EIA for Proposed Redevelopment Activities of Cochin Port Trust at Cochin...
Transcript of EIA for Proposed Redevelopment Activities of Cochin Port Trust at Cochin...
UPDATED FORM-1September 2015
EIA for Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port,
Willingdon IslandIn Ernakulam Distr ict, Kerala
Prepared By
C1121308 RP009, Rev 0
COCHIN PORT TRUST
L&T Infrastructure Engineering Ltd.6‐3‐1192/1/1, 5th Floor, Block No.3,
White House, Kundan Bagh, Begumpet, Hyderabad – 500 016Ph: 91‐040‐40354444; Fax: 91‐040‐40354430
L&T Infrastructure Engineering Ltd. Client: Cochin Port Trust (CoPT)
Project: EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island
Project No.:
C1121308
Title:
Updated Form-1 Document No.:
RP009
Rev.:
0 This document is the property of L&T Infrastructure Engineering Ltd. (formerly known as L&T-Rambøll Consulting Engineers Limited) and must not be passed on to any person or body not authorised by us to receive it nor be copied or otherwise made use of either in full or in part by such person or body without our prior permission in writing.
File path: r:\ports\2012\c1121308 - eia for cochin port trust\outputs\reports\009-updated form1\009-r0-updated form1.docx
Notes:
1.
Revision Details:
0 28.08.2015 Updated Form-1 seeking ToR Validity Extension
RBV CVS CVS
Rev. Date Details Init. Sign. Init. Sign. Init. Sign.
Prepared Checked Approved
Table of Contents
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
Table of Contents Page i
TABLE OF CONTENTS
1 Basic Information ...........................................................................................................................1
2 Activity .............................................................................................................................................6
3 Environmental Sensitivity ........................................................................................................... 21
LIST OF APPENDICES
Appendix A: MoEF Approved ToR
Appendix B: Location Map
Updated Form-1
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
1 Basic Information Page 1
UPDATED FORM 1
1 Basic Information
S. No. Item Details
1. Name of the Project
Redevelopment Activities of Cochin Port Trust at
Willingdon Island, Kochi
This Updated Form-1 is prepared/submitted
as part of application seeking extension of
validity of Terms of Reference (issued vide
F.No.11-45/2013-IA.III, dated October 31,
2013 - MoEF approved ToR is given as
Appendix A) for One (01) additional year to
enable submission of the EIA Report to
MoEF
2. S. No. in the schedule Activity 7(e)
3.
Proposed
capacity/area/length/tonnage to be
handled / command area/lease
area/number of wells to be drilled
With proposed expansion/modernization the
capacity is envisaged to be enhanced to handle
~30 MTPA (General Cargo, Liquid Cargo, Dry
Bulk Cargo, Clean Cargo), 92,000 ECU/annum
and 3,500 passenger capacity cruise vessels at
the existing 17 berths.
An area of ~ 40.1 hectares (ha) has been
earmarked for backup area of dry bulk cargo
storage and cruise terminal, storage area for
Ro-Ro berth and tank farms for liquid cargo.
In addition, an area of ~ 145.56 ha is envisaged
as part of redevelopment of Willingdon Island to
include following facilities/activities:
Logistics Park – 44.8 ha
Ship Repair Yard – 18.21 ha
Free Trade Warehousing Zone – 41.27 ha
Port Users Complex – 3.7 ha
Hospitality Node and Business District –
22.38 ha
Business District – 7.88 ha
Office space – 5.5 ha
Retail development – 1.82 ha
4. New/ Expansion/Modernisation Expansion/Modernisation
5. Existing Capacity/Area etc
Cochin Port is currently handling ~21.60 MTPA
of General Cargo, Liquid Cargo, Dry Bulk Cargo,
Clean Cargo and 1,300 passenger capacity
cruise vessels with existing 17 berths
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
1 Basic Information Page 2
S. No. Item Details
CoPT has under its jurisdiction approximately
886.04 ha of land at various locations in Kochi
including Willingdon Island (385.90 ha),
Bolghatty (16.68 ha), Vallarpadam (163.70 ha),
Puthuvypeen (308.27 ha), Ernakulam (4.813
ha), Fort Kochi (2.150 ha), Palluruthy (3.959 ha)
and Thevara (0.587 ha).
