ENAM
ENAM - INFRA Project 2013
SCOOP OF WORKTo setup the new Information
Technology Infrastructure for ENAM consisting of ~ 80 users.
OBJECTIVETo upgrade the existing
infrastructure to cater to new business requirement OR
To build and operate from separate Information Technology Infrastructure.
CHALLENGESTo setup Separate IT
Infrastructure.PlanningImplementation.Processes.People.
INFRASTRUCTURE SETUPSpace for Office.Data Center Space.UPS.Cooling.Server & Network Racks.Servers / Storage / Backup / Network
Devices.Applications / Mail / Website (Domain
Name).Internet / VPN connectivitySecurity – UTM Box / Endpoint / Content Filtering &
Proxy.
PROCESSBCP / DR – Separate Proposal will be
planned with budget.
Policy & Procedures.Incidence ManagementChange ManagementPurchase Management – IT
Procurement & Payments.Vendor Management.
PEOPLE
System Administrator.Network Administrator.IT Helpdesk.
IMPLEMENTATIONData Center Implementation Plan:Server & Network Rack.Blade Server Chassis.Blade Severs.SAN Box & SAN Switch.Tape Library.VMWARE Virtual Environment.Network Monitoring Tools.L3 Switches, Router.UTM Box.
IMPLEMENTATION
Application Implementation Plan:Primary / Secondary DNS.AD Server.Microsoft Exchange Mail Server.Intranet Portal (SharePoint).Website.Compliance Software.Business Applications like PMS
software etc.
PLAN 1New Office Space as decided by
management.Need to start from Scratch for IT
Infra.Adequate server room, more
space for equips.Atomized cooling system.
PLAN 2Existing Office Space usedNo more space in server room for
new equips.Cooling system problems.
GUIDE MAPNeed Office Space premises
guidance.Clear Indication for Separation of
Infra between 2 company.Parallel New Infra Setup with
existing Infra.Information Security Audit/ISO
Certification for ENAM.
PROGRESS REPORTNew data center space allocated @ AMC
office.Separate Cooling facility will be provided.PO raised for the DELL Hardware, which
includes Storage / Backup / Switches. We have received hardware.
Installation of hardware is done & now the concern data from central datacenter will be migrated to New datacenter.
TECHNOLOGY LAYER enam.com DC / ADC (Domain Controllers) AD (Active Directory) Windows Server 2008 R2 / Windows 7 Exchange Server 2010 SharePoint Server 2010 SQL Enterprise Server Revamp existing Website Microsoft stack of products Video Conferencing Facility Audio Conferencing Facility Web Conferencing Facility (Webex) Blackberry Server (BES) Software (IT Helpdesk / Asset Mgnt / Vendor / Contract / SLA
Monitoring) Business Intelligence
TECHNOLOGY LAYER
HRMS Server Forefront Anti-virus Server SCCM Server SCOM Server OCS Server DLP Server ISA Server Websense Server DL Server DAS VPN Server VMWARE Servers vCenter Server
DISASTER RECOVERYFinalize the DR site in India.Business continuity Planning.
(BCP)Backup Site.Backup Storage Site.
ADVANCE PROCESSISMS ImplementationISO 27001 – ENAM AMC InfraSystem AuditSecurity Audit for applications
Existing IT FrameworkConnected to Central Server &
internetENAM local File serverBackup Software & ManagementPMS Software on Oracle/ SQL
PlatformHandheld devices for users
Areas of WorkCompliance Software ProcuredENAM Website evaluation &
finalizationIntranet PortalHRMS Software evaluation &
finalizationCRM Software evaluation &
finalizationNew mobile phones for usersCreating New Infra for ENAM AMC
CRM SoftwareTalisma CRM Software evaluationSales Force Cloud CRM software
evaluatedSugar CRM evaluatedMicrosoft Dynamics CRM
evaluated and Finalized as it is more appropriate & convenient for us.
Thank You