ELEVATION STAFF COURTYARD - NORTH 1:250 @A1

1
_1 PROJECT: DRAWING TITLE: ARCHITECTS PROJECT NUMBER: ISSUE: SCALE: CHECKED: DRAWING NUMBER: DA 1502 KEY PLAN CLIENT NORTH POINT PROJECT MANAGER DESCRIPTION OF CHANGE DATE REV DRAWN CHECK P: 02 9978 5402 F: 02 8904 1377 W:www.hinfra.health.nsw.gov.au 77 PACIFIC HIGHWAY NORTH SYDNEY NSW 2060 P: 02 9955 2300 F: 02 9955 5574 W:www.capitalinsight.com.au 77 BERRY STREET NORTH SYDNEY NSW 2060 CAPITAL INSIGHT CONSULTANT P: 02 9928 2330 W: www.skmconsulting.com 100 CHRISTIE STREET ST LEONARDS NSW 2065 SINCLAIR KNIGHT MERZ QUANTITY SURVEYOR P: 02 9956 8822 W: www.davislangdon.com/ANZ/ L5 100 PACIFIC HIGHWAY NORTH SYDNEY NSW 2060 GA ELEVATIONS ELEVATIONS - SHEET 02 PHASE 1 CONTRACTORS P: 02 9770 7600 F: 02 9770 7601 W:www.capitalinsight.com.au LEVEL6, 15 BOURKE RD MASCOT NSW 2060 teamwork://rdbim01/10509 MASTER Wagga Wagga A4 A1 A2 A3 A4 WAGGA WAGGA BASE REDEVELOPMENT STAGES 1A, 1B & 2A EDWARD STREET WAGGA WAGGA, NSW, 2650 110 WALKER STREET | NORTH SYDNEY 2060 T: 02 9956 2666 | F: 02 9959 3015 [email protected] | www.ricedaubney.com.au the rice daubney group (nsw) pty ltd - abn: 77 001 350 769 rice daubney trading trust - abn: 56 880 304 993 ANALYSING CREATING AND IMPLEMENTING ARCHITECTURE 10509 AS SHOWN THIS DOCUMENT IS THE COPYRIGHT OF RICE DAUBNEY (NSW) Pty. Ltd. ALL INFORMATION ILLUSTRATED ON THIS DOCUMENT IS TO BE CHECKED AND VERIFIED ON SITE. IN THE EVENT OF DISCREPANCIES REFER TO ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK. DO NOT SCALE DRAWINGS MANUALLY OR ELECTRONICALLY. A1 A KS JS 29.08.11 ISSUED FOR PART 3A PROJECT APPLICATION PHASE 1 LEGEND A BRICKWORK COLOUR: RED B CFC CLADDING COLOUR: WHITE C CFC CLADDING COLOUR: DARK GREY F ALUMINIUM PERFORATED SUNSCREENS POWDER COATED COLOUR: TBC 40% TO 50% PERFORATIONS WITH ˘7 MM G ANODISED ALUMINIUM AIRFOIL LOUVRES COLOUR: SPANISH SILVER H METAL LOUVRES POWDER COATED COLOUR: GUN METAL GREY I FRITTED GLAZING TO BALCONIES K SHOPFRONT GLAZING WITH SHADOW BOX HEAD PANEL POWDER COATED ALUMINIUM FRAME L GLAZED DOORS WITH CFC HEAD PANEL POWDER COATED ALUMINIUM FRAME M SHOPFRONT GLAZING WITH CFC HEAD PANEL ALLOW 20% OF PANELS TO BE IN TRANSLUCENT GLASS POWDER COATED ALUMINIUM FRAME R SOLID FENCING COLOUR : WHITE S MESH FENCING COLOUR : TBC T METAL ROOFING IN KLIP-LOCK 700 COLOUR : WINDSPRAY U GLAZED HIGH LEVEL WINDOWS POWDER COATED ALUMINIUM FRAME V GLASS BALUSTRADE WITH S/S HANDRAIL AND STAUNCHION Y SINGLE PLY MEMBRANE ROOF COLOUR : TBC Z SILL PANEL COLOUR : TO MATCH HEAD PANEL Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 RL 192.735 RL 192.970 RL 191.150 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 40 RL 186.750 191.075 FFL 187.370 FFL 183.545 FFL 191.885 MHU GROUND MHU LEVEL 01 PLANT LEVEL 02 YATHONG ST PROPOSED MENTAL HEALTH UNIT EXISTING WARD BLOCK RL 191.535 196.460 197.835 RL 192.915 PHASE 2 (FUTURE APPLICATION) PHASE 2 (FUTURE APPLICATION) BEYOND T B R M B F F A B C R K S I B R A K C K I I A C Y6 Y5 Y4 Y3 Y2 RL 193.860 RL 192.735 8 400 8 400 8 400 8 400 196.460 FFL 187.370 FFL 183.545 FFL 191.885 B T M M G A U MHU GROUND MHU LEVEL 01 PLANT LEVEL 02 PLANT STAFF ROOM ADL STAFF COURTYARD VIEWING COURTYARD SECURE COURTYARD A M Z B Y2 Y3 Y4 Y5 Y6 RL 193.120 RL188.705 8 400 8 400 8 400 8 400 FFL 187.370 FFL 183.545 C A M T G MHU GROUND MHU LEVEL 01 STAFF ROOM LOUNGE / DINING / ACTIVITIES ROOM STAFF COURTYARD VIEWING COURTYARD SECURE COURTYARD SECURE COURTYARD X19 X20 X21 X22 RL 183.175 8 400 8 400 8 400 RL192.400 FFL 187.370 FFL 183.545 C T A Z M MHU GROUND MHU LEVEL 01 STAFF COURTYARD RL 186.820 L1 MH COURTYARD M M R X22 X21 X20 X19 RL 192.970 8 400 8 400 8 400 RL 197.835 FFL 187.370 FFL 183.545 B A A F M U M T H Z MHU GROUND MHU LEVEL 01 STAFF COURTYARD L1 MH COURTYARD T Y11 Y10 Y9 Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 RL 192.915 RL182.525 RL183.595 RL193.120 RL 186.820 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 RL 191.035 197.835 196.460 192.735 193.860 FFL 187.370 FFL 183.545 FFL 191.885 LINK LINK MHU GROUND MHU LEVEL 01 PLANT LEVEL 02 PROPOSED MENTAL HEALTH UNIT MH LINK PROPOSED MENTAL HEALTH UNIT SECURE DROP-OFF RL 192.035 M A K B G B M C T A H M B A M T U U H T T A Z M ELEVATION EAST (MHU) 1:250 @A1 1 ELEVATION SECURE COURTYARD WEST 1:250 @A1 6 ELEVATION SECURE COURTYARD EAST 1:250 @A1 5 ELEVATION STAFF COURTYARD - SOUTH 1:250 @A1 4 ELEVATION STAFF COURTYARD - NORTH 1:250 @A1 3 ELEVATION MHU - WEST 1:250 @A1 2 NOTE: ALL SITE LEVELS SUBJECT TO DETAIL SURVEY JS A

