Essex Junction Recreation and Parks Advisory Council Recreation Governance Survey Results On September 14, 2010, the EJRP Recreation Advisory Council opened up a survey for the community to comment on Executive Summary (pg 1 of 2): Question 1: Are you satisfied with EJRP staff, parks and programs? the proposed governance change of EJRP from the school district to the Village. The survey was closed on November 9, 2010. 208 individuals responded. 199 of the respondents identified themselves as residents of the Village of Essex Junction. The data that is presented below is derived from the responses by Village residents only. majority of people are satisfied with EJRP staff, parks, and programs o Most cited excellent, quality programming, a great staff, and wellmaintained parks and facilities. oves. Respondents mentioned the baseball field, staff issues, a lack of/repeated program options, and high uestion 2: Do you think having EJRP governed by the school district (current status) serves 85% Yes 7% No 8% Not Sure An overwhelming 170 respondents said “yes” o Citizens said that EJRP is an important/defining part of the community and provides a great service. o Several people commented on the progressive nature of the department, noting it continuously impr o Several people said they did not have a single complaint and would not change anything. o 29 “not sure” or “no” o budget/costs. Q our community well? 11% No 17% Not Sure 72% Yes Nearly 3 out of 4 respondents think that the current governance structure works well. o collaboration and integration that takes place with the schools and the was mentioned ten times. is a common thread of recreation and o commented they are not sure. ion and that schools have enough on their plate. People appreciate the 144 respondents said “yes” shared/coordinated use of facilities. o The line “If it ain’t broke, don’t fix it” o Respondents noted that both organizations serve children, there education, and that the recreation department provides excellent, quality programming. o Several people said this is just about the baseball field. Several people simply 55 said “not sure” or “no” o Others do not believe that recreation is a school funct o Some people had questions that they needed answered in order to make up their mind.

description

 

Transcript of Ejrp Governance Survey Results

Page 1: Ejrp Governance Survey Results

Essex Junction Recreation and Parks Advisory Council Recreation Governance Survey Results

On September 14, 2010, the EJRP Recreation Advisory Council opened up a survey for the community to comment on  

Executive Summary (pg 1 of 2):

Question 1: Are you satisfied with EJRP staff, parks and programs?  

the proposed governance change of EJRP from the school district to the Village.  The survey was closed on November 9,2010.  208 individuals responded.  199 of the respondents identified themselves as residents of the Village of Essex Junction.  The data that is presented below is derived from the responses by Village residents only. 

 

 

 majority of people are satisfied with EJRP staff, parks, and programs 

 

o Most cited excellent, quality programming, a great staff, and well‐maintained parks and facilities.    oves. 

Respondents mentioned the baseball field, staff issues, a lack of/repeated program options, and high 

uestion 2: Do you think having EJRP governed by the school district (current status) serves 

85% Yes

7% No 8% Not Sure 

• An overwhelming

  170 respondents said “yes”  

o Citizens said that EJRP is an important/defining part of the community and provides a great service.o Several people commented on the progressive nature of the department, noting it continuously impro Several people said they did not have a single complaint and would not change anything. 

o  29 “not sure” or “no” 

o budget/costs. 

 

Qour community well?    11% No17% Not Sure72% Yes

• Nearly 3 out of 4 respondents think that the current governance structure works well. 

 

o  collaboration and integration that takes place with the schools and the 

was mentioned ten times.  is a common thread of recreation and 

o  commented they are not sure. ion and that schools have enough on their plate. 

 

  People appreciate the

144 respondents said “yes”  

shared/coordinated use of facilities. o The line “If it ain’t broke, don’t fix it” o Respondents noted that both organizations serve children, there

education, and that the recreation department provides excellent, quality programming.   o Several people said this is just about the baseball field. 

 

  Several people simply

55 said “not sure” or “no” 

o Others do not believe that recreation is a school functo Some people had questions that they needed answered in order to make up their mind. 

 

Page 2: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 2

Essex Junction Recreation and Parks Advisory Council Recreation Governance Survey Results

Executive

 

 governance to the Village (proposed status) would serve 

  

Summary (pg 2 of 2):

Question 3: Do you think transferringour community well? 

 not feel a governance transfer would serve the community well  pondents are not   would serve the community well 

l function.  Some people said that the  department should be governed by citizens.  Others said schools should focus on schools.  