Most of the Port activities are based on
Willingdon Island, which consists of reclaimed
area of 233.44 ha on the North end and ~
152.46 ha at the South end of Willingdon Island,
which is partially reclaimed.
6. Category of Project i.e., ‘A ‘or ’B’ Category ‘A’
7. Does it attract the general condition?
If yes, please specify No
8. Does it attract the specific condition?
If yes, please specify No
9.
Location
Cochin Port (Port) is located on the south-west
coast of India, in the state of Kerala.
Location Coordinates:
Latitude – 09058’N
Longitude – 76016’E
Location map is given as Appendix B
Plot/Survey/Khasra No.
Survey No. 2578/4 in Thoppumpady Village for
W/Island North portion (233.44 ha)
Survey No. 1166/2 in Rameswaram Village for
Willingdon Island South portion (south end
reclamation area – 152.46 ha)
Proposed redevelopment activities are
planned within areas currently being used
for Port operations and on areas under
CoPT’s jurisdiction
Village Thoppumpady and Rameswaram
Tehsil Kochi
District Ernakulam
State Kerala
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
1 Basic Information Page 3
S. No. Item Details
10. Nearest railway station/ airport along
with distance in kms
Railway Station: Ernakulam (~10.0 km)
Harbour Railway station - For Cargo movement
Airport: Kochi (~35.0 km)
Defence (Navy) airport (0 km, on W/Island)
11. Nearest Town, city, district head
quarters along with distance in kms
Town: Kochi (~2.0 km)
City: Ernakulam (~ 3.0 km)
District HQ: Ernakulam (~3.0 Km)
12.
Village Panchayats, Zilla Parishad,
Municipal Corporation, Local body
(complete postal addresses with
telephone nos,to be given)
Kochi Taluk Office
Fort Kochi, Ernakulam, 682001
Phone: 0484 221 5559
Corporation Of Cochin Zonal Office
Moulana Azad Road, Star Junction,
Mattancherry, Kochi, Kerala 682002
Phone:0484 222 6202
Ernakulam District Collectorate Office
Civil Station Rd, Kakkanad
Phone: 0484 242 2294
13. Name of the applicant Cochin Port Trust (CoPT)
14. Registered Address
Cochin Port Trust,
Willingdon Island, Kochi- 682009
Kerala, India
Tel:+91 04842666414
15.
Address for correspondence:
Chief Engineer
Cochin Port Trust
Willingdon Island, Kochi-682009
Kerala, India
Tel:+91 04842666414
Name Augustine J. Puducherry
Designation (Owner/Partner/CEO) Chief Engineer i/c
Address
Cochin Port Trust
Willingdon Island, Kochi- 682009
Kerala, India
Tel:+91 04842666414
Pin code 682 009
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
1 Basic Information Page 4
S. No. Item Details
E-mail [email protected]; [email protected]
Telephone No +91 0484 2666414
Fax No +91 0484 2666414, 2668163
16.
Details of Alternative Sites examined,
if any. Location of these sites should
be shown on a Toposheet.
Not applicable as proposed redevelopment
activities are planned within the area currently
being used for port operations.
17. Interlinked Projects None
18.
Whether separate application of
interlinked project has been
submitted.
Not Applicable
19. If yes, date of submission Not Applicable
20. If no, reason Not Applicable
21.
