EGNOS Performance and Operational Implementation status

12
25-27.06.2013 ESSP-MEMO-9634_01-00 1 EGNOS Performance and Operational Implementation status IWG 25 - 25-27.06.2013 1 Angéline Billot

description

EGNOS Performance and Operational Implementation status. IWG 25 - 25-27.06.2013. Angéline Billot. 1. Content. 2013 Q1-Q2 Performance Impact of Solar Activity Iono film 2013 Q1-Q2 Main events GEO SWAP ARTEMIS Next steps. EGNOS Performance. - PowerPoint PPT Presentation

Transcript of EGNOS Performance and Operational Implementation status

Page 1: EGNOS Performance and Operational Implementation status

25-27.06.2013 ESSP-MEMO-9634_01-00 1

EGNOS Performance and Operational Implementation status

IWG 25 - 25-27.06.2013

1

Angéline Billot

Page 2: EGNOS Performance and Operational Implementation status

25-27.06.2013 ESSP-MEMO-9634_01-00 2

Content

• 2013 Q1-Q2 Performance– Impact of Solar Activity– Iono film

• 2013 Q1-Q2 Main events– GEO SWAP – ARTEMIS

• Next steps

Page 3: EGNOS Performance and Operational Implementation status

25-27.06.2013 3ESSP-MEMO-9634_01-00

• Very good performance over the last six months

EGNOS Performance

APV1 availability – February 2013

Page 4: EGNOS Performance and Operational Implementation status

25-27.06.2013 4ESSP-MEMO-9634_01-00

EGNOS Performance

• Impact of solar activity in the North: Geomagnetic storms

17/03/2013 16/03/2013 (for comparison)

Page 5: EGNOS Performance and Operational Implementation status

25-27.06.2013 5ESSP-MEMO-9634_01-00

EGNOS Performance

• Impact of solar activity in the North: Geomagnetic storms

01/06/2013 30/05/2013 (for comparison)

Page 6: EGNOS Performance and Operational Implementation status

25-27.06.2013 6ESSP-MEMO-9634_01-00

IONO FILMS

• Iono delay/GIVEi broadcast by WAAS, EGNOS, SDCM, GAGAN and MSAS* on 27/04/2013

• Corresponding film of TEC values**

* Data from CNES Regina network** 2 hours IGS IONEX data (jprg files)

Page 7: EGNOS Performance and Operational Implementation status

25-27.06.2013 7ESSP-MEMO-9634_01-00

2013 Q1-Q2 Main Events

• GEO SWAP

Due to INMARSAT 4F2 NLES band C antenna replacement

• PRN124 (EGNOS TEST) daily outages– Due to ARTEMIS high inclination => Excessive Doppler

for NLES

Cf. Service Notice 7

7

Geostationary Satellite Name PRN Orbital Location Status 26/03 to 26/04 2013INMARSAT-3F2 AOR-E 120 15.5° W Operational Operational INMARSAT-4F2 IND-W 126 25.0° E Operational TestARTEMIS 124 21.5° E Test Operational

Page 8: EGNOS Performance and Operational Implementation status

25-27.06.2013 8ESSP-MEMO-9634_01-00

Next steps

• ESR2.3.2 – Improvement of iono monitoring in the North– Inclusion of RIMS Abu Simbel (Egypt) and Agadir

(Morocco)– Deployment: September 2013

• Migration on new network – Obsolescence management – November – December 2013

Page 9: EGNOS Performance and Operational Implementation status

25-27.06.2013 9ESSP-MEMO-9634_01-00 9

EGNOS Performance Reporting

− Real-Time Performance Monitoring:http://egnos-user-support.essp-sas.eu/egnos_ops/

public_upcm

– EGNOS User Support Website: http://egnos-user-support.essp-sas.eu/

– Monthly Performance Reports:http://www.essp-sas.eu/

monthly_performance_reports

– Yearly Performance Reports:http://www.essp-sas.eu/printed_documents

– NOTAM Proposals to NOF (via EAD or AFTN) for EGNOS predictive outages

Page 10: EGNOS Performance and Operational Implementation status

25-27.06.2013 ESSP-MEMO-9634_01-00 10EVENT TITLE 1026 Oct 2009

Thanks!

20-21.06.2012 10ESSP-MEMO-9634_01-00

Page 11: EGNOS Performance and Operational Implementation status

25-27.06.2013 ESSP-MEMO-9634_01-00 11

Back Up Slides

Page 12: EGNOS Performance and Operational Implementation status

25-27.06.2013 ESSP-MEMO-9634_01-00 12

TEC max value in [Lat 10 to 30 – Lon -40 to 0]