 

o The most frequent response was, “it if ain’t broke, don’t fix it,” which was said in a variety of ways.  baseball field.  The same number said that the Village already has too  recreation to it.   

that the 

ate and serve families and youth, while others noted 

ly used for recreation purposes and they were 

 and variety would be 

make an informed opinion 

 

• Half of the respondents do

13% Yes  36% Not Sure 51% No 

• 1/3 of res sure if a transfer

   26 said “yes” 

o People thought that it could be cost effective and that it is a municiparecreation

 173 respondents said “not sure” or “no” 

o Many felt that this was all about themuch to do and can’t do it, why add

o People felt that either their taxes or recreation fees would go up if there was a transfer.  Some said Village should put their efforts into more important things. 

o Respondents state that recreation and the school educthat the village does not have the infrastructure or expertise to operate rec. 

o It was noted by several that currently recreation money is onconcerned that it would not remain that way under Village governance.   

o People did not see advantages to change and were concerned that program optionsreduced.   

o Some who were unsure said that recreation is a municipal function.   o Some people wondered why so much attention was being given to an issue raised by so few people. 

 

Question 4: What questions do you need answered in order to about the question of rec governance? 

o 104‐respondents had questions.  Based on the nature of the question, questions were sent out to the VillageEssex Junction (35 questions), Essex Junction Recreation and Parks (9 questions), the petitioners (Cindy GoJeff Harton, Joyce Stannard, Bob Willey

 of din, 

) (5 questions) and Chittenden Central Supervisory Union (5 questions). 

e benefits of Village governance because those benefits have 

o For some people, until they can compare the difference of governance from the school district to the Village, they cannot make a determination. 

o EJRP and CCSU provided responses to their questions. o Neither the petitioners nor the Village provided any answers to any of the questions. 

o There are a lot of unanswered questions.   o Many people commented that they do not see the impetus for change. o There are a lot of unanswered questions related to how the Village would manage the recreation 

department and many are not sure about thnot been presented.   

Page 3: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 3

SURVEY:

Recreation ions to the Essex Junction Community  Advisory Council Quest

We and Parks (EJRP). We are inspired by the people, the parks, and the programs.  are proud to represent Essex Junction Recreation EJRP serves our community well. We appreciate our 40‐year history of administration by the school district. It has fostered the development and growth of a quality department. We are always seeking ways to improve our parks and programs for the community. Some peop  le have suggested that there be a governance change from the school board (Prudential Committee) to the Village of Essex Junction (Board of Trustees). This important community decision requires a thorough process and comprehensive study. To gather your opinion, we ask members of the Essex Junction community to weigh in on the following questions. 

BEFORE taking this survey we encourage you to visit www.ejrp.org/governance to learn more about this topic. The Frequently Asked Questions and the Petition Assertions and Counter Points should be particularly helpful. 

Thanks for your time and opinion. It matters. Essex Junction Recreation Advisory Council 

1. Are you a resident of the Village of Essex Junction? Yes No 

2. Are you satisfied with EJRP staff, parks and programs?   Please explain:

3. Do you think having EJRP governed by the school district (current status) serves our community well?   Please explain:

4. Do you think transferring governance to the Village (proposed status) would serve our community well?   Please explain:

5. What questions do you need answered in order to make an informed opinion about the question of rec governance? 

  

6. The following contact information is encouraged but optional. Your name will not be linked directly to your answers. Your answers and comments will be shared in aggregate data. Your name may appear on public listings of who completed the survey, but your contact information will not be shared. 

Name 

Phone 

Address 

Email 7. Do  want to   governance? 

Yes No 

Questions? Contact Bridget Meyer, 879‐5409, [email protected]

YesNot Sure 

  

 No

YesNot Sure 

  

No

YesNot Sure 

  

No

 you receive future e‐mails about rec

Page 4: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 4

Of the 170 respondents that said “yes,” 71 

Serving All Age  a Variety fordable/Wise use of Resources 

  

                    Best in the Stat  A great asset to the community • Love the integration between EJRP and schools • Like the 

 • An amazingly valuable resou  Community reso why we live here • Enrich our community • Truly adds value to living in this community • An asset to me as a homeowner • Brought us a feeling of a close community • Envy of surrounding communities • Essential to my child’s education • Huge part of their childhood • Great community for raising kids, in part due to the rec department • Like feeling as if my kids are with family when they are at rec 

  (14) 

 

Of the 29 respondents that said “not sure” or “no,” 22 provided comments or concerns: 

        BA  (4) 

