Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and...

35
Enabling Datacenter Servers to Scale Out Economically and Sustainably IDEAL (Intelligent Design of Efficient Architectures Laboratory) Department of Electrical and Computer Engineering University of Florida 3UHVHQWHG E\ Chao Li MICRO-46 'HF 'DYLV &$ Chao Li, Yang Hu, Ruijin Zhou, Ming Liu, Longjun Liu, Jingling Yuan, Tao Li

Transcript of Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and...

Page 1: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

Enabling Datacenter Servers to Scale Out Economically and Sustainably

IDEAL (Intelligent Design of Efficient Architectures Laboratory)Department of Electrical and Computer Engineering

University of Florida

3UHVHQWHG�E\�Chao Li

MICRO-46'HF�����������'DYLV� &$

Chao Li, Yang Hu, Ruijin Zhou, Ming Liu, Longjun Liu, Jingling Yuan, Tao Li

Page 2: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Talk Overview

1. Background and Motivation 2. Oasis: Design and Prototype

3. Optimized Oasis Operation 4. Evaluation and Discussion

Inverter

PLCHMI

MPPT

SensorSensor

Switch Panel

Charger

/ 1 *

Pow

er C

ontr

ol H

ub

Utility Power

4%7%

9%

13%

16%22%

29%

Others Mechanical HMI BatteryInverter PLC Solar Panel

5%

14%

76%

Server Racks

P Load > P Renewable

1

5'%�!��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ+LJKHVW¶�

2 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

3'%� ��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ/RZ¶�

4 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

5

8'%�!��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ+LJKHVW¶

6 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

7'%� ��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ/RZHVW¶

8 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

Page 3: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Datacenter Footprint Continues to Expand

• Horizontal scaling (scale out) has gained increasing attention[1] DCD Industry Census 2012: Energy, http://www.dcd-intelligence.com/

020406080

100120140160

% Increase in cloud infrastructure capacity in 2013

Everything is in the Cloud

Ever-increasing user data

Endless data processing

More servers are needed!

Page 4: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

The Power Provisioning Capacity Problem

• Datacenters are power-constrained:– Limited power capacity headroomRun out of power capacity in 2012 ?

30

70

00 Capacity expanded in the last 5 years?

80

20

3RZHU�&DSDFLW\�&RQVWUDLQWV

Automatic Transfer Switch (ATS)Power Panel / Switch Gear

Uninterruptable Power SupplyPower Distribution Units

Server Clusters

Page 5: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Existing Solutions

66%

10%

42%29% 24% 30%

ConsolidateServers

DeployContainers

UpgradeEquipment

Build NewDatacenters

LeaseColocation

Move to theCloud

Improve Efficiency Facility Construction Third-Party Solutions

[1] the Uptime Institute 2012 Data Center Industry Survey, 2012

66%

10%

42%29% 24% 30%

ConsolidateServers

DeployContainers

UpgradeEquipment

Build NewDatacenters

LeaseColocation

Move to theCloud

Preference to different solutions [1]

Page 6: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Existing Solutions

ConsolidateServers

DeployContainers

UpgradeEquipment

Build NewDatacenters

LeaseColocation

Move to theCloud

Schemes ProblemsImprove Efficiency Power under-provisioning issue and low performanceFacility Construction High capital investment and long construction lead timeThird-Party Solutions Not suitable for large-scale enterprise datacenters

Improve Efficiency Facility Construction Third-Party Solutions

Page 7: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Energy and Environmental Problems

[1] C. Belady, Projecting Annual New Datacenter Construction Market Size, Global Foundation Services, 2011[2] DCD Industry Census 2012: Energy, http://www.dcd-intelligence.com/

USAChinaU.K.JapanBrazilFranceBeneluxCanada

GermanyRussia

8 TWh3 TWh2 TWh2 TWh2 TWh1 TWh1 TWh1 TWh1 TWh1 TWh

AustraliaIndia

1 TWh1 TWh

The increase in server energy demand (2012 - 2013) [2]

• Server energy consumption:– 1.8% of global electricity usage– Might triple within 8 years [1]

300 ~ 400 TWh in 2012

1000 ~ 1400 TWh in 2020

Page 8: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Energy and Environmental Problems

