Electrical (General)
Transcript of Electrical (General)
20
Electrical (General)
Kota Railway Station
Heritage Coach Sawai Madhopur Station
SAVE ENERGY SAVE EARTH
21
ORGANISATION CHART
SSE/EL/G/Tech SSE/EL/G/Tech SSE/EL/G/Tech SSE/EL/G/Tech
SSE/EL/G/PH SSE/EL/G/WRS Col SSE/EL/G/NRC SSE/EL/TL-AC
Kota Kota Kota Kota
SSE/EL/G/RAC SSE/EL/G/ERS SSE/EL/G/SGZ SSE/EL/G/BWM
SSE/EL/G/LKE SSE/EL/G/SWM SSE/EL/G/GGC SSE/EL/G/BTE
SSE/EL/G/Bundi SSE/EL/G/TKD JE/EL/BXN JE/EL/G/BAZ
PANKAJ SHARMA
DRM
Manoj Kumar Jain
ADRM (O&A)
Sudhir Sarvaria
ADRM (T&I)
Harish Ranjan
Sr. DEE (Gen.)
Rahul Choudha
ADEE (Gen.)
22
fo/kqr lkekU;
ELECTRICAL GENERAL
Ikfjp; ( INTRODUCTION )
The power maintenance wing is dealing with a huge connected load of 22517 KW (up to Jan.
2021) with an average monthly consumption of over 20.16 Lakh units. This is through a
distribution network comprising 24 HT connections &332 Nos. LT connections. The supply is
being availed from JVVNL/AVVNL, KEDL, MPPKVVCL, UPPCL& BSES. In addition,
uninterrupted power supply is ensured at 15 PRS, 18 UTS cum PRS centre & 88 UTS terminals
all over the division. There are as many as 242 Nos. electrical pumps installed at various locations
in the division for watering arrangements.
3.1. Je ’kfDr ( MANPOWER )
SN Category Sanctioned post Men on roll Vacancy
1 Supervisor 41 37 04
2 Artisan staff
a) OSM Group 265 233 32
b) TL/RAC Group 72 53 19
3 Unskilled staff
a) OSM Group 171 117 54
b) TL/RAC Group 50 42 08
4 Ministerial staff 15 15 0
3.2. vuqj{k.kfMiks (MAINTENANCE DEPOTS)
SN Name of depot Jurisdiction
A) General Service
1. Shamgarh NAD (Excl.) Bhawanimandi (Excl.)
2. BhawaniMandi Bhawanimandi (Incl.) Kanwalpura (Incl.)
RamganjMandi Jhalawar City
3. Kota (New Colony) Kanwalpura (Excl.) Kota New Colony
4. Kota (Power) Kota New Colony (Excl.) KeshoraiPatan
5. Kota ( WRS Colony ) Kota ( WRS Colony ) Baran ( Excluding )
6. Lakheri KeshoraiPatan (Excl.) Amli (Excl.)
7. SawaiMadhopur Amli( Incl.) Makholi
8. Gangapur City Makholi (Excl.) ShriMahabirji
9. Bayana ShriMahabirji (Excl.) Bayana
10 Bharatpur Bayana (Excl.) Mathura (Excl.)
11 Bundi Gurla (Excl.) Chanderia (Excl.)
12 Baran Baran (Incl.) Ruthiyai (Excl.)
B) Train Lighting & Air Conditioning – Only one depot at Kota
23
3.3. ;k=h dkspksa dk fooj.k
DETAILS OF HOLDING OF TL & AC COACHES ( Only one TL & AC Depot)
Station Primary
maintenance
Platform
attention
Remarks
TL AC TL AC
KTT 213 + 62
(LHB)
10 + 25
(LHB)
+10(Power
car)
477 165 270 coaches of trains + 06 coaches of ART
at Kota, 01 coach of RA 01 of RE, 03
coaches of TTM, & 7 coaches of ART &
ARME at GGC + 3 coach SPART
3.4. izkFkfed vuqj{k.k dh xkfM;kWa ( PRIMARY MAINTENANCE OF RAKES)
SN Train no. Rake Nos. of
coaches
Nos. of
rake
AC
coach
a) Primary Maintenance rake
1 19807/19808, 59803/59804 Kota-Hisar-RTM- Kota Exp.
