Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf
Effective Frameworks for Renewable Energy Deployment: A Regional Overview Oman Energy & Water...
-
Upload
lizbeth-wheeler -
Category
Documents
-
view
216 -
download
2
Transcript of Effective Frameworks for Renewable Energy Deployment: A Regional Overview Oman Energy & Water...
Effective Frameworks for Renewable Energy Deployment: A Regional Overview
Oman Energy & Water ConferenceMay 19, 2015
2
About RCREEE
Independent regional inter-governmental organization
In operation since 2008
Headquartered in Cairo, Egypt
3
Our Member States
16 member statesBoT members from every stateNational focal point in every state
4
Awareness of Stakeholders
National Policies &
Regulations
Our Results Framework
A Significant Share of Renewable Resources and a Highly Efficient Use of
Energy
Public & Private
Investments
Institutional Capacities &
Technical Standards
Facts & Figures Institutions People Policies Finance
5
t
RenewableEnergy
6
Energy Prices: Electricity Residential
7
Energy Prices: Electricity Industrial
8
Energy Prices: Diesel (USD/litre)
Saudi Arabia
Libya
Iraq
Algeria
Kuwait
Egypt
Bahrain
Sudan
Qatar
Syria
Tunisia
Yemen
Lebanon
UAE
Jordan
Morocco
Palestine
Global average
0.07
0.12
0.13
0.18
0.19
0.26
0.27
0.37
0.41
0.42
0.73
0.89
0.89
0.94
0.97
1.04
1.81
0.97
9
Energy Subsidy Reforms 2014
10
Renewable Energy Targets
0 1000 2000 3000 4000 5000 6000 7000 8000 9000
Total RE targets
Current Installed Capacity
RE Projects under Con-struction
by 2020
by 2030
by 2020
by 2030
by 2020
by 2020
by 2020
by 2030
by 2031
by 2020
by 2025
by 2020
by 2020
by 2030
11
Renewable Energy Installed Capacity, 2014
Non-Renewable94.78%
0.15%
0.79%4.25%
0.02%
Solar
Wind
Hydro
Other
12
Supporting Policies for Large-scale Projects
1. IPP Public Competitive Bidding:Wind Target: 1,000 MWWind Tendered: 1,000 MWSolar Target: 1,000 MW Solar Tendered: 510 MW
2. Law 13-09: Third-Party Supply
Feed-in Tariffs IPP Public Competitive Bidding
Direct Proposal Submission: Round 1: 13 PPAs concluded at $0.17 per kWh for 210MW aggregate PV capacity
Round 2: 34 proposal received (50MW each), totaling 1700 MW. Only 4 proposals will be selected (200 MW)
1. Feed-in Tariffs 2. IPP Public Competitive Bidding:
Wind target: 2,500 MW Tendered: 250 MW
13
RE Supporting Policies
•At least 5 countries IPP Public Competitive Bidding
• 2 countriesDirect Proposal Submission
•3 countries Feed-in Tariffs
•4 countriesNet Metering
•More than 15 countries EPC Contracting
14
Supporting Policies for Small-scale Projects
Net-metering and high retail electricity prices• PV installation for self-
consumption already at grid parity, today more than 15 MW have been installed
Net-metering combined with grant and bank loan15 MW of PV installed
National Energy Efficiency and Renewable Energy Action (NEEREA) • offers low-interest loans as low as 0.6% with a
repayment period of as long as 14 years for decentralized PV systems
15
Trends in Developers Market
EgyptDiverse pool:
foreign & local investors
JordanDiverse pool:
foreign & local investors
Morocco
Algeria Mostly Algerian investors (SKTM)
Diversity of Developers’ Pool
RE market is dominated by few big
investors
16
Trends in Developers’ Market
17
ALG
BAH
EGY
IRA
J OR
KUWLEB
LIB
MOR
PAL
QATSAU SUD
SYR
TUN
UAE
YEM
0.0
0.2
0.4
0.6
0.8
1.0
0.0 0.2 0.4 0.6 0.8 1.0
ENERGY PRICING
Market Structure
Energy Markets and Pricing
18
Policy Framework & Institutional Capacity