Endend Oil and gas market. endend Customer requirements High reliability Low operating costs Low...

21
e n d Oil and gas market

Transcript of Endend Oil and gas market. endend Customer requirements High reliability Low operating costs Low...

end

Oil and gas marketOil and gas market

end

Customer requirementsCustomer requirements

High reliability

Low operating costs

Low first cost

Local codes and standards

Domestic content

High reliability

Low operating costs

Low first cost

Local codes and standards

Domestic content

end

Manufacturing and packagingManufacturing and packaging

Mount Vernon, Ohio, USAMount Vernon, Ohio, USALiverpool, United KingdomLiverpool, United Kingdom

end

Gas turbine applicationsGas turbine applications

Compressor Drive

Pump Drive

AC Generator Drive

Process Heat

Compressor Drive

Pump Drive

AC Generator Drive

Process Heat

009656/11 PPT25/03/99

end

Compressor applicationsCompressor applications

Gas Transport

Gas Storage

Gas Processing

Gas Reinjection

Gas Gathering

Gas Transport

Gas Storage

Gas Processing

Gas Reinjection

Gas Gathering

009656/03 PPT25/03/99

end

Pipeline booster compressorsPipeline booster compressors

High Flow

Low to Medium Pressure Ration

Direct Drive Through Gas Turbine or Electric Motor

Dry Gas Seals

Compressor Mounted on Base Plate or Block Foundations

Lube Oil System Integrated in Base Plate pr Free Standing Console

Magnetic Bearings

High Flow

Low to Medium Pressure Ration

Direct Drive Through Gas Turbine or Electric Motor

Dry Gas Seals

Compressor Mounted on Base Plate or Block Foundations

Lube Oil System Integrated in Base Plate pr Free Standing Console

Magnetic Bearings

009656/05 PPT25/03/99

end

AC generator driveAC generator drive

2 or 4 Pole AC Generator Drive in Combination with Compressor

Application

AC Generator Drive in Compliance with API and other High Grade

Specification Requirements, mainly for Oil and Gas Companies

In Connection with Rolls-Royce Power Generation Projects

2 or 4 Pole AC Generator Drive in Combination with Compressor

Application

AC Generator Drive in Compliance with API and other High Grade

Specification Requirements, mainly for Oil and Gas Companies

In Connection with Rolls-Royce Power Generation Projects

009656/07 PPT25/03/99

end

Pump drivePump drive

Crude Oil Pipeline Pumps

Water Injection Pumps

Crude Oil Pipeline Pumps

Water Injection Pumps

009656/06 PPT25/03/99

end

Electric motor applicationsElectric motor applications

Fixed Speed Barrel Compressor Drive

Variable Speed Barrel Compressor Drive

Fixed Speed Pipeline Booster Drive

Variable Speed Pipeline Booster Compressor Drive

Fixed Speed Barrel Compressor Drive

Variable Speed Barrel Compressor Drive

Fixed Speed Pipeline Booster Drive

Variable Speed Pipeline Booster Compressor Drive

009656/02 PPT25/03/99

end

Coberra 6562 DLE Pipeline booster applicationCoberra 6562 DLE Pipeline booster application

009656/01 PPT25/03/99

end

Coberra 6556 AC generator drive single lift packageCoberra 6556 AC generator drive single lift package

009656/08 PPT25/03/99

end

Coberra 2556 Process heat applicationCoberra 2556 Process heat application

009656/09 PPT25/03/99

end

Coberra 6562 Crude oil pump packageCoberra 6562 Crude oil pump package

009656/10 PPT25/03/99

end

Coberra Gas Turbine Air freight package design for remote locationsCoberra Gas Turbine Air freight package design for remote locations

009656/12 PPT25/03/99

end

Amoco Pascagoula motor driven RC5BAmoco Pascagoula motor driven RC5B

end

“All in” package Plan view“All in” package Plan view

end

Driver and driven equipmentDriver and driven equipment

end

Flexible skid arrangementFlexible skid arrangement

end

DLE fuel gas pipingDLE fuel gas piping

end

GG lube oil systemGG lube oil system

end

End of Oil and gas market