ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.
• Bank erosion is threatening a farm road• NRCS –Environmental Quality Incentives Program
{EQIP} cost share with landowner • Rural (farmland)• Bed material: gravel-cobble-sand, incised• Pool-riffle-pool regime, slope around 1%• Average width 20-30 ft, 10-14 ft tall banks• Partially spring fed.• High-quality trout stream, not stocked, natural
reproduction of Rainbow, Brown, & upstream, Brook Trout
![Page 2: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/2.jpg)
LPSTP WITH LIVE
SILTATION & LIVING DIKES
PERPENDICULAR TO FLOW
![Page 3: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/3.jpg)
LIVE SILTATION
{Willow branches about 1-2 inches in diameter, 6 to 8 ft long, 2/3 in ground, 1/3 out, intermixed with
Silky & Red osier Dogwood that is 4 to 6 ft long}
![Page 4: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/4.jpg)
Drawing by Robert Shenk, Catt County Soil & Water
THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE
FLOW
THE PLAN THE AREA OF
INTEREST
![Page 5: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/5.jpg)
Looking DS @ veg in LPSTP with backfilled bank.
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 6: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/6.jpg)
Looking DS. Dug trench landward of LPSTP.
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 7: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/7.jpg)
Elton Creek near Freedom 7 Bridge, Freedom, NY
Install Live Siltation
![Page 8: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/8.jpg)
Looking DS at installed Live Siltation (willow & dogwood).
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 9: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/9.jpg)
Live Siltation providing mid & upper bank protection
8 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-derrick-JUNE 13, 2008
![Page 10: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/10.jpg)
TRANSPLANTING A LARGE CLUMP OF
WILLOW TO USE AS A LIVING DIKE
Multi-stem (20 to 40 stems) bushes approx. 14 to 24 ft tall, transplanted as a single
clump, with roots in trench directly behind the LPSTP. Tops of branches were trimmed
& used as Live Poles (6 to 10 ft long).
![Page 11: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/11.jpg)
Drawing by Robert Shenk, Catt County Soil & Water
THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE
LIVING DIKE WILLOW BUSH
TRANSPLANTATIONFLOW
LIVE SILTATION
LPSTP
![Page 12: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/12.jpg)
Elton Creek near Freedom 7 Bridge, Freedom, NY
Dig trenches to
receive willow bushes
![Page 13: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/13.jpg)
Looking DS at LPSTP, backfilled bank, & dug trench.
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 14: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/14.jpg)
Elton Creek near Freedom 7 Bridge, Freedom, NY
Transplant large multi-stem Willow Bushes
![Page 15: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/15.jpg)
Looking DS. Transplanting willow bush in trench
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 16: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/16.jpg)
Elton Creek near Freedom 7 Bridge, Freedom, NY
Then trim long branches from bush & plant as
Willow Poles
![Page 17: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/17.jpg)
Looking DS. Trim willow & plant poles in trench.
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 18: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/18.jpg)
Looking DS. Transplant complete.
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
![Page 19: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/19.jpg)
Veg planted on a grid, Live Siltation in front & transplants
Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007
Live Siltation
Willow shrub
transplants &
willow poles
![Page 20: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/20.jpg)
Jumping ahead,1 growing season & 2 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation & two large willow bush transplants that
took 45 minutes to install.
19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009
Live Siltation
LPSTP, Live Siltation, & Living Dikes
Living Dike
Living Dike
![Page 21: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/21.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation & two large willow bush
transplants that took 45 minutes to install. Veg is very robust.
![Page 22: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/22.jpg)
32 MONTHS AFTER PROJECT
COMPLETIONPhotos by Derrick JUNE 15, 2010
FROM THE CHANNEL, WALKING US TO DS
![Page 23: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/23.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. From top bank looking DS. Stream & all stone is hidden by dense veg.
![Page 24: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/24.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Looking DS @ the apex of the bend. Live Siltation & transplanted willows & dogwood growing well. Nice deep pool to dissipate energy.
![Page 25: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/25.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Close-up of stacked stone wall with Live Siltation behind & some planted willow & dogwood growing through the stone wall.
![Page 26: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/26.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Looking DS @ good aquatic habitat by stone (deep-shallow-slow-fast-structure-overhanging veg).
![Page 27: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/27.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Looking @ the kicker @ the DS end of the deep pool. Note thalweg & willow growth.
![Page 28: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/28.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Looking DS @ kicker & robust veg planted on a grid pattern.
![Page 29: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/29.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Close-up of willow growth behind the LPSTP.
![Page 30: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56814e91550346895dbc3bcc/html5/thumbnails/30.jpg)
32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010
2 years & 8 months after completion. Looking @ amazing willow growth in the DS key. Willow was planted up to 14 ft above base
flow water surface elevation, but was planted 4 ft deep & has grown exceptionally well over the last 2+ years.