Whether the proposal involves
approval/ clearance under:
The Forest (Conservation)
Act, 1980
The Wildlife (Protection)
Act,1972
The CRZ Notification, 2011
No Forest (Conservation) Act involved
The Mangalavanam Bird sanctuary falls
within 10 km radius of the Project Site. As
such, it attracts the provisions of the Office
Memorandum from MoEF vide No. J-
11013/41/2006-IA.II(I), dated December 2,
2009 and F.No. J-II013/41/2006-IA.II(I)
(Part), dated March 30, 2015. Accordingly,
CoPT is in the process of submitting the
application for clearance to Forest and
Wildlife department, Govt. of Kerala. This
will be taken up by CoPT prior to coming to
MoEF seeking Environmental Clearance for
CoPT’s proposed redevelopment activities at
Willingdon Island. A copy of the same shall
be furnished along with the application for
Environmental Clearance.
Project attracts the CRZ Notification, 2011 in
respect of the redevelopment activities of the
Port and its infrastructure facilities.
o HTL/LTL, CRZ demarcation has
been carried out by NCESS,
Thiruvananthapuram
22. Whether there is any Government
order/ policy relevant / related to the
This area is under Jurisdiction of CoPT,
constituted under Major Port Trusts Act 1963.
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
1 Basic Information Page 5
S. No. Item Details
site?
23. Forest land involved (hectare) No forest area involved
24.
Whether there is any litigation
pending against the project and/or
land in which the project is proposed
to be set up
Name of the court
Case no
Orders/ directions of the court, if any
and its relevance with the proposed
project.
No major litigation is pending against the project
and /or land in which the project is proposed to
be developed. However, there is a case filed by
M/s. A.V. Kowdai & Co. in the High Court of
Kerala, with respect to an 18 cent area (included
in the back up area of Q8 – Q9 berths), which
was being used by them on lease, since 1961.
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 6
2 Activity
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, etc.)
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
1.1
Permanent or temporary
change in land use, land
cover or topography including
increase in intensity of land
use (with respect to local
land use plan)
Yes
Permanent change in land use, land cover
and topography due to the redevelopment
activities is envisaged. An area of ~ 40.1
ha has been earmarked for backup area
for cargo storage. Additional area of ~
145.56 ha is envisaged as part of non-port
side redevelopment activities at W/Island.
1.2 Clearance of existing land,
vegetation and buildings? Yes
Proposed redevelopment activities as per
the project requirement will involve
clearance of land/vegetation/buildings.
However all activities will be limited to the
land area falling under CoPT’s jurisdiction
and in areas of existing port operations.
1.3 Creation of new land uses? Yes As per the requirement of proposed
redevelopment activities.
1.4
Pre-construction
investigations e.g. bore holes,
soil testing?
Yes
Field surveys and investigations have
been carried out by CoPT for seabed
surveys (viz. bathymetry), topography,
marine geotechnical investigations,
oceanographic measurements (wave, tide
and current).
1.5 Construction works? Yes
Proposed Port Side Developments
Dredging
Restoration/redevelopment of existing
berths
Due to proposed deepening of
channel/berthing area between
Dufferin Point and Q9 berth, certain
existing berthing structures along this
stretch (on W/Island) need to be
demolished and rebuilt
Modernization/mechanization of cargo
handling facilities
Development of Ship Repair Yard
Development of operational
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 7
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
buildings/areas (Logistics Park, Port
Users Complex, Customs Office,
bonded ware housing, truck parking
and truck loading/ unloading stations,
etc.)
Providing firefighting systems
Providing Utilities and Services
Proposed Non Port Side Developments
Free Trade Warehousing Zone
Administrative/ office buildings
Business District with a functional mix
of hospitality, convention centre and
commercial complex
1.6 Demolition works? Yes As per requirement of proposed
redevelopment
1.7
Temporary sites used for
construction works or housing
of construction workers?
No
Majority of the works will be sub-
contracted and as the Port area is located
in urban area, workers will be sourced
from nearby areas. However, a temporary
site for construction workers camp if
required will be earmarked within the
Project Site with proper security/ fencing.
Also, proposed developments are not
envisaged at one go and will be
constructed phase wise.
1.8
Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes Envisaged as a part of the redevelopment
activities
1.9 Underground works including
mining or tunneling? No -
1.10 Reclamation works? No
Proposed redevelopment activities shall
be carried out on land area that has
already been reclaimed at W/Island;
hence no further reclamation works are
envisaged as part of proposed
redevelopment.
