EMAS - Engineered Material Arrestor System (seminar ppt)
-
Upload
chinnu-mohanan -
Category
Engineering
-
view
1.049 -
download
2
Transcript of EMAS - Engineered Material Arrestor System (seminar ppt)
![Page 1: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/1.jpg)
1
![Page 2: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/2.jpg)
1
2
Guided by, Presented by,
Ms. SARITHA JASWANT CHINNU MOHANAN
Asst. Professor Reg No: 11134435
Civil Department S7 Civil
KVM CE & IT KVM CE & IT
![Page 3: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/3.jpg)
CONTENTS3
INTRODUCTION
MATERIAL REQUIREMENTS
MATERIAL COMPOSITION OF ARRESTOR BED
DESIGN CONSIDERATIONS
ARRESTOR BED GEOMETRY
THEORY OF OPERATION
EMAS INSTALLATIONS
SUCCESS RECORDS
CASE STUDIES
ADVANTAGES AND DISADVANTAGES
CONCLUSIONS
REFERENCE
![Page 4: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/4.jpg)
4Aircraft overruns are a frequent occurrence during
landing & takeoff.
It is reported to be the 4th largest cause of airline
fatalities.
Overrun : • Occurs when aircraft passes beyond the end of
runway during aborted takeoff or while landing
• Responsible for 97% runway accidents
• 30% of all aircraft accidents
To minimize the hazards of overruns, FAA put
forward the concept of a safety area beyond the
runway end into airport design standards.
![Page 5: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/5.jpg)
5
Continued…
But construction of RESA becomes impracticable inairports where there is no area available due to naturalobstacles.
EMAS is a crushable concrete that is placed at the end ofrunways in order to stop the failed takeoff or landing of afully loaded airliner.
The EMAS bed is composed of blocks of foamed cementconcrete that are joined and sealed on top.
EMAS has an outstanding success record on all incidentsoccurred in past years.
![Page 6: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/6.jpg)
Continued…
1
6
![Page 7: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/7.jpg)
7
Engineered Material Arrestor System (EMAS)
![Page 8: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/8.jpg)
8
MATERIAL REQUIREMENTS
Water-resistant.
Not attract birds, wildlife or other creatures.
Constant strength and density characteristics.
Resistant to deterioration. (Salts, aircraft fuels, water and UV rays.)
Non sparking and non combustable.
Should not promote any plant growth.
Non flammable.
![Page 9: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/9.jpg)
MATERIAL COMPOSITION
Component Quantity
Cement type II A-LL 42,5 R [kg] 05
Limestone filler [kg] 10
Expanded polystyrene [L] 42
Water [L] 07.90
Air entraining agent [g] 81.75
w∕c ratio 01.58
9
Recommended by the FAA advisory circular (FAA 2005)
![Page 10: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/10.jpg)
DESIGN REQUIREMENTS
Based on:
Weight of the biggest aircraft served by the airport.
Aircraft parameters like type, landing gear configuration and
tyre pressure.
Available runway safety-area space.
10
1. Concept 4. Drainage
2. Location 5. Width
3. Design 6. Base
![Page 11: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/11.jpg)
Concept:
Designed to stop overrunning aircrafts by exerting
predictable deceleration forces on its landing gear as the
EMAS materials deforms.
Must be designed for 20 year service life.
Location:
Located beyond the end of the runway and centered on the
extended runway centerline.
Usually begin at some setback distance from the end of the
runway to avoid damage due to jet blast and undershoots.1
11
![Page 12: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/12.jpg)
Design:
EMAS performance is dependent not only on aircraft
weight, but also on landing gear configuration and tyre
pressure.
Design method must be derived from field or lab tests.
Testing may be based either on passage of an actual
aircraft or an equivalent single wheel load through a test
bed.
Drainage:
The EMAS must be designed to prevent water from
accumulating on the surface of the EMAS bed, the runway
or the runway safety area. 1
12
![Page 13: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/13.jpg)
ARRESTOR-BED GEOMETRY
The arrestor system is constructed above paved material.
The arrestor bed begins with a 229mm thickness.
The bed is sloped to attain a 610mm thickness over a 42.7m
length.
13
A constant thickness of 610 mm for 42.7m.
Bed sloped from 610mm to 762mm over a 7m length.
762mm thickness for remaining portion of the arrestor-bed
length.
![Page 14: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/14.jpg)
Arrester bed geometry14
![Page 15: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/15.jpg)
15
![Page 16: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/16.jpg)
THEORY OF OPERATION
As an aircraft enters the bed, wheel crushes the
EMAS material creating a wheel-tire interface.
This interface provides resistive loads to decelerate
the aircraft.
Drag forces are induced on the landing gear.
As the aircraft transition from the rigid pavement
lead to the arrestor bed, landing gear strut
experiences a vertical force drop at the arrestor bed
start.
16
![Page 17: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/17.jpg)
Landing gear- Arrestor bed interaction.17
![Page 18: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/18.jpg)
1
18
![Page 19: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/19.jpg)
Continued…
The 610mm arrestor-bed section for lighter
weight aircraft.
The 762mm arrestor-bed section for heavier
aircraft.
Maximum drag force developed at 762-mm
arrestor-bed section.
