GEF/C.50/10 May 17, 2016 50 th GEF Council Meeting June 07 – 09, 2016 Washington, D.C. Agenda Item 16 GEF BUSINESS PLAN AND CORPORATE BUDGET FOR FY17

Transcript of EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business...

Page 1: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

GEF/C.50/10May17,2016

50thGEFCouncilMeetingJune07–09,2016Washington,D.C.AgendaItem16

GEFBUSINESSPLANANDCORPORATEBUDGETFORFY17

Page 2: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

i

RECOMMENDEDCOUNCILDECISION

TheCouncil,havingrevieweddocumentGEF/C.50/10,GEFBusinessPlanandCorporateBudgetforFY17,takesnoteofthebusinessplan,andapprovesaFY17corporatebudgetfromtheGEFTrustFundof$25.586million,comprisedof:

(a) $19.979millionfortheGEFSecretariat,

(b) $2.620millionforSTAP,and

(c) $2.987millionfortheTrustee,

TheCouncilalsoapprovesatotalFY17administrativebudgetfortheNagoyaProtocolImplementationFund(NPIF)of$31,000,comprisedofthefollowingallocationsfromtheNPIFtocovertheSecretariat’sandTrustee’sexpensesforNPIFadministrationandimplementation:

(a) $20,000fortheGEFSecretariat;and

(b) $11,000fortheTrustee

TheCouncilrequeststheSecretariat,inconsultationwithSTAPandtheTrustee,topresentacombinedFY18corporatebudgetandbusinessplanfordiscussionatits2017springmeeting.

Page 3: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

ii

EXECUTIVESUMMARY

1. ThisdocumentpresentstheupdateoftheGEFBusinessPlanforGEF-6andFY17budgetrequesttocoverexpensesofthreeofthecentralGEFentitiesfortheiractivitiesundertheGEFTrustFund:theSecretariat;theScientificandTechnicalAdvisoryPanel(STAP);andtheTrustee.ItalsoincludesbudgetrequestsfortheSecretariatandTrusteefortheiractivitiesundertheNagoyaProtocolImplementationFund(NPIF).1

2. ThedocumentfirstsetsoutthecombinedFY17corporatebudgetrequest,andtheexplanationssupportingthisrequest.ThetotalFY17budgetrequestfromtheGEFTrustFundforthethreeGEFentitiesamountsto$25.586million.AssetoutinTable1inthetext,thisiscomprisedof:

1. Secretariat:$19.979million

2. STAP:$2.620million;and

3. Trustee:$2.987million.

3. Thebudgetrequestsectionalsoincludestheadministrativebudgetrequestof$31,000tocovertheexpensesoftheSecretariatandtheTrusteefortheadministrationandimplementationoftheNagoyaProtocolImplementationFundduringFY17:2(i)$20,000fortheSecretariat;and(ii)$11,000fortheTrustee.

4. ThedocumentthensetsoutthesecondannualupdateoftheGEFBusinessPlan.ThisupdatedescribeskeyprioritiesandtasksthattheentitiesoftheGEFnetworkwillundertakeduringFY17,forwhichthebudgetrequestresourcesareneededandwillbeused.AcoreemphasisoftheSecretariat,asreflectedintheBusinessPlan,continuestobetoacteffectivelyandefficientlywithitspartnersandstakeholderstofullydeliverGEF-6,inlinewiththestrategicdirections,priorities,andpoliciesadoptedandapprovedbyCouncil,andthemandateanduniqueassetsoftheGEF.

5. ThedocumentalsoreportsontheuseofGEFresourcesandkeyaccomplishmentsinFY16oftheGEFSecretariat,STAPandtheTrustee.ThisincludesmultipleactionssupportedbytheSecretariattoprogramresourcesandtoimplementtherecommendationsfromtheGEF-6replenishmentnegotiations.

1Beginninglastfiscalyear,thebudgetrequestoftheIndependentEvaluationOffice(IEO)ispresentedseparatelyfromthoseoftheotherthreeGEFentities.PleaserefertoGEF/ME/C.48/01,Four-YearWorkProgramandBudgetoftheGEFIndependentEvaluationOffice,fordetails.TheFY17budgetfortheLDCFandSCCFTrustFundsalsoarepresented separately to the LDCF/SCCF Council. In addition, during this Council meeting the Secretariat ispresenting a separate paper to Council seeking approval of a new small Trust Fund to support projects toimplementtheCapacityBuildingInitiativeforTransparency(CBIT)thatwaspartofthe2015ParisAgreementonClimate Change. See Council Document Establishment of a New Trust Fund for Capacity-building Initiative forTransparency,GEF.C.50/05.Thistopicisnotaddressedinthepresentdocument.2ResourcesarerequestedfromtheNagoyaProtocolImplementationFund.

Page 4: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

iii

TABLEOFCONTENTS

ExecutiveSummary........................................................................................................................iiFY17GEFTrustFundCorporateBudgetRequest...........................................................................1SecretariatFY17BudgetRequest,Activities,andOutputs.............................................................2SecretariatFY17BudgetRequest.................................................................................................2

STAPFY17BudgetRequest,Activities,andOutputs......................................................................4MaximizingSTAPvaluetotheGEF..........................................................................................4

FY17STAPBudgetRequest..........................................................................................................5TrusteeFY17BudgetRequest,Activities,andOutputs..................................................................6TrusteeFY17GEFTrustFundBudgetRequest.............................................................................7

FY17NagoyaProtocolImplementationFundBudgetRequest,ActivitiesandOutputs.................8SecretariatNPIFActivitiesinFY16...............................................................................................9SecretariatNPIFActivitiesandBudgetforFY17..........................................................................9TrusteeNPIFActivitiesandBudgetforFY17................................................................................9

BusinessPlanofGEFSecretariat..................................................................................................10PoliciesandPriorityInitiatives...................................................................................................11

Results-basedManagement(RBM).......................................................................................11KnowledgeManagement(KM).............................................................................................11EnhancingGenderMainstreaming........................................................................................12Revampedtechnologyplatform............................................................................................13

CountryandStakeholderEngagementandPartnership............................................................14CivilSocietyandIndigenousPeoplesEngagement...............................................................14EnhancingEngagementwiththePrivateSector...................................................................15

StrategicandEffectiveResourceProgramming.........................................................................15ProgrammingActivities.........................................................................................................15EfficiencyoftheProjectCycle...............................................................................................17EngaginginGlobalPolicyDiscussions...................................................................................17GEFSecretariatOrganization................................................................................................18

Annex1:SpecialInitiatives..........................................................................................................19Annex2:STAPPublicationsandDocuments,GEF-5toPresent..................................................21Annex3:Trustee--FY16ReviewofActivitiesandAchievements...............................................24

Page 5: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

1

FY17GEFTRUSTFUNDCORPORATEBUDGETREQUEST

1. ThisdocumentpresentstheGEFcorporatebudgetrequestforFY17,whichisthesecondofthefouryearGEF-6budgetperiod.TheGEFcorporatebudgetfinancestheadministrativecostsofthreeofthecentralentitiesoftheGEF–theSecretariat,STAP,andtheTrustee-undertheGEFTrustFund(thebudgetfortheIEOispresentedseparately).

2. AsshowninTable1below,$25.586millionisrequestedfromGEFTrustFundforFY17budget.Thisconsistsofthefollowing:

(a) Acorebudgetrequestof$19.979millionbytheGEFSecretariat,whichisanincreaseof$148,000or0.8percentfromtheFY16approvedbudget

(b) Acorebudgetrequestof$2.620millionbySTAP,whichisanincreaseof$80,000or3.1percentfromtheFY16approvedbudget

(c) Acorebudgetrequestof$2.987millionbytheTrustee,whichisadecreaseof$50,000or1.6percentfromtheFY16approvedbudget

(d) Noadditionalrequestfor“SpecialInitiatives”(seeAnnex1)

3. AsnotedintheBusinessPlanandBudgetpaperpresentedtoCouncillastyear,itwasagreedundertheGEF-6replenishmentnegotiationthatthebudgetaryenvelopefortheGEFTrustFundfortheSecretariat,STAPandtheTrusteewillbe$106millionforfouryears(FY16-19).3InpresentingFY17budgetrequest,theSecretariat,STAPandtheTrusteeensurethattheoverallbudgetremainswithintheagreedfouryearbudgetaryenvelope.