    LACK , OR REPEATED PROGRAM OPTIONS (3) 

    HIGH BUDGET/COSTS (3)   

Question 1:

ARE YOU SATISFIED WITH EJRP STAFF, PARKS & PROGRAMS? 

provided comments or reasons: 

s • Offering /Diversity • Af

                  

       e •

coordination of programs between EJRP and schools • Hidden gem • Huge part of our family’s liferce • urce • This is 

 

                                    NOT A SINGLE COMPLAINT/WOULDN’T CHANGE ANYTHING  (7) 

SEBALL FIELD

        STAFF ISSUES (4) 

 OF

Yes85%

Not sureNo7% 

8% 

EXCELLENT, QUALITY PROGRAMMING  (42)

GREAT STAFF  (26) 

WELL MAINTAINED PARKS & FACILITIES  (23)

IMPORTANT/DEFINING PART OF OUR COMMUNITY  (23)

GREA  SERVICE TO COMMUNITY T

PROGRESSIVE  (8) 

 

 

 

 

 

Page 5: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 5

uestion 2:

NK HAVING 

TUS) SERVES OUR COMMUNITY WELL?

Of the 144 respondents that said “yes,” 55 

                

                                                   

 

ents that said “not sure” or “no,” 17 provided comments or concerns: 

Q

DO YOU THI

Yes72%

Not sure17%

No11%

EJRP GOVERNED BY THE SCHOOL DISCTICT (CURRENT STA

provided comments or reasons: 

COLLABORATION/INTEGRATION WITH SCHOOLS (16)

 IF IT AIN’T BROKE…  (10) 

  SHARED/COORDINATED USE OF FACILITIES (9)

                            BOTH ORGANIZATIONS SERVE CHILDREN  (9)

EXCELLENT, QUALITY PROGRAMMING  (7)

Serving all ages • Offering variety/diversity • Affordable 

                   

                   

THIS IS JUST ABOUT THE BASEBALL FIELD  (7)

WORRIED ABOUT WHAT MIGHT CHANGE (7)

          COMMON THREAD OF REC. & ED.  (6) 

Of the 55 respond

     NOT SURE  (8) 

         NOT A SCHOOL FUNCTION  (7) 

           SCHOOLS ARE BUSY  (4) 

         QUESTIONS  (4) 

Page 6: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 6

Que

DO YOU THINK TRANSFERRING GOVERNANCE TO THE VILLAGE (PROPOSED STATUS) WOULD SERVE OUR COMMUNITY WELL?

Of the 26 respondents that said “yes,” 14 provided comments or reasons: 

      COULD BE COST EFFECTIVE (3) 

             SHOULD BE GOVERNED BY VILLAGE RESIDENTS  (2)             NOT SURE  (2) 

           SCHOOLS SHOULD FOCUS ON SCHOOLS  (2)                           A MUNICIPAL FUNCTION (2)   

Of the 173 respondents that said “not sure” or “no,” 83 provided comments or concerns: 

                          IF IT AIN’T BROKE…  (27)  

                       THIS IS JUST ABOUT THE BASEBALL FIELD  (11) 

            VILAGE ALREADY HAS TOO MUCH TO DO, AND CAN’T DO THAT  (10) 

            COSTS WILL GO UP (FEES AND/OR TAXES)  (10) 

            REC & SCHOOLS BOTH EDUCATE AND SERVE FAMILIES & YOUTH (8) 

            I DON’T SEE ANY ADVANTAGES/BENEFITS TO VILLAGE GOVERNANCE  (8) 

         VILLAGE SHOULD PUT EFFORTS INTO MORE IMPORTANT THINGS  (6) 

         REC MONEY SHOULD ONLY BE USED FOR REC PURPOSES  (6) 

          CHANGE WILL REDUCE PROGRAM OPTIONS AND VARIETY  (5) 

      VILLAGE CAN’T DO IT – NO EXPERTISE/INFRASTRUCTURE  (3) 

              IT’S A MUNICIPAL FUNCTION  (2)               WHY ARE WE LISTENING TO SO FEW PEOPLE  (2)  

stion 3: Yes13%

Not sure36%

No51%

 

      

 

 

 

 

 

 

 

 

 

 

 

 

Page 7: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 7

 NEED ANSWERED IN  OPINION ABOUT THE 

ion. From this information, questions were sent 

• Petitioners (Cindy Godin, Jeff Harton, Joyce Stannard, Bob Willey) – 5 questions 9 questions 

isory Union – 5 questions • Village of Essex Junction – 35 questions 

R THE PETITIONERS

ed   achie a transfer of governance?  

e petitioners. 

 benefit the community? 

