Electricity Tariff (2000-2011)
-
Upload
jatin-sarvaiya -
Category
Documents
-
view
100 -
download
1
Transcript of Electricity Tariff (2000-2011)
Electricity Tariffs Singapore 2004 - 2011Trends Low Tension Non-Residential Jan 2004 2005 2006 2007 2008 2009 2010 2011 15.44 16.73 21.02 20.02 22.62 22.93 22.87 24.1 Apr 15.8 16.06 20.49 18.88 23.88 18.03 23.56 25.58 Jul 16.35 18.26 21.15 20.52 25.07 19.28 19.28 27.28 Oct 16.53 19.57 21.64 21.38 30.45 21.69 23.34 26.9835 30 25 20 15 10 5 0 2004 2005 2006
/kWh
Jan Apr Jul Oct
2006
2007 Year
2008
2009
2010
2011
Electricity Tariff (2000) Tariff Category Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge High Tension Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Extra High Tension Charge Peak period Off-peak period Reactive power charge Low Tension
Feb-0015.49 15.49 9.01 13.51 11.10 8.81 0.72 6.97 10.45 10.39 8.37 0.47
May-0015.93 15.93 9.01 13.51 11.55 9.18 0.72 6.97 10.45 10.84 8.74 0.47
Aug-0018.46 18.46 9.01 13.51 14.75 11.84 0.72 6.97 10.45 14.02 11.40 0.47
Electricity Tariff (2001) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Feb-01 May-0119.87 19.87 9.01 13.51 14.58 11.69 0.72 6.97 10.45 13.90 11.30 0.47 17.21 17.21 9.01 13.51 12.93 10.30 0.72 6.97 10.45 12.18 9.88 0.47
Nov-0116.46 16.46 9.01 13.51 12.50 9.95 0.72 6.97 10.45 11.99 9.72 0.47
High Tension
Extra High Tension
Electricity Tariff (2002) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-02 Jul-02 Oct-0215.02 15.02 9.01 13.51 11.33 7.04 0.72 6.97 10.45 10.51 6.59 0.47 16.01 16.01 9.01 13.51 12.44 7.66 0.72 6.97 10.45 11.62 7.21 0.47 16.51 16.51 9.01 13.51 12.98 8.07 0.72 6.97 10.45 12.15 7.62 0.47
High Tension
Extra High Tension
Electricity Tariff (2003) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0315.24 15.24 8.57 12.86 11.96 6.47 0.71 7.94 11.91 10.85 6.34 0.56
Apr-0317.81 17.81 7.33 10.99 14.64 8.89 0.61 7.02 10.53 13.68 8.77 0.50
May-0315.85 15.85 7.33 10.99 12.62 7.16 0.61 7.02 10.53 11.67 7.04 0.50
Jul-0316.56 16.56 7.33 10.99 13.36 7.76 0.61 7.02 10.53 12.40 7.64 0.50
Oct-0315.81 15.81 7.33 10.99 12.60 7.02 0.61 7.02 10.53 11.64 6.90 0.50
High Tension
Extra High Tension
Nov-0315.27 15.27 7.33 10.99 12.08 6.43 0.61 7.02 10.53 11.12 6.31 0.50
Electricity Tariff (2004) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0415.44 15.44 7.33 10.99 12.20 6.76 0.61 7.02 10.53 11.25 6.64 0.50
Apr-0415.80 15.80 7.33 10.99 12.57 7.04 0.61 7.02 10.53 11.62 6.92 0.50
Jul-0416.35 16.35 7.04 10.56 13.11 7.70 0.59 6.74 10.11 12.21 7.60 0.48
Oct-0416.53 16.53 7.04 10.56 13.34 7.67 0.59 6.74 10.11 12.44 7.57 0.48
High Tension
Extra High Tension
Electricity Tariff (2005) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0516.73 16.73
Apr-0516.06 16.06
Jul-0518.26 18.26 7.04 10.56 15.27 8.91 0.59
Oct-0519.57 19.57 7.04 10.56 16.68 9.83 0.59 7.04 10.56 16.62 9.82 0.59 6.74 10.11 15.69 9.73 0.48
High Tension (Small) 1700KWh
Extra High Tension
Electricity Tariff (2006) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0621.02 21.02 7.04 10.56 18.26 10.86 0.59 7.04 10.56 18.2 10.85 0.59 6.74 10.11 17.26 10.76 0.48
Apr-0620.49 20.49 7.04 10.56 17.76 10.45 0.59 7.04 10.56 17.64 10.44 0.59 6.74 10.11 16.70 10.35 0.48
