formal miners and miners under formalization
process who operate within the Piura region.
� Second stage: Promotion of a portfolio of
agriculture and livestock development projects
and others that are intended to solve problems
related to water for domestic and agriculture
purposes in the influence area of the formal
mining operations.
Estimated investment (VAT not included): US$ 12
million
Estimated award date : II Quarter 2014
TO BE CALLED
Location of the ore benefit plant
Operations area of
informal mining
PACIFIC OCEAN