EEA Neighbourhood project - Presentation to workshop on real time data exchange and forecast in...
-
Upload
coral-charles -
Category
Documents
-
view
216 -
download
0
Transcript of EEA Neighbourhood project - Presentation to workshop on real time data exchange and forecast in...
EEA Neighbourhood projectEEA Neighbourhood project- - Presentation to workshop on real time Presentation to workshop on real time data exchange and forecast in Europedata exchange and forecast in Europe
7 – 8 April 2005
EEA strategy 2004 – 2008EEA strategy 2004 – 2008
An extensive geographic Internet portal to regional and selected localised information will be made available.
The objective is to enable the public to locate information about their surrounding environment. By simply entering postal codes or by using interactive maps and tools, people will be able to find information on environmental conditions (…).
The system will contain a variety of historical and real-time data on environmental quality.
Prevailingwind
Barseback –30Km
EPER energy site
EPER chemicals
Main flight paths (stacks over Helsingor and Koge bay)
munitions
Tank farm
EPER energy site
shipping
traffic
My My HomeHome
Natura 2000
DIY Neighbourhood conclusions DIY Neighbourhood conclusions
• Numerous data sources;• Numerous ways to present data;• Not yet clear what user focus is;• Very easy to overload users with
information;• Very easy to duplicate what is being
done elsewhere.
The EEA communication triangleThe EEA communication triangle
EEAPolicy makers
Public
What is going on in the environment?
What is the EEA vision?What is the EEA vision?
• Env info in spatial context for public;• Benchmarking from local to EU level;• Making better use of reported EU data;• Improving exchange of data;• Linking to other providers;
Warehouse views
Portal
The Neighbourhood and INSPIREThe Neighbourhood and INSPIRE
Neighbourhood can be seen as an INSPIRE Pilot Neighbourhood will be integrated into EEA SDI INSPIRE Policy priorities include 6EAP Air quality
strategy (CAFE)
Project focus in 2005Project focus in 2005
1. prototype on flood risk mapping methodologies;
2. focus groups and user expectations;3. air quality website;4. background data;5. data exchange and links;6. communication (EEA, Management,
Eionet, countries, public);7. SDI capacity and functionalities.
Prototype on flood risk - ObjectivesPrototype on flood risk - Objectives
The prototyping exercise will: • Give a thematic focus to the project in
initial stages• test data collection and cooperation with
countries and other organisations; • develop and test systems, processes,
spatial infrastructure and web GIS mapping;• create awareness and understanding of the
Neighbourhood project within EEA networks and wider audiences.
Stage 3 prototype – Air qualityStage 3 prototype – Air quality
• Build on ozone web experience;• Get near real-time data in and out;• Improve interface;• Align functionality with real-life
requirements;• Integrate into the EEA’s SDI;• Get started with web services;
Current statusCurrent status
Information mandateInformation mandate
• Up-to-date information on ambient concentrations of SO2, NO2, NOx, PM, Pb, benzene and O3 shall be routinely made available to the public and appropriate organisations.
• Exchange of information about ozone episodes and exceedences of limit values.
EU: 1999/30/EC Art. 8 (1), 2000/69/EC Art. 7 (1), 2002/3/EC Art. 6 (1)
The visionThe vision
• Neal real-time monitored air quality data with European coverage (t0 – -t24 months)
• Build capacity: points interpolation and dynamic time series;
• European perspective with benchmarking to EU limit values;
• Start-point to navigate to other resources (portal).
Ozone prototype and EFNETOzone prototype and EFNET
• Many links to workpackage 2;• Scoping work and knowledge already
exists in Eionet;• Data aqcuisition processes and issues
understood; Considerable potential to create synergies.
QuestionsQuestions
Prevailingwind
Barseback –30Km
EPER energy site
EPER chemicals
Main flight paths (stacks over Helsingor and Koge bay)
munitions
Tank farm
EPER energy site
shipping
traffic
Natura 2000
First steps - Deliverables in 2005First steps - Deliverables in 2005
• Scoping paper neighbourhood project ( February) • Prototype web site on flood risk information
(Oct)
• Working paper Feasibility study (Oct)
• Flooding: Support and process documentation to support extension to further countries (Dec)
• Plans and preparation to translate and create a fully operational website integrated into the EEA site (Dec)
• Processes to ensure continuity of the service at an operational level (Dec)
• Improved real time air quality website (Dec)
Project organisational structureProject organisational structure
Ia n na Yo rd a no vaP ro jec t sup p o rt
P ro je ct re sou rces P ro je ct re sou rces P ro je ct re sou rces
C o re p ro je c t te am
T im H a ighp ro jec t m a na g er
P ro jec t bo a rdS ig fus B ja rna sonJa cq u ie M cG la de
Project team
Neighbourhood project stagesNeighbourhood project stages
Stage 210/2005
Stage 34/2006
Stage 411/2006
time*
Stage 55/2007
Stage 69/2007
Stage 73/2008
Stage 89/2008
Stage 13/2005
Stage 1 Initiation (3/2005)
•Set up the project approach and scope of work•Set up the project team•Visit countries•Get contractors in place•Start up flood risk mapping
Stage 2 feasibility and flood prototype (10/2005)
•Undertake a feasibility study•Complete a prototype on flood risk mapping methods•Prepare background data•Initiate cooperation with countries•Prepare ozone prototype (data exchange connectors, etc)
Stage 3 Air quality and user requirement analysis (4/2006)
•Define user requirements•Analyse user requirements•Complete a prototype on ozone/air quality•Prepare datasets•extend cooperation with countries
Stage 4 Top10 desktop (11/2006)
•Desktop Arc GIS version of priority functionalities•Water quality content (Eurowaternet/ WISE / WFD)•Improved air quality prototype (translation / data connectors)•Priority EU datasets in SDI•Data exchange requirements confirmed•Data management system in place
Stage 5 Top10 prototype and key EU datasets (5/2007)
•web prototype of Top10 priorities;•Identification of framing and explanatory content;•functionalities and user interface tested;•Key EU datasets in EEA’s SDI for processing and display in prototype;•SDI operational capacities increased.
Stage 6 Links and Geoportal (9/2007)
•compile content•implement automated data exchange protocols with users and providers. •EEA data is published;•EU datasets are published in test environment.
Stage 7 test system (3/2008)
•systems tested for robustness and stability;•quality reviews carried out;•text content and user interfaces are finalised;•text is dispatched for translation;•Change requests limited, bug fixing undertaken.
Stage 8 Operational system (9/2008)
•bug fixing and system optimisation continues;•Quality feedback implemented;•translated content is compiled in the system•system is made operational - ready to be launched.
Stage characteristicsStage characteristics
Chunks of work with management decision points:
• stepwise approach;• build capacity;• develop a prototype;• develop data exchange or acquisition;• provide communication opportunities;• develop cooperation.
scope next stage
EEA business case – rationale for EEA business case – rationale for project project
• Interactive / graphic presentation of environmental information;
• spatial context to information at relevant scales;
• channel for communication with wider public;• mechanism to improve data use;• a platform for disseminated data exchange
and visualisation;• support EEA and member country on Århus
Convention.