Jul-0621.15 21.15 7.04 10.56 18.82 11.13 0.59 7.04 10.56 18.7 11.12 0.59 6.74 10.11 17.6 10.94 0.48
Oct-0621.64 21.64 7.04 10.56 19.35 11.51 0.59 7.04 10.56 19.23 11.50 0.59 6.74 10.11 18.13 11.32 0.48
High Tension (Small) 1700KWh
Extra High Tension
Electricity Tariff (2007) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0720.02 20.02 7.04 10.56 17.53 10.39 0.59 7.04 10.56 17.41 10.38 0.59 6.74 10.11 16.34 10.20 0.48
Apr-0718.88 18.88 7.04 10.56 16.34 9.62 0.59 7.04 10.56 16.19 9.61 0.59 6.74 10.11 15.07 9.44 0.48
Jul-0720.52 20.52 7.04 10.56 18.06 10.74 0.59 7.04 10.56 17.91 10.73 0.59 6.74 10.11 16.78 10.57 0.48
Oct-0721.38 21.38 7.04 10.56 19.03 11.30 0.59 7.04 10.56 18.88 11.29 0.59 6.74 10.11 17.73 11.12 0.48
High Tension (Small) 1700KWh
Extra High Tension
Electricity Tariff (2008) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0822.62 22.62 7.04 10.56 20.40 12.17 0.59 7.04 10.56 20.25 12.16 0.59 6.74 10.11 19.08 11.99 0.48
Apr-0823.88 23.88 7.04 10.56 21.81 13.00 0.59 7.04 10.56 21.66 12.99 0.59 6.74 10.11 20.46 12.81 0.48
Jul-0825.07 25.07 7.04 10.56 22.96 13.81 0.59 7.04 10.56 22.81 13.80 0.59 6.74 10.11 21.64 13.64 0.48
Oct-0830.45 30.45 6.96 10.44 29.08 17.77 0.59 6.96 10.44 28.93 17.76 0.59 6.52 9.78 27.83 17.58 0.48
High Tension (Small) 1700KWh
Extra High Tension
Electricity Tariff (2009) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-0922.93 22.93 6.96 10.44 20.80 12.62 0.59 6.96 10.44 20.65 12.61 0.59 6.52 9.78 19.67 12.45 0.48
Apr-0918.03 18.03 6.96 10.44 15.46 9.08 0.59 6.96 10.44 15.31 9.07 0.59 6.52 9.78 14.39 8.93 0.48
Jul-0919.28 19.28 6.96 10.44 16.99 9.83 0.59 6.96 10.44 16.84 9.82 0.59 6.52 9.78 15.94 9.70 0.48
Oct-0921.69 21.69 6.96 10.44 19.65 11.48 0.59 6.96 10.44 19.50 11.47 0.59 6.52 9.78 18.58 11.36 0.48
High Tension (Small) 1700KWh
Extra High Tension
Rates are not inclusive of GST.
Electricity Tariff (2010) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-1022.87 22.87 6.96 10.44 20.91 12.45 0.59 6.96 10.44 20.76 12.44 0.59 6.52 9.78 19.83 12.32 0.48
Apr-1023.56 23.56 6.96 10.44 21.50 12.95 0.59 6.96 10.44 21.35 12.94 0.59 6.52 9.78 20.34 12.78 0.48
Jul-1024.13 24.13 6.96 10.44 22.10 13.40 0.59 6.96 10.44 21.95 13.39 0.59 6.52 9.78 20.94 13.23 0.48
Oct-1023.34 23.34 6.96 10.44 21.18 13.01 0.59 6.96 10.44 21.03 13.00 0.59 6.52 9.78 20.04 12.84 0.48
High Tension (Small) 1700KWh
Extra High Tension
Rates are not inclusive of GST.
Electricity Tariff (2011) Tariff CategoryLow Tension
Usage ChargeResidential Non-residential Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge Contracted Capacity Charge Uncontracted Capacity Charge Peak period Off-peak period Reactive power charge
Jan-1124.10 24.10 6.96 10.44 22.02 13.53 0.59 6.96 10.44 21.87 13.52 0.59 6.52 9.78 20.87 13.36 0.48
Apr-1125.58 25.58 6.96 10.44 24.10 14.78 0.59 6.96 10.44 23.88 14.77 0.59 6.52 9.78 22.98 14.69 0.48
Jul-1127.28 27.28 6.96 10.44 25.99 15.96 0.59 6.96 10.44 25.77 15.95 0.59 6.52 9.78 24.85 15.87 0.48
Oct-1126.98 26.98 6.96 10.44 25.64 15.79 0.59 6.96 10.44 25.42 15.78 0.59 6.52 9.78 24.50 15.70 0.48
High Tension (Small) 1700KWh
Extra High Tension
Rates are not inclusive of GST.