0%

20%

40%Ru

ssia

Fran

ceIta

lyBr

azil

Spai

nCh

ina

Mex

ico

Nor

dics

Cana

daTu

rkey

Bene

lux

USA

Germ

any

Indi

aU

KJa

pan

% Performing Carbon Monitoring

Hurricane Sandy, 2012(Northeastern US)

Typhoon Haiyan, 2013(Southeast Asia)

• The greenhouse effect and climate change

• 1MW  data  center  →  10~15 Kt CO2 yearly

• Datacenters are carbon-constrained: – Must cap carbon emissions

Page 9: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

� ����

Renewable Energy Powered Systems

Many IT Companies start tointegrate non-conventional

clean energy solutions

Page 10: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Green Computing - Related Work

• Mainly focus on managing solar/wind– Supply/Load co-scheduling

[ASPLOS’13,  HPCA’13]– Supply-aware job scheduling

[Eurosys’12]– Supply-driven load migration

[ISCA’12]– Avoid shedding critical load

[ASPLOS’11]– Optimal power allocation

[HPCA’11]

• We explore carbon-conscious capacity expansion schemes – Scalable, sustainable, and economical power provisioning

Page 11: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Talk Overview

1. Background and Motivation 2. Oasis: Design and Prototype

3. Optimized Oasis Operation 4. Evaluation and Discussion

Inverter

PLCHMI

MPPT

SensorSensor

Switch Panel

Charger

/ 1 *

Pow

er C

ontr

ol H

ub

Utility Power

4%7%

9%

13%

16%22%

29%

Others Mechanical HMI BatteryInverter PLC Solar Panel

5%

14%

76%

Server Racks

P Load > P Renewable

1

5'%�!��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ+LJKHVW¶�

2 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

3'%� ��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ/RZ¶�

4 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

5

8'%�!��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ+LJKHVW¶

6 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

7'%� ��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ/RZHVW¶

8 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

Page 12: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Server Racks

Power Distribution Units (PDUs)

A/C SystemsEnergy Storage Cabinets/UPS

Generators

Switch Gears

Utility Power Over-Provisioning (Conventional)

Page 13: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Centralized Power Capacity Expansion (Conventional)

Solar Array

Server Racks

Power Distribution Units (PDUs)

A/C SystemsEnergy Storage Cabinets/UPS

Generators

Switch Gears

Inverter

Page 14: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Scale-Out Models

Carbon Emission

Capacity Scalability

Cost of Utility Power

Cost of Green Power

Utility Over-Provisioning Poor Poor High 1�$

Centralized Expansion Good Poor Reduced High

Ideal Power Provisioning Good Good Reduced Reduced

ModelsMetrics

• Oasis: green energy solutions + pay-as-you-grow model– Adds green power budget directly to server racks– Gradually increases green power capacity

Page 15: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

We Leverage Modular Power Sources

• Distributed Battery System

• Solar Module with Micro-inverters

AC

DC

AC①�&RDUVH�JUDLQHG

Battery CabinetRack Triplets

②�)LQH�JUDLQHG

Battery Cabinet

Page 16: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Distributed Incremental Integration (Architecture of Oasis)

Micro-inverters

Solar Array

Distributed Battery Cabinet

Oasis Power Control Hub

Page 17: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Oasis Implementation: An Overview

Rack Power Strip

Cluster-Level PowerManagement Agent

Inverter

PLCHMI

MPPT

SensorSensor

Switch Panel

Network SwitchEthernet

ModBus

Charger

/ 1 *Se

rver

s

Pow

er C

ontr

ol H

ub

Utility Power • Power Ctrl. Hub– PLC

� Manages sensorsand switchgears

– HMI� Communication

gateway of Oasis

• Power Mgmt. Agent– Send/Receive power

management signals – Coordinates power

supply and server load

Page 18: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Oasis Implementation: An Overview

Oasis Node

� ,QWHO�L���EDVHG�PLFUR�VHUYHU

Server Nodes

� $0'�ORZ�SRZHU�QRGH����:�

Power Mgmt. Agent

� 3/&���+0,���,QYHUWHU���«

Power Ctrl. Hub

� 1LQH���$K�OHDG�DFLG�EDWWHULHV

Battery Chassis

Page 19: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Hybrid Power Supply Scheme

0 500 1000 1500 2000 2500 3000 350011.5

12

12.5

13

Time (Seconds)

Bat

tery

Vol

tage

(V

)