Table1:GEFTrustFundCorporateBudgetProjectionsforFY16-FY19($Million)

GEFEntitiesFY16

ApprovedBudget

FY16EstimatedExpenses

FY17Projection

FY18Projection

FY19Projection

FY16-19TOTAL

SecretariatCoreBudget 19.831 19.539 19.979 20.288 20.823 80.630

RefundfromFY15* (0.532)

(0.532) 19.007 80.098SecretariatSpecialInitiative 0.000 0.000 0.000 1.825 0.000 1.825SecretariatTotal 19.831 19.007 19.979 22.113 20.823 81.923STAPTotal 2.540 2.540 2.620 2.698 2.753 10.611TrusteeCoreBudget 3.037 3.008 2.987 3.483 3.638 13.115TrusteeSpecialInitiative 0.000 0.000 0.000 0.351 0.000 0.351TrusteeTotal 3.037 3.008 2.987 3.834 3.638 13.466TotalCorporateBudget 25.408 24.555 25.586 28.645 27.213 106.000*Reflectsarefundof$0.532mfromhostinstitution(WorldBank)duetoadjustmentdownwardinIndirectRatechargeonGEFforofficeandITexpensesduringFY15

3GEFBusinessPlanandCorporateBudgetforFY16,GEF/C.48.05,paragraph26andTable1,reflectingtheagreedallocationsintheSummaryofNegotiationsoftheSixthReplenishmentoftheGEFTrustFund,Table1,GEF/C.46/07/Rev.01.

Page 6: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

2

SECRETARIATFY17BUDGETREQUEST,ACTIVITIES,ANDOUTPUTS

SecretariatFY17BudgetRequest

4. FortheSecretariat,animportantfeatureofitsbudgetplanninginGEF-6isthesequencingtoimplementkeyGEF-6prioritiesandreforms.AsexplainedintheBudgetdocumentpresentedtoCouncillastyear,theFY16budgetincrease(thispastfiscalyear)wasneededtokick-startimplementationoftheseCouncil-agreedpriorities.4

5. MovingintothesecondyearoftheGEF-6budgetcycle(FY17),andinlinewiththeprojectionspresentedtoCouncillastyear,theSecretariatproposestostayatamoresteady-statetrendforthisupcomingyear,FY17.Specifically,theSecretariatisrequestingacoreFY17budgetof$19.979million,comparedtotheFY16estimatedexpenseof$19.539million(seeTable2,below).

6. ThisFY17Secretariatbudgetrequest,indicatedinTable2,is0.8%increaseintheapprovedbudgetofFY16,anditremainsatthesamelevelforFY17asprojectedintheBusinessPlanandBudgetdocumentpresentedtoCouncillastyear(GEF/C.48.05).ThebudgetisrequestedtosupportthecoreworkandkeyactionsoftheSecretariattodeliverGEF-6assetoutintheBusinessPlan,includinginrespecttopoliciesandprioritiesinitiatives,countryandstakeholderengagementandpartnership,andstrategicandeffectiveprogrammingofresourcestoprogramsandprojects.

7. Table2alsoshowsthattheSecretariatestimatesanearlyfulluseofbudgetedfundsinFY16,namelyestimated$19.539millionagainstapproved$19.831million(99%).5Thisreflects,amongotherthings,theuseofFY16resourcestokickofftheimplementationofCouncil-agreedpriorityactionsforGEF-6.InthecaseofRBM,KMandGender,theSecretariathasreinforceditsstaffcapacityandengagedinaseriesofactivitiestokick-startimplementationofagreedactionplansandinitiatives.TheSecretariatalsohasembarkedonitsoverallITupgrade,andhasmadegoodprogressonupdatingitsexternalwebsite,internalintranet,ProjectManagementInformationSystem(PMIS)andotherfeatures.TheactionsandprogressontheseitemsinFY16isdescribedinmoredetailintheBusinessPlanpresentedlaterinthisdocument.6

4Theprioritiesincluded:(1)implementtheRBMandGenderEqualityActionPlans,theproposedapproachonKM,andnewprivatesectorinitiatives,inresponsetorequestsbyCouncil;and(2)upgradetheSecretariat’sInformationTechnologysystemstosupportthesepriorityinitiativesandGEFprogrammingwork.5TheestimatedactualforFY16inTable2reflectstheamountofresourcesused,at$19.539million.Thisis99%oftheapprovedFY16budget.TheTablealsonotesthatarefundfromtheWorldBankhasbeenapplied,whichbringsthenetestimatedactualexpensesto$19.007million.6TheSecretariatalsohasupdateditsinternalbudgettrackingsysteminFY16tofullyalignwiththeseandotherGEF-6priorities.Theupdatedsystemhelpsustobettertrackexpensesinthesepriorityitems(andothers),bothintermsoffixedandvariablecosts.

Page 7: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

3

8. TheFY16approvedbudgetalsocontainedasmallallocationof$50,000inordertocoverthepotentialrelocationoftheofficesoftheSecretariatandIEOduetoplannedmajorconstructiononthepreviousGEF’sbuildingfacilities(thatrendersitunusableforaperiodofsome18months).ThisOfficere-locationhastakenplaceinasatisfactorymannerandwithintheGEFbudgetenvelope.Infact,inthisstart-upyearunderthenewleasetheSecretariat(alongwiththeco-locatedIndependentEvaluationOfficeandSecretariatoftheAdaptationFund)receivedarebateofthreemonthsinrent(fromitsnewlessor)asanincentivetomakethemove.ThisisonereasonthattheestimatedactualexpensesintheOfficelineitemis$1.722millionandmuchlowerthantheapproved$2.080million.7

9. TheFY16estimatedexpensesinTable2alsoreflectsarefundof$0.532millionfromthehostinstitution,theWorldBank,duetoanadjustmentdownwardinindirectratechargebytheWorldBankforofficeandITexpensesduringFY15.

10. WithintheoverallFY17request,thespecificlineitemsindicatedinTable2areupdatedtoreflectthelatesttrendsandanticipatedneeds.OnebigchangefromtheFY16estimatedis

7Inaddition,certaincapitalcostsassociatedwiththephysicalofficemovearespreadintosubsequentyearsonadvicefromGSDandaccordingtothegenerallyacceptedaccountingprinciples.

Staff Costs 15.197 15.233 15.177 Salaries and Benefits 13.247 13.169 13.170 Travel 1.850 1.964 1.907 Training 0.100 0.100 0.100 Consultant Costs 0.700 0.702 0.700 Council Costs 0.721 0.721 0.721 Cross Support from World Bank 0.123 0.123 0.557 External Outreach, Publications, Media, and Web 0.950 0.982 1.000

General Operations Costs 2.140 1.780 1.824 Office, Equipment, Supplies, Communications & Internal Computing

2.080 1.722 1.764

Representation and Hospitality 0.060 0.057 0.060 TOTAL 19.831 19.539 19.979 Refund from FY15* (0.532) Grand total 19.831 19.007 19.979 * Reflects a refund of $0.532m from host institution (World Bank) due to adjustment downward in Indirect Rate charge on GEF for office and IT expenses during FY15

Table 2: FY17 GEF Secretariat Core Budget Request ($ million)

Expense Category

FY16 Approved

Budget

FY16Estimated Expenses

FY17 Requested

Page 8: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

4

thatthelineitemonCrossSupportfromtheWorldBankhasincreasedby$0.434million,duetothefactthatinformationtechnology(IT)staffsupportfromtheWorldBankisnowaccountedforunderthislineitem.ThelineitemonSalariesandBenefits,correspondingly,isreducedbythisamount.

11. ThelineitemonOfficeandEquipmentinTable2islessthantheFY16approvedbudget.ThisadjustedfigurereflectsactualnewleasecostsandthelatestcostsforITsupportfromthehostinstitution,theWorldBank.Forotheritems,theFY17requestreflectsnochangefromtheFY16Councilapprovedbudgetlastyear.Thisincludestraining,consultants,Councilcosts,andrepresentationandhospitality,astrendsandanticipatedneedshaveconfirmedprojectionstodate.

12. Insum,theFY17requestisrequiredtomeetcorebusinessneedsandstaywithinthefouryearbudgetenvelopeof$80.098millionofthe$106millionoverallbudgetenvelopeagreedduringreplenishment.

STAPFY17BUDGETREQUEST,ACTIVITIES,ANDOUTPUTS

MaximizingSTAPvaluetotheGEF

13. InthewakeoftheadoptionoftheParisAgreementonClimateChangeandthe2030AgendaforSustainableDevelopment,newopportunitieshaveemergedfortheGEFtodesignandimplementactionsthatarecognizantofourrapidlychangingworld.STAPwillsupporttheGEFtoembracetheseopportunitiesandstrengthenitsconcertedactionsontheenvironmentandhumanwell-being.STAPwillcontinue,therefore,togreatlyamplifytheintegrativenatureofitsworkbyaddressingcommondriversofenvironmentaldegradation–apillaroftheGEF’s2020strategy.Throughitsworkonthescienceofintegratedapproaches,STAPwillfocuson“howto”achievetransformationalchangeatabroaderscale,drawingonglobalassessmentsandmulti-stakeholderplatforms.ThisworkwillcontributetoidentifyingsolutionsformeetingtheGEF’sactionsonsustainability,andinparticularonplanningforresilienceinGEFPrograms.Additionally,STAPwillcontinueworkingontheIntegratedApproachPilotprogramsbyfollowing-uponthemetricsandindicatorsthatassessprogressonenvironmentalsustainabilityanddevelopment.