1.11 Dredging? Yes As part of proposed redevelopment
activities, dredging shall be carried out for
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 8
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
the following:
Increasing depth from SCB to Dry
Dock in Mattancherry Channel from 4
to 7 m
Increasing the Turning Circle
dimension in Mattancherry Channel
from 240 to 400 m
Increasing depth in Ernakulam
Channel (Dufferin Point to Q9 Berth)
from 13.2 to 15.2 m
Estimated dredging quantity is about 2.0
Mm3. Dredged materials will be disposed
at designated dumping locations, offshore.
However, CoPT is also examining the
feasibility of using the dredged material
from various dredging activities in the Port
to create an artificial island in the
backwaters in order to streamline the
currents and minimize the extent of
siltation in the Ernakulam and
Mattancherry Channels. This option is
being examined by CoPT with respect to
cost benefit analysis, promotion of
Nation’s Tourism, loss of wetland area
and other factors and is not
addressed/covered as part of current
proposed redevelopment.
1.12 Offshore structures? No -
1.13 Production and
manufacturing processes? No -
1.14 Facilities for storage of goods
or materials? Yes
Necessary storage area for coal, general
cargo, liquid cargo, and other materials
will be provided.
1.15
Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes
Sewerage system along with a Sewage
Treatment Plant (STP) is proposed to be
developed for collection/treatment of
sewage.
Oil contaminated water will be sent to
proposed oil water separator; separated
oil will be sent to KSPCB approved
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 9
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
vendors and water will be sent to STP for
further treatment.
It is proposed to integrate solid waste
disposal with the waste-to-energy
proposal under implementation in close
vicinity. Non treatable solid waste will be
sent to authorized and organized solid
waste disposal sites.
1.16
Facilities for long term
housing of operational
workers?
No No additional basic infrastructure for
housing etc. is envisaged.
1.17
New road, rail or sea traffic
during construction or
operation?
Yes
Construction Phase:
Vehicles involved in men and material
transportation
Movement of construction equipment,
machinery and material
Operation Phase:
Vehicles involved in men and cargo
movement
Road/ Rail/ Sea traffic during import/
export of cargo
1.18
New road, rail, air,
waterborne or other transport
infrastructure including new
or altered routes and stations,
ports, airports etc?
Yes
Present road connectivity of Port is
through two bridges on Ernakulam
Channel and one on Mattancherry
Channel which links Port to mainland.
Construction of another bridge connecting
southern part of W/Island close to site of
Business District to Palluruthy area on
south west part of the city has now
commenced. There exists adequate road
connectivity to all the berths on W/Island.
1.19
Closure or diversion of
existing transport routes or
infrastructure leading to
changes in traffic
movements?
No Nil
1.20 New or diverted transmission
lines or pipelines? Yes
Based on the proposed redevelopment
activities, new internal transmission lines
and pipelines are envisaged to be laid as
necessary to cater the additional
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 10
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
requirements.
1.21
Impoundment, damming,
culverting, realignment or
other changes to the
hydrology of watercourses or
aquifers?
No -
1.22 Stream crossings? Yes
Majority of Port activities are carried out
on W/Island where current redevelopment
activities are planned. Connectivity from
Island to mainland is through bridges and
waterway. Currently there are three road
bridges providing connectivity to the
mainland. Construction of another bridge
connecting southern part of W/Island
close to site of Business District to
Palluruthy area on south west part of the
city has now commenced.
1.23
Abstraction or transfers of
water from ground or surface
waters?
No Water requirement to be sourced from
Kerala Water Authority (KWA).
1.24
Changes in water bodies or
the land surface affecting
drainage or run-off?
No
Not envisaged; redevelopment will be
planned in such a way that natural
drainage or runoff will not be affected.
1.25
Transport of personnel or
materials for construction,
operation or
decommissioning?
