1 BROOKHAVEN SCIENCE ASSOCIATES
Electrical Procurements
Thomas C. Nehring, PELead Electrical Engineer
Conventional Facilities Advisory Committee - Review March 10-11, 2009
![Page 2: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/2.jpg)
2 BROOKHAVEN SCIENCE ASSOCIATES
Outline
• Substation Expansion• 69 kV to 13.8 kV Substations Expansion• Pre-Purchased Equipment• Estimated Costs• Construction/Procurement Schedule• Construction Package Management/Oversight
• Secondary Unit Substations – for Ring Building Contract• Pre-Purchased Equipment• Estimated Cost• Procurement Schedule
• Concerns
![Page 3: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/3.jpg)
3 BROOKHAVEN SCIENCE ASSOCIATES
69 -13.8 kV Substation Expansion
• Scope• Modify 69 kV Yard and Tower @ B 603• Add 69 kV Breaker• Install 20 MVA Transformer and oil retention pit• Install 15 kV Switchgear and bus duct• Install new ductbank to vicinity of NSLS-2 Site
![Page 4: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/4.jpg)
4 BROOKHAVEN SCIENCE ASSOCIATES
Overall Electrical Utility Plan
Substation expansion and new ductbank
![Page 5: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/5.jpg)
5 BROOKHAVEN SCIENCE ASSOCIATES
Pre-Purchased Equipment
• Pre-Purchased Equipment• 69 kV Breaker• 20 MVA Transformer• 15 kV Switchgear
![Page 6: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/6.jpg)
6 BROOKHAVEN SCIENCE ASSOCIATES
Estimated Costs
• Estimated Costs• $1,975K Construction Contract• $80K 69 kV Breaker• $1,200K 20 MVA Transformer• $445K 15 kV Switchgear
![Page 7: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/7.jpg)
7 BROOKHAVEN SCIENCE ASSOCIATES
Construction/Procurement Schedule
• Construction Package Schedule Baseline CWE• Bid Package available 3/20/09 3/23/09
• Bid Solicitation 4/14/09 4/13/09
• Bids Returned 5/6/09 4/28/09
• Contract Award 6/17/09 5/29/09
• Notice to Proceed (Construction Start) 6/24/09 6/17/09
• Construction Complete 4/14/11 4/14/11
![Page 8: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/8.jpg)
8 BROOKHAVEN SCIENCE ASSOCIATES
Construction/Procurement Schedule
![Page 9: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/9.jpg)
9 BROOKHAVEN SCIENCE ASSOCIATES
Construction Package Management/Oversight
• Design• Design by HDR• Design review by NSLS-II
• Procurement• Bid solicitation by NSLS-II Procurement & Property Management
Group (PPM)• Review by NSLS-II Conventional Facilities (CF)
• Construction• Construction management/oversight by NSLS-II CF
![Page 10: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/10.jpg)
10 BROOKHAVEN SCIENCE ASSOCIATES
Pre-Purchased Equipment for Ring Bldg
• Secondary Unit Substations (SUS) • 8 SUS’s that include:
• 15 kV Switching• 15 kV Circuit Breaker• 2.5 MVA Transformer• 480 Outdoor Switchgear• 480 Indoor Switchgear
![Page 11: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/11.jpg)
11 BROOKHAVEN SCIENCE ASSOCIATES
Site Plan
Substations
![Page 12: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/12.jpg)
12 BROOKHAVEN SCIENCE ASSOCIATES
Construction/Procurement Schedule
![Page 13: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/13.jpg)
13 BROOKHAVEN SCIENCE ASSOCIATES
Concerns
• Storage of indoor pre-purchased equipment• To be received around the time it can be installed• Indoor Storage Space is available in C-AD complex if needed
• Work in 69 kV yard• Needs to be coordinated around the Lab’s operating schedule• Needs to be coordinated around LIPA’s summer demands• Need to be able to de-energize a portion of the 69 kV bus• Construction scheduled extended to incorporate two summer/fall
periods to allow ample time for shutdowns and coordination with site operating schedules
![Page 14: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/14.jpg)
14 BROOKHAVEN SCIENCE ASSOCIATES
69 kV Gas Insulated Circuit Breaker
![Page 15: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/15.jpg)
15 BROOKHAVEN SCIENCE ASSOCIATES
20 MVA Main Transformer
![Page 16: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/16.jpg)
16 BROOKHAVEN SCIENCE ASSOCIATES
15 kV Switchgear
![Page 17: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/17.jpg)
17 BROOKHAVEN SCIENCE ASSOCIATES
Main Substation Installation
![Page 18: Electrical Procurements](https://reader035.fdocuments.us/reader035/viewer/2022062422/5681353a550346895d9ca032/html5/thumbnails/18.jpg)
18 BROOKHAVEN SCIENCE ASSOCIATES
Secondary Unit Substation