    Using XSteps for Integrated

    Production Scenarios

    Dr. Arne Manthey, ASM Manufacturing, SAP AGDr. Uwe Dittes, Manufacturing Development, SAP AG

    15.09.2008

    SESSION CODE: MFG 0905

  • 8/3/2019 Ehp 4 New Features

    2/43

    SAP 2007 / Page 2

    1. New developments in 2008 (EhP4)

    2. Easily manage rework by using XSteps

    3. Shift note functionality for PI Sheets or electronic work instructions

    4. Visual and functional integration of SAP MII in browser-based PI Sheets

    and electronic work instructions

    5. XStep Caf

    Agenda

  • 8/3/2019 Ehp 4 New Features

    3/43

    SAP 2007 / Page 3

    1. New developments in 2008 (EhP4)

    2. Easily manage rework by using XSteps

    3. Shift note functionality for PI Sheets or electronic work instructions

    4. Visual and functional integration of SAP MII in browser-based PI Sheets

    and electronic work instructions

    5. XStep Caf

    Agenda

  • 8/3/2019 Ehp 4 New Features

    4/43

    SAP 2007 / Page 4

    New Core Manufacturing Developments in

    2008 (EhP4)

    Enhanced functionality for Production Order Split

    Fair cost distribution between child order and parent order

    New split methods (split to produce something different, split to stock)

    Calculation of split quantity etc.

    Work-in-Process Batch (WIP Batch)

    Track work in process Enhanced batch traceability etc.

  • 8/3/2019 Ehp 4 New Features

    5/43

    SAP 2007 / Page 5

    1. New developments in 2008 (EhP4)

    2. Easily Manage Rework by using XSteps

    3. Shift note functionality for PI Sheets or electronic work instructions

    4. Visual and functional integration of SAP MII in browser-based PI Sheets

    and electronic work instructions

    5. XStep Caf

    Agenda

  • 8/3/2019 Ehp 4 New Features

    6/43

    SAP 2007 / Page 6

    Definition of Rework

    Definition of rework:

    The work performed to correct defects in a product after it has been manufactured

    Use

    Execute additional operations during or at end of a production process

    in order to improve components or products with insufficient quality

    These additional processing steps are referred to as rework

  • 8/3/2019 Ehp 4 New Features

    7/43 SAP 2007 / Page 7

    Rework: Actions & Elements

    Actions:

    Identify cause for rework

    Inform affected parties (shift leader, production supervisor, plant manager)

    Define appropriate additional process steps

    Execute additional process steps (rework)

    Check success of rework

    Repeat additional process steps

    Stop reworking

    Insert reworked items into production process again

    Alert message

    Process

    Messages

    PI Sheet/WorkInstructions for

    Rework

    Standard

    XStep (SXS)

    Elements:

  • 8/3/2019 Ehp 4 New Features

    8/43

    Rework-Demo: Challenges

    Challenges:

    Trigger rework actions during processing of PI Sheets/Work Instructions

    First click

    Select appropriate rework actions

    Second click

    Inform production supervisor/plant manager per email

    Process rework actions

  • 8/3/2019 Ehp 4 New Features

    9/43

    Rework-Demo: Solution for Challenges

    Solution:

    Standard XStep Composite for Rework

    Dynamic function call

    Offers Standard Xsteps as rework actions

    Automatically creates XStep tree for rework

    Automatically generates corresponding control instruction/recipe

    Process message for rework alert

    Automatically send alert email

    Provide information about the rework process (manufacturing order, time & date, user etc.)

  • 8/3/2019 Ehp 4 New Features

    10/43

    Rework Demo: SXS Composite

  • 8/3/2019 Ehp 4 New Features

    11/43

    Rework Demo: Control Instructions

  • 8/3/2019 Ehp 4 New Features

    12/43

    Rework Demo: Trigger Rework

  • 8/3/2019 Ehp 4 New Features

    13/43

    Rework Demo: Select Rework Actions (SXS)

  • 8/3/2019 Ehp 4 New Features

    14/43

    Rework Demo: Process Message triggers Alert

  • 8/3/2019 Ehp 4 New Features

    15/43

    Rework Demo: XSteps for Production Order

  • 8/3/2019 Ehp 4 New Features

    16/43 SAP 2007 / Page 16

    1. New developments in 2008 (EhP4)

    2. Easily manage rework by using XSteps

    3. Shift note functionality for PI Sheets or electronic work instructions

    4. Visual and functional integration of SAP MII in browser-based PI Sheets

    and electronic work instructions

    5. XStep Caf

    Agenda

  • 8/3/2019 Ehp 4 New Features

    17/43

    Shift Note Functionality for PI Sheets

    or Electronic Work Instructions

    Definition:

    Shift notes are short comments concerning events that cant be recorded differently likeconfirmations or maintenance notifications. Examples:

    Worker arrived late

    Comments (e. g. activated pump, started MES system)

    Material exchange

  • 8/3/2019 Ehp 4 New Features

    18/43

    Ways to Create Shift Notes

    Options to create shift notes for PI Sheets/electronic Work Instructions

    Dynamic function call

    Process Message (new category)

    Alternative Idea, shown on the next slides:

    Create shift notes by creating comments for operations or phases

    Create additional process message destination

    Create function module that creates shift notes

    Enhance process message category PI_COMM

    Prerequisites:

    Business function for shift note active

    Shift note customizing maintained

    Shift note type assigned to work center/resource

    Work center maintained for operation/phase

  • 8/3/2019 Ehp 4 New Features

    19/43

    Shift Note: New Message Destination ZSN

    Function module

  • 8/3/2019 Ehp 4 New Features

    20/43

    Shift Note: Adopt PI_COMM

  • 8/3/2019 Ehp 4 New Features

    21/43

    Shift Note: Creating Comment

    Comment created for operation 10

    Work center WE_1310 assigned to

    Shift note type SN

    Work center WE_1310 maintained

    for operation 10

  • 8/3/2019 Ehp 4 New Features

    22/43

    Shift Note: Process Message Handling

  • 8/3/2019 Ehp 4 New Features

    23/43

    Shift Note (TC SHN3)

    Added text lines

    (operation, user)

    Information about

    message proces-

    sing (batch job,

    send date/time)

  • 8/3/2019 Ehp 4 New Features

    24/43 SAP 2007 / Page 24

    1. New developments in 2008 (EhP4)

    2. Easily manage rework by using XSteps

    3. Creation of shift notes inside PI Sheets or electronic work instructions

    4. Visual and functional integration of SAP MII in browser-based PISheets and electronic work instructions

    5. XStep Caf

    Agenda

  • 8/3/2019 Ehp 4 New Features

    25/43 SAP 2007 / Page 25

    Connecting MII and PI Sheet /

    Electronic Work Instructions

    FIFI COCO

    ERP/S

    CM

    ERP/S

    CM

    M

    OM

    M

    OM

    HRHRHRHR WMWMWMWM MMMMMMMM PMPMPMPM QMQMQMQMAPOAPO

    PP/DSPP/DS

    APOAPO

    PP/DSPP/DS

    PI Sheet / Electronic

    Work Instructions

    PP /PP /

    PPPP--PIPI

    PP /PP /

    PPPP--PIPI

    BAPI / RFC

    Synchronous Data Transfer Asynchronous Data Transfer

    ProcessProcessMessagesMessages

    ControlControlRecipesRecipes

    FunctionFunctionCallCall

    SAP MII

    DataSer

    vices

    Visualization

    Bus. Logic

    HTTP request

    Iframe (HTML)HTML content

    HTTP

    Data from MII

    Visualization Applet(Grid)

    Query

    Function Calls

    Query

    Display Template

  • 8/3/2019 Ehp 4 New Features

    26/43

    SAP 2007 / Page 26

    Demo

    MII content

  • 8/3/2019 Ehp 4 New Features

    27/43

    SAP 2007 / Page 27

    Demo

  • 8/3/2019 Ehp 4 New Features

    28/43

    SAP 2007 / Page 28

    Demo

  • 8/3/2019 Ehp 4 New Features

    29/43

    SAP 2007 / Page 29

    Demo

  • 8/3/2019 Ehp 4 New Features

    30/43

    SAP 2007 / Page 30

    Demo

  • 8/3/2019 Ehp 4 New Features

    31/43

    SAP 2007 / Page 31

    Demo

  • 8/3/2019 Ehp 4 New Features

    32/43

    SAP 2007 / Page 32

    Demo

  • 8/3/2019 Ehp 4 New Features

    33/43

    SAP 2007 / Page 33

    Demo

    Diff t l

  • 8/3/2019 Ehp 4 New Features

    34/43

    Different example:

    MII Analytics during Confirmation

    SAP 2007 / Page 34

    D t il

  • 8/3/2019 Ehp 4 New Features

    35/43

    Detail:

