Electrical Pending List 1. Unit-3 GCP Panel Power Factor meter not working 2. Unit-3 Permanent Earth Flat welding to be done for Startup Booster Fan 3. Unit-3 Generator DE Bearing temperature to be lined up for DCS & Temperature Scanner in GCP 4. All Units Bed material screw feeders Operation (ON/OFF) to be arranged from DCS. 5. All Units VFD Motors Winding and Bearing temperatures monitoring to be arranged from DCS. 6. All Units Voltage & Current Monitoring to be arranged from DCS. 7. Coal Feeder Motor Terminal Boxes Cover was sent for sample and yet to be received. Most of the Coal feeder terminals boxes are covered with polythene cover. 8. Unit-1 Esp MCC Hopper Heater cable to be replaced for all heaters 9. Water Proof paint to be arranged for CT fan 10. Permanent Cable tray to be arranged for Unit-1&2 CT Fan 11. Permanent Earth Flat to be arranged for Unit-1&2 CT Fan 12. Soot blower Motors earthing to be done for all three units 13. Soot Blower Motors MPCB 14. Scaffolding to be arranged for lighting fault attending near Station Transformer. 15. Scaffolding to be arranged for lighting fault attending In Street light near Switch yard.. 16. Transformer yard Roof sheet to be corrected 17. Multiple Single phase supply sources to be arranged in VFD room for pedestal fans and cooling fans which are placed (Cable & Boxes required) 18. Three phase Supply with Neutral Power DB to be arranged near GT-1&2 for the purpose of oil filtration 19. The control Box in High mast fitting backside of Weigh bridge near D.M Plant is fixed temporarily welding to be done for fixing the box permanently.

description

Electrical Pending List as on 20.04.2014

Transcript of Electrical Pending List as on 20.04.2014

Page 1: Electrical Pending List as on 20.04.2014

Electrical Pending List

1. Unit-3 GCP Panel Power Factor meter not working2. Unit-3 Permanent Earth Flat welding to be done for Startup Booster Fan3. Unit-3 Generator DE Bearing temperature to be lined up for DCS & Temperature

Scanner in GCP4. All Units Bed material screw feeders Operation (ON/OFF) to be arranged from DCS.5. All Units VFD Motors Winding and Bearing temperatures monitoring to be arranged from

DCS.6. All Units Voltage & Current Monitoring to be arranged from DCS.7. Coal Feeder Motor Terminal Boxes Cover was sent for sample and yet to be received.

Most of the Coal feeder terminals boxes are covered with polythene cover.8. Unit-1 Esp MCC Hopper Heater cable to be replaced for all heaters9. Water Proof paint to be arranged for CT fan 10. Permanent Cable tray to be arranged for Unit-1&2 CT Fan11. Permanent Earth Flat to be arranged for Unit-1&2 CT Fan12. Soot blower Motors earthing to be done for all three units13. Soot Blower Motors MPCB 14. Scaffolding to be arranged for lighting fault attending near Station Transformer.15. Scaffolding to be arranged for lighting fault attending In Street light near Switch yard..16. Transformer yard Roof sheet to be corrected 17. Multiple Single phase supply sources to be arranged in VFD room for pedestal fans and

cooling fans which are placed (Cable & Boxes required)18. Three phase Supply with Neutral Power DB to be arranged near GT-1&2 for the purpose

of oil filtration 19. The control Box in High mast fitting backside of Weigh bridge near D.M Plant is fixed

temporarily welding to be done for fixing the box permanently.