A response has not yet been provided by the petitioners. 

 governance enhance our recreation department? 

ided by the petitioners.  

 sponse has not yet been provided by the petitioners. 

 ight address each of these needs? 

as no  yet been provided by the petitioners. 

 

Question 4: 

WHAT QUESTIONS DO YOUORDER TO MAKE AN INFORMEDQUESTION OF REC GOVERNANCE?

104 respondents filled out information in this sectout to the following: 

• Essex Junction Recreation & Parks – • Chittenden Central Superv

 

QUE

STIO

NS

FOR

THE

PETIT

ION

ERS

QUESTIONS FO

GOVERNANCE  

e accomp ishWhat do you think will b   l by ving 

A response has not yet been provided by th In your opinion, how will a transfer of governance 

 In your opinion, how will a transfer of A response has not yet been prov

In your opinion, what needs (please provide a list) are not being met by CCSU governance? 

A re

How will Village overs A   hresponse t

Page 8: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 8

QUESTIONS FOR ESSEX JUNCTION RECREATION AND PARKS

dget? 

nues (39%)  (5%) 

 level for the past 5‐years. 

  

 and approved by the Prudential Committee and o separate items via Australian ballot, by voters of the Village of Essex Junction.  

The budget is overseen by the CCSU Chief Financial Officer/Executive Director of Operations, and  the EJRP Director. 

 

 % of a

of EJRP’s budget is supported by tax dollars.  While most of the programs are considered “pay‐to‐

 H EJRP has  $1.5 m sses nearly 1,200 accounts payable, makes over 2,200 deposits, and serves 5,228 participants through 129‐different p am   In FY fiscal services (payroll, accounts payable, budget execution, bank deposits, financial reporting/auditing support), reasu formation technology support, HR support, and consultation support in the areas of curriculum, special education, and legal.   

BUDGET  What is the EJRP bu

 For FY11, the EJRP budget is $1,529,988. 

• $863,246 is from user fees (56%) • $591,742 is from General Fund tax reve• $75,000 is from Capital Fund tax revenues

 The EJRP tax rate has either declined or remained Who manages the EJRP budget?

The EJRP budget and capital plan are developedvoted on, as tw

implemented and managed by

Is the EJRP program self‐sustaining? 

QUE

STIO

NS

FOR

ESSE

X JU

NC

TION

REC

REA

TION

& P

ARK

S

Nationally, on average, taxes support 60  recreation department’s total budget.  Only 44% 

play,” tax revenue is needed to support the infrastructure of the department. 

ow much does EJRP contribute to the school district for managing the EJRP program? 

 a illion budget, 300‐employees, and in one year proce

rogr s. 11, the Essex Junction School District charged EJRP $83,174 for providing 

 t rer services (payments and deposits), supervision, in

 

Page 9: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 9

QUESTIONS FOR ESSEX JUNCTION RECREATION AND PARKS (continued)  

GOVERNANCE  What is the current governance structure of EJRP? What type of oversight does EJRP staff receive? 

    

 Q

UEST

ION

S FO

R ES

SEX

JUN

CTIO

N R

ECRE

ATIO

N &

PA

RKS

Page 10: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 10 

NS FOR ESSEX JUNCTION RECREATION AND PARKS (continued)  

What is the purpose of the Recreation Advisory Council? 

nd recreational services as provided by the Essex Junction Recreation and Parks Department (EJRP).” 

ent report?  

 to the e EJRP director is requested to attend a 

 questions, or present information.  An  is delivered to every home in Essex Junction.  The 

CCSU Chief Financial Officer/Executive Director of Operations provides quarterly, year‐to‐date, budget reports to the Prudential Committee. 

 remain the same if there is a transfer of governance? 

urrently EJRP staff have the support to create and manage programs in order to meet the needs ed information indicating how programs 

ernance. 

nsfer of governance? 

 policies.  To what the EJRP budget, vision, mission, or 

ricing policies would be under Village governance. 

