Title:Organization/Area
BUSINESS PROCESS PROCEDURE
Long-term Planning: Stock Requirements ListMaterials Management - MRP controller
File Name: ems04d40.doc R/3 Release: 4.0B/4.5A
Responsibility: Production Status:
Overview
Trigger:In Long term planning the MRP controller can evaluate information requirement to current availability of material.
Business Process Description Overview
Long Term Planning allows you to simulate demand (sales forecast) to see a) what new kinds of capacityrequirements are created, b) new planned material requirements for lower level assemblies andcomponents. If you are happy with the results of the simulated planned orders, you can make themoperational. In long-term planning, various versions of the master plan are created which are eachtested, in simulative mode, in the planning run and in capacity planning. The system thus calculates thecapacity requirements, the activity category requirements of the cost centers, and the purchased partsrequirements.
When the planning run is completed the evaluation function enables the MRP controller to process therequirements and make informed decisions to convert planned orders to purchase requisitions thustriggering the purchasing department to proceed with acquiring the materials. The MRP controller usesthe display function to review both MRP lists and stock requirements list to analyze the requirements anddecide on a course of action Stock requirements use dynamic stocking levels.
Input - Required Fields Field Value / Comments
Material Material IDPlant Plant ID
Output - Results CommentsUnit Unit of MeasureDate Receipt / Requirements dateMRP Element Identifies the MRP element for the specific row (line item)R-Date Descriptive data for the element including the element number, rescheduling date, etc.
EM Exception Message Number
Recpt/reqd qty Quantity required or received
Avail quantity Available quantity after the effect of the line item has been taken into account
Output - Results CommentsDisplay of current stock requirements
Last changed on: Last changed by: Mark Dirkes Version: Page:
3/10/99 1 of 5
7/27/2019 ems04d40
http://slidepdf.com/reader/full/ems04d40 2/3
Title:Organization/Area
BUSINESS PROCESS PROCEDURE
Long-term Planning: Stock Requirements ListMaterials Management - MRP controller
File Name: ems04d40.doc R/3 Release: 4.0B/4.5A
Responsibility: Production Status:
Tips and Tricks
It should be noted the user can convert planned orders to purchase requisitions directlyfrom the display screens without having to go back to either create or change function.
Procedure Steps
1.1. Access transaction by:
Via Menus Logistics>Production> Master Planning > Long-term Planning ( New Screen ) >Evaluations >Stock/reqmts list
Via Transaction Code MS04
1.2. On Screen Long-term Planning Stock/Requirements List: Initial Screen.Enter data then, press enter.
<<Screen-print>>
Field Name Description R/O/C User Action and Values Comments
PlanningScenario
Key that identifies the planningscenario
R Enter Planning scenario number Enter scenarionumber
Material Material master R Number known or via matchcode Enter MaterialNumber
Plant plant where MRP list was generated R Enter plant number Enter Plant Number
Product group If material belongs to a product group,and this indicator is on, the membersof the group will be displayed and canbe selected for display purposes
O Enter if required
1.3. On screen Long term Planning Stock/Requirements List
<<Screen-print>>
Displays
Field Name Description R/O/C User Action and Values Comments
Material Material master R Defaults from Initial Screen
Description material short description R Defaults from Material Master
PlanningScenario
Planning scenario number R Defaults from initial Screen
Plant plant where material located R Defaults from Initial Screen
MRP Type Reorder Type R Defaults from Material Master
Material type Material type R Defaults from Material Master- (HALB)
Unit unit of measure R Defaults from Material Master
Last changed on: Last changed by: Mark Dirkes Version: Page:
3/10/99 2 of 5
7/27/2019 ems04d40
http://slidepdf.com/reader/full/ems04d40 3/3
Title:Organization/Area
BUSINESS PROCESS PROCEDURE
Long-term Planning: Stock Requirements ListMaterials Management - MRP controller
File Name: ems04d40.doc R/3 Release: 4.0B/4.5A
Responsibility: Production Status:
Date Receipt / Requirements date Display Only
MRP Element Identifies the MRP element for thespecific row ( line item ) Display Only
MRP Elementdata
Descriptive data for the elementincluding the element number rescheduling date, ect
Display only ◊ Here you will see
dependent requirements from a higher level assembly and simulated plannedorders.
Exception Exception message number Click on the message number and clickmenu path Edit > Disp.Except.MessageOr double click in the message for moreinformation.
Message display’s atbottom of screen
Rec./ reqd qty Quantity received or required Display only
Available qty Quantity available to user dependingon lead times
Defaults from planning run
Productionversion
Key which identifies the varioustechniques according to which amaterial can be manufactured.
Display Only
Storagelocation
The number of the storage locationwhere the material is stored.
Display Only
1.4 Access Further Display Screens on MRP List by using the menu paths listed below.
Field Name Description R/O/C User Action and Values Comments
Edit Key Display exception messages Additional date for element
O Further Displays and information
GoTo Stock statisticsSales StatisticsMaterial OverviewMaterial memo
Revision LevelsCompare MRP Lists
O Further Displays and information
Settings Detailed Header Period TotalsChoose periodIndividual SplitChange PeriodRequirement/receipt dateGroup requirement
R Further Displays and information
Environment Display ElementChange ElementConvert Planned Order/PurchaseRequisition
R Further Displays and information
Double click on any item for additional overview information, for example to see additional information on an MRP
element, double click on this element and the following screen appears.
<<Screen-print>>
Last changed on: Last changed by: Mark Dirkes Version: Page:
3/10/99 3 of 5