Recruitment ServicesPower T&D Solutions

Page 2: Employ Staff-Power-T&D-NR-WEB.compressed
Page 3: Employ Staff-Power-T&D-NR-WEB.compressed

ContentsPreliminary and General Conditions...................................4

General Information..............................................................6

Quality Assurance Principles...............................................7

Projects upon which Labour has been supplied...............8

Vetting and Interviewing Procedures................................9

Training Matrix.....................................................................10

Candidate Coverage.............................................................11

Page 4: Employ Staff-Power-T&D-NR-WEB.compressed

Preliminaries& General Conditions1. Overview

This information is for your review, and is to compareagainst existing labour supplies to enable you, the Client,to determine best value and standards required.The information submitted is for the Client to analyse inorder to determine if Employ Staff Limited can become apreferred supplier of Temporary Labour (Civil EngineeringOperatives, M&E Labour and Technical Services includ-ing Site Management).There will be a provision for volume discounts and a feeproposal for situations where the temporary workerbecomes a permanent employee of the contractor.The projects we supply to consist of a variety ofschemes involving the upgrade or new build of electricitysubstations and the refurbishment and upgrades ofoverhead lines throughout the UK.

2. Description of Services

The services are for provision of temporary site labourand permanent placements.Time sheets will only contain the descriptions of labourcontained on this list. Changes to the descriptions of thelabour provided can only be undertaken with the prioragreement of the Commercial Manager of the Client.Rates for specific roles will only be reviewed on an annual basis or upon a change in relevant UK legislation

3. Qualifications/Competencies

All operatives are to hold the appropriate qualificationsfor the role they are appointed for and per the schedulecontained in the Training Matrix.Employ Staff check all the operatives’ qualifications,certificates and experience in the role prior to supplyof the services and ensure that they remain valid for theanticipated duration of the services.Any training or renewal of certification required by theoperatives to meet the criteria in the Training Matrixshall be arranged by Employ Staff.Training – Operative / Employ Staff are responsible forqualifications and maintenance of approvals andverifying that they are genuine and valid.D&A test within the last 2 years prior to mobilisation tosite by an appropriate independent testing organisation.This will be confirmed prior to mobilisation onsite.

4. Background Checking

Employ Staff will at our cost comply with the NationalGrid background checking policy.For the avoidance of doubt all costs associated with thebackground checking at any levels will be at the sole cost of Employ Staff.These background checks will be completed beforethe individual is offered to the Client to fulfil a role andevidence that the background check has been complet-ed will form part of the “CV” for each individual offered.

5. Contracts

As part of the process a standard sub contract will beagreed with each project having an individual purchaseorder number.

6. Payments

Employ Staff shall submit application for payment to therelevant Clients QS and clearly identify the particularproject and order number on the application.The application shall specifically contain the following:

(a) Order Number(b) Project Name(c) Contractor Name(d) Week Commencing Date(e) Application value with cost back-up.

In the relation to time sheets, the name and trade foreach operative will be stated on each time sheet. It willinclude the actual start time, breaks and finish times,hours worked per day and a total for that week. Timesheets are to be signed by an appropriate Site Managerprior to submitting to the QS, only one project to be listed on each time sheet. There will be a separate time sheet for each site detailing the operatives times. The allocations of time sheets must reflect the work on each sheet and only authorised time sheets will be submitted with invoices. Employ Staff understands that traveling time and subsistence will not be paid for in addition to working times. It is Employ Staff’s responsibly to meet the labour requirements at the various substations locations/sites. Only overtime instructed by the Site Managers will be paid after normal hours have been worked. Weekend working undertaken will be with the approval of the Site Manager, or a suitability authorised representative of the Client.

4

Page 5: Employ Staff-Power-T&D-NR-WEB.compressed

Working hours can only be varied by authorised Clientpersonnel, i.e. Construction Managers, Site Managers.Adverse weather payments – lightning risks will be paidup to the standard 9 hour day. Snow falls resulting in,failure to attend site, no payment. If the site is closedduring the morning half a shift will be paid. If the site isstopped in the afternoon the full shift will be paid.

7. Hours of work

Standard hours of work are as follows:Monday to Friday: 8.00am – 5.30pmStandard work days are 9 hours per day and 45 hoursper week.The proposed operative is only paid for each hour ofworking time and includes annual leave, sickness andthe like.A minimum 0.5 hours will be taken for lunch breaksin a standard day.Changes to work hours can only be varied by authorisedClient personnel, i.e. Construction Managers,Site Managers.

8. Variations

Employ Staff will only action an instruction if it is issuedin writing by the authorised personnel from the Client.A list of the authorised personnel is to be provided toEmploy Staff.

