Embassy Suites Hillsboro, OR - OCAPA
Transcript of Embassy Suites Hillsboro, OR - OCAPA
![Page 1: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/1.jpg)
Embassy Suites
Hillsboro, OR
![Page 2: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/2.jpg)
Technical Information Project Completion Date: October 31, 2014 Project Location: Hillsboro, OR Size of Project: The hotel consists of 7 stories with a basement, 165 guest rooms, and 6,411 cubic yards of concrete. Strength Requirements: 4,000 – 6,000 psi Water/Cement Ratios: 0.38 – .047
Embassy Suites – Hillsboro
![Page 3: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/3.jpg)
Embassy Suites – Hillsboro
The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting
Rooms, Exercise Room, and Indoor Pool.
![Page 4: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/4.jpg)
Embassy Suites – Hillsboro
The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting
Rooms, Exercise Room, and Indoor Pool.
![Page 5: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/5.jpg)
Embassy Suites – Hillsboro
The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting
Rooms, Exercise Room, and Indoor Pool.
![Page 6: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/6.jpg)
Embassy Suites – Hillsboro
This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.
![Page 7: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/7.jpg)
Embassy Suites – Hillsboro
This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.
![Page 8: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/8.jpg)
Embassy Suites – Hillsboro
The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs
with longer spans between supporting walls and columns.
![Page 9: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/9.jpg)
Embassy Suites – Hillsboro
The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs
with longer spans between supporting walls and columns.
![Page 10: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/10.jpg)
Embassy Suites – Hillsboro
The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.
![Page 11: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/11.jpg)
Embassy Suites – Hillsboro
The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.
![Page 12: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/12.jpg)
Embassy Suites – Hillsboro
The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.
![Page 13: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/13.jpg)
Embassy Suites – Hillsboro
![Page 14: Embassy Suites Hillsboro, OR - OCAPA](https://reader035.fdocuments.us/reader035/viewer/2022080210/62e7ad6106d244344f15e9d6/html5/thumbnails/14.jpg)
Embassy Suites – Hillsboro