1
Case Study: Sealed Air Burn Hours: 8,568 hours p/ year Sector: Packaging Location: Cambridgeshire, UK Building Type: Factory Size of Property: 200,000 ft2 Average Net Savings per annum £31,600 Average Net % Savings per annum 27% Carbon Reduction over 5 years 1,621 tCO2 Client Capital Outlay £0 Unlocking £158,202 over 5 years BEFORE AFTER BEFORE AFTER Lux Levels: 21-621 lux Lux Levels: 150-1000 lux kWh Usage: 1,060,000 kWh Usage: 332,700 kWh Savings: 69% Annual Lighting Costs: £108,200 Annual Lighting Costs: £26,700
Transcript of eLight Case Study Sealed Air - eLight Group · Case Study: Sealed Air Burn Hours: 8,568 hours p/...
Case Study: Sealed Air
Burn Hours: 8,568 hours p/ year
Sector: Packaging
Location: Cambridgeshire, UK
Building Type: Factory
Size of Property: 200,000 ft2
Average Net Savings
per annum£31,600
Average Net % Savings
per annum27%
Carbon Reduction over 5 years
1,621 tCO2
Client Capital Outlay
£0
Unlocking £158,202 over 5 years
BEFORE AFTER
BEFORE AFTERLux Levels: 21-621 lux Lux Levels: 150-1000 lux
kWh Usage: 1,060,000 kWh Usage: 332,700
kWh Savings: 69%
Annual Lighting Costs: £108,200 Annual Lighting Costs: £26,700