9. Notice Periods

The Client shall provide Employ Staff Ltd with a minimumof 1 weeks’ notice prior to ceasing the operative’stemporary assignment.The Client reserves the right to request a replacementor cancel a temporary assignment of an individualimmediately based on any non-performance or due tonot meeting the expecting minimum standards.

10. Health and Safety Requirements/PPEProvisions

Employ Staff shall ensure all operatives have thefollowing PPE prior to reporting for work:

• Light Eye Protection (to EN166 –F1)• White Hard Hat (to EN397)• Lace up Safety Boots (to EN345)• Standard Work Wear (to BS5426) and Hi-VisibilityWork Wear (to EN471)

Option 1

One piece overall with yellow hi visibility jacketor waistcoat.

Option 2

Two piece overall with yellow hi visibility jacketor waistcoat.The client will provide site specific PPE such as:

• Banksman orange hi visibility jacket or waistcoat(to EN531)

• Gloves (to EN388)• Ear Defenders or Ear Plugs (to EN352)

The site operatives shall comply with the informationprovided by the Project Site Managers during the siteinductions and other instructions issued from time totime. Failure to have PPE as specified may result in theoperative being excluded from the site and no paymentwill be made in respect of that day.

11. Alcohol and Drug Policy

Employ Staff will ensure that each worker offered foran assignment will have undertaken a drug and alcoholtest within the preceding 24 months.Employ Staff will certify that the worker has passedthat test and will arrange at no cost to the client,bi annual testing of the workers inline with NG policy.For clarity with regard to this requirement the testsmust be carried out by an independent accreditedtesting company.

12. Bribery and Corruption

Employ Staff shall not offer, give or agree to any giftor consideration as any kind of gift or reward to anyemployee of the Client.

13. Security Checks

Employ Staff shall check on the operative’s identityand confirm their right to work in the UK. Shouldhigher checks be required Employ Staff shall providethe operatives address for a period of 3 years prior totheir engagement and criminal certificate under section112 of the Police Act 1997 of their criminal record forunspent criminal convictions.

Preliminaries& General Conditions (con’t)

5

Page 6: Employ Staff-Power-T&D-NR-WEB.compressed

General Information1. Numbers of personnel directlyemployed and sub-contractors

Employ Staff has 14 members of staff employed toselect and vet prospective workers and ensure that ourQA systems are adhered to. We engage workers to workon projects throughout the UK but as a recruitmentagency they are not classed as our employees.

2. Total numbers of trades on books

Our database increases by approximately 200 workersa month and currently stands at 14,543 which consistsof all types of blue collar and white collar workers.

3. Where the subcontractor considersthey are regional strongest

Extensive Coverage - South/Mid/North Wales

Extensive Coverage - South West

Extensive Coverage - M4 Corridor

Extensive Coverage - East/West Midlands

Strong Coverage - South East

Strong Coverage - North West

Good Coverage - Yorkshire/Humber

Good Coverage - North East

Limited Coverage - Scotland

4. Bulk Discount Proposal – Trades andLabour

Our discount proposal is based on numbers on anindividual subcontract/site:

These figures are based on 45 hour working week applyto the trades and labour on the Civils and M&E sections.Where white collar workers as placed in addition we willoffer preferential margins based on their day rates.

5. Permanent Placements

Fee Structure:

6. Client References

David BanksJ2M, Construction Manager: 01454 422 400

Colin McMahonMUS, Construction Manager: 01454 422 400

Matt CollierPJ Carey, Construction Manager: 01454 877 674

Neilan PerumalSkanska, Construction Manager: 01923 776 666

Sam ClarkeDurkin & Sons, Site Manager: 02392 389 100

Gary SutterLyndon Scaffolding, Estimator: 01217 853 932

Refund Structure:

Number ofworkers

0 - 9

10 - 19

20 -29

30 - 50

50 - 100

0 - 9

10p per hour

15p per hour

20p per hour

25p per hour

0 - 9

£85.50

£192.75

£450

£1125

Discountper hour

Potential savingper week

Week in whichengagement terminates

0 - 2

2 - 4

4 - 8

8 - 12

90%

50%

25%

10%

% of introductionfee refunded

Remuneration

£0 - £49,999

£50,000+

12.5%

15%

Fee - %

6

Page 7: Employ Staff-Power-T&D-NR-WEB.compressed

Quality AssurancePrinciples

Every worker has their qualifications checked,with copies of qualifications available upon request prior to starting onsite.

We cover at least 3 years employment history with each worker, with 5 years being tracked on most occasions.

Every worker has to provide at least 2 workingreferences from a supervisor/manager to whomthey have reported.

