EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.
-
Upload
sierra-mcdonough -
Category
Documents
-
view
216 -
download
1
Transcript of EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.
![Page 1: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/1.jpg)
EIM: What is it?(And why should I care?)
Dr. Joel N. Orr
KollabNet, Inc.
![Page 2: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/2.jpg)
Benefits of EIM
Increase profits through reduced errors Reduce time-to-market through reusable
designs Reduce time-to-market through in-process
change-impact analysis Continuously improve through “corporate
memory” – what and why More profits through better designs Broaden innovation base to reduce
competitive risks Integrated outsourcing while reducing IP
losses
![Page 3: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/3.jpg)
What is EIM?
Engineering information modeling A systems view of engineering The next step in engineering
automation
![Page 4: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/4.jpg)
Product
Management View
The engineering processRequirements
![Page 5: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/5.jpg)
Reality
![Page 6: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/6.jpg)
The History of Design
Physical models “Paper” Electronic paper Electronic “physical models” Data-based models Knowledge-based models
![Page 7: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/7.jpg)
The Virtualization of Design
THE THING ITSELFTHE THING ITSELF
PHYSICAL MODELPHYSICAL MODEL
““PAPER”PAPER”
E-PAPERE-PAPER
ConcreteConcrete
AbstractAbstract
3D WIREFRAME3D WIREFRAME3D SURFACES3D SURFACES
SOLIDSSOLIDSSOLIDS W/BEHAVIORSOLIDS W/BEHAVIOR
RealReal VirtualVirtual
ImplicitImplicit ExplicitExplicitKnowledge
![Page 8: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/8.jpg)
The Product Development Cycle
![Page 9: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/9.jpg)
Product development cycle (time)
Pe
rce
nta
ge
Knowledge about the design problem
Design freedom
Today
Knowledge vs. Freedom
With KollabNet
KollabNet
![Page 10: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/10.jpg)
Product development cycle (time)
Co
st 80% of product cost is committed80% of product cost is committed
in the first 25% of the process.in the first 25% of the process.
$
80%
Effect of Design on Cost
KollabNet
![Page 11: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/11.jpg)
Co
st
Cost of a Change: Early vs. Late
$$$
$$$
$$$$
Product development cycle (time)
KollabNet
![Page 12: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/12.jpg)
Summary
EIM is a direction, not a destination
The benefits are substantial: Significantly reduced error rates Cumulative knowledge Project integrity
You need the right tools
![Page 13: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/13.jpg)
The only long-term The only long-term sustainable competitive sustainable competitive advantage is to learn faster advantage is to learn faster than your competitors.than your competitors.
Arie de GeussArie de Geuss
Royal Dutch ShelRoyal Dutch Shelll
![Page 14: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/14.jpg)
Get the Power of EIM
Caminante, no hay camino; se hace camino al andar
Antonio Machado
![Page 15: EIM: What is it? (And why should I care?) Dr. Joel N. Orr KollabNet, Inc.](https://reader035.fdocuments.us/reader035/viewer/2022062417/5514a776550346b2598b5e0f/html5/thumbnails/15.jpg)
Thanks! [email protected] www.kollabnet.com