QUESTIO

 From the Council’s Charter:   “The Essex Junction Recreation and Parks Advisory Council (Advisory Council) will serve in an advisory capacity to the Department’s administrative staff in the development, maintenance, and stewardship of a comprehensive system of leisure a

Does EJRP report on a monthly, quarterly or annual basis? Does EJRP give a financial state of the departm

EJRP meets monthly with the Recreation Advisory Council and provides monthly updatesPrudential Committee.  Two to five times per year thPrudential Committee meeting to deliver reports, answerannual report (both narrative and budget)

 

PROGRAMS  ill program offeringsW

 Cof the community.  To date, the Village has not providwill be developed nor what programs would continue under Village gov Will program prices remain the same if there is a tra EJRP currently sets program prices based on our budget, vision, mission, and pricingdate, the Village has not provided information about p 

QUE

STIO

NS

FOR

ESSE

X JU

NC

TION

REC

REA

TION

& P

ARK

S

Page 11: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 11EJRP GOVERNANCE SURVEY RESULTS 11

QUESTIONS FOR CHITTENDEN CENTRAL SUPERVISORY UNION

BUDGET  What is the anticipated total savings to CCSU if the Supervisory Union no longer administered EJRP?   In FY’11, EJSD directed the Rec Dept to contribute $78,174 toward the school district’s portion of the CCSU assessment. An additional $5,000 was levied to contribute toward EJ Treasurer expenses which aren’t part of the CCSU. The total CCSU assessment from all member school districts was $2,688,295. This means the Rec Dept contributed 2.9% ($78,174÷$2,688,295) toward the overall CCSU assessment. Logically, it would follow that the Rec Dept represents approximately 2.9% of the CCSU workload.  It is unlikely that a 2.9% workload reduction would result in any salaried employee dropping below the level of 40 hours per week. CCSU may be able to make a small reduction in the number of hours for support staff and the estimated value would be about $10,000.  As an aside, the amount EJSD directs the Rec Dept to contribute for the CCSU assessment may be lower in FY’12.  How much of that would be saved by Essex Junction School District?   The CCSU assessment to EJSD would have decreased by $25,357, but EJSD would not have been able to collect the Rec Dept contribution of $78,174. The net effect would actually be an increased cost of $52,817. These figures are explained in the paragraphs below.  Most of the CCSU assessment is based on the percentage of staff. If the Rec Dept was transferred to the Village, the percentage would drop slightly for EJSD and increase for the other two school districts (Westford and U#46).  The lower percentage, combined with the assumed CCSU savings of $10,000, would have resulted in an assessment of $951,593 for EJSD. Since EJSD would not be able to receive a Rec Dept contribution toward the assessment, EJSD would have paid the full $951,593. The actual EJSD assessment was $976,950, but EJSD only paid $898,776 because of the Rec Dept contribution of $78,714. So, while the CCSU assessment to EJSD would have decreased by $25,357 ($976,950 vs. $951,593), the actual cost to EJSD would have increased by $52,817 ($898,776 vs. $951,593).  Additionally, the U#46 assessment would have increased by nearly $15,000 and an increase to the U#46 budget impacts Essex Junction residents (for EJ students attending EHS). Therefore, the cost to EJ taxpayers would be even higher than $52,817.     

Q

UEST

ION

S FO

R C

HITT

ENDE

N C

ENTR

AL

SUPE

RVIS

ORY

UN

ION

Page 12: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 12

d)  

 would be a decrease in the expenses and assessment, but now only four  the expense of EJSD’s assessment, how would that affect the school tax rate for 

  consider the U#46 implications. In FY’11, EJSD was ution of $78,174 from the Rec Dept which nets at 

 $951,593 and received no 

 additional $52,817 ($951,593‐$898,776). 

income sensitivity? 

 rate would have been $0.0034 higher, a family with 

 by the Village. d need  the 

 Dept has historically paid for some support from U#46 information technology (IT) and 

Since the IT support is based on the percentage of computers, the Rec Dept only paid U#46 $1,800.  Since this represents such a small body of work and since U#46 already anticipates the reduction of one computer technician position in FY’12, there would be no additional savings to U#46.  The Rec Dept has had its own full‐time maintenance person for over a year now. As a result, the need for U#46 maintenance support has declined dramatically and the Rec Dept cost to U#46 should also decrease in FY’12. There would be no significant savings to U#46. 

QUE

STIO

NS

FOR

CHI

TTEN

DEN

CEN

TRA

L SU

PERV

ISO

RY U

NIO

N

QUESTIONS FOR CHITTENDEN CENTRAL SUPERVISORY UNION (continue

Given that thereroups sharinggEJSD?  