    MII Analytics during Confirmation

    SAP 2007 / Page 35

    A d

  • 8/3/2019 Ehp 4 New Features

    36/43

    SAP 2007 / Page 36

    1. New developments in 2008 (EhP4)

    2. Easily manage rework by using XSteps

    3. Shift note functionality for PI Sheets or electronic work instructions

    4. Visual and functional integration of SAP MII in browser-based PI Sheets

    and electronic work instructions

    5. XStep Caf

    Agenda

  • 8/3/2019 Ehp 4 New Features

    37/43

    SAP 2007 / Page 37

    Dos:

    Exchange of experience

    Discussion on common problems

    Share of tipps and tricks

    Donts:

    Consulting on specific customer issues

    Training replacement

    OSS replacement

    Rules

    Regular informal web meeting to spread the knowhow on XSteps, PI Sheets and Electronic Work

    Instructions

    Live demos

    Schedule: Every first Wednesday of a month

    World-wide access

    Recordings available

    (Links can be found in the SCM-PP forum)

    What is it?

    Customers (13): Process and discrete

    industries SI Partners (34)

    SAP internals (17)

    Global: US, Europe, India, Japan

    Audience

    mailto:[email protected]

    Thread in SCM-PP forum:Invitation to the XStep Caf'

    https://www.sdn.sap.com/irj/sdn/thread?threadID=855471

    Contact / Information

    Th k Y f P ti i ti !

    mailto:[email protected]://www.sdn.sap.com/irj/sdn/thread?threadID=855471https://www.sdn.sap.com/irj/sdn/thread?threadID=855471mailto:[email protected]
  • 8/3/2019 Ehp 4 New Features

    38/43

    Thank You for Participating !

    [

    SESSION CODE: MFG 0905

    Please remember to complete and return your

    evaluation form following this session.For ongoing education on this area of focus, visit the Year-Round

    Community page at www.asug.com/yrc

    A di

    http://www.asug.com/yrchttp://www.asug.com/yrc
  • 8/3/2019 Ehp 4 New Features

    39/43

    Appendix

    SAP Enhancement Package (EHP) General

  • 8/3/2019 Ehp 4 New Features

    40/43

    SAP Enhancement Package (EHP) - General

    Technical basis: SAP ECC 6.00 (ERP 2005) -> stable core

    Implementation of EHP doesnt change the system behaviour

    Activation of new functionality by switching on corresponding business function

    Business Functions do have detailed documentation

    Business Functions have test cases that are shipped also

    Adaptivness (Fine tuning) via Customizing

    Please note:

    Deactivation of an activated business function not possible

    Example: Enterprise Business Function

  • 8/3/2019 Ehp 4 New Features

    41/43

    Example: Enterprise Business Function

    (transaction SPRO)

    BusinessFuction Documentation

    Release

    Information

    Test Case

    Manufacturing Landscape

  • 8/3/2019 Ehp 4 New Features

    42/43

    SAP 2007 / Page 42

    Manufacturing Landscape

    FIFI COCO

    ERP/SC

    M

    ERP/SC

    M

    MOM

    MOM

    SFAC

    SFAC

    HRHRHRHR WMWMWMWM MMMMMMMM PMPMPMPM QMQMQMQMAPOAPO

    PP/DSPP/DSAPOAPO

    PP/DSPP/DS

    SCADA / HMISCADA / HMI

    DCS / PCSDCS / PCS

    ~1s

    ~8h

    OPC

    UDS SAP ODAMDS

    DevicesDevices

    PIPI--PCSPCS

    Enterprise Services

    Industrial Bus

    PI Sheet /Electronic

    Work Instructions

    PP /PP /PPPP--PIPIPP /PP /

    PPPP--PIPI

    Autom.Process

    Messages

    Weigh ScalesActors Meters

    Mapping/S95

    BAPI / RFC

    Synchronous Data Transfer Asynchronous Data Transfer

    SAP MII

    ProcessProcessMessagesMessages

    ControlControlRecipesRecipes

    FunctionFunctionCallCall

    XI/PI (opt.)XI/PI (opt.)

    Bus. Logic

    Visualization

    DataServices

    IDOCIDOC

    SAPTemplates& PartnerContent

    Third Party /Partner Systems

    (MES, LIMS, Maintenance)Visiprise, Werum, NRX,

    Third Party /Partner Systems

    (MES, LIMS, Maintenance)Visiprise, Werum, NRX,

    Data HistorianData Historian

  • 8/3/2019 Ehp 4 New Features

    43/43

    Thank you!