Swtich to Utility

Switch to Solar

Voltage Drop

• Stored solar energy– Release solar energy when batteries are fully charged– Charge batteries with solar power when the SOC is low

• Utility power supply– The primary energy source in cloudy days or at night

Roof-mounted solar panels in our lab Battery charging and discharging scenarios

Page 20: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Power Control Hub - I

• Monitors power supply status– Emergency alert– Battery capacity check– Health status assessment

Inside the Pwr. Ctrl. Hub

Two Monitoring Approaches

to the power mgmt. agent

to HMI touch screen display

Page 21: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Power Control Hub - II

• Bridges power supply and load– Send/Receive control signals– Send/Store monitored data

Inside the Pwr. Ctrl. Hub

HMI PLC

(ModBus TCP/Server)(ModBus TCP/Client)

RS-232/485

Server Clusters

Power Control Hub

Battery Solar Utility

Ethe

rnet

Actuator

Server Clusters

Battery Solar Utility

ActuatorHMIPLC

Comm. Gateway!

Page 22: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Power Control Hub - III

• Performs Power Supply Switch – Switch between solar power

and utility power– Leverage high-voltage relay

array controlled by a PLCInside the Pwr. Ctrl. Hub

Two Switching Modes!

Page 23: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Power Management Agent (PMA)

• Adaptive power source switching– Manages utility power usage (affect carbon footprint)– Manages solar energy and battery usage

• Supply-aware server load tuning– Dynamic voltage and frequency scaling (DVFS)– Trigger VM migration/checkpointing if necessary

&DQ�EH�LPSOHPHQWHG�DV�HLWKHU�PLGGOHZDUH�RU�H[WHUQDO�FRQWURO�QRGH

PCH

(ModBus TCP/Server)(ModBus TCP/Client)

Server OS PMA (as server node)

Workload Workload

PMA (as middleware)

Workload

6HUYHU�6\VWHP��7KH�/RDG�

Page 24: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Talk Overview

1. Background and Motivation 2. Oasis: Design and Prototype

3. Optimized Oasis Operation 4. Evaluation and Discussion

Inverter

PLCHMI

MPPT

SensorSensor

Switch Panel

Charger

/ 1 *

Pow

er C

ontr

ol H

ub

Utility Power

4%7%

9%

13%

16%22%

29%

Others Mechanical HMI BatteryInverter PLC Solar Panel

5%

14%

76%

Server Racks

P Load > P Renewable

1

5'%�!��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ+LJKHVW¶�

2 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

3'%� ��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ/RZ¶�

4 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

5

8'%�!��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ+LJKHVW¶

6 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

7'%� ��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ/RZHVW¶

8 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

Page 25: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Ozone: Optimized Oasis Operation (O3)

� $GMXVW�GHPDQG�OHYHO

6HUYHU�ORDG

� 6ZLWFK�SRZHU�VRXUFH

3RZHU�VXSSO\

� 6WRUHG�JUHHQ�HQHUJ\�XVDJH

%DWWHU\�V\VWHPV

� 3HUIRUPDQFH�DFFHSWDEOH"� &DUERQ�IRRWSULQW�VDWLVILHG"� %DWWHU\�FRVW�UHGXFHG"� $YDLODELOLW\�JXDUDQWHHG"

'HVLJQ�WUDGH�RIIV

Page 26: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Backup Capacity

• Capping green energy usage for each discharge cycle– The stored green energy level affects backup time– Should avoid low state of charge (SOC)

Flexible Capacity

Reserved Capacity

SOC

0%10

0%

Limited emergency handling capability Relatively longer recharge time

Limited green energy delivery

• Use different power management schemes at different SOC– Abundant stored energy? (60% ~ 100% SOC)– Not enough stored energy? (20% ~ 60% SOC)– Should avoid low SOC (i.e., SOC < 20%)

Page 27: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Discharge Budget

• Discharge throughput model– The total energy that can be cycled through a battery is fixed

�������������������������

��������������������������������

���

���

���

���

���

���

���

���

���

����

Thro

ughp

ut (k

Wh)

# of

Cyc

les

&\FOHV�WR�)DLOXUH 7KURXJKSXW

• Capping the aggregated discharge throughput– Predicting lifetime based on the remaining throughput– Capping battery discharge to avoid over-use