Yes
Construction Phase:
Movement of construction material
including cement, aggregates, rock,
sand, steel, etc.,
Movement of construction workers by
vans/buses.
Operation Phase:
Movement of cargo from/to the port
Movement of work force from
townships/habitations to project site
1.26
Long-term dismantling or
decommissioning or
restoration works?
Yes
As per requirements of proposed
redevelopment activities dismantling and
restoration works are envisaged.
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 11
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
1.27
Ongoing activity during
decommissioning which could
have an impact on the
environment?
No -
1.28
Influx of people to an area in
either temporarily or
permanently?
Yes
Temporary and limited during
construction phase
Marginal and permanent during
operation phase
1.29 Introduction of alien species? No -
1.30 Loss of native species or
genetic diversity? No -
1.31 Any other actions? No -
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources that are non-renewable or in
short supply):
S.
No.
Information/checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
2.1 Land especially undeveloped
or agricultural land (ha) Yes
Redevelopment activities shall be carried
out on areas already reclaimed to form
W/Island and under CoPT’s jurisdiction.
Most of the areas are already being used
for various Port operations/activities; no
agricultural land is involved.
~ 40.1 ha has been earmarked for backup
area/storage of cargo. Additional area of ~
145.56 ha is envisaged as part of non-
port side redevelopment activities at
W/Island
2.2 Water (expected source &
competing users) unit: KLD Yes
Estimated water requirement is ~ 8 MLD
which will be sourced from KWA’s
proposed new water treatment plant (100
MLD capacity)
2.3 Minerals (MT) No Nil
2.4 Construction material – stone,
aggregates, sand / soil Yes Construction work will be outsourced to
reputed contractors/agencies who will
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 12
S.
No.
Information/checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
(expected source – MT) procure necessary materials. Soil, sand,
gravel, stone aggregates will be procured
from nearby licensed sources.
Cement/steel will be procured from
reputed manufacturers as per availability.
2.5 Forests and timber (source –
MT) Yes
Timber for use in construction of
buildings, modernisation/ mechanization
plans, etc. will be needed as per project
requirement and will be sourced (by the
contractor) from licensed suppliers.
2.6
Energy including electricity
and fuels (source, competing
users) Unit: fuel (MT), energy
(MW)
Yes
Power requirement for effective
functioning of activities after proposed
redevelopment is ~ 40 MVA. Required
power will be sourced from substations of
KSEB; DG sets will also be used as
source of power, as required.
2.7
Any other natural resources
(use appropriate standard
units)
No Nil
3. Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health.
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
3.1
Use of substances or
materials, which are
hazardous (as per MSIHC
rules) to human health or the
environment (flora, fauna,
and water supplies)
Yes
Existing Port facility is already handling
POL products. Proposed redevelopment
plan also includes handling/storage of
hazardous liquid cargo (Class A), POL
products. During construction/operation
phase of project, hazardous materials
such as welding gases, paints, lubricants,
etc. may be stored at project site. These
will be stored as per prescribed safety
norms and requirements of
handling/storing hazardous materials
(Hazardous Waste Management Rules).
Risks associated with handling, storage of
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 13
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
hazardous materials have been
addressed in EIA Study carried out for
proposed redevelopment project;
necessary mitigation measures have been
suggested in the EIA Report (EIA for
Proposed Redevelopment Activities of
Cochin Port Trust at Cochin Port,
W/Island).
3.2
Changes in occurrence of
disease or affect disease
vectors (e.g. insect or water
borne diseases)
No -
3.3
Affect the welfare of people
e.g. by changing living
conditions?
Yes
Direct and indirect employment during
construction and operation phases of
the project
Improved living conditions of local
people
3.4
Vulnerable groups of people
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.,
No -
3.5 Any other causes No -
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
4.1 Spoil, overburden or mine
wastes No -
4.2 Municipal waste (domestic
and or commercial wastes) Yes
Details regarding quantifications,
collection, handling and disposal
/management of MSW has been
addressed as part of the EIA study and
presented in the EIA Report.
