IAQG 9120:2009 Revision Overview Prepared by IAQG 9120 Team Rev: 2 Dated: 15 July 2009.
Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 [email protected].
Click here to load reader
-
Upload
margaret-strickland -
Category
Documents
-
view
215 -
download
1
Transcript of Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 [email protected].
![Page 2: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/2.jpg)
Ideal Title V Permit
• Allows for changes to be undertaken with as little delay and paperwork as possible
• Little effort and foresight can cut time to implementation of operational changes
• Multiple vehicles designed into title V regulations for accommodating changes
• Reduce recordkeeping/reporting
![Page 3: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/3.jpg)
One ToolAlternative Operating Scenarios
• 40 CFR 70.6(a)(3)(i)(9)
• Permit should include all alternative operating scenarios REQUESTED BY THE FACILITY in title V application
• If you can dream it and write it, then install it in the title V permit
![Page 4: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/4.jpg)
Alternative Operating Scenarios
• Facility may request inclusion of alternative scenario at any time
• Alternative operating scenario can be a different means of compliance with an existing standard or an entirely new applicable requirement
• Why wait to trigger and applicable requirement if you think one is coming?
![Page 5: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/5.jpg)
Alternative Operating Scenarios
• Florida – Chapter 62-213.410(1)
• Georgia – 391-3-1-.03(10)(d)(1)(i)
• North Carolina – 15A NCAC 2Q.0508(p)
• Kentucky – 401 KAR Chapter 52:020, Section 10
• Colorado – 1001 AQC, Regulation 3
• Arkansas – Regulation 26,Chapter 7,Section 26.701(I)
![Page 6: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/6.jpg)
Alternative Operating Scenarios
• Virginia – 9 VAC 80-110.J
• New Jersey – 7.27-22.16(h)
• New York – Chapter III, Subpart 201-6.5(f)(1)
![Page 7: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/7.jpg)
Alternative Operating Scenarios• Examples
– HON-affected facility desires multiple compliance options stated to show compliance with MACT standard
– Other examples
![Page 8: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/8.jpg)
Alternative Operating Scenario
• Does your facility have a five-year plan?
• What affected units might be subject to additional air regulations or a change in regulations already in the permit?
![Page 9: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/9.jpg)
Flexible Preconstruction Permits
• Couple flexible preconstruction permits with alternative operating scenarios to obtain the most flexibility and move toward the “ideal” title V permit
![Page 10: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/10.jpg)
Streamlining Multiple Requirements
• Streamline multiple applicable requirements to which a process unit may be subject into ONE set of requirements
• Perform a streamlining analysis per
EPA White Paper II
![Page 11: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/11.jpg)
Streamlining
• Basis of Streamlining found here:
• http://www.epa.gov/ttn/oarpg/t5/memoranda/wtppr-2.pdf
![Page 12: Effective Title V Permits Scott Miller U.S. EPA Region 4 (404) 562-9120 miller.scott@epa.gov.](https://reader038.fdocuments.us/reader038/viewer/2022100509/5697bfc61a28abf838ca77a9/html5/thumbnails/12.jpg)
Streamlining
• Once again, REQUESTED BY THE FACILITY not an automatic
• Imation Example