(Daily)
17 3 03
2 59811/59812 59813/59814 Kota-AF-Kota (Daily) 14 4 0
3 59831/59832 59833/59834
59838/59839/59840/59837
Kota-BRC-NMH (Daily) Kota-
JLWC-Kota (Daily)
11 4 0
4 12059/12060 Kota-NZM-Kota
Jan Shatabdi Exp (Daily)
22 1 03
5 19811/19812 Kota- BIX-Kota (Daily) 13 2 01
6 22981/22982, 22997/22998 Kota-SGNR-Kota(Daily)
Kota - JLWC-Kota (Trice)
22 2 08
7 22983/22984 Kota-INDB-Kota (Daily) 14 1 01
8 19803/19804
19805/19806
Kota-SVDK-Kota (Weekly)
Kota – UHP – Kota (Weekly)
22 1 08
9 19809/19810 KTT-JBP-KTT (Daily) 12 2 0
Total 20 24
3.5. f}rh;d vuqjf{kr xkfM;kWa (SECONDARY MAINTENANCE) :Nil
Only platform attention of Train no. 13237/13238/13239/13240 (Kota – PNBE – Kota Exp.) &
Train no. 12402/12401 (Kota – HW – Kota, Nanda Devi Express)
3.6. nq/kZVuk jkgr xkfM;kWa (ARME & ART DETAILS)
Stations ART ARME SPART
KTT 6 Coaches 2 Coaches 3 coaches
GGC 5 Coaches 2 Coaches -
3.7. csVjh pkftZax lqfo/kk (BATTERY CHARGING FACILITIES)
Battery charging facility has been provided at washing lines, ARME & ART siding,
saloon sidings and station platform at KTT, station platform & saloon siding at SWM,
ART & ARME siding at GGC, MFD coach siding at BXN & saloon siding at BTE. In all
30 nos. battery chargers have been provided at these stations.
3.8. PRE-COOLING CHARGING FACILITIES FOR AC COACHES
27 nos. pre-cooling points have been provided in the pit line, stabling line, saloon siding &
station platform at KTT, SWM, GGC, BTE &SGZ railway station.
24
3.9. o`gn fo/kqrh; lalk/ku (MAJOR ELECTRICAL ASSETS)
Electrified stations 88 stations out of 95 (07 Nos. Flag station )
Pumping Installation 242 Nos.
Power Transformers 82 Nos.
HT connections 24 Nos.
LT Connection 332 Nos.
Air conditioners 563 Nos. (Window AC - 185 Nos., Split AC - 378 Nos.)
Water coolers 166 Nos. (Passenger – 83, Service building – 90)
Refrigerators 49 Nos.
AC Plants 03 Nos. ( Each 30T capacity at Remote Control center)
Escalator 04 Nos. (02 on PF 1 side & 2 on PF 2/3) at Kota station
Lift
05 Nos.
(Kota stn.PF 1 -01, PF 2/3 – 01 & DRM office – 01,
SWM stn. PF 1 -01, PF 4 - 01)
Electrified staff Qtrs. 8776 Nos.
(Type I – 5574, Type II – 2572, Type III – 360, Type IV – 231, Type V - 39)
Solar water heater At 04 station ( KTT, GGC, BTE and TKD)
Solar Pump 01 ( 02 HP, 02 kWp plant) at MLGH in Kota – COR sec.
Standby power supply 18 Nos. DG sets of various capacity
3.10. xSj ikjEifjd ÅtkZ L=ksr
DETAILS OF NON-CONVENTIONAL SOURCES OF ENERGY
i. Solar Power Plant
Sl. Station Location Capacity
1 VMA Station 05 kWp
2 SGZ Station 50 kWp (CSR)
3 BWM Station 30 kWp (CSR)
4 RMA Station 05 kWp
5 SYL Station 05 kWp
6 BAZ Rly. Dispensary 10 kWp
7 IDG Station Building 05 kWp
8 TKD Electric Loco Shed 2 x 10 kWp
9 Bundi Station Building 05 kWp
10 GGC Station building, PF cover shed 73 kWp
11 BTE Station building, PF cover shed 79.5 kWp
12 Kota Kota Station (PF1 & PF 2), DRM office, Rly.
Hospital, RPF Barak, PRS Building, Construction
office, Parcel office, AEN office (DRM office campus)
1000 kWp
25
ii. Solar Wind Hybrid system –
Section Location Capacity
KOTA-RTA LC gate 41 2.5 kWp
KOTA – COR Tunnel (SNGR – JNRI) 2.5 kWp
iii. Solar panel at LC gates & Stations – 121 Nos. (14 at stations &107 at LC gates)
Section Station LC gate
KOTA-RTA 03 11
NAD-KOTA Nil 28
KOTA-MTJ 01 61
KOTA-COR 10 07
Total 14 107
3.11. ;k=h vkj{k.k iz.kkyh ( PASENGER RESERVATION SYSTEM )
15 Nos. PRS system are in operation over Kota division at SGZ, Jhalawar, DKNT, KTT
(Station), KTT (CAD Circle), BAZ, Bundi, SWM, Sapotra, Karauli, Srimahabirji, BTE,
SarasChauraha BTE, Sangaud, Military Gate no. 3 at Kota.
18 Nos. UTS cum PRS system are in operation over Kota Division at GGC, HAN, BXN,
RMA, VMA, BWM, LKE, SVA, CMU, CAG, IDG, ATH, MEP, MKX, KPTN, MLGH,
NNW& SYL.
