Title:Organization/Area:EUP Category:
BUSINESS PROCESS PROCEDURE Change planning scenarioLong-term planningPP-MRP-BD
File Name: EMC32B40.DOC Release: 4.0B
Responsibility: Long-term planner Status:
OverviewTrigger:You want to change a planning scenario that will be used in long-term planning
Business Process Procedure Overview
Select the planning scenario number and description. Change the information associated with the scenario and then save and release itfor use in long-term planning
Input – Required Fields Field Value/CommentsPlanning scenario number PLSCN - 3 digit number
Output – Results CommentsNumber of planning file entries
Tips and Tricks
Last changed on: Last changed by: Version: Page:November 16,1998
Derek Johnson 1 of 5
7/27/2019 ems32b40
http://slidepdf.com/reader/full/ems32b40 2/5
7/27/2019 ems32b40
http://slidepdf.com/reader/full/ems32b40 3/5
Title:Organization/Area:EUP Category:
BUSINESS PROCESS PROCEDURE Change planning scenarioLong-term planningPP-MRP-BD
File Name: EMC32B40.DOC Release: 4.0B
Responsibility: Long-term planner Status:
To Specifies the end of the planning
period, which is used to define theperiod for which planned independentrequirements taken into account inlong-term planning
Display only
Controlparameters
Section header
Opening stock Determines how opening stock will becalculated
Display only
Dep reqmts for reorder pointmaterials
This selection determines whether dependent requirements are also to becreated for materials planned usingone of the consumption-basedplanning procedures and whether theyare include in the planning run.
Display only
Include firmedreceipts
This selection takes purchase orders,production orders and reservations intoaccount in long-term planning
Display only
Availablecapacity
Section header
Active version Selects the amount of capacity that willbe available. This indication will affectorder scheduling
Display only
LogisticsControlling
Section header
Purchase infosystem version
Information structure number Display only
Inventorycontrollingversion
Inventory controlling version Display only
Last transfer toPURCHIS
Last transfer to PURCHIS Display only
Last INV. COdata transfer
Last INV. CO data transfer Display only
If changes are made, additional steps willneed to be followed to release the scenariofor use in long-term planning
1.4. Planning Scenario – Allocated Planned Indep. Reqmnts Versions, enter information inthe fields as specified in the table below:
Note: Press the “PLND INDEP REQMNTS” button
<<< Screen print goes here >>>
Field Name Description R/O/C User Action and Values Comments
Press “NEWENTRY” to addplannedindependentrequirements toa new version.
Last changed on: Last changed by: Version: Page:November 16,1998
Derek Johnson 3 of 5
7/27/2019 ems32b40
http://slidepdf.com/reader/full/ems32b40 4/5
Title:Organization/Area:EUP Category:
BUSINESS PROCESS PROCEDURE Change planning scenarioLong-term planningPP-MRP-BD
File Name: EMC32B40.DOC Release: 4.0B
Responsibility: Long-term planner Status:
Press
“DELETE” todelete theplannedindependentrequirements of a version
Press“CONFIRM” tosubmitchanges to thesystem
Press“CANCEL” toexit the screen
Version Version number used to save thedemand program
R Enter the version number
Vers to be
replaced
Enter the version number that will be
replaced by the pervious versionnumber
O Leave blank
From Enter the beginning date for which theversion will be replaced
O Leave blank
To Enter the finish date for which theversion will be replaced
O Leave blank
Press the “CONFIRM” button to continue
You will return to the previous main screen
Will need to enter a planning plant to releasethe planning scenario
1.5. Change Planning Scenario, enter information in the fields as specified in the table below:
Note: Press the “PLANTS” button to select planning plants
<<< Screen print goes here >>>
Field Name Description R/O/C User Action and Values Comments
Planning Plant Number that indicates where theplanning is carried out
Display only
Press “CANCEL” key
1.6. Change Planning Scenario, enter information in the fields as specified in the table below: Note: At this stage the scenario will be saved and released
<<< Screen print goes here >>>
Field Name Description R/O/CUser Action and Values
Comments
Last changed on: Last changed by: Version: Page:November 16,1998
Derek Johnson 4 of 5
7/27/2019 ems32b40
http://slidepdf.com/reader/full/ems32b40 5/5
Title:Organization/Area:EUP Category:
BUSINESS PROCESS PROCEDURE Change planning scenarioLong-term planningPP-MRP-BD
File Name: EMC32B40.DOC Release: 4.0B
Responsibility: Long-term planner Status:
Press the “CANCEL RELEASE” button Note that the
status fieldchanges to“ReleaseCanceled”
Press the “SAVE AND RELEASE” button Note that thestatus fieldchanges to“Released”
Click “YES” to get past the informationmessage on the popup window titled“Release Planning Scenario”
Press “IMMEDIATELY” on the popupwindow titled “Change Planning Scenario”
Press the “ENTER” key and the final screentitled “MRP” will show the number of fileentries per plant
Press the “BACK” or “EXIT” key
Last changed on: Last changed by: Version: Page:November 16,1998
Derek Johnson 5 of 5