14. TheSTAPbudgetrequestreflectsthestrategicsupportexpectedofSTAPtotheGEFwhileatthesametimerecognizingtheneedforbudgetconstraint.

15. SpecificactivitiesproposedinFY17andbeyondinclude:

(a) Screening:TheSTAPscreeningfunctionwillbemorestrategicatportfoliolevel,withanintegratedapproachtoscreeningoffullsizedprojectsfocusingonmulti-focalinitiativesofaparticularlychallengingandinnovativenature(GEF/C.46/Inf.01),andinitiatereviewsatmid-termandprojectconclusiontoevaluatetheimpact;

Page 9: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

5

(b) Scienceofintegratedapproaches:ThisactivityaimstoprovidesupportindefiningthefuturedirectionoftheGEFwithregardtotheSustainableDevelopmentGoalsandParisAgreement,andalsoinpreparationoftheGEF’sGlobalCommonsConference.

(c) KnowledgeManagementandRBM:STAPwillhelpreshapetheRBMandKnowledgeManagementfunctionsacrossfocalareas,refineindicatorstoincludeoutcomesandimpact,minedatafromthecurrentrepositoryofcompletedorongoingprojectstodeveloplessonslearnedandbestpractices,ensurethatdataandinformationassetsgeneratedbynewprojectsareavailableforfutureanalysis,andadvancetheuseofresearchandscientificmethodsinsupportoftheintegratedapproachpilotsandacrosstheGEFProgram(GEF/R.6/21,pg.5).

(d) Mercury:STAPwilldevelopadviceonappropriatetechnologiestoeliminateand/orminimizetheuseofmercuryacrosssectors.

(e) GreenChemistry:TheGEFisinterestedinexploringnewapproachesintheareaofgreenchemistryduringtheGEF-6period,consideringtherelevanceoftheissueofgreenchemistryforchemicalsandwaste,namelythroughremovalofhazardoussubstancesfromtheproductionandconsumptionchain,whilstseekingoutand/ornotingmultiplebenefitsfromgreaterenvironmentallyfriendlytechnologiesinotherfocalareassuchasclimatechange,biodiversityandinternationalwatersinthechemicalsdomain.

(f) EnvironmentalSecurity:STAPwilltargetadviceontheroleofenvironmentallysustainabledevelopment,security,andstabilitytosupportthedeliveryofIAPsaswellasGEBoutcomes.

(g) Metrics/Tools:WorkcloselywiththeEvaluationOfficeandotherpartnerstoimprovemetricsforsuccess,screeningtools,andindicators(GEF/STAP/C.43/Inf.02;GEF/C.41/Inf.18);

(h) Outreach:ImprovedirectSTAPengagementwiththeGEFCouncilandefficienciesinresourceusewithintheGEFPartnership,inpartthroughhostingofSTAPPanelMeetingsconcurrentwiththeGEFCouncilMeetingsandexploringmechanismstoraisetheengagementofSTAPwithscientificbodiesinrecipientcountries.Develophigherimpactandmorevisiblereportsandworkshopsonkeyintegrativetopics.

16. TheseactivitieswillimproveGEFprojectimpacttoday,assistindesigningmoreeffectivemulti-focalprojects,andexploreprospectivenewprogramareasbeyondGEF-6

FY17STAPBudgetRequest

17. STAP’sexpectedFY16expendituresandrequestedFY17corporatebudgetaresummarizedinthetablebelow.STAPworkprogramactivitiesforFY16havebeen

Page 10: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

6

implementedwithintheapprovedbudget.STAPwishestostressthatFY16expendituresareestimatesatthistime,duetothedifferingGEFandUNEPfiscalyears.

Table3:FY17STAPBudgetRequest($million)

STAP--Secretariat FY16 FY16 FY17

Approved Estimated Budget

Budget Expenditures Request

StaffCosts 1.283 1.283 1.212

SalariesandBenefits 1.170 1.170 1.097

Travel 0.107 0.107 0.110

Training 0.006 0.006 0.005

ConsultantCosts 0.325 0.325 0.378

Fees(long-term) 0.250 0.250 0.283

Travel 0.075 0.075 0.095

GeneralOperationsCosts 0.253 0.253 0.286

OfficeSpace,Equipment,andSupplies 0.125 0.125 0.158

CommunicationsandInternalComputing 0.041 0.041 0.041

CorporateServices 0.085 0.085 0.085

RepresentationandHospitality 0.002 0.002 0.002

SUB-TOTAL 1.861 1.861 1.876

STAP--PanelMember Honoraria&Logistical/SecretarialSupport 0.300 0.300 0.315

MOUswithExpertInstitutions 0.100 0.100 0.135

STAPMeetings 0.240 0.240 0.247

STAPPublications 0.039 0.039 0.047

SUB-TOTAL 0.679 0.679 0.744

TOTAL 2.540 2.540 2.620TRUSTEEFY17BUDGETREQUEST,ACTIVITIES,ANDOUTPUTS

18. TheWorldBankasTrusteeprovidesarangeofservices,broadlydefinedintheInstrument,inthefollowingcategories:financialandriskmanagement;investmentandcashflowmanagement;managementofGEFpartnerrelationshipsandtransactions;accountingandreporting;legalservices;commitmentanddisbursementoftrustfundresources;systemsinfrastructureandmaintenance;andresourcemobilization.

19. AccordingtoAnnexBoftheInstrumentfortheEstablishmentoftheRestructuredGlobalEnvironmentFacility(inparagraph8),the“reasonableexpensesincurredbytheTrusteefortheadministrationoftheFundandforexpensesincurredinadministrativelysupportingtheSecretariat”arereimbursedannually,onthebasisofestimatedcost,subjecttoend-of-year

Page 11: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

7

adjustment.AtitsJune2007meeting,theGEFCouncilapprovedthemethodologyforreimbursementoftheTrustee’scostsandexpensesasfollows:TheTrusteepresentsitsprojectedbudgetforthecomingfiscalyearbasedontheexpectedworkprogramandassociatedstaffcostsandexpenses,andreceivesanallocationfromtheGEFtrustfund;attheendofeachfiscalyear,theTrusteereportstheactualstaffcostsandexpensesincurredtotheCouncil,andreconcilesthisamountagainsttheallocationprovided.

20. InJune2015,Councilapprovedacorebudgetestimateof$3.04millionforFY16tocoverTrustee’sservicesandthecostofexternalauditoftheGEFTrustFund.TheTrusteeestimatesthatexpensesforFY16areexpectedtobe$3million,reflectingadecreaseof$28,950comparedtotheapprovedbudget.Thedecreasewasonaccountofthedecreasesininvestmentmanagementcostsasaresultofthelowerthanexpectedlevelofliquidity(fundbalance)inGEF,andaccountingandreportingcosts.

TrusteeFY17GEFTrustFundBudgetRequest

21. Inadditiontostandardtrusteeservices,theFY17workprogramwillincludethefollowingitems:

(a) ImplementationoftheGEF-6replenishmentresolution,includingworkingwithdonorstofacilitatedepositofInstrumentsofCommitment,ensuringcompliancewithreplenishmentresolutionpolicies;

(b) On-goingnegotiationstoreviseandupdatetheFPAwiththeexistingGEFAgencies;

(c) EnsureAgency’scomplianceundertheFPAincludingperiodicfinancialreportsrelatedtoGEFfinancedactivitiesimplementedbytheAgencies;

(d) AdministrativesupporttotheGEFSecretariatinimplementingpoliciesapprovedbytheCouncil;

(e) InitialcoordinationandpreparationforGEF-7.

22. TheTrustee’sbudgetestimateforFY17amountsto$2.99millionasshowninTable4below.Thisrepresentsadecreaseof$20,300fromtheFY16estimatedactuals.Thedecreaseismainlyonaccountofefficiencygainsinaccountingandreportingservices.

Page 12: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

8

Table4:ProposedTrusteeBudgetforGEFTrustFundFY17($million)

GEFEntitiesandBudgetItems

FY16ApprovedBudget

FY16EstimatedExpenses

FY17BudgetRequest

StandardServices

FinancialManagementandRelationshipManagement 1.259 1.265 1.278InvestmentManagement/a 1.341 1.304 1.304AccountingandReporting 0.173 0.173 0.123LegalServices 0.144 0.145 0.162Sub-total,StandardServices 2.917 2.887 2.867

Audit

ExternalAuditofTrustFund 0.120 0.121 0.120

TotalCoreBudget 3.037 3.008 2.987

SpecialInitiatives - - -

TotalCosts,includingSpecialInitiatives 3.037 3.008 2.987 FY17NAGOYAPROTOCOLIMPLEMENTATIONFUNDBUDGETREQUEST,ACTIVITIESANDOUTPUTS

23. TheGEFSecretariatandTrusteerequestatotalof$31,000fromtheNPIFtosupporttheirrespectiveactivitiestoadministerthetrustfund.TheseparatebudgetrequestsandtherelatedbackgroundandjustificationsarepresentedinTable5below.