3-11 fo/kqfrd`r leikj QkVd
Details of Electrified LC Gates –
SN Section LC Gates
1 KOTA-RTA 31
2 NAD-KOTA 45
3 KOTA-MTJ 90
4 KOTA-COR 35
Total 201
26
3.12. PERFORMANCE STATISTICS :-
(A) Train lighting & AC
SN Description 2019-20 up to
Jan.
2020-21up to
Jan.
% Improvement
w.r.t.
Target Actual Target Actual Target L/year
1 Certificate for Non-AC 0 0 0 0 0 100
(imp.)
2 Punctuality loss cases on
TL/AC/PS (Ownership basis) 0 0 0 0 0
100
(imp.)
3 Ineffective percentage of AC
coaches 0.7 0.26 0.7 0.072
89.71
(imp.)
72.30
(imp.)
4 Ineffective percentage of TL
coaches 0.2 0.231 0.2 0.001
99.5
(imp.)
99.56
(imp.)
5
Mobile charging points in GS
coaches : 02 nos. in cabin side & 02
nos. on corridor side (36 points)
46 0 40 43 107.5
(imp.)
100
(imp.)
6
Mobile charging points in GSCN
coaches : 02 nos. in cabin side & 02
nos. on corridor side (36 points)
36 0 12 11 08.33
(Det.)
100
(imp.)
(B) Power side
S
N
Description 2019-20 up to
Jan.
2020-21 up to Jan. % Improvement
w.r.t.
Target Actual Target Actual Target Actual
1 Electrical accident 0 0 0 0 0 0
2 Renewable Energy
Generation (in 000’s unit) 0 1197 0 1228 0
02.58
(imp.)
3 Energy consumption
(in 000’s Units) 18000 19522 18750 18149
03.20
(imp.)
07.03
(imp.)
4 SEC 90 89.96 90 80.60 10.44
(imp.)
10.40
(imp.)
5 Rebate on power factor
(in Rs. 000’s ) 0 2806 0 2497
100
(imp.)
11.01
(det.)
6 Connected load 0 21700 0 22517 100
(imp.)
03.76
(imp.)
7 Penalty paid to SEBs 0 0 0 0 0 0
27
eq[; miyfC/k;kWa ( HIGHLIGHTS ) 2020–21
1. COMMISSIONING OF RENEWABLE ENERGY SOURCES –
Solar Power Plant – Rooftop solar power plant of 152.5 kWp capacity has been installed
at 02 stations of Kota division (GGC – 73 kWp, BTE – 79.5 kWp). It has been generated
1.67 Lakhs units per Annum and saving in Rs. 10.89 Lakhs per Annum.
2. USE OF ENERGY EFFICIENT FITTINGS
LED lights in Service buildings - All service buildings of Kota division has been
completed by providing 20 watt LED tube Light fittings.
LED light at Railway Station – All stations of Kota division has been completed by
providing LED lights on PF and offices.
28
3. STAFF AMENITIES –
Emergency Feed in Running Room – Emergency supply by providing DG set provided
in all Running Rooms (Kota, SWM, GGC) of Kota division.
4. Improvement in Goods Shed Lighting –
Improved Illumination level - Improvement has been done in illumination level in Goods
Shed of Bundi, Kota, SWM, GGC, HAN, BAZ, SGZ & MEP by replacement & providing
additional LED light fittings
5. Automation of Platform lighting - - 70% PF Lighting circuits has been controlled with
Signalling system at SGZ, BWM, RMA, LKE, IDG, SWM, GGC, SMBJ, BXN, BAZ and
SYL (11 stations) of Kota division. It has been resulted Annual saving of 81000 kWh and
saving by cost in Rs. 6.89 Lakhs per Annum.
6. OTHERS –
Beautification – Beautification of Kota station building and DRM office compound has
been done by providing LED lighting & Lighting fountain.
29
Scrap Disposal – 19923 Kg. Ferrous and 7313 Kg. Non-Ferrous disposed off during the
year 2019-20.
Energy Consumption –
During the year 2020 - 21, 18.149 Million units consumed in current year This is 7.03 %
more than last year’s consumption in the same period.
Solar Generation – During the year 2020-21, 12.28 lakh units generated by renewable
sources installed over Kota div. This is 02.58% more than last year in the same period
Provision of Electronic Energy Meter - 133 nos. Electronic Energy meters provided staff
quarter in place of conventional Energy meter.
Energy Efficient Pumps – 11 nos. ordinary pump replaced by Energy efficient
submersible pump set at various stations over the division during the year 2019 – 20.
Energy Audit – Energy Audit of 08 locations of Kota division have been done during
2020-21
0
5000
10000
15000
20000
2019-202020-21
Energy Cons.
SEC
11.8
12
12.2
12.4
2019-20 2020-21
Solar Generation
Solar Generation
30