Eligibility to work in the UK is checked by either passport or birth certificate prior to start onsite.

All qualifications, work history and relevant details are held on file for seven years which enables historical audits to take place. This can be requested inline with data protection regulations.

No worker is paid or invoiced to the client without an approved timesheet that has been signed by a designated site manager.

All invoices are accompanied by the associated timesheets.

We evaluate all workers prior to start onsite, during their contracts and at the end of the project to ensure that the best workers are made available to clients in the future.

All commercial queries are dealt with in a timelyfashion, with a maximum resolution timeframe of10 working days.

All candidate paperwork, registration forms and T&C’s are based on REC models and therefore meet all legislation.

All Employ Staff team members must demon-strate competence and knowledge of NG proce-dures before dealing with requirements. This is backed up with regular training sessions and exams.

Employ Staff is currently undertaking ISO9001 toensure that our QA is strictly documented in a quality management manual. Investor in People (Bronze level) was awarded in June 2013.

7

Page 8: Employ Staff-Power-T&D-NR-WEB.compressed

Relevant projects on whichwe have supplied labour

• Uskmouth Power – Coal-fired Power Station

• Pembroke CCGT

• Swansea North 400kV substation

• Didcot 400kV substation

• Taunton 400/275 kV substation

• Hams Hall kV substation

• Indian Queens 400kV substation

• Creyke Beck 400kV substation

• Iron Acton 275kV substation

• Sizewell 400kV substation

• Bramford 400kV substation

• Kirkstall 400kV substation

• Wymondley 400kV substation

• Melksham 400/275kV substation

• Minety 400kV substation

• Exeter 400kV substation

• Ratcliffe 400kV substation

• Penwortham 275kV substation

• Heysham 400kV substation

• Hawthorne Pit 400kV substation

• West Burton 400kV substation

• Willenham 275kV substation

• Neepsend, Sheffield

• Didcot Power Station

• Staythorpe Power Station

• Hinkley

• ISS Projects UK wide

8

Page 9: Employ Staff-Power-T&D-NR-WEB.compressed

Vetting and InterviewingProcedures

Client advises Employ Staff of recruitment needs

Candidate registersfor new position

Face to face or telephone interview to screen initialsuitability and referencedetails taken.

Full qualification checks using Phoenix, ESUA, D&A and UK eligibility checks completed.

Two working references taken from a supervisoror manager for whom the candidate has worked

If verification checks confirm suitabilitythen added to shortlist.

Relevant forms and T&Cs are sent to candidatefor return prior to start.

Contact is confirmed and start dates agreed

9

Candidate indentified from in-house network

Page 10: Employ Staff-Power-T&D-NR-WEB.compressed

Training Matrix

PC Site Manager (M&E)

PC Site Manager (Civils)

Assistant Site Manager (Civils)

Assistant Site Manager (M&E)

Site Supervisor (M&E)

Site Supervisor (Civils)

Site/Setting Out Engineer

Gateman/NSI 8 Full

Gateman/Limited

Civils General Operatives

Shuttering Carpenter

Steel Fixer

Brick Layer

Banksman

Skilled Operative(Forward Tipping Dumper)

Skilled Operative (Ride on Roller)

Excavator Plant Operative(Up to 10 tons)

Excavator Plant Operative(Above 10 tons)

Telehandler Operative

MEWP Operator

Lift Supervisor

Signaller (Lifting Operations)

Slinger (Lifting Operations)

