• Board approval in 2006• Funding

2002 Bond 2005 Bond

• Location Camino A Lago Meadows

Page 3: Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.

Opening Date – 2014 versus 2015• 2014 Opening Considerations

Construction costs Committee support Enrollment stabilization

• Challenges Alternate location Budgeting considerations New Request For Proposal (RFP) requirements

for Construction Manager (CM) at Risk Compressed timeline

Page 4: Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.

Opening Date – 2014 versus 2015• 2015 Opening Considerations

More time for review and development of school design

More time to ready fixtures and furnishings upon completion

• Challenges More than one move for some

students

Page 5: Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.

Design Options

• Proceed with 2008 design• Review prototypes from approved

architects• Design committee to work with architect

to develop site plans and make recommendations to Board