Transcript of ELEVATION STAFF COURTYARD - NORTH 1:250 @A1

Page 1: ELEVATION STAFF COURTYARD - NORTH 1:250 @A1

_1

PROJECT:

DRAWING TITLE:

ARCHITECTS

PROJECT NUMBER: ISSUE:

SCALE: CHECKED:

DRAWING NUMBER:

DA 1502

KEY PLAN

CLIENT

NORTH POINT

PROJECT MANAGER

DESCRIPTION OF CHANGE DATEREV DRAWN CHECK

P: 02 9978 5402F: 02 8904 1377W:www.hinfra.health.nsw.gov.au

77 PACIFIC HIGHWAYNORTH SYDNEYNSW 2060

P: 02 9955 2300F: 02 9955 5574W:www.capitalinsight.com.au

77 BERRY STREETNORTH SYDNEYNSW 2060

CAPITAL INSIGHT

CONSULTANT

P: 02 9928 2330W: www.skmconsulting.com

100 CHRISTIE STREETST LEONARDSNSW 2065

SINCLAIRKNIGHT MERZ

QUANTITY SURVEYOR

P: 02 9956 8822W: www.davislangdon.com/ANZ/

L5 100 PACIFIC HIGHWAYNORTH SYDNEYNSW 2060

GA ELEVATIONSELEVATIONS - SHEET 02

PHASE 1

CONTRACTORS

P: 02 9770 7600F: 02 9770 7601W:www.capitalinsight.com.au

LEVEL6, 15 BOURKE RDMASCOTNSW 2060

teamwork://rdbim01/10509 MASTER Wagga WaggaA4A1 A2 A3

A4

WAGGA WAGGA BASE REDEVELOPMENTSTAGES 1A, 1B & 2AEDWARD STREETWAGGA WAGGA, NSW, 2650

110 WALKER STREET | NORTH SYDNEY 2060T: 02 9956 2666 | F: 02 9959 [email protected] | www.ricedaubney.com.au

the rice daubney group (nsw) pty ltd - abn: 77 001 350 769rice daubney trading trust - abn: 56 880 304 993

ANALYSING CREATING ANDIMPLEMENTING ARCHITECTURE

10509

AS SHOWN

THIS DOCUMENT IS THE COPYRIGHT OF RICE DAUBNEY (NSW) Pty. Ltd.ALL INFORMATION ILLUSTRATED ON THIS DOCUMENT IS TO BE CHECKED AND VERIFIED ON SITE.IN THE EVENT OF DISCREPANCIES REFER TO ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.DO NOT SCALE DRAWINGS MANUALLY OR ELECTRONICALLY.