For simplicity sake this response does notassessed $976,950 and received a contrib$898,776.  Using the assumptions above, EJSD would have been assessedcontribution.  Therefore, EJSD would have paid an The resulting EJSD Grade K‐8 Homestead Tax Rate would have been $0.0570 instead of $0.0536 –an increase of $0.0034.  What would be the anticipated effect on school taxes on an average family with a $250K ssessed property value, with no adjustment for a

 sing the assumptions above, if the taxU

property valued at $250,000 would have paid an additional $8.50.  NOTE: This estimated impact only relates to school taxes. We do not know what the impact ould be to the Recreation Municipal tax rate if the department was governedw

Logically, if it costs more than $83,174 for the Village to support the Rec Dept, there woulo be a tax increase to that rate as well. It should be noted that the Rec Dept would becometlargest department in the Village with a budget roughly equivalent to half of the entire municipality as it currently exists.  EJRP also pays U46 for some services. If these services were no longer administered to EJRP, would there be a savings to U46 or would these expenses still exist and need to be covered by some other revenue source?  he RecTmaintenance personnel.  

Page 13: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 13

s take place in the schools. Current District policy does not charge EJRP for  outside of normal custodial or security work hours. A governance change 

given  

whereby EJRP would be required to pay for facility use?  The decision to revise the Use of School Facilities policy resides with the CCSU Board which is made up of representatives of the EJSD, U#46 and Westford School Boards.  If there was a change in building wear and tear or if there was a significant change in the type of usage or frequency, administration may recommend that the board revisit the policy.  In this scenario, even if the policy does not change, the personnel costs would likely increase since, as EJSD employees, some members of the Rec Dept staff are provided keys and access codes which currently eliminates much of the need for security overtime hours.  

GOVERNANCE  What are the key steps involved in transferring EJRP from school governance to Village governance? What is a reasonable time frame to successfully accomplish each step?  The list below is clearly not all‐inclusive. CCSU: 

• Ensure an agreement is in place whereby the Village agrees to pay the long term debt related to the bond for the pool and building renovation. One month – dependent on approval by boards (Trustees and Prudential Committee). 

• Cancel internet (T‐1 line), phone and copier contracts. One month. •  Cancel insurance coverage. One month. • Employee terminations – cancelation of medical, dental and life insurance coverages. Up 

to one month. (Note: three employees have contracts through 6/30/2012 which must be honored.) 

• Produce W‐2 Forms early – if requested by employees. One month. •  Transfer any fund balances – entire amount could be transferred if Village agrees to 

assume accounts payable/receivable (if not, some residual amount may need to be held to cover payables). One month. 

• Determine whether or not to run certain programs such as after‐school care in the K‐5 schools – would need to know what programs would continue to be offered by the Rec Dept and the conditions for use of school building. Time frame to be determined. 

    

QUE

STIO

NS

FOR

CHI

TTEN

DEN

CEN

TRA

L SU

PERV

ISO

RY U

NIO

N

QUESTIONS FOR CHITTENDEN CENTRAL SUPERVISORY UNION (continued) 

50% of EJRP programchool use unless it isswould not affect this policy. If EJRP was no longer associated with the school district,  and the current climate of school budget challenges, do you anticipate CCSU revisiting this policy,

Page 14: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 14EJRP GOVERNANCE SURVEY RESULTS 14

QUESTIONS FOR CHITTENDEN CENTRAL SUPERVISORY UNION (continued)  What are the key steps involved in transferring EJRP from school governance to Village governance? What is a reasonable time frame to successfully accomplish each step?  (continued from previous page)  Village: 

• Specific timelines need to be established by the Village. • Establish staffing. • Establish benefits (e.g., medical, dental, etc.). • Load budget data (including salaries and benefits) into an Accounting and Personnel 

System. • System should allow for separate accounts for various programs. •  System must be capable of processing payroll for approximately 300 employees 

throughout the year. •  System must be capable of processing over 1,000 invoices per year. •  System must be capable of processing over 2,000 cash receipts per year. 

• Establish contracts for internet, phone and copier. • Obtain insurance coverage. • Determine which programs will continue to be offered – for programs residing in EJSD 

schools, the Rec Dept would need to coordinate with the school district.  

PROGRAMS  Are there any programs that are currently operated by EJRP that the school district would continue running in the event of a transfer of governance (i.e. not transfer to the Village)?  This would be a Prudential Committee decision. Administration would need to know which programs the Rec Dept is interested in continuing to offer and would need to consider factors such as facility access and insurance coverage. Such would require a detailed understanding of this new relationship. It is likely administration would recommend the continuation of after‐school care at the K‐5 schools – either by the Rec Dept or by establishing a program internally. 

