Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy...
Transcript of Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy...
![Page 1: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/1.jpg)
May 2006, CMS Users Group, May 2006, CMS Users Group, Minneapolis, MNMinneapolis, MN 11
Eigenvalue Trends at BVPS-1 and BVPS-2
Kenneth NaugleFirst Energy Nuclear Operating Company
A-GO-276 S. Main St.
Akron, OH [email protected]
![Page 2: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/2.jpg)
May 2006, CMS Users Group, Minneapolis, MN
2
Computer Codes
CASMO-4, v2.05.10
CMSLINK, v1.22.00
INTERPIN, v3.03
SIMULATE-3, v6.07.17 (FENOC build)
XIMAGE tool, v2.0.36
![Page 3: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/3.jpg)
May 2006, CMS Users Group, Minneapolis, MN
3
BVPS Reactivity Issue
Recent experience with EOC Keff & Critical boron indicates an adverse trend for BVPS-2 (and BVPS-1 to a lesser extent)Increasing excess reactivity towards EOCCurrently ~+300 pcm at BVPS-1 EOC17. BVPS-2 ~+400 pcm MOC12. Project >+500 pcm at EOC12.
![Page 4: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/4.jpg)
May 2006, CMS Users Group, Minneapolis, MN
4
History
Both units, calorimetric using Feed Venturi until 2001Switch to LEFM measurement and 1.4% power uprate after 10/2001.Unit 2 did not see a power increase (OE12686) and concluded BVPS-2 was running at ~1.5% overpower prior to 2001.Core model did not confirm overpower condition.
![Page 5: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/5.jpg)
May 2006, CMS Users Group, Minneapolis, MN
5
BVPS-1 EOC Critical Boron
• BVPS-1 current trends indicate a relatively steady trend in EOC reactivity as represented by the EOC ΔBoron
• Note 1.4% power uprate (improved calorimetric, Cycle 15)
• There may be a trend from cycle 15 on.
• Current EOC Keff ≈ 0.9970
![Page 6: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/6.jpg)
May 2006, CMS Users Group, Minneapolis, MN
6
• Current data indicates an increasing trend in EOC surplus reactivity at BVPS-2 as represented by the rising EOC ΔBoron
• Note 1.4% power uprate (implementation of improved calorimetric mid-Cycle 9)
• Current EOC Keff ≈ 0.9961
BVPS-2 EOC Critical Boron
![Page 7: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/7.jpg)
May 2006, CMS Users Group, Minneapolis, MN
7
BVPS-1 Cycle K-eff Trends
![Page 8: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/8.jpg)
May 2006, CMS Users Group, Minneapolis, MN
8
BVPS-2 Cycle K-eff Trend
![Page 9: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/9.jpg)
May 2006, CMS Users Group, Minneapolis, MN
9
BV2C12 Eigenvalue Comparison
![Page 10: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/10.jpg)
May 2006, CMS Users Group, Minneapolis, MN
10
Issues
Vendor code agrees with SIMULATE-3 results.System experts have not identified any problem with current calorimetric.The BVPS-2 system is the superior system (Check+ LEFM). BVPS-1 has the older “Check”system.Future power uprates will add additional 7.8% power at both units
![Page 11: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/11.jpg)
May 2006, CMS Users Group, Minneapolis, MN
11
BVPS-2 EOC Critical Boron at Constant Power
![Page 12: Eigenvalue Trends at BVPS-1 and BVPS-2 - Studsvik...BVPS-1 and BVPS-2 Kenneth Naugle First Energy Nuclear Operating Company A-GO-2 76 S. Main St. Akron, OH 44308 nauglek@firstenergycorp.com](https://reader034.fdocuments.us/reader034/viewer/2022051805/5ff8ed86e48d2b314418153a/html5/thumbnails/12.jpg)
May 2006, CMS Users Group, Minneapolis, MN
12
Conclusions
Current core models show a gradual reduction in critical Keff with increasing core exposure.Concern at BVPS-2 is to avoid Δρ approaching T.S. limit of 1%.BVPS-2 model at constant power is consistent, but Δρ seems high.Future power uprates are a wildcard, effect must be carefully watched.