Lift Appointed Person

Ganger

Advanced Craftsman/Fitter

Fitter

Advanced CraftsmanWireman

Wireman

Ope

rativ

e Tr

aini

ng

Dru

g &

Alc

ohol

Pre

-em

ploy

men

t Tes

t

Em

ploy

men

t & S

ecur

ity C

heck

Cur

ricul

um V

itae

CS

CS

Car

d or

CC

NS

G S

afet

y C

ard

SM

ST

S fo

r S

ite M

anag

ers

SS

ST

S fo

r S

ite S

uper

viso

rs

HS

G 4

7 - A

void

ance

of B

urie

d S

ervi

ces

Man

ual H

andl

ing

Trai

ning

Firs

t Aid

at W

ork

LOLE

R r

eg,8

Com

pete

nce

Con

fined

Spa

ce A

war

enes

s

Con

fined

Spa

ce T

rain

ing

Ban

ksm

an tr

aini

ng

Sig

nalle

r Tr

aini

ng

Slin

ger

Trai

ning

Rid

e on

Rol

ler

trai

ning

Dum

per

Ope

rato

r Tr

aini

ng

Lift

Sup

ervi

sor

Trai

ning

Tele

hand

ler

Trai

ning

NP

OR

s, IP

AF

or

CP

CS

Exc

avat

or T

rain

ing

CP

CS

LOLE

R A

war

enes

s

ISO

H M

anag

ing

Saf

ely

NG

Env

ironm

enta

l Was

te C

BT

ISO

H E

nviro

nmen

tal r

espo

nsib

ilitie

s

NG

Env

ironm

enta

l Was

te C

BT

CD

M R

egul

atio

ns A

war

enes

s

CD

M R

egul

atio

ns –

Prin

cipa

l Con

trac

tor

Trai

ning

to b

e P

rovi

ded

by C

lient

Offi

ce In

duct

ion

Site

indu

ctio

n

Tool

-box

Tal

ks

Saf

ety

Obs

erva

tion

Rep

ortin

g

RA

MS

Eva

luat

ion

Trai

ning

Saf

e P

lan

of A

ctio

n P

roce

ss

SH

ES

Pla

n B

riefin

g

Intr

oduc

tion

to B

ehav

iour

al S

afet

y (M

anag

ers)

Beh

avio

ural

Saf

ety

Pro

gram

me

Tele

hand

ler

Co-

ordi

nato

r

Nat

iona

l Grid

Req

uire

d Tr

aini

ng

NG

Per

son

BE

SC

Ass

essm

ent

NG

Com

pete

nt P

erso

n

Impr

esse

d V

olta

ge A

war

enes

s C

BT

Impr

esse

d V

olta

ge E

CP

NS

I-8

Ful

l

NS

I-12

Equ

ival

ent

NS

I – 2

4 E

quiv

alen

t

TP

144A

Ass

essm

ent

M M M M M M M M M M M M M M M M M M M M M M M M M M M M MOM FA- - - - - - - - - - - -

M M M M M M M M M M M M MM FA- - - - - - - - - - - -

M M M M M M M M O O O O MM FA- - - - - - - - - - - -

M M M M M M M M O O O O MM FA- - - - - - - - - - - -

M M - M - M M M - - - - OM FAM O O - - - - - M - - -

M M - M - M M M - - - - O- FAM O O - - - - - O - - -

M M M M - M M M - - - - OM FAM O - - - - - - - - - -

M M - M - M - - - - - - -- -- - - - - - - - - - - -

M M - M - M - - - - - - -- -- - - - - - - - - - - -

M M - M - M M - - - - - -O -- - O O - O O O - - - O

M M - M - M M - - - - - -- -- - O - - - - - - - - -

M M - M - M M - - - - - -- -- - O - - - - - - - - -

M M - M - M M - - - - - -- -- - M - - - - - - - - -

M M - M - M M - - - - - -- -- - O M - - - - - - - -

- -

M M M M M M M M M M M M M - - M-- O

- M M M M M M M M M M M M - - O-- O

- M M M M M M M M M M M M M M OO- O

- M M M M M M O M M M M M - - --O O

M M - M - M - - - - - - -- -- - O - - - - M - - - -

M M - M - M - - - - - - -- -- - O - - - M - - - - -

M M - M - M - - - - - - -- -- - O - - - - - - - M -

M M - M - M - - - - - - -- -- - O - - - - - - - M -

M M - M - M - - - - - - -- -- M O - - - - - - M M -

M M - M - M - - - - - - -- -- - O - - - - - M - - M

M M - M - M - - - - - - -- FAM M - - - - - - M - - -

M M - M - M - - - - - - -- -- M OO M O - - - - - -

M M - M - M - - - - - - -- -- M OO O M - - - - - -

M M - M - M - - - - - - -- -- M O- O M - - O - - -

M M - M - M O - - - - - -- -M M -O - - - - - - - -

M M - M - M M - - - - - -O -M O OO - O - - M - - O

M M - M - M M - - - - - -- -- - -O - - - - - O - -

M M - M - M M - - - - - -O -M - -O - - - - M - - O

M M - M - - M - - - - - -O -M - -O - - - - - O - -

- M M M M M M O M M M M M - - --O O

- M M M M M M O M M M O M - - --- O

- M M M - M - - M M M M M - - --- M

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M O M - - --- O

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M M M - - --- M

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- M

- M M M - M - - M M M - M - - --- M

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M M M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M - M - - --- -

- M M M - M - - M M M O M - M -O- O

- M M M - M - - M M M - M - M --- -

- M M M - M - - M M M O M M - --- -

- M M M - M - - M M M - M O - --- -

10

Page 11: Employ Staff-Power-T&D-NR-WEB.compressed

11

Page 12: Employ Staff-Power-T&D-NR-WEB.compressed

Employ Staff impressed meenormously when they provided me with competent, skilled staff

quickly to ensure that our biggest substation project continued.

South West Electricity Alliance