Q

UEST

ION

S FO

R C

HITT

ENDE

N C

ENTR

AL

SUPE

RVIS

ORY

UN

ION

Page 15: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS Q

UEST

ION

S FO

R TH

E VI

LLA

GE

OF

ESSE

X JU

NC

TION

15

 a separate line item by the voters by Australian ballot in April. Hch

ll er Village governance ‐ will EJRP be separate from the General Fund? 

ital 

 response has not yet been provided by the Village. 

e to oversee recreation, what are, if any, the anticipated increase in Village  compensation 

ce change? hat would be the anticipated effect on Village taxes on an average family with a $250K 

 internet under a governance change and 

A response has not yet been provided by the Village.  EJRP currently has several cell phones. Who would the provider be under a governance change?   A response has not yet been provided by the Village.

QUESTIONS FOR THE VILLAGE OF ESSEX JUNCTION

BUDGET  The EJRP budget is voted on asow will the budget for the Recreation Department be voted on if there is a governance ange? 

  response has not yet been provided by the Village. 

All revenue realized by EJRP stays with EJRP. It cannot be accessed for any other purposes. Withis remain the same und A response has not yet been provided by the Village.  EJRP has a rolling capital fund that is voted on as a separate line item by the voters by Australian ballot in April. Will EJRP continue to have a capital fund dedicated to recreation purposes only? How will this be funded? At what level will this be funded? How will the capbudget for the Recreation Department be voted on if there is a governance change?  A If the Village wercosts for: Legal services? Audit services? Property & liability insurance? Workersinsurance?  A response has not yet been provided by the Village.  What will the tax implications for the Village property tax rate be of a governanWassessed property value?  A response has not yet been provided by the Village.  EJRP currently has phone and internet connectivity through a T1 line connected to Essex HighSchool. How would EJRP connect to the phone and how much would it cost per year? 

 

Page 16: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 16

)

ANCE

  response has not yet been provided by the Village. 

lan? 

w will the ownership of the buildings transfer? 

llage pay for the emainder of the bond through 2019, if there is a change in governance? 

not yet been provided by the Village. 

 Is this already in use r will it need to be purchased? If so, at what expense? 

or the Village, what are the key steps involved in transferring EJRP from school governance to 

 response has not yet been provided by the Village. 

 of ocial media be permitted under Village oversight? 

JRP has it’s own website and domain name. Content is routinely updated and visitors have the ain name (www.ejrp.org) and type 

of independent, interactive website continue to be permitted and promoted under Village oversight?  A response has not yet been provided by the Village. 

QUE

STIO

NS

FOR

THE

VILL

AG

E O

F ES

SEX

JUN

CTIO

N

QUESTIONS FOR THE VILLAGE OF ESSEX JUNCTION (continued

GOVERN Under Village governance, will there be changes to the EJRP mission and vision? 

A How would a change in governance affect implementation of the EJRP 10‐year Master P A response has not yet been provided by the Village.  In the event of a transfer of governance, ho A response has not yet been provided by the Village.  How will the bond debt be transferred to the Village and/or how will the Vir A response has  If the Village were to govern EJRP, what accounting system will be used?o A response has not yet been provided by the Village.  FVillage governance (HR, budget set‐up, phone, internet, vendor relations, bank accounts, hiring new personnel, etc.)? What is a reasonable time frame to successfully accomplish each step?  A What are the anticipated costs?  A response has not yet been provided by the Village.  EJRP has over 525‐friends on Facebook and 90+ followers on Twitter. Will use of these typess A response has not yet been provided by the Village.  Eability to comment on articles and programs. Will this dom

Page 17: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 17

the 

up remain in place in the same capacity? If not, then how would the Village provide for ommunity input? 

t the request of the Prudential Committee, the Recreation Advisory Council has reached out  to the 

ire for this change. What have the Trustees done to gather public input on this ubject? 

 response has not yet been provided by the Village. 

rces being spent exploring an issue raised by such a small but vocal inority? 

ed by the Village. 

e youth. Services that are currently accessed through CCSU clude support, guidance, meetings, and consultation with guidance counselors, principals, 

t e to working with youth? 

urrently the schools use EJRP parks and facilities at no charge. Will this change under Village 

 response has not yet been provided by the Village.     