Table5:FY17NPIFBudgetRequest

(inUSD)

GEFEntitiesandBudgetItemsFY16Approved

BudgetFY16Estimated

Expenses

FY17BudgetRequest

Secretariat-NPIFAdministrativeBudget 20,000 20,000 20,000

TrusteeNPIFBudget 19,000 17,800 11,000

Total–NPIFBudgetRequests 39,000 37,800 31,000

24. SincetheinceptionoftheNPIFinthesummerof2011,theGEFCEOhasapprovedatotalof13NPIFprojectproposals,totaling$15.1million(includingAgencyfee)andleveraging$32.4millioninco-financing.Theseprojectshavebenefitedatotalof52countriesinsupportofNagoyaProtocolratificationandhaveincluded:10country-basedprojects(inArgentina,

Page 13: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

9

Bhutan,Cameroon,Colombia,CookIslands,CostaRica,Fiji,Gabon,KenyaandPanama),tworegionalprojects(oneinCentralAfrica,forthe10memberstatesoftheCentralAfricanForestCommission(COMIFAC),andanotherinthePacificregion,forthe12membercountriesoftheSecretariatofthePacificRegionalEnvironmentProgramme(SPREP),andoneglobalproject(in21differentcountries).

SecretariatNPIFActivitiesinFY16

25. The46thGEFCouncilinMay2014tooknoteoftheGEFSecretariat’sgoodprogressinmanagingtheNPIF.ItdecidedtoextendtheoperationoftheNPIFtoDecember31,2020foroperationalreasonstoallowcontinuedprojectpreparationandimplementationofprojectsforwhichaProjectIdentificationForm(PIF)hadalreadybeenapproved.ConsistentwiththeGEFCouncildecisionontheNPIFfromMay2011,theCouncilhasnotapprovednewPIFsundertheNPIFsinceJune30,2014.

26. DuringFY16,theSecretariatstaffhaveworkedcloselywithandprovidednecessaryguidancetotheGEFAgenciesoncontinuedpreparationofthePIF-approvedprojects.All13projectsfundedbytheNPIFhavebeenCEOendorsedtodate.

SecretariatNPIFActivitiesandBudgetforFY17

27. TheGEFSecretariatwillcontinuetoworkwiththeGEFAgenciesonfinalapprovalofPIF-approvedprojects,portfoliomonitoringandreporting,andothernecessaryoversightfunctions.TheGEFwillalsocontinuetoreportontheprojects’progressandresultstotheGEFCouncil,totheCBDCOP13,andtotheCOPservingastheMeetingofthePartiestotheNagoyaProtocolonAccessandBenefitSharing.Tocovertheseminimumfunctions,andasreflectedinTable6below,theGEFSecretariatrequestsanadministrativebudgetof$20,000,allofwhichwillcoverstaffcosts.

Table6:GEFSecretariatFY17NPIFBudgetRequest (inUSD)

ExpenseCategoryFY16

ApprovedBudget

FY16EstimatedExpenses

FY17BudgetRequest

StaffCosts(Salaries&Benefits) 20,000 20,000 20,000

Total 20,000 20,000 20,000

TrusteeNPIFActivitiesandBudgetforFY17

28. AsagreedwithNPIFdonorsundertherelevantTrustAdministrationAgreements,theTrusteereceivesanannualadministrativefeetocoverthereasonableactualexpensesincurredbytheTrusteeincarryingoutitsfunctionfortheNPIF.

Page 14: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

10

29. ThecoreelementsoftheTrustee’sworkprograminFY17include:(i)financialandinvestmentmanagementofresources,(ii)commitmentsandtransferstotheAgencies,(iii)infrastructureandsystemssupport,and(iv)accountingandreportingforthefinancialandoperationalactivitiesoftheNPIF.Table7belowshowsthebreakdownoftheTrusteefeebyservicesprovidedtotheNPIF

30. TocoveritsexpensesforFY17,theTrusteerequestsabudgetof$11,000aspresentedinTable7below.Thisrepresentsanoveralldecreaseof$6,800comparedtotheFY16estimatedactualcostof$17,800.ItisanticipatedthatFY17requirementsforTrusteeserviceswillbereducedcomparedtoFY16levels

Table7:TrusteeFY17NPIFBudgetRequest

BUSINESSPLANOFGEFSECRETARIAT

31. ThissectionfocusesontheBusinessPlanoftheGEFSecretariat,andfollowstheseparatesectiononthebudgetrequestforFY17(above).ThediscussionprovidesanupdateoftheGEFBusinessPlanoftheSecretariatpresentedtoCouncilatits46thmeetinginMay2014,whichreflectedtheprioritiesagreeduponforGEF-6andactionstoimplementthosepriorities.8AstheGEFisnowenteringintothethirdyearsincetheReplenishment,thediscussionupdatesonprogressandkeyareasoffocusfortheBusinessPlanforFY17,andprovidesadditionaldetailandinformationtoexplainthebasisandneedforthebudgetaryresourcesrequestedabove.

8ThepolicyrecommendationsandprogrammingprioritiesestablishedfortheGEF-6Replenishment,whichareincludedintheSummaryofNegotiationsoftheSixthReplenishmentoftheGEFTrustFund(CouncilDocumentGEF/C.46/07).TheActionPlanforimplementingtheGEF-6PolicyRecommendationsisattachedasAnnex1.

Trustee Services FY 16 ApprovedFY 16 Expected

ActualFY 17 Proposed

Budget

Investment Management a/ 5,000 3,400 3,000

Accounting and Reporting 4,000 4,000 2,000

Legal Services 5,000 5,100 3,000

Total Costs 19,000 17,800 11,000

a/ Investment Management fees are calculated based on a cost of 3.5 basis points against the average annual balance of the portfolio.

FY 17(in USD)

3,000 Financial Management and Relationship Management 5,000 5,300

Page 15: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

11

32. TheBusinessPlanalsoreflectskeyelementsoftheLong-TermStrategyfortheGEF(GEF2020),9includingintegratedapproaches,supportforinnovativeandscalableinterventionsfocusedonthedriversofenvironmentaldegradation,enhancingcountryownership,mobilizingstakeholdersforsolutions,andputtingafocusonresultsandefficiency.AcorecontinuingemphasisoftheSecretariatistoworkwithpartnersandstakeholderstofullydeliverGEF-6.Inaddition,andasnotedfurtherbelow,theSecretariatwillbeginstepsinthisupcomingyeartohelpprepareforGEF-7replenishmentdiscussions.

PoliciesandPriorityInitiatives

33. TheSecretariatwillcontinuetofocuseffortsontheeffectiveandefficientimplementationofseveralpolicyandpriorityinitiativesestablishedforGEF-6,inconsultationwiththeAgencies,Conventions,IEO,STAPandotherstakeholders,andinlinewithprioritiesanddecisionssetbyCouncil.

Results-basedManagement(RBM)

34. InrespecttoRBM,theSecretariat,inpartnershipwiththeAgencies,theConventionsandothers,iscontinuingtoimplementthefivekeyactionssetoutintheProgressReportpresentedtoCouncilatits48thSession(seeGEF/C.48/Inf.07,ProgressReportontheImplementationoftheResults-basedManagementActionPlan).

35. ImplementationoftheRBMActionPlanhasacceleratedsinceSeptember2015,whenanewRBMspecialistwasbroughtonboardtospearheadtheeffort.Inparticular,therehasbeensignificantprogresson:forminganupdatedcorporatescorecardtoenhancetrackingofprogresstowardresults;updatingtheAnnualMonitoringReport(AMR)tofocusonkeyindicatorsandalignwithGEF6prioritiesandtheGEF2020Strategy;anddiscussingwiththeIndependentEvaluationOfficeaboutanevaluationofRBM.TheSecretariatalsoisengagedcloselyintheITupgradewithintheSecretariat(notedbelow)toensurethatthenewplatformsupportsRBMpriorityneeds,andworkingtohelpensureafocusonassessingrelevantresultsinallaspectsofGEFoperations,policyandreporting(e.g.,reportstoConventions).

36. LookingaheadtoFY17,priorityattentionwillbeputonbringingtheactionsnotedabovetocompletion,andcontinuingtostrengthena“results-based”culturewithinthepartnership.AmoredetaileddescriptionofprogressandnextstepsissetoutintheCouncildocumentprovidinganupdateontheCorporateScorecardandimplementationoftheRBMactionplan(GEF.C.50.03).

KnowledgeManagement(KM)

37. InrespecttoKM,theSecretariat,workingwiththeAgenciesandotherstakeholders,ispursuingtwomainobjectives:first,toinformglobal,regionalandnationalpolicydialogueson

9SeeLong-TermStrategyfortheGEF–GEF2020.