4.3 Hazardous wastes (as per Yes Hazardous wastes such as used oil will
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 14
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
Hazardous Waste
Management Rules)
be stored in closed drums and disposed
at nearest Treatment, Storage and
Disposal Facility (TSDF) through
approved KSPCB vendors. Hazardous
materials will be stored as per prescribed
safety norms in locations with restricted
entry and provided with
appropriate/adequate fire-fighting
facilities.
4.4 Other industrial process
wastes No -
4.5 Surplus product No -
4.6
Sewage sludge or other
sludge from effluent
treatment
Yes
Sewage generated at the Port premises
on W/Island (from toilets, bathrooms,
etc.) will be drained into and treated at
the proposed onsite STP. Currently only
septic tanks are available.
4.7 Construction or demolition
wastes Yes
Construction/demolition waste to the
extent possible will be utilised at the Port
premises for site grading etc; remaining
waste will be disposed suitably as per
Kerala State Pollution Control Board
(KSPCB) guidelines.
4.8 Redundant machinery or
equipment No -
4.9 Contaminated soils or other
materials No -
4.10 Agricultural wastes No -
4.11 Other solid wastes No -
5. Release of pollutants or any hazardous, toxic or noxious substances to air
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 15
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
5.1
Emissions from combustion
of fossil fuels from stationary
or mobile sources
Yes
Emissions from construction machinery,
dredgers, vehicular movements, etc.
during construction/ operational phases
are envisaged. Such vehicles will have
Pollution Under Control Certificate as
applicable; DG sets will ensure to meet
stipulated emission standards.
5.2 Emissions from production
processes No -
5.3
Emissions from materials
handling including storage
or transport
Yes
Fugitive emissions are anticipated from
cargo loading/unloading, transfer points,
stacking/transfer of cargo (especially
coal), etc. and other emissions from
diesel run handling equipment’s. Impacts
due to fugitive emissions are addressed
and presented in the EIA Report.
5.4
Emissions from construction
activities including plant and
equipment
Yes
Emission from construction
equipment and vehicles, diesel
operated pumps, concrete mixers,
dredgers, etc.
Fugitive dust emissions during
transport of construction material
Equipment’s will be maintained to ensure
minimum emissions; more-over
construction activity will be for a short
duration of period and restricted within
the proposed redevelopment area of the
Port.
5.5
Dust or odours from handling
of materials including
construction materials,
sewage and waste
Yes
Dust due to handling of construction
material during construction phase
Dust due to coal and other dry bulk
cargo handling
STP is proposed to be set up at the
Port; STP operation may lead to
possible odour
5.6 Emissions from incineration
of waste No -
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 16
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
5.7
Emissions from burning of
waste in open air (e.g. slash
materials, construction
debris)
No -
5.8 Emissions from any other
sources No -
6. Generation of Noise and Vibration, and Emissions of Light and Heat
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
6.1
From operation of equipment
e.g. engines, ventilation
plant, crushers
Yes
Noise generation from:
Vehicle movement, construction
equipments/machinery
Welding and cutting operation of metal
Pile driving activities during
construction
Grab unloaders/Mobile Harbour
Cranes
Stacker cum reclaimer
Conveyor system
DG sets etc.
Other Handling Equipments
However, equipment will be deployed
with noise mitigating devices conforming
to applicable standards; DG sets will
ensure to meet stipulated standards for
noise
6.2 From industrial or similar
processes No -
6.3 From construction or
demolition Yes
Trucks, dredgers, dumpers,
earthmovers, equipment for
welding/drilling, etc.
Personnel Protection Equipment (PPE)
will be provided to workers during
construction activities
6.4 From blasting or piling Yes There will be piling activity; PPE will be
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 17
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
provided to workers
6.5 From construction or
operational traffic Yes
From vehicular and inland cargo
movement
During the construction activities utmost
care will be taken to control the noise
levels within the standards. Similarly
during operation phase necessary
mitigation measures will be followed.