QUE

STIO

NS

FOR

THE

VILL

AG

E O

F ES

SEX

JUN

CTIO

N

QUESTIONS FOR THE VILLAGE OF ESSEX JUNCTION (continued)  Current EJRP structure includes a seven member volunteer advisory council that serves as liaison between the administration and the community. Under a governance change, would this groc A response has not yet been provided by the Village.  Ato the community with a survey and several public meetings to obtain more feedback asresidents’ dess A Why are time and resoum A response has not yet been provided by the Village.  Why are the Trustees adamant that this be dealt with in such a short timeframe? Is there aemergency?  A response has not yet been provided by the Village.  If it ain’t broke why fix it? The school district has managed the recreation department for forty years, why is a change needed at this time?   A response has not yet been provid 

PROGRAMS  80% of EJRP program users arinathletic directors, and teachers. Under Village governance, how will the Village provide supporand expertise in referenc A response has not yet been provided by the Village.  Cgovernance?  A

Page 18: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 18

Are there any programs that are currently operated by EJRP that the Village would no longer run in the event of a transfer of governance?  A response has not yet been provided by the Village.  With a change in governance, would the Village revise existing fee structures for programs, parks, facilities, and pools? If so, please explain.  A response has not yet been provided by the Village.  

STAFF  EJRP utilizes IT support from CCSU for purchasing, server maintenance and back‐ups, computer security, software installation, network infrastructure, and more. If there was a change in governance, what IT support will the Village provide? Who will provide it? Is there a cost for these services?  A response has not yet been provided by the Village.  EJRP utilizes maintenance support from CCSU. If there was a change in governance, what support will the Village provide in terms of each of the following: plumbing (winterizing park, installing/removing water meters, leaks, problems, etc.)?   A response has not yet been provided by the Village.  Electrical (installing new electrical, addressing electrical issues, replacing parking lot/ball field lights, etc.)? Auto repair (EJRP truck)? Equipment repair (tractors, lawn mowers, etc.)? Who will pay for these services?  A response has not yet been provided by the Village.   Does the Village adhere to a pay scale for full time staff? If so, please provide a copy. What is the standard for determining pay rates and how would existing full‐time recreation employee’s rates be calculated for the first year in the event of a governance change? How long are employment contracts?  A response has not yet been provided by the Village.  What benefits (health, dental, leave, tuition reimbursement, retirement match, life insurance, travel and conference, etc. – please provide detail) would be offered to full time recreation employees under Village governance? What are the costs to both the Village and the employee for single, two‐person, and family healthcare and dental plans?  A response has not yet been provided by the Village.  

QUESTIONS FOR THE VILLAGE OF ESSEX JUNCTION (continued)  

QUE

STIO

NS

FOR

THE

VILL

AG

E O

F ES

SEX

JUN

CTIO

N

Page 19: Ejrp Governance Survey Results

EJRP GOVERNANCE SURVEY RESULTS 19

 

 e the annual 

xpense? Will any additional staff need to be hired?  If so, how many? In what capacities? At 

 response has not yet been provided by the Village. 

d, uch? 

t been provided by the Village. 

,  

ssurances are there that the existing recreation staff will become employed by the Village in 

en said that they are at their e the additional 

hips of Village ding 

QUE

STIO

NS

FOR

THE

VILL

AG

E O

F ES

SEX

JUN

CTIO

N

QUESTIONS FOR THE VILLAGE OF ESSEX JUNCTION (continued)

For employees at EJRP who have accrued benefits (achieved waiting period for retirement match, accumulated unused sick, vacation, and personal time) how will these transfer to Village employment under a governance transfer?  A response has not yet been provided by the Village.  If the Village were to assume oversight of EJRP, who will provide accounting, finance, humanresource, and/or administrative support for EJRP’s operations? What will bewhat total compensation?  A If the Village were running the recreation department and taking on that additional workloawill there be in an increase in any existing Village staff salaries? If so, by how m A response has not ye Under Village governance, would there be any changes to the existing staffing structurepersonnel, titles, job descriptions, and/or work related responsibilities at EJRP? Whatatheir  current positions?  A response has not yet been provided by the Village.  Several times, in reference to the Village staff workload, it has belimit. In its current configuration and numbers, can the Village staff assumresponsibilities of adding a new department?  A response has not yet been provided by the Village.  Please provide a current organizational chart, demonstrating the relations