Page 16: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

12

optionsandapproachestoreversethecourseofenvironmentaldegradation;andsecond,toimprovetheimpactofGEF-supportedprojectsandprograms.10

38. TheSecretariathasundertakenanumberofinitialactionstotheseends.Theseinclude:(1)settingupanewKMteamintheGEFSecretariat;(2)establishinganinter-agencyKMAdvisoryGroup(AG)tosupporttheGEFKMagenda;(3)undertakinganinternalGEFSECstaffsurveyonKMaswellascountrylevelsurveysonKMneeds/preferencesofrecipientcountries,takingadvantageofextendedconstituencyworkshops(ECW);(4)conductingaKMAuditandaknowledgeassetanalysisacrossthePartnership,andpreparingadetailedKMimplementationRoadMapthatbuildsontheinitialKMactions;and(5)undertakingapilotexercisetoextractlessonslearnedfromterminalevaluationsofcompletedGEFmulti-focalareaprojectsforintegrationintoPMIS.

39. SeveralotheractionshavebeeninitiatedandwillcontinueintoFY17.Theseinclude:(1)engagingwiththeupgradeforITtoensureKMsupporttools(suchasthepilot"KALEOAsktheGEFExpert"on-linetool)arepartofthefuturevisionandimplementation,withthe"open-access"approachtoinformationfullyembedded;(2)incorporatinglessons/knowledgecaptureandsharingtoECWsandorganizingGEFKnowledgeDaysattheECWstoenablelearningfromGEFprojectsontheground;and(3)engagingontheRBMactionplanimplementationtoensurestrongsynergyandsupportintheseactions.AmoredetaileddescriptionofprogressandnextstepissetoutintheCouncilinformationdocumentonKnowledgeManagementProgressReport(GEF.C.50.Inf.06).

EnhancingGenderMainstreaming

40. TheGEFiscommittedtostrengtheningitsgendermainstreamingeffortsandcontributingtogenderequalityandwomen’sempowermentthroughitsoperationsinGEF-6.TheSecretariatisworkingasamatterofprioritytoimplementtheGenderEqualityActionPlan,(GEAP)withsupportfromaseniorgenderexpertanditsrecentlycreatedGenderandSocialIssuesteam.BuildingontheActionPlan,theGEFcreatedagenderpartnershipplatformin2015forpartnerstoshareknowledgeandcollaborateonimplementingtheActionPlan.TheGEFGenderPartnershipnowengagesgenderfocalpointsfromallGEF’s18Agencies,MEASecretariats,andotherpartners.Together,withthePartnership,theSecretariatisfocusingonthefollowingactions:

(a) DevelopmentoftheGEFoperationalguidelinestomainstream,offeringpracticalframeworkforGEFAgencies,staffandotherpartnerstosystematicallyandconsistentlyaddressgenderaspectsacrosstheGEFprojectcycle;

(b) Strengtheningtheresults-basedmonitoring(RBM)frameworkforgendermainstreamingacrossthecorporateandGEFfocalarealevels,includingdesignofagendermarker/categorizationsystemtobettermonitorandreportonprogressandresults;

10SeeGEF/C.48/07,GEFKnowledgeManagementApproachPaper.

Page 17: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

13

(c) AdvancingtheknowledgebaseandcommunicationongenderasrelatedtoGEFprogramandprojectportfolio,revampingGEF’sgenderwebpagetocreateamoreinteractiveinterfacetoshowcasebestpractices,andeventsandtoolsrelevanttoGEFworkongenderandtheenvironment;

(d) DevelopmentandimplementationofaGEFSECstaffcapacitydevelopmentplanbasedonthegendercapacitystaffassessmentthatwasconductedattheGEFSECin2015,andawarenessraisingtrainingmodulestosupportcapacitydevelopmentofGEFOperationalFocalpointsandotherlocalpartners.

41. AmoredetaileddescriptionofprogressandnextstepsissetoutintheCouncildocumentwiththeGEAPProgressReport(GEF.C.50.Inf.07).

Revampedtechnologyplatform

41. AsindicatedtoCouncillastyear,theSecretariatistakingseveralstepstorevampitstechnologyplatforminsupportofitspriorityworkactivities,inresponsetotherecommendationsfromtheReplenishment.Keyactionsincludethefollowing:

(a) DocumentandProjectLifecycleManagement.TheSecretariathasmadesignificantprogressthisyearinre-toolingtheGEFProjectManagementInformationSystem(PMIS)toamoreupdatedanduser-friendlytechnologyplatform.Theupgradeofthiscoreoperationalsystemisongoing,andwillalignwithup-to-datepoliciesandguidancefromCouncilontheprojectcycle,andenableeasieraccessandmoreefficientinformationflowamongonproject-cycleactionsthroughoutthepartnership.

(b) CommunicationandStakeholderEngagement.TheSecretariathasundertakenseveralsteps:(i)amajorupgradeofitsexternalwebsitewithanew,modern,lookandfeel,enhancedsearchfunction,resourcemapping,livedatafromtheprojectdatabaseandresponsivedesign,whilealigningthecontentwithup-to-datepolicies,strategicdirectionsandguidancefromCouncil;(ii)anewGEFintranettoenhanceinternalcommunicationsandknowledgesharingamongGEFstaff;and(iii)improvedsocialmediachannelsandonlinecommunicationmaterial(includingmultimediaande-publications)tostrengthentheengagementwithpartnersandkeystakeholders,andpromoteGEFworkwiththegeneralpublic.

(c) EventManagement.TheSecretariatisenhancingitsEventManagement(includingCouncilmeetings,ExpandedConstituencyWorkshops(ECWs),ConstituencyMeetings,Assembly)andClientRelationshipManagement(CRM)systems,whichisbasedontheWorldBank’sMicrosoftDynamicsCRMplatform.ThisactionshouldbecompletedinFY2017,andwillprovidetheGEFwithahighlyaccessiblesystemtomanagepartnerrelationships.

(d) DataAnalytics.InsupportofitsworkonRBMandKMinparticular,theSecretariatisexploringtheuseofadvanceddataanalyticmethodstomore

Page 18: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

14

efficientlyextractandutilizeinformationandlessonsfromtheGEFworkportfolio.TheRBMteam,forexample,isusingtheseadvancedmethodstoinformthe2016AnnualPortfolioMonitoringandResultsReport,futurestrategicdirectionofdatacollection,anddatauseinGEF7.TheKMteamissimilarlyapplyingtheupdatedtoolstoinventoryandshareinformationamongGEFpartneragencies.

CountryandStakeholderEngagementandPartnership

CivilSocietyandIndigenousPeoplesEngagement

42. TheSecretariatanditspartnersrecognizethepositiveandcrucialrolesplayedbyCivilSocietyOrganizations(CSOs),includingindigenouspeoples,insafeguardingtheglobalenvironmentandcontributingtotheworkoftheGEF.Insupportofthisengagement,theSecretariatdevelopedinFY15newGEFGuidelinestobetterimplementtheGEF’sPublicInvolvementPolicy.Theseguidelinesincludeguidanceandanactionplan,andtheSecretariatisworkingactivelywithstakeholdersandpartnerstotranslatethisintoreality.

43. Aspartofthiswork,theSecretariatinpartnershipwithcivilsociety,agencies,anumberofOFPsandmembersofCouncil,andtheGEFIEO,hassetupaWorkingGroup(WG)toconsiderwaystosupporttheimplementationofthenewGuidelinesand,ifneeded,recommendanupdatetotheGEFpolicy.TheWGhasmetinadvanceofbothofthelasttwoCouncilmeetings,andviavideoconferencethreetimesthisfiscalyear.

44. Toassistthiseffort,theSecretariatreviewedthepolicies,guidelines,andpracticesoftheGEFPartnerAgencies,andrecommendaconcreteactionplantoenhancetheimplementationandclarityofthepolicy.TheWGisplanningtoprovideareportandrecommendationstoCouncilatthemeetingeitherinFall2016orSpring2017.

45. TheSecretariatwillalsocontinueandstrengthenitsengagementwithIndigenousPeoplesinitsprojectsandoperations.TheGEFIndigenousPeoplesAdvisoryGroup(IPAG),consistingofmembersofIndigenousPeoples,IndigenousPeoplesexpert,GEFAgency,andGEFSecretariatrepresentatives,willcontinuetoplayakeyroleinimplementingtheGEFPrinciplesandGuidelinesontheEngagementwithIndigenousPeoples(2012).TheGEFSecretariat,togetherwiththeIPAG,hasparticipatedinthe14thUnitedNationsPermanentForumonIndigenousIssuesinApril2015andmadeanofficialjointstatementwiththeWorldBankGrouponitsprogressinengagingwithIndigenousPeoplesforGEFprojects.TheSecretariatwillcontinuethisparticipationandengagementgoingforward.

