E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title...

24
E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Sea Operations for “km 3 ” neutrino telescope

Transcript of E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title...

Page 1: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

E.G. Anassontzis University of Athens

NESTOR COLLABORATION

 5-8 October 2003

NIKHEF - Amsterdam

Sea Operations for “km3” neutrino telescope

Page 2: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

• Modular system with built in redundancy

• Detector configuration

Towers (NEMO, NESTOR) Strings with many light sensor points per deployment per depth level

Strings (ANTARES) Strings with several light sensor points per deployment

• Connections to be made

in air (NESTOR)

in underwater (ANTARES, NEMO)

• Use ships of opportunity and non highly specialized surface vessels for deployment

• Use locally available transport vessels

•Retrievable and expandable

Deployment considerationsDeployment considerations

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Page 3: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

• Use ships of opportunity and non highly specialized surface vessels for deployment

• Use locally available transport vessels

• Use of bathyscaphs or ROVs ?

NO (NESTOR)

YES (ANTARES, NEMO) Dynamic positioning

• Vessels with dynamic positioning

• Short base line detector positioning

• Sea state working conditions up to 4+ beaufort

…. Deployment considerationsDeployment considerations

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Page 4: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

NESTOR towerNESTOR tower

32 m diameter

30 m between floors

144 PMTs

20 000 m2

Effective Area

for E>10TeV

Energy threshold as low as 4 GeV

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

with positioning transponders

Anchor Unit with

NESTOR

TOWER

Page 5: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Folded star

Page 6: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Typical cable-laying shipsTypical cable-laying ships

Page 7: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

Some of DELTA VERENIKI’s heavy deployment equipment

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Page 8: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

Under Construction: Under Construction: to be commissioned at Pylos next spring

•Central well-ballasted platform•Dynamic position, keeping station 5m•Operational up to wind/sea state force 4 beaufort•Heave compensating winches•Each side 51m long

DELTA VERENIKI

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Page 9: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.
Page 10: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Anchor Unit on deck and just above the surface, during deployment

Page 11: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.
Page 12: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

Star on the surface and just below, during deployment

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Page 13: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.
Page 14: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Series of towers and/or strings

During deployment, we have to make less connections with towers than with strings

Dynamically position of each system

Page 15: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

3 900 m

150 m

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Deployment of a tower

Page 16: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

3 900 m

150 m

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Deployment of a tower

Page 17: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

3 900 m

150 m

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Deployment of a tower

Page 18: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

4 000 m

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Deployment of a tower

Page 19: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Deployment schematic of towers

Shore Station

Electro-optical cable

Several km long

Main Buoy

Detector

Anchor

REBU

4000m

MARO

RERO

Depth, e/o cable and rope lengths not in scale

Page 20: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.
Page 21: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

Simulation of deployment

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

Simulation of deployment or recovery of a NESTOR tower by Makai, Hawaii

Simulation of deployment ANTARES strings by ANTARES

MAKAI simulation snap s

MAKAI simulation snap shot

Page 22: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

ANTARES (with IFREMER) have shown that they can deploy string like detector with success

NEMO believe that they can deploy tower like detector

NESTOR have shown that they can deploy tower like detector with sucess

ConclusionsConclusions

VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR

We can deploy jointly the km3 Very Large Volume v Telescope

Page 23: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.
Page 24: E.G. Anassontzis University of Athens NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Sea Operations for “km 3 ” neutrino telescope.

end

End