6.6 From lighting or cooling
systems No -
6.7 From any other sources No -
7. Risks of contamination of land or water from releases of pollutants into the ground
or into sewers, surface waters, groundwater, coastal waters or the sea
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
7.1
From handling, storage, use
or spillage of hazardous
materials
Yes
Existing port facility is already handling
POL products and chemicals.
Hazardous liquid cargo (Class A), POL
products will continue to be handled at
the port. Handling of fuel oils required for
port operations will be stored/ used as
per the stipulations laid. Cargo will be
handled using mechanised cargo
handling systems, thereby limiting the
possibilities of spills from occurring
during normal operations. Handling of
coal at the port will also be by using
mechanised coal handling systems.
Hazardous materials will be stored and
handled as per the provisions of the
manufacturer, storage and import of
Hazardous Chemical Rules, Hazardous
Wastes (Management and Handling)
Rules and Amendments thereof.
In the event of accidental spills of cargo
during transfer from/to the ships, marine
water quality and sediment quality in the
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 18
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
harbour basin may be affected.
Measures shall be taken to recover the
spills in order to minimise the impacts on
marine water quality. Risks associated
with handling, storage of hazardous
materials have been addressed in the
EIA study and appropriate mitigation
measures have been suggested in the
EIA report.
7.2
From discharge of sewage or
other effluents to water or the
land (expected mode and
place of discharge)
No
Currently only septic tanks are available
for all requirements. The sewage
generated will be collected and treated in
proposed STP to be developed on
W/Island. Treated wastewater is
proposed to be reused.
Oily wastewater, if any, will be sent to the
oil-water separator also proposed at the
Port.
7.3
By deposition of pollutants
emitted to air, onto the land
or into water
Yes
Port is already handling the different
types of Cargo which are also planned as
part of the redevelopment activities;
however increase in handling capacity
will have fugitive emissions due to cargo
handling which can build up the air
pollutant concentrations; the build up of
air pollutant concentrations will also
include fugitive emissions resulting from
coal handling at the port. Accidental oil
spills, ship wastes can impact the marine
waters if not controlled. These issues
have been addressed in the EIA study
and covered in the EIA Report.
7.4 From any other sources No
Adequate drainage system will be
provided at the Port with separate
collection streams to segregate the storm
water run-off, material storage areas and
other wastewater streams.
7.5
Is there a risk of long term
build up of pollutants in the
environment from these
sources?
No -
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 19
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
8.1
From explosions, spillages,
fires etc from storage,
handling, use or production
of hazardous substances
Yes
During construction phase, hazardous
material such as welding gases,
paints, lubricants etc. will be stored on
site.
During operational phase, there will be
storage of hazardous liquid cargo,
POL products, coal (Non-Hazardous
Material), all of which may cause fire
hazards.
Hazardous materials will be stored
and handled as per the provisions of
the manufacturer, storage and import
of Hazardous Chemical Rules,
Hazardous Wastes (Management and
Handling) Rules and Amendments
thereof to avoid accidents during
construction or operational phase.
As per Disaster Management Plan
(DMP), the necessary measures will
be followed to meet any eventuality
and to combat hazards or disasters
during port operations.
8.2 From any other causes No -
8.3
Could the project be affected
by natural disasters causing
environmental damage (e.g.
floods, earthquakes,
landslides, cloudburst etc)?
Yes
During the design stage the effects from
natural disasters (like cyclones, floods
etc.) will be considered and necessary
precautionary measures would be built in
or implemented. The project area lies
beyond the cyclone zone and therefore
the risk of cyclones is negligible.
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
2 Activity Page 20
9. Factors which should be considered (such as consequential development) which
could lead to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality
S.
No.
Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
9.1
Lead to development of
supporting utilities, ancillary
development or development
stimulated by the project
which could have impact on
the environment e.g.
1. Supporting infrastructure
(roads, power supply,
waste or wastewater
treatment, etc.)