46. TheGEFandpartnershavealsoorganizedasideeventattheUNPFIIandhighlightedoneofthekeyIndigenousPeoplesledprojectsinBrazilonsustainableforestmanagementinindigenousterritories.The4thMeetingoftheIPAGwasheldbacktobackwiththeGEFCouncilinJune2015,whichdiscussedfinancialwindows,knowledgeproducts,andoutreachrelatedtoGEFprojectsthatinvolveIndigenousPeoples.TheIPAGmembershavealsoactively

Page 19: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

15

participatedintheCSOConsultationMeetingattheGEFCouncil,andprovidedconstructiveinputstorelatedGEF’swork.

47. TheSecretariatalsoiscontinuingitsworkintheCountrySupportProgram(CSP)toconveneregionalmeetingsandactivitiestobuildawarenessandadvanceimplementationofnewstrategicdirections,priorities,andprogrammingactivitiesforGEF-6.TheseincludeseveralExpandedConstituencyWorkshops(ECWs),andNationalDialogues.Eachyear,theSecretariatupdatesandtheformatandcontentoftheworkshopstobuilduponpastactivitiesandmakethemmoreparticipativeandengaginginordertomaximizetheirrelevanceandeffectiveness.

EnhancingEngagementwiththePrivateSector

48. TheGEFhastakenseveralstepstobettermainstreamprivatesectorengagementinitsprojectsandprogramsduringGEF-6,includingintheGEFfocalareasandthroughtheIAPsandprojectsaccessingtheNon-grantsInstrument(NGI)Pilotwindow.GEFPartnerAgenciescontinuetoofferprojectproposalswithstrongprivatesectorengagementacrossallfocalareas,andareworkingactivelywithinvolvedgovernmentsandotherpartnersandstakeholders,includingtheprivatesector,toimplementtheIAPs.

49. FortheCommoditiesIAP,forexample,therehasbeenanextensiveoutreachtomultipleactorswithinthesustainableforestrysectorandalongtheentiresupplychain,includingprivatesectorcompanies.TheimplementationmodalitiesoftheNGIPilotalsoincludemultiplecommunicationandoutreachchannelstoattractprojectproposalsfrompublicandprivatesectorrecipientsthroughGEFPartnerAgencies,andtherehasbeenstrongprogressinprogramming.

50. TheSecretariatandthePartnerAgenciesalsoaresupportinganumberofenergyefficiencyacceleratorprogramswithasignificantrolefortheprivatesector,includingtheEnergyEfficientEquipmentandAppliancesAccelerator(suchasfans,lightingandmotors,withUNEP);theEnergyEfficiencyFinancingFacility(helpinglocalbanksinChina,India,andBrazil,withEBRD);theGlobalFuelEconomyInitiative(forfuelefficientlightdutyvehicle,withUNEP);andtheInternationalLightingEfficiencyFacility(LEDstreetlighting,withWorldBank).Withover$5millionindirectinvestment,GEFpartnersareabletoleverageatleast$500millioninco-financing.GEF’sprivatesectorengagementwillcontinuetofocusoncuttingedgeinnovationandrisk-taking,buildingonexperienceandlessonslearned.

StrategicandEffectiveResourceProgramming

ProgrammingActivities

51. TheGEFprogrammingworkputsemphasisonsupportingprojectsandprogramsthatalignwithGEFprogrammingstrategies,addressthedriversofenvironmentalloss,ignitenewandinnovativeapproachestoachievingglobalenvironmentalbenefits,andprovideopportunitiestoscale-upbenefits.Throughenhancedengagementwiththeprivatesectorand

Page 20: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

16

otherstakeholders,theGEFwillcontinuetopursueopportunitiesforcutting-edgepracticesandtechnologiestoaccelerateachievementofGlobalEnvironmentalBenefits(GEBs).

52. Asweapproachthemid-pointofGEF-6,andiftheJune2016WorkProgramisapprovedinitsentirety,resourceprogrammingwillreachapproximately47%ofthereplenishmenttargetforfocalareasandprograms.ThisinessencereflectsthefactthatGEFandagenciesarebeingabletoprogramvirtuallyallresourcesmadeavailablebyGEFdonorsthroughtheTrustee.11TheSecretariatwillcontinueitsprogrammingactivitiesintoFY17andgoingforwardasacorepartofitsbusinessplanandresponsibilities.

53. Inthiscontext,theSecretariatwillcontinuetosupportcoreGEFworkinsupportingtheConventionsforwhichGEFisafinancialmechanism,andmaintainingcloseengagementwithotherrelatedintergovernmentalarrangementsandbodies.Theyear2015wasalandmarkyearfortheglobalenvironment,withvariousmultilateralenvironmentalagreements(MEAs)reachingkeynegotiationmilestones.

54. Amongthese,theGEFisworkingasamatterofhighprioritytosupportimplementationofthenewcommitmentsandprioritiesonclimatechangecontainedintheParisAgreementandrelateddecisions,inlinewiththeGEF’sroleandmandateinthiswork.ThelastGEFWorkProgramandtheproposedWorkProgramforthecurrentCouncilmeetingincludeseveralpriorityprojectstoaddressclimatechange,includingthosethatsupportcountriestoaddresstheircontributionsashighlightedintheirIntendedNationallyDeterminedContributions(INDCs).TheGEFalsoisworkingtocarryoutitsnewresponsibilitytohelpcountriesbuildcapacityfortransparencyofactionandofsupport,throughtheestablishmentandoperationoftheCapacity-buildingInitiativeforTransparency(CBIT).TheSecretariatiscontinuingdiscussionswiththeGreenClimateFund(GCF)andotherclimatefundstofosterandhelpensurecomplementarityandeffectivenessinclimatechangefinancinggoingforward.

55. TheGEFalsoisworkingactivelywithinitsmandatetofacilitatetheprocessandprovidesupporttoprogramsandprojectsthataddressthegoalsofotherConventionsinacountry-drivenmanner.TheGEFSecretariatparticipatedinkeymeetings,including:theUNConventiontoCombatDesertification(UNCCD)COP12inAnkara,Turkey,inOctober2015;theUNFCCCCOP21inParis,FranceinDecember2015;theseventhsessionoftheIntergovernmentalNegotiatingCommitteeonMercury(INC7)inDeadSea,Jordan,inFebruary2016.Inthesemeetings,PartiesacknowledgedthesupportprovidedbytheGEF,re-affirmedGEF’srole,andalsoprovidedguidancethatarticulatedemergingareasofGEF’sengagement.FY17isacrucialperiodwherecountriesaremovingintoimplementationoftheConventionsandrelatedagreements.GEF’sroleisdescribedindetailintheseparateCouncilDocument(GEF.C.50.09, 11WithrespecttotheIntegratedApproachPilots(IAPs),forexample,programdesignhasprogressedsteadilysinceCouncilapprovalofthethreeIAPs:FoodSecurityinSub-SaharanAfrica,TakingDeforestationoutofCommoditySupplyChains,andSustainableCities.TheleadagenciesareworkingactivelywithinvolvedgovernmentsandotherpartnersandstakeholderstodevelopchildprojectsandestablishinstitutionalframeworksforimplementationoftheseIAPprograms.ThedesignphasefortheIAPsisamajorsteptowarddeliveringmoreimpactfulintegratedfinancepackages

Page 21: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

17

RelationswithConventionsandOtherInternationalInstruments),whichsetsoutGEF’sactionsinsupportoftheseagreementsanditsresponsetoguidanceofPartiestotheConventions.

EfficiencyoftheProjectCycle

56. TheSecretariatandtheAgenciesareimplementingtheefficiencymeasuresfortheprojectcycleidentifiedanddevelopedinrecentyears,includingthenewCancellationPolicyofOctober201412toenhancepredictabilityandreinforceincentivestospeedupprojectpreparation,andtheCouncilapprovedExpeditingthePreparationoftheStockofDelayedProjectsinJune2015,(GEF/C.48/04)toaddresstheexistingstockofGEF-4andGEF-5overdueprojects.

57. PursuanttothesedecisionsoftheCouncil,theSecretariathasbeen,andwillbe,inclosetouchwithAgenciesandrecipientgovernmentstosupportandfacilitateefficientprocessingofprojects,andtoinformthemaheadoftimeofcancellationdatesincaseofalackofmovementforward.TheSecretariatwillcontinueimplementingtheCancellationPolicybyfollowingthestepsincludedintheabovementionedCouncilDocumentsaimingtoencouragebothcountriesandAgenciestosubmitontimetheirprojectsforCEOEndorsement/Approvalasappropriate.

EngaginginGlobalPolicyDiscussions

58. TheGEFaimstotakepartinshapingglobalpolicydialogues,buildingonitsaccumulatedknowledge,itsconveningpower,anditsmandateacrossarangeofenvironmentaldomains.ThisrequiresastrongoutreachandcommunicationstrategythathelpsbringmessagesandknowledgefromwithintheGEFtotherightforaattherighttime.Therewillbeanumberofopportunitiesinthisregardinthecomingyear.