Manage solar energy usage based on

�t

aggregated AhD D

�budget ratedD T Lifetime D

budget aggregatedD D

Page 28: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Supply/Load Control of Ozone

• Coordinating server load and power supply switch – Based on the capacity level of stored green energy– Based on the aggregated stored green energy usage

Discharge Budget > 0 Discharge Budget = 0

Flexible Capacity > 0

Give Priority to ReleasingStored Solar Energy

(Use DVFS if necessary)Switch to Utility

Flexible Capacity = 0

Give Priority to Server Power Capping

(Use battery if necessary)Switch to Utility

Page 29: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Talk Overview

1. Background and Motivation 2. Oasis: Design and Prototype

3. Optimized Oasis Operation 4. Impact of Oasis Design

Inverter

PLCHMI

MPPT

SensorSensor

Switch Panel

Charger

/ 1 *

Pow

er C

ontr

ol H

ub

Utility Power

4%7%

9%

13%

16%22%

29%

Others Mechanical HMI BatteryInverter PLC Solar Panel

5%

14%

76%

Server Racks

P Load > P Renewable

1

5'%�!��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ+LJKHVW¶�

2 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

3'%� ��

XSV&�!���� 6ZLWFK� �µ1¶��FSX)UHT� �µ/RZ¶�

4 XSV&������ 6ZLWFK� �µ<¶��FSX)UHT� �µ7%'¶

5

8'%�!��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ+LJKHVW¶

6 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

7'%� ��

XSV&�!���� 6ZLWFK� �µ<¶��FSX)UHT� �µ/RZHVW¶

8 XSV&������ 6ZLWFK� �µ1¶��FSX)UHT� �µ7%'¶

Page 30: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Job Latency vs. Battery Life

• Ozone seeks a balance between supply tuning and load tuning– Battery-based design (Oasis-B) emphasis performance– Load scaling based design (Oasis-L) emphasis battery lifetime

0%

1%

2%

3%

4%

5%

6%

7%

8%

Oasis-B Oasis-L Ozone

Job

Dela

y

Sort

WCount

PRank

Nutch

Bayes

Kmeans

Web

Media

YCSB

SWtest

Avg. 0

1

2

3

4

5

6

7

Life

time

(Yea

rs)

Oasis-B Oasis-L Ozone

Page 31: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Battery Backup Time

• Ozone also maintains the best battery backup capacity – Under various renewable power variability

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Back

up C

apac

ity

Oasis-B Oasis-L Ozone

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Back

up C

apac

ity

Oasis-B Oasis-L Ozone

High solar power variability Low solar power variability

Page 32: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Cost Projection

• Solar systems and batteries are major cost components– PCH: < 4% total cost

• Oasis could result in 25% less total CapEx– Depending on the

hardware cost trend

6RODU%DWWHU\3&+2WKHUV

Scaled-down Prototype

Large-scale Deployment 0 2nd 4th 6th 8th 10th0

0.2

0.4

0.6

0.8

1

Year

Nor

mal

ized

Cos

t

Oaiss with 6%/year Solar Cost Decline Oasis with 12%/year Solar Cost DeclineConventional Centralized Integration

0 2nd 4th 6th 8th 10th0

0.2

0.4

0.6

0.8

1

Year

Nor

mal

ized

Cos

t

Oaiss with 6%/year Solar Cost Decline Oasis with 12%/year Solar Cost DeclineConventional Centralized Integration

0 2nd 4th 6th 8th 10th0

0.2

0.4

0.6

0.8

1

Year

Nor

mal

ized

Cos

t

Oaiss with 6%/year Solar Cost Decline Oasis with 12%/year Solar Cost DeclineConventional Centralized Integration

Page 33: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Conclusions

• A distributed, incremental green energy integration method can reduce 25% capital expenditure

• Balancing power supply control and server load control can further improve the design trade-offs

• IT can be the enabler of sustainability: Expanding datacenters using green energy in the big data era!

• Integrating modular green energy sources allows data centers to scale out sustainably

Page 34: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

February 15-19, 2014http://hpca20.ece.ufl.edu/

Welcome!

Page 35: Enabling Datacenter Servers to Scale Out Economically and ... · Talk Overview 1. Background and Motivation 2. Oasis: Design and Prototype 3. Optimized Oasis Operation 4. Evaluation

�� ����

Green Computing

�35