2. Housing development
3. Extractive industries
4. Supply industries
5. Other
Yes
Redevelopment of the Port will lead to
overall socio-economic development of
region. Necessary supportive utilities,
infrastructure, etc. to cater the
requirements of the Port will be
developed/enhanced as part of the
proposed redevelopment project.
9.2
Lead to after-use of the site,
which could have an impact
on the environment
No
The proposed redevelopment activities
are planned to modernise/ optimise the
existing Port operations and would be a
permanent establishment.
9.3 Set a precedent for later
developments Yes
The proposed redevelopment will lead to
increase in commercial activities in the
region due to additional traffic movement
at Cochin Port and will also lead to
benefit future developments.
9.4
Have cumulative effects due
to proximity to other existing
or planned projects with
similar effects
Yes No other projects in the vicinity with
similar effects.
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
3 Environmental Sensitivity Page 21
3 Environmental Sensitivity
S. No. Areas Name/Identity Aerial Distance
(within 15 km)1
1
Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
Mattancherry Palace
Museum ~ 0.8 km - West
Fort Kochi
(Archaeological
Excavation Site)
~ 1.8 km - West
St. Francis Church,
Cochin (Fort Kochi) ~ 1.8 km - West
Hill Palace Museum,
Thripunithura ~ 8.6 km - East
2
Areas which are important or
sensitive for ecological reasons -
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
Vembanad Kayal ~ 2.2 km - NNE
3
Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
Mangalavanam Bird
Sanctuary ~ 2.3 km - NE
4 Inland, coastal, marine or
underground waters
Arabian Sea ~ 2.5 km - West
Vembanad Kayal ~ 2.2 km - NNE
5 State, National boundaries Nil Nil
6
Routes or facilities used by the
public for access to recreation or
other tourist, pilgrim areas
NH 47 A Passing through
W/Island
NH 47 ~ 2.5 km - East
NH 49 ~ 3.0 km - East
NH 17 ~ 7.6 km - NE
Southern Railway
Main Line ~ 1.5 km - East
1 Distances are aerial distances measured from the port boundary.
EIA for the Proposed Redevelopment Activities of Cochin Port Trust at Cochin Port, Willingdon Island C1121308 Updated Form-1 RP009 rev. 0
3 Environmental Sensitivity Page 22
S. No. Areas Name/Identity Aerial Distance
(within 15 km)1
7 Defence installations
Indian Navy (Southern
Command) Defence
Airport
Adjacent to Port (on
W/Island)
8 Densely populated or built-up
area
Entire project is in
Kochi urban area –
Mattancherry
Ernakulam
~ 0.6 km - West
~ 6.3 km - NE
9
Areas occupied by sensitive
man-made land uses (hospitals,
schools, places of worship,
community facilities)
Port is an existing port
in the Island area,
where there are
hospitals, schools,
places of worship and
community facilities in
the Island itself.
Ernakulam
~ 0.6 km - West
~ 6.3 km - NE
10
Areas containing important, high
quality or scarce resources,
(ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
Thoppumpady
Fisheries Harbour ~ 0.5 km - West
11
Areas already subjected to
pollution or environmental
damage (those where existing
legal environmental standards
are exceeded)
Nil --
12
Areas susceptible to natural
hazard which could cause the
project to present environmental
problems, (earthquakes,
subsidence, landslides, erosion
or extreme or adverse climatic
conditions)
The project falls under Seismic Zone III
(moderate earthquake zone) as per the
Seismotectonic Atlas of India. The project area
lies beyond the cyclone zone and therefore the
risk of cyclones is negligible.
During the design stage of project development,
the effects from natural disasters will be
considered and necessary precautionary
measures would be built-in/ implemented.
Appendices
Appendix-A
MoEF Approved ToR
Appendix-B
Location Map
L&T INFRASTRUCTURE ENGINEERING LTD.6‐3‐1192/1/1, 5th Floor, Block No.3,
White House, Kundan Bagh, Begumpet, Hyderabad – 500 016Ph: 91‐040‐40354444; Fax: 91‐040‐40354430