59. Aspartofarenewedstrategiccommunicationsapproachfocusedon“doinglessbetter”andworkingmoreeffectivelywithpartners,intheupcomingmonths,theGEFisplanningseveralactivitiestosupportdialogueonglobalenvironmentalissues,andtohelpprepareforupcomingGEF-7replenishmentdiscussions.ThisincludescommunicationandoutreachactivitiesfortheGEF’s25thanniversary,acelebratorypublicationwithcontributionsfromparticipantcountries,donorsandpartners,thelaunchofthenewGEFwebsite,enhancedonlineandsocialmedia,aswellastargetedcommunicationsonemergingpriorityissuesliketheglobalenvironmentalcommons,sustainablecities,foodsecurity,oceans,water,landandforestsandforkeyeventssuchasUNFCCCCOP22inMarrakeshandUNCBDCOP13inCancun.13

12AmendedbyCouncilinOctober2014,thisPolicy(CancellationofProjects)hasbeenpostedtotheGEF’swebpageat:https://www.thegef.org/gef/policies_guidelines/project_cancellation.13DuringFY16,theGEFwaspresentandmadededicatedoutreacheffortsatnumerousglobalmeetingsandevents,includingGEF-relevantCOPs(inFY16:UNCCDCOP12,UNFCCCCOP21,andMinamataINC7),andotherhigh-profileevents,forexampletheThirdInternationalConferenceonFinancingforDevelopmentinAddis,theSustainableDevelopmentGoalsinNewYork,theWorldEconomicForuminDavos,ClimateAction2016inWashingtonDCandtheUNEnvironmentAssembly(UNEA-2)inNairobi.

Page 22: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

18

ThroughitsKMefforts,theGEFintendstoachievegreaterinformationexchangeandcommunicationaboutkeyglobalenvironmentalchallengesandpotentialsolutions,inlightoftheexperienceandlessonslearnedthroughitswork.

60. TheGEFalsofollowedcloselythedevelopmentofthepost-2015developmentagenda,notablytheSustainableDevelopmentGoals(SDGs)adoptedinNewYorkinlate2015,andisinapositiontocontributetotheimplementationofkeyelementsoftheSDGs.TheGEFwillstayapprisedofthedevelopmentsonSDGindicators,andwillcontinuetocooperatewithpartnerstoarticulatehowtheGEFsupportcouldenablecountriestoaddressMEAgoalsandobjectivesinsynergywiththeSDGs.

GEFSecretariatOrganization

61. BytheendofFY16,theSecretariatcompletedreorganizingitsinternalstructuretoensurefullalignmentwithnewstrategicdirectionsandkeyprioritiesofGEF-6,andtoenhanceefficiencyandeffectivenessofdelivery.Akeyobjectiveofthereorganizationhasbeentomoveawayfroma“silo-based”programingmodeltowardamoreintegratedandregion-orientedmodel,andtostrengthenGEFSEC’spolicyandpartnershipcapabilities.

62. TheSecretariatisnowworkingunderthenewstructure,consistingoftwomainunits,eachheadedbyaDirector:aProgramingunitresponsibleinteraliaforworkprogramdevelopmentandrelationswiththeConventionSecretariatsandothermultilateralagreements,andaPolicyandPartnershipunitresponsibleforpolicyandpartnershipactivitiesincludinggenderandsocialissues,RBMandKM,countryandstakeholderpartnershipsandassociatedinformationtechnologyneeds.ThenewSecretariatstructurealsoincludesanenhancedteamandcapacityoneffectivecommunicationsandoutreachinsupportofthedeliveryofGEF-6prioritiesandstrategicobjectives.

Page 23: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

19

ANNEX1:SPECIALINITIATIVES

1. ThediscussionbelowreportsonactivitiesconductedinFY16underSpecialInitiativesapprovedbyCouncilinpreviousyears,someofwhichwereapprovedseveralyearsago.Table8providesasummaryoftheoriginallyapprovedamountintheSpecialInitiativeaccount,estimatedFY16expensesintherespectiveaccounts,whereincurred,andtheavailablebalanceremainingundertheseinitiativesthroughend-March2016.ThetextwhichfollowsprovidesadditionalinformationontheestablishmentandpurposeofeachSpecialInitiative,andontheamountoffunds(ifany)usedinFY16forthepurposesindicated.

Table9:SpecialInitiatives

SpecialInitiativeNameOriginallyApprovedAmount

EstimatedFY16Expenses

EstimatedAvailableBalancefor

FY17

Rio+20SpecialInitiative $210,000 $19,382 $91,257PerformanceBasedAllocationSystem $1,356,000 - $222,229GEFManagementInformationSystem $700,000 $65,765 $397,994ResultsBasedManagement $408,000 - $13,233GEFFifthAssembly $2,118,528 - $265,359

Total $4,792,528 $85,147 $990,072

Rio+20–SpecialInitiative

2. InMay2011,theGEFCouncilapproved$210,000tosupportactivitiesbytheGEFSecretariatrelatedtotheGEF’sparticipationintheRio+20SummitheldinRiodeJaneiroinJune2012,includingrelatedpublications.SinceJune2012,theSecretariathasusedfundingfromthisspecialinitiativetosupportfollow-onworkfromtheRio+20Conference,includingstafftraveltomeetingsrelatingtotheSDGsandpost-2015sustainabledevelopmentagenda.DuringFY16,$19,382weredrawnfromthisaccountfortheseactivities.

PerformanceBasedAllocationSystem

3. BetweenFY04andFY07,theGEFCouncilapprovedatotalof$1,356,000tosupporteitherthedevelopmentofaperformance-basedallocationsystem(whichdevelopedintotheRAF)ortorefinetheRAF,includingitspotentialapplicationtootherfocalareas.AsindicatedtoCouncilinitsBusinessPlanandBudgetdocumentlastyear,May2015(GEF/C.48/05),theSecretariatisdrawingontheavailablebalanceofthisSpecialInitiativetosupportitsoverallITupgrade,asdescribedintheBusinessPlan,aspartoffurtherimprovementstoperformance-basedapproachestoallocationofresourcesandprogramming.NoresourcesweredrawnfromthisaccountinFY16.

Page 24: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

20

ManagementInformationSystem

4. InNovember2005,theCouncilapproved$700,000todevelopamanagementinformationsystemtoenabletheGEFanditspartnerstoimproveeffectivenessacrossallareasofGEFbusinessoperations. AsindicatedtoCouncilinitsBusinessPlanandBudgetdocumentlastyear,May2015(GEF/C.48/05),theSecretariatisdrawingontheavailablebalanceofthisSpecialInitiativetohelpimplementtheactionsmentionedinthemainpapertoupgradetheGEF’sITplatform,togetherwithresourcesfromthepreviousinitiativeandthecorebudget.DuringFY16,$65,765weredrawnfromthisaccounttosupporttheupgradeoftheGEFexternalwebsite.

Results-basedManagement

5. InJune2006(FY2007budget)andJune2009(FY2010budget),theGEFCouncilapprovedtwospecialinitiativestofurtherstrengthentheGEF’scapacityforRBMandlearningthroughspecificactivitiesandstudies.AsindicatedtoCouncilinitsBusinessPlanandBudgetdocumentlastyear,May2015(GEF/C.48/05),theSecretariatisdrawingonthisaccounttosupportfurtherstrengtheningofRBM.NoresourcesweredrawnfromthisaccountinFY16.

GEFFifthAssembly

6. InJune2013,theCouncilapproved$750,000tosupportinitialworkonplanningtheFifthAssembly,tobeheldinCancun,MexicoinMay2014.BasedonCouncilDocumentGEF/C.45/7,NoteontheOrganizationoftheFifthGEFAssembly,whichincludedadetailedbudgetproposal,theCouncilapprovedanadditional$1,368,528,resultinginatotalbudgetof$2,118,528milliontosupporttheorganizationoftheAssembly.Thesecostssupported,amongotherthings,travelcostsforrepresentativesfromGEFrecipientcountries,15travelforGEFSecretariatstaff,hospitality,translationandinterpretation,websitedevelopment,exhibitioncosts,communicationsandgeneraloperations.NoresourcesweredrawnfromthisaccountinFY16.