A1

A KS JS 29.08.11ISSUED FOR PART 3APROJECT APPLICATION PHASE 1

AMENDEDLEGEND

A BRICKWORK COLOUR: RED

B CFC CLADDING COLOUR: WHITE

C CFC CLADDING COLOUR: DARK GREY

F ALUMINIUM PERFORATED SUNSCREENS POWDER COATED COLOUR: TBC 40% TO 50% PERFORATIONS WITH Æ7 MM G ANODISED ALUMINIUM AIRFOIL LOUVRES COLOUR: SPANISH SILVER

H METAL LOUVRES POWDER COATED COLOUR: GUN METAL GREY

I FRITTED GLAZING TO BALCONIES

K SHOPFRONT GLAZING WITH SHADOW BOX HEAD PANEL POWDER COATED ALUMINIUM FRAME

L GLAZED DOORS WITH CFC HEAD PANEL POWDER COATED ALUMINIUM FRAME

M SHOPFRONT GLAZING WITH CFC HEAD PANEL ALLOW 20% OF PANELS TO BE IN TRANSLUCENT GLASS POWDER COATED ALUMINIUM FRAME

R SOLID FENCING COLOUR : WHITE

S MESH FENCING COLOUR : TBC T METAL ROOFING IN KLIP-LOCK 700 COLOUR : WINDSPRAY

U GLAZED HIGH LEVEL WINDOWS POWDER COATED ALUMINIUM FRAME

V GLASS BALUSTRADE WITH S/S HANDRAIL AND STAUNCHION

Y SINGLE PLY MEMBRANE ROOF COLOUR : TBC

Z SILL PANEL COLOUR : TO MATCH HEAD PANEL

AMENDED 30.09.11

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18

RL 192.735 RL 192.970

RL 191.150

8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400

RL 186.750

191.075

FFL 187.370

FFL 183.545

FFL 191.885

MHU GROUND

MHU LEVEL 01

PLANT LEVEL 02

YATHONG ST PROPOSED MENTAL HEALTH UNIT EXISTING WARD BLOCK

RL 191.535

196.460

197.835

RL 192.915

PHASE 2(FUTURE APPLICATION)

PHASE 2 (FUTURE APPLICATION) BEYOND

T

B

RMB F F A B C RK S I B R AKC KII A

C

Y6 Y5 Y4 Y3 Y2

RL 193.860

RL 192.735

8 400 8 400 8 400 8 400

196.460

FFL 187.370

FFL 183.545

FFL 191.885

B

T

M

MG A

U

MHU GROUND

MHU LEVEL 01

PLANT LEVEL 02 PLANT

STAFF ROOM

ADL

STAFFCOURTYARD

VIEWING COURTYARD

SECURECOURTYARD

A

M ZB

Y2 Y3 Y4 Y5 Y6

RL 193.120

RL188.705

8 400 8 400 8 400 8 400

FFL 187.370

FFL 183.545

C A M T G

MHU GROUND

MHU LEVEL 01 STAFF ROOM

LOUNGE / DINING /ACTIVITIES ROOM

STAFFCOURTYARD

VIEWINGCOURTYARD

SECURE COURTYARDSECURECOURTYARD

X19 X20 X21 X22

RL 183.175

8 400 8 400 8 400

RL192.400

FFL 187.370

FFL 183.545

C

T

AZ M

MHU GROUND

MHU LEVEL 01

STAFF COURTYARD

RL 186.820

L1 MHCOURTYARD

M

M

R

X22 X21 X20 X19

RL 192.970

8 400 8 400 8 400

RL 197.835

FFL 187.370

FFL 183.545

BA AF

M

U

M

T

H

Z

MHU GROUND

MHU LEVEL 01

STAFF COURTYARD

L1 MHCOURTYARD

T

Y11 Y10 Y9 Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1

RL 192.915

RL182.525 RL183.595

RL193.120

RL 186.820

8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400

RL 191.035

197.835

196.460

192.735193.860

FFL 187.370

FFL 183.545

FFL 191.885

LINK

LINK

MHU GROUND

MHU LEVEL 01

PLANT LEVEL 02

PROPOSED MENTAL HEALTH UNIT MH LINK PROPOSED MENTAL HEALTH UNIT SECURE DROP-OFF

RL 192.035

M AK B G B M

C T

A H M BA M

T

U

U

H

T

T

AZ M

ELEVATIONEAST (MHU) 1:250 @A1

1

ELEVATIONSECURE COURTYARD WEST 1:250 @A1

6ELEVATIONSECURE COURTYARD EAST 1:250 @A1

5ELEVATIONSTAFF COURTYARD - SOUTH 1:250 @A1

4

ELEVATIONSTAFF COURTYARD - NORTH 1:250 @A1

3ELEVATIONMHU - WEST 1:250 @A1

2

NOTE: ALL SITE LEVELS SUBJECT TO DETAIL SURVEY

JS

A