19
![Page 20: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/20.jpg)
Landing gear crushed the EMAS
1
20
![Page 21: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/21.jpg)
21
EMAS INSTALLATIONS
o Installations constructed only by FAA approvedsupplier- ESCO.
o Suited for airports that don’t have adequate space tomeet the required dimensions set forth by FAA.
o 1st in JFK,1996.
o 74 EMAS installed since 1996. (47 U.S. airports)
o 15 EMAS installations remain to be completed during2015-2016.
o Average of 4 installations yearly occurs in U.S.
o After an EMAS arrestment, only the damaged blocksneed to be replaced.
![Page 22: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/22.jpg)
1
22INSTALLATIONS OUTSIDE U.S
In China, Spain, Taiwan
Jiuzhai Huanglong Airport, Sichuan Province,
China
Madrid-Barajas International Airport, Madrid,
Spain
Songshan Airport, Taipei City, Taiwan
![Page 23: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/23.jpg)
1
23
ESCO Projects currently under contract
N0:
![Page 24: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/24.jpg)
Boston Logan International Airport, Boston, USA24
![Page 25: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/25.jpg)
25
![Page 26: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/26.jpg)
1
26
![Page 27: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/27.jpg)
SUCCESS RECORDS27
80 EMAS installed around the world.
Majority in US. (about 74 in 47 airports)
9 aircrafts arrested.
More than 240 people have been protected
from serious injury only due to EMAS.
No negative result is reported yet.
![Page 28: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/28.jpg)
1. John F-Kennedy Airport incident may-30,2003
28CASE STUDIES
![Page 29: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/29.jpg)
McDonnell Douglas MD-11F ,operated by Gemini
Air Cargo.
Due to a late touchdown in normal night visibility , a
runway overrun was resulted.
Only minor damage occurred to the air craft.
All the occupants were uninjured.
29 1. John F-Kennedy Airport incident
May-30, 2003
![Page 30: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/30.jpg)
2. Charleston (CRW) Airport Arrestment30
![Page 31: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/31.jpg)
Bombardier CRJ 200 , operated by PSA
Airlines
High speed rejected take off in normal day
visibility.
None of the 34 occupants were injured.
312. Charleston Airport Arrestment,
19 Jan. 2010
![Page 32: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/32.jpg)
32
3. Teterboro Airport incident on October 1 , 2010
![Page 33: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/33.jpg)
Gulfstream G-IV , operated by Jennifer
Friedberg (General Aviation Flying Service)
Due to a deep landing in normal day
visibility, aircraft overran the end of the
runway at a high speed.
None of the occupants were injured.
333. Teterboro Airport incident on Oct 1, 2010
![Page 34: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/34.jpg)
1
34
![Page 35: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/35.jpg)
ADVANTAGES
The EMAS material is non-threatening to
Aircraft engines
Avoid foreign-object damage (FOD)
Non-combustible
Highly energy absorbent
Has predictable load-deflection behaviour
Avoids over cost
Avoids environmental issues
Enhance airport and aircraft safety
35
![Page 36: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/36.jpg)
DISADVANTAGES
The main disadvantage of the EMAS is its
less durability.
Has only 20 year service life with a
maintenance after every 10 year.
36
![Page 37: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/37.jpg)
DEVELOPMENTS IN EMAS
Lot of researches are carried out in account of the
improvement, cost reduction, durability..
“EMASMAX” is the third generation upgrade of
the EMAS .
37
![Page 38: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/38.jpg)
38
EMASMAX arrestor beds are composed of blocks of
light weight, crushable cellular cement material.
Easy and quick to install.
Improved durability and less cost.
Maximizes the runway safety.
EMASMAX
![Page 39: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/39.jpg)
CONCLUSIONS
The issues of risk of safety related to the available RESA inairports can be solved by EMAS.
Ideal solution for the aircraft overrun problem is the FAAapproved Engineered Material Arresting System (EMAS).
EMAS is highly economic while considering the life cost and aircraft cost.
Research should be conducted to improve the service life of EMAS.
EMAS should be installed in more airports to avoid the overrun and RESA issues.
39
![Page 40: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/40.jpg)
REFERENCE
Wail N. Al-Rifaie , Nabeel I. Al-Sarraj, Salama G. Sulaiman,
‘‘Development of an Engineered Material Arresting System to
Protect Overrun Aircraft” , September 4, 2014.
Matthew A. Barsotti, John Mark Howard Puryear, David J.
Stevens ,“Developing Improved Civil Aircraft Arresting
Systems” , ACRP report 29, 2013.
Ernest Heymsfield, W. Micah Hale, Tyler L. Halsey, “Aircraft
Response in an Airfield Arrestor System during an Overrun”
ASCE library, 15 March 2012.
E. Heymsfield, W. M. Hale and T. L. Halsey, “Optimizing Low
Density Concrete Behaviour for Soft Ground Arrestor
Systems”, 2012.
40
![Page 41: EMAS - Engineered Material Arrestor System (seminar ppt)](https://reader034.fdocuments.us/reader034/viewer/2022050614/587d59851a28abee158b6559/html5/thumbnails/41.jpg)
1
41 Continued..
Chun- shui JIANG, Hong- yu YAO, Xian- bo
XIAO1, Xiang- jun KONG, Ya- jie SHI ,
“Phenomena of Foamed Concrete under Rolling of
Aircraft Wheels”, Science Tech 2014.
Marco Bassani, Emanuele Sacchi and Fulvio
Canonico, “ Performance Prediction for Innovative
Crushable Material Used in Aircraft ArrestorBeds” ,
2011.
Ernest Heymsfield, “Sensitivity Analysis of
Engineered Material Arrestor Systems to Aircraft
and Arrestor Material Characteristics”, 2014.