Page 25: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

21

ANNEX2:STAPPUBLICATIONSANDDOCUMENTS,GEF-5TOPRESENT

STAP2010.ProgrammingApproachforUtilizationoftheResourcesSet-AsideOutsidetheSTAR.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.10

STAP2010.TheEvidenceBaseforCommunityForestManagementasaMechanismforSupplyingGlobalEnvironmentalBenefitsandImprovingLocalWelfare.ASTAPadvisorydocument.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.14

STAP2010.EnvironmentalCertificationandtheGlobalEnvironmentalFacility:ASTAPadvisorydocument.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.15

InstituteforTransportationandDevelopmentPolicy(PreparedonbehalfofSTAP)2010ManualforCalculatingGreenhouseGasBenefitsofGlobalEnvironmentalFacilityTransportationProjects.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.16

STAP2010.AdvancingSustainableLow-CarbonTransportthroughtheGEF.ASTAPadvisorydocument.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.17

STAP2010.EnhancingResiliencetoReduceClimateRisks:ScientificRationalefortheSustainedDeliveryofGlobalEnvironmentalBenefitsinGEFFocalAreas.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.18

STAP2010.RecommendationsoftheGEF-STAPCross-FocalAreaWorkshop:ApproachestoAddressCarbonBenefitsinthecontextofMultipleGlobalEnvironmentalBenefitsinImplementingtheSFM/REDD+PrograminGEF-5.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.39/Inf.19

STAP2011.MarineDebris:DefiningaGlobalEnvironmentalChallenge.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.40/Inf.14

STAP2011.HypoxiaandNutrientReductionintheCoastalZone.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.40/Inf.15/Rev.1

STAP2011.SelectionofPersistentOrganicPollutantDisposalTechnologyfortheGlobalEnvironmentFacility.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.40/Inf.16

STAP2011.ReviewofToolsandMethodstoIncreaseClimateResilienceofGEFProjectandPrograms.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/C.41.Inf.16

Page 26: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

22

STAP2011.BiodiversityandEcosystemsPolicyBrieftoInformtheUnitedNationsConferenceonSustainableDevelopment(Rio+20).GlobalEnvironmentFacility,Washington,DC.GEFID:GEF.C41.Inf.17

STAP2011.EnvironmentalProjectDesignintheGEF:DesigningProjectstoCreateEvidenceandCatalyzeInvestmentstoSecureGlobalEnvironmentalBenefits.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF.C.41.Inf.18

STAP2012.ResearchwithintheGEF:ProposalsforRevisingtheTargetedResearchModality.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/STAP/C.43/Inf.02

STAP2012.ClimateChange:ScientificAssessmentfortheGEF.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/STAP/C.43/inf.03

SecretariatoftheConventiononBiologicalDiversityandSTAP2012.ImpactsofMarineDebrisonBiodiversity:CurrentStatusandPotentialSolutions.TechnicalSeriesNo.67.Montreal,Canada.GEFID:GEF/STAP/C.43/Inf.04

SecretariatoftheConventionofBiologicalDiversityandSTAP2012.MarineSpatialPlanningintheContextoftheConventionofBiologicalDiversity.TechnicalSeriesNo.68.Montreal,Canada.GEFID:GEF/STAP/C.43/Inf.05

STAP2012.GEFGuidanceonEmergingChemicalsManagementIssuesinDevelopingCountriesandCountrieswithEconomiesinTransition.ASTAPAdvisoryDocument.GlobalEnvironmentFacility,Washington,DC.Retrievedfrom:<http://www.stapgef.org/emerging-chemicals-management-issues-in-developing-countries-and-countries-with-economies-in-transition/>

STAP2012.RevisedMethodologyforCalculatingGreenhouseGasBenefitsofGEFEnergyEfficiencyProjects(Version1.0).GlobalEnvironmentFacility,Washington,DC.Retrievedfrom:<http://www.stapgef.org/revised-methodology-for-calculating-green-house-gas-benefits-of-gef-energy-efficiency-projects-version-1-0/>

Govers,G.,Merckx,R.,VanOost,K.andvanWesemael,B.2013.ManagingSoilOrganicCarbonforGlobalBenefits:ASTAPTechnicalReport.GlobalEnvironmentFacility,Washington,DC.Retrievedfrom:<http://www.stapgef.org/managing-soil-organic-carbon-for-global-benefits/>

STAP2013.EnhancingtheGEF’scontributiontoSustainableDevelopment.GlobalEnvironmentFacility,Washington,DC.GEFID:GEF/R.6/Inf.03

Yengoh,G.,Dent,D.,Olsson,L.,Tengberg,A.andTucker,C.2014.TheuseoftheNormalizedDifferenceVegetationIndex(NDVI)toassesslanddegradationatmultiplescales:areviewof

Page 27: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

23

thecurrentstatus,futuretrends,andpracticalconsiderations.LundUniversityCenterforSustainabilityStudies(LUCSUS),SwedenandTheScientificandTechnicalAdvisoryPaneloftheGlobalEnvironmentFacility(STAP/GEF),Washington,DC.

O’Connell,D.,Walker,B.,Abel,N.,Grigg,N.2015.TheResilience,AdaptationandTransformationAssessmentFramework:fromtheorytoapplication.CSIRO,Australia.

STAP2015.OptimizingtheGlobalEnvironmentalBenefitsofTransportBiofuels.ScientificandTechnicalAdvisoryPaneloftheGlobalEnvironmentFacility,Washington,DC.AuthoredandeditedbyBierbaumR.,CowieA.,GorsevskiV.,SimrsR.(STAP);RackM.,StrapassonA.,WoodsJ.(ImperialCollege,London)andRavindranathN.(IndianInstituteofScience,Delhi).GEF/STAP/C.48/Inf.02

Sims,R.,Gorsevski,V.,andAnenberg,S.2015.BlackCarbonMitigationandtheRoleoftheGlobalEnvironmentFacility:ASTAPAdvisoryDocument.GlobalEnvironmentFacility,Washington,D.C.GEF/STAP/C.49/Inf.02

O’Connell,D.,Abel,N.,,Grigg,N.,Maru,Y.,Butler,J.,Cowie,A.,Stone-Jovicich,S.,Walker,B.,Wise,R.,Ruhweza,A.,Pearson,L.,Ryan,P.,StaffordSmith,M.(2016).Embeddingresilience,adaptationandtransformationintoprojectdesign:GuidelinesforapplicationofRAPTA(1.0).GlobalEnvironmentFacility,Washington,D.C.GEF/STAP/C.50/Inf.02

Rasmussen,L.,Agrawal,A.,Oldekop,J.(2016).Areviewofindicatorsusedtoassessthesustainabilityofcommodityagriculturalproduction.GlobalEnvironmentFacility,Washington,D.C.GEF/STAP/C.50/Inf.04

Henry,B.andMurphy,B.(2016).Sustainablelandmanagementanditsrelationshiptoglobalenvironmentalbenefitsandfoodsecurity:AsynthesisreportfortheGEF.GlobalEnvironmentFacility,Washington,D.C.GEF/STAP/C.50/Inf.03

Page 28: EN GEF.C.50.10 GEF Business Plan and Corporate …...Budget for FY17, takes note of the business plan, and approves a FY17 corporate budget from the GEF Trust Fund of $25.586 million,

24

ANNEX3:TRUSTEE--FY16REVIEWOFACTIVITIESANDACHIEVEMENTS

1. TheWorldBankasTrusteeprovidesarangeofservices,broadlydefinedintheInstrument,inthefollowingcategories:financialandriskmanagement;investmentandcashflowmanagement;managementofGEFpartnerrelationshipsandtransactions;accountingandreporting;legalservices;commitmentanddisbursementoftrustfundresources;systemsinfrastructureandmaintenance;andresourcemobilization.

2. Inadditiontotheseservices,additionalactivitiessupportedbytheTrusteeinFY16included:implementationoftheGEF-6Replenishmentresolution,includingworkingwithdonorstofacilitatedepositofInstrumentsofCommitment,addressingdonorinquiriesregardingGEF-6cashoutlays,creditsanddiscounts;enhancementstotheinternalcontrolrelatedtothepreparationoffinancialstatements;workwiththeSecretariatonpolicyinitiatives,implementationofseveralCouncilapprovedpoliciesinthecontextofstreamliningprocedures;negotiationofFinancialProceduresAgreements(FPA)withthenewGEFAgencies;andrevisionstoFPAwiththeexistingGEFAgencies.

FY16Projectedvs.EstimatedActual

3. Basedonthefirstnine-monthperiodendedMarch31,2016andprojectionsfortheremainingthreemonths,theestimatedactualexpenditureforFY16forTrusteeservicesis$3million,reflectingadecreaseof$28,950comparedtotheapprovedbudget.ThedecreasewasmainlyduetolowerinvestmentmanagementcostsresultingfromlowerthananticipatedliquidityintheGEFTrustFundinFY16.

4. LiquiditylevelsareinfluencedbydonorcontributionsandcashdrawdownbyAgencies.Investmentmanagementcostisavariablecostthatiscalculatedbasedon3.5basispointsagainsttheaverageannualbalanceoftheTrustFund.ThenetcashinflowsduringFY16resultedindecreasedliquidityoftheGEFfromaprojectedaverageof$3.41billionto$3.39billion,therebydecreasinginvestmentmanagementcosts.

FY15Actualexpenses

5. TheactualamountofTrusteeexpensesincurredforFY15was$3.04millionincludingthecostofaudit.ThisisconsistentwiththeexpectedactualexpenditurethatwasreportedintheCouncilmeetinginJune2015.